Software system development method and device

By building a development framework, predicting and analyzing possible problems during the software development process, formulating response plans, and timely identifying and solving problems, the shortcomings of the existing technology that cannot predict and respond to problems during the development process in advance are solved, and the software development process is realized smooth progress and problem-solving accuracy.

CN118885154APending Publication Date: 2024-11-01ZHEJIANG HAILANG SOFTWARE DEVELOPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410911302.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

In the prior art, software system development cannot predict possible problems during the development process in advance, resulting in the inability to formulate a response plan in a timely manner, resulting in the inability to proceed smoothly.

Method used

A software system development method is adopted, including building a development framework, predicting and analyzing possible problems through acquisition modules, change prediction modules, opinion collection modules, analysis and judgment modules, probability calculation sorting modules, response planning modules, etc., and formulating Response plans, identify and solve problems in a timely manner, and modify modules and application module application solutions, detect and backup solutions.

Benefits of technology

The software development process is achieved smoothly, and through automatic learning and continuous expansion of the problem database and solution database, the accuracy of solving targeted problems is improved, ensuring the smooth implementation of the development plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118885154A_ABST
    Figure CN118885154A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of software system development, particularly relates to a software system development method and device, and aims to solve the problems that problems occurring in the development process cannot be predicted in advance according to the requirements and purposes of development projects, corresponding response plans cannot be made according to the problems, and the problems cannot be predicted in advance when the problems occur in the development process of an existing software system. In order to solve the problem that the development plan cannot be carried out smoothly due to the fact that the problem cannot be solved in time, the invention provides the following scheme that the method comprises the following steps: S1, establishing a development framework of a software system, the development framework comprises an acquisition module and a change condition prediction module, when corresponding conditions are encountered during software development, extracting a coping plan corresponding to the conditions, according to the method, smooth operation of a software development process is ensured, automatic learning is realized, a problem library and a scheme library are continuously expanded, a targeted problem occurs next time, a targeted solution can be accurately proposed, and the accuracy is continuously improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of software system development, and in particular to a software system development method and device thereof. Background Art

[0002] Software systems refer to computer software systems composed of system software, support software and application software. It is the part of the computer system that is composed of software. Software development is the process of building a software system or the software part of the system according to user requirements. Software development is a system engineering that includes demand capture, demand analysis, design, implementation and testing.

[0003] The patent document with publication number: CN110633095B discloses a system and method for software development, the system comprising: a first code server that manages a first code in a first network and is installed with a first SVN server software; a second code server that manages a second code in a second network and is installed with a second SVN server software, wherein the first code is a copy of the second code, wherein the system is capable of synchronizing changes of the second code in the second code server to the first code in the first code server through a synchronization mechanism between the first SVN server software and the second SVN server software.

[0004] In the prior art, when a software system is developed, it is not possible to predict in advance the problems that may arise during the development process according to the needs and objectives of the development project, and it is not possible to formulate corresponding response plans based on the problems. As a result, when problems arise, they cannot be solved in a timely manner, and the development plan cannot proceed smoothly. Therefore, we propose a software system development method and device to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings in the prior art that when a software system is developed, problems arising in the development process cannot be predicted in advance according to the needs and objectives of the development project, and corresponding response plans cannot be formulated according to the problems, resulting in the inability to solve the problems in time when they arise, causing the development plan to be unable to proceed smoothly. A software system development method and device are proposed.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] A method for developing a software system comprises the following steps:

[0008] S1. Build a development framework for the software system, which includes a collection module, a change prediction module, an opinion collection module, an analysis and judgment module, a probability calculation and sorting module, a response plan module, a storage module, a parsing module, a problem identification module, a response plan extraction module, a compliance rate determination module, a supplementary modification module, an application module, a solution degree detection module, a comparison module, and a backup module;

[0009] S2. The purpose and requirements of software system development are collected and analyzed through the collection module. The change prediction module predicts the changes that may occur during the development process based on the collected information, and the opinion collection module collects opinions at the same time;

