By optimizing the NBGS overload reduction power and analog quantity criteria, and adjusting the NBSF operation process, the problem of bipolar locking in the UHV DC transmission system is solved, the reliability of the conversion execution is improved, and the isolation of the fault pole and the operating pole is ensured. .
Patent Information
- Application Number
- CN202410919854.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-10-22
AI Technical Summary
In UHV DC transmission systems, bipolar locking is easily caused during the NBSF sequence control process. Existing technology cannot effectively prevent bipolar locking problems caused by unsatisfied analog quantity criteria, DC overload, and loss of separator position signals.
By optimizing the timing of NBGS overload power reduction and the analog and switching criteria during NBSF operation, the timing of separation of the faulty pole neutral line separator and NBGS is adjusted to ensure that the separation command is delayed when specific conditions are met to avoid accidents. Bipolar lockout due to interpolar coupling voltage and overload.
It effectively improves the reliability of NBSF conversion execution, avoids bipolar lockout caused by unsatisfied analog criteria, DC overload and loss of separator position signals, and ensures reliable isolation between fault poles and operating poles.
Smart Images

Figure CN118825931A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of control and protection of ultra-high voltage direct current transmission systems, and in particular, relates to a NBSF sequential control method, device, equipment and storage medium. Background Art
[0002] When a permanent ground fault occurs in the UHV DC transmission system, if the bipolar system is in operation before the fault, the fault circuit cannot be cut off by simply shutting down the valve group after the fault. In this case, the neutral bus switch (NBS) is required to disconnect the fault pole to isolate the fault pole from the non-fault pole. However, if the NBS switch fails to arc or the fault point is between the NBS switch and the I DNE Between the measuring points, the fault point cannot be isolated from the operating pole at this time. At this time, it is necessary to start the NBSF (neutral bus switch failure) function, close the NBGS (neutral bus ground switch), through the station grounding, the fault grounding point and the station grounding point are at the same potential, separate the neutral line isolation knife, and realize the reliable isolation between the operating pole and the fault point.
[0003] Since large current cannot flow through the grounding electrode in the station for a long time, the NBSF sequential control operation must be completed within 12 seconds from closing the NBGS to opening the NBGS. At the same time, the NBSF sequential control operation includes a series of complex sequential control operations, so the probability of the NBSF function causing bipolar locking is very high. The strategy has the following main problems in the actual implementation process: (1) During the execution of the NBSF sequential control logic, the conditions for allowing the NBSF sequential control to be executed need to be judged. In the existing logic, the high neutral current or low DC voltage judgment is used. When coupling occurs between the pole lines, the fault The induced voltage generated by the two poles will cause the low DC voltage criterion to be not met. After the grounding switch in the station is closed, the high neutral current criterion will not be met. After the current or voltage criterion is not met, the NBGS cannot be separated normally, causing bipolar lockout; (2) In the existing NBGS overload power reduction logic, a power reduction command is issued when the NBGS is separated. The time for the NBGS to fall back to the current breaking capacity and the NBGS overcurrent protection action time are not properly coordinated, resulting in bipolar lockout; (3) In the existing logic, the neutral point isolation position signal must be judged when the NBGS is separated. The NBGS separation operation can only be performed after both isolations are separated. However, when the isolation position signal of the main system is lost, the NBGS separation command cannot be issued, resulting in bipolar lockout.
[0004] According to statistics from on-site engineering commissioning, many domestic converter stations have caused bipolar lockout during NBSF conversion tests. Current research results have not yet proposed NBSF conversion processes and methods to prevent bipolar lockout in UHV DC from the perspectives of analog quantity judgment, switch quantity judgment, and control and protection coordinated logic optimization. Summary of the invention
[0005] The purpose of the present invention is to overcome the deficiencies in the prior art and to provide a NBSF sequential control method, device, equipment and storage medium, which can effectively improve the reliability of NBSF conversion execution and prevent bipolar lockout by optimizing the timing of NBGS overload power reduction and optimizing the analog and switch quantity judgment criteria during NBSF operation.
