Capacity configuration prediction method and device of source network load storage system, and computer equipment
By obtaining and updating the system information of the source network load storage system, configuring and solving the capacity configuration prediction model, and determining the optimal capacity configuration, the problem of poor accuracy of capacity configuration information in the traditional method is solved, and the operational stability and efficiency of the system are improved.
Patent Information
- Application Number
- CN202411158038.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-10-25
AI Technical Summary
Traditional energy systems fail to fully incorporate actual operating conditions in capacity planning, resulting in poor accuracy of capacity configuration information and inability to effectively respond to complex load demand fluctuations in industrial park power supply.
By obtaining the system information of the target source network load storage system, configure the initial capacity configuration prediction model, update the objective function, constraints and sub-models, solve the candidate capacity configuration plan, determine the optimal capacity configuration based on the preset screening information, and improve the efficiency of capacity configuration prediction. accuracy and stability.
It improves the accuracy and stability of the capacity configuration prediction of the source grid load storage system, enables the system to better adapt to different loads and operating scenarios, and improves overall operating efficiency and reliability.
Smart Images

Figure CN118841978A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of energy management technology, and in particular to a method, device, computer equipment, computer-readable storage medium and computer program product for predicting capacity configuration of a source-grid-load-storage system. Background Art
[0002] As energy demand continues to grow, large power-consuming areas such as industrial parks are facing increasingly complex energy management challenges. Traditional energy systems are usually supported by a single energy supply source and cannot flexibly respond to the volatility of load demand. In recent years, the source-grid-load-storage integrated system has received widespread attention as a solution that integrates renewable energy, energy storage equipment and smart grid technology. Such systems can effectively integrate distributed energy, load management and energy storage facilities to improve energy efficiency.
[0003] However, in traditional methods, industrial parks often only consider the physical characteristics and working principles of each component when planning the capacity of the park's power supply energy system, and fail to fully combine more comprehensive and actual operating conditions for analysis. As a result, the obtained capacity configuration information is different from the actual operating scenario and has poor accuracy. Summary of the invention
[0004] Based on this, it is necessary to provide a capacity configuration prediction method, device, computer equipment, computer-readable storage medium and computer program product for a source-grid-load-storage system that can improve the accuracy of capacity configuration prediction in response to the above technical problems.
[0005] In a first aspect, the present application provides a method for predicting capacity configuration of a source-grid-load-storage system, comprising:
[0006] Obtain system information and initial capacity configuration prediction model of the target source grid-load-storage system;
[0007] According to the system information, configuring the initial capacity configuration prediction model to obtain a target capacity configuration prediction model;
[0008] Solving the target capacity configuration prediction model to obtain candidate capacity configuration prediction information of the target source grid-load-storage system;
[0009] Based on the preset screening information, the target capacity configuration prediction information of the target source grid-load-storage system is determined from the candidate capacity configuration prediction information.
[0010] In one of the embodiments, configuring the initial capacity configuration prediction model according to the system information to obtain the target capacity configuration prediction model includes:
[0011] According to the system information, respectively updating the initial objective function and initial constraint conditions in the initial capacity configuration prediction model to obtain updated objective function and objective constraint conditions;
[0012] According to the system information, an initial sub-model in the initial capacity configuration prediction model is updated to obtain a target sub-model;
[0013] A target capacity configuration prediction model is determined according to the updated objective function, the target constraint conditions and the target sub-model.
[0014] In one embodiment, the updating of the initial objective function and the initial constraint conditions in the initial capacity configuration prediction model according to the system information to obtain the updated objective function and the objective constraint conditions includes:
[0015] Acquire historical load data, equipment information and economic information of the target source grid-load storage system from the system information;
[0016] According to the historical load data, the equipment information and the economic information, an initial objective function in the initial capacity configuration prediction model is updated to obtain an updated objective function;
[0017] According to the device information, the initial constraint conditions in the initial capacity configuration prediction model are updated to obtain the target constraint conditions.
[0018] In one embodiment, updating the initial objective function in the initial capacity configuration prediction model according to the historical load data, the equipment information and the economic information to obtain the updated objective function includes:
[0019] Determining candidate function items from initial function items of the initial objective function according to the device information;
[0020] An updated objective function is determined according to the historical load data, the economic information and the candidate function items.
[0021] In one embodiment, updating the initial constraint conditions in the initial capacity configuration prediction model according to the device information to obtain the target constraint conditions includes:
[0022] Determining candidate constraints from the initial constraints according to the device information;
[0023] Determining the equipment capacity range information of the target source grid-load-storage system from the equipment information;
[0024] A target constraint condition is determined according to the candidate constraint condition and the equipment capacity range information.
[0025] In one of the embodiments, updating the initial sub-model in the initial capacity configuration prediction model according to the system information to obtain the target sub-model includes:
[0026] Acquire equipment information, economic information and environmental information of the target source grid-load-storage system from the system information;
[0027] Determine a candidate sub-model from the initial sub-model according to the device information;
[0028] The candidate sub-model is updated according to the device information, the economic information and the environmental information to obtain a target sub-model.
[0029] In a second aspect, the present application also provides a capacity configuration prediction device for a source-grid-load-storage system, comprising:
[0030] An initial data acquisition module is used to obtain system information and an initial capacity configuration prediction model of the target source grid-load-storage system;
[0031] A target model acquisition module, configured to configure the initial capacity configuration prediction model according to the system information to obtain a target capacity configuration prediction model;
[0032] A candidate prediction acquisition module is used to solve the target capacity configuration prediction model to obtain candidate capacity configuration prediction information of the target source grid-load-storage system;
[0033] The target prediction determination module is used to determine the target capacity configuration prediction information of the target source grid-load-storage system from the candidate capacity configuration prediction information based on preset screening information.
[0034] In a third aspect, the present application further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:
[0035] Obtain system information and initial capacity configuration prediction model of the target source grid-load-storage system;
[0036] According to the system information, configuring the initial capacity configuration prediction model to obtain a target capacity configuration prediction model;
[0037] Solving the target capacity configuration prediction model to obtain candidate capacity configuration prediction information of the target source grid-load-storage system;
[0038] Based on the preset screening information, the target capacity configuration prediction information of the target source grid-load-storage system is determined from the candidate capacity configuration prediction information.
[0039] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the following steps are implemented:
[0040] Obtain system information and initial capacity configuration prediction model of the target source grid-load-storage system;
[0041] According to the system information, configuring the initial capacity configuration prediction model to obtain a target capacity configuration prediction model;
[0042] Solving the target capacity configuration prediction model to obtain candidate capacity configuration prediction information of the target source grid-load-storage system;
[0043] Based on the preset screening information, the target capacity configuration prediction information of the target source grid-load-storage system is determined from the candidate capacity configuration prediction information.