[0010] S3. The predicted situation and the collected opinions are analyzed and judged through the analysis and judgment module, the probability of occurrence is ranked through the probability calculation and ranking module, and the response plan module formulates a corresponding response plan according to the situation;

[0011] S4. When encountering a corresponding situation during software development, the problem is identified through the problem identification module, the response plan corresponding to the problem is extracted through the response plan extraction module, and the compliance rate of the response plan is determined through the compliance rate determination module. When the compliance rate reaches a certain value, suggestions are given according to the plan, the compliance rate is announced, and the non-compliant parts are marked according to the compliance rate;

[0012] S5. Through the supplement and modification module, the plan can be supplemented and modified in a targeted manner according to experience, compliance rate and annotations. The supplemented and modified solutions can be saved, and the supplemented and modified solutions can be applied to solve the problem through the application module. The solution degree detection module can detect the solution degree, the comparison module can compare the corresponding solved problems and solutions, and the backup module can back up the feasible solutions and mark them.

[0013] Preferably, the analysis module is used to analyze the problems that arise, analyze the problems in detail from multiple levels, and then sort them and determine the priorities.

[0014] Preferably, for the response plan, problems at multiple levels are matched one by one, and solutions are integrated according to the priority of the problem to form a final solution plan.

[0015] Preferably, according to the difficulty of implementation, the solution steps of the solution are automatically optimized to generate the most time-saving and labor-saving solution technology, and the solution progress can be detected and displayed in real time, so that developers can have a solution plan for the overall solution.

[0016] Preferably, a timetable is drawn up for completion. If the time exceeds the specified time, a reminder is given to speed up the process, and the corresponding long time locations are recorded to facilitate developers to have overall control. If the time is short, developers are reminded to pay attention to quality. At the same time, tests are carried out and compared with the plan to avoid omissions.

[0017] Preferably, the acquisition module includes a development purpose acquisition unit, the development purpose acquisition unit is connected to the development requirement acquisition unit, the development requirement acquisition unit is connected to the data classification unit, and the data classification unit is connected to the data transmission unit.

[0018] Preferably, the parsing module includes a detailed analysis unit, the detailed analysis unit is connected to a sorting unit, the sorting unit is connected to a priority determination unit, and the priority determination unit is connected to an output unit.

[0019] Preferably, the compliance rate determination module includes a compliance rate determination unit, the compliance rate determination unit is connected to a compliance rate value determination unit, the compliance rate value determination unit is connected to a plan suggestion unit, and the plan suggestion unit is connected to a compliance rate publicizing unit.

[0020] Preferably, the acquisition module is connected to the change prediction module, the change prediction module is connected to the opinion collection module, the opinion collection module is connected to the analysis and judgment module, the analysis and judgment module is connected to the probability calculation and sorting module, the probability calculation and sorting module is connected to the response plan module, the response plan module is connected to the storage module, the storage module is connected to the response plan extraction module, the response plan extraction module is connected to the compliance determination module and the supplementary modification module, the supplementary modification module is connected to the application module, the application module is connected to the solution degree detection module, the solution degree detection module is connected to the comparison module, the comparison module is connected to the backup module, and the problem identification module is connected to the response plan extraction module and the analysis module.

[0021] The present invention also proposes a software system development device, including a development framework, the development framework includes a workbench, a display screen is provided on the top of the workbench, a host is provided under the workbench, the host is electrically connected to the display screen, vertical plates are fixedly installed on both sides of the workbench, the same horizontal plate is fixedly installed on one side of the two vertical plates, a rectangular groove is opened at the bottom of the horizontal plate, a rectangular block is slidably installed in the rectangular groove, two fixed blocks are fixedly installed at the bottom of the rectangular block, the same rotating shaft is rotatably installed on the two fixed blocks, a camera is fixedly installed on the outside of the rotating shaft, a first motor is fixedly installed on one of the two fixed blocks, the output shaft of the first motor is fixedly connected to one end of the rotating shaft, a second motor is fixedly installed in the rectangular groove, a screw is fixedly installed on the output shaft of the second motor, and the screw is threadedly connected to the rectangular block.

