220kV bus load prediction result adjustment method and system, medium and equipment

By analyzing the spatiotemporal characteristics of historical load data in the power grid topology model, establishing a bus load prediction model and optimizing the weights, and generating a load adjustment strategy, the problem of inaccurate load forecasting in the existing technology is solved, and the operating efficiency and reliability of the power grid are improved.

CN118825972APending Publication Date: 2024-10-22童晨涛
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410801692.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

The existing technology fails to fully study the characteristic correlation of load data during the 220kV bus load prediction process, resulting in inaccurate predictions and inability to achieve precise adjustments.

Method used

By establishing a power grid topology model, collecting and preprocessing historical load data, using spatiotemporal characteristic analysis to obtain correlation coefficients of load characteristics, establishing a bus load prediction model, training the model to optimize weights based on clustering results, generating load adjustment strategies, and under constraint conditions Choose the best solution.

Benefits of technology

It improves the precision and accuracy of bus load prediction, realizes the optimization of the power supply process of the power grid, and improves the efficiency and reliability of the power grid operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118825972A_ABST
    Figure CN118825972A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power systems, in particular to a 220kV bus load prediction result adjusting method and system, a medium and equipment. Comprising the steps that firstly, characteristic analysis is conducted by collecting historical related load data related to a bus; new data is generated by calculating correlation coefficients of data features and combining the correlation coefficients with the original data; according to the method, the bus load prediction precision is improved; secondly, a bus load prediction model is provided, the adaptability of the model can be enhanced by introducing deviation information into a model training process, and the model can adjust the weight and parameters more finely so as to improve the prediction capability of the model; finally, a bus load prediction result adjusting method is provided, according to the method, all bus load adjusting schemes conforming to future electric power activities are generated through constraint conditions, a minimum bus load scheme is selected from numerous methods to serve as an adjusting strategy of an optimal bus prediction result, and management of an electric power system is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power systems, and in particular to a 220kV bus load prediction result adjustment method, system, medium and equipment. Background Art

[0002] In the power system, busbar is one of the important components of the power transmission system. It is used to connect multiple power sources or loads together and transmit electrical energy to each load through the transmission line. Busbar is generally composed of conductors with a large cross-sectional area to withstand high current; it is usually presented as a horizontal or vertical metal rod or wire, sometimes mounted on an insulating bracket or insulator for isolation and protection.

[0003] Busbars can be divided into 220kV busbars and 110kV busbars according to voltage levels; among them, 220kV busbars belong to high-voltage transmission systems. This voltage level is usually used for long-distance transmission, urban power supply, and power transmission connecting different areas.

[0004] With the continuous advancement of social economy and urban construction, the power systems in various regions have shown a high load density. Among them, population growth, changes in industrial structure and seasonal changes are all important factors affecting excessive power load. Excessive power load may have many impacts on the power system and social economy, including: insufficient power supply, system overload, equipment damage and economic losses. Therefore, in order to avoid the negative impact of excessive load, power system operators usually adjust the power supply plan through load forecasting. Among them, bus load forecasting in the power system is a very important aspect; accurate prediction of bus load and scientific adjustment plan are an indispensable part of the power system.

[0005] In recent years, researchers have proposed many excellent methods for bus load forecasting and adjustment. For example, the Chinese patent with the prior art application number CN201910769833.7 discloses a 220kV bus load forecasting result adjustment method, system, medium and equipment. The patent includes: receiving maintenance order information; parsing the maintenance order information, extracting at least one component, and determining the component type of the at least one component; determining the connection status of the at least one component with other components according to the power grid model; determining the load to be transferred in the predicted bus according to the connection status of the at least one component with other components and the component type of the at least one component. The load amount transferred; the load prediction result of the predicted bus is adjusted according to the transferred load amount; in addition, the Chinese patent with the prior art application number CN202211480945.9 discloses a method for automatically adjusting the bus load prediction following the grid operation mode; the method includes a load model selection module and a bus load prediction module, the load model selection module is used to select the prediction model with the best prediction effect from a plurality of candidate combinations of bus load prediction models in an action manner after the grid operation mode is adjusted; the bus load prediction module is used to predict the bus load in the future time period according to meteorological, historical statistics and other characteristics. The above-mentioned prior arts can realize the load prediction and adjustment of the bus, but there are still some defects in the implementation process. For example, in the process of bus load prediction, the correlation between the various features in the load data is not further studied, which will lead to inaccurate bus load prediction, and thus it is impossible to make accurate adjustments.

[0006] To this end, the present invention proposes a 220kV bus load prediction result adjustment method, system, medium and equipment. Summary of the invention

[0007] The present invention proposes a 220kV bus load prediction result adjustment method, system, medium and equipment for predicting and adjusting the bus load in the power grid topology model; wherein, the content of the present invention mainly includes: first, first, a power grid topology model is built according to the power grid design drawing; the model reflects the connection relationship and working status of each component in the power grid structure, and can guide the working status of the power grid under actual conditions through the study of the power grid topology model; secondly, in order to accurately predict the bus load conditions in the power grid topology model, the present invention performs feature analysis on the collected historical related load data of the bus; the analysis method performs analysis based on the spatiotemporal characteristics, studies the bus load conditions in different time periods and different regions, obtains the correlation coefficient of the bus related load characteristics, and combines the original pre-processed data to enhance the training data and improve the subsequent bus load prediction. The accuracy of the bus load prediction is improved; in the prediction of the future load situation of the bus, the present invention proposes a bus load prediction model, which uses the data after bus feature analysis as a training set; in the training process, the data deviation is obtained according to the clustering result of the training set, and the influence of the difference between the same category of data on the prediction result can be accurately grasped by calculating the deviation, and guiding opinions are provided for the weight optimization of the model, which deepens the prediction accuracy of the bus load prediction model; finally, the present invention proposes a bus prediction load adjustment method, which establishes a related vector according to the bus prediction result and the bus information of the power system, and generates a bus load adjustment strategy through a bus load adjustment function; in order to make the bus load adjustment strategy meet the needs of the power system, the bus load adjustment constraint condition is set in the function to seek a feasible solution, and the optimal adjustment solution is selected from many feasible solutions as the final adjustment strategy.

[0008] The grid topology model is adjusted according to the prediction results of the bus load prediction model to optimize the bus load state during the actual grid power supply process, thereby improving the operation efficiency and reliability of the grid.

[0009] To achieve the above object, the present invention provides the following technical solutions:

[0010] In a first aspect, the present invention provides a method for adjusting a 220kV bus load prediction result, comprising:

[0011] Establishing a power grid topology model according to the power grid design diagram; wherein the power grid topology model is based on the topological structure between various components in the power system;

[0012] Further, collecting historical relevant load data of the busbars in the power grid topology model;

[0013] Further, the historical relevant load data is preprocessed to obtain standard historical relevant load data; wherein the preprocessing includes: data cleaning the historical relevant load data to obtain first historical relevant load data; data smoothing the first historical relevant load data to obtain second historical relevant load data; processing the second historical relevant load data using an interpolation sampling method to obtain third historical relevant load data; performing outlier processing on the third historical relevant load data to obtain fourth historical relevant load data; filling missing values ​​on the fourth historical relevant load data to obtain fifth historical relevant load data; performing data conversion on the fifth historical relevant load data to obtain sixth historical relevant load data; standardizing the sixth historical relevant load data to obtain seventh historical relevant load data; and time aligning the seventh historical relevant load data to obtain the standard historical relevant load data.

