Welding equipment for green construction of steel tower construction site ring opening and welding method of welding equipment

By using automated welding equipment and monitoring systems at the ring entrance of the steel tower construction site, the problems of low welding efficiency and environmental pollution are solved, and an efficient and safe welding process and weld quality are achieved.

CN118875434AInactive Publication Date: 2024-11-01CHINA RAILWAY SOUTH ENG EQUIP CO LTD +3
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410968449.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The welding efficiency of the weld at the annular weld at the steel tower construction site is low, the appearance forming is difficult to control, and high-altitude welding has safety hazards and environmental pollution problems.

Method used

Design a green construction welding equipment including robot body, carrier assembly and mobile control assembly, use robots for automated welding, combine magnets and side curtain plates for wind and light protection, and collect welding waste in real time through waste storage components Welding quality is monitored using industrial cameras and machine learning algorithms.

Benefits of technology

It improves the stability and consistency of welding efficiency and weld appearance quality, reduces the safety risks and environmental pollution of high-altitude operations, and realizes automation of welding processes and green construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118875434A_ABST
    Figure CN118875434A_ABST
Patent Text Reader

Abstract

The invention relates to green construction welding equipment for a steel tower construction site annular opening and a welding method of the green construction welding equipment, and belongs to the field of steel structures and buildings. The robot body bearing assembly is used for supporting and guiding operation of the robot body; and the movable control assembly is used for controlling the robot body. The welding machine has the advantages that the movable integrated box is designed, a welding power source, a high-pressure contact sensor, a controller, a carbon dioxide gas cylinder and the like are stored in a centralized mode and stopped during operation, and sliding and falling are prevented. Meanwhile, the containing space for containing the wire feeder, the welding gun, the robot, the operation box, the guide rail and other components is arranged on the integration box, centralized storage is achieved in the non-operation period, space is saved, and the risks that equipment on the aerial work platform is placed in a mess and parts fall off are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to green construction welding equipment for a steel tower construction site ring and a welding method thereof, and belongs to the field of steel structure and construction engineering. Background Art

[0002] The weld position of the ring mouth of the steel tower segment of the steel structure bridge is horizontal welding, which currently mainly relies on manual welding. The welding method used is mostly gas shielded welding, which has low operation efficiency and high requirements on the skill level of the welder. The appearance of the horizontal welding seam is difficult to control, and a lot of grinding work is required on the appearance after welding.

[0003] Climbing formwork construction platforms are often used in on-site construction of steel towers and high-rise buildings. The platform width is limited and the area is narrow, so there is little space for placing items. The working area is high, and it is difficult to provide wind protection for high-altitude welding and arc protection for horizontal welding. Welding equipment parts are prone to falling downward, posing a safety hazard of falling objects below the working area. Welding construction waste is prone to falling downward and floating around, causing pollution to the surrounding environment and waters.

[0004] Therefore, there is an urgent need for a green construction welding equipment that can be used in high-altitude working environments, has the functions of centralized storage of construction equipment, wind and light protection during the welding process, and real-time collection of construction waste. It is suitable for horizontal welding of the ring mouth at steel tower construction sites and can improve the stability and consistency of the weld appearance quality. Summary of the invention

[0005] In order to overcome the defects of the prior art, the present invention provides a green construction welding equipment for the ring mouth of a steel tower construction site. The technical solution of the present invention is:

[0006] A green construction welding equipment for the ring mouth of a steel tower construction site, comprising:

[0007] The robot body is used for on-site welding;

[0008] The robot body bearing assembly is used to support and guide the operation of the robot body;

[0009] The mobile control component is used to control the robot body.

[0010] The robot body bearing assembly includes a guide rail, a guide rail rack, a magnetically controlled switch magnet, a fixed joint and a connecting positioning pin. The guide rail is arranged along the running direction of the robot body. A guide rail rack integrally formed with the guide rail is arranged at the lower part of the guide rail. Fixed joints are respectively arranged at both ends of the guide rail. A connecting positioning pin is installed on the guide rail close to one of the fixed joints. The front part of the guide rail forms a mounting surface for mounting the robot body, and the rear part is installed with a plurality of first magnetically controlled switch magnets for connecting to a parent material.

