Reactor for removing phosphorus in electrical stimulation vertical flow constructed wetland

By using electrically stimulated vertical flow artificial wetland reactor in the sewage treatment system, combined with microbial electrolytic cell technology, using pyrite and plants in the anode chamber for electrochemical treatment, the stability of phosphorus removal and The efficiency issues have achieved efficient sewage treatment and ecological and environmental protection effects.

CN118878087APending Publication Date: 2024-11-01XINJIANG UNIVERSITY
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411217109.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

Traditional sewage treatment systems have stability and reliability problems in removing phosphorus, and the prior art is difficult to effectively improve the removal effect of organic pollutants, especially in the case of complex water quality.

Method used

Using an electrically stimulated vertical flow artificial wetland reactor, the reactor is divided into water inlet module, anaerobic module, aeration module and aerobic module, combined with microbial electrolytic cell technology, pyrite and plants in the anode chamber are used for Electrochemical treatment promotes the removal of phosphorus.

Benefits of technology

It significantly improves the phosphorus removal rate in sewage, improves the stability and removal effect of the system, avoids the problem of reactor blockage, and realizes ecological and environmentally friendly sewage treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118878087A_ABST
    Figure CN118878087A_ABST
Patent Text Reader

Abstract

The invention discloses a reactor for removing phosphorus in an electrical stimulation vertical flow constructed wetland. The reactor comprises a water inlet module, an anaerobic module, an aeration module, an aerobic module and a water outlet module which are sequentially divided from bottom to top based on a reactor body, the water inlet module is used for inputting sewage to be treated; the anaerobic module is used for carrying out preliminary degradation on the sewage to be treated to obtain degraded water; the aeration module is used for providing continuous and stable dissolved oxygen for the aerobic module; the aerobic module is used for carrying out deep treatment on the degraded water to obtain water subjected to deep treatment; and the water outlet module is used for carrying out microbial decomposition and plant absorption and enrichment on the water subjected to deep treatment so as to remove phosphorus. The phosphorus removal effect on the wastewater is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of sewage treatment, and in particular relates to a reactor for removing phosphorus in an electrically stimulated vertical flow artificial wetland. Background Art

[0002] Inefficient phosphorus removal is one of the main concerns of traditional sewage treatment systems. This is mainly due to the release of wastewater containing a large amount of phosphorus, which leads to eutrophication in receiving water bodies and threatens aquatic organisms. Many enhanced biological phosphorus removal (EBPR) systems have been proposed, but they all require the establishment of additional anoxic / anaerobic devices in existing sewage treatment plants or the time adjustment of anoxic / anaerobic conditions. Although this EBPR system can provide considerable phosphate removal rates, it has the main disadvantages of lack of stability and reliability. In addition, given the complexity and diversity of water quality, traditional water treatment processes have been unable to achieve effective removal effects, and seeking an efficient combination of different processes has become a technical key to ensuring the safety of the water environment. The technologies currently used in sewage treatment mainly include anaerobic treatment processes, biofilm treatment technologies, and other methods. These conventional sewage biological treatment technologies are not efficient in treating some difficult-to-degrade pollutants and are limited by the concentration of pollutants in polluted water bodies. Constructed wetlands (CWs), as a mature ecological sewage treatment technology, are feasible for removing phosphorus from wastewater. Constructed wetlands have been used to treat polluted wastewater for decades due to their stable removal effect, low cost, and easy operation and maintenance. In constructed wetlands, plants, substrates, and microorganisms work together to remove pollutants such as nitrogen, phosphorus, and organic pollutants from wastewater through processes such as plant absorption and enrichment, substrate adsorption and filtration, and microbial decomposition. Pyrite, which has been found to be an excellent substrate for CWs to treat phosphorus-containing wastewater, is mainly composed of FeS2. Fe 2+ Can be oxidized to generate Fe under aerobic conditions 3+ , with PO4 3- Further reaction forms FePO4 precipitation, improving phosphorus removal efficiency: FeS2+3.75O2+0.5H2O→Fe 3+ +2SO4 2- +H + .