[0014] Furthermore, the standard historical related load data is subjected to characteristic analysis to obtain historical load characteristic data; wherein the analysis process of the historical load characteristic data includes:

[0015] Clustering the standard historical related load data using a clustering algorithm to obtain multiple load data clusters; wherein the clustering algorithm uses spatiotemporal characteristics as clustering criteria;

[0016] Further, discrete changes are respectively made to the plurality of load data, and a plurality of load data discrete distribution graphs are established;

[0017] Furthermore, by analyzing a plurality of the load data discrete distribution graphs, a load data characteristic distribution result is obtained; wherein the analysis of the load data characteristic distribution result can be performed by analyzing the frequency characteristics of the data in the load data discrete distribution graph by Fourier transform;

[0018] Furthermore, the load data characteristic distribution result can be expressed as a set I = {c k |1≤k≤K};c k It is represented as the load data characteristic distribution result of load data cluster k; K is the total number of the load data clusters;

[0019] The load data characteristic distribution result of the load data cluster k is expressed as c k =(v m |1≤m≤M) T ; where v m It is represented as the characteristic analysis value of the mth item of relevant load data in the load data cluster k; M is represented as the total number of items of relevant load data;

[0020] Further, combining the historical load characteristic data with the load data characteristic distribution result, the historical load characteristic data is obtained through a calculation formula;

[0021] Wherein, the calculation formula is expressed as:

[0022]

[0023] in, It is represented as the historical load characteristic data vector of the jth standard historical related load data in the load data cluster k; Normal() is represented as the normalization function; D kj represents the jth standard historical related load data in the load data cluster k; k It is expressed as the correlation coefficient of the spatiotemporal characteristics of the load data cluster k.

[0024] Furthermore, a bus load prediction model is established;

[0025] Furthermore, the bus load prediction model is trained using the historical load characteristic data; wherein the training steps of the bus load prediction model include:

[0026] Step 1: Randomly initialize the model parameters of the bus load prediction model;

[0027] Step 2: Input the historical load characteristic data into the deviation calculation layer to perform cluster internal deviation calculation, and obtain multiple characteristic deviation matrices and multiple bus load deviation vectors respectively;

[0028] Step 3: Input the plurality of characteristic deviation matrices and the bus load deviation vector into a load deviation calculation function; the load deviation calculation function is expressed as: Among them, ΔP k Represented as the deviation correlation coefficient vector of the kth cluster; FDM k The feature deviation matrix of the k-th cluster is represented as BDV k is represented as the bus load deviation vector of the kth cluster; f() is represented as the load deviation calculation function;

[0029] The load deviation calculation function is used to calculate the influence between the bus load characteristic deviation and the bus load deviation, and the formula is expressed as follows: Among them, RG() represents the regression prediction model; Represented as a related parameter, obtained by step 1; e nm ∈FDM k It is represented by the mth load characteristic deviation value of the nth data in the kth cluster; bn is represented by the bus load deviation value of the nth data in the kth cluster;

[0030] Step 4: predicting the bus load according to the deviation correlation coefficient vector;

[0031] Step 5: Calculate the error between the bus load and the actual historical bus load;

[0032] Step 6: updating the model parameters according to the error;

[0033] Step 7: Repeat step 2 to step 6 until the preset conditions are met and the bus load prediction model training is completed;

[0034] Step 8: Save the optimal model parameters to obtain the trained bus load prediction model.

[0035] Furthermore, the trained bus load prediction model is used to predict the future bus load to obtain the bus load prediction result;

[0036] Further, the bus load prediction result of the power grid topology model is adjusted; wherein the adjustment process of the bus load prediction result includes:

[0037] Using the bus load prediction model to predict the power grid topology model at the future time t, to obtain the bus load prediction result;

[0038] Further, obtaining bus-related information of the current power grid topology model; wherein the bus-related information includes: location information, state information, connection information and attribute information;

[0039] Further, the data formats of the bus load prediction results and the bus related information are unified and normalized;

[0040] Furthermore, a bus vector is established; the bus vector is represented as BusV i =(Q i ,P i ,S i ,C i ,A i ), i∈(1,2,…,N); where BusV i represents the busbar vector of busbar numbered i; i represents the busbar number, and there are N buses in total; Q i It is represented as the normalized value of the bus load prediction result of the bus numbered as i; i It is represented by the normalized value of the position information of the bus numbered i, S i It is represented as the normalized value of the state information of the bus numbered i; C i A is represented by the normalized value of the connection information of the bus numbered i; iIt is represented as the normalized value of the attribute information of the bus numbered i; the attribute information is queried from the dictionary according to the bus number, including: brand, material, shape, layout, rated current and rated voltage; wherein the rated voltage is 220kV;

[0041] Furthermore, a bus load adjustment function is established according to the bus vector; wherein the bus load adjustment function is expressed as:

[0042]

[0043] Wherein, EAV is the power activity value of the current power grid topology model; BusF() represents the bus load adjustment function; sat() represents the bus load adjustment constraint condition;

[0044] The bus load adjustment constraint condition is expressed as follows: in, It is expressed as the lower limit of the load of bus number i; It is expressed as the upper limit of the load of bus number i; It is expressed as the adjusted predicted load of bus number i; TPL - It is represented as the load lower limit of the power grid topology model; TPL + is represented as the load upper limit of the power grid topology model; is represented as the sum of all bus adjustment predictions in the power grid topology model; It is expressed as the lower limit of active power of bus number i; It is represented by the upper limit of active power of bus number i; AP i It is represented by the current active power of bus number i; It is expressed as the lower limit of reactive power of bus number i; The upper limit of reactive power of bus number i; UP i It is represented by the current reactive power of bus number i; max{CL i} represents the maximum thermal stability value of the load set of busbar connection element number i; TL i Expressed as the upper limit of thermal stability of busbar number i

[0045] Further, according to the bus load adjustment function, M bus load adjustment strategies are obtained;

[0046] Further, according to the M bus load adjustment strategies, an optimal bus load adjustment scheme is obtained; wherein the optimal bus load adjustment scheme is expressed as: Among them, (B1, B2, …, B N ) M It is expressed as the load adjustment strategy of the Mth bus; B N It is expressed as the adjustment parameter of bus numbered N;

[0047] Furthermore, the optimal bus load adjustment scheme is used to adjust the bus load prediction result of the power grid topology model.