[0022] In the present invention, the method and device for developing a software system have the following beneficial effects:

[0023] Collect and analyze the purpose and requirements of software system development, predict the changes that may occur during the development process based on the collected information, and solicit opinions at the same time, analyze and judge the predicted situation and the solicited opinions, rank the probability of occurrence, and formulate corresponding response plans for the situations that occur; when encountering corresponding situations during software development, extract the corresponding response plans for the situations to ensure the smooth progress of the software development process;

[0024] Based on experience, compliance rate and annotation, the plan is supplemented and modified in a targeted manner, the supplemented and modified solutions are saved, and then the supplemented and modified solutions are applied to solve the problem, and then the degree of solution is tested, and the corresponding solved problems and solutions are compared, and the feasible solutions are backed up and marked; in this way, automatic learning is achieved, and the problem library and solution library are continuously expanded. Next time a targeted problem occurs, targeted solutions can be accurately proposed, and the accuracy rate is continuously improved;

[0025] It can parse the problems that arise, analyze the problems in detail from multiple levels, and then sort them and determine the priority. The same is true for the solutions. Problems at multiple levels are matched one by one, and solutions are integrated according to the priority of the problem to form a final solution plan; according to the difficulty of implementation, the solution steps of the solution are automatically optimized to generate the most time-saving and labor-saving solution technology, and the solution progress can be detected and displayed in real time, so that developers can have a solution plan for the overall solution and formulate a completion schedule. If the time exceeds the limit, it will remind you to speed up and record the corresponding long time positions, so that developers can have a comprehensive control of the overall situation. If the time is short, it will remind developers to pay attention to quality. At the same time, it will conduct testing and compare with the solution to avoid omissions. After the problem is solved, the overall process of solving the problem is formulated, and the omissions and mistakes that occurred in solving the problem are sorted out, so as to improve the developer's own capabilities.

[0026] When the present invention encounters a corresponding situation during software development, it extracts the response plan corresponding to the situation, ensures the smooth progress of the software development process, realizes automatic learning, and continuously expands the problem library and solution library. Next time when a targeted problem occurs, it can accurately propose a targeted solution, and continuously improve the accuracy rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 A development framework diagram of a software system development method proposed by the present invention;

[0028] Figure 2 A block diagram of a collection module of a software system development method proposed by the present invention;

[0029] Figure 3 A block diagram of a parsing module of a software system development method proposed by the present invention;

[0030] Figure 4 A block diagram of a compliance rate determination module of a software system development method proposed by the present invention;

[0031] Figure 5 This is a front view structural schematic diagram of a software system development device proposed by the present invention. DETAILED DESCRIPTION

[0032] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0033] Embodiment 1

[0034] Reference Figure 1-Figure 5 , a method for developing a software system, comprising the following steps:

[0035] S1. Build a development framework for the software system, which includes a collection module, a change prediction module, an opinion collection module, an analysis and judgment module, a probability calculation and sorting module, a response plan module, a storage module, a parsing module, a problem identification module, a response plan extraction module, a compliance rate determination module, a supplementary modification module, an application module, a solution degree detection module, a comparison module, and a backup module;

[0036] S2. The purpose and requirements of software system development are collected and analyzed through the collection module. The change prediction module predicts the changes that may occur during the development process based on the collected information, and the opinion collection module collects opinions at the same time;

[0037] S3. The predicted situation and the collected opinions are analyzed and judged through the analysis and judgment module, the probability of occurrence is ranked through the probability calculation and ranking module, and the response plan module formulates a corresponding response plan according to the situation;