[0011] A welding gun is arranged at the lower part of the robot body, and side curtain bracket fixing seats are respectively arranged on both sides of the upper part of the robot body, a side curtain bracket is installed on each of the side curtain fixing seats, and a side curtain plate is installed at the lower end of the side curtain bracket, and a welding space for the welding gun is formed between the two side curtain plates, and the two side curtain plates protect the welding gun; a slider slidingly matched with the guide rail and a driving gear meshing with the guide rail rack are arranged on the side of the robot body, and the driving gear is driven by the driving motor of the robot body.

[0012] There are two side curtain brackets on each side curtain bracket fixing seat, each of which is arranged in an arc shape, and the lower end of the side curtain bracket extends downward and is connected to the side curtain plate; the two side curtain brackets are arranged parallel to each other and form a spacing.

[0013] A waste collection assembly is installed on the mother material at the lower part of the robot body, and the waste collection assembly includes a collection bracket, a collection cloth and a second magnetic control switch magnet. The second magnetic control switch magnet and the collection cloth are installed on the collection bracket, and several second magnetic control switch magnets are evenly arranged on the collection bracket for connecting with the mother material; the collection cloth corresponds to the moving space of the robot body and is used to receive waste.

[0014] The mobile control assembly includes a mobile integrated box and a welding power supply, a high-voltage contact sensor, a controller, a teaching pendant and a carbon dioxide cylinder installed in the mobile integrated box. A positive welding power supply connection cable, a negative welding power supply connection cable, a welding power supply control cable and a high-voltage contact sensor power supply cable are connected between the high-voltage contact sensor and the welding power supply; the controller and the high-voltage contact sensor are electrically connected through the high-voltage contact sensor control cable and the controller power supply cable; the teaching pendant and the controller are electrically connected through the teaching pendant cable; the wire feeder is located outside the mobile integrated box and is connected to the welding power supply. The wire feeder and the controller are electrically connected through a driver control cable; the wire feeder and the high-voltage contact sensor are electrically connected through a wire feeder welding cable, the handheld operating box and the wire feeder are electrically connected through a handheld control box cable, the robot body and the wire feeder are electrically connected through a head control cable, the welding gun and the wire feeder are electrically connected through a welding gun cable, the base material and the high-voltage contact sensor are electrically connected through a base material cable, the welding power supply is grounded through a grounding cable, and a carbon dioxide gas pipe is also installed between the carbon dioxide gas cylinder and the wire feeder.

[0015] A welding method based on a green construction welding device for a steel tower construction site ring mouth comprises the following steps:

[0016] (1) Setting welding parameters: operate the teaching pendant, use the teaching mode to detect the groove angle, plate thickness, and plate thickness difference parameters of the welding area, generate welding specifications or call historical specification parameters;

[0017] (2) Welding process control: Start the driving motor of the robot body, make the driving gear mesh with the guide rack, and drive the robot body to move along the planned path; operate the handheld operation box to start the welding gun and use the side curtain plate to protect the welding gun; use the welding gun to complete the multi-layer and multi-pass automatic welding of the weld;

[0018] (3) Waste collection and processing: A waste collection assembly is installed on the base material at the bottom of the robot body. The collection bracket is connected to the base material through the second magnetic switch magnet, and the collection cloth is used to receive the waste, ensuring effective collection of the waste.

[0019] (4) Welding quality monitoring;

[0020] (5) Welding data recording and analysis: Record various parameters during the welding process and use statistical analysis methods to evaluate the stability and consistency of the welding process.

[0021] In the step (2), during the welding process, the parameters of welding current, welding voltage, welding speed, swing width and swing center are adjusted in real time.

[0022] In the step (4), the welding quality monitoring is specifically as follows:

[0023] (4-1) Using CAD software to design a welding appearance drawing based on welding process parameters such as current, voltage and welding speed; converting the design drawing into a digital model;

[0024] (4-2) Image recording and recognition during welding: The welding molten pool is captured by an industrial camera, and the installation position of the industrial camera is ensured to cover the entire welding area while avoiding direct exposure to the welding arc. The image data is then transmitted to the computer system using an image acquisition card for real-time image data processing.