[0048] In a second aspect, the present invention provides a 220kV bus load prediction result adjustment system, the system comprising: a power grid model generation unit, a power grid data acquisition unit, a data storage unit, a data processing unit, a bus load data analysis unit, a bus load prediction unit, a bus prediction load adjustment unit and a visualization unit;

[0049] Wherein, the power grid model generating unit is used to generate a power grid topology model;

[0050] The power grid data acquisition unit is used to collect data during the operation of the power system;

[0051] The data storage unit is used to store the data acquired by the power grid data acquisition unit;

[0052] The data processing unit is used to pre-process bus-related data;

[0053] The bus load data analysis unit is used to perform characteristic analysis on bus-related load data; wherein the bus load data analysis unit includes:

[0054] A clustering algorithm is used to cluster the standard historical related load data to obtain multiple load data clusters; wherein the clustering algorithm uses spatiotemporal characteristics as clustering criteria;

[0055] Further, discrete changes are respectively made to the plurality of load data, and a plurality of load data discrete distribution graphs are established;

[0056] Furthermore, by analyzing a plurality of the load data discrete distribution graphs, a load data characteristic distribution result is obtained; wherein the analysis of the load data characteristic distribution result can be performed by analyzing the frequency characteristics of the data in the load data discrete distribution graph by Fourier transform;

[0057] Furthermore, the load data characteristic distribution result can be expressed as a set I = {c k |1≤k≤K};c k It is represented as the load data characteristic distribution result of load data cluster k; K is the total number of the load data clusters;

[0058] The load data characteristic distribution result of the load data cluster k is expressed as c k =(v m |1≤m≤M) T ; where v mIt is represented as the characteristic analysis value of the mth item of relevant load data in the load data cluster k; M is represented as the total number of items of relevant load data;

[0059] Further, combining the historical load characteristic data with the load data characteristic distribution result, the historical load characteristic data is obtained through a calculation formula;

[0060] Wherein, the calculation formula is expressed as:

[0061]

[0062] in, It is represented as the historical load characteristic data vector of the jth standard historical related load data in the load data cluster k; Normal() is represented as the normalization function; D kj represents the jth standard historical related load data in the load data cluster k; k It is expressed as the correlation coefficient of the spatiotemporal characteristics of the load data cluster k.

[0063] The bus load prediction unit is used to predict the load of the bus; the bus load prediction unit uses a bus load prediction model to perform prediction;

[0064] The bus predicted load adjustment unit is used to adjust the bus predicted load; wherein the bus predicted load adjustment unit includes:

[0065] Using the bus load prediction model to predict the power grid topology model at the future time t, to obtain the bus load prediction result;

[0066] Further, bus-related information of the current power grid topology model is obtained; wherein the bus-related information includes: location information, state information, connection information and attribute information;

[0067] Further, the data formats of the bus load prediction results and the bus related information are unified and normalized;

[0068] Furthermore, a bus vector is established; the bus vector is represented as BusV i =(Q i ,P i ,S i ,C i ,A i ), i∈(1,2,…,N); where BusV i represents the busbar vector of busbar numbered i; i represents the busbar number, and there are N buses in total; Q i It is represented as the normalized value of the bus load prediction result of the bus numbered as i; iIt is represented by the normalized value of the position information of the bus numbered i, S i It is represented as the normalized value of the state information of the bus numbered i; C i A is represented by the normalized value of the connection information of the bus numbered i; i It is represented as the normalized value of the attribute information of the bus numbered i; the attribute information is queried from the dictionary according to the bus number, including: brand, material, shape, layout, rated current and rated voltage; wherein the rated voltage is 220kV;

[0069] Furthermore, a bus load adjustment function is established according to the bus vector; wherein the bus load adjustment function is expressed as:

[0070]

[0071] Wherein, EAV is the power activity value of the current power grid topology model; BusF() represents the bus load adjustment function; sat() represents the bus load adjustment constraint condition;

[0072] Further, according to the bus load adjustment function, M bus load adjustment strategies are obtained;

[0073] Further, according to the M bus load adjustment strategies, an optimal bus load adjustment scheme is obtained; wherein the optimal bus load adjustment scheme is expressed as: Among them, (B1, B2, …, B N ) M It is expressed as the load adjustment strategy of the Mth bus; B N It is expressed as the adjustment parameter of bus numbered N;

[0074] Furthermore, the optimal bus load adjustment scheme is used to adjust the bus load prediction result of the power grid topology model.

[0075] The visualization unit is used to display the working process of the power grid and the working status of each component.

[0076] In a third aspect, the present invention proposes a 220kV bus load prediction result adjustment medium, which can be a computer program executed by an electronic device. When the program runs on the electronic device, the electronic device executes the steps of the prediction method described in any one of claims 1-5.

[0077] In a fourth aspect, the present invention proposes a 220kV bus load prediction result adjustment device, the device comprising at least a processor and a memory, the processor being used to implement the steps of the prediction method as described in any one of claims 1-5 when executing a computer program stored in the memory.

[0078] Compared with the prior art, the present invention has the following beneficial effects:

[0079] 1. In order to accurately predict the bus load conditions in the power grid topology model, the present invention performs feature analysis on the collected historical relevant load data of the bus; the analysis method performs analysis based on the spatiotemporal characteristics, studies the bus load conditions in different time periods and different regions, obtains the correlation coefficients of the bus related load characteristics, and combines the original preprocessed data to enhance the training data, thereby improving the accuracy of subsequent bus load predictions, thereby facilitating accurate adjustment of the bus load prediction results.

[0080] 2. In predicting the future load conditions of the bus, the present invention proposes a bus load prediction model, which uses the data after bus characteristic analysis as a training set; during the training process, the data deviation is obtained according to the clustering results of the training set, and the influence of the differences between the same category of data on the prediction results can be accurately grasped by calculating the deviation, providing guiding opinions for the weight optimization of the model, and deepening the prediction accuracy of the bus load prediction model; through accurate prediction results, sufficient data support is provided for the adjustment of the bus load prediction results.

[0081] 3. The present invention proposes a bus prediction load adjustment method, which establishes a related vector based on the bus prediction results and the bus information of the power system, and generates a bus load adjustment strategy through a bus load adjustment function; in order to make the bus load adjustment strategy meet the needs of the power system, the bus load adjustment constraint conditions are set in the function to seek feasible solutions, and the optimal adjustment solution is selected from many feasible solutions as the final adjustment strategy; this method can realize scientific adjustment of the bus load prediction results. BRIEF DESCRIPTION OF THE DRAWINGS

[0082] Figure 1 A power system diagram in a real scenario provided by an embodiment of the present invention;

[0083] Figure 2 A flow chart of a 220kV bus load prediction result adjustment method provided by an embodiment of the present invention;

[0084] Figure 3 A structural diagram of a 220kV bus load prediction result adjustment system provided by an embodiment of the present invention;

[0085] Figure 4 A discrete distribution diagram of load data cluster 1 and load data cluster 2 provided in an embodiment of the present invention;

[0086] Figure 5 A structural schematic diagram of a 220kV bus load prediction result adjustment device provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0087] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0088] See also Figure 1 As an important component of the power system, busbar is used to connect multiple power sources or loads together and transmit electrical energy to each load through transmission lines. Busbar is generally composed of conductors with a large cross-sectional area to withstand high currents; it is usually presented as a horizontal or vertical metal rod or wire, sometimes mounted on an insulating bracket or insulator for isolation and protection.