[0038] The analysis and judgment module uses cluster analysis, and there are several clustering methods: (1) Direct clustering method: First, each classification object is regarded as a class separately, and then a pair of classification objects are selected in turn according to the principle of minimum distance, and they are combined into a new class. If one of the classification objects has been classified into one class, the other is also classified into this class; if a pair of classification objects happen to belong to two already classified classes, the two classes are merged into one class. Each time a merger is performed, the row with the same column order as the object is crossed out. After m-1 times, all classification objects can be classified into one class, so that a clustering pedigree diagram can be made according to the order of merger. (2) Shortest distance clustering method: The shortest distance clustering method is to find out from the non-diagonal elements of the original m×m distance matrix, merge the classification objects Gp and Gq into a new class Gr, and then calculate the distance between the original classes and the new class according to the calculation formula, so as to obtain a new (m-1) order distance matrix; then select the smallest dij from the new distance matrix, merge Gi and Gj into a new class; then calculate the distance between the classes and the new class, and continue in this way until all classification objects are classified into one class. (3) Farthest distance clustering method: The difference between the farthest distance clustering method and the shortest distance clustering method is that the formula used to calculate the distance between the original class and the new class is different. The farthest distance clustering method uses the farthest distance to measure the distance between samples.

[0039] S4. When encountering a corresponding situation during software development, the problem is identified through the problem identification module, the response plan corresponding to the problem is extracted through the response plan extraction module, and the compliance rate of the response plan is determined through the compliance rate determination module. When the compliance rate reaches a certain value, suggestions are given according to the plan, the compliance rate is announced, and the non-compliant parts are marked according to the compliance rate;

[0040] The response plan extraction module extracts the response plan corresponding to the problem, using the matching algorithm: Rabin-Karp algorithm. The implementation of this algorithm is different from the above character matching. First, the hash values ​​of the two strings are calculated, and then the size of the two hash values ​​is compared to determine whether there is a match. In order to help better solve the string matching problem, the hash function should have the following properties:

[0041] 1. Efficient and computable; 2. Better string recognition; 3. When calculating hash(y[j+1..j+m]), it should be easy to get the result from hash(y[j..j+m-1]) and y[j+m], that is, hash(y[j+1..j+m])=rehash(y[j],y[j+m],hash(y[j..j+m-1]); We define the hash function as follows:

[0042] hash(w[0..m-1])=(w[0]*2^m-1+w[1]*2^m-2+···+w[m-1]*2^0)mod q; Since the calculated hash value may be very large, a modulo operation is required. It is best to select a relatively large number and a prime number for q. w[i] represents the ASCII code corresponding to y[i].

[0043] hash(w[1..m])=rehash(w[0],w[m],hash(w[0..m-1]));

[0044] rehash(a,b,h)=((ha*2^m-1)*2+b)mod q During the matching process, the window is continuously slid to calculate whether the hash value of the text string is the same as the pattern string. If they are the same, it is necessary to check again whether the strings are really the same, because there will be a hash collision.

[0045] S5. Through the supplement and modification module, the plan can be supplemented and modified in a targeted manner according to experience, compliance rate and annotations. The supplemented and modified solutions can be saved, and the supplemented and modified solutions can be applied to solve the problem through the application module. The solution degree detection module can detect the solution degree, the comparison module can compare the corresponding solved problems and solutions, and the backup module can back up the feasible solutions and mark them.

[0046] The resolution degree detection module detects the resolution degree. The resolution degree detection module is based on clustering anomaly detection methods and isolation forest algorithms. Clustering-based anomaly detection methods usually rely on the following assumptions: 1) Normal data instances belong to a cluster in the data, while abnormal data instances do not belong to any cluster; 2) Normal data instances are close to their nearest cluster centroid, while abnormal data are far away from their nearest cluster centroid; 3) Normal data instances belong to large and dense clusters, while abnormal data instances belong to either small clusters or sparse clusters; By classifying data into different clusters, abnormal data are those that belong to small clusters or do not belong to any cluster or are far away from the cluster center. Data far from the cluster center is regarded as anomaly points: such methods include SOM, K-means, expectation maximization (EM) and semantic anomaly factor-based algorithms; small cluster data obtained by clustering is regarded as anomaly points: representative methods include K-means clustering; data that does not belong to any cluster is regarded as anomaly points: representative methods include DBSCAN, ROCK, and SNN clustering.

[0047] The Isolation Forest Algorithm is an anomaly detection method based on Ensemble, so it has a linear time complexity. It is also highly accurate and fast when processing big data, so it is currently widely used in the industry. The basic idea is: randomly split the sample space through the tree model method, and those clusters with high density will be cut many times before the cutting stops (that is, each point exists in a subspace alone), but those sparsely distributed points (that is, abnormal points) mostly stop in a subspace very early. The algorithm steps are: 1) Randomly select Ψ samples from the training data to train a single tree.

