Method and system for evaluating horizontal regional distribution of infrastructure construction

By constructing three-dimensional models and multi-dimensional data analysis, combining residents' evaluation and economic trends, using machine self-learning algorithms to evaluate the level of infrastructure construction, the problem of single evaluation system in the existing technology is solved, and the accuracy and practicality of evaluation is improved. Provide scientific evaluation reports and promote regional balanced development.

CN118886751AInactive Publication Date: 2024-11-01ZHONGYUAN CONSTR MANAGEMENT CO LTD

Patent Information

Application Number
CN202411293966.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing infrastructure evaluation methods are difficult to fully consider physical factors such as spatial layout and service scope, which leads to the evaluation system being too single and lacks in-depth consideration of residents' actual experience, which reduces the accuracy of regional distribution assessment of infrastructure construction level.

Method used

By obtaining geographical data and policy data, building a three-dimensional model, combining residents' evaluation and economic data, using machine self-learning algorithms to analyze the development trends and economic trends of the facilities, generate a detailed regional distribution assessment report on infrastructure construction level, and dynamically adjust the assessment data to improve accuracy sex.

Benefits of technology

It improves the real-time and predictiveness of the assessment, enhances the targetedness and practicality of the assessment, ensures that residents' needs are fully reflected, and provides scientific assessment reports to help optimize resource allocation and promote regional balanced development.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886751A_ABST
    Figure CN118886751A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of engineering evaluation, in particular to an infrastructure construction level regional distribution evaluation method, which realizes comprehensive evaluation of regional infrastructure construction level by integrating geographic data, policy data, infrastructure data, resident evaluation and economic data. According to the method, three-dimensional modeling, a machine self-learning algorithm and a multi-dimensional data analysis technology are utilized, the infrastructure construction progress is dynamically monitored, the development trend is predicted, and association analysis is carried out on resident expectation and the economic development level. In addition, the scheme further comprises an evaluation data correction mechanism based on the resident satisfaction and expectation, a comprehensive evaluation report is generated, and a scientific basis is provided for policy making and resource optimization configuration. Balanced development of regional infrastructures is effectively promoted, and economic benefits and social benefits of infrastructure construction are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering evaluation, and in particular to a method and system for evaluating the horizontal regional distribution of infrastructure construction. Background Art

[0002] The regional distribution of infrastructure construction levels refers to the development level and coverage of infrastructure construction in different regions in terms of transportation, energy, communications, water conservancy, etc. This distribution is often closely related to factors such as the region's economic development level, policy support, and geographical environment.

[0003] Existing infrastructure assessment methods mainly use subjective assessment methods such as field surveys and project evaluations. However, this method is difficult to fully consider physical factors such as spatial layout and service scope at the supply level, as well as the inherent requirements of the industry in which the facilities are located, such as classification, scale, and management mechanism. This leads to an overly simplistic assessment system and a lack of in-depth consideration of residents' actual experience, which reduces the accuracy of the assessment of the regional distribution of infrastructure construction levels. Therefore, it needs to be improved. Summary of the invention

[0004] In order to improve the accuracy of regional distribution assessment of infrastructure construction levels, the present application provides a method and system for regional distribution assessment of infrastructure construction levels.

[0005] In the first aspect, the above-mentioned invention objective of the present application is achieved through the following technical solutions: A method for evaluating the regional distribution of infrastructure construction levels, the method comprising the steps of: Obtaining geographic data of the area to be evaluated, and constructing a three-dimensional model of the area to be evaluated based on a preset three-dimensional model of the area; Acquiring local policy data of the area to be assessed, generating expected facility distribution data based on the local policy data and the geographic data, and marking the expected facility distribution on the three-dimensional model of the area to be assessed, so as to generate an expected three-dimensional model marked with the expected infrastructure distribution; Acquire infrastructure data of the area to be evaluated, and mark actual facility construction on the three-dimensional model of the area to be evaluated according to the infrastructure data, wherein the infrastructure data includes the type, quantity, distribution and real-time status of the facilities, wherein the real-time status includes being planned, under construction and completed; Comparing the expected facility distribution data with the infrastructure data to generate construction difference data, and generating first evaluation data based on the construction difference data, the first evaluation data being used to represent an evaluation of a real-time construction situation; Acquire residents' evaluation survey feedback data and generate first resident evaluation data based on a preset satisfaction value analysis model; modifying the first assessment data based on the first resident evaluation data to generate first modified evaluation data; Recording real-time infrastructure data based on a preset public timeline and constructing a facility data set, wherein a preset construction development analysis model analyzes the facility data set based on a machine self-learning algorithm to generate construction development trends corresponding to different types of facilities; Obtaining economic data of the area to be evaluated, and constructing an economic data set based on the economic data of the history recorded on the public time axis, and analyzing the economic data set through a preset economic development model to generate an economic development trend; Correlating the construction development trend with the economic development trend based on the public timeline to analyze and generate a correlation coefficient between infrastructure construction and economic development; The preset economic evaluation model analyzes the correlation coefficient between the historical infrastructure construction and economic development to generate the second evaluation data; Acquire residents' expected construction data, analyze the expected construction data to generate an expected development trend, compare the expected development trend with the construction development trend based on a preset development trend comparison model, and analyze and generate second resident evaluation data; modifying the second evaluation data based on the second resident evaluation data to generate second modified evaluation data; A regional distribution assessment report on infrastructure construction level in the area to be assessed is generated based on the first revised assessment data and the second revised assessment data.

[0006] By adopting the above technical solutions, building a three-dimensional model and multi-dimensional data analysis, the level of infrastructure construction is comprehensively evaluated, ensuring the real-time and predictive nature of the evaluation. The solution introduces residents' evaluation and expectations, enhances the pertinence and practicality of the evaluation, and ensures that residents' needs are fully reflected. In addition, through machine self-learning algorithms and correction mechanisms, the solution can dynamically adjust the evaluation data and generate more accurate evaluation results. The generation of evaluation reports provides a scientific basis for policymakers and planners, helps optimize resource allocation and promote balanced regional development. This solution not only improves the efficiency of infrastructure construction and management, but also promotes the scientific nature of policy making and the coordination of regional development, improves the efficiency of infrastructure construction, promotes regional economic development, and effectively improves residents' satisfaction with their needs.

[0007] In a preferred example, the present application can be further configured as follows: in the step of obtaining local policy data of the area to be evaluated, generating expected facility distribution data based on the local policy data and the geographic data, and marking the expected facility distribution on the three-dimensional model of the area to be evaluated, so as to generate an expected three-dimensional model marked with the expected infrastructure distribution, the steps are as follows: Obtain policy documents, planning reports, construction codes and guidelines relevant to the area to be assessed; Analyze policy documents, planning reports, construction specifications and guidelines to generate expected facility distribution data corresponding to different development periods of the area to be assessed, wherein the expected facility distribution data includes the expected types, expected quantities, expected distribution density and expected status of infrastructure; The three-dimensional model of the area to be evaluated is marked based on the expected facility distribution data corresponding to different development periods to generate expected three-dimensional models corresponding to different development periods.

