Park electricity purchase combination optimization method and device based on electricity, carbon and green certificate market coupling
By constructing an electricity-carbon green certificate coupling optimization model and combining the power market, carbon emission rights and green power certificate market, the complexity of power purchase decision-making caused by the randomness and volatility of new energy power generation has been solved, and a scientific power purchase strategy has been realized. safety and accuracy, meet environmental protection regulations and market requirements, and improve energy economic benefits.
Patent Information
- Application Number
- CN202410812365.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-25
AI Technical Summary
Existing technologies are deficient in handling the randomness and volatility of new energy power generation, resulting in increased power system operation complexity and management costs, and failure to fully utilize the market coupling effect, resulting in power purchase decisions that cannot effectively balance costs, environmental impacts and System stability, lack of scientificity and accuracy, and inability to meet increasingly stringent environmental regulations and market requirements.
The park power purchase portfolio optimization method based on the coupling of the electricity carbon green certificate market is adopted. By obtaining the power load forecast data, an electricity carbon green certificate coupling optimization model is constructed, combining the characteristics and rules of the electric energy market, the carbon emission rights market and the green electricity certificate market. , construct a power purchase portfolio model, take the minimization of power purchase cost or maximization of benefits as the objective function, and consider multi-dimensional constraints at the same time to formulate a power purchase strategy.
By comprehensively considering the costs and benefits of power purchase, operation and maintenance, energy storage, we can achieve a more accurate cost-benefit analysis, ensure the economic rationality of power purchase decisions, adapt to the randomness and volatility of new energy power generation, and promote low-carbon power supply. Maximize energy utilization, reduce energy waste, and improve energy economic benefits.
Smart Images

Figure CN118839802A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power resource allocation, and in particular to a method and device for optimizing a park power purchase combination based on the coupling of the electricity-carbon green certificate market. Background Art
[0002] There are deficiencies in dealing with the randomness and volatility of renewable energy generation, and existing technologies cause the complexity of power system operation and increase the cost of uncertainty management. Existing technologies may not fully utilize the market coupling effect, and lack a decision-making model that comprehensively considers the interaction between the electricity market, the carbon emission rights market, and the green electricity certificate market. This results in the purchase of electricity decisions that may fail to effectively balance costs, environmental impacts, and system stability. Existing technologies may not integrate carbon emission restrictions and green energy policy goals well, resulting in defects in achieving low-carbon environmental protection goals and failing to meet increasingly stringent environmental regulations and market requirements.
[0003] Existing technologies may not fully consider carbon emission limits and green energy policy goals, resulting in insufficient adaptability in low-carbon electricity supply. Existing power purchase decisions may rely on experience or simple rules, lack scientificity and precision, and cannot accurately reflect market dynamics and policy changes. Summary of the invention
[0004] The purpose of the present invention is to provide a method and device for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market to solve the above-mentioned technical problems.
[0005] To achieve the above objectives, this application provides the following technical solutions:
[0006] According to the first aspect of the present invention, the present invention claims a method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market, comprising:
[0007] S101. Obtain forecast data on the power load in the park, including at least analysis of historical power consumption data, taking into account seasonality, weekdays, weekends, holidays, and the expected impact of new or closed enterprises in the park;
[0008] S102. Construct an electricity-carbon-green certificate coupling optimization model, which includes the electricity purchase volume, carbon emission limit constraints and green certificate demand satisfaction conditions;
[0009] S103. Combining the characteristics and rules of the electricity market, carbon emission rights market and green electricity certificate market, a park power purchase combination model is constructed. The model takes minimizing the power purchase cost or maximizing the benefit as the objective function, while considering multi-dimensional constraints;
[0010] S104. Formulate a power purchase strategy for the industrial park based on the optimization results, and determine a power purchase portfolio optimization method for the industrial park that takes into account the coupling of the electricity-carbon green certificate market.
[0011] Furthermore, step S102 further includes:
[0012] The objective function is constructed with the minimum electricity purchase cost as the optimization goal:
[0013]
[0014] Where: max 1≤i≤m {Q r,i (P r,i,t ), Q w,j (P w,j )} represents the system marginal electricity price; P Lt is the total power load of the system during period t; Q r,i (P r,i,t ) is the bidding function of thermal power suppliers participating in the electricity market transaction; Q w,j (P w,j,t ) is the quotation function of renewable energy generators participating in the electricity market transaction;
[0015] For conventional thermal power plants and thermal power plants equipped with carbon capture devices, the power generation costs can be expressed as:
[0016]
[0017] Where: P r,i,t is the output of thermal power in period t; ai, bi, ci represent the power generation cost parameters of the i-th thermal power supplier, i = 1, 2, ..., m; is the carbon market transaction price, that is, the transaction price of 1 ton of carbon emissions; It represents the carbon emissions bought or sold by the i-th thermal electricity supplier in the carbon market. Buying is positive and selling is negative. The transaction price of green certificate market, RMB / capital; is the carbon trading cost of thermal power i; pγλP r,i,t Δt is the green certificate transaction cost of thermal power i;
[0018] The electricity generation cost of renewable energy generators is expressed as:
[0019]
[0020] In the formula is the number of green certificates sold by renewable energy power producer j in the green certificate market; aj, bj, cj represent the power generation cost parameters of renewable energy power producer j (j=m+1,…,R); under the current trading mechanism, the bidding function of thermal power producers participating in the electric energy market transaction is:
[0021]
[0022] Where: represents the marginal cost of thermal power i operation; represents the marginal cost of thermal power infiltration and carbon market transactions; γρ It represents the marginal cost of thermal power participating in green certificate trading; the quotation function of renewable energy power generators participating in the electric energy market transaction is expressed as:
[0023]
[0024] In the formula: the first two items represent the marginal operating costs of renewable energy generator j; the last two items represent the marginal benefits obtained by renewable energy generator j from selling green certificates.
