Testing system for sprinkler equipment accessories and working method thereof

By designing a test system for sprinkler and spraying equipment, the automatic docking and spraying test of the nozzle head is achieved using the lifting and rotating disks, the problem of low automation in the prior art is solved and the testing efficiency and accuracy are improved.

CN118837091BActive Publication Date: 2024-12-06CHANGZHOU SUNAN ENVIRONMENT PROTECTION EQUIP CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411282924.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-12-06
Estimated Expiration
2044-09-13

AI Technical Summary

Technical Problem

The existing sprinkler spraying equipment needs to be manually installed when replacing the nozzle, which is low in automation, time-consuming and labor-intensive, and affects the testing efficiency.

Method used

A test system for sprinkler equipment accessories is designed, including a roof plate, a screw portion, a support seat, a water injection pipe and a collection barrel, which contacts the locking thread of the nozzle head through the lifting and rotary disk drive locking sleeve. and tighten to realize automatic docking and spraying test of nozzle heads, use flowmeter to detect spraying volume, and empty the water in the test chamber through a conical rubber plug to achieve automated testing.

Benefits of technology

Automatic docking and spraying test of nozzle heads is realized, working efficiency is improved, manual manual operation is reduced, and the accuracy and efficiency of the test is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118837091B_ABST
    Figure CN118837091B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of sprinkler spraying, and in particular to a test system for sprinkler spraying equipment accessories and a working method thereof, comprising a top plate, a tightening part, a support seat, a water injection pipe and a collecting bucket, the tightening part is arranged on the lower side of the top plate, the lower end of the top plate is fixedly connected to a plurality of connecting rods, the lower ends of the connecting rods are fixedly connected to a workbench, the support seat is arranged on the upper side of the workbench, and the collecting bucket is arranged on the inner side of the workbench; the support seat is used to fix a nozzle head, and a locking thread is arranged on the upper side of the nozzle head; the tightening part comprises a locking sleeve, the inner side of the locking sleeve is provided with an internal thread, the locking sleeve is adapted to the locking thread, the water injection pipe extends into the locking sleeve, the upper end of the locking sleeve is fixedly connected to a lifting disk, and the upper end of the lifting disk is provided with a rotating disk. The present invention realizes the automatic testing function conveniently and efficiently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of sprinkler technology, and in particular to a test system for sprinkler equipment accessories and a working method thereof. Background Art

[0002] Environmental protection equipment refers to mechanical products, structures and systems manufactured and built by production units or construction installation units for controlling environmental pollution and improving environmental quality. It also refers to mechanical processing products for controlling environmental pollution, such as dust collectors, welding fume purifiers, single water treatment equipment, noise controllers, etc. Among them, water sprinkler equipment is the most common dust removal equipment. In the production and manufacturing process of water sprinkler equipment, it is extremely important to ensure the spray flow rate of the nozzle, which greatly affects the dust removal efficiency.

[0003] A multifunctional test device for fire sprinklers is disclosed in the existing patent publication number CN112098057A, which includes a water supply pressure regulating component, a monitoring component, a sprinkler component, a spray test component and a wind resistance test component; the water supply pressure regulating component, the monitoring component and the sprinkler component are connected in sequence, the sprinkler component is connected to the spray test component, and the sprinkler component is connected to the wind resistance test component.

[0004] The above technical solution uses a water supply and pressure regulating component to provide the water flow used in the nozzle testing process and adjust the water pressure, and a monitoring component to provide real-time monitoring of the fluid in the nozzle and display the water pressure of the water flow under different pressures. However, when the tested nozzle needs to be replaced, manual operation and installation are still required, which has a low degree of automation and is time-consuming and labor-intensive.

[0005] Therefore, it is necessary to provide a test system for sprinkler equipment accessories and a working method thereof, which can achieve the effect of automatic testing. Summary of the invention

[0006] The object of the present invention is to provide a testing system for sprinkler equipment accessories and a working method thereof to solve the problems raised in the above background technology.