[0008] By adopting the above technical solutions, we can ensure that the planning goals and development plans in the policy documents are accurately converted into expected facility distribution data, providing scientific and reasonable guidance and predictions for infrastructure construction. This solution improves the efficiency and accuracy of policy document analysis, and helps to achieve the optimal layout of infrastructure construction and the rational allocation of resources.

[0009] In a preferred example, the present application may be further configured as follows: in the step of comparing the expected facility distribution data with the infrastructure data to generate construction difference data, and generating first evaluation data based on the construction difference data, wherein the first evaluation data is used to represent the evaluation of the real-time construction situation, the construction difference data includes differences in types, quantities, distribution, and status of facilities; The first evaluation data calculation formula includes: ; is the score of the first evaluation data, Score the pre-set base assessments; is the basic weight, which is used to reflect the basic impact of facility types on the evaluation score; C is the facility type difference data, which is used to represent the diversity of different types of facilities in the area to be evaluated; is the quantity weight, which is used to reflect the impact of the number of facilities on the evaluation score; N is the total number of facilities, which indicates the total number of facilities in the area to be evaluated; D is the distribution density, which is used to indicate the uniformity of the distribution of facilities in the area; is the status weight, which reflects the impact of the expected status of the facility on the evaluation score; S is the status score, which is used to evaluate the status score of the facility.

[0010] By adopting the above technical solution, the diversity of facility types, the total number of facilities, the distribution density and the expected status at different construction stages are taken into consideration when calculating the first assessment data. These scores are taken into comprehensive consideration and a comprehensive calculation formula is used to obtain the score of the first assessment data. The score reflects the consistency between the real-time construction status and the expected goals, thereby improving the accuracy of the assessment. We compare and analyze the assessment results with the preset goals, and compile a detailed assessment report to provide data support and suggestions for the construction and improvement of infrastructure.

[0011] In a preferred example, the present application can be further configured as follows: In the calculation formula of the first evaluation data calculation formula, S= ; ; is the total score among the planned facilities; is the total score of facilities under construction; is the total score of built facilities; is the facility score of the ith state; is the fluctuation value of the jth facility in state i; is the weight value of the jth facility in state i, and n is the total number of infrastructure facilities.

[0012] By adopting the above technical solution, the expected status score of the facility is calculated, and the different contributions of planned, under-construction and completed facilities to the evaluation score are taken into account to improve the accuracy of the evaluation.

[0013] In a preferred example, the present application may be further configured as follows: in the step of obtaining residents' evaluation survey feedback data and generating first resident evaluation data based on a preset satisfaction value analysis model, the steps are as follows: Preprocessing the evaluation survey feedback data to obtain resident evaluation data, and recording the resident evaluation data to construct a resident evaluation data set; The satisfaction value analysis model analyzes the resident evaluation data set through a machine self-learning algorithm based on preset evaluation indicators and weights to generate residents' satisfaction with the level of infrastructure construction; The first resident evaluation data is generated based on residents’ satisfaction with the level of infrastructure construction.

[0014] By adopting the above technical solution, first-line resident evaluation data reflecting residents’ satisfaction with the level of infrastructure construction can be generated, which not only helps to evaluate the construction quality of existing infrastructure, but also provides valuable feedback information for future infrastructure planning and improvement.

[0015] In a preferred example, the present application may be further configured as follows: after recording real-time infrastructure data based on a preset public timeline and constructing a facility data set, a preset construction development analysis model analyzes the facility data set based on a machine self-learning algorithm to generate construction development trends corresponding to different types of facilities, the following steps are included: Acquiring operation data of the infrastructure, the operation data including energy consumption data, maintenance data and usage data; Record the operation data based on the common time axis and construct an operation data set; The preset demand analysis model analyzes the operation data set based on a machine self-learning algorithm to generate infrastructure demand data; comparing the infrastructure demand data with the infrastructure data to generate demand difference data; The demand difference data is analyzed to generate demand development trends corresponding to different infrastructures, and the demand development trends are used as a reference for subsequent construction.

[0016] By adopting the above technical solutions, infrastructure demand can be more accurately predicted and planned, resource allocation can be optimized, traffic congestion can be reduced, and the overall efficiency and reliability of infrastructure can be improved. In addition, this approach can help achieve more sustainable infrastructure development, guide construction and maintenance work through accurate demand forecasts, and reduce unnecessary investment and waste.

[0017] In a preferred example, the present application may be further configured as follows: after the step of analyzing the demand difference data to generate demand development trends corresponding to different infrastructures, the following steps are included: The development trend comparison model compares the demand development trend with the construction development trend and analyzes and generates demand deviation evaluation data; The infrastructure construction level regional distribution assessment report is optimized based on the demand deviation evaluation data to generate an optimized infrastructure construction level regional distribution assessment report.

[0018] By adopting the above technical solutions, we can ensure that infrastructure construction is consistent with residents' needs and regional development goals, reduce resource waste, and improve the overall efficiency and benefits of infrastructure. The optimized evaluation report provides decision makers with more accurate information and suggestions, helps rationalize resource allocation and planning decisions, and improves residents' satisfaction.

[0019] In the second aspect, the above invention objective of the present application is achieved through the following technical solutions: A device for evaluating the horizontal regional distribution of infrastructure construction, the device comprising: a module for constructing a three-dimensional model of the area to be evaluated, for acquiring geographic data of the area to be evaluated, and constructing a three-dimensional model of the area to be evaluated based on a preset three-dimensional regional model; An expected three-dimensional model generation module is used to obtain local policy data of the area to be evaluated, generate expected facility distribution data based on the local policy data and the geographic data, and mark the expected facility distribution on the three-dimensional model of the area to be evaluated to generate an expected three-dimensional model marked with the expected infrastructure distribution; An actual facility construction marking module is used to obtain infrastructure data of the area to be evaluated, and to mark the actual facility construction on the three-dimensional model of the area to be evaluated according to the infrastructure data, wherein the infrastructure data includes the type, quantity, distribution and real-time status of the facilities, wherein the real-time status includes being planned, under construction and completed; a first assessment data generating module, configured to compare the expected facility distribution data with the infrastructure data to generate construction difference data, and to generate first assessment data based on the construction difference data, wherein the first assessment data is used to represent an assessment of a real-time construction situation; A first resident evaluation data generating module, used to obtain residents' evaluation survey feedback data and generate first resident evaluation data based on a preset satisfaction value analysis model; a first revised evaluation data generating module, configured to revise the first evaluation data based on the first resident evaluation data to generate first revised evaluation data; A construction development trend generation module is used to record real-time infrastructure data based on a preset public timeline and construct a facility data set. A preset construction development analysis model analyzes the facility data set based on a machine self-learning algorithm to generate construction development trends corresponding to different types of facilities. An economic development trend generation module is used to obtain economic data of the area to be evaluated, and to construct an economic data set based on the economic data of the history recorded on the public time axis, and to analyze the economic data set through a preset economic development model to generate an economic development trend; A facility and economic correlation coefficient generation module, used to associate the construction development trend with the economic development trend based on the common time axis to analyze and generate a correlation coefficient between infrastructure construction and economic development; A second evaluation data generating module is used to preset an economic evaluation model to analyze the correlation coefficient between the historical infrastructure construction and economic development to generate second evaluation data; A second resident evaluation data generating module is used to obtain residents' expected construction data, analyze the expected construction data to generate an expected development trend, compare the expected development trend with the construction development trend based on a preset development trend comparison model, and analyze and generate second resident evaluation data; a second revised evaluation data generating module, configured to revise the second evaluation data based on the second resident evaluation data to generate second revised evaluation data; An assessment report generation module is used to generate an assessment report on the regional distribution of infrastructure construction levels in the area to be assessed based on the first revised assessment data and the second revised assessment data.

