Method and system for digital generation of project data

By obtaining the comparison of the unique mark of the project data and the comparison mark, the digital file of the project data is automatically generated, which solves the problem of low efficiency of traditional project data generation and realizes efficient project data management.

CN118862831BActive Publication Date: 2025-01-21JIANGXI HENGSHI CONSTR MANAGEMENT CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411305311.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2025-01-21
Estimated Expiration
2044-09-19

AI Technical Summary

Technical Problem

Traditional project data generation requires a long manual time, resulting in inefficient generation.

Method used

By obtaining the unique mark of the project data and the comparison of the control marks, digital files of the project data are automatically generated to reduce manual intervention.

Benefits of technology

It improves the efficiency of project data generation, reduces confusion and errors caused by manual processing, and realizes an automated project data generation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118862831B_ABST
    Figure CN118862831B_ABST
Patent Text Reader

Abstract

The present application is applicable to the technical field of data generation, and in particular to a method and system for digitally generating project data, the method comprising: obtaining the mark of the project data to be generated; obtaining the comparison status of the comparison mark recorded in the project data digital generation device; wherein the comparison status is used to reflect whether the comparison mark is a findable mark; based on the mark of the project data to be generated and the comparison status, a project data generation method is obtained. The project data digital generation method provided by the present application can solve the problem that in the traditional project data generation process, it usually takes a long time for manual labor to generate and process project data, thereby reducing the generation efficiency of project data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of data generation, and in particular, relates to a method and system for digitally generating project data. Background Art

[0002] Project data refers to the various documents, data and information generated, collected, organized and stored throughout the life cycle of a project. These data are essential for the planning, execution, monitoring and summary of the project.

[0003] Traditional project data generation usually requires manual work that takes a long time to generate and process project data, thereby reducing the efficiency of project data generation. Summary of the invention

[0004] The embodiments of the present application provide a method and system for digitally generating project data, which can solve the problem that in the traditional project data generation process, it usually takes a long time for manual labor to generate and process project data, thereby reducing the generation efficiency of project data.

[0005] In a first aspect, an embodiment of the present application provides a method for digitally generating project data, which is applied to a device for digitally generating project data, and the method includes:

[0006] Get the token of the project data to be generated;

[0007] Obtaining the comparison status of the comparison mark recorded in the project data digital generation device; wherein the comparison status is used to reflect whether the comparison mark is a findable mark;

[0008] Based on the mark of the project data to be generated and the comparison situation, a project data generation method is obtained; wherein the project data generation method is used to instruct the project data digitization generation device to generate a project data digitization file according to the project data to be generated.

[0009] The above technical solutions in the embodiments of the present application have at least the following technical effects:

[0010] The project data digital generation method provided by the present application, first, by obtaining the marks of the project data to be generated, it can ensure that each project data has a unique symbol, can accurately identify and track each part, reduce confusion and errors caused by manual processing, and thus help to improve the subsequent generation efficiency of project data. Then, by obtaining the comparison of the comparison marks recorded in the project data digital generation device, clear records and comparison information can be provided to avoid confusion of project data caused by invalid or repeated marks, thereby reducing manual intervention and helping to improve the subsequent generation efficiency of project data. Finally, based on the marks and comparison marks of the project data to be generated, a project data generation method is obtained, which can implement an automated project data generation process, reduce manual intervention, help the generation and management of project data, and thus improve the generation efficiency of project data.

[0011] In a possible implementation of the first aspect, obtaining a project information generation method based on the mark of the project information to be generated and the comparison situation includes:

[0012] Monitoring a first generation instruction; wherein the first generation instruction includes a first mark, and the first generation instruction is used to indicate that the project data request corresponding to the first mark generates a corresponding project data digitized file in the project data digitization generation device;

[0013] When the comparison situation reflects that the comparison mark is a findable mark, and the first mark is inconsistent with the comparison mark, a first generation signal corresponding to the first generation instruction is generated; wherein the comparison mark is a findable mark used to indicate that within a preset time period before the first generation instruction is monitored, the project information digitization generation device has used at least one project information to generate a project information digitization file, and the at least one project information does not include the project information corresponding to the first mark; the first generation signal is used to reject the first generation instruction;

[0014] A first generation method in the project data generation method is determined according to the first generation signal; wherein the first generation method is used to instruct the project data digital generation device not to use the project data corresponding to the first mark to perform project data digital generation activities.

[0015] In a possible implementation manner of the first aspect, after monitoring the first generation instruction, the method further includes:

[0016] When the comparison situation reflects that the comparison mark is a findable mark and the first mark is consistent with the comparison mark, generating a second generation signal corresponding to the first generation instruction; wherein the first generation signal is used to approve the first generation instruction;

[0017] A second generation method in the project data generation method is determined according to the second generation signal; wherein the second generation method is used to instruct the project data digital generation device to use the project data corresponding to the first mark to perform a project data digital generation activity.

[0018] In a possible implementation manner of the first aspect, after monitoring the first generation instruction, the method further includes:

[0019] In the case where the comparison situation reflects that the comparison mark is an untraceable mark, a third generation signal corresponding to the first generation instruction is generated; wherein the comparison mark is an untraceable mark used to indicate that the project data digitization generation device has not used at least one project data to generate a project data digitization file within a preset time period before the first generation instruction is monitored, and the third generation signal is used to approve the first generation instruction;

[0020] A third generation method in the project data generation method is determined according to the third generation signal; wherein the third generation method is used to instruct the project data digital generation device to use the project data corresponding to the first mark to perform a project data digital generation activity.

[0021] In a possible implementation manner of the first aspect, the method further includes:

[0022] During the data generation period, the project data digitization generation activity for other project data except the project data corresponding to the first mark is rejected.