[0048] 2) Randomly specify a q dimension (attribute) and randomly generate a cutting point p in the current node data. The p cutting point is generated between the maximum and minimum values ​​of the specified q dimension in the current node data.

[0049] 3) The selection of this cutting point generates a hyperplane, which divides the current node data space into two subspaces: points less than p under the currently selected dimension are placed on the left branch of the current node, and points greater than or equal to p are placed on the right branch of the current node;

[0050] 4) Recursively repeat steps 2 and 3 on the left and right branches of the node, and continuously construct new leaf nodes until there is only one data on the leaf node (no further cutting is possible) or the tree has grown to the set height. (The maximum height of a single tree is set because there are relatively few abnormal data records and their path length is relatively low. We only need to distinguish normal records from abnormal records, so we only need to care about the part below the average height, which makes the algorithm more efficient.)

[0051] 5) Since the process of cutting feature space in each tree training is completely random, the ensemble method is needed to converge the results, that is, to build several trees and then comprehensively calculate the average value of each tree's cutting results. For each sample x, the comprehensive anomaly score s is calculated by the following formula.

[0052]

[0053] h(x) is the height of x in each tree, and c(Ψ) is the average path length for a given sample number Ψ, which is used to standardize the path length h(x) of sample x.

[0054] In this embodiment, the analysis module is used to analyze the problems that arise, analyze the problems in detail from multiple levels, and then sort them to determine the priority. For the response plan, one-to-one matching is performed for the problems at multiple levels, and the solutions are integrated according to the priority of the problem to form a final solution plan. According to the implementation difficulty, the solution steps of the solution are automatically optimized to generate the most time-saving and labor-saving solution technology, and the solution progress can be detected and displayed in real time, so that the developer can have a solution plan for the overall solution and formulate a completion schedule. If the time exceeds the specified time, the developer is reminded to speed up the speed and the corresponding long time position is recorded, so that the developer can have a comprehensive control of the overall situation. If the time is short, the developer is reminded to pay attention to the quality. At the same time, the developer is tested and compared with the solution to avoid omissions.

[0055] In this embodiment, the collection module includes a development purpose collection unit, the development purpose collection unit is connected to the development requirement collection unit, the development requirement collection unit is connected to the data classification unit, and the data classification unit is connected to the data transmission unit.

[0056] In this embodiment, the parsing module includes a detailed analysis unit, the detailed analysis unit is connected to a sorting unit, the sorting unit is connected to a priority determination unit, and the priority determination unit is connected to an output unit.

[0057] In this embodiment, the compliance rate determination module includes a compliance rate determination unit, the compliance rate determination unit is connected to the compliance rate value determination unit, the compliance rate value determination unit is connected to the plan suggestion unit, and the plan suggestion unit is connected to the compliance rate publicizing unit.

[0058] In this embodiment, the acquisition module is connected to the change prediction module, the change prediction module is connected to the opinion collection module, the opinion collection module is connected to the analysis and judgment module, the analysis and judgment module is connected to the probability calculation and sorting module, the probability calculation and sorting module is connected to the response plan module, the response plan module is connected to the storage module, the storage module is connected to the response plan extraction module, the response plan extraction module is connected to the compliance determination module and the supplementary modification module, the supplementary modification module is connected to the application module, the application module is connected to the solution degree detection module, the solution degree detection module is connected to the comparison module, the comparison module is connected to the backup module, and the problem identification module is connected to the response plan extraction module and the analysis module.

[0059] In this embodiment, the acquisition module specifically includes the following contents: Data source selection: Determine the data source to be collected according to the needs, which can be a database, web page, log file, or sensor.

[0060] Data collection: Obtain data from data sources using various techniques and tools, such as using web crawlers to extract data from web pages, using APIs to access databases, or reading files directly;

[0061] Data cleaning and preprocessing: Clean and preprocess the collected data, including removing duplicate data, processing missing values, processing outliers, etc., to ensure the accuracy and consistency of the data.