[0025] Furthermore, for the carbon trading, green certificate trading mechanism and safe operation of the power system, the model must meet the following constraints:
[0026] Constraint 1: The total output of the generator sets should be equal to the load power;
[0027]
[0028] Where λ1 is the Lagrange multiplier corresponding to the system power balance constraint;
[0029] Constraint 2: The regulatory agency stipulates that all power generators in the region should bear a certain proportion of non-hydro renewable electricity quota indicators, namely the green certificate ratio coefficient, which should not be lower than a certain standard;
[0030]
[0031] Where: C is the lower limit of the green certificate ratio that power generators in the region should bear, C ≥ 0; is a Lagrange multiplier that satisfies
[0032] Furthermore, the carbon trading, green certificate trading mechanism and safe operation of the power system, the model also meets the following constraints:
[0033] Constraint 3: The actual output of each generator set should be between the maximum output and the minimum output;
[0034]
[0035] Where: P r;min , P r;max Respectively represent the lower and upper limits of thermal power unit output; P w,jmin , P w,jmax They represent the lower and upper limits of the output of renewable energy units respectively; the Lagrange multipliers corresponding to the upper and lower power inequality constraints should satisfy
[0036] Constraint 4: The carbon market is a fully competitive market, and all trading entities are recipients of carbon prices. Therefore, when the carbon quota supply is sufficient, power generators with excessive carbon emissions will give priority to buying carbon quotas from the carbon market, while power generators that meet the assessment requirements will sell all the remaining carbon quotas on the carbon market trading platform, thereby reducing their own marginal cost of power generation; the carbon emissions actually bought or sold by thermal power generators in the carbon market are expressed as:
[0037]
[0038] Where: is the carbon emission quota benchmark coefficient t=1, 2, ..., J, t / (MW-h) corresponding to the set of thermal power units classified as Class I in the region, which is a specially optimized variable; δ l,i It represents the actual unit carbon emission coefficient of thermal power classified as the lth type of generating units, t / (MW·h).
[0039] Furthermore, the carbon trading, green certificate trading mechanism and safe operation of the power system, the model also meets the following constraints:
[0040] Constraint 5: The actual total carbon emissions of thermal power units in the region shall not exceed the total free carbon quotas stipulated by the regional regulatory agency:
[0041]
[0042] Where: Indicates the actual carbon emissions of thermal power units in the region; is the total carbon emission quota of the regional thermal power company; μ4 is the Lagrange multiplier corresponding to the inequality, which represents the change in the total electricity purchase cost caused by an increase of 1t (MW-h) in the free carbon emission quota of the region, satisfying μ4 ≥ 0;
[0043] Constraint 6: In the green certificate market, the number of green certificates sold by renewable energy power generators should not exceed the number of remaining green certificates they hold after completing the renewable energy quota assessment;
[0044]
[0045] Where: (1-λ)γP w,jt Δt represents the remaining number of green certificates held by renewable energy generator j after completing the quota assessment; λ3 is the Lagrange multiplier corresponding to the equality constraint; α is a parameter greater than 0, indicating that when there is an oversupply of regional green certificates, the increase in the price of green certificates leads to a decrease in the number of green certificates sold by renewable energy generator j to generators outside the region.
[0046] Furthermore, step S103 further includes:
[0047] The specific combination model of power purchase in the park is as follows:
[0048] maxR=R s +R xq -C z,t -C z,q -C g -C y -C e -C xq
[0049] Among them, the maintenance, electricity purchase and energy storage costs of the park operator are composed of:
[0050]
[0051] C in =c e E max
[0052] C ym =C yc E max
[0053] C rec =λC in
[0054] The income structure is:
[0055]
[0056] Where R is the daily revenue of the park operator; R s The revenue from electricity sales to the park operator; R xq Profits from providing demand response services to the large power grid for the park operator; C g The electricity purchase cost for the park operator; C y The daily operation and maintenance cost of the park; C e The total cost of the park's energy storage equipment during its life cycle is averaged to the cost per day; C z,t The cost of purchasing electricity directly from the park operator and the thermal power company; C z,g The cost of purchasing electricity from direct transactions between the park operator and the new energy generator; C xq The demand response compensation fee paid by the park operator to users; t is the electricity price of the park during period t; Q t is the power sales volume of the park during period t; Δt is the period of power sales by the park operator; p xt Q is the subsidy price for the park to participate in demand response during period t; xt is the amount of users participating in demand response in the park operator’s aggregated form during period t; p gt Q is the electricity purchase price of the park operator during period t; gt p is the amount of electricity purchased by the park operator during period t; m,z,tQ is the price of electricity purchased directly from the mth thermal power supplier by the park operator during period t; m,z,t is the amount of electricity that the park operator directly purchases from the mth thermal power supplier during period t; p n,z,g Q is the price of electricity purchased directly by the park operator from the nth green electricity supplier during period t; n,z,g is the amount of electricity that the park operator directly purchases from the nth green electricity supplier during period t; c y,j is the operation and maintenance cost of the jth device in the park; P j,1 is the output of the jth device in the park during period t; C in is the energy storage installation cost; C ym is the annual maintenance cost of energy storage; T bat The estimated service life of the park's energy storage equipment; C rec The recycling value of the energy storage device after it exceeds its service life; c e is the unit cost of energy storage; E max is the maximum capacity of the energy storage device; C yc is the cost required for annual management and maintenance of the energy storage device per unit capacity; λ is the recovery factor; p k,xq,t The subsidy price given by the operator to the user participating in the demand response during period t: Q k,xq,t is the amount of electricity that the kth user participates in demand response during period t; K is the total number of users.