[0023] In a possible implementation manner of the first aspect, the method further includes:

[0024] Obtaining the generation status of the project data corresponding to the first mark;

[0025] When the generation state is a preset state, the project data digital generation device stops the current project data digital generation activity and initiates a first activity for the project data corresponding to the first mark; wherein the preset state is a state in which the project data digital generation activity has been started and the generation has failed, and the first activity is used to instruct the project data digital generation device to reuse the project data corresponding to the first mark to perform the project data digital generation activity.

[0026] In a possible implementation manner of the first aspect, the method further includes:

[0027] Initiate the first activity for the project data corresponding to the first mark when the number of times the first activity is initiated does not exceed the preset number of initiations and the project data corresponding to the first mark meets the generation condition; wherein the preset number of initiations is the number of times the project data digitization generation device reuses the project data corresponding to the first mark to perform the project data digitization generation activity when the project data digitization generation device stops the current project data digitization generation activity; and the generation condition is the condition that a generation error caused by an error in the project data corresponding to the first mark has been repaired.

[0028] In a possible implementation manner of the first aspect, obtaining a generation status of the project data corresponding to the first mark includes:

[0029] The generation data of the project data corresponding to the first mark is detected at a set time interval to determine the generation status of the project data corresponding to the first mark.

[0030] In a possible implementation manner of the first aspect, the method further includes:

[0031] In a case where the generation data reflects a generation rate of the project data corresponding to the first mark, if the generation rate does not exceed or equal to a first rate, the generation state is the preset state.

[0032] In a possible implementation manner of the first aspect, after obtaining the generation status of the project data corresponding to the first mark, the method further includes:

[0033] When the generation state is a normal state, the project data digital generation device maintains the current project data digital generation activity; wherein the normal state is that the generation process has been started and no failure state has been generated.

[0034] In a second aspect, an embodiment of the present application provides a project data digitization generation system, which is used to implement the project data digitization generation method described in any one of the first aspects above, wherein the project data digitization generation system is applied to a project data digitization generation device, and the project data digitization generation system includes:

[0035] A first acquisition unit, used for acquiring a sign of the project data to be generated;

[0036] A second acquisition unit is used to acquire the comparison status of the comparison mark recorded in the project data digital generation device; wherein the comparison status is used to reflect whether the comparison mark is a findable mark;

[0037] A generating unit is used to obtain a project data generating method based on the mark of the project data to be generated and the comparison situation; wherein the project data generating method is used to instruct the project data digitization generating device to generate a project data digitization file according to the project data to be generated.

[0038] In a third aspect, an embodiment of the present application provides a device for digitally generating project data, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method for digitally generating project data as described in any one of the first aspects above when executing the computer program.

[0039] It can be understood that the beneficial effects of the second to third aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0041] Figure 1 It is a flowchart of a method for digitally generating project data provided by an embodiment of the present application;

[0042] Figure 2 It is a schematic diagram of the implementation process of step S300 in the project data digital generation method provided in one embodiment of the present application;

[0043] Figure 3 It is a schematic diagram of the implementation process after step S310 in the project data digital generation method provided in one embodiment of the present application;

[0044] Figure 4 It is a schematic diagram of the implementation flow after step S310 in the project data digital generation method provided in another embodiment of the present application;

[0045] Figure 5 is a flowchart of a method for digitally generating project data provided by another embodiment of the present application;

[0046] Figure 6 It is a structural schematic diagram of a project data digital generation system provided in an embodiment of the present application;

[0047] Figure 7 It is a structural schematic diagram of a project data digitization generation device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0048] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0049] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0050] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0051] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting" depending on the context. Similarly, the phrase "if it is determined" or "if the described condition or event is detected" can be interpreted as meaning "uponce determined" or "in response to determining" or "uponce the described condition or event is detected" or "in response to detecting the described condition or event" depending on the context.

[0052] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0053] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0054] In related technologies, project data refers to various documents, data and information generated, collected, organized and stored throughout the life cycle of a project. These data are essential for project planning, execution, monitoring and summary.

[0055] Traditional project data generation usually requires manual work that takes a long time to generate and process project data, thereby reducing the efficiency of project data generation.

[0056] To solve the above problems, the embodiments of the present application provide a method and system for digitally generating project data.

[0057] In this method, first, by obtaining the marks of the project data to be generated, it can be ensured that each project data has a unique symbol, which can accurately identify and track each part, reduce confusion and errors caused by manual processing, and thus help improve the subsequent generation efficiency of project data. Then, by obtaining the comparison of the comparison marks recorded in the project data digital generation device, clear records and comparison information can be provided to avoid confusion of project data caused by invalid or repeated marks, thereby reducing manual intervention and helping to improve the subsequent generation efficiency of project data. Finally, based on the marks and comparison marks of the project data to be generated, a project data generation method is obtained, which can implement an automated project data generation process, reduce manual intervention, help generate and manage project data, and thus improve the generation efficiency of project data.

[0058] The project data digitization generation method provided in the embodiment of the present application can be applied to a project data digitization generation device. In this case, the project data digitization generation device is the executor of the project data digitization generation method provided in the embodiment of the present application. The embodiment of the present application does not impose any restrictions on the specific type of the project data digitization generation device.

[0059] For example, the project data digital generation device can be a mobile phone, tablet computer, laptop computer, ultra-mobile personal computer (UMPC), netbook, desktop computer, computing device or computer connected to a wireless modem, laptop computer, handheld communication device, handheld computing device, project data cloud service platform, etc. The project data digital generation device can integrate data generation and management in different business processes. For example, it can automatically generate standardized documents and reports such as project plans and supervision plans based on preset templates and input data. It can also integrate project planning, progress tracking, resource management and other functions to generate various project reports and data.