[0025] (4-3) Graphic fitting comparative analysis: Use the graphic fitting method to fit the actual weld profile with the preset standard weld profile, and evaluate the consistency and quality of the weld by comparing the fitting results with the standard;

[0026] (4-4) Identify surface defects such as pores, slag inclusions, and cracks in welds: Use machine learning algorithms to train models to automatically identify surface defects such as pores, slag inclusions, and cracks in welds; Apply image segmentation methods to separate surface defects;

[0027] (4-5) The weld appearance forming rate is obtained as follows:

[0028] (4-5-1) Calculate the actual weld area: Extract the actual weld contour from the image and calculate its area S 实际 ;

[0029] (4-5-2) Calculate the standard weld area: Calculate the standard weld area S according to the CAD design drawing. 标准 ;

[0030] (4-5-3) Calculation of forming rate: Use the following formula to calculate the weld appearance forming rate:

[0031] Rate % = (S 实际 / S 标准 )×100%, this ratio reflects the degree of closeness between the actual weld and the designed weld in appearance.

[0032] In the step (5), specifically:

[0033] (5-1) Input welding parameters: receiving the basic input parameters of the welding process, including the total length of the weld L, the welding speed v, in meters per minute, and the preset standard values ​​and allowable deviations of the current I and voltage U;

[0034] (5-2) Real-time monitoring of welding process: During the welding process, the welding current It and voltage Ut, as well as the welding time t, are monitored and recorded in real time;

[0035] Out-of-tolerance detection: If the current or voltage during welding exceeds the preset range, record the start and end time of the out-of-tolerance, as well as the corresponding position. Specifically:

[0036] When 200A≤It≤240A, record the start time and end time tmi and tmi+1 of the deviation;

[0037] When 26V≤Ut<30V, the out-of-tolerance time is also recorded;

[0038] (5-3) Calculate the out-of-tolerance position: Use the welding speed v and the out-of-tolerance time tmi, tmi+1 to calculate the out-of-tolerance start position Lmi=v×tmi and the out-of-tolerance end position Lmi+1=v×tmi+1;

[0039] (5-4) Calculation of welding stability:

[0040] P is a percentage value that indicates the stability of the welding process. Ideally, P should be close to 100%, indicating that the welding process is completely stable.

[0041] (5-5) When the welding process is completed, the monitoring is ended and the final welding stability result is output.

[0042] The advantages of the present invention are:

[0043] 1. A movable integrated box is designed to store welding power supply, high-voltage contact sensor, controller and carbon dioxide cylinder in a centralized manner, which can be parked during operation to prevent sliding and falling. At the same time, the integrated box is provided with a placement space for wire feeder, welding gun, robot, operation box, guide rail and other components, which can be stored in a centralized manner during non-operation period, saving space and avoiding the risk of equipment being placed in a mess on the aerial work platform and parts falling.

[0044] 2. Use welding robots for on-site welding, teach and detect groove parameters, automatically generate corresponding welding specifications or call stored welding specifications, and realize automatic utilization of steel tower site ring welding automation equipment.

[0045] 3. By adjusting the shaking button on the operation box, you can manually intervene in the welding process, adjust the welding parameters, increase or decrease the swing amplitude of the welding gun, and move the welding gun position.

[0046] 4. The magnetic seat track is set up, and the product is adsorbed in the form of adsorption, which does not damage the steel plate and coating. The track has strong rigidity, good weld straightness, and beautiful appearance.

[0047] 5. A black plexiglass sheet is provided as a windproof and lightproof side curtain plate. The windproof and lightproof side curtain plate is connected to the robot body through a side curtain bracket. The arc state and welding molten pool condition can be observed during the welding process. At the same time, the influence of side wind on welding is reduced.

[0048] 6. A modular waste collection component is set under the weld, which is adsorbed under the weld by the second magnetically controlled switch magnet to collect welding slag, flux and other construction waste in real time, while reducing the impact of wind from below on welding. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Figure 1 It is a schematic diagram of the main structure of the green construction welding equipment for the ring mouth of a steel tower construction site of the present invention.