[0057] Furthermore, the constraints in step 103 include:
[0058] Constraint 1: Energy balance constraint
[0059]
[0060] Where P dis,t , P ch,t are the discharge power and charging power of the energy storage equipment in the park at time t respectively; P grid,t P is the power exchanged between the park operator and the power grid, as well as thermal power, renewable energy and other power generation companies at time t; t,k,load is the load of the kth user in the park at time ι, and K is the total number of users;
[0061] Constraint 2: Energy storage equipment output constraint
[0062] E t =(1-μ)E t-1 +(P ch,t η ch -P dis,t η dit )Δt
[0063]
[0064] Emin ≤E, ≤E max
[0065] 0≤I dis,t +I ch,t ≤1
[0066] In the formula, E t is the energy storage output at time t; μ is the energy loss of the energy storage device; P dis,t , P ch,t are the charging and discharging power of the energy storage device at time t; η dis , η ch are the charging and discharging efficiency of the energy storage device; I dis,t ,I ch,t is a binary variable, and when the value is 1, it indicates the charging or discharging state of the energy storage device during time period t; dis,t ,I ch,t It indicates that the constraints in the charging and discharging step 103 also include:
[0067] Constraint 3: Energy storage state of charge constraint
[0068]
[0069] E0=E T
[0070] In the formula, SOC e,min , SOC e,max are the minimum and maximum state of charge specified for energy storage; E now is the current remaining capacity of the energy storage; E0, E T Respectively represent the charge retention in the energy storage device at the beginning and end of regulation;
[0071] Constraint 4: Other user output constraints
[0072] P l,min ≤P 1,t ≤P l,max
[0073] Where P l,t is the output of the lth cluster user in the park; P l,min is the minimum output limit of the l-th cluster user; P l,max It is the maximum output limit of class l cluster users.
[0074] Furthermore, the constraints in step 103 also include:
[0075] Constraint 5: Tie Line Constraint
[0076] P e,min ≤P e,t ≤P e,max
[0077] Where P e,min、 P e,max P is the lower and upper limits of the power purchased by the park at time t; e,t It represents the amount of electricity purchased by the park at time t;
[0078] Constraint 6: Carbon emission market operation constraints:
[0079] The baseline method is used to determine the carbon emission quota of VPP:
[0080]
[0081] In the formula, is the total amount of carbon quota issued by VPP, η b、 η g is the quota coefficient for purchasing electricity from the market and thermal power units, To purchase electricity, Total output of thermal power;
[0082] The actual carbon emissions of VPP are calculated as follows:
[0083]
[0084] In the formula, is the actual carbon emissions of VPP, a p 、b p 、c p is the actual emission coefficient, To purchase electricity, net emissions for carbon capture plants;
[0085] The carbon emission market trading demand is calculated as follows:
[0086]
[0087] In the formula, is the VPP carbon emission market transaction volume, is the actual carbon emissions of VPP, The total amount of carbon allowances issued for VPP;
[0088] Constraint 7: VPP consumption rights and responsibilities and green certificate trading constraints:
[0089] The sum of the renewable energy consumption and green certificate trading volume within the VPP should not be less than the total power consumption stipulated in the consumption rights and responsibilities:
[0090]
[0091] In the formula, represents the total amount of renewable energy consumption; w is the consumption weight; is the total power; is the amount of green certificates purchased or sold by VPP at time t; is the equivalent load at time t; is the cooling power of the central air conditioner; Respectively represent the charging and discharging power of energy storage; They are the photovoltaic and wind power actually absorbed respectively.
[0092] According to the second aspect of the present invention, the present invention claims protection for a park electricity purchase combination optimization device based on the coupling of the electricity-carbon green certificate market, comprising:
[0093] one or more processors;
[0094] A memory having one or more programs stored thereon. When the one or more programs are executed by the one or more processors, the one or more processors implement the method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market as described by you.
[0095] The present application relates to the technical field of power resource allocation, and in particular to a method and device for optimizing the power purchase combination of a park based on the coupling of the electricity, carbon and green certificate markets. By constructing an optimization model for the coupling of electricity, carbon and green certificates, it innovatively integrates the electricity, carbon emission rights and green electricity certificate markets, and provides an optimization solution for power purchase decisions under multi-market interactions, adapting to the randomness and volatility of new energy power generation. Multi-dimensional constraints such as carbon emissions and green certificate requirements are incorporated into the optimization model, making the power purchase strategy more comprehensive and in line with actual operational needs; through a sophisticated power purchase strategy, the balance between supply and demand is effectively managed, and the scheduling difficulty and cost caused by fluctuations in renewable energy are reduced. The present invention conducts a more accurate cost-benefit analysis by comprehensively considering power purchase, operation and maintenance, energy storage costs and benefits, to ensure the economic rationality of power purchase decisions. By optimizing the power purchase combination, low-carbon power supply can be promoted, energy utilization can be maximized, energy waste can be reduced, and energy economic benefits can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0096] Figure 1 A workflow diagram of a method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market as claimed in an embodiment of the present application. DETAILED DESCRIPTION
[0097] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0098] The terms "first", "second" and "third" in this application are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Thus, the features defined as "first", "second" and "third" can explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined. All directional indications in the embodiments of the present application (such as up, down, left, right, front, back...) are only used to explain the relative position relationship, movement, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication also changes accordingly. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally also includes steps or units that are not listed, or optionally also includes other steps or units inherent to these processes, methods, products or devices.