[0020] On the third aspect, the above-mentioned purpose of the present application is achieved through the following technical solutions: An electronic device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned method for evaluating the horizontal regional distribution of infrastructure construction when executing the computer program.

[0021] Fourthly, the above-mentioned purpose of the present application is achieved through the following technical solutions: A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned method for evaluating the horizontal regional distribution of infrastructure construction.

[0022] In summary, the present application includes at least one of the following beneficial technical effects: 1. Construct a three-dimensional model and multi-dimensional data analysis to comprehensively evaluate the level of infrastructure construction, ensuring the real-time and predictive nature of the evaluation. The plan introduces residents' evaluation and expectations, enhances the pertinence and practicality of the evaluation, and ensures that residents' needs are fully reflected. In addition, through machine self-learning algorithms and correction mechanisms, the plan can dynamically adjust the evaluation data and generate more accurate evaluation results. The generation of the evaluation report provides a scientific basis for policymakers and planners, which helps to optimize resource allocation and promote balanced regional development. This plan not only improves the efficiency of infrastructure construction and management, but also promotes the scientific nature of policy making and the coordination of regional development, improves the efficiency of infrastructure construction, promotes regional economic development, and effectively improves residents' satisfaction with their needs; 2. Ensure that the planning goals and development plans in policy documents are accurately converted into expected facility distribution data, and provide scientific and reasonable guidance and predictions for infrastructure construction. This plan improves the efficiency and accuracy of policy document analysis, and helps to achieve the optimal layout of infrastructure construction and the rational allocation of resources; 3. When calculating the first assessment data, we consider the diversity of facility types, the total number of facilities, the distribution density, and the expected status at different construction stages. We take these scores into consideration and use a comprehensive calculation formula to derive the score of the first assessment data. This score reflects the consistency between the real-time construction status and the expected goals, improving the accuracy of the assessment. We compare and analyze the assessment results with the preset goals, compile a detailed assessment report, and provide data support and suggestions for the construction and improvement of infrastructure; 4. More accurately predict and plan infrastructure demand, optimize resource allocation, reduce traffic congestion, and improve the overall efficiency and reliability of infrastructure. In addition, this approach helps to achieve more sustainable infrastructure development, guide construction and maintenance work through accurate demand forecasts, and reduce unnecessary investment and waste. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a flowchart for implementing step S020 in a method for evaluating the horizontal regional distribution of infrastructure construction in one embodiment of the present application; Figure 2 This is a principle block diagram of a device for evaluating the horizontal regional distribution of infrastructure construction in one embodiment of the present application; Figure 3 It is a schematic diagram of an electronic device in an embodiment of the present application.

[0024] Figure Number: 1. Module for constructing the three-dimensional model of the area to be evaluated; 2. Module for generating the expected three-dimensional model; 3. Module for marking the actual facility construction; 4. Module for generating the first evaluation data; 5. Module for generating the first resident evaluation data; 6. Module for generating the first revised evaluation data; 7. Module for generating the construction development trend; 8. Module for generating the economic development trend; 9. Module for generating the facility and economic correlation coefficient; 10. Module for generating the second evaluation data; 11. Module for generating the second resident evaluation data; 12. Module for generating the second revised evaluation data; 13. Module for generating the evaluation report. DETAILED DESCRIPTION

[0025] The present application is further described in detail below in conjunction with the accompanying drawings.

[0026] In one embodiment, if Figure 1 As shown, the present application discloses a method for evaluating the horizontal regional distribution of infrastructure construction, which specifically includes the following steps: A method for evaluating the regional distribution of infrastructure construction levels, the method comprising the steps of: S010: Acquire geographic data of the area to be evaluated, and construct a three-dimensional model of the area to be evaluated based on a preset three-dimensional model of the area; Specifically, a geographic information system (GIS system) is used to collect spatial data on the topography, landforms and existing infrastructure of a certain urban area (to be evaluated), and a three-dimensional model of the area is constructed using three-dimensional modeling software.

[0027] S020: Acquire local policy data of the area to be assessed, generate expected facility distribution data based on the local policy data and geographic data, and mark the expected facility distribution on the three-dimensional model of the area to be assessed, so as to generate an expected three-dimensional model marked with the expected infrastructure distribution; Specifically, based on urban planning policies, determine the number and locations of schools, hospitals and transportation stations planned to be built in the next five years, and mark the locations of these expected facilities on the three-dimensional model of the area to be evaluated.

[0028] S030: Obtain infrastructure data of the area to be assessed, and mark the actual facility construction on the three-dimensional model of the area to be assessed based on the infrastructure data. The infrastructure data includes the type, quantity, distribution and real-time status of the facilities, where the real-time status includes being planned, under construction and completed; Specifically, the infrastructure data of the current area is collected, including the mileage of built roads, the number of bridges, etc., and their status (under planning, under construction, completed) is indicated by different color markings on the three-dimensional model.

[0029] S040: Compare the expected facility distribution data with the infrastructure data to generate construction difference data, and generate first evaluation data based on the construction difference data, the first evaluation data being used to represent an evaluation of the real-time construction situation; Specifically, the generated construction difference data includes the following data: Facility quantity difference: compare the quantity difference of various facilities in the expected model and the actual data. Facility distribution difference: analyze the difference in geographical distribution between the expected distribution and the actual facilities; Facility type difference: identify the difference between the expected facility type and the actual facility type; Facility status difference: record the inconsistency between the expected status (planning, construction, completed) and the actual status; Time schedule difference: compare the expected construction schedule with the actual schedule, and analyze the delay or early completion; Quality standard difference: evaluate whether the actual construction quality meets the expected quality standards; Resource utilization difference: analyze the expected resource utilization efficiency and actual resource consumption; Environmental impact difference: evaluate the difference between the actual construction impact on the environment and the expected environmental impact assessment; Cost-effectiveness difference: calculate the comparison between the expected cost-effectiveness and the actual cost-effectiveness.

