Source network load storage intelligent scheduling optimization method and system considering source load uncertainty

Through the intelligent dispatch optimization method of source, grid, load and storage, the problem of lack of coordinated control of source, load and storage in the power system is solved by using probability rules to mine and optimize the dispatch model, and the economy and safety of power grid operation are improved.

CN118826162APending Publication Date: 2024-10-22YUNNAN POWER GRID CO LTD
View PDF 0 Cites 6 Cited by

Patent Information

Application Number
CN202410836616.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

The existing power system dispatch planning system and spot market trading system lack an effective source-grid-load-storage coordinated control mechanism, resulting in grid operation uncertainty and reduced economic efficiency, and the inability to fully utilize new energy storage and adjustable load resources.

Method used

An intelligent dispatching optimization method for source, network, load and storage is proposed. By acquiring model data and operating boundary data, and mining based on probability rules, a variety of prediction scenarios for source and load output are constructed. An optimized dispatch model is constructed with the goal of minimizing dispatch costs, and real-time optimization of dispatch is achieved. The results are provided to the spot system to realize coordinated scheduling of source, load and storage resources.

Benefits of technology

It reduces the uncertainty of power grid operation, improves the level of resource optimization and global coordination, promotes the safe, stable, efficient and economical operation of the power grid, and achieves the rational allocation and utilization of source, load and storage resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118826162A_ABST
    Figure CN118826162A_ABST
Patent Text Reader

Abstract

The invention provides a source network load storage intelligent scheduling optimization method and system considering source load uncertainty. The uncertainty of wind, light and load is considered in the day-ahead / real-time optimization calculation, optimization scheduling is carried out on various resources of source, network, load and storage, the method is connected with a spot system, reasonable and reliable boundary conditions are provided for the spot system, risks caused by the uncertainty of power grid operation are reduced, and collaborative optimization and safety check of the source, network, load and storage resources are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to a source-grid-load-storage intelligent dispatch optimization method and system taking into account source-load uncertainty, belonging to the technical field of power system dispatching. Background Art

[0002] With the large-scale access of renewable energy, distributed energy and adjustable loads to the power system, the operation of the power system has become complex and uncertain. The existing dispatching and planning system lacks a coordinated regulation mechanism between sources, grids, loads and storage to smooth out the random volatility of new energy and loads. Grid dispatching and the spot market need to reserve more positive and negative backup resources to cope with system uncertainties. This can easily lead to problems of wind and solar power abandonment, while reducing the overall operating economy.

[0003] In the new power system, it is necessary to adopt a new risk dispatching plan model to solve the problem, introduce a probabilistic method, more accurately quantify the volatility of source and load, and optimize the dispatching plan, so as to better balance the uncertainty of new energy and the reliability requirements of the system. The current power spot market trading system is usually based on the prediction of deterministic load and new energy, and ensures the safety of the system under uncertain conditions by reserving reserves. Whether the boundary conditions of spot market clearing are reasonable not only affects the economy of the overall system, but also affects whether the spot market can be cleared normally. At present, the preparation of boundary conditions such as reserves of power spot market trading systems often relies on manual experience.

[0004] In addition, the optimization object of the electricity spot market is market-oriented resources. During dispatch optimization, the balance of electricity supply and demand is maintained by coordinating market-oriented thermal power generation and new energy and other power generation resources. Non-market resources, as market boundaries, do not participate in optimization, and their reasonable allocation problem has not been effectively solved. With the continuous increase of new energy and the rapid growth of electricity demand, it is urgent to further explore and utilize new energy storage technologies and the flexibility of adjustable load resources to achieve "source-grid-load-storage coordination" dispatch, and to cope with the increasingly complex power system operation environment with resource optimization and overall coordination in a larger range. The current dispatch planning system and spot market trading system lack the source-grid-load-storage interaction model, and the optimization scope is limited, which makes it impossible to deeply explore and utilize the adjustable resources in each link of source-grid-load-storage. Summary of the invention

[0005] In view of the above problems, the present invention proposes a source-grid-load-storage intelligent scheduling optimization method and system taking into account the uncertainty of source and load, so as to solve the problems of the lack of source-grid-load-storage interaction model in the current scheduling planning system and spot market trading system, the limited optimization scope, and the inability to deeply explore and utilize the adjustable resources in each link of source-grid-load-storage.