[0099] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0100] According to the first embodiment of the present invention, the present invention claims a method for optimizing the power purchase combination of a park based on the coupling of the power carbon green certificate market, referring to Figure 1 ,include:
[0101] S101. Obtain forecast data on the power load in the park, including at least analysis of historical power consumption data, taking into account seasonality, weekdays, weekends, holidays, and the expected impact of new or closed enterprises in the park;
[0102] S102. Construct an electricity-carbon-green certificate coupling optimization model, which includes the electricity purchase volume, carbon emission limit constraints and green certificate demand satisfaction conditions;
[0103] S103. Combining the characteristics and rules of the electricity market, carbon emission rights market and green electricity certificate market, a park power purchase combination model is constructed. The model takes minimizing the power purchase cost or maximizing the benefit as the objective function, while considering multi-dimensional constraints;
[0104] S104. Formulate a power purchase strategy for the industrial park based on the optimization results, and determine a power purchase portfolio optimization method for the industrial park that takes into account the coupling of the electricity-carbon green certificate market.
[0105] Furthermore, step S102 further includes:
[0106] The objective function is constructed with the minimum electricity purchase cost as the optimization goal:
[0107]
[0108] Where: max 1≤i≤m {Q r,i (P r,i,t ), Q w,j (P w,j )} represents the system marginal electricity price; P Lt is the total power load of the system during period t; Q r,i (P r,i,t ) is the bidding function of thermal power suppliers participating in the electricity market transaction; Q w,j (P w,j,t ) is the quotation function of renewable energy generators participating in the electricity market transaction;
[0109] For conventional thermal power plants and thermal power plants equipped with carbon capture devices, the power generation cost can be expressed as
[0110]
[0111] Where: P r,i,t is the output of thermal power in period t; ai, bi, ci represent the power generation cost parameters of the i-th thermal power supplier, i = 1, 2, ..., m; is the carbon market transaction price, that is, the transaction price of 1 ton of carbon emissions; It represents the carbon emissions bought or sold by the i-th thermal electricity supplier in the carbon market. Buying is positive and selling is negative. The transaction price of green certificate market, RMB / capital; is the carbon trading cost of thermal power i; pγλP r,i,t Δt is the green certificate transaction cost of thermal power i;
[0112] The electricity generation cost of renewable energy generators is expressed as:
[0113]
[0114] In the formula is the number of green certificates sold by renewable energy power producer j in the green certificate market; aj, bj, cj represent the power generation cost parameters of renewable energy power producer j (j=m+1,…,R); under the current trading mechanism, the bidding function of thermal power producers participating in the electric energy market transaction is:
[0115]
[0116] Where: represents the marginal cost of thermal power i operation; represents the marginal cost of thermal power infiltration and carbon market transactions; γρ It represents the marginal cost of thermal power penetration and green certificate trading; the quotation function of renewable energy power generators participating in the electric energy market transaction is expressed as:
[0117]
[0118] In the formula: the first two items represent the marginal operating costs of renewable energy generator j; the last two items represent the marginal benefits obtained by renewable energy generator j from selling green certificates.
[0119] Furthermore, for the carbon trading, green certificate trading mechanism and safe operation of the power system, the model must meet the following constraints:
[0120] Constraint 1: The total output of the generator sets should be equal to the load power;
[0121]
[0122] Where λ1 is the Lagrange multiplier corresponding to the system power balance constraint;
[0123] Constraint 2: The regulatory agency stipulates that all power generators in the region should bear a certain proportion of non-hydro renewable electricity quota indicators, namely the green certificate ratio coefficient, which should not be lower than a certain standard;
[0124]
[0125] Where: C is the lower limit of the green certificate ratio that power generators in the region should bear, C ≥ 0; is a Lagrange multiplier that satisfies
[0126] Furthermore, the carbon trading, green certificate trading mechanism and safe operation of the power system, the model also meets the following constraints:
[0127] Constraint 3: The actual output of each generator set should be between the maximum output and the minimum output;
[0128]
[0129] Where: P r;min , P r;max Respectively represent the lower and upper limits of thermal power unit output; P w,jmin , P w,jmax They represent the lower and upper limits of the output of renewable energy units respectively; the Lagrange multipliers corresponding to the upper and lower power inequality constraints should satisfy
[0130] Constraint 4: The carbon market is a fully competitive market, and all trading entities are recipients of carbon prices. Therefore, when the carbon quota supply is sufficient, power generators with excessive carbon emissions will give priority to buying carbon quotas from the carbon market, while power generators that meet the assessment requirements will sell all the remaining carbon quotas on the carbon market trading platform, thereby reducing their own marginal cost of power generation; the carbon emissions actually bought or sold by thermal power generators in the carbon market are expressed as:
[0131]
[0132] Where: is the carbon emission quota benchmark coefficient t=1, 2, ..., J, t / (MW-h) corresponding to the set of thermal power units classified as the lth category in the region, which is a special optimized variable; δ l,i It represents the actual unit carbon emission coefficient of thermal power classified as the lth type of generating units, t / (MW·h).