[0044] In a fifth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:
[0045] Obtain system information and initial capacity configuration prediction model of the target source grid-load-storage system;
[0046] According to the system information, configuring the initial capacity configuration prediction model to obtain a target capacity configuration prediction model;
[0047] Solving the target capacity configuration prediction model to obtain candidate capacity configuration prediction information of the target source grid-load-storage system;
[0048] Based on the preset screening information, the target capacity configuration prediction information of the target source grid-load-storage system is determined from the candidate capacity configuration prediction information.
[0049] The above-mentioned capacity configuration prediction method, device, computer equipment, computer-readable storage medium and computer program product of the source-grid-load-storage system first obtain the system information and initial capacity configuration prediction model of the target source-grid-load-storage system, and provide reliable basic data for subsequent capacity configuration prediction by collecting the system information of the target source-grid-load-storage system; then, according to the system information, configure the initial capacity configuration prediction model to obtain the target capacity configuration prediction model, and configure the initial model in combination with the actual system information to make the prediction model closer to the actual operating conditions, improve the accuracy of the model, and ensure that the model can more accurately reflect the performance of each component under different operating conditions; then, solve the target The target capacity configuration prediction model is used to obtain the candidate capacity configuration prediction information of the target source grid-load-storage system. By solving the target model, multiple candidate capacity configuration schemes are generated, which provide multiple possibilities for further screening, can comprehensively consider the different operating scenarios of the system, and provide a basis for the subsequent selection of the optimal configuration scheme; finally, based on the preset screening information, the target capacity configuration prediction information of the target source grid-load-storage system is determined from the candidate capacity configuration prediction information. By applying the preset screening criteria, the capacity configuration scheme that best meets the actual needs is selected from multiple candidate schemes to ensure that the final selected configuration can meet the current actual needs, thereby improving the operating stability of the target source grid-load-storage system. In the above method, by obtaining the actual system information of the target source grid-load-storage system and optimizing the configuration of the initial model, the target capacity configuration prediction model for the target source grid-load-storage system can be obtained, and then multiple candidate capacity configuration schemes are solved, and the optimal capacity configuration prediction information is determined by screening, thereby improving the prediction accuracy of the capacity configuration, ensuring the reliability and stability of the source grid-load-storage system in actual operation, enabling the system to better adapt to different loads and operating scenarios, and improving the overall operating efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0051] FIG1 is a schematic flow chart of a method for predicting capacity configuration of a source-grid-load-storage system in one embodiment;
[0052] FIG2 is a schematic flow diagram of a target capacity configuration prediction model determination step in one embodiment;
[0053] FIG3 is a schematic flow chart of the steps of determining the updated objective function and objective constraint conditions in one embodiment;
[0054] FIG4 is a schematic flow chart of a method for predicting capacity configuration of a source-grid-load-storage system in another embodiment;
[0055] FIG5 is a structural block diagram of a capacity configuration prediction device for a source-grid-load-storage system in one embodiment;
[0056] FIG. 6 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0057] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0058] In one embodiment, as shown in FIG1 , a method for predicting the capacity configuration of a source-grid-load-storage system is provided. This embodiment uses the method applied to a terminal as an example for illustration. It is understandable that the method can also be applied to a server, and can also be applied to a system including a terminal and a server, and is implemented through the interaction between the terminal and the server. Among them, the terminal can be, but is not limited to, various personal computers, laptops, smart phones, and tablet computers. The server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services. In this embodiment, the method includes the following steps:
[0059] Step S101, obtaining system information and an initial capacity configuration prediction model of a target source grid-load-storage system.
[0060] Among them, the source-grid-load-storage system is composed of a variety of components, including switches, micro power sources, energy storage units, power electronic equipment, and communication equipment; the micro power sources inside the source-grid-load-storage system refer to a variety of distributed power generation equipment, including non-dispatch units such as solar photovoltaic panels, wind turbines, and hydroelectric generators, as well as adjustable dispatchable units such as micro gas turbines, fuel cells, and diesel engines. When the system runs in parallel with the main power grid, the main grid can be regarded as a dispatchable power supply unit. The energy storage units commonly used in the source-grid-load-storage system involve devices such as batteries, supercapacitors, and flywheels. The core function of these energy storage units is to accumulate excess electrical energy when the power generated by distributed generation exceeds the load demand; conversely, when the demand exceeds the generated amount, they can release the stored energy to supplement the supply and ensure the power balance of the system.
[0061] Among them, system information refers to various data and parameters related to the target source grid-load-storage system, including but not limited to the historical load data, equipment information, environmental information and economic information of the target source grid-load-storage system. This information provides basic data for subsequent capacity configuration prediction.
[0062] Among them, the initial capacity configuration prediction model refers to a preliminary model built based on existing experience or historical data, which is used to predict the capacity configuration of each component in the source-grid-load-storage system. The initial model usually contains comprehensive but basic physical properties and working principles, but may need to be adaptively adjusted for the target source-grid-load-storage system. For example, the initial capacity configuration prediction model covers the preliminary configuration information of various components in the source-grid-load-storage system, including sub-models such as energy storage device models, photovoltaic power generation models, gas turbine models, etc., as well as related objective function terms and constraint terms. The initial model provides a broad starting point. Subsequently, it is necessary to adjust the parameters or make trade-offs of these sub-models, function terms and constraints according to the specific needs of the target system to make the model more adaptable to the actual operating environment.
[0063] Exemplarily, the terminal first obtains the system information of the target source grid-load-storage system based on user input or database query. The data source may include the sensor network and environmental monitoring system inside the system. Subsequently, the terminal calls the initial capacity configuration prediction model from local storage or from the database through a network connection. The model contains sub-models of various possible devices, preliminary objective function terms and constraint terms. The terminal combines this system information with the initial model to lay the foundation for subsequent parameter adjustment and model configuration, which can ensure the accuracy and effectiveness of the model in subsequent steps, thereby improving the accuracy of capacity configuration prediction.
[0064] Step S102: configuring an initial capacity configuration prediction model according to system information to obtain a target capacity configuration prediction model.
[0065] Exemplarily, the terminal first calls the initial capacity configuration prediction model from local storage or from a central database through a network connection. The model includes sub-models of various possible devices, preliminary objective function items and constraint items. The terminal adjusts the parameters in the initial capacity configuration prediction model according to the system information, and selects and discards each module in the initial capacity configuration prediction model, thereby obtaining a target capacity configuration prediction model for the target source grid load storage system.
[0066] Step S103, solving the target capacity configuration prediction model to obtain candidate capacity configuration prediction information of the target source grid-load-storage system.