[0030] These difference data will be used to generate the first evaluation data, reflecting the evaluation of the real-time construction situation. In the embodiment of the present application, for example, the expected model predicts that 10 schools will be built in a certain area, but the actual data only shows that 7 schools have been built, then the difference in the number of facilities is 3. In addition, if the expected construction progress is that all schools will be completed before a certain date, but the actual progress shows a delay, then the time progress difference will be recorded and the reason will be analyzed.

[0031] Through these detailed comparative analyses, the level of regional infrastructure construction can be more accurately assessed, and a basis for decision makers to improve existing facilities and plan future construction can be provided. This assessment method helps to optimize resource allocation, improve construction efficiency, and ensure that infrastructure construction better meets regional development goals.

[0032] S050: Obtaining residents' evaluation survey feedback data and generating first resident evaluation data based on a preset satisfaction value analysis model; Specifically, the following steps are involved in the survey of residents: Quantitative evaluation level: preset standardized evaluation levels for residents to choose from, for example, 5 levels can be set, from 1 (very dissatisfied) to 5 (very satisfied). Questionnaire design: design questionnaires to collect residents' satisfaction with various aspects of infrastructure, including but not limited to infrastructure coverage, service quality, maintenance status, etc.; Data collection: widely collect residents' evaluation data through online questionnaires, field visits, telephone interviews, etc.; Data processing: quantify the collected data, for example, convert open-ended text feedback into quantitative scores; Statistical analysis: perform statistical analysis on the quantified data, and calculate the average score, standard deviation, distribution, etc. of each indicator. Application of results: apply the analysis results to the assessment of the level of infrastructure construction, and provide decision makers with a basis for improving existing facilities and planning future construction.

[0033] In the embodiment of the present application, residents evaluate a newly built park facility, and they give a score of 1 to 5 based on the park's greening level, facility completeness, maintenance status, etc. These scores are then recorded, summarized, and used to generate first resident evaluation data through a satisfaction value analysis model, and then the preliminary infrastructure assessment data is revised to more accurately reflect the residents' real feelings and needs.

[0034] In this way, residents' evaluation survey feedback data provides a direct and quantitative basis for the assessment of infrastructure construction levels, helping to achieve more accurate and humane urban planning and management.

[0035] It should be noted that in the embodiment of the present application, the satisfaction value analysis model is assigned pre-set evaluation indicator weights to distinguish the importance of different indicators (survey data categories). In the embodiment of the present application, the weighting method is generally the hierarchical analysis method. In other embodiments, it can be user weighting, such as linear regression based on the relationship between user satisfaction scores and overall satisfaction, factor analysis, etc.

[0036] S060: Modifying the first evaluation data based on the first resident evaluation data to generate first modified evaluation data; Specifically, the calculation formula for the first revised evaluation data is: in, is the corrected evaluation value, is the initial evaluation value, is the resident satisfaction influence coefficient, is the resident satisfaction score. The resident satisfaction impact coefficient is generated through the satisfaction value analysis model.

[0037] S070: Record real-time infrastructure data based on a pre-set public timeline and construct a facility data set. The pre-set construction development analysis model analyzes the facility data set based on a machine self-learning algorithm to generate construction development trends corresponding to different types of facilities. Specifically, historical infrastructure data and machine self-learning algorithms are used to analyze development trends and predict hot spots for future facility construction.

[0038] S080: Obtain economic data of the area to be evaluated, and construct an economic data set based on the historical economic data recorded on a public time axis, and analyze the economic data set through a preset economic development model to generate an economic development trend; Specifically, economic data of the region are collected and analyzed. In the embodiment of the present application, the economic data include economic indicator data such as GDP and investment amount of the region to be evaluated, which are used to evaluate the level and trend of economic development.

[0039] S090: Based on the public timeline, the construction development trend and the economic development trend are associated to analyze and generate the correlation coefficient between infrastructure construction and economic development; the preset economic evaluation model analyzes the correlation coefficient between historical infrastructure construction and economic development to generate the second evaluation data; Specifically, the correlation between infrastructure construction and economic growth is analyzed, and the correlation coefficient between infrastructure construction and economic development is generated through a correlation algorithm. The contribution of key infrastructure to economic development is determined by generating second evaluation data by analyzing the correlation coefficient between historical infrastructure construction and economic development.

[0040] It is further explained that if the correlation decreases with the growth of time, the contribution is low; if the correlation increases with the growth of time, the contribution is high, and the score of the second evaluation data is positively correlated with the contribution.

[0041] S100: Acquire residents' expected construction data, analyze the expected construction data to generate expected development trends, compare the expected development trends with the construction development trends based on a preset development trend comparison model, and analyze and generate second resident evaluation data; Specifically, the expectations and suggestions of residents for infrastructure construction are collected through questionnaires, community meetings, online platforms and other channels and used as residents' expected construction data. The pre-set development trend comparison model uses text analysis and sentiment analysis technology to extract key information and quantitative evaluation indicators from unstructured resident feedback, and uses data mining technology such as cluster analysis to identify common themes and patterns in residents' expectations, and generate expected development trends, specifically how the types and quantities of infrastructure buildings will develop and be constructed in the future.

[0042] In an embodiment of the present application, it is assumed that when conducting an infrastructure assessment of a community living circle, we find that residents generally expect to increase green space and improve public transportation systems. By analyzing residents' feedback, we can determine the specific content of these expectations, such as increasing the number of parks and improving the frequency and coverage of public transportation.

[0043] Compare and analyze the residents' expected development trends with the construction development trends generated by the construction development analysis model (step S070), identify the differences between the two, and determine which residents' expectations have been met and which have not been considered by the existing construction plan.

[0044] For example: If we find that the public transportation improvements that residents expect do not match the current construction and development trends, for example, the additional bus routes that residents expect are not reflected in the existing plans, this will be identified as an area that needs attention and adjustment.

[0045] Second resident evaluation data generation: Based on the comparison between the expected development trend and the construction development trend, the second resident evaluation data is generated. These data reflect the gap between residents' expectations and actual construction.

[0046] In the embodiments of this application, quantitative methods (such as satisfaction rating) and qualitative methods (such as open feedback) are used to comprehensively evaluate residents' satisfaction. Through this step, the real needs and expectations of residents can be more accurately reflected, and more humane and goal-oriented guidance can be provided for infrastructure construction, which enhances the transparency and public participation of policy making, and helps to improve residents' acceptance and satisfaction with infrastructure construction projects.

