Forecasting traffic series correction method and device
By correcting the observation data of multiple rainfall stations, calculating the flow error and inverting the correction cycle proportional coefficient, the problem of insufficient heterogeneity of rainfall distribution in the existing technology is solved, and the accuracy of flood forecasting and flow correction are improved. .
Patent Information
- Application Number
- CN202411055988.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-10-29
AI Technical Summary
In the existing technology, the spatial heterogeneity of rainfall distribution in the basin is insufficiently considered in flood forecasting, resulting in low accuracy in correcting the forecast flow series.
By obtaining the observed rainfall series and evaporation series of multiple rainfall stations, the flow error is calculated, the cycle proportion coefficient of the rainfall station is inverted and corrected, the observed rainfall series is corrected, and the corrected data is input into the flood forecast model to correct the forecast flow series.
The joint error correction of rainfall at multiple stations in the basin is realized, which improves the accuracy of flood forecasting and flow forecasting.
Smart Images

Figure CN118857431A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a forecast flow series correction method and device, belonging to the technical field of flood flow forecast and real-time correction. Background Art
[0002] Flood forecasting is of great significance to flood prevention and disaster reduction in river basins and water resource utilization. Due to the complexity of the flood process itself and the limitations of human understanding of its laws, when using hydrological models for flood forecasting, there are inevitably uncertainties in many aspects such as model input, model structure and parameters, and initial values of model state variables, which makes the final forecast results also have errors. Therefore, it is necessary to use error correction technology to further improve the accuracy of forecast results.
[0003] The system differential response error correction method is a feedback correction technology that traces back to the source of the error. When the system differential response error correction method is used to correct the variables in the hydrological model, it actually corrects the model variables by backtracking the flow calculation error. The system differential response error correction method uses the least squares method to solve. If there is M equation, M unknowns can be solved successfully; if there is only M equation, but to solve M+i ( i =1,2,…) unknowns. Taking the feedback correction of rainfall in the system differential response theory as an example, when there is only one rainfall station in the basin, that is, through the inversion of flow calculation errors in T time periods t The rainfall error in each period ( t ≤ T ), the solution can be successfully performed because of sufficient information; N ( N >1) rainfall station, that is, through T Error inversion of flow calculation for each period N × t The rainfall error in each period ( N × t > T ), which often involves the problem of insufficient information and makes it difficult to perform error inversion. At present, the system differential response error correction method is often used to correct the basin average rainfall series for further flood correction, but the spatial heterogeneity of rainfall distribution in the basin is not considered enough during the correction process, resulting in low correction accuracy of the forecast flow series. Summary of the invention
[0004] The purpose of the present invention is to provide a method and device for correcting a forecast flow series, so as to solve the problem of low correction accuracy of the forecast flow series in the prior art.
[0005] To achieve the above objectives, the present invention is implemented by adopting the following technical solutions: In a first aspect, the present invention provides a method for correcting a series of forecast flows, comprising: Obtain the observed flow series and forecast flow series of the target basin outlet section, obtain the observed rainfall series observed at different time periods by each rainfall station in the basin above the outlet section and the observed evaporation series observed at different time periods by each evaporation station; Calculating the difference between the observed flow series and the forecast flow series to obtain a calculated flow error, and inverting and correcting the preset circulation proportional coefficient of each rainfall station based on the calculated flow error to obtain a corrected circulation proportional coefficient series; Correcting the observed rainfall series based on the corrected cycle proportional coefficient series to obtain a corrected observed rainfall series; The modified observed rainfall series and the observed evaporation series are input into the constructed flood forecast model to obtain a corrected forecast flow series.
[0006] Furthermore, the forecast flow series is obtained by the following method: Obtain the observed rainfall series observed at different time periods by each rainfall station in the basin above the outlet section and the observed evaporation series observed at different time periods by each evaporation station, input the observed rainfall series and the observed evaporation series into the constructed flood forecasting model to obtain the forecast flow series.
[0007] Furthermore, the flood forecasting model includes the Xin'anjiang model, the HBV model and the vertical mixed runoff model.