[0006] To achieve the above object, the present invention is implemented by adopting the following technical solutions:
[0007] In a first aspect, the present invention provides a NBSF sequential control method, comprising:
[0008] In response to receiving a pole isolation NBS (neutral bus switch) signal from a pole protection and detecting the NBS switch protection action, the NBSF (neutral bus switch failure) function is started and the following operations are performed;
[0009] Close the NBGS (neutral bus ground switch);
[0010] Determine whether the DC system is in an overload state. If so, limit the operating pole power to the rated power value and determine whether the preset criterion 1 is satisfied;
[0011] When the preset criterion 1 meets all the conditions, a command to disconnect the faulty pole-neutral line is issued, and a delay of T1 is issued to disconnect the NBS; T1 is a simulation value, and 5000ms is selected to ensure reliable disconnection of the pole-neutral line and avoid NBS disconnection faults;
[0012] After issuing the command to disconnect the faulty pole neutral line, when all the preset criteria 2 are met, the command to disconnect NBGS is issued.
[0013] Further, if the DC system is not in an overload state, it is determined whether all preset criteria 1 are satisfied.
[0014] The method for determining whether the DC system is in an overload state includes: determining whether the actual current of the DC system is greater than the maximum rated current; if so, the DC system is in an overload state.
[0015] Furthermore, the preset criterion 1 is specifically:
[0016] The NBSF function is started, the metal earth return line switch is closed, the grounding switch in the station is closed, and the NBSF sequential control execution signal is valid.
[0017] Furthermore, the preset criterion 2 is specifically:
[0018] The neutral line isolation switch is received, the NBSF function is started, the metal earth return line switch is closed, the grounding switch in the station is closed, the NBSF sequential control execution signal is valid, the fault pole DC current is less than the grounding current in the station, and the grounding pole lead switch is closed.
[0019] Furthermore, the determination basis for satisfying the requirement of allowing the NBSF sequential control execution signal to be valid is:
[0020] Meet the line voltage ≤ 0.03pu, after the delay T2, the line voltage ≤ 0.03pu;
[0021] Or if the neutral line current is less than 0.02pu and the DC line outlet current is less than 0.02pu, after the delay T3, the neutral line current is less than 0.02pu and the DC line outlet current is less than 0.02pu.
[0022] The T2 and T3 are analog quantity judgment anti-shake time. In order to ensure rapid execution of polar isolation, the T2 is selected as 1000ms and the T3 is selected as 1000ms.
[0023] Furthermore, the basis for determining whether the neutral line isolation switch position signal has been received is that any one of the two control systems receives the neutral line isolation switch position signal.
[0024] In a second aspect, the present invention provides a NBSF sequential control device, comprising:
[0025] The NBSF function starting module starts the NBSF function in response to receiving the pole isolation NBS signal sent by the pole protection and detecting the NBS switch protection action;
[0026] The overload judgment module, after the NBSF function is started, closes the NBGS switch; judges whether the DC system is in an overload state, and if so, limits the operating pole power to the rated power value;
[0027] The faulty pole neutral line isolation instruction module, when the preset judgment criteria 1 are met, issues a faulty pole neutral line isolation instruction, delays T1, and issues an NBS isolation instruction;
[0028] The NBGS instruction module, after the faulty pole neutral line isolation instruction module issues the faulty pole neutral line isolation instruction, issues the NBGS isolation instruction when all the preset judgment criteria 2 are met.
[0029] In a third aspect, the present invention provides a computer device, including a processor and a storage medium;
[0030] The storage medium is used to store instructions;
[0031] The processor is used to operate according to the instruction to implement the steps of the NBSF sequential control method as described in the first aspect.
[0032] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed by a processor, implements the NBSF sequential control method as described in the first aspect.
[0033] Compared with the prior art, the present invention has the following beneficial effects:
[0034] It can avoid bipolar lockout caused by NBGS refusal to disconnect due to failure to meet analog quantity criterion caused by excessive inter-pole coupling voltage; avoid bipolar lockout caused by NBGS overload due to DC overload; avoid bipolar lockout caused by failure to execute sequential control steps normally due to loss of a single position node in the secondary circuit. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 Shown is a typical schematic diagram of the DC system in the present invention;
[0036] Figure 2 The figure is a schematic diagram of the execution flow of the NBSF sequential control operation method in the present invention;
[0037] Figure 3 The figure shows the logic diagram of the neutral line isolation analog quantity and switch quantity judgment criteria in the present invention;
[0038] Figure 4 The figure shows the logic diagram of separating the NBGS analog quantity and the switch quantity judgment criteria in the present invention;
[0039] Figure 5 The figure shows a logic diagram of allowing the NBSF sequential control execution signal to be valid in the present invention;
[0040] Figure 6 Shown is a schematic diagram of the waveform of the NBSF sequential control operation execution in the present invention. DETAILED DESCRIPTION
[0041] The technical concept of the present invention is to effectively improve the reliability of NBSF conversion execution and prevent bipolar lockout by optimizing the NBGS overload power reduction timing and optimizing the analog quantity and switch quantity judgment criteria during NBSF operation.