[0003] However, previous studies have shown that simply changing the flow pattern (horizontal, subsurface, vertical flow), operation mode (intermittent flow, continuous flow), and operation parameters (residence time, organic load) of the wetland cannot improve the removal effect of organic pollutants by artificial wetlands. Therefore, the removal effect of phosphorus in wastewater by enhanced CWs system needs to be further explored, and finding an enhanced CWs system that can effectively remove phosphorus-containing wastewater has become a problem that needs to be solved at present. Bioelectrochemical system (BES) is an effective degradation pathway for organic pollutants, and it has achieved good removal effects when combined with various other technologies. The BES system mainly uses the function of microorganisms to achieve cathode reduction or anodic oxidation electrochemical system, mainly including microbial fuel cell (MFC) and microbial electrolysis cell (MEC). The BES system can generate metal cations or their compounds during electrolysis to form precipitation with phosphates in the wastewater to remove phosphorus from the wastewater.

[0004] Through the coupling system of artificial wetlands and bioelectrochemistry, the growth, metabolic activity, microbial community structure, and microecological environment of plants and microorganisms are changed to improve the removal of pollutants. The coupling system implants bioelectrochemistry into artificial wetlands, which helps to regulate the redox potential of wetlands and provides more electron acceptors for pollutants in anaerobic zones, thereby accelerating microbial metabolism and enhancing phosphorus removal. The basic principle is to change the chemical form of pollutants through the electrolysis of the electrode system and remove pollutants by oxidation-reduction, electrocoagulation, and electrodeposition. By using the induction of plants by electric fields, the activation of microorganisms, and the migration of pollutants, the migration and conversion rate of pollutants are accelerated, and the biological conversion capacity is strengthened, thereby promoting the removal of phosphorus in wastewater.

[0005] Due to these characteristics, enhanced composite artificial wetlands have attracted widespread attention from scholars around the world in recent years, and their performance has also been greatly improved. Among them, the configuration with the best performance and the most practical potential is the artificial wetland coupled bioelectrochemical system, which has the following advantages: (1) Stable operation: The artificial wetland coupled bioelectrochemical system can continuously inflow water, effectively remove urban sewage through the anode and cathode chambers, and continuously operate well. (2) Enhanced sewage treatment: The artificial wetland coupled bioelectrochemical system removes phosphorus from wastewater by utilizing the synergistic effects of microbial decomposition, plant absorption and enrichment, and matrix adsorption and filtration. It has a stable and excellent removal effect. (3) Ecological and environmental protection: Compared with traditional processes, it has both good removal effect and ecological and environmental protection value. However, there are relatively few studies on artificial wetland coupled bioelectrochemical systems, which have the following limitations: (1) The system's phosphorus removal effect and optimal operation mode are not yet clear. (2) The hydraulic retention time is long, and suspended microorganisms and detached biofilms can easily cause reactor blockage. Summary of the invention

[0006] In order to solve the above technical problems, the present invention proposes a reactor for removing phosphorus by using an electrically stimulated vertical flow artificial wetland to improve the phosphorus removal effect on wastewater.

[0007] To achieve the above object, the present invention provides a reactor for removing phosphorus by an electrically stimulated vertical flow artificial wetland, comprising: based on the reactor body, the reactor is divided into an inlet module, an anaerobic module, an aeration module, an aerobic module and an outlet module from bottom to top;

[0008] The water inlet module is used to input sewage to be treated;

[0009] The anaerobic module is used to preliminarily degrade the sewage to be treated to obtain degraded water;

[0010] The aeration module is used to provide continuous and stable dissolved oxygen to the aerobic module;

[0011] The aerobic module is used to perform deep treatment on the degraded water to obtain deeply treated water;

[0012] The water outlet module is used to perform microbial decomposition and plant absorption enrichment on the deeply treated water to complete the removal of phosphorus.