[0008] Furthermore, the inversion correction of the preset circulation proportional coefficient of each rainfall station based on the calculated flow error includes: set up N Round iteration, each round iteration uses T The calculated flow error is corrected from the l to l+T- 1 total T The cycle proportionality factor, l The initial value of is set to 1, where N is the number of rainfall stations, T is the number of time periods, and the iteration includes: Calculate the system response caused by the change of the circulation proportional coefficient to the flow of the outlet section of the target basin based on the flood forecasting model; Construct a system response matrix based on the responses of each system; calculating a loop proportionality coefficient error based on the system response matrix and the calculated flow error; Add the corresponding loop proportional coefficient error to the loop proportional coefficient to obtain the corrected loop proportional coefficient.l = l + T , repeat the above iteration until l =( N -1) T+ 1. End the iteration and obtain a modified cyclic proportional coefficient series consisting of all modified cyclic proportional coefficients.
[0009] Furthermore, the system response caused by the change in the circulation proportional coefficient to the flow rate at the outlet section of the target basin is calculated by the following formula: ; in, For the l + i -1 period cycle ratio coefficient change to the export j The system response caused by the traffic in each period, ε is a preset constant, The first section of the target basin outlet is calculated by inputting the flood forecasting model using the circulation scale coefficient before correction. j The flow rate of each period, For the l + i -1 period cycle proportionality factor adds disturbance term ε Then input the target basin outlet section calculated by the flood forecasting model. j The flow rate of each period, i =1,2,…, T , j =1,2,…, T .
[0010] Furthermore, the system response matrix is constructed based on the responses of each system, and is performed by the following formula: ; in, U is the system response matrix. The general formula of each item in the system response matrix is ,and i =1, 2,…, T , j =1,2,…, T .
[0011] Further, the calculation of the cyclic proportional coefficient error based on the system response matrix and the calculated flow error is performed by the following formula: Δ α=(U R U) -1 U R ΔQ ; Among them, Δ α is the loop proportional coefficient error, U is the system response matrix, Δ Q To calculate the flow error, R Indicates transpose.
[0012] Furthermore, the observed rainfall series is corrected based on the corrected cycle proportional coefficient series by the following formula: ; in, P new To correct the observed rainfall series, The first rainfall observation series n The rainfall station t The observed rainfall values for each period, α (n-1)T+t To correct the cycle proportionality coefficient series t Period n The corrected cycle scaling factor for each rainfall station, t =1,2,…, T ,n=1,2,…, N .
[0013] Furthermore, after obtaining the corrected forecast flow series, it also includes: The coefficient of certainty is calculated by the following formula: ; in, DC is the coefficient of certainty, T is the number of time periods, t is the current period number, t =1,2,…, T , Q O is the observed flow series, is the mean of the observed flow series, is the corrected forecast flow series; If the certainty coefficient reaches the preset value or the difference between the certainty coefficients of two consecutive calculations is less than 0.001, the correction is terminated. Otherwise, the corrected cycle proportional coefficient series and the corrected observed rainfall series are corrected again, and the forecast flow series is calculated using the latest observed rainfall series.
[0014] In a second aspect, the present invention provides a forecast flow series correction device, comprising: The data acquisition module is configured to: obtain the observed flow series and the forecast flow series of the outlet section of the target basin, obtain the observed rainfall series observed by each rainfall station in the basin above the outlet section at different time periods and the observed evaporation series observed by each evaporation station at different time periods; The circulation proportional coefficient series correction module is configured to: calculate the difference between the observed flow series and the forecast flow series to obtain a calculated flow error, and invert and correct the preset circulation proportional coefficient of each rainfall station based on the calculated flow error to obtain a corrected circulation proportional coefficient series; The observed rainfall series correction module is configured to: correct the observed rainfall series based on the correction cycle proportional coefficient series to obtain a corrected observed rainfall series; The forecast flow series correction module is configured to: input the corrected observed rainfall series and the observed evaporation series into the constructed flood forecast model to obtain a corrected forecast flow series.