[0007] In order to solve the above technical problems, the present invention provides the following technical solutions: a testing system for sprinkler equipment accessories and a working method thereof, comprising a top plate, a tightening part, a support seat, a water injection pipe and a collection bucket,

[0008] The tightening part is arranged on the lower side of the top plate, a plurality of connecting rods are fixedly connected to the lower end of the top plate, a workbench is fixedly connected to the lower end of the connecting rods, the support seat is arranged on the upper side of the workbench, and the collection bucket is arranged on the inner side of the workbench;

[0009] The support seat is used to fix the nozzle head, and a locking thread is provided on the upper side of the nozzle head;

[0010] The tightening part includes a locking sleeve, an inner side of the locking sleeve is provided with an internal thread, the locking sleeve is adapted to the locking thread, the water injection pipe extends into the locking sleeve, the upper end of the locking sleeve is fixedly connected with a lifting plate, the upper end of the lifting plate is provided with a rotating plate, and the rotating plate and the lifting plate simultaneously drive the locking sleeve to be tightened on the nozzle head;

[0011] A test chamber is arranged inside the collecting barrel, the lower end of the supporting seat is connected with the test chamber, a flow meter is arranged inside the test chamber, a conical water outlet is opened at the lower end of the test chamber, and a conical rubber plug is arranged at the upper end of the conical water outlet.

[0012] In one embodiment, the support seat includes a support plate, which is fixed to the upper side of the workbench. A fixing ring is fixedly connected to the upper end of the support plate. A support disk is arranged on the inner side of the fixing ring. A plurality of opening grooves are provided on the upper side of the support disk. A limiting rod is slidably fitted in the opening groove. A contraction spring is arranged between the opening groove and the limiting rod. A limiting hole is provided on the middle side of the support disk, and the limiting hole is adapted to the nozzle head.

[0013] In one embodiment, the support plate is slidably matched with the fixing ring, and a baffle is fixedly connected to the bottom of the fixing ring. A through hole is provided on the middle side of the baffle, and the through hole is matched with the nozzle head. A spring member is provided between the baffle and the support plate, and one end of the limit rod is fixedly connected to a cross bar, and the cross bar passes through the support plate and slidably matches with the cross bar. A round chamfer is provided at one end of the cross bar, and a plurality of oblique grooves are provided on the upper end of the fixing ring, and the oblique grooves are matched with the cross bar.

[0014] In one embodiment, a plurality of guide rods are fixedly connected to the lower end of the support plate. The guide rods penetrate the baffle plate and slideably cooperate with the baffle plate. The lower ends of the guide rods are fixedly connected to the conical rubber plugs.

[0015] In one embodiment, the lower end of the top plate is fixedly connected to a fixed sleeve, the rotating disk is arranged on the inner side of the fixed sleeve, a plurality of guide columns are passed through and slidably fitted in the rotating disk, the lower end of the guide column is fixedly connected to the lifting disk, the upper end of the lifting disk is fixedly connected to a nut cylinder, an adaptation hole for the movement of the nut cylinder is provided on the middle side of the rotating disk, the upper end of the nut cylinder is threadedly connected to a power rod, the upper end of the power rod is rotatably connected to the fixed sleeve, the water injection pipe passes through the power rod and is clearance-fitted with the power rod, a gear 1 is provided on the lower side of the top plate, one side of the gear 1 is meshedly connected with a gear 2, the gear 2 is driven to rotate by the motor assembly, and the lower end of the gear 1 is fixedly connected to the power rod.

[0016] In one embodiment, an outer side of the rotating disk is provided with an external thread, an inner side of the fixing sleeve is provided with an internal thread, and the rotating disk is threadedly connected to the fixing sleeve.

[0017] In one embodiment, a retaining ring is fixedly connected to the upper ends of several guide columns, and a plurality of L-shaped clips are arranged on the outer side of the fixed sleeve. The vertical surface of the L-shaped clip is adapted to the fixed sleeve and a spring retraction rod is arranged between the two. The lower end of the L-shaped clip passes through the fixed sleeve and slides with it. The lower end of the L-shaped clip extends to the inner side of the fixed sleeve and supports the rotating disk.

[0018] In one embodiment, the upper end of the retaining ring is rotatably connected to a lifting ring, and the outer end of the lifting ring is fixedly connected to a trapezoidal wedge block 1. A plurality of vertical grooves are opened on the outer side of the fixed sleeve, and the vertical grooves are slidably matched with the trapezoidal wedge block 1. The vertical grooves extend to the lower end of the L-shaped clamping plate, and the upper end of the L-shaped clamping plate is fixedly connected to a trapezoidal wedge block 2, and the trapezoidal wedge block 2 is matched with the vertical grooves. The trapezoidal wedge block 2 is matched with the trapezoidal wedge block 1. When the lower end face of the retaining ring contacts the upper end face of the rotating disk, the L-shaped clamping plate releases its support for the rotating disk.