[0067] Exemplarily, the terminal solves the target capacity configuration prediction model through optimization calculation. The solution process includes simulating and calculating each sub-model in the model to evaluate the performance of different configuration schemes in actual operation. The terminal uses an optimization algorithm (such as linear programming, genetic algorithm or other suitable optimization method) to solve the objective function and generate a series of candidate capacity configuration schemes. These candidate schemes may include different equipment configurations, different capacity allocation strategies, and system performance evaluation results under various operating conditions. The terminal stores or displays these candidate schemes as candidate capacity configuration prediction information, providing multiple options for subsequent screening steps. Through this solution process, the terminal can generate a variety of configuration schemes that meet the needs of the target system, laying the foundation for ultimately determining the optimal capacity configuration scheme.
[0068] Step S104: based on the preset screening information, determine the target capacity configuration prediction information of the target source grid-load-storage system from the candidate capacity configuration prediction information.
[0069] Among them, preset screening information refers to the screening criteria and conditions determined in advance by the user during the system design and planning stage. This information usually includes energy indicators, operating costs, equipment utilization, and other parameters related to system operating efficiency. The preset screening information is used to select the solution that best meets the target requirements from multiple candidate capacity configuration solutions. For example, it may include but is not limited to the new energy consumption rate reaching the set target, the abandoned solar and wind abandonment rates being lower than the set targets, the average carbon emissions being lower than the set targets, or the unit electricity cost being lower than the set targets.
[0070] Exemplarily, the terminal first loads preset screening information, which may be pre-set by the system administrator according to specific requirements and operating conditions. Then, the terminal compares the candidate capacity configuration forecast information with the preset screening information, evaluates the performance of each candidate solution under each screening condition, and selects the best solution from the candidate capacity configuration solutions. Finally, the terminal determines the target capacity configuration forecast information that meets the screening criteria, and outputs or transmits the information as the final capacity configuration recommendation to the downstream system. Ensure that the selected capacity configuration solution can not only meet the system's operating requirements, but also achieve optimized environmental and economic benefits.
[0071] In the above-mentioned capacity configuration prediction method of the source-grid-load-storage system, first, the system information and the initial capacity configuration prediction model of the target source-grid-load-storage system are obtained, and reliable basic data is provided for subsequent capacity configuration prediction by collecting the system information of the target source-grid-load-storage system; then, according to the system information, the initial capacity configuration prediction model is configured to obtain the target capacity configuration prediction model, and the initial model is configured in combination with the actual system information, so that the prediction model is closer to the actual operating conditions, the accuracy of the model is improved, and it is ensured that the model can more accurately reflect the performance of each component under different operating conditions; then, the target capacity configuration prediction model is solved to obtain the candidate capacity configuration prediction information of the target source-grid-load-storage system, and by solving the target model, a plurality of candidate capacity configuration schemes are generated, which provides a variety of possibilities for further screening, can comprehensively consider different operating scenarios of the system, and provide a basis for the subsequent selection of the optimal configuration scheme; finally, based on the preset screening information, the target capacity configuration prediction information of the target source-grid-load-storage system is determined from the candidate capacity configuration prediction information, and the capacity configuration scheme that best meets the actual needs is screened out from multiple candidate schemes by applying the preset screening criteria, so as to ensure that the configuration finally selected can meet the current actual needs, thereby improving the operation stability of the target source-grid-load-storage system. In the above method, by obtaining the actual system information of the target source grid-load-storage system and optimizing the configuration of the initial model, a target capacity configuration prediction model for the target source grid-load-storage system can be obtained, and then multiple candidate capacity configuration schemes are solved, and the optimal capacity configuration prediction information is determined by screening, thereby improving the prediction accuracy of the capacity configuration, ensuring the reliability and stability of the source grid-load-storage system in actual operation, enabling the system to better adapt to different loads and operating scenarios, and improving the overall operating efficiency.
[0072] In an exemplary embodiment, as shown in FIG. 2 , the above step S102 configures the initial capacity configuration prediction model according to the system information to obtain the target capacity configuration prediction model, which can also be implemented by the following steps:
[0073] Step S201, according to the system information, respectively updating the initial objective function and initial constraint conditions in the initial capacity configuration prediction model to obtain updated objective function and objective constraint conditions;
[0074] Step S202, updating the initial sub-model in the initial capacity configuration prediction model according to the system information to obtain a target sub-model;
[0075] Step S203, determining the target capacity configuration prediction model according to the updated target function, target constraint conditions and target sub-model.
[0076] The initial objective function refers to the function preset in the initial capacity configuration prediction model for optimizing system performance or cost, which is usually used to measure the pros and cons of system configuration solutions. The initial constraints refer to various restrictions or requirements on system operation, such as the upper limit of equipment capacity, minimum energy efficiency standards, etc. The initial conditions may be set based on a typical operating environment, but may not fully meet the actual needs of the target system.
[0077] The initial sub-model refers to the mathematical model representing each system component in the initial capacity configuration prediction model, such as the energy storage device model, photovoltaic power generation model, wind power generation model, etc. These sub-models define the performance and behavior of each component, but may need to be adjusted based on the information of the actual system.
[0078] Exemplarily, the terminal first obtains system information, including historical load data (such as historical fluctuations and peak conditions of load demand), economic information (such as electricity prices, operating costs, etc.), environmental information (such as climate data, light and wind speed, etc.), and equipment information (such as equipment type, specifications, and operating status, etc.). The terminal uses this information to adjust the initial objective function. At the same time, the terminal updates the initial constraints based on the equipment information to ensure that the configuration scheme meets the actual capacity limit and operating conditions of the equipment. Through this process, the terminal generates updated objective functions and target constraints so that the model can more accurately reflect the actual system requirements. Next, the terminal updates the initial sub-model by analyzing the system information, especially environmental information (such as climate data) and equipment information. For example, the terminal adjusts the parameters of the photovoltaic power generation model based on environmental information to more accurately reflect the actual lighting conditions; or determines the charging and discharging efficiency parameters of the energy storage device based on the equipment information. By evaluating and updating the initial sub-model, the terminal ensures that the target sub-model can accurately reflect the specific operating conditions and equipment characteristics of the target system. Finally, the terminal integrates the updated objective function and target constraints with the target sub-model to form the final target capacity configuration prediction model. The model comprehensively considers historical load data (to reflect actual changes in load demand), economic information (to optimize system operating costs), environmental information (to improve the utilization of new energy), and equipment information (to ensure that the system operates within the equipment capacity). The integrated model provides an accurate and comprehensive basis for subsequent solutions and optimizations, and can adapt to the actual operating environment of the target system.
[0079] In this embodiment, by comprehensively utilizing system information such as historical load data, economic information, environmental information, and equipment information, the objective function, constraints, and sub-models in the initial capacity configuration prediction model are dynamically adjusted and optimized, generating a more accurate and practical target capacity configuration prediction model. This enables the target capacity configuration prediction model to effectively reflect the actual operating environment and requirements of the target source grid load storage system, thereby improving the accuracy and reliability of the capacity configuration prediction. Ultimately, it ensures that the system can achieve efficient and stable operation under complex and changeable operating conditions, and provides an optimized capacity configuration solution to support the actual application of the system.