[0060] In order to better understand the project data digitization generation method provided in the embodiment of the present application, the specific implementation process of the project data digitization generation method provided in the embodiment of the present application is exemplarily introduced below.

[0061] Figure 1 A schematic flow chart of a method for digitally generating project data provided in an embodiment of the present application is shown. The method for digitally generating project data includes:

[0062] S100, obtaining a symbol of the project data to be generated.

[0063] It is understandable that a clear marking system can be designed to identify project data, which can include numbers, labels, classification codes, etc. A unique mark is assigned to each data, and the mark can be generated based on predefined rules, such as project number, version number, category identification, etc. The mark can be associated with the corresponding data to obtain the mark of the project data to be generated. As shown in Table 1:

[0064] Table 1

[0065]

[0066] By setting up in this way, by obtaining the mark of the project data to be generated, it can be ensured that each project data has a unique symbol, which can accurately identify and track each part, reduce confusion and errors caused by manual processing, and thus help improve the efficiency of subsequent project data generation.

[0067] S200, obtaining the comparison status of the comparison mark recorded in the project data digital generation device, wherein the comparison status is used to reflect whether the comparison mark is a findable mark.

[0068] It is understood that a digital system or database for managing and recording the reference mark can be used, which can be a document management system, an ERP system, or a custom database. Enter the reference mark or other relevant information to retrieve the corresponding record in the system. View the detailed information of the reference record to confirm whether the reference mark is a findable mark.

[0069] For example, within a certain period of time before the project data digitization generation device needs to use project data A to perform a project data digitization generation activity (i.e., use project data A to generate a project data digitization file corresponding to project data A), if the project data digitization generation device has used at least one project data to generate a project data digitization file, then the comparison mark is a findable mark, wherein at least one project data does not include project data A; otherwise, the comparison mark is an unfindable mark.

[0070] With such a setting, by obtaining the comparison status of the comparison marks recorded in the project data digital generation device, clear records and comparison information can be provided, avoiding confusion of project data caused by invalid or repeated marks, thereby reducing manual intervention and helping to improve the efficiency of subsequent project data generation.

[0071] S300, based on the marks and comparison conditions of the project data to be generated, a project data generation method is obtained; wherein the project data generation method is used to instruct the project data digitization generation device to generate a project data digitization file according to the project data to be generated.

[0072] For example, the project data digitization generation device can use any one of the construction data, supervision data, and security log to perform project data digitization generation activities. The project data digitization generation device records a comparison mark reflecting the project data used last time. When the project data digitization generation device needs to use the project data (the project data can be any one of the construction data, supervision data, and security log) to perform project data digitization generation activities, the project data digitization generation device determines whether the comparison mark is a default mark; if the comparison mark is a default mark (the comparison mark is a default mark used to indicate that the project data digitization generation device can use any current data to perform project data digitization generation activities), the project data digitization generation device uses the current project data to perform project data digitization generation activities, and obtains the mark of the current project data, and changes the comparison mark from the default mark to the mark of the current project data, that is, the comparison mark becomes a searchable mark (the comparison mark is the mark corresponding to the current project data), that is, the project data generation method. If the comparison mark is not a default mark (the comparison mark is not a default mark used to indicate that the project data digitization generation device only allows the use of a specific data to perform project data digitization generation activities), the project data digitization generation device determines whether the mark of the current project data is consistent with the comparison mark. If they are consistent, the project data digitization generation device uses the current project data to perform project data digitization generation activities; if they are inconsistent, the project data digitization generation device does not use the current project data to perform project data digitization generation activities, that is, the project data generation method. If the operator wants the project data digitization generation device to use the rejected project data to generate activities (that is, the project data required by the operator), the project data digitization generation device can be set to use the project data required by the operator to perform project data generation activities.

[0073] For example, when an operator decides to use a project document to perform a project document digital generation activity, he or she will generally still want to continue to use the project document to perform a project document digital generation activity (for example, a project document includes data of multiple time periods, and the project document digital generation device generates data in different time periods, and initially uses the project document of the 8:00-9:00 time period for generation, and then uses the project document of the 9:00-10:00 time period for generation), that is, the operator currently expects the project document digital generation device to use the project document that was used last time by the project document digital generation device. Therefore, instead of setting generation priorities for different project documents, the project document digital generation device is allowed to determine which project document among the construction documents, supervision documents, and safety logs to use for the project document digital generation activity based on the marks and comparison marks of the project documents to be generated, that is, the project document generation method.

[0074] With such a setting, a project data generation method is obtained based on the marks and comparison conditions of the project data to be generated, and an automated project data generation process can be implemented to reduce manual intervention, which is helpful for the generation and management of project data, thereby improving the efficiency of project data generation.

[0075] In one possible implementation, see Figure 2 S300, based on the mark and comparison mark of the project data to be generated, a project data generation method is obtained, including:

[0076] S310, monitoring a first generating instruction, wherein the first generating instruction includes a first mark, and the first generating instruction is used to instruct the project data corresponding to the first mark to generate a corresponding project data digitized file in a project data digitization generating device.

[0077] It is understandable that a monitoring program is configured in the project data digital generation device to monitor the first generation instruction. The first generation instruction may instruct the project data digital generation device to use the project data corresponding to the first mark to perform a project data digital generation activity to generate a corresponding project data digital file.

[0078] With such an arrangement, by monitoring the first generation instruction, the instruction can be received and processed in real time, which reduces the possibility of human error and thereby ensures the accuracy of subsequent project data generation results.