[0089] Busbars can be divided into 220kV busbars and 110kV busbars according to voltage levels; among them, 220kV busbars belong to high-voltage transmission systems. This voltage level is usually used for long-distance transmission, urban power supply, and power transmission connecting different areas.

[0090] There are many methods for adjusting the 220kV bus load prediction results in the prior art, but there are some shortcomings. In order to adjust the 220kV bus load prediction results more accurately, the present invention proposes a 220kV bus load prediction result adjustment method, system, medium and device; the following will be described in detail from two embodiments.

[0091] Embodiment 1

[0092] In the embodiments of the present application, the system and method proposed in the present invention are combined, and the functions in the method are implemented by the units of the system;

[0093] First, the present invention proposes a method for adjusting a 220kV bus load prediction result; Figure 2 As shown, the method includes the following steps: S10. Establishing a power grid topology model; S20. Collecting historical bus-related load data; S30. Data preprocessing; S40. Bus load data feature analysis; S50. Establishing a bus load prediction model; S60. Training the bus load prediction model; S70. Predicting the bus load; S80. Adjusting the bus load prediction result. Figure 2 The system unit is implemented in Figure 2 As shown, the system includes: a power grid model generation unit, a power grid data acquisition unit, a data storage unit, a data processing unit, a bus load data analysis unit, a bus load prediction unit, a bus predicted load adjustment unit and a visualization unit.

[0094] Furthermore, combined with Figure 2 and Figure 3 The specific implementation process is as follows:

[0095] The power grid model generation unit of the system is used to establish a power grid topology model, corresponding to Figure 2 Step S10; wherein the power grid topology model is established through professional modeling software according to the power grid structure and various components in the power grid design diagram, and the model can reproduce the workflow of the power system under real conditions.

[0096] Furthermore, the power grid data acquisition unit of the system acquires historical relevant load data of the bus in the power grid topology model, corresponding to step S20; wherein the historical relevant load data mainly includes: time series data, peak load data, relevant festival types, seasonality, weather condition data (such as temperature, humidity and precipitation, etc.) and geographic information data;

[0097] Among them, weather conditions significantly affect electricity demand (such as the use of heating and cooling); in addition, seasonal changes will also be reflected in the data. For example, winter and summer may have higher loads due to increased use of heating and air conditioning.

[0098] Table 1 shows the weather condition data in the collected historical data, and the bus load changes with the change of weather.

[0099] Table 1. Historical changes in bus load and weather

[0100]

[0101] Furthermore, the acquired historical data is stored by the data storage unit of the system to facilitate subsequent analysis;

[0102] Furthermore, the data processing of the acquired historical data is implemented by the data processing unit of the system, corresponding to Figure 2 S30 step; the specific processing process includes:

[0103] The historical relevant load data is cleaned to obtain first historical relevant load data; the first historical relevant load data is smoothed to obtain second historical relevant load data; the second historical relevant load data is processed by interpolation sampling method to obtain third historical relevant load data; the third historical relevant load data is processed for outliers to obtain fourth historical relevant load data; the fourth historical relevant load data is filled with missing values ​​to obtain fifth historical relevant load data; the fifth historical relevant load data is converted to obtain sixth historical relevant load data; the sixth historical relevant load data is standardized to obtain seventh historical relevant load data; the seventh historical relevant load data is time aligned to obtain the standard historical relevant load data.

[0104] Furthermore, the characteristic analysis of the standard historical related load data is performed by the bus load analysis unit of the system, corresponding to the above step S40; the characteristic analysis process is as follows:

[0105] Clustering the standard historical related load data using a clustering algorithm to obtain multiple load data clusters; wherein the clustering algorithm uses spatiotemporal characteristics as clustering criteria;

[0106] Among them, in step S40, the K-means algorithm is used as the basic clustering method. In order to study the influence of time and region on the load of the busbar in the power grid system, a nonlinear kernel function is introduced as a restriction condition in the original clustering algorithm. The nonlinear kernel function converts the time and space kernel function parameters into constraints.

[0107] Further, the plurality of load data are discretely changed respectively, and a plurality of load data discrete distribution diagrams are established; wherein, in the embodiment of the present application, Figure 4 The discrete distribution diagrams of load data cluster 1 and load data cluster 2 are given in the figure; the horizontal axis x1 represents the time distribution, and the vertical axis x2 represents the spatial distribution; thus the data is discretely distributed.

[0108] Furthermore, by analyzing a plurality of the load data discrete distribution graphs, a load data characteristic distribution result is obtained; wherein the analysis of the load data characteristic distribution result can be performed by analyzing the frequency characteristics of the data in the load data discrete distribution graph by Fourier transform;

[0109] Furthermore, the load data characteristic distribution result can be expressed as a set I = {c k |1≤k≤K};c k It is represented as the load data characteristic distribution result of load data cluster k; K is the total number of the load data clusters;

[0110] The load data characteristic distribution result of the load data cluster k is expressed as c k =(v m |1≤m≤M) T ; where v m It is represented as the characteristic analysis value of the mth item of relevant load data in the load data cluster k; M is represented as the total number of items of relevant load data;

[0111] Further, combining the historical load characteristic data with the load data characteristic distribution result, the historical load characteristic data is obtained through a calculation formula;

[0112] Wherein, the calculation formula is expressed as:

[0113]

[0114] in, It is represented as the historical load characteristic data vector of the jth standard historical related load data in the load data cluster k; Normal() is represented as the normalization function; D kj represents the jth standard historical related load data in the load data cluster k; k It is expressed as the correlation coefficient of the spatiotemporal characteristics of the load data cluster k.

[0115] In the embodiment of the present application, the characteristic correlation coefficient analysis is performed on the historical relevant load data, and the characteristic correlation analysis is performed according to the weather data in Table 1. Through the above analysis process, the analysis results of the weather conditions can be obtained; refer to Table 2, which gives the correlation analysis results of the weather condition data;

[0116] Table 2. Correlation statistics between maximum load and weather condition data

[0117]

[0118] In the embodiment of the present application, by collecting relevant historical bus load data in the power system and performing feature analysis on the collected data, the analysis method studies the bus load conditions in different time periods and different regions based on the spatiotemporal characteristics of the data, obtains the correlation coefficient of the bus-related load characteristics, and combines the original preprocessed data to obtain the relevant data for subsequent predictions; this method can help establish an accurate prediction model to predict the trend and magnitude of future load changes. This accurate prediction is crucial for the planning and operation of the power system, and can avoid resource waste or power shortages caused by load forecasting deviations.