[0080] In an exemplary embodiment, as shown in FIG3 , the above step S201 updates the initial objective function and initial constraints in the initial capacity configuration prediction model according to the system information to obtain the updated objective function and objective constraints, which can also be implemented by the following steps:
[0081] Step S301, obtaining historical load data, equipment information and economic information of the target source grid-load storage system from the system information;
[0082] Step S302, updating the initial objective function in the initial capacity configuration prediction model according to historical load data, equipment information and economic information to obtain an updated objective function;
[0083] Step S303: updating the initial constraint conditions in the initial capacity configuration prediction model according to the device information to obtain the target constraint conditions.
[0084] Among them, historical load data refers to the load demand of the target source grid-load storage system in the past period of time, usually including load curves, peak and valley load periods and other information; according to the power supply mode of the power-consuming equipment, the load can also be divided into AC load, DC load, single-phase load and three-phase load; when the target industrial park is mainly powered by the power grid, the load data can be obtained from the power grid company. Equipment information refers to the type, specification, performance parameters and operating status of each device in the system. Economic information refers to economic parameters related to system operation, such as electricity price fluctuations, operating costs, equipment maintenance costs, etc.
[0085] The initial objective function refers to the function used to optimize system performance in the initial capacity configuration prediction model, which may include optimization objectives such as system cost, energy efficiency ratio, and new energy utilization rate.
[0086] Exemplarily, the terminal extracts the historical load data, equipment information and economic information of the target source grid-load storage system from the database or real-time monitoring system of the system through the data acquisition module. The terminal analyzes and adjusts the initial objective function based on the historical load data, equipment information and economic information. For example, the terminal may adjust the parameters of the load demand in the objective function according to the historical load data, so that the capacity configuration is predicted at least based on the historical load data; according to the equipment information and economic information, adjust the parameter value of the system cost or energy efficiency in the objective function, determine which equipment is in the target source grid-load storage system, and then determine the parameter value in the objective function according to the performance of the equipment. Through these adjustments, the terminal generates an updated objective function to make it more suitable for the actual optimization needs of the target source grid-load storage system. The terminal evaluates the applicability of the initial constraints based on the equipment information. For example, the terminal may adjust the constraints according to the capacity limitations of the actual equipment, or set new operating restrictions according to the maintenance cycle and service life of the equipment. Through these updates, the terminal ensures that the constraints in the model can reflect the actual capabilities and limitations of the equipment, and finally generates the target constraints to ensure the accuracy and feasibility of the capacity configuration prediction model.
[0087] In this embodiment, by obtaining the historical load data, equipment information and economic information of the target source grid-load-storage system, and combining these actual data to update the objective function and constraints in the initial capacity configuration prediction model, a more accurate objective function and objective constraints are generated. This ensures that the model more accurately reflects the actual operating requirements of the system, optimizes the decision-making process of capacity configuration, and improves the operating efficiency and reliability of the system. In turn, it is possible to provide an optimized capacity configuration solution for the target source grid-load-storage system in a complex and changeable operating environment, ensuring efficient and stable operation of the system.
[0088] In an exemplary embodiment, the above step S302 updates the initial objective function in the initial capacity configuration prediction model according to historical load data, equipment information and economic information to obtain an updated objective function, and also includes: determining candidate function items from the initial function items of the initial objective function according to the equipment information; and determining the updated objective function according to the historical load data, economic information and candidate function items.
[0089] The initial function items refer to the sub-items contained in the objective function, which represent factors such as the operating cost and maintenance cost of different equipment in the system.
[0090] Exemplarily, the terminal first obtains the equipment information to determine the type of equipment actually used in the target source grid-load storage system and its related operation and maintenance costs. Based on the equipment information, the terminal selects the candidate function items corresponding to these devices from the initial function items of the initial objective function. For example, if the system includes photovoltaic power generation equipment, energy storage devices and wind power generation equipment, the candidate function items may include the operation cost, maintenance cost, etc. of these equipment. At the same time, a necessary grid power purchase cost function item is also retained because no matter how the system is configured, the cost of purchasing electricity from the grid may be involved. Through this process, the terminal determines the candidate function items required to update the objective function. Then, based on the historical load data, the terminal determines the difference between the power generation in the target source grid-load storage system in each period and the actual load demand, thereby determining the additional amount of electricity that the system needs to purchase from the grid, and then combined with economic information (such as electricity price fluctuations, operation and maintenance costs), the calculation coefficient of the grid power purchase cost function item can be determined. At the same time, the terminal analyzes the power demand of the system under different load conditions, and evaluates the calculation coefficient of each candidate function item in the objective function in combination with economic information (such as electricity price fluctuations, operation and maintenance costs). By analyzing this data, the terminal determines how each function item affects the total cost of the system, and adjusts the weights or coefficients in the objective function to more accurately reflect the actual cost of system operation. For example, if the maintenance cost of a certain device increases significantly under high load conditions, the terminal will increase the weight of the device cost function item in the objective function accordingly. For example, the terminal can adjust the weight in the objective function so that the cost of reducing the amount of electricity purchased from the grid during high electricity price periods takes precedence over other cost optimization items. Finally, the terminal generates an updated objective function, which will be used to guide the capacity configuration optimization of the system.
[0091] In this embodiment, by screening out candidate function items related to the actual system configuration based on the equipment information, and combining the historical load data to determine the amount of electricity that needs to be purchased from the power grid after the system generates electricity, and then adjusting the objective function based on the economic information, an updated objective function that is more in line with the actual operation needs is generated. The updated objective function can more accurately reflect the total cost of the system under different load conditions, including the cost of self-generation and the cost of purchasing electricity from the power grid, thereby providing an accurate guide for capacity configuration optimization. Ultimately, this method improves the cost control capability and overall operation efficiency of the system.
[0092] In an exemplary embodiment, the above step S303 updates the initial constraints in the initial capacity configuration prediction model according to the equipment information to obtain the target constraints, and also includes: determining candidate constraints from the initial constraints according to the equipment information; determining the equipment capacity range information of the target source grid-load-storage system from the equipment information; and determining the target constraints according to the candidate constraints and the equipment capacity range information.
[0093] Exemplarily, the terminal first obtains the equipment information of the target source grid load storage system, including the type, model, rated capacity, operating life, efficiency, etc. of each device. Based on this equipment information, the terminal selects candidate constraints that are applicable to the current equipment configuration from the initial constraints. For example, if the system contains a specific type of energy storage device, the candidate constraints may include the maximum charging and discharging capacity and the minimum operating efficiency of the energy storage device. The terminal extracts the equipment capacity range information from the equipment information, such as the power generation range of photovoltaic power generation equipment under different lighting conditions, the charging and discharging power range of energy storage equipment, and the output power range of wind power generation equipment at different wind speeds. The candidate constraints screened by the terminal are combined with the determined equipment capacity range information to finally determine the target constraints. For example, the terminal may adjust the upper and lower limits of energy storage during the system operation period according to the charging and discharging capacity of the energy storage device; or set the maximum output power limit of photovoltaic power generation under specific conditions according to the power generation capacity of the photovoltaic device.