[0050] Figure 2 yes Figure 1 Schematic diagram of the connection relationship between the welding power supply and the high-voltage contact sensor.

[0051] Figure 3 yes Figure 1 Schematic diagram of the structure of the robot body bearing components.

[0052] Figure 4 yes Figure 1 Schematic diagram of the connection between the robot body and the side curtain panels.

[0053] Figure 5 yes Figure 4 Exploded diagram.

[0054] Figure 6 yes Figure 4 main view.

[0055] Figure 7 yes Figure 4 Right view of .

[0056] Figure 8 yes Figure 1 Schematic diagram of the structure of the waste storage component.

[0057] Fig. 9 The invention is a schematic flow chart of welding data recording and analysis of a welding method of a green construction welding equipment for a ring opening of a steel tower construction site. DETAILED DESCRIPTION

[0058] The present invention will be further described below in conjunction with specific embodiments, and the advantages and features of the present invention will become clearer as the description proceeds. However, these embodiments are exemplary only and do not constitute any limitation to the scope of the present invention. It should be understood by those skilled in the art that the details and forms of the technical solution of the present invention may be modified or replaced without departing from the spirit and scope of the present invention, but these modifications and replacements all fall within the scope of protection of the present invention.

[0059] See also Figures 1 to 8 The present invention relates to a green construction welding equipment for the ring mouth of a steel tower construction site, comprising:

[0060] Robot body 8.1 is used for on-site welding; the automated robot body 8.1 can work continuously, reducing interruptions caused by manual welding, thereby increasing construction speed; it can provide more uniform and consistent welding quality and reduce welding defects.

[0061] The robot body bearing assembly is used to support and guide the operation of the robot body;

[0062] The mobile control component is used to control the robot body.

[0063] like Figure 3 and Figure 4As shown, the robot body bearing assembly includes a guide rail 9.2, a guide rail rack 9.3, a first magnetically controlled switch magnet 9.1, a fixed joint 9.5 and a connecting positioning pin 9.4. The guide rail 9.2 is arranged along the running direction of the robot body 8.1, and a guide rail rack 9.3 integrally formed with the guide rail 9.2 is arranged at the lower part of the guide rail 9.2, and fixed joints 9.5 are respectively arranged at both ends of the guide rail 9.2. A connecting positioning pin 9.4 is installed on the guide rail 9.2 close to one of the fixed joints 9.5; the front part of the guide rail 9.2 forms a mounting surface for mounting the robot body 8.1, and the rear part is installed with a plurality of first magnetically controlled switch magnets 9.1 for connecting to the base material 13.

[0064] The design of the guide rail 9.2 and the guide rail rack 9.3 provides an accurate linear motion path, ensuring that the robot body 8.1 moves smoothly along the predetermined trajectory.

[0065] The arrangement of the fixed joints 9.5 at both ends of the guide rail 9.2 enhances the stability of the overall structure and prevents deformation caused by welding load or impact.

[0066] The connecting positioning pins 9.4 allow the robot body 8.1 to be positioned quickly and accurately on the guide rail 9.2, thereby improving work efficiency.

[0067] The first magnetically controlled switch magnet 9.1 provides a strong adsorption force to ensure a stable connection with the base material 13.

[0068] A welding gun 8.2 is arranged at the lower part of the robot body, and side curtain bracket fixing seats 10.3 are respectively arranged on both sides of the upper part of the robot body 8.1, and a side curtain bracket 10.2 is installed on each of the side curtain fixing seats 10.3. A side curtain plate 10.1 is installed at the lower end of the side curtain bracket 10.2, and a welding space for the welding gun is formed between the two side curtain plates. The two side curtain plates 10.1 protect the welding gun 8.2; a slider that slides with the guide rail 9.2 and a driving gear that meshes with the guide rail rack 9.3 are arranged on the side of the robot body 8.1, and the driving gear is driven by the driving motor of the robot body 8.1.