[0047] S110: modifying the second evaluation data based on the second resident evaluation data to generate second modified evaluation data; S120: generating a regional distribution assessment report on infrastructure construction level in the area to be assessed based on the first revised assessment data and the second revised assessment data; Specifically, the first revised evaluation data and the second revised evaluation data are integrated to generate a detailed evaluation report, which includes the current status, problems, residents' evaluations and improvement suggestions of infrastructure construction.

[0048] In summary, this plan provides a systematic approach to assess the regional distribution of infrastructure construction levels, taking into account not only actual construction and policy expectations, but also residents' satisfaction and expectations, as well as the relevance of economic development. This helps decision makers to fully understand the current status and future needs of infrastructure construction and formulate more effective planning and improvement measures.

[0049] In the step of S020: obtaining local policy data of the area to be evaluated, generating expected facility distribution data based on the local policy data and the geographic data, and marking the expected facility distribution on the three-dimensional model of the area to be evaluated, so as to generate an expected three-dimensional model marked with expected infrastructure distribution, the following steps are included: S021: Obtain policy documents, planning reports, construction specifications and guidelines relevant to the area to be assessed; Specifically, these documents usually come from official government websites or official announcements to ensure the authority and accuracy of the data.

[0050] S022: Analyze policy documents, planning reports, construction specifications and guidelines to generate expected facility distribution data corresponding to different development periods of the area to be assessed, wherein the expected facility distribution data includes the expected types, expected quantities, expected distribution density and expected status of infrastructure; Specifically, text mining technology is used. In the embodiment of this application, natural language processing technology (NLP) is used to quantitatively analyze policy documents and extract key information related to infrastructure construction. This includes policy goals, expected results, time frames, and resource allocation. Existing policy tools and evaluation models, such as the PMC policy evaluation model, are used to evaluate policy documents to determine their potential impact and contribution to infrastructure construction, match the goals proposed in the policy documents with the expected facility distribution data, analyze the degree and direction of policy support for different types of infrastructure, and build a forecasting model based on the planning goals and development plans in the policy documents to predict infrastructure demand and distribution in different development periods.

[0051] S023: marking the three-dimensional model of the area to be evaluated based on the expected facility distribution data corresponding to different development periods, so as to generate expected three-dimensional models corresponding to different development periods; Specifically, the policy analysis results are integrated with the Geographic Information System (GIS) to visualize the impact of policies on the infrastructure layout in a specific area.

[0052] In summary, this plan ensures that the planning objectives and development plans in policy documents are accurately converted into expected facility distribution data, providing scientific and reasonable guidance and forecasts for infrastructure construction. It improves the efficiency and accuracy of policy document analysis and helps to achieve the optimal layout of infrastructure construction and the rational allocation of resources.

[0053] In step S40, the first evaluation data calculation formula includes: ; S = ; ; is the score of the first evaluation data, Score the pre-set base assessments; is the basic weight, which is used to reflect the basic impact of facility types on the evaluation score; C is the facility type difference data, which is used to represent the diversity of different types of facilities in the area to be evaluated; is the quantity weight, which is used to reflect the impact of the number of facilities on the evaluation score; N is the total number of facilities, which indicates the total number of facilities in the area to be evaluated; D is the distribution density, which is used to indicate the uniformity of the distribution of facilities in the area; is the status weight, which reflects the impact of the expected status of the facility on the evaluation score; S is the status score, which is used to evaluate the status score of the facility; is the total score among the planned facilities; is the total score of facilities under construction; is the total score of built facilities; is the facility score of the ith state; is the fluctuation value of the jth facility in state i; is the weight value of the jth facility in state i, and n is the total number of infrastructure facilities.

[0054] Specifically, in the step of generating the first assessment data, we first collected detailed data on all relevant infrastructure in the region, including type, quantity, distribution location and real-time status. Then, based on expert consultation and data analysis, we determined the weight of each factor ( ), such as the diversity of facility types, the total number of facilities, the distribution density, and the expected status at different construction stages. Using these weights and the corresponding facility data, we calculated the expected status score of the facility, taking into account the different contributions of planned, under-construction, and completed facilities to the evaluation score. Then, these scores were taken into account and a comprehensive calculation formula was used to derive the score of the first evaluation data, which reflects the consistency between the real-time construction status and the expected goals. Finally, we compared and analyzed the evaluation results with the preset goals and compiled them into a detailed evaluation report to provide data support and suggestions for the construction and improvement of infrastructure.

[0055] In summary, this solution improves the accuracy and practicability of the evaluation, and ensures the comprehensiveness and objectivity of the evaluation results by comprehensively considering multiple factors to calculate the first evaluation data.

[0056] In the step of S050: obtaining residents' evaluation survey feedback data and generating first resident evaluation data based on a preset satisfaction value analysis model, the following steps are included: S051: preprocessing the evaluation survey feedback data to obtain resident evaluation data, and recording the resident evaluation data to construct a resident evaluation data set; Specifically, feedback provided by residents through online questionnaires, community meetings, and mobile applications was collected, and text analysis, including sentiment analysis and keyword extraction, was performed on the collected text feedback to quantify residents' emotional tendencies (positive, negative, or neutral), clean the data, remove invalid or incomplete questionnaires, and ensure the quality of the data set.

[0057] S052: The satisfaction value analysis model analyzes the resident evaluation data set through a machine self-learning algorithm based on preset evaluation indicators and weights to generate residents' satisfaction with the infrastructure construction level; Specifically, the quantified residents’ feedback is classified according to different evaluation indicators (such as facility quality, accessibility, maintenance status, etc.), a unique identifier is assigned to each indicator, and the residents’ specific scores or emotional tendencies are recorded, the data sets are stored, and a database is established to facilitate further analysis and query.

[0058] Evaluation indicators and corresponding weights are set. For example, facility quality may account for 40% of total satisfaction, accessibility accounts for 30%, and maintenance status accounts for 30%. Using machine self-learning algorithms, in the embodiment of the present application, support vector machines (SVMs) and random forest algorithms are used to train the resident evaluation data set to learn the importance and impact of different indicators; the trained satisfaction value analysis model is used to analyze the resident evaluation data set to calculate the satisfaction score of each resident.

[0059] S053: Generate first resident evaluation data based on residents’ satisfaction with the level of infrastructure construction; Specifically, based on the output of the satisfaction value analysis model, a satisfaction index is generated for each resident. The index integrates the weighted impact of all evaluation indicators and converts the satisfaction index into a standardized score, for example, a scoring system of 1 to 5 or 1 to 10. Statistical methods, such as calculating the mean score, median or standard deviation, are used to obtain an overview of the overall residents' satisfaction with the level of infrastructure construction.

[0060] First resident evaluation data reflecting residents’ satisfaction with the level of infrastructure construction can be generated, which not only helps to evaluate the construction quality of existing infrastructure, but also provides valuable feedback information for future infrastructure planning and improvement.