[0119] Furthermore, the bus load of the power grid topology model is predicted; wherein, before predicting the bus load, it also includes establishing a bus load prediction model and training the bus load model using historical data; Figure 2 Steps S50 and S60 describe the preparation work before prediction;

[0120] Furthermore, the specific training of the busbar prediction model includes the following steps:

[0121] Step 1: Randomly initialize the model parameters of the bus load prediction model;

[0122] The initialization parameters of the model in this step include: model weight parameters and bias parameters; in general, the two parameter values ​​can be set to 0 or randomly assigned from the interval [-1,1];

[0123] Step 2: Input the historical load characteristic data into the deviation calculation layer to perform cluster internal deviation calculation, and obtain multiple characteristic deviation matrices and multiple bus load deviation vectors respectively;

[0124] The calculation of the internal deviation of the dining cluster of the historical load characteristic data refers to clustering according to the bus number corresponding to the data and calculating the internal deviation; as shown in the following example:

[0125] When the power grid topology model includes two buses, according to the record document, the bus numbers are L1 and L2; the clustering set of the two buses can be obtained by clustering conditions: L1 = {BF 1i |1≤i≤Q}; L={BF 2j |1≤j≤P}; where L1 and L2 represent the cluster set numbered L1 and the cluster set numbered L2 respectively; BF 1i and BF 2j They are respectively represented as the i-th data numbered L1 and the j-th data numbered L2; Q and P are respectively represented as the total number of data in the L1 cluster set and the total number of data in the L2 cluster set;

[0126] BF 1i and BF 2i It can be expressed in the following form:

[0127] BF 1i =(F i1 ; F i2 ;…;F im BL i );

[0128] BF 2j =(F j1 ; F j2 ;…;F jm BL j );

[0129] Among them, F imIt is represented as the feature value of the mth feature of the i-th data in the L1 clustering set; BL i It is represented by the bus load after the i-th data in the L1 cluster is standardized; F jm It is represented as the feature value of the mth feature of the jth data in the L2 clustering set; BL j It is represented as the bus load after the j-th data in the L2 cluster is standardized;

[0130] Further, the deviation calculation is performed based on the two cluster sets; the deviation calculation results of the embodiment of the present application will be reflected in Table 3 and Table 4 below;

[0131] Table 3. Internal deviation calculation of clustering set about L1 mother line

[0132]

[0133] Table 4. Internal deviation calculation of clustering set about L2 mother line

[0134]

[0135] Step 3: Input the plurality of characteristic deviation matrices and the bus load deviation vector into a load deviation calculation function; the load deviation calculation function is expressed as: Among them, ΔP k Represented as the deviation correlation coefficient vector of the kth cluster; FDM k The feature deviation matrix of the k-th cluster is represented as BDV k is represented as the bus load deviation vector of the kth cluster; f() is represented as the load deviation calculation function;

[0136] The load deviation calculation function is used to calculate the influence between the bus load characteristic deviation and the bus load deviation, and the formula is expressed as follows: Among them, RG() represents the regression prediction model; Represented as a related parameter, obtained by step 1; e nm ∈FDM k It is represented by the mth load characteristic deviation value of the nth data in the kth cluster; bn is represented by the bus load deviation value of the nth data in the kth cluster;

[0137] Step 4: predicting the bus load according to the deviation correlation coefficient vector;

[0138] Step 5: Calculate the error between the bus load and the actual historical bus load;

[0139] Step 6: updating the model parameters according to the error;

[0140] Step 7: Repeat step 2 to step 6 until the preset conditions are met and the bus load prediction model training is completed;

[0141] Step 8: Save the optimal model parameters to obtain the trained bus load prediction model.

[0142] In the application embodiment, the bus load prediction model is trained using historical data after feature analysis; during the training process, the data is clustered by bus number, and the data deviation in each set is calculated based on the clustering result, and the correlation between the load feature and the bus load is obtained through the deviation, so as to predict the bus load and update the model weight; this process introduces deviation information into the model training process to enhance the flexibility and adaptability of the model, and the model can adjust weights and parameters more finely to better predict bus load changes under different conditions, thereby improving the accuracy and stability of the prediction.

[0143] Furthermore, the bus load prediction unit performs bus load prediction, corresponding to Figure 2 Step S70 in the embodiment of the present application; wherein, in the embodiment of the present application, the bus load is predicted, including predicting each bus in the power grid topology model; the prediction results of the bus load prediction model will be described in Table 5 below;

[0144] Table 5. Prediction of bus load prediction model

[0145]

[0146] Further, according to the predicted bus load forecast results, adjustments are made. Figure 3 The bus load prediction unit is implemented, corresponding to Figure 2 The specific adjustment steps are as follows:

[0147] Using the bus load prediction model to predict the power grid topology model at the future time t, to obtain the bus load prediction result;

[0148] Further, obtaining bus-related information of the current power grid topology model; wherein the bus-related information includes: location information, state information, connection information and attribute information;

[0149] In the implementation of this application, the status information of the bus includes: open / closed status information, current, frequency, power, temperature and load conditions; the connection information mainly includes various components connected to the bus; where the components may refer to the connection status of transformers, generators, and other buses);

[0150] Further, the data formats of the bus load prediction results and the bus related information are unified and normalized;

[0151] Furthermore, a bus vector is established; the bus vector is represented as BusV i =(Q i ,P i ,S i ,C i ,A i ), i∈(1,2,…,N); where BusV i represents the busbar vector of busbar numbered i; i represents the busbar number, and there are N buses in total; Q i It is represented as the normalized value of the bus load prediction result of the bus numbered as i; i It is represented by the normalized value of the position information of the bus numbered i, S i It is represented as the normalized value of the state information of the bus numbered i; C i A is represented by the normalized value of the connection information of the bus numbered i; i It is represented as the normalized value of the attribute information of the bus numbered i; the attribute information is queried from the dictionary according to the bus number, including: brand, material, shape, layout, rated current and rated voltage; wherein the rated voltage is 220kV;

[0152] Furthermore, a bus load adjustment function is established according to the bus vector; wherein the bus load adjustment function is expressed as:

[0153]

[0154] Wherein, EAV is the power activity value of the current power grid topology model; BusF() represents the bus load adjustment function; sat() represents the bus load adjustment constraint condition;

[0155] In the embodiment of the present application, the power activity value is mainly obtained through big data analysis; including: residential electricity consumption, commercial electricity consumption and industrial electricity consumption in the same period in the past; and combined with whether there is a scale of large-scale events or performances in the predicted time period.

[0156] The bus load adjustment constraint condition is expressed as follows: in, It is expressed as the lower limit of the load of bus number i; It is expressed as the upper limit of the load of bus number i; It is expressed as the adjusted predicted load of bus number i; TPL - It is represented as the load lower limit of the power grid topology model; TPL + is represented as the load upper limit of the power grid topology model; is represented as the sum of all bus adjustment predictions in the power grid topology model; It is expressed as the lower limit of active power of bus number i; It is represented by the upper limit of active power of bus number i; AP i It is represented by the current active power of bus number i; It is expressed as the lower limit of reactive power of bus number i; The upper limit of reactive power of bus number i; UP i It is represented by the current reactive power of bus number i; max{CL i} represents the maximum thermal stability value of the load set of busbar connection element number i; TL i Expressed as the upper limit of thermal stability of busbar number i.