[0006] In order to achieve the above objectives, this application provides the following technical solutions:

[0007] In a first aspect, an embodiment of the present application provides a source-grid-load-storage intelligent scheduling optimization method taking into account source-load uncertainty, which is applied to a source-grid-load-storage intelligent scheduling system, and the method includes:

[0008] Obtaining model data and operation boundary data of source-grid-load-storage equipment; the operation boundary data includes declaration data, forecast data, plan data and constraint data;

[0009] Probabilistic law mining is performed based on historical forecast data and historical actual data of source-load output, and multiple source-load output forecasting scenarios are constructed based on the mining results;

[0010] An optimization scheduling model is constructed with the goal of minimizing the scheduling cost, and the optimization scheduling model is solved in day-ahead or in real time based on the model data and the operation boundary data to obtain a scheduling result under a corresponding prediction scenario;

[0011] The scheduling result is sent to the spot system to provide boundary conditions for the spot system.

[0012] Based on the above method, optionally, the model data of the source-grid-load-storage device includes:

[0013] Generator set / unit group model, set model, energy storage equipment model, adjustable load model, bus load model, tie line / tie line group model, substation model, electrical bus model, line model, transformer / transformer winding model.

[0014] Based on the above method, optionally, the historical forecast data and historical actual data based on the source-load output are used to mine probability rules, and multiple source-load output forecast scenarios are constructed based on the mining results, including:

[0015] Based on the historical new energy forecast output data, meteorological forecast data and actual meteorological data, probability law mining is carried out, and based on the new energy short-term / ultra-short-term forecast output data on the forecast day, the short-term / ultra-short-term output interval probability information of each new energy station is obtained, and various new energy output scenarios are obtained based on the probability information sampling;

[0016] In addition, based on the historical system load forecast data and the actual system load data, probability law mining is carried out, and based on the short-term / ultra-short-term forecast data of the system load on the forecast day, the short-term / ultra-short-term interval probability information of the system load is obtained, and various system load forecast scenarios are obtained based on probability information sampling.

[0017] Based on the above method, optionally, the formula of the optimization scheduling model is expressed as:

[0018]

[0019] Where t is the time period number, T is the total number of time periods considered; N is the total number of generator sets; C i,t (P i,t ) is a multi-segment linear function related to each output range and operating cost for adjusting the operating cost of various directly controlled resources such as energy storage and power supply; is the startup cost of conventional power supply; h is the cluster resource number, and H is the number of cluster resources; is the operating cost of cluster resource h in time period t, which is a multi-segment linear function related to each output interval and operating cost; M represents the network power flow constraint relaxation penalty factor used for optimization calculation; are the forward and reverse power flow relaxation variables of line l respectively; NL is the total number of lines; are the positive and negative flow relaxation variables of section s respectively; NS is the total number of sections.

[0020] Based on the above method, optionally, the constraints when solving the optimization scheduling model include:

[0021] System load balancing constraints:

[0022]

[0023] Where, T j,t represents the planned power of tie line j in time period t (input is positive, output is negative), NT is the total number of tie lines, P Load,t is the total load of the system in period t;

[0024] System positive and negative standby constraints:

[0025]

[0026] In the formula, is the maximum and minimum output of thermal power unit i; is the start and stop status of thermal power unit i in time period t; is the system positive spare capacity requirement for period t, is the negative reserve capacity requirement of the system during time period t;

[0027] Unit output upper and lower limit constraints:

[0028]

[0029] Where: is the maximum output of wind turbine j and photovoltaic unit k;

[0030] Energy storage resource operation constraints:

[0031]

[0032]

[0033] In the formula, E b,t is the state of charge of the energy storage system; is the energy storage charging and discharging power, is the charging and discharging efficiency of the energy storage system; E b,l , are the initial and final values ​​(expected values) of the energy storage system; is the charging and discharging state of energy storage, taking the value of 1 or 0; is the maximum charging and discharging power of the energy storage system; The minimum and maximum state of charge allowed for energy storage during dispatch;

[0034] Aggregate resource cluster operation constraints:

[0035]

[0036] Where M + 、M - Adjust the total number of cost curve segments up or down for a resource cluster; For the resource cluster in the mth + 、m - The upward and downward adjustment of power in the upward and downward adjustment output range must meet the maximum upward and downward adjustment capacity range constraints.