[0061] After the step of recording real-time infrastructure data based on a preset public timeline and constructing a facility data set, and analyzing the facility data set based on a machine self-learning algorithm by a preset construction development analysis model to generate construction development trends corresponding to different types of facilities, the following steps are included: S0701: Acquire operation data of infrastructure, where the operation data includes energy consumption data, maintenance data, and usage data; S0702: Record the operation data based on the common time axis and construct an operation data set; S0703: The preset demand analysis model analyzes the operation data set based on a machine self-learning algorithm to generate infrastructure demand data; S0704: Compare the infrastructure demand data with the infrastructure data to generate demand difference data; S0705: Analyze the demand difference data to generate demand development trends corresponding to different infrastructures, and use the demand development trends as a reference for subsequent construction.

[0062] Specifically, taking urban transportation infrastructure as an example, the operating data includes the number of vehicles recorded by traffic flow counters, speed data from road sensors, and energy consumption data collected from the vehicle information system. The time series database is used to record daily, weekly and monthly operating data to construct a comprehensive data set, which can be used for long-term trend analysis and short-term fluctuation prediction; a machine self-learning algorithm is applied, and random forest and gradient boosting machine are selected in the embodiment of the present application to analyze the operating data set to identify traffic congestion patterns and predict traffic demand in a specific time period in the future; the predicted traffic demand is compared with the existing traffic capacity to generate demand difference data, for example, to identify which sections of the road may face excessive congestion during peak hours; based on the demand difference data, the development trends of different infrastructures (such as roads, bridges, and public transportation) are analyzed, for example, to identify sections of the road that need to be expanded or optimized to cope with the growing traffic demand.

[0063] This solution more accurately predicts and plans infrastructure demand, optimizes resource allocation, reduces traffic congestion, and improves the overall efficiency and reliability of infrastructure. In addition, this approach helps achieve more sustainable infrastructure development by guiding construction and maintenance work through accurate demand forecasts and reducing unnecessary investment and waste.

[0064] After the step of analyzing the demand difference data to generate demand development trends corresponding to different infrastructures, the following steps are included: The development trend comparison model compares the demand development trend with the construction development trend and analyzes and generates demand deviation evaluation data; The infrastructure construction level regional distribution assessment report is optimized based on the demand deviation evaluation data to generate an optimized infrastructure construction level regional distribution assessment report.

[0065] Specifically, the embodiment of the present application takes high-speed broadband network as an example, and uses the development trend comparison model to match and compare the demand development trend with the construction development trend. For example, if the demand analysis shows that the demand for high-speed broadband network in a certain area has increased sharply, and the current construction development trend shows that there is no corresponding network infrastructure planning, this will generate a demand deviation; based on the results of the comparative analysis, the system will generate demand deviation evaluation data. For example, the evaluation data may indicate that the growth rate of demand for educational infrastructure exceeds the current construction speed, and immediate attention and adjustment are required. The demand deviation evaluation data is used to optimize the regional distribution assessment report of the infrastructure construction level. The report will contain a detailed analysis of the differences between current construction and demand, and put forward corresponding improvement suggestions. For example, the report may recommend increasing investment in transportation infrastructure in a certain area to meet the growing travel needs.

[0066] This plan ensures that infrastructure construction is consistent with residents' needs and regional development goals, reduces resource waste, and improves the overall efficiency and effectiveness of infrastructure. The optimized evaluation report provides decision makers with more accurate information and suggestions, helps rationalize resource allocation and planning decisions, and improves residents' satisfaction.

[0067] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0068] In one embodiment, a device for evaluating the regional distribution of infrastructure construction levels is provided, and the device for evaluating the regional distribution of infrastructure construction levels corresponds one-to-one to the method for evaluating the regional distribution of infrastructure construction levels in the above embodiment. Figure 2 As shown, the infrastructure construction horizontal regional distribution assessment device includes a three-dimensional model construction module 1 for the area to be assessed, which is used to obtain geographic data of the area to be assessed and construct a three-dimensional model of the area to be assessed based on a preset regional three-dimensional model; The expected three-dimensional model generation module 2 is used to obtain local policy data of the area to be evaluated, generate expected facility distribution data based on the local policy data and the geographic data, and mark the expected facility distribution on the three-dimensional model of the area to be evaluated to generate an expected three-dimensional model marked with the expected infrastructure distribution; The actual facility construction marking module 3 is used to obtain the infrastructure data of the area to be evaluated, and to mark the actual facility construction on the three-dimensional model of the area to be evaluated according to the infrastructure data, wherein the infrastructure data includes the type, quantity, distribution and real-time status of the facilities, wherein the real-time status includes being planned, under construction and completed; A first evaluation data generating module 4 is used to compare the expected facility distribution data with the infrastructure data to generate construction difference data, and to generate first evaluation data based on the construction difference data, wherein the first evaluation data is used to represent the evaluation of the real-time construction situation; A first resident evaluation data generating module 5, for obtaining residents' evaluation survey feedback data and generating first resident evaluation data based on a preset satisfaction value analysis model; a first revised evaluation data generating module 6, configured to revise the first evaluation data based on the first resident evaluation data to generate first revised evaluation data; A construction development trend generation module 7 is used to record real-time infrastructure data based on a preset public timeline and construct a facility data set. A preset construction development analysis model analyzes the facility data set based on a machine self-learning algorithm to generate construction development trends corresponding to different types of facilities; An economic development trend generating module 8 is used to obtain economic data of the area to be evaluated, and to construct an economic data set based on the economic data of the history recorded on the public time axis, and to analyze the economic data set through a preset economic development model to generate an economic development trend; A facility and economic correlation coefficient generating module 9 is used to associate the construction development trend with the economic development trend based on the common time axis to analyze and generate a correlation coefficient between infrastructure construction and economic development; The second evaluation data generating module 10 is used to preset an economic evaluation model to analyze the correlation coefficient between the historical infrastructure construction and economic development to generate second evaluation data; The second resident evaluation data generating module 11 is used to obtain the residents' expected construction data, analyze the expected construction data to generate an expected development trend, compare the expected development trend with the construction development trend based on a preset development trend comparison model, and analyze and generate the second resident evaluation data; a second revised evaluation data generating module 12, configured to revise the second evaluation data based on the second resident evaluation data to generate second revised evaluation data; The assessment report generating module 13 is used to generate an assessment report on the regional distribution of infrastructure construction levels in the area to be assessed based on the first revised assessment data and the second revised assessment data.

[0069] For the specific definition of the infrastructure construction horizontal regional distribution assessment device, please refer to the definition of the infrastructure construction horizontal regional distribution assessment method above, which will not be repeated here. Each module in the above-mentioned infrastructure construction horizontal regional distribution assessment device can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the electronic device in the form of hardware, or can be stored in the memory of the electronic device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0070] In one embodiment, an electronic device is provided. The electronic device may be a server, and its internal structure diagram may be as follows: Figure 3As shown. The electronic device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the electronic device is used to provide computing and control capabilities. The memory of the electronic device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the electronic device is used to store a database. The network interface of the electronic device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for evaluating the horizontal regional distribution of infrastructure construction is implemented.

