Tunnel stability analysis method and system based on Newton force

Through the Newtonian force-based tunnel stability analysis system, the displacement and stress changes of the tunnel structure are monitored and analyzed in real time, and the mechanical parameters are optimized, which solves the problem of difficult to deal with sudden environmental changes in the existing technology, and achieves the accuracy of tunnel stability assessment. adaptability to sex and design.

CN118885756AInactive Publication Date: 2024-11-01中电建路桥集团有限公司

Patent Information

Application Number
CN202410995835.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When dealing with real-time changing environments such as sudden natural disasters, it is difficult to adjust the structural analysis model immediately, resulting in inaccurate tunnel stability assessment, which may lead to inappropriate safety factors, over-design or waste of resources, and even in the event of a disaster. Necessary damage.

Method used

Using a tunnel stability analysis system based on Newtonian forces, the power system construction module, state space analysis module, parameter optimization module and crack prediction module are used to monitor the displacement and stress changes of the tunnel structure in real time, establish a dynamic system model, and optimize the mechanical parameter configuration. Identify and predict crack development trends and generate accurate tunnel stability analysis.

Benefits of technology

Real-time dynamic response tracking and prediction of tunnel structures is achieved, preventive measures are implemented in advance, significantly reducing accident risks and maintenance costs, and improving the adaptability and economicality of the design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118885756A_ABST
    Figure CN118885756A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of structure analysis, in particular to a tunnel stability analysis method and system based on Newton force, and the system comprises a power system construction module which calculates the distance and relative position between elements based on the coordinates and physical parameters of tunnel structure elements, collects seismic activity data and soil liquefaction records, and transmits the seismic activity data and the soil liquefaction records to a calculation module; and the stress data of the tunnel supporting wall and the joint are monitored in real time. According to the method, the tunnel maintenance becomes more active by implementing real-time monitoring and data analysis, tracking and predicting the dynamic response of the tunnel structure in real time, adopting a dynamic system model and combining current and historical monitoring data, and preventive measures can be implemented in advance by identifying and analyzing the displacement and stress change trend of the tunnel, so that the safety of tunnel maintenance is improved. And in addition, the design is more suitable for specific geology and using conditions through accurate parameter adjustment, and the economical efficiency and adaptability of the structure are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of structural analysis, and in particular to a tunnel stability analysis method and system based on Newton force. Background Art

[0002] The technical field of structural analysis involves the use of various engineering principles and mathematical methods to predict the behavior of physical structures under given loads and environmental conditions. This field not only includes traditional static and dynamic analysis, but also extends to complex nonlinear model analysis, such as fatigue, fracture, and large deformation analysis. The goal of structural analysis is to ensure the safety and functionality of the design, reduce the risk of over-engineering, and optimize the performance and cost-effectiveness of the structure. Commonly used tools include finite element analysis (FEA), computational fluid dynamics (CFD), and multi-body dynamics (MBD). These techniques play a key role in the civil, mechanical, aerospace, and automotive industries, helping engineers evaluate design proposals, predict potential failures, and optimize structural layouts.

[0003] Among them, the tunnel stability analysis method and system based on Newton force refers to the technology that uses Newton's laws of physics to calculate and evaluate the stability of tunnel structures under specific environmental and load conditions. This system simulates the stress conditions of tunnel structures and predicts possible deformation and damage, thereby providing a scientific basis for tunnel design and maintenance. Its uses include identifying potential structural risks in advance, optimizing design parameters, and ensuring the safety of construction and operation, especially in geologically unstable areas or urban tunnels that are subject to large traffic flows. This technology is an indispensable part of modern civil engineering and is crucial to improving the reliability and durability of large infrastructure projects.

[0004] Existing technologies usually rely on static or preset models for structural analysis and lack the ability to respond to real-time changing environments. For example, in the case of sudden earthquakes and other natural disasters, existing methods may not be able to adjust the analysis model immediately to adapt to new situations, resulting in an inaccurate assessment of structural stability. This deficiency may lead to an inappropriate assessment of the safety factor, affecting the cost-effectiveness and safety of the project. Failure to promptly reflect actual load and environmental changes during the design and maintenance process may increase the risk of over-design or waste of resources, as well as cause unnecessary damage when a disaster occurs. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings in the prior art and to propose a tunnel stability analysis method and system based on Newton force.

[0006] In order to achieve the above object, the present invention adopts the following technical solution: A tunnel stability analysis system based on Newton force comprises:

[0007] The dynamic system building module calculates the distance and relative position between elements based on the coordinates and physical parameters of the tunnel structure elements, collects seismic activity data and soil liquefaction records, monitors the stress data of the tunnel support walls and joints in real time, analyzes the correlation between the data and the tunnel stability, and establishes a dynamic system model;

[0008] The state space analysis module monitors the tunnel based on the dynamic system model, obtains real-time data of displacement and stress, analyzes the change rate and trend of the real-time data, describes the dynamic behavior of the tunnel in combination with the time series changes of the data, and generates a state space description;

[0009] The parameter optimization module calibrates the mechanical parameters of the tunnel model based on the state space description, uses the real-time and past monitoring data of the tunnel, evaluates the simulation results of the differentiated parameter configurations, selects the parameter configurations by comparison, matches the current tunnel conditions, and obtains the optimized system parameter configurations;

[0010] The crack prediction and assessment module monitors the stress concentration area of ​​the tunnel structure based on the optimization system parameter configuration, identifies the estimated crack development area, calculates the stress overload probability of the crack development area, and analyzes the expansion trend of cracks and joints to generate a crack development prediction.