[0133] Furthermore, the carbon trading, green certificate trading mechanism and safe operation of the power system, the model also meets the following constraints:
[0134] Constraint 5: The actual total carbon emissions of thermal power units in the region shall not exceed the total amount of free carbon quotas stipulated by the regional regulatory agency;
[0135]
[0136] Where: Indicates the actual carbon emissions of thermal power units in the region; is the total carbon emission quota of the regional thermal power company; μ4 is the Lagrange multiplier corresponding to the inequality, which represents the change in the total electricity purchase cost caused by an increase of 1t (MW-h) in the free carbon emission quota of the region, satisfying μ4 ≥ 0;
[0137] Constraint 6: In the green certificate market, the number of green certificates sold by renewable energy power generators should not exceed the number of remaining green certificates they hold after completing the renewable energy quota assessment;
[0138]
[0139] Where: (1-λ)γP w,jt Δt represents the remaining number of green certificates held by renewable energy generator j after completing the quota assessment; λ3 is the Lagrange multiplier corresponding to the equality constraint; α is a parameter greater than 0, indicating that when there is an oversupply of regional green certificates, the increase in the price of green certificates leads to a decrease in the number of green certificates sold by renewable energy generator j to generators outside the region.
[0140] Among them, in this embodiment, the line loss statistics are calculated to calculate the difference between the total amount of input electricity and the total amount of electricity purchased by users. For example, if it is a partition line loss statistics, it is to calculate the difference between the total amount of input electricity and the total amount of electricity purchased by users in the same area. If it is a voltage division line loss statistics, it is to calculate the difference between the total amount of input electricity of the same voltage and the total amount of electricity purchased by users. The line loss statistics of the line division is to calculate the difference between the total amount of input electricity and the total amount of electricity purchased by users of the same power supply line; the line loss statistics of the substation area are to calculate the difference between the total amount of input electricity and the total amount of electricity purchased by users in the same substation area. After calculating the line loss statistics of the four parts (i.e., partition, voltage division, line division, and substation area) using the basic data of the power grid, the line loss benchmark threshold can be used to determine whether the line loss statistics are abnormal. Specifically, when judging whether the four-part line loss statistics are abnormal, different types of line losses can also be judged according to different line loss benchmark thresholds.
[0141] Among them, the line loss benchmark threshold is the normal value range of the statistical line loss determined based on the theoretical line loss value or the reasonable statistical line loss benchmark value and the line loss abnormal threshold coefficient. If the line loss statistical value is within the interval determined by the line loss benchmark threshold, the line loss statistical value is determined to be normal. If the line loss statistical value is outside the interval, the line loss statistical value is determined to be abnormal. Among them, the specific origin of the calculation of the line loss statistical value using the basic data of the power grid and the line loss benchmark threshold can refer to the current calculation method of the line loss statistical value and the determination method of the line loss benchmark threshold, which will not be repeated here.
[0142] After determining whether the outgoing line loss statistics are abnormal, it is determined whether to perform abnormal diagnosis according to the determination result. Specifically, if the determination result is yes, step S103 is executed; if the determination result is no, no operation is performed.
[0143] Furthermore, step S103 further includes:
[0144] The specific combination model of power purchase in the park is as follows:
[0145] maxR=R s +R xq -C z,t -C z,q -C g -C y -C e -C xq
[0146] Among them, the maintenance, electricity purchase and energy storage costs of the park operator are composed of:
[0147]
[0148] C in =c e E max
[0149] C ym =C yc E max
[0150] C rec =λC in
[0151] The income structure is:
[0152]
[0153] Where R is the daily revenue of the park operator; R s The revenue from electricity sales to the park operator; R xq Profits from providing demand response services to the large power grid for the park operator; C g The electricity purchase cost for the park operator; C y The daily operation and maintenance cost of the park; C e The total cost of the park's energy storage equipment during its life cycle is averaged to the cost per day; C z,t The cost of purchasing electricity directly from the park operator and the thermal power company; C z,g The cost of purchasing electricity from direct transactions between the park operator and the new energy generator; C xq The demand response compensation fee paid by the park operator to users; t is the electricity price of the park during period t; Q t is the power sales volume of the park during period t; Δt is the period of power sales by the park operator; p xt Q is the subsidy price for the park to participate in demand response during period t; xt is the amount of users participating in demand response in the park operator’s aggregated form during period t; p gt Q is the electricity purchase price of the park operator during period t; gt p is the amount of electricity purchased by the park operator during period t; m,z,t Q is the price of electricity purchased directly from the mth thermal power supplier by the park operator during period t; m,z,t is the amount of electricity that the park operator directly purchases from the mth thermal power supplier during period t; p n,z,g Q is the price of electricity purchased directly by the park operator from the nth green electricity supplier during period t; n,z,h is the amount of electricity that the park operator directly purchases from the nth green electricity supplier during period t; c y,j is the operation and maintenance cost of the jth device in the park; P j,l is the output of the jth device in the park during period t; C in is the energy storage installation cost; C ym is the annual maintenance cost of energy storage; T bat The estimated service life of the park's energy storage equipment; C recThe recycling value of the energy storage device after it exceeds its service life; c e is the unit cost of energy storage; E max is the maximum capacity of the energy storage device; C yc is the cost required for annual management and maintenance of the energy storage device per unit capacity; λ is the recovery factor; p k,xq,t The subsidy price given by the operator to the user participating in the demand response during period t: Q k,xq,t is the amount of electricity that the kth user participates in demand response during period t; K is the total number of users.