[0079] In one possible implementation, see Figure 3 In step S310, after monitoring the first generation instruction, the project data digital generation method further includes:

[0080] S311, when the comparison result shows that the comparison mark is a findable mark and the first mark is consistent with the comparison mark, a second generation signal corresponding to the first generation instruction is generated. The first generation signal is used to approve the first generation instruction.

[0081] It can be understood that when the comparison situation reflects that the comparison mark is a findable mark, and the first mark is consistent with the comparison mark, it means that the project data digitization generation device used project data A for project data generation last time, and the project data corresponding to the first mark (i.e., project data A) applied to generate corresponding project data digitized files in the project data digitization generation device, and in the scenario where both project data A and project data B apply to generate corresponding project data digitized files in the project data digitization generation device, the project data digitization generation device will approve the use of project data A for project data generation and reject the use of project data B for project data generation (i.e., the first generation signal) based on the fact that project data A was the last used by the project data digitization generation device.

[0082] With such a setting, when the comparison situation reflects that the comparison mark is a findable mark and the first mark is consistent with the comparison mark, a second generation signal corresponding to the first generation instruction is generated. This can reduce problems caused by inconsistent processing or erroneous data, thereby reducing the risk of errors in the generation process, and further helping to improve the efficiency of subsequent project data generation.

[0083] S312, determining a second generation method in the project data generation method according to the second generation signal, wherein the second generation method is used to instruct the project data digital generation device to use the project data corresponding to the first mark to perform a project data digital generation activity.

[0084] It can be understood that the generation algorithm or logic of the project data digitization generation device can be adjusted according to the content of the second generation signal so that the project data digitization generation device uses the project data corresponding to the first mark to perform project data digitization generation activities, that is, the second generation method.

[0085] With such a configuration, determining the second generation method in the project data generation method according to the second generation signal can reduce the generation of irrelevant or erroneous data due to inconsistent or erroneous data, thereby helping to improve the efficiency of project data generation.

[0086] In one possible implementation, see Figure 4 In step S310, after monitoring the first generation instruction, the project data digital generation method further includes:

[0087] S313, when the comparison result shows that the comparison mark is an undetectable mark, a third generation signal corresponding to the first generation instruction is generated. The comparison mark being an undetectable mark is used to indicate that the project data digitization generation device has not used at least one project data to generate a project data digitization file within a preset time period before the first generation instruction is monitored, and the third generation signal is used to approve the first generation instruction.

[0088] It can be understood that the comparison situation reflects that the comparison mark is an untraceable mark, which means that the comparison mark is a default mark, and the default mark is not a mark of any of the construction data, supervision data, and safety log. In the case where the comparison situation reflects that the comparison mark is an untraceable mark, it means that the project data digitization generation device did not use any project data for project data generation last time, so the project data digitization generation device can directly approve the use of project data A for project data generation, that is, the third generation signal.

[0089] For example, when using project data A to generate project data, the reference mark will be adjusted from the default mark to the mark corresponding to project data A. In a scenario where both project data A and project data B are applied to generate corresponding project data digitized files in the project data digitization generation device, it can also be determined based on the reference mark and the mark of the current project data which project data among the construction data, supervision data, and security log (for example, project data A, project data B, and project data C) to use for the project data digitization generation activity.

[0090] With such a setting, when the comparison situation reflects that the comparison mark is an unfindable mark, a third generation signal corresponding to the first generation instruction is generated, which can ensure that the generated file is consistent with the current project information, avoid the problem of using irrelevant data, ensure the integrity of the project information, and thus help improve the efficiency of subsequent project information generation.

[0091] S314, determining a third generation method in the project data generation method according to the third generation signal, wherein the third generation method is used to instruct the project data digital generation device to use the project data corresponding to the first mark to perform a project data digital generation activity.

[0092] It can be understood that the generation algorithm or logic of the project data digitization generation device can be adjusted according to the content of the third generation signal so that the project data digitization generation device uses the project data corresponding to the first mark to perform project data digitization generation activities, that is, the third generation method.

[0093] With such a configuration, determining the third generation method in the project data generation method according to the third generation signal can reduce the generation of irrelevant or erroneous data due to inconsistent or erroneous data, thereby helping to improve the efficiency of project data generation.

[0094] S320, when the comparison situation reflects that the comparison mark is a findable mark, and the first mark is inconsistent with the comparison mark, a first generation signal corresponding to the first generation instruction is generated. The comparison mark is a findable mark to indicate that the project data digitization generation device has used at least one project data to generate a project data digitization file within a preset time period before the first generation instruction is monitored, and the at least one project data does not include the project data corresponding to the first mark. The first generation signal is used to reject the first generation instruction.

[0095] For example, the project data used first by the project data digitization generation device is not the project data with the highest priority, while the project data with a higher priority can interrupt the project data digitization generation activity of the project data digitization generation device using the project data that is not the highest priority, thus resulting in the problem of low project data generation efficiency.

[0096] For example, both project data A and project data B apply to generate corresponding project data digitized files in the project data digitization generation device. If the project data digitization generation device generates project data B more quickly, the project data digitization generation device may use project data B first. For another example, the project data digitization generation device is using project data A to generate project data, and can also generate project data for project data B. However, since the priority of project data B is higher than that of project data A, the project data digitization generation device will stop using project data A to generate project data, and use project data B to generate project data. If the project data used by the project data digitization generation device last time was project data A, the operator originally wanted to use project data A to generate project data, and using a faster processing method or priority rule will interrupt the current project data generation activity of the project data digitization generation device, thereby leading to the problem of low efficiency in project data generation.