[0037] Based on the above method, optionally, the source-grid-load-storage intelligent dispatching system is operated before the day-ahead market, and the dispatching results obtained provide spot boundary conditions for the spot system, including: energy storage control plan, new energy output plan, load control plan, operation standby plan, and upper and lower limits of market unit output;

[0038] In addition, the source-grid-load-storage intelligent dispatching system runs in real time, updates the dispatching results and amends the day-ahead planning strategy to provide boundary conditions for the real-time spot market.

[0039] Based on the above method, optionally, it also includes:

[0040] When the spot system is abnormal, the scheduling model and boundary conditions of the spot system are obtained, and the spot market is scheduled and operated instead of the spot system.

[0041] In a second aspect, the embodiment of the present application further provides a source-grid-load-storage intelligent dispatching optimization system taking into account source-load uncertainty, which includes:

[0042] A data acquisition module is used to acquire model data and operation boundary data of source-grid-load-storage equipment; the operation boundary data includes declaration data, forecast data, plan data and constraint data;

[0043] The scenario construction module is used to mine probability rules based on historical forecast data and historical actual data of source-load output, and to construct forecast scenarios of various source-load outputs based on the mining results;

[0044] A scheduling module, used to construct an optimized scheduling model with the goal of minimizing scheduling costs, and solve the optimized scheduling model based on the model data and the operation boundary data in the day-ahead or in real time to obtain a scheduling result under a corresponding prediction scenario;

[0045] The sending module is used to send the scheduling result to the spot system to provide boundary conditions for the spot system.

[0046] The source-grid-load-storage intelligent dispatch optimization method and system provided in this application takes into account the uncertainty of source and load, considers the uncertainty of wind, solar and load in the day-ahead / real-time optimization calculation, optimizes the dispatch of various types of source, grid, load and storage resources, and connects with the spot system to provide reasonable and reliable boundary conditions for the spot system, reduce the risks brought by the uncertainty of power grid operation, and realize the coordinated optimization and safety verification of source, grid, load and storage resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] The accompanying drawings herein are incorporated into and constitute a part of the specification, illustrate embodiments consistent with the present application, and together with the specification are used to explain the principles of the present application. In addition, these drawings and text descriptions are not intended to limit the scope of the concept of the present application in any way, but to illustrate the concept of the present application for those skilled in the art by referring to specific embodiments.

[0048] Figure 1 An architecture diagram of a source-grid-load-storage intelligent dispatching system taking into account source-load uncertainty provided by one embodiment of the present application;

[0049] Figure 2 A flow chart of a source-grid-load-storage intelligent scheduling optimization method taking into account source-load uncertainty provided by one embodiment of the present application;

[0050] Figure 3 A schematic diagram of the connection and operation between the source-grid-load-storage intelligent dispatching system and the spot system provided in one embodiment of the present application;

[0051] Figure 4 A schematic diagram of the connection operation between the day-ahead optimization process of the source-grid-load-storage intelligent dispatching system and the spot system provided in one embodiment of the present application;

[0052] Figure 5 A schematic diagram of the connection operation between the real-time optimization process of the source-grid-load-storage intelligent dispatching system and the spot system provided in one embodiment of the present application;

[0053] Figure 6A schematic diagram of the structure of a source-grid-load-storage intelligent scheduling system provided for one embodiment of the present application. DETAILED DESCRIPTION

[0054] In order to make the purpose, technical solutions and advantages of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in combination with the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.

[0055] At present, the construction of source-grid-load-storage collaborative optimization platforms at home and abroad is mainly based on virtual power plant platforms and local pilots. There is a lack of source-grid-load-storage collaborative optimization platforms that take into account the power spot operation mechanism in combination with the background and characteristics of the new power system, and it is impossible to fully utilize various types of distributed and centralized resource endowments. To this end, the present invention proposes a source-grid-load-storage intelligent dispatching system suitable for uncertain scenarios under the conditions of the power spot market that considers the uncertainty of source and load output at multiple time scales. By optimizing the probabilistic dispatch of various types of source-grid-load-storage resources, and fully considering the uncertainty factors on both the source and load sides, it can provide a reasonable operating boundary for the power spot system, adapt to the existing power market mechanism and the characteristics of the new power system, improve the overall coordination and interaction level of the power grid, and promote the safe, stable, efficient and economical operation of the power grid. The following is a non-restrictive explanation of the specific implementation scheme through several examples or embodiments.

