Large warhead and cabin connecting structure and method
By designing a three-point connection structure including cabin, warhead, rear flange, central hinge ring and front auxiliary support ring, the influence of large warhead on cabin strength and stiffness is solved, and a more stable connection is achieved. Vibration control.
Patent Information
- Application Number
- CN202410909567.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-11-01
AI Technical Summary
Large warheads affect the strength and stiffness of the cabin during flight, especially the weak front-end support structure, resulting in vibration and thermal matching problems.
Design a connection structure including cabin, warhead, warhead rear flange, middle ring, middle support screw, front auxiliary support ring, lock nut and arc-shaped gasket, and improve the connection strength and Stiffness, use rubber gaskets to reduce the front auxiliary support stiffness.
It effectively solves the connection strength and stiffness of large and heavy warheads in the cabin, improves the stiffness of the front end of the cabin, and improves the vibration and heat matching performance during flight.
Smart Images

Figure CN118882418A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of rocket technology, and in particular relates to a large-scale warhead and cabin connection structure and method. Background Art
[0002] The ultimate goal of missile flight is to transport the warhead to a specific target safely and effectively. The connection design of the warhead in the cabin is particularly important. Due to the heavy weight of the warhead, the overload caused by the change in trajectory during flight makes the warhead have a greater impact on the strength of the cabin. Since the warhead is long, the middle support is generally slightly forward of the center of gravity of the warhead, resulting in a longer front cantilever. The vibration during flight causes a larger vibration value in front of the middle support. In order to solve the strength problems of the large and heavy warhead cabin, the problem of weak rigidity at the front end of the cabin, and the problem of thermal matching after the cabin is heated during flight, it is urgent to design a new type of connection structure. Summary of the invention
[0003] In order to overcome the deficiencies of the prior art, the present invention provides a large warhead and cabin connection structure and method, including a cabin, a warhead, a warhead rear flange, a middle holding ring, a middle support screw, a front auxiliary support ring, a locking nut, an arc-shaped gasket, etc. The cabin is a conical section, the warhead is placed inside the cabin, the warhead rear flange is installed at the rear end of the cabin, the middle holding ring is installed in front of the center of gravity of the warhead, and plays a radial main support role, and the front auxiliary support ring is installed at the front end of the warhead, and plays an auxiliary support role. The present invention solves the problem of connection strength and rigidity of a large and heavy warhead in the cabin, and solves the problem of weak rigidity at the front end of the cabin through the front auxiliary support.
[0004] The technical solution adopted by the present invention to solve the technical problem is as follows:
[0005] A large warhead and cabin connection structure, comprising a cabin, a warhead, a warhead rear flange, a middle holding ring, a middle supporting screw, a front auxiliary supporting ring, a locking nut and an arc-shaped gasket;
[0006] The warhead rear flange is connected to the warhead;
[0007] The warhead rear flange is connected to the cabin;
[0008] The middle holding ring is installed on the warhead and consists of two half holding rings;
[0009] The warhead is installed at the front of the cabin;
[0010] The front auxiliary support ring cooperates with the warhead arc surface and is connected to the front end of the warhead through a locking nut;
[0011] The arc-shaped gasket is arranged at the supporting position of the front auxiliary supporting ring, and a rubber pad is pasted on the surface of the arc-shaped gasket.
[0012] Preferably, the warhead rear flange is connected to the warhead via threads, and after being connected as one, positioning pin holes are uniformly drilled on the warhead rear flange, and the central support position of the warhead is axially and circumferentially marked for positioning.
[0013] Preferably, the middle holding ring is connected to the middle of the warhead by screws.
[0014] Preferably, the warhead is installed in the cabin by means of a vertical assembly method through the warhead rear flange, and the middle supporting screw is used to symmetrically tighten the middle holding ring.
[0015] Preferably, the front auxiliary support ring is adhered to the rubber pad and installed at the front end of the warhead through a locking nut to reduce the stiffness of the front auxiliary support.
[0016] Preferably, the warhead rear flange is connected to the cabin body by bolts and locating pins.
[0017] A method for installing a large warhead and cabin connection structure comprises the following steps:
[0018] Step 1: The rear flange of the warhead is connected to the warhead through threads. After being connected as one, the positioning pin holes are uniformly drilled on the rear flange of the warhead, and the axial and circumferential markings are performed on the support position of the middle part of the warhead;
[0019] Step 2: Connect the middle ring to the corresponding position in the middle of the warhead with screws;
[0020] Step 3: The warhead is installed in the cabin by vertical assembly through the rear flange of the warhead, and the middle support screw is used to symmetrically tighten the middle holding ring and apply torque;
[0021] Step 4: The front auxiliary support ring is attached to the rubber pad and installed on the front end of the warhead through the locking nut, and torque is applied;
[0022] Step 5: Stick the arc-shaped gasket to the rubber pad and connect it to the corresponding position of the cabin with screws;
[0023] Step 6: Use bolts to tighten the arc gasket through the front auxiliary support ring and apply torque.
[0024] The beneficial effects of the present invention are as follows:
[0025] The present invention solves the problem of connection strength and rigidity of a large and heavy warhead within a cabin, and solves the problem of weak rigidity at the front end of the cabin through a front auxiliary support. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the structure of the present invention.
[0027] Figure 2 It is a partial enlarged view of the structure of the present invention.