[0011] As a further solution of the present invention, the step of acquiring the dynamic system model is specifically as follows:

[0012] Collect the 3D coordinates of the tunnel structure elements and calculate the distance between each pair of elements using the formula:

[0013]

[0014] Get distance;

[0015] Among them, (x i ,y i ,z i ) and (x j ,y j ,z j ) represent the three-dimensional coordinates of the two tunnel structure elements, d ij Represents distance;

[0016] Based on the distances, seismicity data and soil liquefaction records, the formula is used:

[0017]

[0018] Calculate the environmental risk weights between each element to obtain the environmental risk weight matrix;

[0019] Among them, q k represents the intensity of earthquake activity, l m represents the soil liquefaction probability, Rij represents environmental risk weight;

[0020] The environmental risk weight matrix and stress data are integrated using the formula:

[0021] S total =∑ i,j (S data ·|R ij -λ|)

[0022] Calculate overall stress and obtain an assessment of stress and environmental risks;

[0023] Among them, S data is the stress data obtained by real-time monitoring, R ij is the environmental risk weight, λ is used to adjust the weight impact, S total is the overall stress;

[0024] Based on the assessment of the stress and environmental risks, the formula is used:

[0025]

[0026] Calculate the stability index of the tunnel and establish a dynamic system model;

[0027] Among them, θ is the stability constant used to adjust the reaction sensitivity, P stable It is an indicator of tunnel stability.

[0028] As a further solution of the present invention, the steps of acquiring the real-time data of displacement and stress are specifically as follows:

[0029] Based on the dynamic system model, sensors are deployed at key structural locations of the tunnel, and monitoring technology is used to collect original displacement and stress. The formula is:

[0030] x(t)=Asin(ωt+φ)

[0031] σ(t)=Bcos(ωt+θ)

[0032] Generate raw displacement x(t) and stress data σ(t);

[0033] Where A is the amplitude of displacement, B is the amplitude of stress, ω is the angular frequency, φ is the displacement phase shift, and θ is the stress phase shift;

[0034] The raw displacement and stress data are subjected to signal processing using a moving average filtering technique using the formula:

[0035]

[0036] Get the filtered displacement x filtered (t) and stress σfiltered (t) data;

[0037] Where n is the filter window length;

[0038] To extract key information from the filtered displacement and stress data, differential analysis techniques are applied using the formula:

[0039] Δx(t)=x filtered (t)-x filtered (t-1)

[0040] Δσ(t)=σ filtered (t)-σ filtered (t-1)

[0041] Generate real-time data of displacement and stress;

[0042] Among them, Δx(t) is the displacement change rate and Δσ(t) is the stress change.

[0043] As a further solution of the present invention, the step of obtaining the state space description is specifically:

[0044] Based on the real-time data of displacement and stress, an initial time series analysis was performed using the formula:

[0045]

[0046] Calculate the output Y(t) of the time series model;

[0047] Among them, α1 is the weight of the quadratic term of the displacement change rate, α2 is the square root weight of the stress change rate, and α3 and α4 adjust the weights of the trigonometric functions;

[0048] The enhanced state estimation algorithm is applied to the output of the time series model using the formula:

[0049]

[0050] Improve the prediction accuracy through nonlinear transformation and generate the predicted state Z(t);

[0051] Among them, γ is the enhancement coefficient, which is responsible for adjusting the impact of the output of the time series model, δ and ζ are the offset and quadratic term coefficients respectively;

[0052] According to the predicted state, a state space model is constructed using the formula:

[0053]

[0054] Generate state space description S(t);

[0055] Among them, λ is the state space conversion coefficient and μ is a constant term.

[0056] As a further solution of the present invention, the step of obtaining the optimization system parameter configuration is specifically:

[0057] Using the state space description output and historical monitoring data of the tunnel, a preliminary calibration of the mechanical parameters was performed using the formula:

[0058] P init =k1S(t)+k2D(t)+b1

[0059] The mechanical parameters P of the preliminary calibration are calculated init ;

[0060] Among them, k1 and k2 are adjustment coefficients, and b1 is a constant term;

[0061] The mechanical parameters of the preliminary calibration are simulated and evaluated, according to the differentiated parameter configuration, using the formula:

[0062]

[0063] Reflects the sensitivity of parameter configuration to simulation effect and generates evaluation result P eval ;

[0064] Among them, a1 and a2 are sensitivity adjustment coefficients, and b2 and b3 are offsets;

[0065] According to the evaluation results and the current tunnel conditions, the most suitable parameter configuration is selected using the formula:

[0066] P opt =γ1P eval ·log(1+P eval )+γ2P init / (1+P init )+μ

[0067] Get the optimized system parameter configuration P opt ;

[0068] Among them, γ1 and γ2 are weight coefficients, and μ is a constant term.