[0069] The welding gun 8.2 is arranged at the lower part of the robot body 8.1, so as to accurately align the welding points and realize high-precision welding.

[0070] The two side curtain plates 10.1 form a welding space for the welding gun 8.2 and protect the welding gun to prevent welding spatter from harming the robot body or surrounding personnel; the side curtain plates 10.1 play an isolating role during the welding process to reduce the impact of external factors such as wind and dust on the welding quality; the design of the side curtain bracket fixing seat 10.3 and the side curtain bracket 10.2 provides a stable supporting structure to ensure the stability of the side curtain plates 10.1 during the welding process.

[0071] There are two side curtain brackets 10.2 on each side curtain bracket fixing seat 10.3, each side curtain bracket 10.2 is arranged in an arc shape, and the lower end of the side curtain bracket 10.2 extends downward and is connected to the side curtain plate 10.1; the two side curtain brackets 10.2 are arranged parallel to each other and form a spacing.

[0072] The side curtain plate 10.1 is connected to the side curtain bracket 10.2 by bolts, and the side curtain bracket 10.2 is connected to the side curtain bracket fixing seat 10.3 by means of a slot.

[0073] The curved side curtain bracket 10.2 provides a more comprehensive protection range, which can more effectively cover the welding area and protect the welder and the surrounding environment from spatter and strong light.

[0074] The two side curtain brackets 10.2 are arranged parallel to each other, which increases the stability of the overall structure and reduces deformation caused by vibration or impact during welding.

[0075] A waste collection assembly is installed on the mother material at the lower part of the robot body, and the waste collection assembly includes a collection bracket 11.2, a collection cloth 11.1 and a second magnetic control switch magnet 11.3. The second magnetic control switch magnet 11.3 and the collection cloth 11.1 are installed on the collection bracket 11.2, and several second magnetic control switch magnets 11.3 are evenly arranged on the collection bracket 11.2 for connection with the mother material; the collection cloth 11.1 corresponds to the moving space of the robot body 8.1 and is used to receive waste; the design of the collection cloth can effectively receive and collect waste generated during welding and keep the working area clean; timely collection of waste can reduce pollution to the working environment and meet the requirements of green construction; reduce scattered waste, reduce the risk of slipping or injury, and improve workplace safety.

[0076] The mobile control assembly includes a mobile integrated box 1 and a welding power supply 2, a high-voltage contact sensor 3, a controller 4, a teaching pendant 5 and a carbon dioxide cylinder 12 installed in the mobile integrated box 1. A positive welding power supply connection cable 17, a negative welding power supply connection cable 18, a welding power supply control cable 25 and a high-voltage contact sensor power supply cable 28 are connected between the high-voltage contact sensor 3 and the welding power supply 2; the controller 4 and the high-voltage contact sensor 3 are electrically connected through the high-voltage contact sensor control cable 24 and the controller power supply cable 26; the teaching pendant 5 and the controller 4 are electrically connected through the teaching pendant cable 27; the wire feeder 6 is located outside the mobile integrated box 1 and is connected to the welding power supply 2. The wire feeder 6 is electrically connected via a wire feeder control cable 20; the wire feeder 6 and the controller 4 are electrically connected via a driver control cable 19; the wire feeder 6 and the high-voltage contact sensor 3 are electrically connected via a wire feeder welding cable 23; the handheld operating box 7 and the wire feeder 6 are electrically connected via a handheld control box cable 21; the robot body and the wire feeder 6 are electrically connected via a head control cable 16; the welding gun and the wire feeder 6 are electrically connected via a welding gun cable 15; the base material 13 and the high-voltage contact sensor 3 are electrically connected via a base material cable 14; the welding power source 2 is grounded via a grounding cable 30; and a carbon dioxide gas pipe 22 is also installed between the carbon dioxide gas cylinder 12 and the wire feeder 6.