[0028] Figure markings: 1-cabin, 2-warhead, 3-warhead rear flange, 4-middle holding ring, 5-middle support screw, 6-front auxiliary support ring, 7-arc gasket, 8-locking nut. DETAILED DESCRIPTION
[0029] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0030] The present invention discloses a connection structure between a large warhead and a cabin. The structure adopts a three-point connection design concept. The main functions of each component are as follows:
[0031] The connection structure between the large warhead and the cabin is mainly composed of the cabin, warhead, warhead rear flange, middle holding ring, middle support screw, front auxiliary support ring, locking nut, arc-shaped gasket, etc.
[0032] The rear flange of the warhead is connected to the warhead through threads. After being connected as one, positioning pin holes are drilled on the rear flange of the warhead, and the axial and circumferential markings are performed on the middle support position of the warhead.
[0033] Connect the middle holding ring to the corresponding position in the middle of the warhead by screws.
[0034] The warhead is installed in the cabin by vertical assembly through the rear flange of the warhead, and the middle supporting screw is used to symmetrically tighten the middle holding ring.
[0035] The front auxiliary support ring is attached to the rubber pad and installed at the front end of the warhead through a locking nut, which can effectively reduce the stiffness of the front auxiliary support.
[0036] The arc-shaped gasket is attached to the rubber pad and connected to the corresponding position of the cabin with screws to further reduce the stiffness of the front auxiliary support.
[0037] Use bolts to tighten the arc gasket through the front auxiliary support ring.
[0038] Example:
[0039] The specific scheme of the structural installation method is as follows:
[0040] 1. The rear flange of the warhead is connected to the warhead through threads. After being connected as one, the positioning pin holes are uniformly drilled on the rear flange of the warhead, and the axial and circumferential markings are performed on the support position in the middle of the warhead.
[0041] 2. Connect the middle ring to the corresponding position in the middle of the warhead with screws.
[0042] 3. The warhead is installed in the cabin by vertical assembly through the rear flange of the warhead, and the middle support screw is used to symmetrically tighten the middle holding ring and apply torque.
[0043] 4. The front auxiliary support ring is attached to the rubber pad and installed at the front end of the warhead through the locking nut and torque is applied.
[0044] 5. Stick the arc-shaped gasket to the rubber pad and connect it to the corresponding position of the cabin with screws.
[0045] 6. Use bolts to tighten the arc gasket through the front auxiliary support ring and apply torque.
Claims
1. A large warhead and cabin connection structure, characterized in that: It includes a cabin, a warhead, a warhead rear flange, a middle holding ring, a middle supporting screw, a front auxiliary supporting ring, a locking nut and an arc-shaped gasket; The warhead rear flange is connected to the warhead; The warhead rear flange is connected to the cabin body; The middle holding ring is installed on the warhead and consists of two half holding rings; The warhead is installed at the front of the cabin; The front auxiliary support ring cooperates with the warhead arc surface and is connected to the front end of the warhead through a locking nut; The arc-shaped gasket is arranged at the supporting position of the front auxiliary supporting ring, and a rubber pad is pasted on the surface of the arc-shaped gasket.
2. A large warhead and cabin connection structure according to claim 1, characterized in that: The warhead rear flange is connected to the warhead via threads, and after being connected as one, positioning pin holes are uniformly drilled on the warhead rear flange, and the central support position of the warhead is axially and circumferentially marked for positioning.
3. A large warhead and cabin connection structure according to claim 1, characterized in that: The middle holding ring is connected to the middle of the warhead by screws.
4. A large warhead and cabin connection structure according to claim 1, characterized in that: The warhead is installed in the cabin by a vertical assembly method through the warhead rear flange, and the middle supporting screw is used to symmetrically tighten the middle holding ring.
5. The large warhead and cabin connection structure according to claim 1, characterized in that: The front auxiliary support ring is adhered to the rubber pad and is installed at the front end of the warhead through a locking nut to reduce the front auxiliary support stiffness.
6. A large warhead and cabin connection structure according to claim 1, characterized in that: The warhead rear flange is connected to the cabin body through bolts and locating pins.
7. A method for installing the connection structure according to claim 1, characterized in that: The steps include: Step 1: The rear flange of the warhead is connected to the warhead through threads. After being connected as one, the positioning pin holes are uniformly drilled on the rear flange of the warhead, and the axial and circumferential markings are performed on the support position of the middle part of the warhead; Step 2: Connect the middle ring to the corresponding position in the middle of the warhead with screws; Step 3: The warhead is installed in the cabin by vertical assembly through the rear flange of the warhead, and the middle support screw is used to symmetrically tighten the middle holding ring and apply torque; Step 4: The front auxiliary support ring is attached to the rubber pad and installed on the front end of the warhead through the locking nut, and torque is applied; Step 5: Stick the arc-shaped gasket to the rubber pad and connect it to the corresponding position of the cabin with screws; Step 6: Use bolts to tighten the arc gasket through the front auxiliary support ring and apply torque.
Citation Information
Patent Citations
Connecting structure for warhead and cabin body of guided missile
CN117516295A
Mounting structure of gear and shaft
CN209083843U
Contact type sealing device for high-speed bearing box of multi-wire sawing machine
CN209569339U
Pipe connection with deformed pipe
EP1462702A2
Missile-borne explosive activated grenade release device
US7044060B1