[0157] In the embodiment of the present application, a reasonable bus predicted load adjustment plan is generated by setting bus load adjustment constraints; the constraints strictly limit the bus load conditions, power conditions, and connected component information, which not only ensures the scientific nature of the plan generation, but also complies with the operating rules of the actual power system.

[0158] Further, according to the bus load adjustment function, M bus load adjustment strategies are obtained;

[0159] Further, according to the M bus load adjustment strategies, an optimal bus load adjustment scheme is obtained; wherein the optimal bus load adjustment scheme is expressed as: Among them, (B1, B2, …, B N ) M It is expressed as the load adjustment strategy of the Mth bus; B N It is expressed as the adjustment parameter of bus numbered N;

[0160] Furthermore, the optimal bus load adjustment scheme is used to adjust the bus load prediction result of the power grid topology model.

[0161] In the embodiment of the present application, a bus load forecast result adjustment method is used to adjust the bus in the power grid topology model; the method makes adjustments by combining the future bus load forecast situation with various types of bus information in the power grid topology model; the method mainly generates all bus load adjustment schemes that meet future power activities through set constraints, and selects the load cost minimization scheme from many methods as the optimal bus forecast result adjustment strategy; the method can not only improve the efficiency and stability of power grid operation, but also reduce operating costs, and support the effective operation and management of power systems in complex and changing environments.

[0162] Furthermore, the management personnel can view the detailed information of the working process of the power grid topology model through the visualization unit of the system.

[0163] In the first embodiment, the system and method of the present invention are combined to realize the adjustment of the bus load prediction result in the power grid topology model; the present invention mainly starts from the following methods: first, a power grid topology model is established, and the operation status of the power system in the real scenario can be reflected by observing the power grid topology model; then, by collecting the relevant historical bus load data in the power system and performing feature analysis on the collected data, the analysis method studies the bus load conditions in different time periods and different regions according to the spatiotemporal characteristics of the data, obtains the correlation coefficient of the bus-related load characteristics, and combines the original pre-processed data to obtain the relevant data for subsequent prediction; this method can help establish an accurate prediction model to predict the future load change trend and magnitude; secondly, a bus load prediction model is established, which clusters the data according to the bus number during the training process, and calculates each according to the clustered results. The data deviation in the set is used to obtain the correlation between load characteristics and bus load through the deviation, so as to predict the bus load and update the model weight; this process introduces deviation information into the model training process to enhance the flexibility and adaptability of the model, and the model can adjust weights and parameters more finely to better predict bus load changes under different conditions, thereby improving the accuracy and stability of the prediction; finally, a bus load prediction result adjustment method is used to adjust the bus in the power grid topology model; this method adjusts the future bus load forecast situation in combination with various types of bus information in the power grid topology model; it mainly generates all bus load adjustment schemes that meet future power activities through set constraints, and selects the load cost minimization scheme from many methods as the optimal bus prediction result adjustment strategy; this method can not only improve the efficiency and stability of power grid operation, but also reduce operating costs.

[0164] Embodiment 2

[0165] In the first embodiment, the method of the present invention is combined with the system to adjust the 220kV bus load prediction result. In this embodiment, a method for adjusting the 220kV bus load prediction result is described again, and the specific process includes:

[0166] Establishing a power grid topology model according to the power grid design diagram; wherein the power grid topology model is based on the topological structure between various components in the power system;

[0167] Further, collecting historical relevant load data of the busbars in the power grid topology model;

[0168] Further, the historical relevant load data is preprocessed to obtain standard historical relevant load data;

[0169] Further, characteristic analysis is performed on the standard historical related load data to obtain historical load characteristic data;

[0170] Further, combining the historical load characteristic data with the load data characteristic distribution result, the historical load characteristic data is obtained through a calculation formula;

[0171] Wherein, the calculation formula is expressed as:

[0172]

[0173] in, It is represented as the historical load characteristic data vector of the jth standard historical related load data in the load data cluster k; Normal() is represented as the normalization function; D kj represents the jth standard historical related load data in the load data cluster k; k It is expressed as the correlation coefficient of the spatiotemporal characteristics of the load data cluster k.

[0174] Furthermore, a bus load prediction model is established;

[0175] Furthermore, the bus load prediction model is trained using the historical load characteristic data; wherein the training steps of the bus load prediction model include:

[0176] Step 1: Randomly initialize the model parameters of the bus load prediction model;

[0177] Step 2: Input the historical load characteristic data into the deviation calculation layer to perform cluster internal deviation calculation, and obtain multiple characteristic deviation matrices and multiple bus load deviation vectors respectively;

[0178] Step 3: Input the plurality of characteristic deviation matrices and the bus load deviation vector into a load deviation calculation function; the load deviation calculation function is expressed as: Among them, ΔP k Represented as the deviation correlation coefficient vector of the kth cluster; FDM k The feature deviation matrix of the k-th cluster is represented as BDV k is represented as the bus load deviation vector of the kth cluster; f() is represented as the load deviation calculation function;

[0179] The load deviation calculation function is used to calculate the influence between the bus load characteristic deviation and the bus load deviation, and the formula is expressed as follows: Among them, RG() represents the regression prediction model; Represented as a related parameter, obtained by step 1; e nm ∈FDM kIt is represented by the mth load characteristic deviation value of the nth data in the kth cluster; bn is represented by the bus load deviation value of the nth data in the kth cluster;

[0180] Step 4: predicting the bus load according to the deviation correlation coefficient vector;

[0181] Step 5: Calculate the error between the bus load and the actual historical bus load;

[0182] Step 6: updating the model parameters according to the error;

[0183] Step 7: Repeat step 2 to step 6 until the preset conditions are met and the bus load prediction model training is completed;

[0184] Step 8: Save the optimal model parameters to obtain the trained bus load prediction model.