[0094] In a specific example, when the target source grid-load storage system includes a photovoltaic power generation device, the power generation power of the photovoltaic power generation device is , the corresponding constraints are , and They are the minimum power generation and maximum power generation of photovoltaic power generation equipment respectively.
[0095] When the target source grid-load storage system includes energy storage equipment, the capacity of the battery energy storage system in the energy storage equipment is , the corresponding constraints are , and are the minimum and maximum capacities of the battery energy storage system, respectively. The capacity of the hydrogen energy storage system in the energy storage device is , the corresponding constraints are , and They are the minimum and maximum capacities of the hydrogen energy storage system respectively.
[0096] In addition, since the life of the battery in the battery energy storage system is closely related to its state of charge (SOC), maintaining a too high or too low state of charge level for a long time will have a negative impact on the life of the battery; therefore, in practical applications, the hydrogen energy storage system at least includes an electrolyzer, a hydrogen storage tank and a fuel cell, wherein the hydrogen produced after the electrolyzer is powered on is stored in a hydrogen storage tank, and the hydrogen storage tank supplies hydrogen to the fuel cell for power generation. Usually some restrictive measures are taken to avoid the extreme state of charge of the battery, such as keeping the battery's state of charge at the median (20%-80%) to avoid being too high or too low. Among them, the maximum charging power of the battery It can be defined by maximum charge rate or maximum charge current: .in, is the number of batteries in the battery energy storage system, is the maximum charging current in amperes (A), It is the rated voltage of the battery, in volts (V).
[0097] In a hydrogen energy storage system, the maximum output power of the electrolyzer is determined by the smaller value between the power of the device itself and the energy of the hydrogen stored in the hydrogen storage tank:
[0098]
[0099] in, represents the maximum power output of the electrolyzer at time t, is the maximum electrical power output of the electrolyzer, is the maximum energy value that the hydrogen storage tank can store, represents the actual energy storage in the hydrogen storage tank at time t, is the time step, is the electrical power output efficiency of the electrolyzer.
[0100] The maximum output power of a fuel cell is affected by its own power output characteristics and the energy that can be stored in the hydrogen storage tank. The smaller value between the two is taken as the maximum output power of the fuel cell:
[0101]
[0102] in, represents the maximum power output of the fuel cell at time t; is the maximum power output of the fuel cell; Indicates the actual energy storage of the hydrogen storage tank, Indicates the minimum energy value that a hydrogen storage tank can store.
[0103] When the target source grid-load-storage system includes wind power generation equipment, the power generation capacity of the wind power generation equipment is , the corresponding constraints are , and They are the minimum power generation and maximum power generation of the wind power generation equipment respectively.
[0104] In addition, based on the equipment information, it can be determined that the wind and solar power abandonment rate is no more than 5% as a constraint condition, that is:
[0105]
[0106] in, is the wind and solar power abandonment rate, , , , , are the total power of wind power generation equipment, active power of photovoltaic power generation equipment, total load power, and charging and discharging power of energy storage equipment at time t.
[0107] In this embodiment, by screening candidate constraints based on device information and adjusting and optimizing these constraints in combination with the device's capacity range information, target constraints that are more in line with the actual device capabilities are generated. The target constraints not only take into account the physical limitations of the device, but also combine the actual needs of system operation to ensure that when optimizing the capacity configuration prediction model, the system can remain safe, stable, and efficient in actual operation. Ultimately, this process effectively improves the accuracy of the capacity configuration prediction model and ensures the reliability of the system in actual applications.
[0108] In an exemplary embodiment, the above step S202 updates the initial sub-model in the initial capacity configuration prediction model according to the system information to obtain the target sub-model, and also includes: obtaining the equipment information, economic information and environmental information of the target source grid-load-storage system from the system information; determining the candidate sub-model from the initial sub-model according to the equipment information; and updating the candidate sub-model according to the equipment information, economic information and environmental information to obtain the target sub-model.
[0109] Among them, environmental information refers to the meteorological conditions in the area where the target source grid-load-storage system is located, such as light intensity, wind speed, temperature, etc. This information affects the actual operating performance of the equipment.
[0110] Among them, the initial sub-model refers to the mathematical model representing each system component in the initial capacity configuration prediction model. These sub-models usually include energy storage device model, photovoltaic power generation model, wind power generation model, gas turbine model, etc.
[0111] Exemplarily, the terminal first obtains the equipment information, economic information and environmental information of the target source grid load storage system from the system information. The terminal evaluates the applicability of the initial sub-model based on the equipment information, and selects the candidate sub-models related to the actual system configuration. For example, if photovoltaic power generation equipment and energy storage devices are used in the system, the terminal will select the corresponding photovoltaic power generation model and energy storage device model as candidate sub-models, and will not select irrelevant wind power generation models. Through this screening process, the terminal ensures that the subsequently updated sub-models match the actual system configuration. Finally, the terminal adjusts the parameters in the model based on the candidate sub-models, combined with the equipment information, economic information and environmental information. For example, the terminal may update the efficiency parameters in the energy storage device model according to the operating efficiency and life of the equipment; adjust the output power prediction of the photovoltaic power generation model according to the light intensity and temperature data; and adjust the operating cost parameters in the sub-model according to the electricity price information. By comprehensively considering this information, the terminal refines and optimizes the candidate sub-models to generate a more accurate target sub-model.
[0112] In a specific example, the initial sub-model includes an energy storage device model, a photovoltaic power generation model, a gas turbine model, and a microgrid model.
[0113] When the energy storage device model includes a battery model and / or a hydrogen energy storage system model, the energy storage device model is specifically:
[0114] The battery model is set based on the KiBam power battery model; the electrolyzer model, hydrogen tank model and fuel cell model are established separately to form a hydrogen energy storage system model.
[0115] The KiBam power battery model is shown in the following formula:
[0116]
[0117]
[0118]
[0119]
[0120] The power limit when the battery is discharged is as follows:
[0121]
[0122]
[0123] Among them, in the battery model, Indicates the maximum charging power of the battery; Indicates the maximum discharge power of the battery; Indicates the maximum charging power allowed for the battery in each time step; Indicates the maximum charging power of the battery limited by the maximum charging rate; Indicates the maximum charging power of the battery limited by the maximum charging current; Indicates the maximum discharge power allowed by the battery in each time step; Indicates the charging efficiency of the battery; is the rated voltage of the battery; Indicates the discharge efficiency of the battery; Q1 represents the available electrical energy of the battery; Q max Represents the maximum energy storage capacity of the battery; Refers to the total number of batteries in series and parallel; c is the capacity ratio of the battery, which reflects the ratio of available energy to total energy in the battery pack; k is the battery rate constant, which is used to indicate the conversion rate between available energy and bound energy inside the battery; Represents the maximum charging rate of the battery; I max Indicates the maximum charging current of the battery.