[0013] Furthermore, the water inlet module includes a water inlet end, a first water inlet pipe, a water inlet pump, a second water inlet pipe and a sewage source, and a container containing the sewage source is sequentially connected to the second water inlet pipe, the water inlet pump, the first water inlet pipe, the water inlet end and the reactor body.

[0014] Furthermore, the anaerobic module includes carbon felt, an anaerobic zone, an anaerobic cathode, matrix pyrite, and a first water outlet end; the carbon felt is filled below the anaerobic zone, the anaerobic cathode is arranged above the anaerobic zone, the anaerobic cathode is filled with matrix pyrite, and the matrix pyrite is connected to the first water outlet end.

[0015] Furthermore, the aeration module includes an aeration zone, a second water outlet end, an aeration port, a check valve, a glass rotor gas flow meter, an air inlet pipe, and an oxygen pump; the aeration zone is respectively connected to the second water outlet end and the aeration port, and the aeration port is sequentially connected to the check valve, the glass rotor gas flow meter, the air inlet pipe, and the oxygen pump.

[0016] Furthermore, the aerobic module includes an aerobic zone, an aerobic anode, and a titanium sheet; the aerobic anode is disposed below the aerobic zone, and the aerobic anode is provided with the titanium sheet.

[0017] Furthermore, the water outlet module includes gravel, a third water outlet end, and artificial wetland plants; the water outlet module is laid with the gravel and planted with the artificial wetland plants, and is also provided with the third water outlet end.

[0018] Furthermore, the aerobic anode and the anaerobic cathode are both connected to a DC power supply to form a closed loop.

[0019] Furthermore, the DC power supply uses a 1.2V DC power combined with a bio-cathode and a bio-anode to form a microbial electrolysis cell coupled with an artificial wetland system.

[0020] Technical effect of the invention: The invention discloses a reactor for removing phosphorus by electrically stimulating vertical flow artificial wetlands, wherein an aeration zone is added to provide sufficient oxygen for the microorganisms in the anode aerobic chamber; the cathode and cathode chambers are filled with carbon felt blocks and pyrite with good electrical conductivity to improve the activation effect of electrolysis on the microorganisms, thereby improving the ability to remove phosphorus; in order to prevent the toxic effect of pyrite roots on plants, gravel is filled on the top of the anode chamber to isolate pyrite and plants. The microorganisms in the anaerobic cathode chamber and the aerobic anode chamber can remove phosphorus-containing wastewater, and the pyrite and plants in the reactor can further remove phosphorus from the wastewater. Under the action of electrical stimulation, the oxidation of pyrite to Fe 3+ , forming FePO4 precipitation; and the structure of the microbial community changes, stimulating plant growth and development, and increasing enzyme activity, thereby improving the phosphorus removal effect on wastewater. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0022] Figure 1 A schematic diagram of an electrically stimulated vertical flow artificial wetland and its operation process according to an embodiment of the present invention;

[0023] Among them, 1 is a reactor body, 2 is an anaerobic zone, 3 is an aeration zone, 4 is an aerobic zone, 5 is a first water outlet end, 6 is a second water outlet end, 7 is a third water outlet end, 8 is a water inlet end, 9 is an anaerobic cathode, 10 is an aerobic anode, 11 is a carbon felt, 12 is a titanium sheet, 13 is a DC power supply, 14 is an air inlet pipe, 15 is an oxygen pump, 16 is a glass rotor gas flow meter, 17 is a check valve, 18 is a first water inlet pipe, 19 is a water inlet pump, 20 is a second water inlet pipe, 21 is a sewage source, 22 is an aeration port, 23 is an artificial wetland plant (wetland plants such as canna can be planted), 24 is a matrix pyrite, and 25 is gravel. DETAILED DESCRIPTION

[0024] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0025] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0026] like Figure 1 As shown, in this embodiment, a reactor for removing phosphorus by an electrically stimulated vertical flow artificial wetland is provided, comprising: based on the reactor body 1, the reactor is divided into an inlet module, an anaerobic module, an aeration module, an aerobic module and an outlet module from bottom to top; the inlet module is used to input sewage to be treated; the anaerobic module is used to perform preliminary degradation of the sewage to be treated to obtain degraded water; the aeration module is used to provide continuous and stable dissolved oxygen to the aerobic module; the aerobic module is used to perform deep treatment of the degraded water to obtain deeply treated water; the outlet module is used to perform microbial decomposition and plant absorption enrichment of the deeply treated water to complete the removal of phosphorus.