[0042] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present application and its application or use.
[0043] Example 1
[0044] This embodiment provides a NBSF sequential control method. A schematic diagram of a typical UHV DC system main circuit in the embodiment is shown in FIG. Figure 1 As shown, including:
[0045] The pole busbar switch P1WPQ17 / P2WPQ17 in the pole line area is mainly used to isolate the DC line from the converter station;
[0046] The neutral line area NBS switch is mainly used to isolate the operating pole from the non-operating pole;
[0047] The WNQ11 / WNQ12 / WNQ13 / WNQ14 / WNQ15 / WNQ17 switches and NBGS switches in the bipolar neutral area are mainly used for DC mode conversion in the bipolar area; WNQ11 / WNQ12 / WNQ13 / WNQ14 are metal earth return line conversion switches, WNQ15 is the station grounding electrode branch switch, WNQ17 is the grounding electrode lead switch, and DCF is a DC filter.
[0048] NBSF sequential control method such as Figure 2 As shown in the figure, when the pole protection issues the pole isolation and separation NBS command and the NBS switch protection is actuated, the NBSF function is started.
[0049] After the NBSF function is activated, close the station grounding switch NBGS; after closing the NBGS switch, it is necessary to determine whether the DC system is in an overload state. If the operating pole is in an overload state, first limit the operating pole power to the rated power value.
[0050] The specific steps include:
[0051] A: After the pole protection sends out the pole isolation NBS signal and the NBS switch protection is actuated, the NBSF function is started;
[0052] B: After the NBSF function is activated, immediately close the NBGS switch.
[0053] C: After closing the NBGS switch, it is necessary to determine whether the DC system is in an overload state. If so, first limit the operating pole power to the rated power value; wherein, the method for determining whether the DC system is in an overload state includes: determining whether the actual current of the DC system is greater than the maximum rated current, if so, the DC system is in an overload state.
[0054] D: When the comprehensive criterion 1 of analog quantity and switch quantity is met, a command to separate the faulty pole and neutral line is issued;
[0055] E: When the comprehensive criterion 2 of analog quantity and switch quantity is met, the NBGS separation instruction is issued;
[0056] F: After issuing the command to disconnect the faulty pole neutral line, after a delay of T1, the command to disconnect the NBS is issued. In order to ensure that the faulty pole neutral line disconnection knife is reliably disconnected and to avoid the NBS disconnection fault again, T1 is generally 5000ms;
[0057] In step D, the analog quantity and switch quantity judgment criteria of the neutral line isolation instruction must meet the conditions that the NBSF function is started, WN-Q14 is closed, and the grounding switch in the station is closed; the NBSF sequential control execution (NBSF active possible) signal is valid;
[0058] In step E, the analog quantity and switch quantity judgment criteria of NBGS are separated, which must meet the following conditions: receiving the neutral line isolation switch position signal, NBSF function startup, WN-Q14 closing, and grounding switch in the station closing; allowing NBSF sequential control execution (NBSF activepossible) signal to be valid; fault pole DC current IDNC / 6 < grounding current IDGND in the station; WN-Q17 closing (inverter station).
[0059] The NBSF sequential control execution signal is allowed to be effective, and the line voltage UDL≤0.03pu must be satisfied, and the delay T2 must be effective, or the neutral line current IDNE<0.02pu and the DC line outlet current IDL≤0.02pu must be satisfied, and the delay T3 must be effective, wherein T2 and T3 are analog quantity judgment anti-shake times. In order to ensure rapid execution of pole isolation, T2 is generally 1000ms and T3 is generally 1000ms.
[0060] The polar neutral isolation knife position signal refers to the position signal comprehensively judged by the two control systems. When any control system receives the position signal, the judgment condition is met and becomes effective.