[0124] In the electrolytic cell model, the voltage characteristic of the electrolytic cell is:
[0125]
[0126] Among them, r1 and r2 are ohmic resistance parameters; T el is the working temperature in the electrolytic cell; A is the electrode area; I el is the current of the electrolytic cell; s1, s2, s3 are overvoltage coefficients; t is the overvoltage coefficient; U rev Indicates reverse voltage.
[0127] The DC voltage equation of the electrolytic cell is: Among them, N el is the number of series modules of the electrolyzer; U el is the electrolytic cell voltage.
[0128] The power of the electrolyzer is: Among them, P el is the power of the electrolytic cell; I el is the electrolytic cell current.
[0129] In the hydrogen tank model, the power consumed in the process of storing hydrogen is expressed as:
[0130]
[0131] in, is the specific heat capacity of hydrogen; T is the intake temperature; P1 and P2 are the pressures at the inlet and outlet of the hydrogen storage tank respectively; K is the specific heat ratio of hydrogen under standard conditions; is the working efficiency of the compressor; W cp is the hydrogen outlet flow rate of the hydrogen storage tank.
[0132] Since the stored hydrogen is converted into electricity through the fuel cell, the output voltage of the fuel cell is expressed as:
[0133]
[0134]
[0135]
[0136]
[0137]
[0138] Among them, E Ne represents ideal electromotive force; U act Represents the energy loss caused by the activation process of electrochemical reaction; U ohm Refers to the ohmic loss caused by the internal resistance of the fuel cell; U co represents the loss due to concentration difference; N CELL is the number of batteries; represents the oxygen partial pressure at the cathode; represents the hydrogen partial pressure at the anode; R is the ideal gas constant, F is the Faraday constant, is the operating temperature of the fuel cell; where, , , , are the coefficients of the fitted model, represents the load current, represents the effective activation area; where R m Represents the equivalent membrane impedance; R c represents the resistance number in the charge transfer process, R is a constant, T represents the temperature of the surrounding environment; n represents the number of electrons involved in the reaction process, J refers to the current density, J max Refers to the maximum value of current density.
[0139] In the photovoltaic power generation model, the power output of the solar panel meets:
[0140]
[0141] in, Represents the maximum power output that a solar panel can achieve under standard test conditions; is the incident radiation of the solar panel; is the solar light intensity under standard test conditions; is the actual ambient temperature, is the standard ambient temperature; is the ambient temperature coefficient.
[0142] In the gas turbine model, the relationship between the output power of the micro gas turbine and the amount of natural gas consumed can be expressed by the following formula: .in, represents the output electrical power of the micro gas turbine; It represents the waste heat of the exhaust gas of the micro gas turbine; is the amount of natural gas consumed when the micro gas turbine outputs electrical power of; It is the lower calorific value of natural gas.
[0143] When the gas turbine generates The amount of natural gas consumed per unit of electrical power can be determined by the following mathematical expression: Among them, F0 represents the intercept coefficient of the micro gas turbine fuel consumption curve; Y gen is the rated power of the micro gas turbine; F1 represents the slope value of the micro gas turbine fuel consumption curve.
[0144] The heating capacity provided by the flue gas waste heat of the micro gas turbine can be calculated by the following formula: , and can also be expressed as electrical power Function: Among them, Q h The heat provided by the waste heat of the flue gas of the micro gas turbine, Q MT It represents the waste heat of the exhaust gas of the micro gas turbine; Indicates the utilization rate of flue gas waste heat.
[0145] In addition, compared with new energy sources such as solar and wind power generation, the power generation process of micro gas turbines involves fossil fuels such as methane and oil, which will cause the emission of harmful atmospheric substances such as nitrogen oxides (NOx), carbon monoxide (CO), sulfur dioxide (SO2) and carbon dioxide (CO2), thus leading to inevitable fuel and environmental costs, which is one of the function terms in the objective function.
[0146] The hourly operating cost of a micro gas turbine can be divided into two main parts: fixed cost and operation and maintenance cost:
[0147]
[0148] Among them, C gen,fixed represents the fixed cost per hour of the micro gas turbine; C gen,power represents the hourly electricity generation cost of the micro gas turbine; C gen,omrepresents the hourly operation and maintenance cost of the micro gas turbine; C gen,rep represents the replacement cost of the micro gas turbine when it reaches the end of its service life; R gen Indicates the estimated effective service life of the engine; C fuel,off is the unit fuel cost after considering environmental factors, Y gen represents the rated power of the micro gas turbine, F1 represents the slope value of the micro gas turbine fuel consumption curve, P gen Represents the output power of the micro gas turbine.
[0149] The microgrid model mainly consists of some lines, switches and intermediate equipment, such as converters;
[0150] In the source-grid-load-storage system, the AC power source type needs to be rectified, and typical representatives include micro gas turbines and wind turbines. These different types of power sources, when supplying standard industrial frequency AC power to the load or connecting to the main power grid, all rely on the core device of the converter to achieve energy conversion. The main power grid can be regarded as a dispatchable power supply unit.
[0151] In the optimization simulation, the installation cost of the main grid is assumed to be zero, and its rated power is equal to the maximum transmission capacity between the microgrid and the main grid. In this operation mode, the hourly operation and maintenance cost of the system is defined as the difference between the cost of purchasing electricity from the grid and the income from selling electricity to the grid during this period. For the source-grid-load-storage system, the specific relationship between the grid power, load power consumption and the power of each distributed power source is as follows: .in, , , , They are the actual load power, battery power, grid output, and missing power of the system at time t. is the actual output power of the photovoltaic power generation equipment at time t of the system.
[0152] In summary, a comprehensive consideration has been given to multiple key data of various components, covering output performance, installation costs, replacement costs, daily operation and maintenance expenses, and environmental costs. This ensures that the capacity configuration prediction model of the source-grid-load-storage system can truly reflect the actual situation and provide a reliable basis for the target source-grid-load-storage system in energy planning decision analysis.
[0153] In this embodiment, by obtaining equipment information, economic information and environmental information from system information, and screening and updating the initial sub-model based on this information, a target sub-model that is more in line with the actual system operation characteristics is generated. These sub-models are optimized and adjusted to more accurately reflect the actual performance, economic operation conditions and environmental impact of the equipment, providing an accurate mathematical basis for subsequent capacity configuration prediction. The accuracy and reliability of the system capacity configuration prediction are improved, ensuring that the model can be effectively applied in a complex actual operation environment.