[0019] In one embodiment, the retaining ring is made of magnetic metal, and a magnet block is disposed on the inner side of the rotating disk.

[0020] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention drives the locking sleeve to descend through the lifting plate, so as to contact the locking threaded end of the nozzle head; then the lifting plate and the locking sleeve are driven to rotate through the rotating plate, so that the locking sleeve and the nozzle head are tightened with each other, so as to ensure the sealing during the test after water injection, and then water is injected into the locking sleeve through the water injection pipe, so that the nozzle head performs a spray test into the test chamber; by using a flow meter to detect the spraying amount of the nozzle head within a certain period of time, and comparing it with the standard value, it is determined whether the water output is qualified, and the test operation can be completed; after the test is completed, the lifting plate and the rotating plate are reset, that is, the rotating plate rotates in the opposite direction, and the nozzle head is released, and the staff can remove it and replace the next one, and then the conical rubber plug rises, opens the conical water outlet, and the water in the test chamber falls into the collection bucket, the water in the test chamber is emptied, and then the conical rubber plug blocks the conical water outlet again, which is convenient for the next nozzle head to be tested, and the accuracy of the test is ensured, and the function of automatic docking and spraying test of the nozzle head is realized, and manual tightening and installation is not required, which greatly improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The technical solution and other beneficial effects of the present application will be made apparent by describing in detail the specific implementation methods of the present application in conjunction with the accompanying drawings.

[0022] In the attached picture:

[0023] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0024] Figure 2 is a front cross-sectional schematic diagram of the present invention;

[0025] Figure 3 is a three-dimensional schematic diagram of the support base of the present invention;

[0026] Figure 4 is a side cross-sectional schematic diagram of the present invention;

[0027] Figure 5 yes Figure 4 A local enlarged schematic diagram of area B;

[0028] Figure 6 is a schematic diagram of the interior of the fixed sleeve of the present invention;

[0029] Figure 7 yes Figure 4 A local enlarged schematic diagram of region A;

[0030] Figure 8 It is a three-dimensional schematic diagram of an L-shaped card board of the present invention;

[0031] In the figure: 1, tightening part; 101, locking sleeve; 102, lifting plate; 103, rotating plate; 104, fixed sleeve; 105, guide column; 106, nut cylinder; 107, power rod; 108, retaining ring; 109, lifting ring; 110, trapezoidal wedge block 1; 111, trapezoidal wedge block 2;

[0032] 2. Support seat; 201. Support plate; 202. Fixing ring; 203. Support plate; 204. Opening slot; 205. Limit rod; 206. Cross bar; 207. Stop plate; 208. Oblique slot;

[0033] 3. L-shaped pallet;

[0034] 4. Test chamber; 401. Conical rubber plug; 402. Conical water outlet; 403. Guide rod;

[0035] 5. Water injection pipe; 501. Gear 1; 502. Gear 2;

[0036] 6. Nozzle head;

[0037] 7. Top plate;

[0038] 8. Workbench; 801. Collection bucket;

[0039] 9. Stop block. DETAILED DESCRIPTION

[0040] The disclosure below provides many different embodiments or examples to realize the different structures of the present application. In order to simplify the disclosure of the present application, the parts and settings of specific examples are described below. Of course, they are only examples, and the purpose is not to limit the present application. In addition, the present application can repeat reference numbers and / or reference letters in different examples, and this repetition is for the purpose of simplification and clarity, which itself does not indicate the relationship between the various embodiments and / or settings discussed. In addition, the various specific processes and material examples provided by the present application, but those of ordinary skill in the art can appreciate the application of other processes and / or the use of other materials.

[0041] See also Figure 1-8 The present invention provides a technical solution: a testing system for sprinkler equipment accessories and a working method thereof, comprising a top plate 7, a tightening portion 1, a support seat 2, a water injection pipe 5 and a collection barrel 801,

[0042] The tightening part 1 is arranged on the lower side of the top plate 7, the lower end of the top plate 7 is fixedly connected with a plurality of connecting rods, the lower end of the connecting rods is fixedly connected with a workbench 8, the support seat 2 is arranged on the upper side of the workbench 8, and the collecting bucket 801 is arranged on the inner side of the workbench 8;

[0043] The support seat 2 is used to fix the nozzle head 6, and a locking thread is provided on the upper side of the nozzle head 6;

[0044] The tightening part 1 includes a locking sleeve 101, the inner side of which is provided with an internal thread, the locking sleeve 101 is adapted to the locking thread, the water injection pipe 5 extends into the locking sleeve 101, the upper end of the locking sleeve 101 is fixedly connected with a lifting plate 102, the upper end of the lifting plate 102 is provided with a rotating plate 103, and the rotating plate 103 and the lifting plate 102 simultaneously drive the locking sleeve 101 to be tightened on the nozzle head 6;

[0045] A test chamber 4 is provided inside the collecting barrel 801, the lower end of the support seat 2 is connected to the test chamber 4, a flow meter is provided inside the test chamber 4, a conical water outlet 402 is provided at the lower end of the test chamber 4, and a conical rubber plug 401 is provided at the upper end of the conical water outlet 402.