[0097] It can be understood that the comparison mark is used to record the identification of the project data last used by the project data digitization generation device. When the comparison situation reflects that the comparison mark is a findable mark, and the first mark is inconsistent with the comparison mark, it means that the project data digitization generation device last used project data A to generate project data, and the project data corresponding to the first mark (i.e., project data B) applied to generate a corresponding project data digitized file in the project data digitization generation device, and in the scenario where both project data A and project data B apply to generate a corresponding project data digitized file in the project data digitization generation device, the project data digitization generation device will approve the use of project data A to generate project data, and reject the use of project data B to generate project data (i.e., the first generation signal), based on the fact that project data A was used by the project data digitization generation device last time, and project data B was not used by the project data digitization generation device last time.

[0098] With such a configuration, when the comparison situation reflects that the comparison mark is a findable mark and the first mark is inconsistent with the comparison mark, a first generation signal corresponding to the first generation instruction is generated. This can prevent higher priority project data from interrupting the project data digitization generation activity of the project data digitization generation device using project data that is not the highest priority, resulting in the generation of irrelevant or erroneous data, thereby helping to improve the subsequent project data generation efficiency.

[0099] S330, determining a first generation method in the project data generation method according to the first generation signal, wherein the first generation method is used to instruct the project data digital generation device not to use the project data corresponding to the first mark to perform a project data digital generation activity.

[0100] It is understandable that the generation algorithm or logic of the project data digitization generation device can be adjusted according to the content of the first generation signal so that the project data digitization generation device does not use the project data corresponding to the first mark to perform project data digitization generation activities, that is, the first generation method.

[0101] With such a configuration, determining the first generation method in the project data generation method according to the first generation signal can reduce the generation of irrelevant or erroneous data due to inconsistent or erroneous data, thereby helping to improve the efficiency of project data generation.

[0102] In a possible implementation, the method for digitally generating project data further includes:

[0103] During the data generation period, the project data digitization generation activity for other project data except the project data corresponding to the first mark is rejected.

[0104] For example, the data generation period may be a period during which the project data digitization generation device uses the project data corresponding to the first mark to perform the project data digitization generation activity, and the data generation period may be 1 minute, 2 minutes, etc. Therefore, the duration of the data generation period may be set, and the project data digitization generation activity for other project data except the project data corresponding to the first mark may be rejected during the data generation period.

[0105] For example, if information about the success of the project data digitization generation activity is obtained during the data generation period, that is, the project data digitization generation device completes the project data digitization generation activity, and the data generation period has not yet ended, the project data digitization generation device may also end the data generation period in advance to reduce the energy loss of the project data digitization generation device.

[0106] For example, if the comparison mark is not a default mark, during the process of the project data digitization generation device using project data A to complete the project data digitization generation activity for project data A, the project data digitization generation device obtains an instruction to use project data B to perform project data digitization generation activities. If the mark corresponding to project data A is consistent with the comparison mark stored in the project data digitization generation device, and the plan corresponding to project data B is inconsistent with the comparison mark stored in the project data digitization generation device, then during the process of the project data digitization generation device using project data A to perform project data digitization generation activities, the project data digitization generation device must also simultaneously perform a confirmation task to determine whether the mark corresponding to project data B is consistent with the comparison mark stored in the project data digitization generation device. If they are inconsistent, the project data digitization generation device will not use project data B to perform project data digitization generation activities and other series of confirmation operations. This will result in the process of the project data digitization generation device using project data A to perform project data digitization generation activities. The project data digitization generation device must also execute the confirmation procedure related to project data B, that is, execute invalid procedures. These invalid tasks will cause energy waste to the project data digitization generation device. Therefore, when the project data digitization generation device uses project data A to perform project data digitization generation activities (i.e., during data generation), rejecting the project data digitization generation activities for other project data except for the project data corresponding to the first mark, can reduce or completely avoid the execution amount of the invalid program executed by the project data digitization generation device, reduce energy waste, and thereby improve subsequent generation efficiency.

[0107] With such a configuration, during the data generation period, the project data digitization generation activities for project data other than the project data corresponding to the first mark are rejected, which can effectively avoid the project data digitization generation device from performing unnecessary tasks, thereby improving the generation efficiency of subsequent project data.

[0108] In one possible implementation, see Figure 5 , the project data digital generation method also includes:

[0109] S400, obtaining a generation status of project data corresponding to a first mark.

[0110] It is understood that the generation status of the project data corresponding to the first mark can be obtained by checking the database or log system storing the generation status and checking the status update record of the project data corresponding to the first mark. The generation status of the project data corresponding to the first mark can also be retrieved through the management platform of the project data digital generation device by using the first mark as a query parameter. The generation status can include information such as generation progress, completion, and whether errors are encountered.

[0111] With this setting, by obtaining the generation status of the project data corresponding to the first mark, the generation status of the project data can be viewed in real time, and the completion status of each stage can be understood, which helps to promptly discover and resolve problems that may arise during the generation process, thereby ensuring smooth generation of the project data.

[0112] S500, when the generation state is the preset state, the project data digital generation device stops the current project data digital generation activity and initiates a first activity for the project data corresponding to the first mark. The preset state is a state where the project data digital generation activity has been started and the generation fails, and the first activity is used to instruct the project data digital generation device to reuse the project data corresponding to the first mark to perform the project data digital generation activity.