[0077] The present invention also relates to a welding method based on a steel tower construction site ring opening green construction welding device, comprising the following steps:

[0078] (1) Setting welding parameters: operate the teaching pendant, use the teaching mode to detect the groove angle, plate thickness, and plate thickness difference parameters of the welding area, generate welding specifications or call historical specification parameters;

[0079] (2) Welding process control: Start the driving motor of the robot body, make the driving gear mesh with the guide rack, and drive the robot body to move along the planned path; operate the handheld operation box to start the welding gun and use the side curtain plate to protect the welding gun; use the welding gun to complete the multi-layer and multi-pass automatic welding of the weld;

[0080] (3) Waste collection and processing: A waste collection assembly is installed on the base material at the bottom of the robot body. The collection bracket is connected to the base material through the second magnetic switch magnet, and the collection cloth is used to receive the waste, ensuring effective collection of the waste.

[0081] (4) Welding quality monitoring;

[0082] (5) Welding data recording and analysis: Record various parameters during the welding process and use statistical analysis methods to evaluate the stability and consistency of the welding process.

[0083] In the step (2), during the welding process, the parameters of welding current, welding voltage, welding speed, swing width and swing center are adjusted in real time.

[0084] In the step (4), the welding quality monitoring is specifically as follows:

[0085] (4-1) Based on the welding process parameters of current, voltage and welding speed, use CAD software to design the welding appearance forming diagram; convert the design diagram into a digital model. This is achieved by digitizing the geometric parameters of the design diagram (such as length, width, depth, etc.).

[0086] (4-2) Image recording and recognition during welding: The welding molten pool is captured by an industrial camera, and the installation position of the industrial camera is ensured to cover the entire welding area while avoiding direct exposure to the welding arc. The image data is then transmitted to the computer system using an image acquisition card for real-time image data processing.

[0087] (4-3) Graphic fitting comparative analysis: Use a graphic fitting method, such as the least squares method, to fit the actual weld profile with the preset standard weld profile. By comparing the fitting results with the standard, the consistency and quality of the weld are evaluated.

[0088] (4-4) Identify surface defects such as pores, slag inclusions, and cracks in welds: Use machine learning algorithms to train models, such as convolutional neural networks (CNNs), to automatically identify surface defects such as pores, slag inclusions, and cracks in welds; use image segmentation methods, such as threshold segmentation or region growing algorithms, to separate surface defects;

[0089] (4-5) The weld appearance forming rate is obtained:

[0090] (4-5-1) Calculate the actual weld area: Extract the actual weld contour from the image and calculate its area S 实际 ;

[0091] (4-5-2) Calculate the standard weld area: Calculate the standard weld area Sstandard according to the CAD design drawing;

[0092] (4-5-3) Calculation of forming rate: Use the following formula to calculate the weld appearance forming rate:

[0093] Rate(%)=(S 实际 / S 标准 )×100%, this ratio reflects the degree of closeness between the actual weld and the designed weld in appearance.

[0094] like Fig. 9 As shown, in the step (5), specifically:

[0095] (5-1) Input welding parameters: receiving the basic input parameters of the welding process, including the total length of the weld L, the welding speed v, in meters per minute, and the preset standard values ​​and allowable deviations of the current I and voltage U;

[0096] (5-2) Real-time monitoring of welding process: During the welding process, the welding current It and voltage Ut, as well as the welding time t, are monitored and recorded in real time;

[0097] Out-of-tolerance detection: If the current or voltage during welding exceeds the preset range, record the start and end time of the out-of-tolerance, as well as the corresponding position. Specifically:

[0098] When 200A≤It≤240A, record the start time and end time tmi and tmi+1 of the deviation;

[0099] When 26V≤Ut<30V, the out-of-tolerance time is also recorded;

[0100] (5-3) Calculate the out-of-tolerance position: Use the welding speed v and the out-of-tolerance time tmi, tmi+1 to calculate the out-of-tolerance start position Lmi=v×tmi and the out-of-tolerance end position Lmi+1=v×tmi+1;

[0101] (5-4) Calculation of welding stability:

[0102] P is a percentage value that indicates the stability of the welding process. Ideally, P should be close to 100%, indicating that the welding process is completely stable.

[0103] (5-5) When the welding process is completed, the monitoring is ended and the final welding stability result is output.