[0046] First, the nozzle head 6 to be tested is manually placed on the support seat 2, and the water outlet is ensured to be at the bottom and the locking thread is facing upward; the locking sleeve 101 is driven down by the lifting plate 102, so as to contact the locking thread end of the nozzle head 6; then the lifting plate 102 and the locking sleeve 101 are driven to rotate by the rotating plate 103, so that the locking sleeve 101 and the nozzle head 6 are tightened to each other, so as to ensure the sealing during the test after water injection, and then water is injected into the locking sleeve 101 through the water injection pipe 5, so that the nozzle head 6 is sprayed into the test chamber 4 for testing; the spraying amount of the nozzle head 6 within a certain period of time is detected by using a flow meter, and compared with the standard value, so as to judge After the test is completed, the lifting plate 102 and the rotating plate 103 are reset, that is, the rotating plate 103 rotates in the opposite direction, and the nozzle head 6 is loosened, and the staff can remove it and replace it with the next one. Then the conical rubber plug 401 rises, and the conical water outlet 402 is opened. The water in the test chamber 4 falls into the collection bucket 801, and the water in the test chamber 4 is emptied. Then the conical rubber plug 401 blocks the conical water outlet 402 again, which is convenient for the next nozzle head 6 to be tested, ensuring the accuracy of the test, and realizing the function of automatic docking and spraying test of the nozzle head 6. There is no need for manual tightening and installation, which greatly improves the work efficiency.

[0047] Preferably, a phase Doppler velocimeter and a particle size analyzer can be similarly provided in the test chamber 4 to collect the particle velocity and particle size of the spray when the nozzle head 6 is sprayed, so as to improve the comprehensiveness of the test. The phase Doppler velocimeter and the particle size analyzer are both existing technologies in this field, so they will not be described in detail here.

[0048] The support seat 2 includes a support plate 201, which is fixed on the upper side of the workbench 8. A fixing ring 202 is fixedly connected to the upper end of the support plate 201. A support disk 203 is arranged on the inner side of the fixing ring 202. A plurality of opening grooves 204 are provided on the upper side of the support disk 203. A limiting rod 205 is slidingly fitted in the opening groove 204. A contraction spring is arranged between the opening groove 204 and the limiting rod 205. A limiting hole is provided on the middle side of the support disk 203, and the limiting hole is adapted to the nozzle head 6.

[0049] Preferably, when loading materials, the staff first puts the water outlet of the nozzle head 6 into the limiting hole on the support plate 203, and the limiting hole clamps the nozzle head 6, and then moves along the opening groove 204 through the limiting rod 205, and a plurality of limiting rods 205 are combined with each other, so as to clamp and fix the nozzle head 6, so that it can keep itself stable when tightened with the locking sleeve 101, thereby improving stability;

[0050] A contraction spring is provided so that the plurality of limit rods 205 are separated from each other in the initial state, which is convenient for placing the nozzle head 6 and for automatically resetting the limit rods 205 after clamping.

[0051] The support plate 203 is slidably matched with the fixed ring 202, and a baffle plate 207 is fixedly connected to the bottom of the fixed ring 202. A through hole is opened on the middle side of the baffle plate 207, and the through hole is adapted to the nozzle head 6. A spring member is arranged between the baffle plate 207 and the support plate 203. One end of the limiting rod 205 is fixedly connected to a cross bar 206, and the cross bar 206 passes through the support plate 203 and slidably matches therewith. A round chamfer is opened at one end of the cross bar 206, and a plurality of inclined grooves 208 are opened on the upper end of the fixed ring 202, and the inclined grooves 208 are adapted to the cross bar 206.