[0069] As a further solution of the present invention, the steps of obtaining the crack development prediction are specifically as follows:

[0070] According to the optimized system parameter configuration, the stress monitoring of the tunnel structure is performed using the formula:

[0071]

[0072] Generate the average stress value σ of the stress concentration area avg ;

[0073] Among them, σ i is the stress value of the monitoring point, w i is the weight factor, n is the number of monitoring points;

[0074] Using the average stress value and structural data of the stress concentration area, potential crack development areas are identified using the formula:

[0075]

[0076] Calculate the stress overload probability P in the crack development zone risk ;

[0077] Among them, σ crit is the critical stress threshold;

[0078] Combined with the stress overload probability, the expansion trend of cracks and joints is analyzed using the formula:

[0079]

[0080] The crack development prediction T crack ;

[0081] Among them, κ is the expansion coefficient, and θ and δ are adjustment parameters.

[0082] A tunnel stability analysis method based on Newton force is performed according to the above-mentioned tunnel stability analysis system based on Newton force, comprising the following steps:

[0083] Collect coordinates and physical parameters of tunnel structural elements, collect seismic activity data and soil liquefaction records, calculate distances and relative positions between elements, monitor stress data of tunnel support walls and joints, build dynamic system models, analyze correlations with tunnel stability, and generate dynamic behavior descriptions;

[0084] Based on the dynamic behavior description, real-time data of tunnel displacement and stress are obtained, the rate of change and development trend of the data are analyzed, and the state space model is established in combination with the changes in the time series to generate the state space description;

[0085] Using state space description, calibrate the mechanical parameters of the tunnel model, use the real-time and historical monitoring data of the tunnel to evaluate the simulation results of the differentiated mechanical parameter configuration, match the parameter configuration of the current tunnel conditions, and obtain the optimized parameter configuration;

[0086] Using optimized parameter configuration, stress concentration areas in tunnel structures are monitored, crack development areas are identified and estimated, the probability of stress overload in crack development areas is calculated, the expansion trend of cracks and joints is analyzed, and crack development predictions are generated.

[0087] Compared with the prior art, the advantages and positive effects of the present invention are:

[0088] In the present invention, the dynamic response of the tunnel structure is tracked and predicted in real time by implementing real-time monitoring and data analysis. The use of dynamic system models, combined with current and historical monitoring data, makes tunnel maintenance more proactive. By identifying and analyzing the displacement and stress change trends of the tunnel, preventive measures can be implemented in advance, thereby significantly reducing the risk of accidents and related maintenance costs. In addition, precise parameter adjustment makes the design more suitable for specific geological and usage conditions, improving the economy and adaptability of the structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0089] Figure 1 is a system flow chart of the present invention;

[0090] Figure 2 A flowchart of the steps for obtaining the dynamic system model of the present invention;

[0091] Figure 3 A flow chart of the steps for acquiring real-time displacement and stress data of the present invention;

[0092] Figure 4 A flow chart of the steps for obtaining the state space description of the present invention;

[0093] Figure 5 A flowchart of the steps for obtaining the configuration of system parameters for the present invention;

[0094] Figure 6 This is a flow chart of the steps for obtaining crack development prediction according to the present invention. DETAILED DESCRIPTION

[0095] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0096] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.

[0097] Embodiment 1

[0098] See also Figure 1 , a tunnel stability analysis system based on Newton force includes:

[0099] The dynamic system building module calculates the distance and relative position between elements based on the coordinates and physical parameters of the tunnel structure elements, collects seismic activity data and soil liquefaction records, monitors the stress data of the tunnel support walls and joints in real time, analyzes the correlation between the data and the tunnel stability, and establishes a dynamic system model;

[0100] The state space analysis module monitors the tunnel based on the dynamic system model, obtains real-time data of displacement and stress, analyzes the rate of change and trend of the real-time data, describes the dynamic behavior of the tunnel in combination with the time series changes of the data, and generates a state space description;

[0101] The parameter optimization module calibrates the mechanical parameters of the tunnel model based on the state space description, uses the real-time and past monitoring data of the tunnel, evaluates the simulation results of the differentiated parameter configuration, selects the parameter configuration by comparison, matches the current tunnel conditions, and obtains the optimized system parameter configuration;

[0102] The crack prediction and assessment module monitors the stress concentration areas of the tunnel structure based on the optimized system parameter configuration, identifies the estimated crack development areas, calculates the stress overload probability in the crack development areas, and analyzes the expansion trends of cracks and joints to generate crack development predictions.

[0103] The dynamic system model specifically refers to the coordinates, physical parameters, seismic activity data, soil liquefaction records, and stress data of tunnel support walls and joints of tunnel structural elements. The state space description includes the displacement, stress, rate of change, trend, and time series changes of the tunnel. The optimization system parameter configuration specifically refers to the simulation results of mechanical parameters, real-time and historical monitoring data, and differentiated parameter configuration. The crack development prediction includes stress concentration areas, estimated crack development areas, stress overload probability, and expansion trends of cracks and joints.