[0104] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A green construction welding equipment for the ring mouth of a steel tower construction site, characterized in that: include: The robot body is used for on-site welding; The robot body bearing assembly is used to support and guide the operation of the robot body; The mobile control component is used to control the robot body.

2. A steel tower construction site ring green construction welding equipment according to claim 1, characterized in that: The robot body bearing assembly includes a guide rail, a guide rail rack, a magnetically controlled switch magnet, a fixed joint and a connecting positioning pin. The guide rail is arranged along the running direction of the robot body. A guide rail rack integrally formed with the guide rail is arranged at the lower part of the guide rail. Fixed joints are respectively arranged at both ends of the guide rail. A connecting positioning pin is installed on the guide rail close to one of the fixed joints. The front part of the guide rail forms a mounting surface for mounting the robot body, and the rear part is installed with a plurality of first magnetically controlled switch magnets for connecting to a parent material.

3. A steel tower construction site ring green construction welding equipment according to claim 2, characterized in that: A welding gun is arranged at the lower part of the robot body, and side curtain bracket fixing seats are respectively arranged on both sides of the upper part of the robot body, a side curtain bracket is installed on each of the side curtain fixing seats, and a side curtain plate is installed at the lower end of the side curtain bracket, and a welding space for the welding gun is formed between the two side curtain plates, and the two side curtain plates protect the welding gun; a slider slidingly matched with the guide rail and a driving gear meshing with the guide rail rack are arranged on the side of the robot body, and the driving gear is driven by the driving motor of the robot body.

4. A steel tower construction site ring mouth green construction welding equipment according to claim 3, characterized in that: There are two side curtain brackets on each side curtain bracket fixing seat, each of which is arranged in an arc shape, and the lower end of the side curtain bracket extends downward and is connected to the side curtain plate; the two side curtain brackets are arranged parallel to each other and form a spacing.

5. A steel tower construction site ring green construction welding equipment according to claim 2 or 3, characterized in that: A waste collection assembly is installed on the mother material at the lower part of the robot body, and the waste collection assembly includes a collection bracket, a collection cloth and a second magnetic control switch magnet. The second magnetic control switch magnet and the collection cloth are installed on the collection bracket, and several second magnetic control switch magnets are evenly arranged on the collection bracket for connecting with the mother material; the collection cloth corresponds to the moving space of the robot body and is used to receive waste.

6. A steel tower construction site ring mouth green construction welding equipment according to claim 5, characterized in that: The mobile control assembly includes a mobile integrated box and a welding power supply, a high-voltage contact sensor, a controller, a teaching pendant and a carbon dioxide cylinder installed in the mobile integrated box. A positive welding power supply connection cable, a negative welding power supply connection cable, a welding power supply control cable and a high-voltage contact sensor power supply cable are connected between the high-voltage contact sensor and the welding power supply; the controller and the high-voltage contact sensor are electrically connected through the high-voltage contact sensor control cable and the controller power supply cable; the teaching pendant and the controller are electrically connected through the teaching pendant cable; the wire feeder is located outside the mobile integrated box and is connected to the welding power supply. The wire feeder and the controller are electrically connected through a driver control cable; the wire feeder and the high-voltage contact sensor are electrically connected through a wire feeder welding cable, the handheld operating box and the wire feeder are electrically connected through a handheld control box cable, the robot body and the wire feeder are electrically connected through a head control cable, the welding gun and the wire feeder are electrically connected through a welding gun cable, the base material and the high-voltage contact sensor are electrically connected through a base material cable, the welding power supply is grounded through a grounding cable, and a carbon dioxide gas pipe is also installed between the carbon dioxide gas cylinder and the wire feeder.