[0185] Furthermore, the trained bus load prediction model is used to predict the future bus load to obtain the bus load prediction result;

[0186] Further, the bus load prediction result of the power grid topology model is adjusted; wherein the adjustment process of the bus load prediction result includes:

[0187] Using the bus load prediction model to predict the power grid topology model at the future time t, to obtain the bus load prediction result;

[0188] Further, obtaining bus-related information of the current power grid topology model; wherein the bus-related information includes: location information, state information, connection information and attribute information;

[0189] Further, the data formats of the bus load prediction results and the bus related information are unified and normalized;

[0190] Furthermore, a bus vector is established; the bus vector is represented as BusV i =(Q i ,P i ,S i ,C i ,A i ), i∈(1,2,…,N); where BusV i represents the busbar vector of busbar numbered i; i represents the busbar number, and there are N buses in total; Q i It is represented as the normalized value of the bus load prediction result of the bus numbered as i; i It is represented by the normalized value of the position information of the bus numbered i, S iIt is represented as the normalized value of the state information of the bus numbered i; C i A is represented by the normalized value of the connection information of the bus numbered i; i It is represented as the normalized value of the attribute information of the bus numbered i; the attribute information is queried from the dictionary according to the bus number, including: brand, material, shape, layout, rated current and rated voltage; wherein the rated voltage is 220kV;

[0191] Furthermore, a bus load adjustment function is established according to the bus vector; wherein the bus load adjustment function is expressed as:

[0192]

[0193] Wherein, EAV is the power activity value of the current power grid topology model; BusF() represents the bus load adjustment function; sat() represents the bus load adjustment constraint condition;

[0194] The bus load adjustment constraint condition is expressed as follows: in, It is expressed as the lower limit of the load of bus number i; It is expressed as the upper limit of the load of bus number i; It is expressed as the adjusted predicted load of bus number i; TPL - It is represented as the load lower limit of the power grid topology model; TPL + is represented as the load upper limit of the power grid topology model; is represented as the sum of all bus adjustment predictions in the power grid topology model; It is expressed as the lower limit of active power of bus number i; It is represented by the upper limit of active power of bus number i; AP i Indicates the current active power of bus number i; UP i - It is expressed as the lower limit of reactive power of bus number i; The upper limit of reactive power of bus number i; UP i It is represented by the current reactive power of bus number i; {CL i} represents the maximum thermal stability value of the load set of busbar connection element number i; TL i Expressed as the upper limit of thermal stability of busbar number i

[0195] Further, according to the bus load adjustment function, M bus load adjustment strategies are obtained;

[0196] Further, according to the M bus load adjustment strategies, an optimal bus load adjustment scheme is obtained; wherein the optimal bus load adjustment scheme is expressed as: Among them, (B1, B2, …, B N ) M It is expressed as the load adjustment strategy of the Mth bus; B N It is expressed as the adjustment parameter of bus numbered N;

[0197] Furthermore, the optimal bus load adjustment scheme is used to adjust the bus load prediction result of the power grid topology model.

[0198] For the adjustment method in the embodiment of the present application, the embodiment of the present application also provides a 220kV bus load prediction result adjustment medium, which can be a computer program executed by an electronic device. When the program runs on the electronic device, the electronic device executes the steps of the above-mentioned prediction method.

[0199] Specifically, the medium can be a general storage medium, such as a mobile disk, a hard disk, etc. When the computer program on the storage medium is run, the above-mentioned adjustment method can be executed.

[0200] like Figure 5 As shown, an embodiment of the present application provides a 220kV bus load prediction result adjustment device for executing the prediction method of an embodiment of the present application, the device comprising: a memory, a processor, a bus, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the adjustment method when executing the computer program.

[0201] Specifically, the above-mentioned memory and processor may be general-purpose memory and processor, which are not specifically limited here. When the processor runs the computer program stored in the memory, the above-mentioned adjustment method can be executed.

[0202] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A 220kV bus load prediction result adjustment method, characterized in that: include: Establish a power grid topology model according to the power grid design drawing; collect historical relevant load data of the busbar; perform data preprocessing on the historical relevant load data to obtain standard historical relevant load data; perform feature analysis on the standard historical relevant load data to obtain historical load feature data; Establishing a bus load prediction model; using the historical load characteristic data to train the bus load prediction model; The training steps include: Step 1: Randomly initialize the model parameters of the bus load prediction model; Step 2: Input the historical load characteristic data into the deviation calculation layer to perform cluster internal deviation calculation, and obtain multiple characteristic deviation matrices and multiple bus load deviation vectors respectively; Step 3: Inputting a plurality of the characteristic deviation matrices and the bus load deviation vectors into a load deviation calculation function to obtain a deviation correlation coefficient vector; Step 4: predicting the bus load according to the deviation correlation coefficient vector; Step 5: Calculate the error between the bus load and the actual historical bus load; Step 6: updating the model parameters according to the error; Step 7: Repeat step 2 to step 6 until the preset conditions are met and the bus load prediction model training is completed; Step 8: Save the optimal model parameters and obtain the trained bus load forecasting model; Using the trained bus load prediction model to perform bus load prediction to obtain a bus load prediction result; The bus load prediction result is adjusted.

2. A 220kV bus load prediction result adjustment method according to claim 1, characterized in that: The analysis process of the historical load characteristic data includes: clustering the standard historical related load data using a clustering algorithm to obtain multiple load data clusters; wherein the clustering algorithm uses spatiotemporal characteristics as clustering criteria; performing discrete changes on the multiple load data respectively, and establishing multiple load data discrete distribution graphs; and obtaining load data characteristic distribution results by analyzing the multiple load data discrete distribution graphs; The analysis of the load data characteristic distribution result may be performed by analyzing the frequency characteristics of the data in the load data discrete distribution diagram through Fourier transform; The load data characteristic distribution result can be expressed as a set I = {c k 1≤k≤K}; ck represents the load data characteristic distribution result of load data cluster k; K is the total number of load data clusters; The load data characteristic distribution result of the load data cluster k is expressed as c k =(v m |1≤m≤M) T ; where v m It is represented as the characteristic analysis value of the mth item of relevant load data in the load data cluster k; M is represented as the total number of items of relevant load data; Combining the historical load characteristic data with the load data characteristic distribution result, obtaining the historical load characteristic data through a calculation formula; Wherein, the calculation formula is expressed as: in, It is represented as the historical load characteristic data vector of the jth standard historical related load data in the load data cluster k; Normal() is represented as the normalization function; D kj represents the jth standard historical related load data in the load data cluster k; k It is expressed as the correlation coefficient of the spatiotemporal characteristics of the load data cluster k.

3. A 220kV bus load prediction result adjustment method according to claim 1, characterized in that: The load deviation calculation function is expressed as: Where ΔP k The deviation correlation coefficient vector of the k-th cluster is represented as: k The feature deviation matrix of the k-th cluster is represented as BDV k is represented as the bus load deviation vector of the kth cluster; f() is represented as the load deviation calculation function; The load deviation calculation function is used to calculate the influence between the bus load characteristic deviation and the bus load deviation, and the formula is expressed as follows: Among them, RG() represents the regression prediction model; Represented as a related parameter, obtained by step 1; e nm ∈FDM k It is represented by the mth load characteristic deviation value of the nth data in the kth cluster; bn is represented by the bus load deviation value of the nth data in the kth cluster.