[0052] Preferably, an inclined groove 208 and a cross bar 206 are provided. When the lifting plate 102 drives the locking sleeve 101 to descend, the locking sleeve 101 contacts with the nozzle head 6 and presses it down. The nozzle head 6 pushes the support plate 203 to descend, so that the rounded chamfered end of the cross bar 206 moves along the inclined groove 208, so that the cross bar 206 drives the limiting rod 205 to move inward until the support plate 203 contacts with the baffle plate 207. Then, a plurality of limiting rods 205 can clamp the nozzle head 6 without the need for additional driving components. By moving the locking sleeve 101 downward to dock with the nozzle head 6, the limiting rod 205 is driven to complete the clamping work, which is highly practical.

[0053] A plurality of guide rods 403 are fixedly connected to the lower end of the support plate 203 . The guide rods 403 penetrate through the baffle plate 207 and slideably cooperate with it. The lower ends of the guide rods 403 are fixedly connected to the conical rubber plug 401 .

[0054] Preferably, when the support plate 203 is in the initial state, under the action of the spring member, the upper end surface of the support plate 203 is flush with the upper end of the fixing ring 202, and the conical rubber plug 401 is separated from the conical water outlet 402, so as to facilitate the emptying of the water in the test chamber 4. When a test is required, the support plate 203 is pressed down, and the limiting rod 205 fixes the nozzle head 6 while the conical rubber plug 401 also blocks the conical water outlet 402. Then the test can be started, so that the sprayed water is stored in the test chamber 4, which is convenient for detecting the water spraying amount. The nozzle head 6 is fixed while the conical water outlet 402 is blocked, and the preparation work is completed synchronously, so that the test can be started directly, with a high degree of automation and improved efficiency. When the test is completed, the support plate 203 is reset, so that the limiting rod 205 is reset to release the nozzle head 6, and the conical rubber plug 401 automatically opens the conical water outlet 402, which is convenient for drainage and prepares for the next test.

[0055] The lower end of the top plate 7 is fixedly connected with a fixed sleeve 104, and the rotating disk 103 is arranged on the inner side of the fixed sleeve 104. A plurality of guide columns 105 are penetrated and slidably matched in the rotating disk 103. The lower end of the guide column 105 is fixedly connected with the lifting disk 102, and the upper end of the lifting disk 102 is fixedly connected with a nut cylinder 106. An adaptation hole for the movement of the nut cylinder 106 is provided on the middle side of the rotating disk 103. The upper end of the nut cylinder 106 is threadedly connected with a power rod 107, and the upper end of the power rod 107 is rotatably connected with the fixed sleeve 104. The water injection pipe 5 penetrates the power rod 107 and is clearance-matched with it. A gear 1 501 is arranged on the lower side of the top plate 7, and one side of the gear 1 501 is meshedly connected with a gear 2 502. The gear 2 502 is driven to rotate by the motor assembly, and the lower end of the gear 1 501 is fixedly connected with the power rod 107.

[0056] Preferably, the motor assembly drives the second gear 502 to rotate, and the second gear 502 drives the first gear 501 and the power rod 107 to rotate. Under the guidance of the guide column 105, the power rod 107 drives the nut barrel 106 to move through the threaded connection, and the nut barrel 106 can drive the lifting plate 102 and the locking sleeve 101 to rise and fall, and then the guide column 105, the lifting plate 102 and the locking sleeve 101 are driven to rotate through the rotating plate 103, so that the locking sleeve 101 and the nozzle head 6 can be locked with each other;

[0057] Preferably, the water injection pipe 5 is configured as a hose to adapt to the lifting and lowering displacement of the locking sleeve 101 .

[0058] An outer side of the rotating disk 103 is provided with an external thread, an inner side of the fixing sleeve 104 is provided with an internal thread, and the rotating disk 103 and the fixing sleeve 104 are threadedly connected.

[0059] Preferably, since the locking sleeve 101 and the nozzle head 6 are threadedly connected, the rotating disk 103 needs to move downward while rotating. Therefore, a threaded connection is set between the rotating disk 103 and the fixed sleeve 104. When the rotating disk 103 rotates, it rotates and moves downward along the internal thread on the inner side of the fixed sleeve 104, and synchronously drives the lifting disk 102 and the locking sleeve 101 to rotate and descend, so that the locking sleeve 101 and the nozzle head 6 are tightened with each other, which is more convenient.

[0060] A retaining ring 108 is fixedly connected to the upper ends of several guide columns 105, and a plurality of L-shaped clamping plates 3 are arranged on the outer side of the fixed sleeve 104. The vertical surface of the L-shaped clamping plate 3 is adapted to the fixed sleeve 104 and a spring retraction rod is arranged between the two. The lower end of the L-shaped clamping plate 3 passes through the fixed sleeve 104 and slides with it. The lower end of the L-shaped clamping plate 3 extends to the inner side of the fixed sleeve 104 and supports the rotating disk 103.