[0071] In one embodiment, an electronic device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program: Obtaining geographic data of the area to be evaluated, and constructing a three-dimensional model of the area to be evaluated based on a preset three-dimensional model of the area; Acquiring local policy data of the area to be assessed, generating expected facility distribution data based on the local policy data and the geographic data, and marking the expected facility distribution on the three-dimensional model of the area to be assessed, so as to generate an expected three-dimensional model marked with the expected infrastructure distribution; Acquire infrastructure data of the area to be evaluated, and mark actual facility construction on the three-dimensional model of the area to be evaluated according to the infrastructure data, wherein the infrastructure data includes the type, quantity, distribution and real-time status of the facilities, wherein the real-time status includes being planned, under construction and completed; Comparing the expected facility distribution data with the infrastructure data to generate construction difference data, and generating first evaluation data based on the construction difference data, the first evaluation data being used to represent an evaluation of a real-time construction situation; Acquire residents' evaluation survey feedback data and generate first resident evaluation data based on a preset satisfaction value analysis model; modifying the first assessment data based on the first resident evaluation data to generate first modified evaluation data; Recording real-time infrastructure data based on a preset public timeline and constructing a facility data set, and a preset construction development analysis model analyzes the facility data set based on a machine self-learning algorithm to generate construction development trends corresponding to different types of facilities; Obtaining economic data of the area to be evaluated, and constructing an economic data set based on the economic data of the history recorded on the public time axis, and analyzing the economic data set through a preset economic development model to generate an economic development trend; Correlating the construction development trend with the economic development trend based on the public timeline to analyze and generate a correlation coefficient between infrastructure construction and economic development; The preset economic evaluation model analyzes the correlation coefficient between the historical infrastructure construction and economic development to generate the second evaluation data; Acquire residents' expected construction data, analyze the expected construction data to generate an expected development trend, compare the expected development trend with the construction development trend based on a preset development trend comparison model, and analyze and generate second resident evaluation data; modifying the second evaluation data based on the second resident evaluation data to generate second modified evaluation data; A regional distribution assessment report on infrastructure construction level in the area to be assessed is generated based on the first revised assessment data and the second revised assessment data.

[0072] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented: Obtaining geographic data of the area to be evaluated, and constructing a three-dimensional model of the area to be evaluated based on a preset three-dimensional model of the area; Acquiring local policy data of the area to be assessed, generating expected facility distribution data based on the local policy data and the geographic data, and marking the expected facility distribution on the three-dimensional model of the area to be assessed, so as to generate an expected three-dimensional model marked with the expected infrastructure distribution; Acquire infrastructure data of the area to be evaluated, and mark actual facility construction on the three-dimensional model of the area to be evaluated according to the infrastructure data, wherein the infrastructure data includes the type, quantity, distribution and real-time status of the facilities, wherein the real-time status includes being planned, under construction and completed; Comparing the expected facility distribution data with the infrastructure data to generate construction difference data, and generating first evaluation data based on the construction difference data, the first evaluation data being used to represent an evaluation of a real-time construction situation; Acquire residents' evaluation survey feedback data and generate first resident evaluation data based on a preset satisfaction value analysis model; modifying the first assessment data based on the first resident evaluation data to generate first modified evaluation data; Recording real-time infrastructure data based on a preset public timeline and constructing a facility data set, and a preset construction development analysis model analyzes the facility data set based on a machine self-learning algorithm to generate construction development trends corresponding to different types of facilities; Obtaining economic data of the area to be evaluated, and constructing an economic data set based on the economic data of the history recorded on the public time axis, and analyzing the economic data set through a preset economic development model to generate an economic development trend; Correlating the construction development trend with the economic development trend based on the public timeline to analyze and generate a correlation coefficient between infrastructure construction and economic development; The preset economic evaluation model analyzes the correlation coefficient between the historical infrastructure construction and economic development to generate the second evaluation data; Acquire residents' expected construction data, analyze the expected construction data to generate an expected development trend, compare the expected development trend with the construction development trend based on a preset development trend comparison model, and analyze and generate second resident evaluation data; modifying the second evaluation data based on the second resident evaluation data to generate second modified evaluation data; A regional distribution assessment report on infrastructure construction level in the area to be assessed is generated based on the first revised assessment data and the second revised assessment data.

[0073] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be implemented by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.

[0074] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.

[0075] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for evaluating the regional distribution of infrastructure construction levels, It is characterized in that The method comprises the steps of: acquiring geographic data of the area to be evaluated, and constructing a three-dimensional model of the area to be evaluated based on a preset three-dimensional model of the area; Acquiring local policy data of the area to be assessed, generating expected facility distribution data based on the local policy data and the geographic data, and marking the expected facility distribution on the three-dimensional model of the area to be assessed, so as to generate an expected three-dimensional model marked with the expected infrastructure distribution; Acquire infrastructure data of the area to be evaluated, and mark actual facility construction on the three-dimensional model of the area to be evaluated according to the infrastructure data, wherein the infrastructure data includes the type, quantity, distribution and real-time status of the facilities, wherein the real-time status includes being planned, under construction and completed; Comparing the expected facility distribution data with the infrastructure data to generate construction difference data, and generating first evaluation data based on the construction difference data, the first evaluation data being used to represent an evaluation of a real-time construction situation; Acquire residents' evaluation survey feedback data and generate first resident evaluation data based on a preset satisfaction value analysis model; modifying the first assessment data based on the first resident evaluation data to generate first modified evaluation data; Recording real-time infrastructure data based on a preset public timeline and constructing a facility data set, wherein a preset construction development analysis model analyzes the facility data set based on a machine self-learning algorithm to generate construction development trends corresponding to different types of facilities; Obtaining economic data of the area to be evaluated, and constructing an economic data set based on the economic data of the history recorded on the public time axis, and analyzing the economic data set through a preset economic development model to generate an economic development trend; Correlating the construction development trend with the economic development trend based on the public timeline to analyze and generate a correlation coefficient between infrastructure construction and economic development; The preset economic evaluation model analyzes the correlation coefficient between the historical infrastructure construction and economic development to generate the second evaluation data; Acquire residents' expected construction data, analyze the expected construction data to generate an expected development trend, compare the expected development trend with the construction development trend based on a preset development trend comparison model, and analyze and generate second resident evaluation data; modifying the second evaluation data based on the second resident evaluation data to generate second modified evaluation data; A regional distribution assessment report on infrastructure construction level in the area to be assessed is generated based on the first revised assessment data and the second revised assessment data.