[0113] For example, when the project information digital generation device is starting a project information digital generation activity, at this time, the project information digital generation device fails to generate information (for example, the project information provided by the sending end that sends the project information or the input end that inputs the project information is incomplete, incorrect, or the project information is not provided to the project information digital generation device), and the sending end that sends the project information to the project information digital generation device or the input end that inputs the project information to the project information digital generation device cannot perceive that the current project information digital generation device fails to generate information. When the project information digital generation device fails to generate information, the sending end that sends the project information or the input end that inputs the project information will continue to provide the project information in accordance with the situation that the project information digital generation device successfully generates information, so that the project information digital generation device continues to perform the project information digital generation activity. In addition, since the sending end that sends the project information or the input end that inputs the project information cannot perceive that the current project information digital generation device fails to generate information, it will still establish a project information digital generation activity with the project information digital generation device (for example, continue to provide incomplete or incorrect project information), which results in the failure to generate the project information.

[0114] It can be understood that when the generation state is the preset state, it means that the project data digitization generation device uses incomplete or erroneous project data to perform project data digitization generation activities, which leads to failure in data generation. Since the sending end that sends the project data or the input end that inputs the project data cannot perceive that the current project data digitization generation device has failed to generate data, the project data digitization generation device needs to stop the current project data digitization generation activity. In addition, the failure to generate data may be caused by the project data digitization generation device not using complete project data (for example, a small part of project data A is used). Therefore, when the project data digitization generation device stops the current project data digitization generation activity, the project data corresponding to the first mark can be reused to perform the project data digitization generation activity, that is, the complete project data A can be used to perform the project data digitization generation activity.

[0115] With such a configuration, when the generation state is the preset state, the project data digital generation device stops the current project data digital generation activity and initiates the first activity for the project data corresponding to the first mark, which can avoid generation failure caused by problems with the project data, thereby helping to improve the subsequent generation efficiency of project data.

[0116] In a possible implementation, the method for digitally generating project data further includes:

[0117] When the number of times the first activity is initiated does not exceed the preset number of initiations and the project data corresponding to the first mark meets the generation condition, the first activity is initiated for the project data corresponding to the first mark. The preset number of initiations is the number of times the project data digital generation device reuses the project data corresponding to the first mark to perform the project data digital generation activity when the project data digital generation device stops the current project data digital generation activity. The generation condition is the condition that the generation error caused by the error in the project data corresponding to the first mark has been repaired.

[0118] For example, the preset number of initiations may be 3, 4, 5, etc. If the number of initiations of the first activity exceeds the preset number of initiations, it indicates that the generation error caused by the wrong project data has not been repaired. If the project data digitization generation device does not use the complete project data to perform the project data digitization generation activity for the first time, resulting in generation failure, and the complete project data is used to perform the project data digitization generation activity for the second time, at this time, the number of initiations of the first activity does not exceed the preset number of initiations, and the project data digitization generation device does not cause the generation error due to the use of the wrong project data, that is, the generation error caused by the wrong project data has been repaired.

[0119] For example, in a scenario where a generation error caused by erroneous project data has not been fixed, after initiating the first activity, the project data digitization generation device will still fail to generate, stop generating after the generation failure, and then continue to initiate the first activity. Therefore, the project data digitization generation device will repeatedly initiate the first activity in a scenario where the generation error caused by erroneous project data has not been fixed.

[0120] For example, the number of times the first activity has been initiated can be obtained first, and after determining that the number of times the first activity has been initiated currently does not exceed the preset number of initiations, it is determined whether the project data corresponding to the first mark meets the generation condition, and if it meets the generation condition, the first activity is initiated for the project data corresponding to the first mark; if it does not meet the generation condition, the first activity is not initiated for the project data corresponding to the first mark. Therefore, it can be avoided that the project data digital generation device repeatedly initiates the first activity in the scenario where the generation error caused by the wrong project data is not fixed.

[0121] With such a setting, when the number of times the first activity is initiated does not exceed the preset number of initiations and the project information corresponding to the first mark meets the generation conditions, the first activity is initiated for the project information corresponding to the first mark. This can avoid the problem of waste of generation resources caused by frequent generation due to generation failure, and thus help avoid repeated invalid generation attempts, thereby saving computing resources and time, and improving the efficiency of subsequent project information generation.

[0122] In a possible implementation, S400, obtaining a generation status of the project data corresponding to the first mark, includes:

[0123] The generated data of the project data corresponding to the first mark is detected at a set time interval to determine the generated state of the project data corresponding to the first mark.

[0124] It is understood that the time interval can be set according to the demand and the frequency of the generation activity, for example, it can be once every 2 minutes, once every 5 minutes, once every 10 minutes, etc. The generation data of the project data corresponding to the first mark is obtained from the system or database, which may include information such as generation progress, generation rate, generation result, etc. According to the obtained generation data, the generation status of the project data corresponding to the first mark is determined, such as success, failure, pending, etc.

[0125] With this arrangement, the generation data of the project information corresponding to the first mark is detected at the set time interval to determine the generation status of the project information corresponding to the first mark. This allows real-time understanding of the progress and status of the generation process, which helps to promptly discover and solve problems during subsequent data generation.

[0126] In a possible implementation, the method for digitally generating project data further includes:

[0127] In a case where the generation data reflects the generation rate of the project data corresponding to the first mark, if the generation rate does not exceed or equal to the first rate, the generation state is the preset state.

[0128] It can be understood that the first rate represents the minimum rate that the generation activity should reach under normal circumstances. The first rate can be set through historical data analysis or business needs. For example, the first rate can be 5 project data items / minute, 10 project data items / minute, etc. The generation rate of the project data corresponding to the first mark can be obtained, which can be obtained through API calls, database queries, etc. The obtained generation rate is compared with the first rate. If the generation rate is lower than or equal to the first rate, it is considered that the generation rate has not reached the expected target, that is, the generation state is the preset state; otherwise, it is considered that the generation rate has reached the expected target, that is, the generation state is normal.