[0154] Furthermore, the constraints in step 103 include:
[0155] Constraint 1: Energy balance constraint
[0156]
[0157] Where P dis,t , P ch,t are the discharge power and charging power of the energy storage equipment in the park at time t respectively; P grid,t P is the power exchanged between the park operator and the power grid, as well as thermal power, renewable energy and other power generation companies at time t; t,k,load is the load of the kth user in the park at time ι, and K is the total number of users;
[0158] Constraint 2: Energy storage equipment output constraint
[0159] E t =(1-μ)E t-1 +(P ch,t η ch -P dis,t η dis )Δt
[0160]
[0161] E min ≤E, ≤E max
[0162] 0≤I dis,t +I ch,t ≤1
[0163] In the formula, E t is the energy storage output at time t; μ is the energy loss of the energy storage device; P dis,t , P ch,t are the charging and discharging power of the energy storage device at time t; η dis , η ch are the charging and discharging efficiency of the energy storage device; I dis,t、 I ch,tis a binary variable, and when the value is 1, it indicates the charging or discharging state of the energy storage device during time period t; dis,t ,I ch,t Represents charging and discharging respectively.
[0164] Furthermore, the constraints in step 103 also include:
[0165] Constraint 3: Energy storage state of charge constraint
[0166]
[0167] E0=E T
[0168] In the formula, SOC e,min , SO∈ e,max are the minimum and maximum state of charge specified for energy storage; E now is the current remaining capacity of the energy storage; E0, E T Respectively represent the charge retention in the energy storage device at the beginning and end of regulation;
[0169] Constraint 4: Other user output constraints
[0170] P l,min ≤P l,t ≤P l,max
[0171] Where P l,t is the output of the lth cluster user in the park; P l,min is the minimum output limit of the l-th cluster user; P l,max It is the maximum output limit of class l cluster users.
[0172] Furthermore, the constraints in step 103 also include:
[0173] Constraint 5: Tie Line Constraint
[0174] P e,min ≤P e,t ≤P e,max
[0175] Where P e,min , P e,max P is the lower and upper limits of the power purchased by the park at time t; e,t It represents the amount of electricity purchased by the park at time t;
[0176] Constraint 6: Carbon emission market operation constraints:
[0177] The baseline method is used to determine the carbon emission quota of VPP:
[0178]
[0179] In the formula, is the total amount of carbon quota issued by VPP, η b , η g is the quota coefficient for purchasing electricity from the market and thermal power units, To purchase electricity, Total output of thermal power;
[0180] The actual carbon emissions of VPP are calculated as follows:
[0181]
[0182] In the formula, is the actual carbon emissions of VPP, a p 、b p 、c p is the actual emission coefficient, To purchase electricity, net emissions for carbon capture plants;
[0183] The carbon emission market trading demand is calculated as follows:
[0184]
[0185] In the formula, is the VPP carbon emission market transaction volume, is the actual carbon emissions of VPP, The total amount of carbon allowances issued for the VPP;
[0186] Constraint 7: VPP consumption rights and responsibilities and green certificate trading constraints:
[0187] The sum of the renewable energy consumption and green certificate trading volume within the VPP should not be less than the total power consumption stipulated in the consumption rights and responsibilities:
[0188]
[0189] In the formula, represents the total amount of renewable energy consumption; w is the consumption weight; is the total power; is the amount of green certificates purchased or sold by VPP at time t; is the equivalent load at time t; is the cooling power of the central air conditioner; Respectively represent the charging and discharging power of energy storage; They are the photovoltaic and wind power actually absorbed respectively.
[0190] According to the second embodiment of the present invention, the present invention claims protection for a park electricity purchase combination optimization device based on the coupling of the electricity-carbon green certificate market, comprising:
[0191] one or more processors;
[0192] A memory having one or more programs stored thereon, and when the one or more programs are executed by the one or more processors, the one or more processors implement the method for optimizing the combination of power purchases in a park based on the coupling of the electricity-carbon green certificate market as described. In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are merely schematic. For example, the division of units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection through some interfaces, devices or units, which may be electrical, mechanical or other forms.
[0193] In addition, each functional unit in each embodiment of the present application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above integrated unit can be implemented in the form of hardware or in the form of software functional units. The above is only an implementation method of the present application, and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the specification and drawings of this application, or directly or indirectly used in other related technical fields, is also included in the patent protection scope of the present application.
[0194] The specific implementation methods of the invention are described in detail above, but they are only examples, and the present application is not limited to the specific implementation methods described above. For those skilled in the art, any equivalent modification or substitution of the invention is also within the scope of the present application, and therefore, the equalization, modification, and improvement made without departing from the spirit and principle of the present application should be included in the scope of the present application.
Claims
1. A method for optimizing the power purchase portfolio of a park based on the coupling of the electricity and carbon green certificate market. It is characterized in that include: S101. Obtain forecast data on the power load in the park, including at least analysis of historical power consumption data, taking into account seasonality, weekdays, weekends, holidays, and the expected impact of new or closed enterprises in the park; S102. Construct an electricity-carbon-green certificate coupling optimization model, which includes the electricity purchase volume, carbon emission limit constraints and green certificate demand satisfaction conditions; S103. Combining the characteristics and rules of the electricity market, carbon emission rights market and green electricity certificate market, a park power purchase combination model is constructed. The model takes minimizing the power purchase cost or maximizing the benefit as the objective function, while considering multi-dimensional constraints; S104. Formulate a power purchase strategy for the industrial park based on the optimization results, and determine a power purchase portfolio optimization method for the industrial park that takes into account the coupling of the electricity-carbon green certificate market.