[0015] Compared with the prior art, the beneficial effects achieved by the present invention are: The present invention provides a forecast flow series correction method and device, which realizes the joint error correction of rainfall at multiple stations in the basin by correcting the observed rainfall at multiple rain gauges in the basin above the outlet section, overcomes the deficiency that the current system differential response error correction method can only correct the surface average rainfall (single-station rainfall), obtains a more accurate spatial and temporal distribution of rainfall in the basin, thereby improving the accuracy of flood forecasting and obtaining a more accurate forecast flow series. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 is a flow chart of a forecast flow series correction method corresponding to Embodiment 1 of the present invention; Figure 2 is a flow chart of a forecast flow series correction method corresponding to Embodiment 2 of the present invention; Figure 3 is a flowchart corresponding to step 4 in embodiment 2 of the present invention; Figure 4 It is a schematic diagram comparing the certainty coefficients of the method corresponding to the second embodiment of the present invention in the correction effect of the flow forecast in the Wuxigou Basin and the basin above the Laoshikan Reservoir; Figure 5 It is a schematic diagram comparing the relative errors of peak flow in the correction effect of the flow forecast in the Wuxigou Basin and the basin above the Laoshikan Reservoir when the method corresponding to the second embodiment of the present invention is applied; Figure 6 It is a schematic diagram comparing the absolute errors of the peak time in the correction effect of the flow forecast in the Wuxigou Basin and the basin above the Laoshikan Reservoir when the method corresponding to the second embodiment of the present invention is applied; Figure 7It is a schematic diagram comparing the relative errors of runoff depth in the correction effect of flow forecast in the Wuxigou Basin and the basin above the Laoshikan Reservoir when the method corresponding to Example 2 of the present invention is applied. DETAILED DESCRIPTION
[0017] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solutions of the present invention and are not intended to limit the protection scope of the present invention.
[0018] Example 1.
[0019] like Figure 1 As shown, the present invention provides a forecast flow series correction method, comprising the following steps: Obtain the observed flow series and forecast flow series of the target basin outlet section, obtain the observed rainfall series observed at different time periods by each rainfall station in the basin above the outlet section and the observed evaporation series observed at different time periods by each evaporation station; The difference between the observed flow series and the forecast flow series is calculated to obtain the calculated flow error. Based on the calculated flow error, the preset circulation proportional coefficient of each rainfall station is corrected by inversion to obtain the corrected circulation proportional coefficient series. The observed rainfall series is corrected based on the corrected cycle proportional coefficient series to obtain a corrected observed rainfall series; The corrected observed rainfall series and observed evaporation series are input into the constructed flood forecast model to obtain the corrected forecast flow series.
[0020] In order to realize the joint error correction of multiple sites in the basin, the present invention characterizes the characteristic relationship between the predicted flow and the rainfall at multiple sites through the differential response of the hydrological model system, establishes a multi-site error correction method of cyclic proportional coefficient based on the differential response of the system, obtains a more accurate spatiotemporal distribution of rainfall in the basin, can realize fine correction of the whole process and further improve the accuracy of flood forecasting; specifically, the present invention realizes the joint error correction of rainfall at multiple sites in the basin by correcting the observed rainfall at multiple rain gauges in the basin above the outlet section, overcomes the deficiency that the current system differential response error correction method can only correct the surface average rainfall (single-site rainfall), obtains a more accurate spatiotemporal distribution of rainfall in the basin, thereby improving the accuracy of flood forecasting and obtaining a more accurate forecast flow series.
[0021] Example 2.
[0022] like Figure 2 As shown, the present invention provides a forecast flow series correction method, comprising the following steps: Step 1: Collect and record the observed flow series at the outlet section of the target basin Q O , the observed rainfall series of each rainfall station in the target basin above the outlet sectionP And the observation evaporation series of each evaporation station E( Composed of evaporation from water surface ) .
[0023] Step 2: Combine the natural geography and hydrological and meteorological conditions of the target basin to establish a flood forecast model suitable for the area f In this example, the Xinanjiang model, HBV model, and vertical mixed runoff model will be used for control experiments, and the observed rainfall series will be input. P And the observation evaporation series of each evaporation station E , output forecast flow series Q c .
[0024] Step 3: Assume that the number of rainfall stations to be corrected is N , the number of time periods to be corrected is T , a total of N × T Observed rainfall.
[0025] Step 4: Calculate the flow error Δ using Q = Q O - Q c Inversion correction cycle proportionality coefficient α O , and then the corrected observed rainfall series is obtained: ; P new To correct the observed rainfall series, The first rainfall observation series n The rainfall station t The observed rainfall values for each period, α O is the cycle proportional coefficient before correction, α (n-1)T+t To correct the cycle proportionality coefficient series t Period n The corrected cycle scaling factor for each rainfall station, t =1,2,…, T ,n=1,2,…, N , set the initial value of the loop proportional coefficient to 1.