[0061] Separating the neutral line is a key step to isolate the fault pole from the running pole. Figure 3 The analog and switch quantity criteria required to separate the neutral line isolation knife are met. When the conditions are met, the neutral line isolation knife separation command is issued.
[0062] Specifically, the analog quantity and switch quantity criteria required to separate the neutral line isolation knife are that the NBSF function is started, WN-Q14 is closed, and the grounding switch in the station is closed; the NBSF sequential control execution signal is allowed to be valid.
[0063] Separating the NBGS is a critical step to prevent operational pole lockout. Figure 4 The analog quantity and switch quantity criteria required to separate NBGS are met, and the NBGS separation command is issued when the conditions are met.
[0064] Specifically, the analog and switch quantity criteria required to separate the NBGS are receiving the pole-neutral isolation switch position signal, NBSF function startup, WN-Q14 closing, grounding switch in the station closing, NBSF sequential control execution signal allowed to be valid, fault pole DC current IDNC / 6 < station grounding current IDGND, and WN-Q17 closing (inverter station); among them, the pole-neutral isolation switch position signal collects the signal collected by the dual control systems. After the master and slave control systems collect the position signal, the criterion is met to prevent the loss of secondary circuit nodes of a single control system from causing the NBGS separation to fail to execute normally.
[0065] Figure 5 The analog quantity and switch quantity criteria that need to be met to allow the NBSF sequential control execution signal to be valid are set. When the conditions are met, the NBSF sequential control execution signal is allowed to be valid.
[0066] Specifically, to allow the NBSF sequential control execution signal to be effective, it is necessary to meet the line voltage UDL≤0.03pu delay T2 to be effective, or to meet the neutral line current IDNE<0.02pu, and the DC line outlet current IDL≤0.02pu delay T3 to be effective, where T2 is 1000ms and T3 is 1000ms. Among them, the neutral line current IDNE adopts a low criterion. Due to the inter-pole coupling between the operating pole line and the fault pole line, when the pole busbar separators P1WPQ17 and P2WPQ17 are not separated, the voltage on the DC line will be directly transmitted to the pole line divider UDL in the station, and the low DC voltage criterion may not be met; when the NBGS is closed, due to the small grounding resistance in the station, the operating pole shunt flows mostly through the grounding electrode in the station, and the neutral line current IDNE is much smaller than the grounding electrode current IDGND in the station. The low criterion for the neutral line current can prevent the bipolar lockout caused by excessive inter-pole coupling voltage.
[0067] After issuing the neutral isolation command, there is a delay of 5000ms and then issuing the NBS isolation command.
[0068] After adopting this method, the NBSF mode conversion implementation example is Figure 6As shown. In the UHV DC transmission system, the DC transmission line includes positive and negative lines, namely pole 1 and pole 2. Before the fault, the bipolar four-valve group was in operation at 8000MW. The valve group connection line was grounded on pole 1 on the inverter side. After 12.5ms, the valve group connection line differential protection was activated, and a lockout and pole isolation signal was issued. The bypass switch was turned on on the high and low end valve combination of pole 1. Due to the failure of the pole isolation NBS, the NBSF function was activated. After 4.6s, the NBGS switch was closed, and the fault pole current was transferred to the grounded pole in the station. The neutral line current of the fault pole I DNE Gradually becomes zero, and a large current flows into the grounding electrode in the station. About 5.2s later, the neutral line of pole 1 is separated. Since the fault grounding point disappears, the neutral line of pole 1 loses its clamping potential. Pole 1 generates an induced voltage due to inter-pole coupling, with a peak value of -50.4kV. After about 14s, the NBGS low current criterion is met and the neutral line of pole 1 is disconnected. The NBGS is successfully disconnected, and the time for the large current to flow through the grounding electrode in the station is 8.8s, which is lower than the delay of the grounding overcurrent protection action in the station (12s). The NBSF function successfully implements the mode conversion, and pole 2 ensures normal operation.