4. A 220kV bus load prediction result adjustment method according to claim 1, characterized in that: The process of adjusting the bus load forecast result includes: Using the bus load prediction model to predict the power grid topology model at the future time t, to obtain the bus load prediction result; Obtaining busbar related information of the current power grid topology model; wherein the busbar related information includes: location information, state information, connection information and attribute information; Unifying the data formats of the bus load prediction results and the bus related information, and performing normalization operations; Establish a bus vector; the bus vector is represented by BusV i =(Q i ,P i ,S i ,C i ,A i ), i∈(1,2,…,N); where BusV i represents the busbar vector of busbar numbered i; i represents the busbar number, and there are N buses in total; Q i It is represented as the normalized value of the bus load prediction result of the bus numbered as i; i It is represented by the normalized value of the position information of the bus numbered i, S i It is represented as the normalized value of the state information of the bus numbered i; C i A is represented by the normalized value of the connection information of the bus numbered i; i It is represented as the normalized value of the attribute information of the bus numbered i; the attribute information is queried from the dictionary according to the bus number, including: brand, material, shape, layout, rated current and rated voltage; wherein the rated voltage is 220kV; A bus load adjustment function is established according to the bus vector; wherein the bus load adjustment function is expressed as: Wherein, EAV is the power activity value of the current power grid topology model; BusF() represents the bus load adjustment function; sat() represents the bus load adjustment constraint condition; According to the bus load adjustment function, M bus load adjustment strategies are obtained; According to the M bus load adjustment strategies, the optimal bus load adjustment scheme is obtained; wherein the optimal bus load adjustment scheme is expressed as: Among them, (B1, B2, …, B N ) M It is expressed as the load adjustment strategy of the Mth bus; B N It is expressed as the adjustment parameter of bus numbered N; The optimal bus load adjustment scheme is used to adjust the bus load prediction result of the power grid topology model.

5. A 220kV bus load prediction result adjustment method according to claim 4, characterized in that: The bus load adjustment constraint condition is expressed as follows: in, It is expressed as the lower limit of the load of bus number i; It is expressed as the upper limit of the load of bus number i; It is expressed as the adjusted predicted load of bus number i; TPL - It is represented as the load lower limit of the power grid topology model; TPL + is represented as the load upper limit of the power grid topology model; It is represented as the sum of all bus adjustment predictions in the power grid topology model; AP i - It is represented by the lower limit of active power of bus number i; AP i + It is represented by the upper limit of active power of bus number i; AP i Indicates the current active power of bus number i; UP i - It is expressed as the lower limit of reactive power of bus number i; UP i + The upper limit of reactive power of bus number i; UP i It is represented by the current reactive power of bus number i; max{CL i } represents the maximum thermal stability value of the load set of busbar connection element number i; TL i Expressed as the upper limit of thermal stability of busbar number i.

6. A 220kV bus load prediction result adjustment system, characterized in that: The system comprises: a power grid model generation unit, a power grid data acquisition unit, a data storage unit, a data processing unit, a bus load data analysis unit, a bus load prediction unit, a bus predicted load adjustment unit and a visualization unit; Among them, the power grid model generation unit is used to generate a power grid topology model; the power grid data acquisition unit is used to collect data during the operation of the power system; the data storage unit is used to store the data acquired by the power grid data acquisition unit; the data processing unit is used to pre-process bus-related data; the bus load data analysis unit is used to perform feature analysis on bus-related load data; the bus load prediction unit is used to predict the load on the bus; the bus predicted load adjustment unit is used to adjust the bus predicted load; the visualization unit is used to display the power grid working process and the working status of each component.

7. A 220kV bus load prediction result adjustment system according to claim 6, characterized in that: The bus load data analysis unit comprises: A clustering algorithm is used to cluster the standard historical related load data to obtain multiple load data clusters; wherein the clustering algorithm uses spatiotemporal characteristics as clustering criteria; respectively making discrete changes to the plurality of load data and establishing a plurality of load data discrete distribution diagrams; By analyzing a plurality of the load data discrete distribution graphs, a load data characteristic distribution result is obtained; wherein the analysis of the load data characteristic distribution result can be performed by analyzing the frequency characteristics of the data in the load data discrete distribution graph by Fourier transform; The load data characteristic distribution result can be expressed as a set I = {c k |1≤k≤K};c k It is represented as the load data characteristic distribution result of load data cluster k; K is the total number of the load data clusters; The load data characteristic distribution result of the load data cluster k is expressed as c k =(v m |1≤m≤M) T ; where v m It is represented as the characteristic analysis value of the mth item of relevant load data in the load data cluster k; M is represented as the total number of items of relevant load data; Combining the historical load characteristic data with the load data characteristic distribution result, obtaining the historical load characteristic data through a calculation formula; Wherein, the calculation formula is expressed as: in, It is represented as the historical load characteristic data vector of the jth standard historical related load data in the load data cluster k; Normal() is represented as the normalization function; D kj represents the jth standard historical related load data in the load data cluster k; k It is expressed as the correlation coefficient of the spatiotemporal characteristics of the load data cluster k.

8. A 220kV bus load prediction result adjustment system according to claim 6, characterized in that: The busbar predicted load adjustment unit comprises: Using the bus load prediction model to predict the power grid topology model at the future time t, to obtain the bus load prediction result; Obtaining busbar related information of the current power grid topology model; wherein the busbar related information includes: location information, state information, connection information and attribute information; Unifying the data formats of the bus load prediction results and the bus related information, and performing normalization operations; Establish a bus vector; the bus vector is represented by BusV i =(Q i ,P i ,S i ,C i ,A i ), i∈(1,2,…,N); where BusV i represents the busbar vector of busbar numbered i; i represents the busbar number, and there are N buses in total; Q i It is represented as the normalized value of the bus load prediction result of the bus numbered as i; i It is represented by the normalized value of the position information of the bus numbered i, S i It is represented as the normalized value of the state information of the bus numbered i; C i A is represented by the normalized value of the connection information of the bus numbered i; i It is represented as the normalized value of the attribute information of the bus numbered i; the attribute information is queried from the dictionary according to the bus number, including: brand, material, shape, layout, rated current and rated voltage; wherein the rated voltage is 220kV; A bus load adjustment function is established according to the bus vector; wherein the bus load adjustment function is expressed as: Wherein, EAV is the power activity value of the current power grid topology model; BusF() represents the bus load adjustment function; sat() represents the bus load adjustment constraint condition; According to the bus load adjustment function, M bus load adjustment strategies are obtained; According to the M bus load adjustment strategies, the optimal bus load adjustment scheme is obtained; wherein the optimal bus load adjustment scheme is expressed as: Among them, (B1, B2, …, B N ) M It is expressed as the load adjustment strategy of the Mth bus; B N It is expressed as the adjustment parameter of bus numbered N; The optimal bus load adjustment scheme is used to adjust the bus load prediction result of the power grid topology model.

9. A 220kV bus load prediction result adjustment medium, characterized in that: The medium is a computer program that can be executed by an electronic device. When the program is run on the electronic device, the electronic device executes the steps of the prediction method according to any one of claims 1 to 5.

10. A 220kV bus load prediction result adjustment device, characterized in that: The device comprises at least a processor and a memory, and the processor is used to implement the steps of the prediction method according to any one of claims 1 to 5 when executing a computer program stored in the memory.