[0026] like Figure 3 As shown, set each use T Calculated flow error Δ Q Correction from l arrive l + T -1 TotalT Cycle proportionality factor, initial l Set to 1. This is the first round of corrections. α 1 ~ α T , the second round of revisions α T+1 ~ α 2T , the third round of revisions α 2T+1 ~ α 3T , and so on, until the N Wheel correction α (N-1)T+1 ~ α NT , we can get the corrected observed rainfall series P new .
[0027] Step 4.1: Since the change of the circulation scale coefficient directly affects rainfall, the hydrological model can be expressed as Q ( α )= f ( α ), for the cycle proportionality factor α Find the total differential, then observe the flow Q ( α )for: ; in, α O is the cycle proportional coefficient before correction, dQ t is the flow rate change caused by the change in the circulation proportional coefficient, t =1,2,…, T , in actual calculation dQ t = Q Ot - Q ct , Q Ot For the t The observed flow rate for each period, Q ct Reason α O Input to flood forecasting models f The obtained t Forecast flow for each period, partial differential For the l + i -1 The change in the cycle proportional coefficient has an effect on the output j The system response caused by the flow rate, andi =1, 2,…, T , j =1,2,…, T .
[0028] It can be calculated by difference: ; in, For the l + i -1 period cycle ratio coefficient change to the export j The system response caused by the traffic in each period, ε is a preset constant, The first section of the target basin outlet is calculated by inputting the flood forecasting model using the circulation scale coefficient before correction. j The flow rate of each period, For the l + i -1 period cycle proportionality factor adds disturbance term ε Then input the target basin outlet section calculated by the flood forecasting model. j The flow rate of each period, i =1,2,…, T , j =1,2,…, T .
[0029] Step 4.2: Calculate the system response matrix U.
[0030] It is done by the following formula: ; in, U is the system response matrix. The general formula of each item in the system response matrix is ,and i =1, 2,…, T , j =1,2,…, T .
[0031] Step 4.3: Calculate the loop proportionality error Δ α .
[0032] Δ α=(U R U) -1 U R Δ Q ; Among them, Δ α is the loop proportional coefficient error, U is the system response matrix, ΔQ To calculate the flow error, R Indicates transpose.
[0033] make α l~l+T-1 = α l~l+T-1 +Δ α .
[0034] Step 4.4: Order l = l + T Repeat steps 4.1 to 4.3 until l =( N -1) T+ 1. End the iteration and get the updated loop proportional coefficient.
[0035] Step 5: Correct the observed rainfall series P new , observation evaporation series of each evaporation station E Input the flood forecast model established in step 2 f , calculate the corrected forecast flow series .
[0036] Step 6: Calculate the coefficient of certainty using the following formula: ; in, DC is the coefficient of certainty, T is the number of time periods, t is the current period number, t =1,2,…, T , Q O is the observed flow series, is the mean of the observed flow series, is the corrected forecast flow series; If the certainty coefficient reaches the preset value or the difference between the certainty coefficients of two consecutive calculations is less than 0.001, the correction is terminated. Otherwise, the corrected cycle proportional coefficient series and the corrected observed rainfall series are corrected again, and the forecast flow series is calculated using the latest observed rainfall series.
[0037] In this embodiment, the above method is applied to the Wuxigou Basin in the upper reaches of the Wanshui River and the upper reaches of the Laoshikan Reservoir in the middle reaches of the Nanxi River. 27 floods in the Wuxigou Basin between 1975 and 2009 and 32 floods in the basin above the Laoshikan Reservoir between 1988 and 2018 are used for application testing. In this embodiment, ε=0.01. Xinanjiang model (XAJ), HBV model and vertical hybrid runoff model (VHY) were constructed in the two study areas for flood forecasting, and the applicability of each hydrological model in the study area was tested. Then, the cyclic proportional coefficient multi-station error correction method (C-SDR) based on system differential response was used for flood correction. According to the "Hydrological Information Forecast Specification GB / T 22482-2008", from multiple perspectives such as flood peak, peak time, flood volume and flood process, the deterministic coefficient DC , relative error of peak flow ΔQ m , peak time absolute error Δ T and runoff depth relative error Δ R The flood forecast accuracy was evaluated and the forecast qualification rate was calculated, as shown in Table 1. The accuracy of each flood in the study area before and after correction is shown in Table 1. Figures 4 to 7 shown.