[0069] Example 2
[0070] This embodiment provides a NBSF sequence control device, including:
[0071] The NBSF function starting module starts the NBSF function in response to receiving the pole isolation NBS signal sent by the pole protection and detecting the NBS switch protection action;
[0072] The overload judgment module, after the NBSF function is started, closes the NBGS switch; judges whether the DC system is in an overload state, and if so, limits the operating pole power to the rated power value;
[0073] The faulty pole neutral line isolation instruction module, when the preset judgment criteria 1 are met, issues a faulty pole neutral line isolation instruction, delays T1, and issues an NBS isolation instruction;
[0074] The NBGS instruction module, after the faulty pole neutral line isolation instruction module issues the faulty pole neutral line isolation instruction, issues the NBGS isolation instruction when all the preset judgment criteria 2 are met.
[0075] Example 3
[0076] In a third aspect, this embodiment provides a computer device, including a processor and a storage medium;
[0077] The storage medium is used to store instructions;
[0078] The processor is used to operate according to the instruction to implement the steps of the NBSF sequential control method as described in Example 1.
[0079] Example 4
[0080] This embodiment provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the NBSF sequence control method as described in Embodiment 1 is implemented.
[0081] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
[0082] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0083] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0084] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0085] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A NBSF sequential control method, It is characterized in that include: In response to receiving the pole isolation NBS signal sent by the pole protection and detecting the NBS switch protection action, the NBSF function is started and the following operations are performed: Close the NBGS switch; Determine whether the DC system is in an overload state. If so, limit the operating pole power to the rated power value and determine whether the preset criterion 1 is satisfied; When the preset judgment criteria 1 are met, a disconnect command for the faulty pole neutral line is issued, and after a delay of T1, a disconnect NBS command is issued; After issuing the command to disconnect the faulty pole neutral line, when the preset judgment criteria 2 are met, the command to disconnect NBGS is issued.
2. The NBSF sequential control method according to claim 1, It is characterized in that If the DC system is not in an overload state, it is determined whether the preset criterion 1 is satisfied.
3. The NBSF sequential control method according to claim 1, It is characterized in that The preset criterion 1 is specifically: The NBSF function is started, the metal earth return line switch is closed, the station grounding switch is closed, and the NBSF sequential control execution signal is valid; The preset criterion 2 is specifically: The pole neutral line isolation switch position signal is received, the NBSF function is started, the metal earth return line switch is closed, the grounding switch in the station is closed, the NBSF sequential control execution signal is valid, the fault pole DC current is less than the grounding current in the station and the grounding pole lead switch is closed.
4. The NBSF sequential control method according to claim 3, It is characterized in that The determination basis for allowing the NBSF sequential control execution signal to be valid is: Meet the line voltage ≤ 0.03pu, after the delay T2, the line voltage ≤ 0.03pu; Or if the neutral line current is less than 0.02pu and the DC line outlet current is less than 0.02pu, after the delay T3, the neutral line current is less than 0.02pu and the DC line outlet current is less than 0.02pu.
5. The NBSF sequential control method according to claim 3, It is characterized in that The basis for determining whether the polar-neutral isolation knife position signal is received is that any control system in the dual control systems receives the polar-neutral isolation knife position signal.
6. The NBSF sequential control method according to claim 4, It is characterized in that The T2 and T3 are preset analog quantity anti-shake time, the T2 is 1000ms, and the T3 is 1000ms.
7. The NBSF sequential control method according to claim 1, It is characterized in that The T1 is a simulation value, which is 5000ms.
8. A NBSF sequential control device, It is characterized in that include: The NBSF function starting module starts the NBSF function in response to receiving the pole isolation NBS signal sent by the pole protection and detecting the NBS switch protection action; The overload judgment module, after the NBSF function is started, closes the NBGS switch; judges whether the DC system is in an overload state, and if so, limits the operating pole power to the rated power value; The faulty pole neutral line isolation instruction module, when the preset judgment criteria 1 are met, issues a faulty pole neutral line isolation instruction, delays T1, and issues an NBS isolation instruction; The NBGS instruction module, after the faulty pole neutral line isolation instruction module issues the faulty pole neutral line isolation instruction, issues the NBGS isolation instruction when all the preset judgment criteria 2 are met.
9. A computer device, It is characterized in that including processor and storage medium; The storage medium is used to store instructions; The processor is used to operate according to the instruction to implement the steps of the NBSF sequential control method according to any one of claims 1 to 7.
10. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the NBSF sequential control method according to any one of claims 1 to 7 is implemented.