[0056] Some embodiments of the present application provide a source-grid-load-storage intelligent scheduling optimization method taking into account source-load uncertainty, and the system is a management system based on a combination of software and hardware. Figure 1 , Figure 1 This is a structural diagram of a source-grid-load-storage intelligent dispatch optimization system provided by one embodiment of the present application. Figure 1 As shown, the system mainly includes platform layer, basic service layer and risk scheduling layer.

[0057] The platform layer interacts with other software / hardware systems to obtain various types of data and also provides human-computer interaction functions. The basic service layer has various algorithms built in, providing model and data management services, source-load interactive safety verification services, core algorithm services, and data services. The risk scheduling layer uses various services of the basic service layer to process the data obtained from the platform service layer, realize uncertainty characterization and scenario construction, as well as day-ahead and real-time risk scheduling.

[0058] Based on this system, Figure 2 As shown, the source-grid-load-storage intelligent scheduling optimization method taking into account source-load uncertainty of this embodiment includes the following steps:

[0059] Step S101: Acquire model data and operation boundary data of source, grid, load and storage equipment; the operation boundary data includes declaration data, forecast data, plan data and constraint data.

[0060] Specifically, source-grid-load-storage equipment refers to various types of equipment in the renewable energy power generation source (source), power grid (grid), load (load) and energy storage system (storage). In practice, the stable and efficient operation of the power grid system is achieved through the coordinated operation of source-grid-load-storage equipment. In order to optimize the scheduling of source-grid-load-storage equipment, it is first necessary to model each device.

[0061] Among them, the source, grid, load and storage equipment is modeled accurately and integrated, and the data of the physical equipment model is obtained by parsing CIME (a data standard for exchanging data between power system software applications) and QS (a data format for describing the steady-state and transient characteristics of power systems) files and adding them through manual maintenance. Furthermore, the model data of the source, grid, load and storage equipment includes: generator set / unit group model, set model, energy storage equipment model, adjustable load model, bus load model, tie line / tie line group model, substation model, electrical bus model, line model, transformer / transformer winding model.

[0062] In addition, in order to accurately construct the source-grid-load-storage model, for low-voltage grid-connected resources, the system can set up an "on-grid point management" page to associate designated buses of small units, small loads, etc., determine their physical connection points, and enable them to participate in topology analysis and power flow analysis. Low-voltage grid-connected resources refer to resources such as small generators, adjustable loads, and energy storage devices that are connected to the distribution network. These resources usually have lower voltage levels (such as 380V or 480V) and are connected to the distribution network through transformers. On-grid point management is a mechanism for determining the physical connection points of low-voltage grid-connected resources, that is, the specific buses to which they are connected to the distribution network. This is essential for accurate network topology analysis and power flow analysis. Topology analysis is a power system analysis technique used to determine the structure and connectivity of the network. It can identify loops, nodes, and lines in the network and determine the connection relationship between different buses. Power flow analysis is a power system analysis technique used to calculate the power flow (power flow) of each line and transformer in the network. It can help determine the operating status of the network and identify potential overloads and voltage violations.

[0063] In addition, the operation boundary data is also obtained to reasonably constrain the dispatch optimization process. The operation boundary data of the source-grid-load-storage intelligent dispatch system is obtained from the new energy forecast system, load forecast system, OMS system (operation management system), dispatch planning system and other systems, mainly including declaration, forecast, plan and constraint data. Among them, the prediction data mainly includes: new energy short-term / ultra-short-term forecast output data, load short-term / ultra-short-term forecast data, bus load short-term / ultra-short-term forecast data, meteorological short-term / ultra-short-term forecast data, etc.; the plan data mainly includes the short-term / ultra-short-term plan of the interconnection line, the unit maintenance plan, and the transmission and transformation equipment maintenance plan data; the constraint data mainly includes the section limit constraint, the start-up and shutdown and output constraint of the unit / unit group; the declaration data mainly includes the power spot market quotation data, the adjustable load declaration data, and the energy storage declaration data.

[0064] Step S102: Probabilistic law mining is performed based on historical forecast data and historical actual data of source-load output conditions, and multiple source-load output forecast scenarios are constructed based on the mining results.