7. A welding method based on the green construction welding equipment for the ring opening of a steel tower construction site according to any one of claims 1 to 6, characterized in that: The following steps are involved: (1) Setting welding parameters: operate the teaching pendant, use the teaching mode to detect the groove angle, plate thickness, and plate thickness difference parameters of the welding area, generate welding specifications or call historical specification parameters; (2) Welding process control: Start the driving motor of the robot body, make the driving gear mesh with the guide rack, and drive the robot body to move along the planned path; operate the handheld operation box to start the welding gun and use the side curtain plate to protect the welding gun; use the welding gun to complete the multi-layer and multi-pass automatic welding of the weld; (3) Waste collection and processing: A waste collection assembly is installed on the base material at the bottom of the robot body. The collection bracket is connected to the base material through the second magnetic switch magnet, and the collection cloth is used to receive the waste, ensuring effective collection of the waste. (4) Welding quality monitoring; (5) Welding data recording and analysis: Record various parameters during the welding process and use statistical analysis methods to evaluate the stability and consistency of the welding process.

8. The welding method of the steel tower construction site ring green construction welding equipment according to claim 7 is characterized in that: In the step (2), during the welding process, the parameters of welding current, welding voltage, welding speed, swing width and swing center are adjusted in real time.

9. The welding method of the steel tower construction site ring green construction welding equipment according to claim 7 is characterized in that: In the step (4), the welding quality monitoring is specifically as follows: (4-1) Using CAD software to design a welding appearance drawing based on welding process parameters such as current, voltage and welding speed; converting the design drawing into a digital model; (4-2) Image recording and recognition during welding: The welding molten pool is captured by an industrial camera, and the installation position of the industrial camera is ensured to cover the entire welding area while avoiding direct exposure to the welding arc. The image data is then transmitted to the computer system using an image acquisition card for real-time image data processing. (4-3) Graphic fitting comparative analysis: Use the graphic fitting method to fit the actual weld profile with the preset standard weld profile, and evaluate the consistency and quality of the weld by comparing the fitting result with the standard; (4-4) Identify surface defects such as pores, slag inclusions, and cracks in welds: Use machine learning algorithms to train models to automatically identify surface defects such as pores, slag inclusions, and cracks in welds; Apply image segmentation methods to separate surface defects; (4-5) The weld appearance forming rate is obtained as follows: (4-5-1) Calculate the actual weld area: Extract the actual weld contour from the image and calculate its area S 实际 ; (4-5-2) Calculate the standard weld area: Calculate the standard weld area S according to the CAD design drawing. 标准 ; (4-5-3) Calculation of forming rate: Use the following formula to calculate the weld appearance forming rate: Rate % = (S 实际 / S 标准 )×100%, this ratio reflects the degree of closeness between the actual weld and the designed weld in appearance.

10. The welding method of the steel tower construction site ring green construction welding equipment according to claim 7 is characterized in that: In the step (5), specifically: (5-1) Input welding parameters: receiving the basic input parameters of the welding process, including the total length of the weld L, the welding speed v, in meters per minute, and the preset standard values ​​and allowable deviations of the current I and voltage U; (5-2) Real-time monitoring of welding process: During the welding process, the welding current It and voltage Ut, as well as the welding time t, are monitored and recorded in real time; Out-of-tolerance detection: If the current or voltage during welding exceeds the preset range, record the start and end time of the out-of-tolerance, as well as the corresponding position. Specifically: When 200A≤It≤240A, record the start time and end time tmi and tmi+1 of the deviation; when 26V≤Ut<30V, also record the deviation time; (5-3) Calculate the out-of-tolerance position: Use the welding speed v and the out-of-tolerance time tmi, tmi+1 to calculate the out-of-tolerance start position Lmi=v×tmi and the out-of-tolerance end position Lmi+1=v×tmi+1; (5-4) Calculation of welding stability: P is a percentage value that indicates the stability of the welding process. Ideally, P should be close to 100%, indicating that the welding process is completely stable. (5-5) When the welding process is completed, the monitoring is ended and the final welding stability result is output.

Citation Information

Patent Citations

  • Process for achieving proper weld quality in course of the welding operation, marking the faults on the workpieces and certifying the quality

    CA1206616A

  • Double-gun horizontal automatic welding device and welding method thereof

    CN102380687A

  • Automatic wall-mounted submerged arc horizontal welding equipment

    CN103537785A

  • Adsorption type tubular column field welding robot

    CN106513948A

  • Automatic street lamp pole welding system and method based on deep learning and online detection