[0061] Preferably, an L-shaped card plate 3 is provided to extend to the inner side of the fixed sleeve 104, so as to support and limit the rotating disk 103 to ensure that it does not fall. Specifically, when the power rod 107 rotates, the nut cylinder 106, the lifting disk 102 and the locking sleeve 101 are driven downward by the threaded connection. At this time, the rotating disk 103 is limited by the L-shaped card plate 3 and remains motionless until the locking sleeve 101 contacts the nozzle head 6 and presses it down. The supporting disk 203 moves downward until it contacts the baffle plate 207, so that the nozzle head 6 can be clamped by the plurality of limiting rods 205. At the same time, the baffle ring 108 also descends to contact the rotating disk 103, so that the lifting disk 102 can no longer descend. At this time, the plurality of L-shaped card plates 3 are relatively separated, so that the rotating disk 103 loses its support. At this time, if it continues to rotate Turn the power rod 107. Since the lifting plate 102 cannot continue to descend, the power rod 107 can only rotate together with the nut tube 106, that is, the power rod 107 transmits torque to drive the nut tube 106, the lifting plate 102, the guide column 105 and the rotating plate 103 to rotate synchronously. The rotating plate 103 is threadedly connected to the fixed sleeve 104, so that the rotating plate 103 rotates and moves downward along the thread, and the locking sleeve 101 can be gradually tightened on the nozzle head 6, and the spraying test can be started. In other words, only by driving the power rod 107, the lifting plate 102 can be lowered first, docked with the nozzle head 6 and pushed to complete its own fixation, and then the rotating plate 103 is driven to rotate and move downward along the thread to complete the locking with the nozzle head 6. The degree of automation is high, and rapid docking with the nozzle head 6 can be achieved.

[0062] The upper end of the retaining ring 108 is rotatably connected to a lifting ring 109, and the outer end of the lifting ring 109 is fixedly connected to a trapezoidal wedge block 110. A plurality of vertical grooves are provided on the outer side of the fixed sleeve 104, and the vertical grooves are slidably matched with the trapezoidal wedge block 110. The vertical grooves extend to the lower end of the L-shaped clamping plate 3, and the upper end of the L-shaped clamping plate 3 is fixedly connected to a trapezoidal wedge block 2 111, and the trapezoidal wedge block 2 111 is matched with the vertical grooves, and the trapezoidal wedge block 2 111 is matched with the trapezoidal wedge block 110. When the lower end face of the retaining ring 108 contacts the upper end face of the rotating disk 103, the L-shaped clamping plate 3 releases its support for the rotating disk 103.

[0063] Preferably, when the power rod 107 drives the lifting plate 102 to move downward, the retaining ring 108 drives the lifting ring 109 to move downward synchronously, and a trapezoidal wedge 110 is arranged on the outer side of the lifting ring 109, which slides along the vertical groove until the trapezoidal wedge 110 contacts the trapezoidal wedge 2 111, and the trapezoidal wedge 2 111 is pushed along the inclined surface, thereby pushing the L-shaped card plate 3 outward until the retaining ring 108 contacts the rotating disk 103. At this time, the L-shaped card plate 3 is also completely separated from the rotating disk 103, and the supporting state is released. The rotating disk 103 can directly rotate and move downward to complete the docking with the nozzle head 6. Automatic control can be achieved without the need for an additional driving component to drive the L-shaped card plate 3, thereby saving costs.

[0064] Preferably, in order to prevent the trapezoidal wedge 110 from interfering with the L-shaped card plate 3 when the rotating disk 103 rotates and moves downward, an opening (such as Figure 8 As shown), the trapezoidal wedge 110 can pass through easily without interfering with the L-shaped card plate 3.

[0065] The retaining ring 108 is made of magnetic metal, and a magnet block is arranged on the inner side of the rotating disk 103 .