[0065] Specifically, in order to fully consider the uncertainties on both the source and load sides, it is necessary to evaluate and quantify the uncertainty of source and load output, and generate various scenarios for optimization calculations.

[0066] In some embodiments, the uncertainty characterization and scenario construction of source-load output includes new energy probability modeling and new energy output scenario generation, system load probability modeling and system load scenario generation. Among them, the new energy output scenario refers to the different output scenarios of new energy such as wind and solar under different conditions. The system load scenario refers to the different power consumption scenarios of each power load under different conditions.

[0067] Furthermore, step S102 may specifically include:

[0068] Based on the historical new energy forecast output data, meteorological forecast data and actual meteorological data, probability law mining is carried out, and based on the new energy short-term / ultra-short-term forecast output data on the forecast day, the short-term / ultra-short-term output interval probability information of each new energy station is obtained, and various new energy output scenarios are obtained based on the probability information sampling;

[0069] In addition, based on the historical system load forecast data and the actual system load data, probability law mining is carried out, and based on the short-term / ultra-short-term forecast data of the system load on the forecast day, the short-term / ultra-short-term interval probability information of the system load is obtained, and various system load forecast scenarios are obtained based on probability information sampling.

[0070] Based on this, prediction scenarios for various source and load outputs are constructed to facilitate subsequent scheduling optimization.

[0071] Step S103: construct an optimized scheduling model with the goal of minimizing the scheduling cost, and solve the optimized scheduling model based on the model data and the operation boundary data in the day-ahead or in real time to obtain the scheduling result under the corresponding prediction scenario.

[0072] Specifically, the objective function of the optimization scheduling model for source-grid-load-storage collaborative optimization mainly considers minimizing the scheduling cost to improve economic efficiency. At the same time, the operating boundary data is used for constraints to ensure safety.

[0073] In some embodiments, the formula of the optimization scheduling model is expressed as:

[0074]

[0075] Where t is the time period number, T is the total number of time periods considered; N is the total number of generator sets; C i,t (P i,t ) is a multi-segment linear function related to each output range and operating cost for adjusting the operating cost of various directly controlled resources such as energy storage and power supply; is the startup cost of conventional power supply; h is the cluster resource number, and H is the number of cluster resources; is the operating cost of cluster resource h in time period t, which is a multi-segment linear function related to each output interval and operating cost; M represents the network power flow constraint relaxation penalty factor used for optimization calculation; are the forward and reverse power flow relaxation variables of line l respectively; NL is the total number of lines; are the positive and negative flow relaxation variables of section s respectively; NS is the total number of sections.

[0076] In addition, the constraints when solving the optimization scheduling model include:

[0077] System load balancing constraints:

[0078]

[0079] Where, T j,t represents the planned power of tie line j in time period t (input is positive, output is negative), NT is the total number of tie lines, P Load,t is the total load of the system in period t;

[0080] System positive and negative standby constraints:

[0081]

[0082] In the formula, is the maximum and minimum output of thermal power unit i; is the start and stop status of thermal power unit i in time period t; is the system positive spare capacity requirement for period t, is the negative reserve capacity requirement of the system during time period t;

[0083] Unit output upper and lower limit constraints:

[0084]

[0085] Where: is the maximum output of wind turbine j and photovoltaic unit k;

[0086] Energy storage resource operation constraints:

[0087]

[0088]

[0089] In the formula, E b,t is the state of charge of the energy storage system; is the energy storage charging and discharging power, is the charging and discharging efficiency of the energy storage system; E b,l , are the initial and final values ​​(expected values) of the energy storage system; is the charging and discharging state of energy storage, taking the value of 1 or 0; is the maximum charging and discharging power of the energy storage system; The minimum and maximum state of charge allowed for energy storage during dispatch;

[0090] Aggregate resource cluster operation constraints:

[0091]

[0092] Where M + 、M - Adjust the total number of cost curve segments up or down for a resource cluster; For the resource cluster in the mth + 、m - The upward and downward adjustment of power in the upward and downward adjustment output range must meet the maximum upward and downward adjustment capacity range constraints.

[0093] In the above optimization scheduling model, the operation and adjustment costs of various types of equipment are taken into consideration, and the scheduling optimization of various types of equipment is achieved with the goal of minimizing the total cost. At the same time, optimization conditions are introduced to ensure the safe and stable operation of the system and each device.