[0129] With such a setting, when the generated data reflects the generation rate of the project information corresponding to the first mark, if the generation rate does not exceed or equal to the first rate, the generation status is the preset status, and the current generation status can be automatically judged to reduce manual intervention, thereby providing data support for subsequent project information generation.

[0130] In a possible implementation, after obtaining the generation status of the project data corresponding to the first mark in step S400, the project data digital generation method further includes:

[0131] When the generation state is a normal state, the project data digital generation device maintains the current project data digital generation activity, wherein the normal state is that the generation process has been started and no failure state has been generated.

[0132] For example, the time interval may be set according to the demand and the frequency of the generation activity, for example, once every 2 minutes, once every 5 minutes, once every 10 minutes, etc. The generation data of the project data corresponding to the first mark is obtained from the system or database, which may include information such as generation progress, generation rate, and generation result. The generation status of the project data corresponding to the first mark is determined according to the obtained generation data.

[0133] It can be understood that when the generation status is normal, it means that the project data digitization generation device has not used wrong project data or incomplete project data for project data digitization generation activities. Therefore, the project data digitization generation device can maintain the current project data digitization generation activities.

[0134] With such arrangement, when the generation state is in a normal state, the project data digital generation device maintains the current project data digital generation activity, which can ensure that the generated project data is accurate and thus improve the generation efficiency of the project data.

[0135] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0136] Corresponding to the project data digitization generation method described in the above embodiment, the embodiment of the present application also provides a project data digitization generation system, and each unit of the system can implement each step of the project data digitization generation method. Figure 6 A structural block diagram of a project data digitization generation system provided in an embodiment of the present application is shown. For ease of explanation, only the parts related to the embodiment of the present application are shown.

[0137] Reference Figure 6 , the project data digital generation system includes:

[0138] The first acquisition unit is used to acquire the symbol of the project data to be generated.

[0139] The second acquisition unit is used to acquire the comparison status of the comparison mark recorded in the project data digital generation device, wherein the comparison status is used to reflect whether the comparison mark is a findable mark.

[0140] The generating unit is used to obtain a project data generating method based on the marks and comparison conditions of the project data to be generated; wherein the project data generating method is used to instruct the project data digitization generating device to generate a project data digitization file according to the project data to be generated.

[0141] It should be noted that the information interaction, execution process, etc. between the above-mentioned systems / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0142] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the division of the above-mentioned functional units is used as an example for illustration. In practical applications, the above-mentioned functions can be assigned to different functional units as needed, that is, the internal structure of the system can be divided into different functional units to complete all or part of the functions described above. The functional units in the embodiment can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0143] The present application also provides a device for digitally generating project data. Figure 7 This is a schematic diagram of the structure of a device for digitally generating project data provided by an embodiment of the present application. Figure 7 As shown, the project data digital generation device 6 of this embodiment includes: at least one processor 60 ( Figure 7 Only one is shown), at least one memory 61 ( Figure 7 Only one is shown in the figure) and a computer program 62 stored in the at least one memory 61 and executable on the at least one processor 60. When the processor 60 executes the computer program 62, the project data digitization generation device 6 implements the steps in any of the above-mentioned project data digitization generation method embodiments, or the project data digitization generation device 6 implements the functions of the units in the above-mentioned system embodiments.

[0144] Exemplarily, the computer program 62 may be divided into one or more units, which are stored in the memory 61 and executed by the processor 60 to complete the present application. The one or more units may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program 62 in the project data digitization generating device 6.

[0145] The project data digitization generation device 6 can be a mobile phone, tablet computer, laptop computer, ultra-mobile personal computer (UMPC), netbook, desktop computer, computing device or computer connected to a wireless modem, laptop computer, handheld communication device, handheld computing device, project data cloud service platform, etc. The project data digitization generation device can integrate data generation and management in different business processes. For example, it can automatically generate standardized documents and reports such as project plans and supervision plans based on preset templates and input data. It can also integrate project planning, progress tracking, resource management and other functions to generate various project reports and data. The project data digitization generation device 6 may include, but is not limited to, a processor 60 and a memory 61. Those skilled in the art will understand that Figure 7 It is only an example of the project data digitization generation device 6 and does not constitute a limitation of the project data digitization generation device 6. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, buses, etc.

[0146] The processor 60 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0147] In some embodiments, the memory 61 may be an internal storage unit of the project data digital generation device 6, such as a hard disk or memory of the project data digital generation device 6. In other embodiments, the memory 61 may also be an external storage device of the project data digital generation device 6, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the project data digital generation device 6. Further, the memory 61 may also include both an internal storage unit and an external storage device of the project data digital generation device 6. The memory 61 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program. The memory 61 may also be used to temporarily store data that has been output or is to be output.

[0148] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.

[0149] An embodiment of the present application provides a computer program product. When the computer program product is run on a project data digitization generation device, the project data digitization generation device implements the steps in any of the above-mentioned method embodiments.

[0150] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium can at least include: any entity or device that can carry the computer program code to the project data digitization generation device, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, RandomAccess Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a disk or an optical disk.