[0038] Table 1-Flood forecast and correction results
[0039] It can be seen from Table 1 that after correction by the multi-station error correction method of the cyclic proportional coefficient based on the system differential response, the deterministic coefficients of the original flood simulation of each hydrological model are DC , peak flow relative error Δ Q m , peak time absolute error Δ T and runoff depth relative error Δ R The pass rates of other indicators have all been improved.
[0040] Depend on Figure 4 It can be seen that in the 27 floods in the Wuxigou Basin, the flood simulation results of the calibrated Xinanjiang model, HBV model and vertical hybrid runoff model are DC The value reaches Class A accuracy ( DC >0.9) increased by 33.3%, 48.1% and 59.3% respectively; in the 32 floods in the basin above Laoshikan Reservoir, the flood simulation results of the calibrated Xinanjiang model, HBV model and vertical hybrid runoff model were DC The value reaches Class A accuracy ( DC >0.9) increased by 46.9%, 62.5%, and 50.0% respectively.
[0041] Depend on Figure 5 It can be seen that after correction, the Δ of flood forecasting of Xinanjiang model, HBV model and vertical mixed runoff model in Wuxigou basin and basin above Laoshikan Reservoir is Q m The qualified rates have all increased to a certain extent, among which the increase in the basin above the Laoshikan Reservoir was nearly 15%, and the correction effect was quite obvious.
[0042] Depend on Figure 6 It can be seen that after correction, the Xinanjiang model, HBV model and vertical mixed runoff model have different Δ T The qualified rates increased by 7.4%, 3.7% and 7.4% respectively, and increased by 15.6%, 28.1% and 15.6% respectively in the basin above Laoshikan Reservoir.
[0043] Depend on Figure 7 It can be seen that after correction, the flood simulation Δ of each hydrological model in the Wuxigou Basin and the basin above the Laoshikan Reservoir R The pass rate reached 100%.
[0044] In summary, the method provided by the present invention effectively improves the accuracy of flood forecasting and has a very good forecast flow series correction effect.
[0045] Example 3.
[0046] The present invention provides a forecast flow series correction device, comprising: The data acquisition module is configured to: obtain the observed flow series and the forecast flow series of the outlet section of the target basin, obtain the observed rainfall series observed by each rainfall station in the basin above the outlet section at different time periods and the observed evaporation series observed by each evaporation station at different time periods; The circulation proportional coefficient series correction module is configured to: calculate the difference between the observed flow series and the forecast flow series to obtain a calculated flow error, and invert and correct the preset circulation proportional coefficient of each rainfall station based on the calculated flow error to obtain a corrected circulation proportional coefficient series; The observed rainfall series correction module is configured to: correct the observed rainfall series based on the correction cycle proportional coefficient series to obtain a corrected observed rainfall series; The forecast flow series correction module is configured to: input the corrected observed rainfall series and the observed evaporation series into the constructed flood forecast model to obtain a corrected forecast flow series.
[0047] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
[0048] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0049] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0050] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0051] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for correcting a series of forecast flows, characterized in that: include: Obtain the observed flow series and forecast flow series of the outlet section of the target basin, obtain the observed rainfall series observed by each rainfall station in the basin above the outlet section at different time periods and the observed evaporation series observed by each evaporation station at different time periods; Calculating the difference between the observed flow series and the forecast flow series to obtain a calculated flow error, and inverting and correcting the preset circulation proportional coefficient of each rainfall station based on the calculated flow error to obtain a corrected circulation proportional coefficient series; Correcting the observed rainfall series based on the corrected cycle proportional coefficient series to obtain a corrected observed rainfall series; The modified observed rainfall series and the observed evaporation series are input into the constructed flood forecast model to obtain a corrected forecast flow series.
2. The forecast flow series correction method according to claim 1, characterized in that: The forecast flow series is obtained by the following method: Obtain the observed rainfall series observed at different time periods by each rainfall station in the basin above the outlet section and the observed evaporation series observed at different time periods by each evaporation station, input the observed rainfall series and the observed evaporation series into the constructed flood forecasting model to obtain the forecast flow series.