[0104] See also Figure 2 , the specific steps for obtaining the dynamic system model are:

[0105] Collect the 3D coordinates of the tunnel structure elements and calculate the distance between each pair of elements using the formula:

[0106]

[0107] Get distance;

[0108] Among them, (x i ,y i ,z i ) and (x j ,y j ,z j) represent the three-dimensional coordinates of the two tunnel structure elements, d ij Represents distance;

[0109] Based on distance, seismicity data and soil liquefaction records, the formula is used:

[0110]

[0111] Calculate the environmental risk weights between each element to obtain the environmental risk weight matrix;

[0112] Among them, q k represents the intensity of earthquake activity, l m represents the soil liquefaction probability, R ij represents environmental risk weight;

[0113] Integrate the environmental risk weight matrix and stress data using the formula:

[0114] S total =∑ i,j (S data ·|R ij -λ|)

[0115] Calculate overall stress and obtain an assessment of stress and environmental risks;

[0116] Among them, S data is the stress data obtained by real-time monitoring, R ij is the environmental risk weight, λ is used to adjust the weight impact, S total is the overall stress;

[0117] Based on the assessment of stress and environmental risks, the formula is used:

[0118]

[0119] Calculate the stability index of the tunnel and establish a dynamic system model;

[0120] Among them, θ is the stability constant used to adjust the reaction sensitivity, P stable It is an indicator of tunnel stability.

[0121] Assumptions

[0122] Assume that there are two coordinates of the tunnel structure elements:

[0123] The coordinates of element A are (x i ,y i ,z i )=(0,0,0)

[0124] The coordinates of element B are (x j ,y j ,zj )=(3,4,0)

[0125] Seismic activity data k and soil liquefaction records m Assume that:

[0126] Seismic activity intensity k =0.7

[0127] Soil liquefaction probability m =0.3

[0128] Step 1: Calculate the distance

[0129] formula:

[0130]

[0131] Parameter explanation:

[0132] x i ,y i ,z i )、(x j ,y j ,z j ) are the three-dimensional coordinates of the tunnel structure elements.

[0133] d ij is the Euclidean distance between two elements.

[0134] Calculation process:

[0135] According to the given coordinates, substitute into the formula: Calculated unit.

[0136] Step 2: Calculation of environmental risk weights

[0137] formula:

[0138]

[0139] Parameter explanation:

[0140] d ij is the distance between elements.

[0141] q k is the intensity of earthquake activity.

[0142] l m is the soil liquefaction probability.

[0143] R ij is the environmental risk weight.

[0144] Calculation process:

[0145] Using the given parameters and distance d ij =5, earthquake intensity q k =0.7, soil liquefaction probability l m =0.3. Calculation formula: Step 3: Comprehensive assessment of stress and environmental risks

[0146] formula:

[0147]

[0148] Parameter explanation:

[0149] S data is the stress data obtained from the monitoring system, assumed to be 10 units.

[0150] R ij is the environmental risk weight, calculated as 5 in the previous step.

[0151] λ is the adjustment factor, which is assumed to be 2.

[0152] S total is the overall stress.

[0153] Calculation process:

[0154] Substitute parameters: S total =10·|5-2|=10·3=30 units.

[0155] Step 4: Calculation of tunnel stability index

[0156] formula:

[0157]

[0158] Parameter explanation:

[0159] S total is the comprehensive stress and environmental risk assessment, calculated as 30 in the previous step.

[0160] θ is the stability constant, assumed to be 10.

[0161] Calculation process:

[0162] Substitute parameters: P stable =1-e -30 / 10 =1-e -3 ≈0.9502, indicating that the tunnel stability is very high.

[0163] See also Figure 3 , the steps for acquiring real-time displacement and stress data are as follows:

[0164] Based on the dynamic system model, sensors are deployed at key structural locations of the tunnel, and monitoring technology is used to collect original displacement and stress. The formula is:

[0165] x(t)=Asin(ωt+φ)

[0166] σ(t)=Bcos(ωt+θ)

[0167] Generate raw displacement x(t) and stress data σ(t);

[0168] Where A is the amplitude of displacement, B is the amplitude of stress, ω is the angular frequency, φ is the displacement phase shift, and θ is the stress phase shift;

[0169] The original displacement and stress data are processed by moving average filtering technology using the formula:

[0170]

[0171] Get the filtered displacement x filtered (t) and stress σ filtered (t) data;

[0172] Where n is the filter window length;

[0173] Extract key information from the filtered displacement and stress data, apply differential analysis techniques, using the formula:

[0174] Δx(t)=x filtered (t)-x filtered (t-1)

[0175] Δσ(t)=σ filtered (t)-σ filtered (t-1)

[0176] Generate real-time data of displacement and stress;

[0177] Among them, Δx(t) is the displacement change rate, and Δσ(t) is the stress change rate.

[0178] Detailed explanation and derivation of the formula for step 1

[0179] formula:

[0180] x(t)=Asin(ωt+φ)

[0181] and

[0182] σ(t)=Bcos(ωt+θ)

[0183] Parameter explanation:

[0184] A: The amplitude of the displacement, assumed to be 5 mm (millimeter)

[0185] B: The amplitude of stress, assumed to be 10 MPa (megapascals)

[0186] ω: angular frequency, set to (radians per second), which is equivalent to a 1 / 12 cycle of periodic change per second

[0187] φ, θ: Phase shift, take radian

[0188] Derivation process:

[0189] Assuming t = 6 seconds, the displacement x(t) and stress σ(t) at this moment will be calculated.

[0190] Calculate x(t):

[0191]

[0192] This means that at 6 seconds, the displacement is -2.5 mm, representing half of the maximum amplitude in the opposite direction.