2. A method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market as claimed in claim 1, It is characterized in that Step S102 further includes: The objective function is constructed with the minimum electricity purchase cost as the optimization goal: Where: max 1≤i≤ m{Q r,i (P r,i,t ), Q w,j (P w,j )} represents the system marginal electricity price; P Lt is the total power load of the system during period t; Q r,i (P r,i,t ) is the bidding function of thermal power suppliers participating in the electricity market transaction; Q w,j (P w,j,t ) is the quotation function of renewable energy generators participating in the electricity market transaction; For conventional thermal power plants and thermal power plants equipped with carbon capture devices, the power generation costs are expressed as: Where: P r,i,t is the output of thermal power in period t; ai, bi, ci represent the power generation cost parameters of the i-th thermal power supplier, i = 1, 2, ..., m; is the carbon market transaction price, that is, the transaction price of 1 ton of carbon emissions; It represents the carbon emissions bought or sold by the i-th thermal electricity supplier in the carbon market. Buying is positive and selling is negative. The transaction price of green certificate market, RMB / capital; is the carbon trading cost of thermal power i; pγλP r,i,t Δt is the green certificate transaction cost of thermal power i; The electricity generation cost of renewable energy generators is expressed as: In the formula is the number of green certificates sold by renewable energy power producer j in the green certificate market; aj, bj, cj represent the power generation cost parameters of renewable energy power producer j (j=m+1,…,R); under the current trading mechanism, the bidding function of thermal power producers participating in the electric energy market transaction is: Where: 2a i P Γ,i,t +b i represents the marginal cost of thermal power plant i; represents the marginal cost of thermal power penetration and carbon market transactions; λγρ represents the marginal cost of thermal power participating in green certificate transactions; the quotation function of renewable energy power generators participating in electric energy market transactions is expressed as: In the formula: the first two items represent the marginal operating costs of renewable energy generator j; the last two items represent the marginal benefits obtained by renewable energy generator j from selling green certificates.
3. A method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market as claimed in claim 2, It is characterized in that Carbon trading, green certificate trading mechanism and safe operation of power system, the model must meet the following constraints: Constraint 1: The total output of the generator sets should be equal to the load power; Where λ 1 is the Lagrange multiplier corresponding to the system power balance constraint; Constraint 2: The regulatory agency stipulates that all power generators in the region should bear a certain proportion of non-hydro renewable electricity quota indicators, namely the green certificate ratio coefficient, which should not be lower than a certain standard; Where: C is the lower limit of the green certificate ratio that power generators in the region should bear, C≥ 0 ; is a Lagrange multiplier that satisfies 4. A method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market as claimed in claim 2, It is characterized in that Carbon trading, green certificate trading mechanism and safe operation of power system. The model also meets the following constraints: Constraint 3: The actual output of each generator set should be between the maximum output and the minimum output; Where: P r;min , P r;max Respectively represent the lower and upper limits of thermal power unit output; P w,jmin , P w,jmax They represent the lower and upper limits of the output of renewable energy units respectively; the Lagrange multipliers corresponding to the upper and lower power inequality constraints should satisfy i=1, 2,…,m; j=m+1,m+2,…,R; Constraint 4: The carbon market is a fully competitive market, and all trading entities are recipients of carbon prices. Therefore, when the carbon quota supply is sufficient, power generators with excessive carbon emissions will give priority to buying carbon quotas from the carbon market, while power generators that meet the assessment requirements will sell all the remaining carbon quotas on the carbon market trading platform, thereby reducing their own marginal cost of power generation; the carbon emissions actually bought or sold by thermal power generators in the carbon market are expressed as: Where: is the carbon emission quota benchmark coefficient t=1, 2, ..., J, t / (MW-h) corresponding to the set of thermal power units classified as Class I in the region, which is a specially optimized variable; δ l,i It represents the actual unit carbon emission coefficient of thermal power classified as Category I generating units, t / (MW·h).
5. A method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market as claimed in claim 2, It is characterized in that Carbon trading, green certificate trading mechanism and safe operation of power system. The model also meets the following constraints: Constraint 5: The actual total carbon emissions of thermal power units in the region shall not exceed the total amount of free carbon quotas stipulated by the regional regulatory agency; Where: Indicates the actual carbon emissions of thermal power units in the region; is the total carbon emission quota of regional thermal power companies; μ 4 is the Lagrange multiplier corresponding to the inequality, which represents the change in the total electricity purchase cost caused by an increase of 1t (MW-h) in the free carbon emission quota in the region, satisfying μ 4 ≥0; Constraint 6: In the green certificate market, the number of green certificates sold by renewable energy power generators should not exceed the number of remaining green certificates they hold after completing the renewable energy quota assessment; Where: (1-λ)γP w,jt Δt represents the remaining number of green certificates held by renewable energy generator j after completing the quota assessment; λ 3 is the Lagrange multiplier corresponding to the equality constraint; α is a parameter greater than 0, which means that when there is an oversupply of regional green certificates, an increase in the price of green certificates leads to a decrease in the number of green certificates sold by renewable energy generator j to generators outside the region.