3. The forecast flow series correction method according to claim 1, characterized in that: The flood forecasting models include Xin'anjiang model, HBV model and vertical mixed runoff model.
4. The forecast flow series correction method according to claim 1, characterized in that: The method of inverting and correcting the preset circulation proportional coefficient of each rainfall station based on the calculated flow error includes: set up N Round iteration, each round iteration uses T The calculated flow error is corrected from the l to l+T- 1 total T The cycle proportionality factor, l The initial value of is set to 1, where N is the number of rainfall stations, T is the number of time periods, and the iteration includes: Calculate the system response caused by the change of the circulation proportional coefficient to the flow of the outlet section of the target basin based on the flood forecasting model; Construct a system response matrix based on the responses of each system; calculating a loop proportionality coefficient error based on the system response matrix and the calculated flow error; Add the corresponding loop proportional coefficient error to the loop proportional coefficient to obtain the corrected loop proportional coefficient. l = l + T , repeat the above iteration until l =( N -1) T+ 1. End the iteration and obtain a modified cyclic proportional coefficient series consisting of all modified cyclic proportional coefficients.
5. The forecast flow series correction method according to claim 4, characterized in that: The system response caused by the change in the circulation proportional coefficient to the flow rate at the outlet section of the target basin is calculated by the following formula: ; in, For the l + i -1 period cycle ratio coefficient change to the export j The system response caused by the traffic in each period, ε is a preset constant, The first section of the target basin outlet is calculated by inputting the flood forecasting model using the circulation scale coefficient before correction. j The flow rate of each period, For the l + i -1 period cycle proportionality factor adds disturbance term ε Then input the target basin outlet section calculated by the flood forecasting model. j The flow rate of each period, i =1,2,…, T , j =1,2,…, T .
6. The method for correcting the forecast flow series according to claim 5, characterized in that: The system response matrix is constructed based on each system response, and is performed by the following formula: ; in, U is the system response matrix. The general formula of each item in the system response matrix is ,and i =1, 2,…, T , j =1,2,…, T .
7. The forecast flow series correction method according to claim 4, characterized in that: The calculation of the cyclic proportional coefficient error based on the system response matrix and the calculated flow error is performed by the following formula: D α=(U R U) -1 U R D Q ; Among them, Δ α is the loop proportional coefficient error, U is the system response matrix, Δ Q To calculate the flow error, R Indicates transpose.
8. The forecast flow series correction method according to claim 1, characterized in that: The correction of the observed rainfall series based on the correction cycle proportional coefficient series is performed by the following formula: ; in, P new To correct the observed rainfall series, The first rainfall observation series n The rainfall station t The observed rainfall values for each period, α (n-1)T+t To correct the cycle proportionality coefficient series t Period n The corrected cycle scaling factor for each rainfall station, t =1,2,…, T ,n=1,2,…, N .
9. The forecast flow series correction method according to claim 1, characterized in that: After obtaining the corrected forecast flow series, it also includes: The coefficient of certainty is calculated by the following formula: ; in, DC is the coefficient of certainty, T is the number of time periods, t is the current period number, t =1,2,…, T , Q O is the observed flow series, is the mean of the observed flow series, is the corrected forecast flow series; If the certainty coefficient reaches the preset value or the difference between the certainty coefficients of two consecutive calculations is less than 0.001, the correction is terminated. Otherwise, the corrected cycle proportional coefficient series and the corrected observed rainfall series are corrected again, and the forecast flow series is calculated using the latest observed rainfall series.
10. A forecast flow series correction device, characterized in that: include: The data acquisition module is configured to: obtain the observed flow series and the forecast flow series of the outlet section of the target basin, obtain the observed rainfall series observed by each rainfall station in the basin above the outlet section at different time periods and the observed evaporation series observed by each evaporation station at different time periods; The circulation proportional coefficient series correction module is configured to: calculate the difference between the observed flow series and the forecast flow series to obtain a calculated flow error, and invert and correct the preset circulation proportional coefficient of each rainfall station based on the calculated flow error to obtain a corrected circulation proportional coefficient series; The observed rainfall series correction module is configured to: correct the observed rainfall series based on the correction cycle proportional coefficient series to obtain a corrected observed rainfall series; The forecast flow series correction module is configured to: input the corrected observed rainfall series and the observed evaporation series into the constructed flood forecast model to obtain a corrected forecast flow series.