[0193] Calculate σ(t):

[0194]

[0195] This means that at 6 seconds, the stress is -7.07 MPa, indicating that a negative value of almost the maximum pressure is reached in the considered direction.

[0196] Detailed explanation and derivation of the formula for step 2

[0197] formula:

[0198]

[0199] and

[0200]

[0201] Parameter explanation:

[0202] n: time window length, assumed to be 3

[0203] Derivation process:

[0204] Assume that the displacement values ​​at time points t-0, t-1, and t-2 are -2.5 mm, -1.0 mm, and 0.5 mm, respectively, and the stress values ​​are -7.07 MPa, -5.0 MPa, and 3.0 MPa, respectively.

[0205] Calculate x filtered (t):

[0206]

[0207] This means that the average displacement after filtering is -1.0 mm.

[0208] Calculate σ filtered (t):

[0209]

[0210] This means that the average stress after filtration is -3.02MPa.

[0211] Detailed explanation and derivation of the formula for step 3

[0212] formula:

[0213] Δx(t)=x filtered (t)-x filtered (t-1)

[0214] and

[0215] Δσ(t)=σ filtered (t)-σ filtered (t-1)

[0216] Derivation process:

[0217] Assume x filtered (t-1) is -0.5 mm and σ filtered (t-1) is -1.0MPa.

[0218] Calculate Δx(t):

[0219] Δx(t)=-1.0-(-0.5)=-0.5mm

[0220] This means that the displacement change rate is -0.5mm, which indicates how fast the displacement changes.

[0221] Calculate Δσ(t):

[0222] Δσ(t)=-3.02-(-1.0)=-2.02MPa

[0223] This means that the stress change rate is -2.02MPa, indicating the speed at which stress changes.

[0224] See also Figure 4 , the specific steps for obtaining the state space description are:

[0225] Based on the real-time data of displacement and stress, an initial time series analysis is performed using the formula:

[0226]

[0227] Calculate the output Y(t) of the time series model;

[0228] Among them, α1 is the weight of the quadratic term of the displacement change rate, α2 is the square root weight of the stress change rate, and α3 and α4 adjust the weights of the trigonometric functions;

[0229] The enhanced state estimation algorithm is applied to the output of the time series model using the formula:

[0230]

[0231] Improve the prediction accuracy through nonlinear transformation and generate the predicted state Z(t);

[0232] Among them, γ is the enhancement coefficient, which is responsible for adjusting the impact of the output of the time series model, δ and ζ are the offset and quadratic term coefficients respectively;

[0233] According to the predicted state, the state space model is constructed using the formula:

[0234]

[0235] Generate state space description S(t);

[0236] Among them, λ is the state space conversion coefficient and μ is a constant term.

[0237] Step 1: Time Series Analysis

[0238] Formula and parameter description:

[0239]

[0240] α1, α2, α3, and α4 are weight coefficients.

[0241] Δx(t) is the rate of change of displacement, and Δσ(t) is the rate of change of stress.

[0242] Assuming numbers:

[0243] α1=0.5, α2=2, α3=1, α4=0.8

[0244] Δx(t)=0.05m / s, Δσ(t)=0.2Pa

[0245] Calculation process:

[0246] Calculate Δx(t) 2 =(0.05) 2 =0.0025m 2 / s 2

[0247] calculate

[0248] Calculate cos(Δx(t))=cos(0.05)≈0.99875

[0249] Calculate sin(Δσ(t))=sin(0.2)≈0.19867

[0250] Substituting these values ​​into the formula:

[0251] Y(t)=0.5×0.0025+2×0.447+1×0.99875×0.8×0.19867

[0252] Y(t)=0.00125+0.894+0.159

[0253] Y(t)=1.05425

[0254] Result interpretation:

[0255] The value of Y(t) represents the evaluation index of the comprehensive displacement and stress state at time t. The larger the value, the more drastic the change.

[0256] Step 2: State Estimation Algorithm

[0257] Formula and parameter description:

[0258]

[0259] γ, δ, ζ are adjustment coefficients.

[0260] Y(t) is obtained from step 1.

[0261] Assuming numbers:

[0262] γ=1.5, δ=0.1, ζ=0.05

[0263] Use Y(t)=1.05425 from step 1

[0264] Calculation process:

[0265] Calculate log(1+|Y(t)|)=log(1+1.05425)≈0.719

[0266] Calculate Y(t) 2 =(1.05425) 2 ≈1.11244

[0267] Substituting these values ​​into the formula:

[0268]

[0269] Z(t)=7.30

[0270] Result interpretation:

[0271] The value of Z(t) represents the predicted value of the future state. A higher value indicates that the predicted future state is more drastic or has greater changes.

[0272] Step 3: Build a state-space model

[0273] Formula and parameter description:

[0274]

[0275] λ, μ are model parameters.

[0276] Z(t) is obtained from step 2.

[0277] Assuming numbers:

[0278] λ=0.9,μ=0.5

[0279] Use Z(t)=7.30 from step 2

[0280] Calculation process:

[0281] Calculate e -Z(t) =e -7.30 ≈0.000673

[0282] calculate

[0283] Substituting these values ​​into the formula:

[0284] S(t)=0.9×7.299+0.5

[0285] S(t)=6.5691+0.5

[0286] S(t)=7.0691

[0287] Result interpretation:

[0288] The value of S(t) represents the description of the system state space, and a high value indicates that the system is in a state of higher dynamic change.