[0027] The specific connection of each device in the reactor is as follows: the water inlet module includes a water inlet end 8, a first water inlet pipe 18, a water inlet pump 19, a second water inlet pipe 20 and a sewage source 21, and a container containing the sewage source 21 is sequentially connected to the second water inlet pipe 20, the water inlet pump 19, the first water inlet pipe 18, the water inlet end 8 and the reactor body 1. The anaerobic module includes a carbon felt 11, an anaerobic zone 2, an anaerobic cathode 9, a matrix pyrite 24, and a first water outlet end 5; the carbon felt 11 is filled below the anaerobic zone 2, an anaerobic cathode 9 is arranged above the anaerobic zone 2, and the matrix pyrite 24 is filled above the anaerobic cathode 9, and the matrix pyrite 24 is connected to the first water outlet end 5. The aeration module includes an aeration zone 3, a second water outlet end 6, an aeration port 22, a check valve 17, a glass rotor gas flowmeter 16, an air inlet pipe 14, and an aeration pump 15; the aeration zone 3 is connected to the second water outlet end 6 and the aeration port 22 respectively, and the aeration port 22 is connected to the check valve 17, the glass rotor gas flowmeter 16, the air inlet pipe 14, and the aeration pump 15 in turn. The aerobic module includes an aerobic zone 4, an aerobic anode 10, and a titanium sheet 12; an aerobic anode 10 is provided below the aerobic zone 4, and the aerobic anode 10 is provided with a titanium sheet 12. The water outlet module includes gravel 25, a third water outlet end 7, and artificial wetland plants 23; the water outlet module is paved with gravel 25 and planted with artificial wetland plants 23, and is also provided with a third water outlet end 7. The aerobic anode 10 and the anaerobic cathode 9 are both connected to a DC power supply 13 to form a closed loop. The DC power supply 13 uses a 1.2V DC power supply in combination with a bio-cathode and a bio-anode to form a microbial electrolysis cell coupled with an artificial wetland system.

[0028] The present invention adopts the technology of coupling artificial wetland with bioelectrochemical system to achieve the removal of phosphorus in wastewater. The reactor mainly adopts a microbial electrolysis cell coupled with an artificial wetland system composed of 1.2V direct current combined with a biological cathode and a biological anode. The cathode anaerobic chamber and the anode aerobic chamber of the reactor are respectively connected to a DC power supply to form a closed loop. The water inlet method is from bottom to top, and the wastewater is first initially degraded in the anaerobic zone and deeply treated in the aerobic zone. Suitable aquatic plants are planted on the upper part of the aerobic zone to further enhance the pollutant removal effect of the aerobic zone. During operation, phosphorus is removed in the cathode chamber and the anode chamber. When the sewage enters the cathode / anode chamber in turn, the microorganisms in the anode and cathode chambers and the pyrite and plants in the system remove phosphorus in turn. The electrically stimulated artificial wetland system coupled with the bioelectrochemical system can treat urban sewage and remove phosphorus in sewage.

[0029] The reactor of the present invention is made of an organic glass container. From bottom to top, the E-VFCWs is divided into an inlet zone, an anaerobic zone, an aeration zone, an aerobic zone, and an outlet zone. There is an aeration zone between the aerobic zone and the anaerobic zone. The aeration zone is connected to an oxygenation pump to provide continuous and stable dissolved oxygen to the aerobic zone through aeration. The air intake is ensured by a gas glass rotor flowmeter, and a check valve is connected to prevent water backflow. The anaerobic cathode chamber is filled with matrix pyrite and a small piece of conductive biofilm carrier carbon felt sandwiched by two titanium meshes, on which cathode anaerobic microorganisms are attached, which can achieve preliminary degradation of phosphorus; the aerobic anode chamber is filled with the same pyrite and electrode layer as the anaerobic cathode chamber, on which anode aerobic microorganisms are attached, and gravel is laid on the upper layer of the anode chamber and wetland plants are planted. The decomposition of microorganisms and the absorption and enrichment of plants are used to further achieve the removal of phosphorus. The cathode and cathode chambers are connected to the external circuit through titanium sheets and then to a DC power supply.