[0066] Preferably, a plurality of stoppers 9 (such as Figure 2 As shown), and a receiving opening is provided on the lifting ring 109 to facilitate the lifting ring 109 to pass through the stopper 9, and the stopper 9 is used to limit the highest height position of the rotating disk 103;

[0067] When the test is completed and needs to be reset, it is necessary to first drive the rotating disk 103 to reverse, thereby separating it from the nozzle head 6, and then drive the lifting disk 102 to rise and reset. However, when the power rod 107 reverses, since the rotating disk 103 can also rotate in the opposite direction, it is impossible to determine whether the power rod 107 reverses to drive the rotating disk 103 to reverse or the nut tube 106 to rise. This will cause the locking sleeve 101 to not separate from the nozzle head 6, and the lifting disk 102 will drive the nozzle head 6 to rise, and normal unloading cannot be achieved. Therefore, a magnet block is provided. When the retaining ring 108 contacts the rotating disk 103, the two are attracted to each other, and there is an adsorption force. When resetting, the power rod 107 reverses, and the lifting plate 102 cannot move relative to the rotating plate 103, that is, the power rod 107 cannot rotate relative to the nut tube 106, so that the power rod 107 drives the nut tube 106 to rotate synchronously, and the rotating plate 103 can be driven to reverse first, so that the locking sleeve 101 is separated from the nozzle head 6, and the rotating plate 103 rises to its original position and contacts with the block 9, so that it cannot continue to move up and rotate. At this time, the power rod 107 continues to reverse, and when the torque force is greater than the magnetic adsorption force, the retaining ring 108 can be separated from the rotating plate 103, and the lifting plate 102 rises and resets, which is highly practical.

[0068] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or mutual communication; it can be a direct connection, internal communication between two elements, or an interaction relationship between two elements. For ordinary technicians in this field, the meanings of the above terms in this application can be understood according to specific circumstances.

[0069] The above is a detailed introduction to the test system for sprinkler equipment accessories and its working method provided in the embodiments of the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the technical solution and its core idea of ​​the present application. Ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some of the technical features therein with equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present application.

Claims

1. A test system for sprinkler equipment accessories, comprising a top plate (7), a tightening portion (1), a support seat (2), a water injection pipe (5) and a collection bucket (801), Features: The tightening portion (1) is arranged on the lower side of the top plate (7), the lower end of the top plate (7) is fixedly connected to a plurality of connecting rods, the lower ends of the connecting rods are fixedly connected to a workbench (8), the support seat (2) is arranged on the upper side of the workbench (8), and the collection bucket (801) is arranged on the inner side of the workbench (8); The support seat (2) is used to fix the nozzle head (6), and a locking thread is provided on the upper side of the nozzle head (6); The tightening portion (1) comprises a locking sleeve (101), the inner side of the locking sleeve (101) is provided with an internal thread, the locking sleeve (101) is adapted to the locking thread, the water injection pipe (5) extends into the locking sleeve (101), the upper end of the locking sleeve (101) is fixedly connected to a lifting plate (102), the upper end of the lifting plate (102) is provided with a rotating plate (103), and the rotating plate (103) and the lifting plate (102) simultaneously drive the locking sleeve (101) to be tightened on the nozzle head (6); A test chamber (4) is provided inside the collection barrel (801), the lower end of the support seat (2) is connected to the test chamber (4), a flow meter is provided inside the test chamber (4), a conical water outlet (402) is provided at the lower end of the test chamber (4), and a conical rubber plug (401) is provided at the upper end of the conical water outlet (402); The support seat (2) comprises a support plate (201), the support plate (201) is fixed to the upper side of the workbench (8), the upper end of the support plate (201) is fixedly connected to a fixing ring (202), a support disc (203) is arranged on the inner side of the fixing ring (202), a plurality of opening grooves (204) are provided on the upper side of the support disc (203), a limiting rod (205) is slidably fitted in the opening grooves (204), a contraction spring is arranged between the opening grooves (204) and the limiting rod (205), a limiting hole is provided on the middle side of the support disc (203), and the limiting hole is adapted to the nozzle head (6); The support plate (203) is slidably matched with the fixing ring (202); a baffle plate (207) is fixedly connected to the bottom of the fixing ring (202); a through hole is provided on the middle side of the baffle plate (207); the through hole is matched with the nozzle head (6); a spring member is provided between the baffle plate (207) and the support plate (203); one end of the limit rod (205) is fixedly connected with a cross bar (206); the cross bar (206) passes through the support plate (203) and is slidably matched with the cross bar; one end of the cross bar (206) is provided with a round chamfer; and a plurality of inclined grooves (208) are provided on the upper end of the fixing ring (202); the inclined grooves (208) are matched with the cross bar (206); A plurality of guide rods (403) are fixedly connected to the lower end of the support plate (203); the guide rods (403) penetrate the baffle plate (207) and are slidably matched therewith; and the lower ends of the guide rods (403) are fixedly connected to the conical rubber plug (401).