[0289] See also Figure 5 , the specific steps for obtaining the optimized system parameter configuration are:

[0290] Using the state space description output and the historical monitoring data of the tunnel, a preliminary calibration of the mechanical parameters was performed using the formula:

[0291] P init =k1S(t)+k2D(t)+b1

[0292] The mechanical parameters P of the preliminary calibration are calculated init ;

[0293] Among them, k1 and k2 are adjustment coefficients, and b1 is a constant term;

[0294] The mechanical parameters of the preliminary calibration are simulated and evaluated, according to the differentiated parameter configuration, using the formula:

[0295]

[0296] Reflects the sensitivity of parameter configuration to simulation effect and generates evaluation result P eval ;

[0297] Among them, a1 and a2 are sensitivity adjustment coefficients, and b2 and b3 are offsets;

[0298] According to the evaluation results and the current tunnel conditions, the most suitable parameter configuration is selected using the formula:

[0299] P opt =γ1P eval ·log(1+P eval )+γ2P init / (1+P init )+μ

[0300] Get the optimized system parameter configuration P opt ;

[0301] Among them, γ1 and γ2 are weight coefficients, and μ is a constant term.

[0302] Detailed explanation and derivation of the formula for step 1

[0303] formula:

[0304] P init =k1S(t)+k2D(t)+b1

[0305] Parameter definition:

[0306] k1 and k2: These are mechanical parameter adjustment coefficients, assuming k1=0.8 and k2=0.5.

[0307] b1: This is a constant term used to adjust the final mechanical parameters, set to b1=10.

[0308] S(t): Parameter value obtained from the state space description, assumed to be 20 at the current time t.

[0309] D(t): The value of historical monitoring data, assumed to be 30.

[0310] Calculation process:

[0311] P init =0.8×20+0.5×30+10

[0312] Pinit =16+15+10

[0313] P init =41

[0314] Example explanation: The initial calibration mechanical parameters P obtained init =41, this value reflects the value of the mechanical parameters adjusted according to the current state space description and historical data.

[0315] Detailed explanation and derivation of the formula for step 2

[0316] formula:

[0317]

[0318] Parameter definition:

[0319] a1, a2: sensitivity adjustment coefficients, assuming a1=0.1, a2=0.05.

[0320] b2, b3: offset, set b2=1, b3=5.

[0321] Calculation process:

[0322]

[0323] Example explanation: Evaluation results P eval ≈0.00209, a value that reflects the sensitivity of the simulation effects evaluated based on the adjusted mechanical parameters.

[0324] Detailed explanation and derivation of the formula for step 3

[0325] formula:

[0326] P opt =γ1P eval ·log(1+P eval )+γ2P init / (1+P init )+μ

[0327] Parameter definition:

[0328] γ1, γ2: weight coefficients, set to γ1=0.8, γ2=0.4.

[0329] μ: constant term, set to μ=5.

[0330] Calculation process:

[0331] P opt =0.8×0.00209·log(1+0.00209)+0.4×41 / (1+41)+5

[0332] Popt =0.8×0.00209×log(1.00209)+0.4×41 / 42+5

[0333] P opt ≈0.8×0.00209×0.00208+0.4×0.9762+5

[0334] P opt ≈0.000003468+0.39048+5

[0335] P opt ≈5.3905

[0336] Example explanation: Optimizing system parameter configuration P opt ≈5.3905, this value reflects the comprehensive effect of the optimal parameter configuration selected considering the current tunnel conditions.

[0337] See also Figure 6 , the specific steps for obtaining the crack development prediction are:

[0338] According to the optimized system parameter configuration, the stress monitoring of the tunnel structure is performed using the formula:

[0339]

[0340] Generate the average stress value σ of the stress concentration area avg ;

[0341] Among them, σ i is the stress value of the monitoring point, w i is the weight factor, n is the number of monitoring points;

[0342] Using the average stress value and structural data of the stress concentration area, potential crack development areas are identified using the formula:

[0343]

[0344] Calculate the stress overload probability P in the crack development zone risk ;

[0345] Among them, σ crit is the critical stress threshold;

[0346] Combined with the probability of stress overload, the expansion trend of cracks and joints is analyzed using the formula:

[0347]

[0348] The crack development prediction T crack ;

[0349] Among them, κ is the expansion coefficient, and θ and δ are adjustment parameters.

[0350] Detailed explanation and example of step 1 formula

[0351] formula:

[0352]

[0353] Parameter interpretation and calculation process:

[0354] σ i : The stress value of the ith monitoring point, assumed to be obtained from the sensor.

[0355] w i :The weight of each monitoring point can be assigned different weights based on the location or importance of the monitoring point.

[0356] n: the total number of monitoring points.

[0357] Derivation process:

[0358] Assume there are three monitoring points, the stress value (σ i ) are 100Pa, 150Pa, and 200Pa respectively. The corresponding weight (w i ) are set to 1, 2, 3. Then:

[0359]

[0360] Result description:

[0361] The calculated σ avg is 166.67Pa, which represents the average stress value after taking the weight into account.