[0030] The above-mentioned cathode and anode electrode filling materials are carbon felt pieces, and the filler particle size is 10mm long × 10mm wide × 6mm high. The electrode conductive material is titanium mesh, with a diameter of 9cm, a wire diameter of 1mm, and a mesh size of 5mm. The matrix filling material is pyrite, with a particle size of 3-8mm in diameter, and gravel, with a particle size of 10-12mm in diameter and 10mm in height. The conductive material for the external circuit is a titanium sheet, with a size of 200mm long × 10mm wide × 0.2mm high.

[0031] The reactor body of the present invention adopts cylindrical organic glass with an inner diameter of 9 cm, an outer diameter of 10 cm and a height of 41 cm. The water outlet and the water inlet are arranged at the top and the bottom respectively, and the aeration port and the water outlet are arranged in the middle layer. The electrode layer is composed of a titanium mesh (diameter 9 cm, wire diameter 1 mm, mesh size 5 mm) and a carbon felt (10 mm long × 10 mm wide × 6 mm high), and the upper and lower cathodes are filled with pyrite (diameter 3-8 mm) as a matrix layer filler. The top of the anode chamber is filled with gravel (diameter 10-12 mm, 10 mm high) to isolate pyrite and plants. In each electrode, the carbon felt is sandwiched between two titanium meshes. Two sandwich electrode plates are arranged in parallel on the upper and lower layers as an aerobic anode and an anaerobic cathode, with a spacing of 12 cm. The electrode is cylindrical, with a diameter of 9 cm and a thickness of 1 cm. An aeration stone is placed in the middle aeration zone to connect the backflow device and the air pump as an aeration device, and the glass rotor gas flowmeter is connected to adjust the aeration amount in real time. The cathode area and the anode area are connected to the external circuit through a titanium sheet (200mm long × 10mm wide × 0.2mm high), and the reactor is connected to an external direct current (WYK10001, EKSI). Suitable aquatic plants are planted in the upper gravel matrix of the aerobic zone unit of the reactor. Actual phosphorus-containing wastewater or urban sewage is used during operation, and the operation mode is upflow. That is, the sewage first enters the anaerobic cathode area (hydraulic retention time is 24h), and electrical stimulation is used to make the microbial community structure in the reactor change with the change of electrolysis intensity, thereby strengthening the activation and transformation ability of microorganisms, accelerating the migration and transformation of pollutants, and using the decomposition of microorganisms to achieve the initial removal of phosphorus in the wastewater. The pollutants subsequently enter the aerobic anode area, and the appropriate electrolysis intensity causes the Fe produced after the pyrite is dissolved in the water to 2+ , Fe 3+ The ions become available ions, playing the role of phosphate flocculant, forming FePO4 precipitate, thereby removing phosphate in the water; and under the action of electrical stimulation, it stimulates plant growth and development, increases enzyme activity, and utilizes the decomposition of microorganisms and the absorption and enrichment of plants to further remove phosphorus in urban sewage, thereby achieving deep treatment of urban sewage.

[0032] The operation process and removal efficiency of the reactor of the present invention specifically include: no power is applied in the first stage, and a 1.2V DC voltage is applied to the system in the second stage; during the operation of the reactor, the phosphorus concentration of the system outlet water is detected every 24 hours. The detection method is carried out according to the national environmental protection standard GB 11893-89. The instrument used is a Shanghai Jingke 721G ultraviolet visible spectrophotometer.