[0151] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0152] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0153] In the embodiments provided in the present application, it should be understood that the disclosed project data digitization generation device, project data digitization generation system and project data digitization generation method can be implemented in other ways. For example, the project data digitization generation device / project data digitization generation system embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0154] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0155] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for digitally generating project data, characterized in that: Applied to a project data digital generation device, the method comprises: Get the token of the project data to be generated; Obtaining the comparison status of the comparison mark recorded in the project data digital generation device; wherein the comparison status is used to reflect whether the comparison mark is a findable mark; the comparison mark is used to reflect the mark of the project data used last time; Based on the mark of the project data to be generated and the comparison situation, a project data generation method is obtained; wherein the project data generation method is used to instruct the project data digitization generation device to generate a project data digitization file according to the project data to be generated; The method of obtaining the project data generation method based on the mark of the project data to be generated and the comparison situation includes: Monitoring a first generation instruction; wherein the first generation instruction includes a first mark, and the first generation instruction is used to indicate that the project data request corresponding to the first mark generates a corresponding project data digitized file in the project data digitization generation device; When the comparison situation reflects that the comparison mark is a findable mark, and the first mark is inconsistent with the comparison mark, a first generation signal corresponding to the first generation instruction is generated; wherein the comparison mark is a findable mark used to indicate that within a preset time period before the first generation instruction is monitored, the project information digitization generation device has used at least one project information to generate a project information digitization file, and the at least one project information does not include the project information corresponding to the first mark; the first generation signal is used to reject the first generation instruction; A first generation method in the project data generation method is determined according to the first generation signal; wherein the first generation method is used to instruct the project data digital generation device not to use the project data corresponding to the first mark to perform project data digital generation activities.

2. The method for digitally generating project data according to claim 1, characterized in that: After monitoring the first generation instruction, the method further includes: When the comparison situation reflects that the comparison mark is a findable mark and the first mark is consistent with the comparison mark, generating a second generation signal corresponding to the first generation instruction; wherein the first generation signal is used to approve the first generation instruction; A second generation method in the project data generation method is determined according to the second generation signal; wherein the second generation method is used to instruct the project data digital generation device to use the project data corresponding to the first mark to perform a project data digital generation activity.

3. The method for digitally generating project data according to claim 1, characterized in that: After monitoring the first generation instruction, the method further includes: In the case where the comparison situation reflects that the comparison mark is an untraceable mark, a third generation signal corresponding to the first generation instruction is generated; wherein the comparison mark is an untraceable mark used to indicate that the project data digitization generation device has not used at least one project data to generate a project data digitization file within a preset time period before the first generation instruction is monitored, and the third generation signal is used to approve the first generation instruction; A third generation method in the project data generation method is determined according to the third generation signal; wherein the third generation method is used to instruct the project data digital generation device to use the project data corresponding to the first mark to perform a project data digital generation activity.

4. The method for digitally generating project data according to claim 2, characterized in that: The method further comprises: During the data generation period, the project data digitization generation activity for other project data except the project data corresponding to the first mark is rejected.

5. The method for digitally generating project data according to claim 2, characterized in that: The method further comprises: Obtaining the generation status of the project data corresponding to the first mark; When the generation state is a preset state, the project data digital generation device stops the current project data digital generation activity and initiates a first activity for the project data corresponding to the first mark; wherein the preset state is a state in which the project data digital generation activity has been started and the generation has failed, and the first activity is used to instruct the project data digital generation device to reuse the project data corresponding to the first mark to perform the project data digital generation activity.

6. The method for digitally generating project data according to claim 5, characterized in that: The method further comprises: Initiate the first activity for the project data corresponding to the first mark when the number of times the first activity is initiated does not exceed the preset number of initiations and the project data corresponding to the first mark meets the generation condition; wherein the preset number of initiations is the number of times the project data digitization generation device reuses the project data corresponding to the first mark to perform the project data digitization generation activity when the project data digitization generation device stops the current project data digitization generation activity; and the generation condition is the condition that a generation error caused by an error in the project data corresponding to the first mark has been repaired.

7. The method for digitally generating project data according to claim 5, characterized in that: The obtaining of the generation status of the project data corresponding to the first mark includes: The generation data of the project data corresponding to the first mark is detected at a set time interval to determine the generation status of the project data corresponding to the first mark.

8. The method for digitally generating project data according to claim 7, characterized in that: The method further comprises: In a case where the generation data reflects a generation rate of the project data corresponding to the first mark, if the generation rate does not exceed or equal to a first rate, the generation state is the preset state.

9. A system for digitally generating project data, characterized in that: Applicable to a project data digital generation device, the project data digital generation system comprises: A first acquisition unit, used for acquiring a sign of the project data to be generated; The second acquisition unit is used to acquire the comparison status of the comparison mark recorded in the project data digital generation device; wherein the comparison status is used to reflect whether the comparison mark is a findable mark; the comparison mark is used to reflect the mark of the project data used last time; A generating unit, configured to obtain a project data generating method based on the mark of the project data to be generated and the comparison situation; wherein the project data generating method is configured to instruct the project data digitization generating device to generate a project data digitization file according to the project data to be generated; Wherein, the generating unit is further used for: Monitoring a first generation instruction; wherein the first generation instruction includes a first mark, and the first generation instruction is used to indicate that the project data request corresponding to the first mark generates a corresponding project data digitized file in the project data digitization generation device; When the comparison situation reflects that the comparison mark is a findable mark, and the first mark is inconsistent with the comparison mark, a first generation signal corresponding to the first generation instruction is generated; wherein the comparison mark is a findable mark used to indicate that within a preset time period before the first generation instruction is monitored, the project information digitization generation device has used at least one project information to generate a project information digitization file, and the at least one project information does not include the project information corresponding to the first mark; the first generation signal is used to reject the first generation instruction; A first generation method in the project data generation method is determined according to the first generation signal; wherein the first generation method is used to instruct the project data digital generation device not to use the project data corresponding to the first mark to perform project data digital generation activities.

Citation Information

Patent Citations

  • Document resource integration method and device, storage medium and electronic device

    CN112650712A

  • Engineering data management method, system and device and storage medium

    CN118585495A