[0362] Detailed explanation and example of step 2 formula

[0363] formula:

[0364]

[0365] Parameter interpretation and calculation process:

[0366] σ avg : The average stress value calculated in the first step.

[0367] σ crit : The critical stress threshold for crack occurrence is assumed to be 200Pa.

[0368] Derivation process:

[0369] Use the σ from step 1 avg ≈166.67Pa and the assumed σ crit =200Pa, calculate P risk :

[0370]

[0371] Result description:

[0372] P risk is 0.5662, which means that under the current conditions, the probability of stress overload in the crack development zone is predicted to be 56.62%.

[0373] Detailed explanation and example of step 3 formula

[0374] formula:

[0375]

[0376] Parameter interpretation and calculation process:

[0377] P risk : The crack development probability calculated in the second step.

[0378] κ: expansion factor, assumed to be 1.5.

[0379] θ: adjustment coefficient, assumed to be 0.5.

[0380] δ: constant term, assumed to be 0.1.

[0381] Derivation process:

[0382] Use the P from the previous step risk = 0.5662, calculate T crack :

[0383]

[0384] Result description:

[0385] T crack It is 1.8486, which is a scaled value used to indicate the strength of the rift development trend.

[0386] A tunnel stability analysis method based on Newton force is performed according to the above-mentioned tunnel stability analysis system based on Newton force, comprising the following steps:

[0387] S1: Collect coordinates and physical parameters of tunnel structural elements, collect seismic activity data and soil liquefaction records, calculate distances and relative positions between elements, monitor stress data of tunnel support walls and joints, build dynamic system models, analyze correlations with tunnel stability, and generate dynamic behavior descriptions;

[0388] S2: Based on the dynamic behavior description, obtain the real-time data of tunnel displacement and stress, analyze the change rate and development trend of the data, combine the changes in the time series, establish the state space model, and generate the state space description;

[0389] S3: Calibrate the mechanical parameters of the tunnel model using the state space description, evaluate the simulation results of the differentiated mechanical parameter configurations using the real-time and historical monitoring data of the tunnel, match the parameter configurations with the current tunnel conditions, and obtain the optimized parameter configurations;

[0390] S4: Using optimized parameter configuration, monitor stress concentration areas in the tunnel structure, identify and estimate crack development areas, calculate the stress overload probability in crack development areas, analyze the expansion trend of cracks and joints, and generate crack development predictions.

[0391] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A tunnel stability analysis system based on Newton force, characterized in that: The system comprises: The dynamic system building module calculates the distance and relative position between elements based on the coordinates and physical parameters of the tunnel structure elements, collects seismic activity data and soil liquefaction records, monitors the stress data of the tunnel support walls and joints in real time, analyzes the correlation between the data and the tunnel stability, and establishes a dynamic system model; The state space analysis module monitors the tunnel based on the dynamic system model, obtains real-time data of displacement and stress, analyzes the rate of change and trend of the real-time data, describes the dynamic behavior of the tunnel in combination with the time series changes of the data, and generates a state space description; The parameter optimization module calibrates the mechanical parameters of the tunnel model based on the state space description, uses the real-time and past monitoring data of the tunnel, evaluates the simulation results of the differentiated parameter configuration, selects the parameter configuration by comparison, matches the current tunnel conditions, and obtains the optimized system parameter configuration; The crack prediction and assessment module monitors the stress concentration area of ​​the tunnel structure based on the optimization system parameter configuration, identifies the estimated crack development area, calculates the stress overload probability of the crack development area, and analyzes the expansion trend of cracks and joints to generate a crack development prediction.

2. The tunnel stability analysis system based on Newton force according to claim 1, characterized in that: The steps for obtaining the dynamic system model are specifically as follows: Collect the 3D coordinates of the tunnel structure elements and calculate the distance between each pair of elements using the formula: Get distance; Among them, (x i ,y i ,z i ) and (x j ,y j ,z j ) represent the three-dimensional coordinates of the two tunnel structure elements, d ij Represents distance; Based on the distances, seismicity data and soil liquefaction records, the formula is used: Calculate the environmental risk weights between each element to obtain the environmental risk weight matrix; Among them, q k represents the intensity of earthquake activity, l m represents the soil liquefaction probability, R ij represents environmental risk weight; The environmental risk weight matrix and stress data are integrated using the formula: S total =∑ i,j (S data ·|R ij -λ|) Calculate overall stress and obtain an assessment of stress and environmental risks; Among them, S data is the stress data obtained by real-time monitoring, R ij is the environmental risk weight, λ is used to adjust the weight impact, S total is the overall stress; Based on the assessment of the stress and environmental risks, the formula is used: Calculate the stability index of the tunnel and establish a dynamic system model; Among them, θ is the stability constant used to adjust the reaction sensitivity, P stable It is an indicator of tunnel stability.