[0154] In an exemplary embodiment, as shown in FIG4 , the present application provides a method for predicting capacity configuration of a source-grid-load-storage system, the method comprising:
[0155] Step S401, according to the required capacity of the target industrial park planning, a mathematical model of the source-grid-load-storage system is established, and a capacity range is set for each component model in the mathematical model.
[0156] Step S402, obtaining load data of the target industrial park and environmental data of the location of the target industrial park.
[0157] Step S403, setting the operating constraints of the mathematical model, solving the mathematical model, and outputting the capacity configuration set of all component models.
[0158] Step S404: compare the capacity configuration set according to the preset screening rule to determine the best capacity configuration.
[0159] For example, the modeling and optimization of the source-grid-load-storage system can be implemented in the HOMER software; the core function of the HOMER software is to provide an optimization model for a multi-energy hybrid system, enabling users to compare the performance of different design schemes in terms of cost-effectiveness, operational reliability, and system performance, thereby assisting users to make more informed investment choices and reduce investment risks. For example, detailed hourly energy balance calculations are performed for 8760 hours throughout the year. It is capable of performing system simulation, optimization, and sensitivity analysis, determining the feasibility of a specific configuration, and estimating the installation and operation and maintenance costs over the entire life cycle of the project. When calculating system costs, the software also takes into account factors such as replacement of accessories, operation, maintenance, fuel costs, financing interest, and government subsidies, which greatly simplifies the evaluation of the cost-effectiveness of power systems under different configuration schemes.
[0160] For example, the load data of an industrial park is purchased from the power grid, so the relevant data can be found based on the market; that is, the current local industrial peak-valley-flat electricity prices are: the peak period is 10:00-12:00, 14:00-19:00, the electricity price is 1.0377 yuan; the low period is 00:00-8:00, the electricity price is 0.2320 yuan; the normal period is 8:00-10:00, 12:00-14:00, 19:00-24:00, the electricity price is 0.6104 yuan.
[0161] In a typical 24-hour load of a certain industrial park in a certain year, the total power consumption reached 178 million kWh, and the average monthly power consumption was 14.3 million kWh. Among them, the maximum total power supply load of the 110kV substation belonging to the park was 40274kW, the minimum was 4170kW, the average load was 16531kW, and the annual power consumption was 178 million kWh. In addition, winter and summer are the peak seasons for power demand, and the daily power load also shows an oscillating distribution. The power load is highest during the day and the night before, and relatively low in the early morning. The peak load is concentrated between 8:00-11:00 and 13:00-17:00.
[0162] Among them, the solar photovoltaic panels of the photovoltaic power generation equipment of the source-grid-load-storage system of a certain industrial park are general-purpose solar photovoltaic panels, and the photovoltaic panel derating factor is 80%; the battery type of the energy storage equipment is a lithium battery, with a single-cell rated capacity and voltage of 1MWh and 600V respectively, and a charging and discharging efficiency of 90%. The initial investment cost, replacement cost, operation and maintenance cost, and life cycle of the photovoltaic array and lithium battery are shown in Table 1. Assuming an annual real interest rate of 8%, an inflation rate of 3%, and a project life cycle of 25 years. In the HOMER software, a load-following scheduling strategy is used to manage the operation of the battery.
[0163] Table 1 Parameters of the source-grid-load-storage system of an industrial park
[0164]
[0165] If the abandonment rate of solar and wind power in the source-grid-load-storage system is no more than 5% (i.e. the consumption rate of new energy power generation is greater than 95%) as one of the constraints, under the constraints of the system load balance and the installed capacity of each equipment determined above, the capacity configuration of photovoltaic power generation equipment, wind power generation equipment, energy storage equipment, etc. planned in the industrial park is calculated, and the capacity configuration of the source-grid-load-storage system can be determined, as shown in Table 2 below:
[0166] Table 2 Maximum capacity configuration table of source-grid-load-storage system in an industrial park
[0167]
[0168] Furthermore, the upper limit of the allowable installed capacity that meets the conditions for new energy consumption is used as the initial value of the HOMER software, and the HOMER software is input into the enumeration method to find the best solution within the calculation results with the cost per kilowatt-hour as the objective function. The results of the HOMER software optimization capacity matching are shown in Table 3:
[0169] Table 3 Capacity configuration table of the source-grid-load-storage system of an industrial park
[0170]
[0171] Among them, Plan A is the current energy consumption of the industrial park, which is completely purchased from the external power grid; Plan B is the configuration obtained by two optimization calculations based on the constraint condition that the new energy power generation consumption rate is greater than 95%; Plan C is the optimal plan obtained by directly using the HOMER software and the enumeration method without the constraint condition that the new energy power generation consumption rate is greater than 95%.
[0172] The economic comparison of the above schemes yields the data in Table 4:
[0173] Table 4 Capacity configuration scheme comparison table
[0174]
[0175] Considering the simulation results of the new energy consumption rate, under the premise of ensuring system reliability and meeting realistic constraints, compared with the existing energy consumption of the industrial park, the economic efficiency of the source-grid-load-storage system has been significantly improved, the annual carbon emissions have been greatly reduced, and the abandonment rate of solar and wind power has been maintained at a reasonable level below 5%, with significant optimization effects. As can be seen from Table 4, Scheme A performs better in the key indicator of the abandonment rate of solar and wind power; the abandonment rate of solar and wind power of Scheme B is 4.98%, which is much lower than the 9.51% of Scheme C. The abandonment rate of solar and wind power is an important indicator to measure the performance of photovoltaic power generation equipment. Low abandonment rate of solar and wind power means that the system can more effectively utilize photovoltaic and wind energy and reduce energy waste. Therefore, from the perspective of the abandonment rate of solar and wind power, Scheme A shows higher energy utilization efficiency and better performance. Scheme B performs better in terms of internal rate of return, return on investment and abandonment rate of solar power, while Scheme C has more advantages in terms of cost per kilowatt-hour, proportion of new energy power generation and annual average carbon emissions. In summary, if the core goal of system planning is to improve the utilization efficiency of photovoltaic and wind power generation and reduce energy waste, then Scheme B is a better choice.
[0176] In this embodiment, a mathematical model of the main components of the source-grid-load-storage system including solar photovoltaic panels, wind turbines, cogeneration micro gas turbines and fuel cells is constructed; the model not only takes into account the physical properties and working principles of each component, but also combines the economic and environmental factors in actual operation to make the model closer to the actual operation scenario; the model can also consider multiple aspects such as investment cost, operating cost, maintenance cost and income, providing strong support for the economic optimization of the system.
[0177] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0178] Based on the same inventive concept, the embodiment of the present application also provides a source-grid-load-storage system capacity configuration prediction device for implementing the above-mentioned source-grid-load-storage system capacity configuration prediction method. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above-mentioned method, so the specific limitations in the embodiments of the capacity configuration prediction device for one or more source-grid-load-storage systems provided below can refer to the limitations of the source-grid-load-storage system capacity configuration prediction method above, and will not be repeated here.