[0062] Data conversion and integration: The collected raw data is converted and integrated to meet the requirements of analysis and processing. For example, data format conversion, data field merging, etc. can be performed.

[0063] Data storage: Store the processed data in a suitable storage medium, such as a database, data warehouse, etc. The data storage method can be selected according to specific needs, such as relational database, NoSQL database, etc.

[0064] Data transmission and distribution: The stored data is transferred to the system or application that needs to use it. Data transmission and distribution can be carried out through API interface, data subscription, message queue, etc.

[0065] Data monitoring and quality control: Monitor the data collection process to ensure the accuracy and completeness of the data. You can set monitoring indicators for data collection, such as data collection rate, error rate, etc.

[0066] In this embodiment, the opinion collection module includes the following contents: Before collecting opinions and suggestions, we first need to clarify the purpose of collection. Determining the purpose of collection can help us collect opinions and suggestions more specifically and ensure that the collected opinions and suggestions can play a positive role in improving products or services. After determining the purpose of collection, we need to formulate a detailed opinion and suggestion collection plan. The collection plan should include the following contents: Collection time: Determine the time period for collecting opinions and suggestions to ensure that users' opinions and suggestions can be fully collected; Collection method: Determine the way to collect opinions and suggestions, which can be collected through questionnaires, interviews, focus groups, etc.; Collection content: Determine the scope of the content of collecting opinions and suggestions to ensure that the key needs of users are covered.

[0067] In this embodiment, the probability calculation and sorting module includes the probability formula:

[0068] P(A)=n(A) / n(S)

[0069] Among them, P(A) represents the probability of event A occurring, n(A) represents the number of sample points where event A occurs, and n(S) represents the number of all sample points.

[0070] In this embodiment, the parsing module includes a parsing algorithm, and the implementation of the parsing algorithm generally includes the following steps: Establishing a correct mathematical model: First, it is necessary to understand the background and conditions of the problem, and then convert the problem into a mathematical expression to establish a correct mathematical model. Converting the mathematical expression into computer executable code: Converting the mathematical expression into an expression in a computer language, usually using a programming language such as Python to implement the calculation of the mathematical expression.

[0071] In this embodiment, the problem identification module includes a deep learning OCR text recognition method: it is mainly based on convolutional neural networks, which can realize irregular text and complex scene recognition. Its main process is divided into two parts: text detection and text recognition. Text recognition: Text recognition mainly includes several methods based on CTC, Attention, Transformer, segmentation and end-to-end recognition. The mainstream methods of text recognition are CRNN, ASTER, SRN, RARE, etc. 1. The CTC-based recognition algorithm is mainly CRNN. ​​CTC loss can solve the sequence alignment problem, with fast inference speed and high recognition accuracy. 2. The Attention-based recognition algorithm mainly includes ASTER, RAEN, etc., which combines the basic idea of ​​the attention mechanism to let the system learn to pay attention to key information while ignoring irrelevant information, effectively improving accuracy. 3. End-to-end recognition mainly includes STN-OCR, FOTS, ABCnet, MORAN and other methods, which can achieve end-to-end recognition without detection and recognition.

[0072] In this embodiment, the compliance rate determination module includes a compliance rate algorithm, compliance rate = (prior probability * likelihood probability) + marginal probability, wherein the prior probability refers to our expected value of the compliance rate when no new data appears; the likelihood probability refers to our new prediction of the compliance rate based on the existing data; and the marginal probability refers to the sum of all possible results.

[0073] In this embodiment, the change prediction module includes a linear trend prediction method, which assumes that the future trend is linear, that is, the trend line is a true line. The formula is as follows:

[0074] Yt=a+bt

[0075] Among them, Yt is the predicted value, a is the intercept, b is the slope, and t is the time variable.