3. The tunnel stability analysis system based on Newton force according to claim 2, characterized in that: The steps for acquiring the real-time data of displacement and stress are specifically as follows: Based on the dynamic system model, sensors are deployed at key structural locations of the tunnel, and monitoring technology is used to collect original displacement and stress. The formula is: x(t)=Asin(ωt+φ) σ(t)=Bcos(ωt+θ) Generate raw displacement x(t) and stress data σ(t); Where A is the amplitude of displacement, B is the amplitude of stress, ω is the angular frequency, φ is the displacement phase shift, and θ is the stress phase shift; The raw displacement and stress data are subjected to signal processing using a moving average filtering technique using the formula: Get the filtered displacement x filtered (t) and stress σ filtered (t) data; Where n is the filter window length; To extract key information from the filtered displacement and stress data, differential analysis techniques are applied using the formula: Δx(t)=x filtered (t)-x filtered (t-1) Δσ(t)=σ filtered (t)-s filtered (t-1) Generate real-time data of displacement and stress; Among them, Δx(t) is the displacement change rate and Δσ(t) is the stress change.

4. The tunnel stability analysis system based on Newton force according to claim 3 is characterized in that: The steps for obtaining the state space description are specifically as follows: Based on the real-time data of displacement and stress, an initial time series analysis was performed using the formula: Calculate the output Y(t) of the time series model; Among them, α1 is the weight of the quadratic term of the displacement change rate, α2 is the square root weight of the stress change rate, and α3 and α4 adjust the weights of the trigonometric functions; The enhanced state estimation algorithm is applied to the output of the time series model using the formula: Improve the prediction accuracy through nonlinear transformation and generate the predicted state Z(t); Among them, γ is the enhancement coefficient, which is responsible for adjusting the impact of the output of the time series model, δ and ζ are the offset and quadratic term coefficients respectively; According to the predicted state, a state space model is constructed using the formula: Generate state space description S(t); Among them, λ is the state space conversion coefficient and μ is a constant term.

5. The tunnel stability analysis system based on Newton force according to claim 4, characterized in that: The steps for obtaining the optimization system parameter configuration are specifically as follows: Using the state space description output and historical monitoring data of the tunnel, a preliminary calibration of the mechanical parameters was performed using the formula: P init =k1S(t)+k2D(t)+b1 The mechanical parameters P of the preliminary calibration are calculated init ; Among them, k1 and k2 are adjustment coefficients, and b1 is a constant term; The mechanical parameters of the preliminary calibration are simulated and evaluated, according to the differentiated parameter configuration, using the formula: Reflects the sensitivity of parameter configuration to simulation effect and generates evaluation result P eval ; Among them, a1 and a2 are sensitivity adjustment coefficients, and b2 and b3 are offsets; According to the evaluation results and the current tunnel conditions, the most suitable parameter configuration is selected using the formula: P opt =γ1P eval ·log(1+P eval )+γ2P init / (1+P init )+μ Get the optimized system parameter configuration P opt ; Among them, γ1 and γ2 are weight coefficients, and μ is a constant term.

6. The tunnel stability analysis system based on Newton force according to claim 5, characterized in that: The steps for obtaining the crack development prediction are specifically as follows: According to the optimized system parameter configuration, the stress monitoring of the tunnel structure is performed using the formula: Generate the average stress value σ of the stress concentration area avg ; Among them, σ i is the stress value of the monitoring point, w i is the weight factor, n is the number of monitoring points; Using the average stress value and structural data of the stress concentration area, potential crack development areas are identified using the formula: Calculate the stress overload probability P in the crack development zone risk ; Among them, σ crit is the critical stress threshold; Combined with the stress overload probability, the expansion trend of cracks and joints is analyzed using the formula: The crack development prediction T crack ; Among them, κ is the expansion coefficient, and θ and δ are adjustment parameters.

7. A tunnel stability analysis method based on Newton force, characterized in that: The tunnel stability analysis system based on Newton force according to any one of claims 1 to 6 comprises the following steps: Collect coordinates and physical parameters of tunnel structural elements, collect seismic activity data and soil liquefaction records, calculate distances and relative positions between elements, monitor stress data of tunnel support walls and joints, build dynamic system models, analyze correlations with tunnel stability, and generate dynamic behavior descriptions; Based on the dynamic behavior description, real-time data of tunnel displacement and stress are obtained, the change rate and development trend of the data are analyzed, and a state space model is established in combination with the changes in the time series to generate a state space description; Using the state space description, calibrate the mechanical parameters of the tunnel model, use the real-time and historical monitoring data of the tunnel to evaluate the simulation results of the differentiated mechanical parameter configuration, match the parameter configuration of the current tunnel conditions, and obtain the optimized parameter configuration; Using the optimized parameter configuration, the stress concentration areas in the tunnel structure are monitored, the crack development areas are identified and estimated, the stress overload probability in the crack development areas is calculated, the expansion trends of cracks and joints are analyzed, and the crack development prediction is generated.

Citation Information

Patent Citations

  • Tunnel crack generation and development whole process positioning, evaluating and monitoring system and method thereof

    CN116480420A

  • Method for monitoring and predicting tunnel surrounding rock deformation

    CN117553738A

  • High-altitude tunnel lining cracking risk monitoring method and system based on digital twinning

    CN117556521A

  • Urban tunnel monitoring strain alarm system

    CN118366291A

  • Analysis method for obtaining change of stress in tunnel lining through amount of displacement, and apparatus and system therefor

    JP2019214930A

Cited By

  • Shield tunnel segment loading test platform data monitoring and analysis method

    CN120336772A

  • A data monitoring and analysis method for shield tunnel segment loading test platform

    CN120336772B