[0179] In an exemplary embodiment, as shown in FIG5 , a capacity configuration prediction device for a source-grid-load-storage system is provided, comprising: an initial data acquisition module 501, a target model acquisition module 502, a candidate prediction acquisition module 503, and a target prediction determination module 504, wherein:
[0180] An initial data acquisition module 501 is used to acquire system information and an initial capacity configuration prediction model of a target source grid-load-storage system;
[0181] The target model acquisition module 502 is used to configure the initial capacity configuration prediction model according to the system information to obtain the target capacity configuration prediction model;
[0182] The candidate prediction acquisition module 503 is used to solve the target capacity configuration prediction model and obtain candidate capacity configuration prediction information of the target source grid-load-storage system;
[0183] The target prediction determination module 504 is used to determine the target capacity configuration prediction information of the target source grid-load-storage system from the candidate capacity configuration prediction information based on the preset screening information.
[0184] In one of the embodiments, the target model acquisition module 502 is further used to update the initial objective function and initial constraints in the initial capacity configuration prediction model according to the system information, respectively, to obtain updated objective function and target constraints; to update the initial sub-model in the initial capacity configuration prediction model according to the system information, to obtain the target sub-model; and to determine the target capacity configuration prediction model according to the updated objective function, target constraints and target sub-model.
[0185] In one of the embodiments, the above-mentioned target model acquisition module 502 is also used to obtain historical load data, equipment information and economic information of the target source grid-load storage system from the system information; based on the historical load data, equipment information and economic information, the initial target function in the initial capacity configuration prediction model is updated to obtain the updated target function; based on the equipment information, the initial constraints in the initial capacity configuration prediction model are updated to obtain the target constraints.
[0186] In one embodiment, the target model acquisition module 502 is further used to determine candidate function items from the initial function items of the initial target function according to the equipment information; and to determine the updated target function according to the historical load data, economic information and the candidate function items.
[0187] In one of the embodiments, the target model acquisition module 502 is also used to determine candidate constraints from the initial constraints based on the equipment information; determine the equipment capacity range information of the target source grid-load-storage system from the equipment information; and determine the target constraints based on the candidate constraints and the equipment capacity range information.
[0188] In one of the embodiments, the target model acquisition module 502 is also used to obtain the equipment information, economic information and environmental information of the target source grid-load-storage system from the system information; determine the candidate sub-model from the initial sub-model based on the equipment information; update the candidate sub-model based on the equipment information, economic information and environmental information to obtain the target sub-model.
[0189] Each module in the above-mentioned capacity configuration prediction device of the source-grid-load-storage system can be implemented in whole or in part by software, hardware, or a combination thereof. Each of the above-mentioned modules can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.
[0190] In an exemplary embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be shown in FIG6. The computer device includes a processor, a memory, an input / output interface, a communication interface, a display unit, and an input device. The processor, the memory, and the input / output interface are connected via a system bus, and the communication interface, the display unit, and the input device are connected to the system bus via the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner may be implemented through WIFI, a mobile cellular network, near field communication (NFC) or other technologies. When the computer program is executed by the processor, a capacity configuration prediction method for a source-grid-load-storage system is implemented. The display unit of the computer device is used to form a visually visible picture, which may be a display screen, a projection device, or a virtual reality imaging device. The display screen can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covering the display screen, or a button, trackball or touchpad set on the computer device shell, or an external keyboard, touchpad or mouse.
[0191] Those skilled in the art will understand that the structure shown in FIG. 6 is merely a block diagram of a partial structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.
[0192] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.
[0193] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.
[0194] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.
[0195] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.
[0196] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.
[0197] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0198] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A capacity configuration prediction method for a source-grid-load-storage system, characterized in that: The method comprises: Obtain system information and initial capacity configuration prediction model of the target source grid-load-storage system; According to the system information, configuring the initial capacity configuration prediction model to obtain a target capacity configuration prediction model; Solving the target capacity configuration prediction model to obtain candidate capacity configuration prediction information of the target source grid-load-storage system; Based on the preset screening information, the target capacity configuration prediction information of the target source grid-load-storage system is determined from the candidate capacity configuration prediction information.
2. The method according to claim 1, characterized in that The configuring the initial capacity configuration prediction model according to the system information to obtain the target capacity configuration prediction model includes: According to the system information, respectively updating the initial objective function and initial constraint conditions in the initial capacity configuration prediction model to obtain updated objective function and objective constraint conditions; According to the system information, an initial sub-model in the initial capacity configuration prediction model is updated to obtain a target sub-model; A target capacity configuration prediction model is determined according to the updated objective function, the objective constraint conditions and the objective sub-model.
3. The method according to claim 2, characterized in that The updating of the initial objective function and the initial constraint conditions in the initial capacity configuration prediction model according to the system information to obtain the updated objective function and the objective constraint conditions includes: Acquire historical load data, equipment information and economic information of the target source grid-load storage system from the system information; According to the historical load data, the equipment information and the economic information, an initial objective function in the initial capacity configuration prediction model is updated to obtain an updated objective function; According to the device information, the initial constraint conditions in the initial capacity configuration prediction model are updated to obtain target constraint conditions.
4. The method according to claim 3, characterized in that The updating of the initial objective function in the initial capacity configuration prediction model according to the historical load data, the equipment information and the economic information to obtain an updated objective function includes: Determining candidate function items from initial function items of the initial objective function according to the device information; An updated objective function is determined according to the historical load data, the economic information and the candidate function items.
5. The method according to claim 3, characterized in that: The updating of the initial constraint conditions in the initial capacity configuration prediction model according to the device information to obtain the target constraint conditions includes: Determining candidate constraints from the initial constraints according to the device information; Determining the equipment capacity range information of the target source grid-load-storage system from the equipment information; A target constraint condition is determined according to the candidate constraint condition and the equipment capacity range information.
6. The method according to claim 2, characterized in that The updating, according to the system information, of the initial sub-model in the initial capacity configuration prediction model to obtain the target sub-model includes: Acquire equipment information, economic information and environmental information of the target source grid-load-storage system from the system information; Determine a candidate sub-model from the initial sub-model according to the device information; The candidate sub-model is updated according to the device information, the economic information and the environmental information to obtain a target sub-model.
7. A capacity configuration prediction device for a source-grid-load-storage system, characterized in that: The device comprises: An initial data acquisition module is used to obtain system information and an initial capacity configuration prediction model of the target source grid-load-storage system; A target model acquisition module, configured to configure the initial capacity configuration prediction model according to the system information to obtain a target capacity configuration prediction model; A candidate prediction acquisition module is used to solve the target capacity configuration prediction model to obtain candidate capacity configuration prediction information of the target source grid-load-storage system; The target prediction determination module is used to determine the target capacity configuration prediction information of the target source grid-load-storage system from the candidate capacity configuration prediction information based on preset screening information.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.