[0076] The present embodiment also proposes a software system development device, including a development framework, which includes a workbench 1. A display screen 2 is provided on the top of the workbench 1, and a host 3 is provided below the workbench 1. The host 3 is electrically connected to the display screen 2. Vertical plates 4 are fixedly installed on both sides of the workbench 1, and the same horizontal plate 5 is fixedly installed on one side of the two vertical plates 4. A rectangular groove 6 is opened at the bottom of the horizontal plate 5, and a rectangular block 7 is slidably installed in the rectangular groove 6. Two fixed blocks are fixedly installed at the bottom of the rectangular block 7, and the same rotating shaft 8 is rotatably installed on the two fixed blocks. A camera 9 is fixedly installed on the outer side of the rotating shaft 8, and a first motor 10 is fixedly installed on one of the two fixed blocks, and the output shaft of the first motor 10 is fixedly connected to one end of the rotating shaft 8. A second motor 11 is fixedly installed in the rectangular groove 6, and a screw 12 is fixedly installed on the output shaft of the second motor 11, and the screw 12 is threadedly connected to the rectangular block 7.

[0077] In this embodiment, through the setting of camera 9, the development process of the worker can be recorded. By driving the rotating shaft 8 to rotate by the first motor 10, the angle of the camera 9 can be adjusted. By driving the screw 12 to rotate by the second motor 11, the rectangular block 7 moves horizontally, and the position of the camera 9 can be adjusted to better complete the recording work.

[0078] Embodiment 2

[0079] The difference between this embodiment and the first embodiment is that: a method for developing a software system includes the following steps:

[0080] S1. Build a development framework for the software system, which includes a collection module, a change prediction module, an opinion collection module, an analysis and judgment module, a probability calculation and sorting module, a response plan module, a storage module, a parsing module, a problem identification module, a response plan extraction module, a compliance rate determination module, a supplementary modification module, an application module, a solution degree detection module, a comparison module, and a backup module;

[0081] S2. The purpose and requirements of software system development are collected and analyzed through the collection module. The change prediction module predicts the changes that may occur during the development process based on the collected information, and the opinion collection module collects opinions at the same time;

[0082] S3. The predicted situation and the collected opinions are analyzed and judged through the analysis and judgment module, the probability of occurrence is ranked through the probability calculation and ranking module, and the response plan module formulates a corresponding response plan according to the situation;

[0083] S4. When encountering a corresponding situation during software development, the problem is identified through the problem identification module, the response plan corresponding to the problem is extracted through the response plan extraction module, and the compliance rate of the response plan is determined through the compliance rate determination module. When the compliance rate reaches a certain value, suggestions are given according to the plan, the compliance rate is announced, and the non-compliant parts are marked according to the compliance rate;

[0084] S5. Through the supplement and modification module, the plan can be supplemented and modified in a targeted manner according to experience, compliance rate and marking. The supplemented and modified solutions can be saved, and the supplemented and modified solutions can be applied through the application module to solve the problem. The solution degree detection module can detect the solution degree, and the comparison module can compare the corresponding solved problems and solutions. The backup module can back up the feasible solutions and mark them. After the problem is solved, the overall process of problem solving is formulated, and the omissions and mistakes that occurred in solving the problem are sorted out.

[0085] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A method for developing a software system, characterized in that: The following steps are involved: S1. Build a development framework for the software system, which includes a collection module, a change prediction module, an opinion collection module, an analysis and judgment module, a probability calculation and sorting module, a response plan module, a storage module, a parsing module, a problem identification module, a response plan extraction module, a compliance rate determination module, a supplementary modification module, an application module, a solution degree detection module, a comparison module, and a backup module; S2. The purpose and requirements of software system development are collected and analyzed through the collection module. The change prediction module predicts the changes that may occur during the development process based on the collected information, and the opinion collection module collects opinions at the same time; S3. The predicted situation and the collected opinions are analyzed and judged through the analysis and judgment module, the probability of occurrence is ranked through the probability calculation and ranking module, and the response plan module formulates a corresponding response plan according to the situation; S4. When encountering a corresponding situation during software development, the problem is identified through the problem identification module, the response plan corresponding to the problem is extracted through the response plan extraction module, and the compliance rate of the response plan is determined through the compliance rate determination module. When the compliance rate reaches a certain value, suggestions are given according to the plan, the compliance rate is announced, and the non-compliant parts are marked according to the compliance rate; S5. Through the supplement and modification module, the plan can be supplemented and modified in a targeted manner according to experience, compliance rate and annotations. The supplemented and modified solutions can be saved, and the supplemented and modified solutions can be applied to solve the problem through the application module. The solution degree detection module can detect the solution degree, the comparison module can compare the corresponding solved problems and solutions, and the backup module can back up the feasible solutions and mark them.