[0033] During the operation of the reactor, the phosphorus concentration was stable at 6.8±0.3 mg / L.

[0034] Phase I: The overall removal rate was 38.7±3.3%.

[0035] Phase II: The overall removal rate was 68.3±5.3%.

[0036] Overall, the removal rate of the electrically stimulated vertical flow constructed wetland system was improved when an external voltage of 1.2V was applied, which was 29.6% higher than that without power.

[0037] The above are only preferred specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A reactor for removing phosphorus by electrically stimulated vertical flow artificial wetland, characterized in that: include: Based on the reactor body (1), the reactor is divided into an inlet module, an anaerobic module, an aeration module, an aerobic module and an outlet module from bottom to top; The water inlet module is used to input sewage to be treated; The anaerobic module is used to preliminarily degrade the sewage to be treated to obtain degraded water; The aeration module is used to provide continuous and stable dissolved oxygen to the aerobic module; The aerobic module is used to perform deep treatment on the degraded water to obtain deeply treated water; The water outlet module is used to perform microbial decomposition and plant absorption enrichment on the deeply treated water to complete the removal of phosphorus.

2. The electrostimulated vertical flow constructed wetland reactor for removing phosphorus according to claim 1, characterized in that: The water inlet module comprises a water inlet end (8), a first water inlet pipe (18), a water inlet pump (19), a second water inlet pipe (20) and a sewage source (21); a container containing the sewage source (21) is sequentially connected to the second water inlet pipe (20), the water inlet pump (19), the first water inlet pipe (18), the water inlet end (8) and the reactor body (1).

3. The electrostimulated vertical flow constructed wetland reactor for removing phosphorus according to claim 1, characterized in that: The anaerobic module comprises a carbon felt (11), an anaerobic zone (2), an anaerobic cathode (9), matrix pyrite (24), and a first water outlet end (5); the carbon felt (11) is filled below the anaerobic zone (2), the anaerobic cathode (9) is arranged above the anaerobic zone (2), the matrix pyrite (24) is filled above the anaerobic cathode (9), and the matrix pyrite (24) is connected to the first water outlet end (5).

4. The electrostimulated vertical flow constructed wetland reactor for removing phosphorus according to claim 1, characterized in that: The aeration module comprises an aeration zone (3), a second water outlet end (6), an aeration port (22), a check valve (17), a glass rotor gas flow meter (16), an air inlet pipe (14), and an aeration pump (15); the aeration zone (3) is connected to the second water outlet end (6) and the aeration port (22), respectively, and the aeration port (22) is connected to the check valve (17), the glass rotor gas flow meter (16), the air inlet pipe (14), and the aeration pump (15) in sequence.

5. The electrostimulated vertical flow constructed wetland reactor for removing phosphorus according to claim 3, characterized in that: The aerobic module comprises an aerobic zone (4), an aerobic anode (10), and a titanium sheet (12); the aerobic anode (10) is arranged below the aerobic zone (4), and the aerobic anode (10) is provided with the titanium sheet (12).

6. The electrostimulated vertical flow constructed wetland reactor for removing phosphorus according to claim 1, characterized in that: The water outlet module comprises gravel (25), a third water outlet end (7), and artificial wetland plants (23); the water outlet module is used to lay the gravel (25) and plant the artificial wetland plants (23), and is also provided with the third water outlet end (7).

7. The electrostimulated vertical flow constructed wetland reactor for removing phosphorus according to claim 5, characterized in that: The aerobic anode (10) and the anaerobic cathode (9) are both connected to a direct current power supply (13) to form a closed loop.

8. The electrostimulated vertical flow constructed wetland reactor for removing phosphorus according to claim 7, characterized in that: The direct current power supply (13) uses a 1.2V direct current combined with a biocathode and a bioanode to form a microbial electrolysis cell coupled with an artificial wetland system.

Citation Information

Cited By

  • Lake eutrophication biological treatment system based on multi-dimensional cooperative regulation and dynamic optimization method

    CN120518270A