[0094] In practice, the scheduling results can be obtained by substituting actual data into the optimization scheduling model. Among them, scheduling optimization includes day-ahead scheduling before the forecast day and real-time scheduling within the forecast day. The combination of the two provides reasonable boundary conditions for the spot system.

[0095] Step S104: Send the scheduling results to the spot system to provide boundary conditions for the spot system.

[0096] Specifically, the spot system uses economic optimization goals (minimizing system power generation costs) as a means to solve the problem of market-based resource allocation, and its non-market boundaries lack reasonable compilation. The active load forecast of the spot system in the operating boundary does not take into account uncertainty, the setting of system reserves depends on manual experience, and non-market units and load resources are not optimized.

[0097] The calculation of the intelligent dispatching system of source, grid, load and storage under uncertain scenarios takes into account the uncertainty on both sides of the source and load, and uniformly optimizes the source, grid, load and storage resources. The optimization target takes into account the cost and safety of the system's dispatching. Different optimization target orientations can be set according to the actual usage scenarios, so that the resource plan and backup plan obtained by the optimized calculation can meet the multi-objective requirements of safety and economy.

[0098] like Figure 3 As shown, the intelligent dispatching system of source, grid, load and storage under uncertain scenarios is connected with the spot system. The intelligent dispatching system of source, grid, load and storage under uncertain scenarios can provide the spot system with system operation backup plans and resource output plans after optimizing the risk dispatch of source, grid, load and storage resources taking into account uncertainty, thereby improving the safety and economy of the spot operation dispatching mode without changing the functions of the existing spot system.

[0099] The connection and operation process between the source-grid-load-storage intelligent dispatching system and the spot system is as follows:

[0100] (1) The day-ahead optimization process of the intelligent dispatching system for sources, grids, loads and storage under uncertain scenarios and its connection with the day-ahead spot market

[0101] like Figure 4 As shown in the figure, the intelligent dispatching system of source, grid, load and storage in uncertain scenarios runs before the day-ahead market, and its optimized dispatching results provide spot boundary conditions for the spot system, including: energy storage regulation plan, new energy output plan, load regulation plan, operation reserve plan, upper and lower limits of market unit output, etc. By optimizing risk reserve through the intelligent dispatching system of source, grid, load and storage in uncertain scenarios, the coordinated optimization and safety verification of source, grid, load and storage resources considering the uncertainty of grid operation can be realized, providing risk-controllable boundary conditions for the spot system.

[0102] (2) Real-time optimization process of intelligent dispatching system for source, grid, load and storage under uncertain scenarios and connection with real-time spot market

[0103] like Figure 5As shown in the figure, the real-time risk scheduling optimization of the intelligent scheduling system of source-grid-load-storage in uncertain scenarios rolls over the scheduling decision for the next hour every 5 minutes (the same rolling frequency as the real-time spot market), and uses the updated forecast, planning information and other scheduling results and system operation status to revise the day-ahead planning strategy, providing boundary conditions for the real-time spot market.

[0104] Based on the above scheme, the uncertainty of wind, solar and load is taken into account in the day-ahead / real-time optimization calculation, and various resources of source, grid, load and storage are optimized and dispatched, and connected with the spot system to provide reasonable and reliable boundary conditions for the spot system, reduce the risks brought by the uncertainty of power grid operation, and realize the coordinated optimization and safety verification of source, grid, load and storage resources.

[0105] In addition, in some embodiments, the source-grid-load-storage intelligent dispatching system can also serve as an emergency dispatching system for the spot system. That is, when the spot system is abnormal, the dispatching model and boundary conditions of the spot system are obtained, and the spot market is dispatched instead of the spot system.

[0106] Specifically, the intelligent dispatching system for source, grid, load and storage in uncertain scenarios can uniformly optimize the source, grid, load and storage resources. The optimization target can be set to the same economically optimal target as the spot system according to demand, access the model and boundary of the spot technical system, and perform optimization calculations without considering the uncertainty of source and load. It can plan and configure market resources and can be used as an emergency backup system for the spot system. In the event of spot system failure, shutdown, maintenance, etc., the intelligent dispatching system for source, grid, load and storage in uncertain scenarios can be used to optimize and calculate all resources to obtain a complete unit dispatch plan and market unit bid information, including energy storage control plan, new energy output plan, load control plan, operation standby plan, market unit output plan, market unit bid electricity price, etc., and the output plan obtained by real-time risk dispatch calculation is sent directly to the AGC (automatic generation control) system to support the normal development of the spot market.