2. A method for developing a software system according to claim 1, characterized in that: The analysis module is used to analyze the problems that arise, analyze the problems in detail from multiple levels, and then sort them and determine the priorities.

3. A method for developing a software system according to claim 2, characterized in that: For the response plan, problems at multiple levels are matched one by one, and solutions are integrated according to the priority of the problem to form a final solution plan.

4. A method for developing a software system according to claim 3, characterized in that: According to the difficulty of implementation, the solution steps of the solution are automatically optimized to generate the most time-saving and labor-saving solution technology. The solution progress can be detected and displayed in real time, making it convenient for developers to have a solution plan for the overall solution.

5. A method for developing a software system according to claim 4, characterized in that: If the time taken to complete the work exceeds the specified time, the developer will be reminded to speed up and the corresponding long time locations will be recorded to facilitate the developer's overall control. If the time taken is short, the developer will be reminded to pay attention to the quality. At the same time, the work will be tested and compared with the plan to avoid omissions.

6. A method for developing a software system according to claim 5, characterized in that: The acquisition module comprises a development purpose acquisition unit, the development purpose acquisition unit is connected to the development requirement acquisition unit, the development requirement acquisition unit is connected to a data classification unit, and the data classification unit is connected to a data transmission unit.

7. A method for developing a software system according to claim 6, characterized in that: The analysis module includes a detailed analysis unit, the detailed analysis unit is connected to a sorting unit, the sorting unit is connected to a priority determination unit, and the priority determination unit is connected to an output unit.

8. A method for developing a software system according to claim 7, characterized in that: The compliance rate determination module comprises a compliance rate determination unit, the compliance rate determination unit is connected to a compliance rate value determination unit, the compliance rate value determination unit is connected to a plan suggestion unit, and the plan suggestion unit is connected to a compliance rate publicizing unit.

9. A method for developing a software system according to claim 8, characterized in that: The acquisition module is connected to the change prediction module, the change prediction module is connected to the opinion collection module, the opinion collection module is connected to the analysis and judgment module, the analysis and judgment module is connected to the probability calculation and sorting module, the probability calculation and sorting module is connected to the response plan module, the response plan module is connected to the storage module, the storage module is connected to the response plan extraction module, the response plan extraction module is connected to the compliance determination module and the supplementary modification module, the supplementary modification module is connected to the application module, the application module is connected to the solution degree detection module, the solution degree detection module is connected to the comparison module, the comparison module is connected to the backup module, and the problem identification module is connected to the response plan extraction module and the parsing module.

10. A software system development device, comprising a development framework, wherein the development framework is the development framework according to any one of claims 1 to 9, and the development framework comprises a workbench (1), characterized in that: A display screen (2) is provided on the top of the workbench (1), a host (3) is provided below the workbench (1), and the host (3) is electrically connected to the display screen (2). Vertical plates (4) are fixedly installed on both sides of the workbench (1), and a same horizontal plate (5) is fixedly installed on one side of the two vertical plates (4). A rectangular groove (6) is provided at the bottom of the horizontal plate (5), and a rectangular block (7) is slidably installed in the rectangular groove (6). Two fixed blocks are fixedly installed at the bottom of the rectangular block (7), and a same rotating shaft (8) is rotatably installed on the two fixed blocks. A camera (9) is fixedly installed on the outer side of the rotating shaft (8). A first motor (10) is fixedly installed on one of the two fixed blocks, and the output shaft of the first motor (10) is fixedly connected to one end of the rotating shaft (8). A second motor (11) is fixedly installed in the rectangular groove (6), and a screw (12) is fixedly installed on the output shaft of the second motor (11), and the screw (12) is threadedly connected to the rectangular block (7).