2. The test system for sprinkler equipment accessories according to claim 1, Features: The lower end of the top plate (7) is fixedly connected to a fixed sleeve (104), the rotating disk (103) is arranged on the inner side of the fixed sleeve (104), a plurality of guide columns (105) penetrate through and slidably fit in the rotating disk (103), the lower end of the guide column (105) is fixedly connected to the lifting disk (102), the upper end of the lifting disk (102) is fixedly connected to a nut cylinder (106), the middle side of the rotating disk (103) is provided with an adaptable hole for the nut cylinder (106) to move, and the nut cylinder (106) is fixedly connected to the lifting disk (102). The upper end of (106) is threadedly connected to a power rod (107), the upper end of the power rod (107) is rotatably connected to the fixed sleeve (104), the water injection pipe (5) passes through the power rod (107) and is clearance-matched with the power rod (107), a gear 1 (501) is provided on the lower side of the top plate (7), one side of the gear 1 (501) is meshingly connected to a gear 2 (502), the gear 2 (502) is driven to rotate by a motor assembly, and the lower end of the gear 1 (501) is fixedly connected to the power rod (107).

3. The test system for sprinkler equipment accessories according to claim 2, Features: The outer side of the rotating disk (103) is provided with an external thread, the inner side of the fixed sleeve (104) is provided with an internal thread, and the rotating disk (103) and the fixed sleeve (104) are threadedly connected.

4. The test system for sprinkler equipment accessories according to claim 3, Features: A retaining ring (108) is fixedly connected to the upper ends of the plurality of guide columns (105); a plurality of L-shaped clamping plates (3) are arranged on the outer side of the fixed sleeve (104); a vertical surface of the L-shaped clamping plate (3) is matched with the fixed sleeve (104) and a spring retractable rod is arranged between the two; the lower end of the L-shaped clamping plate (3) passes through the fixed sleeve (104) and is slidably matched therewith; the lower end of the L-shaped clamping plate (3) extends to the inner side of the fixed sleeve (104) and supports the rotating disk (103).

5. The test system for sprinkler equipment accessories according to claim 4, Features: The upper end of the retaining ring (108) is rotatably connected to a lifting ring (109), and the outer end of the lifting ring (109) is fixedly connected to a trapezoidal wedge block 1 (110). The outer side of the fixed sleeve (104) is provided with a plurality of vertical grooves, and the vertical grooves are slidably matched with the trapezoidal wedge block 1 (110). The vertical grooves extend to the lower end of the L-shaped clamping plate (3). The upper end of the L-shaped clamping plate (3) is fixedly connected to a trapezoidal wedge block 2 (111), and the trapezoidal wedge block 2 (111) is matched with the vertical grooves. The trapezoidal wedge block 2 (111) is matched with the trapezoidal wedge block 1 (110). When the lower end surface of the retaining ring (108) contacts the upper end surface of the rotating disk (103), the L-shaped clamping plate (3) releases its support for the rotating disk (103).

6. The test system for sprinkler equipment accessories according to claim 5, Features: The retaining ring (108) is made of magnetic metal, and a magnet block is arranged on the inner side of the rotating disk (103).

7. The working method of the testing system for sprinkler equipment accessories according to claim 1, Features The following steps are involved: S1. Manually place the nozzle head (6) to be tested on the support seat (2), and ensure that the water outlet is at the bottom and the locking thread is facing upward; S2, driving the locking sleeve (101) to descend via the lifting plate (102), thereby contacting the locking thread end of the nozzle head (6); S3, then driving the lifting plate (102) and the locking sleeve (101) to rotate via the rotating plate (103), so that the locking sleeve (101) and the nozzle head (6) are screwed together; S4, injecting water into the locking sleeve (101) through the water injection pipe (5), so that the nozzle head (6) performs a spray test into the test chamber (4); S5, using a flow meter to detect the spraying amount of the nozzle head (6) within a certain period of time, and comparing it with a standard value, so as to determine whether the water output is qualified; S6. After the test is completed, the conical rubber stopper (401) rises, opening the conical water outlet (402), and the water in the test chamber (4) falls into the collection bucket (801).

Citation Information

Patent Citations

  • Fire-fighting spray head multifunctional test device

    CN112098057A

  • Integrated liquid flow test device capable of automatically clamping nozzle

    CN114486213A

  • Fuel manifold flow comprehensive test device with nozzles

    CN115127790A