[0107] In addition, the intelligent dispatching system of source, grid, load and storage can also realize the optimization simulation of spot transactions taking into account the uncertainty of source and load. Specifically, in the calculation of the current spot market technical support system, most of the new energy output still adopts a fixed output method, and the prediction deviation of new energy is the main consideration for the backup setting when calculating the power market. With the continuous construction of the spot market, the uncertainty of new energy output and the uncertainty of the load side will also be gradually considered in the optimization of spot transactions. Under uncertain scenarios, the intelligent dispatching system of source, grid, load and storage can realize the market clearing calculation considering the uncertainty of source and load, and can use the risk dispatching system to realize the simulation analysis of spot transaction clearing considering the uncertainty of source and load, and compare its results with the clearing results of the existing spot system that does not consider uncertainty, so as to provide support for the subsequent upgrade of the spot trading system.

[0108] In addition, the embodiment of the present application provides a source-grid-load-storage intelligent scheduling optimization system taking into account source-load uncertainty. Figure 6 As shown, the system includes:

[0109] The data acquisition module 61 is used to acquire the model data and operation boundary data of the source-grid-load-storage device; the operation boundary data includes declaration data, forecast data, plan data and constraint data;

[0110] A scenario construction module 62 is used to mine probability rules based on historical forecast data and historical actual data of source-load output conditions, and to construct multiple source-load output forecast scenarios based on the mining results;

[0111] The scheduling module 63 is used to construct an optimized scheduling model with the goal of minimizing the scheduling cost, and solve the optimized scheduling model based on the model data and the operation boundary data in the day-ahead or in real time to obtain a scheduling result under the corresponding prediction scenario;

[0112] The sending module 64 is used to send the scheduling result to the spot system to provide boundary conditions for the spot system.

[0113] Among them, regarding the specific implementation methods of each module of the above-mentioned source-grid-load-storage intelligent scheduling optimization system taking into account source-load uncertainty, reference can be made to the corresponding contents in the aforementioned method embodiments, which will not be repeated here.

[0114] It can be understood that the same or similar parts of the above embodiments can be referenced to each other, and the contents not described in detail in some embodiments can refer to the same or similar contents in other embodiments.

[0115] It should be noted that, in the description of the present invention, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of the present invention, unless otherwise specified, the meaning of "plurality" refers to at least two.

[0116] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by those skilled in the art to which the embodiments of the present invention belong.

[0117] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0118] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium. When the program is executed, it includes one or a combination of the steps of the method embodiment.

[0119] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium. The above-mentioned storage medium may be a read-only memory, a disk or an optical disk, etc.

[0120] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0121] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A source-grid-load-storage intelligent dispatch optimization method taking into account source-load uncertainty, characterized in that: Applied to the source-grid-load-storage intelligent dispatching system, the method includes: Obtaining model data and operation boundary data of source-grid-load-storage equipment; the operation boundary data includes declaration data, forecast data, plan data and constraint data; Probabilistic law mining is performed based on historical forecast data and historical actual data of source-load output, and multiple source-load output forecasting scenarios are constructed based on the mining results; An optimization scheduling model is constructed with the goal of minimizing the scheduling cost, and the optimization scheduling model is solved in day-ahead or in real time based on the model data and the operation boundary data to obtain a scheduling result under a corresponding prediction scenario; The scheduling result is sent to the spot system to provide boundary conditions for the spot system.

2. The method according to claim 1, characterized in that: The model data of source-grid-load-storage equipment includes: Generator set / unit group model, set model, energy storage equipment model, adjustable load model, bus load model, tie line / tie line group model, substation model, electrical bus model, line model, transformer / transformer winding model.

3. The method according to claim 1, characterized in that The historical forecast data and historical actual data based on the source-load output are used to mine probability rules, and multiple source-load output forecast scenarios are constructed based on the mining results, including: Based on the historical new energy forecast output data, meteorological forecast data and actual meteorological data, probability law mining is carried out, and based on the new energy short-term / ultra-short-term forecast output data on the forecast day, the short-term / ultra-short-term output interval probability information of each new energy station is obtained, and various new energy output scenarios are obtained based on the probability information sampling; In addition, based on the historical system load forecast data and the actual system load data, probability law mining is carried out, and based on the short-term / ultra-short-term forecast data of the system load on the forecast day, the short-term / ultra-short-term interval probability information of the system load is obtained, and various system load forecast scenarios are obtained based on probability information sampling.