6. A method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market as claimed in claim 1, It is characterized in that Step S103 further includes: The specific combination model of power purchase in the park is as follows: maxR=R s +R xq -C z,t -C z,q -C g -C y -C e -C xq Among them, the maintenance, electricity purchase and energy storage costs of the park operator are composed of: C in =c e E max C ym =C yc E max C rec =λC in The income structure is: Where R is the daily revenue of the park operator; R s The revenue from electricity sales to the park operator; R xq Profits from providing demand response services to the large power grid for the park operator; C g The electricity purchase cost for the park operator; C y The daily operation and maintenance cost of the park; C e The total cost of the park's energy storage equipment during its life cycle is averaged to the cost per day; C z,t The cost of purchasing electricity directly from the park operator and the thermal power company; C z,g The cost of purchasing electricity from direct transactions between the park operator and the new energy generator; C xq The demand response compensation fee paid by the park operator to users; t is the electricity price of the park during period t; Q t is the power sales volume of the park during period t; Δt is the period of power sales by the park operator; p xt Q is the subsidy price for the park to participate in demand response during period t; xt is the amount of users participating in demand response in the park operator’s aggregated form during period t; p gt Q is the electricity purchase price of the park operator during period t; gt p is the amount of electricity purchased by the park operator during period t; m,z,t Q is the price of electricity purchased directly from the mth thermal power supplier by the park operator during period t; m,z,t is the amount of electricity that the park operator directly purchases from the mth thermal power supplier during period t; p n,z,g Q is the price of electricity purchased directly by the park operator from the nth green electricity supplier during period t; n,z,g is the amount of electricity that the park operator directly purchases from the nth green electricity supplier during period t; c y,j is the operation and maintenance cost of the jth device in the park; P j,l is the output of the jth device in the park during period t; C in is the energy storage installation cost; C ym is the annual maintenance cost of energy storage; T bat The estimated service life of the park's energy storage equipment; C rec The recycling value of the energy storage device after it exceeds its service life; c e is the unit cost of energy storage; E max is the maximum capacity of the energy storage device; C yc is the cost required for annual management and maintenance of the energy storage device per unit capacity; λ is the recovery factor; p k,xq,t The subsidy price given by the operator to the user participating in the demand response during period t: Q k,xq,t is the amount of electricity that the kth user participates in demand response during period t; K is the total number of users.
7. A method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market as claimed in claim 6, It is characterized in that The constraints in step 103 include: Constraint 1: Energy balance constraint Where P dis,t , P ch,t are the discharge power and charging power of the energy storage equipment in the park at time t respectively; P grid,t P is the power exchanged between the park operator and the power grid, as well as thermal power, renewable energy and other power generation companies at time t; t,k,load is the load of the kth user in the park at time ι, and K is the total number of users; Constraint 2: Energy storage equipment output constraint E t =(1-μ)E t-1 +(P ch,t or ch -P dis,t or dis )Δt AND min ≤E,≤E max 0≤I dis,t +I ch,t ≤1 In the formula, E t is the energy storage output at time t; μ is the energy loss of the energy storage device; P dis,t , P ch,t are the charging and discharging power of the energy storage device at time t; η dis , η ch are the charging and discharging efficiency of the energy storage device respectively; I dis,t ,I ch,t is a binary variable, and when the value is 1, it indicates the charging or discharging state of the energy storage device during time period t; dis,t ,I ch,t Represents charging and discharging respectively.
8. A method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market as claimed in claim 7, It is characterized in that The constraints in step 103 also include: Constraint 3: Energy storage state of charge constraint AND 0 =And T In the formula, SOC e,min , SOC e,max are the minimum and maximum state of charge specified for energy storage; E now is the current remaining capacity of energy storage; E 0 、E T Respectively represent the charge retention in the energy storage device at the beginning and end of regulation; Constraint 4: Other users’ output constraints P l,min ≤P l,t ≤P l,max Where P l,t The output of the first type of cluster users in the park; P l,min is the minimum output limit of the clustered users of type I; l,max This is the maximum output limit for users in cluster I.
9. A method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market as claimed in claim 7, It is characterized in that The constraints in step 103 also include: Constraint 5: Tie Line Constraint P e,min ≤P e,t ≤P e,max Where P e,min , P e,max P is the lower and upper limits of the power purchased by the park at time t; e,t It represents the amount of electricity purchased by the park at time t; Constraint 6: Carbon emission market operation constraints: The baseline method is used to determine the carbon emission quota of VPP: In the formula, is the total amount of carbon quota issued by VPP, η b , η g is the quota coefficient for purchasing electricity from the market and thermal power units, To purchase electricity, Total output of thermal power; The actual carbon emissions of VPP are calculated as follows: In the formula, is the actual carbon emissions of VPP, a p , b p 、c p is the actual emission coefficient, To purchase electricity, net emissions for carbon capture plants; The carbon emission market trading demand is calculated as follows: In the formula, is the VPP carbon emission market transaction volume, is the actual carbon emissions of VPP, The total amount of carbon allowances issued for the VPP; Constraint 7: VPP consumption rights and responsibilities and green certificate trading constraints: The sum of the renewable energy consumption and green certificate trading volume within the VPP should not be less than the total power consumption stipulated in the consumption rights and responsibilities: In the formula, represents the total amount of renewable energy consumption; w is the consumption weight; is the total power; is the amount of green certificates purchased or sold by VPP at time t; is the equivalent load at time t; is the cooling power of the central air conditioner; Respectively represent the charging and discharging power of energy storage; They are the photovoltaic and wind power actually absorbed respectively.
10. A park electricity purchase combination optimization device based on the coupling of electricity and carbon green certificate market, It is characterized in that include: one or more processors; A memory having one or more programs stored thereon, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement a method for optimizing the power purchase combination of a park based on the coupling of the electricity-carbon green certificate market according to any one of claims 1 to 9.
Citation Information
Cited By
Capacity allocation method and system considering day-ahead market coupling uncertainty
CN119051044A
Electricity-carbon-green evidence multi-market coupling prediction system
CN119067686A
System and method for optimizing transaction strategy of wind-solar power generator under evidence-electricity separation background
CN119067715A
Multi-energy alliance dynamic optimization decision-making method based on electric carbon green evidence multi-market linkage
CN120297629A