4. The method according to claim 1, characterized in that: The formula of the optimization scheduling model is expressed as: Where t is the time period number, T is the total number of time periods considered; N is the total number of generator sets; C i,t (P i,t ) is a multi-segment linear function related to each output range and operating cost for adjusting the operating cost of various directly controlled resources such as energy storage and power supply; is the startup cost of conventional power supply; h is the cluster resource number, and H is the number of cluster resources; is the operating cost of cluster resource h in time period t, which is a multi-segment linear function related to each output interval and operating cost; M represents the network power flow constraint relaxation penalty factor used for optimization calculation; are the forward and reverse power flow relaxation variables of line l respectively; NL is the total number of lines; are the positive and negative flow relaxation variables of section s respectively; NS is the total number of sections.

5. The method according to claim 4, characterized in that The constraints for solving the optimization scheduling model include: System load balancing constraints: Where, T j,t represents the planned power of tie line j in time period t (input is positive, output is negative), NT is the total number of tie lines, P Load,t is the total load of the system in period t; System positive and negative standby constraints: In the formula, is the maximum and minimum output of thermal power unit i; is the start and stop status of thermal power unit i in time period t; is the system positive spare capacity requirement for period t, is the negative reserve capacity requirement of the system during time period t; Unit output upper and lower limit constraints: Where: is the maximum output of wind turbine j and photovoltaic unit k; Energy storage resource operation constraints: In the formula, E b,t is the state of charge of the energy storage system; is the energy storage charging and discharging power, is the charging and discharging efficiency of the energy storage system; E b,l , are the initial and final values ​​(expected values) of the energy storage system; is the charging and discharging state of energy storage, taking the value of 1 or 0; is the maximum charging and discharging power of the energy storage system; The minimum and maximum state of charge allowed for energy storage during dispatch; Aggregate resource cluster operation constraints: Where M + 、M - Adjust the total number of cost curve segments up or down for a resource cluster; For the resource cluster in the mth + 、m - The upward and downward adjustment of power in the upward and downward adjustment output range must meet the maximum upward and downward adjustment capacity range constraints.

6. The method according to claim 1, characterized in that The source-grid-load-storage intelligent dispatching system is operated before the day-ahead market, and the dispatching results obtained provide spot boundary conditions for the spot system, including: energy storage control plan, new energy output plan, load control plan, operation reserve plan, and upper and lower limits of market unit output; In addition, the source-grid-load-storage intelligent dispatching system runs in real time, updates the dispatching results and amends the day-ahead planning strategy to provide boundary conditions for the real-time spot market.

7. The method according to claim 1, characterized in that Also includes: When the spot system is abnormal, the scheduling model and boundary conditions of the spot system are obtained, and the spot market is scheduled and operated instead of the spot system.

8. A source-grid-load-storage intelligent dispatch optimization system taking into account source-load uncertainty, characterized in that: include: A data acquisition module is used to acquire model data and operation boundary data of source-grid-load-storage equipment; the operation boundary data includes declaration data, forecast data, plan data and constraint data; The scenario construction module is used to mine probability rules based on historical forecast data and historical actual data of source-load output, and to construct forecast scenarios of various source-load outputs based on the mining results; A scheduling module, used to construct an optimized scheduling model with the goal of minimizing scheduling costs, and solve the optimized scheduling model based on the model data and the operation boundary data in the day-ahead or in real time to obtain a scheduling result under a corresponding prediction scenario; The sending module is used to send the scheduling result to the spot system to provide boundary conditions for the spot system.

Citation Information

Cited By

  • Market clearing model construction method considering source load uncertainty

    CN119648468A

  • A Method for Constructing a Market Clearing Model Considering Source Load Uncertainty

    CN119648468B

  • Two-dimensional uncertainty modeling method and system based on random process and deep learning

    CN121169623A

  • Dual-dimensional uncertainty modeling method and system based on stochastic processes and deep learning

    CN121169623B

  • Power system multi-time scale probability scheduling method based on joint opportunity constraint

    CN121529836A