2. According to claim 1, a method for evaluating the regional distribution of infrastructure construction levels, It is characterized in that The step of obtaining local policy data of the area to be evaluated, generating expected facility distribution data based on the local policy data and the geographic data, and marking the expected facility distribution on the three-dimensional model of the area to be evaluated, so as to generate an expected three-dimensional model marked with expected infrastructure distribution, includes the following steps: Obtain policy documents, planning reports, construction codes and guidelines relevant to the area to be assessed; Analyze policy documents, planning reports, construction specifications and guidelines to generate expected facility distribution data corresponding to different development periods of the area to be assessed, wherein the expected facility distribution data includes the expected types, expected quantities, expected distribution density and expected status of infrastructure; The three-dimensional model of the area to be evaluated is marked based on the expected facility distribution data corresponding to different development periods to generate expected three-dimensional models corresponding to different development periods.

3. According to claim 1, a method for evaluating the regional distribution of infrastructure construction levels, It is characterized in that In the step of comparing the expected facility distribution data with the infrastructure data to generate construction difference data, and generating first evaluation data based on the construction difference data, the first evaluation data being used to represent the evaluation of the real-time construction situation, the construction difference data includes differences in types, quantities, distributions, and states of facilities; The first evaluation data calculation formula includes: ; is the score of the first evaluation data, Score the pre-set base assessments; is the basic weight, which is used to reflect the basic impact of facility types on the evaluation score; C is the facility type difference data, which is used to represent the diversity of different types of facilities in the area to be evaluated; is the quantity weight, which is used to reflect the impact of the number of facilities on the evaluation score; N is the total number of facilities, which indicates the total number of facilities in the area to be evaluated; D is the distribution density, which is used to indicate the uniformity of the distribution of facilities in the area; is the status weight, which reflects the impact of the expected status of the facility on the evaluation score; S is the status score, which is used to evaluate the status score of the facility.

4. A method for evaluating the regional distribution of infrastructure construction levels according to claim 3, It is characterized in that In the calculation formula of the first evaluation data calculation formula, S= ; ; is the total score among the planned facilities; is the total score of facilities under construction; is the total score of built facilities; is the facility score of the ith state; is the fluctuation value of the jth facility in state i; is the weight value of the jth facility in state i, and n is the total number of infrastructure facilities.

5. According to claim 1, a method for evaluating the regional distribution of infrastructure construction levels, It is characterized in that The step of obtaining residents' evaluation survey feedback data and generating first resident evaluation data based on a preset satisfaction value analysis model includes the following steps: Preprocessing the evaluation survey feedback data to obtain resident evaluation data, and recording the resident evaluation data to construct a resident evaluation data set; The satisfaction value analysis model analyzes the resident evaluation data set through a machine self-learning algorithm based on preset evaluation indicators and weights to generate residents' satisfaction with the level of infrastructure construction; The first resident evaluation data is generated based on residents’ satisfaction with the level of infrastructure construction.

6. A method for evaluating the regional distribution of infrastructure construction levels according to claim 1, It is characterized in that After recording real-time infrastructure data based on a preset public timeline and constructing a facility data set, a preset construction development analysis model analyzes the facility data set based on a machine self-learning algorithm to generate construction development trends corresponding to different types of facilities, the following steps are included: Acquiring operation data of the infrastructure, the operation data including energy consumption data, maintenance data and usage data; Record the operation data based on the common time axis and construct an operation data set; The preset demand analysis model analyzes the operation data set based on a machine self-learning algorithm to generate infrastructure demand data; comparing the infrastructure demand data with the infrastructure data to generate demand difference data; The demand difference data is analyzed to generate demand development trends corresponding to different infrastructures, and the demand development trends are used as a reference for subsequent construction.

7. A method for evaluating the regional distribution of infrastructure construction levels according to claim 6, It is characterized in that After the step of analyzing the demand difference data to generate demand development trends corresponding to different infrastructures, the following steps are included: The development trend comparison model compares the demand development trend with the construction development trend and analyzes and generates demand deviation evaluation data; The infrastructure construction level regional distribution assessment report is optimized based on the demand deviation evaluation data to generate an optimized infrastructure construction level regional distribution assessment report.

8. An infrastructure construction level regional distribution assessment device, applied to an infrastructure construction level regional distribution assessment method according to any one of claims 1 to 7, It is characterized in that The device comprises: a module (1) for constructing a three-dimensional model of the area to be evaluated, which is used to obtain geographic data of the area to be evaluated and construct a three-dimensional model of the area to be evaluated based on a preset three-dimensional model of the area; An expected three-dimensional model generation module (2) is used to obtain local policy data of the area to be evaluated, generate expected facility distribution data based on the local policy data and the geographic data, and mark the expected facility distribution on the three-dimensional model of the area to be evaluated, so as to generate an expected three-dimensional model marked with the expected infrastructure distribution; An actual facility construction marking module (3) is used to obtain infrastructure data of the area to be evaluated, and to mark the actual facility construction on the three-dimensional model of the area to be evaluated according to the infrastructure data, wherein the infrastructure data includes the type, quantity, distribution and real-time status of the facilities, wherein the real-time status includes being planned, being constructed and being completed; A first evaluation data generating module (4) is used to compare the expected facility distribution data with the infrastructure data to generate construction difference data, and to generate first evaluation data based on the construction difference data, wherein the first evaluation data is used to represent an evaluation of the real-time construction situation; A first resident evaluation data generating module (5), used to obtain residents' evaluation survey feedback data and generate first resident evaluation data based on a preset satisfaction value analysis model; a first revised evaluation data generating module (6), configured to revise the first evaluation data based on the first resident evaluation data to generate first revised evaluation data; A construction development trend generating module (7) is used to record real-time infrastructure data based on a preset public time axis and construct a facility data set, and a preset construction development analysis model analyzes the facility data set based on a machine self-learning algorithm to generate construction development trends corresponding to different types of facilities; An economic development trend generating module (8) is used to obtain economic data of the area to be evaluated, and to construct an economic data set based on the economic data of the history recorded on the public time axis, and to analyze the economic data set through a preset economic development model to generate an economic development trend; A facility and economic correlation coefficient generating module (9), used for associating the construction development trend with the economic development trend based on the common time axis, so as to analyze and generate a correlation coefficient between infrastructure construction and economic development; A second evaluation data generating module (10) is used to preset an economic evaluation model to analyze the correlation coefficient between the historical infrastructure construction and economic development to generate second evaluation data; A second resident evaluation data generating module (11) is used to obtain residents' expected construction data, analyze the expected construction data to generate an expected development trend, compare the expected development trend with the construction development trend based on a preset development trend comparison model, and analyze and generate second resident evaluation data; a second revised evaluation data generating module (12), configured to revise the second evaluation data based on the second resident evaluation data to generate second revised evaluation data; An assessment report generating module (13) is used to generate an assessment report on the regional distribution of infrastructure construction levels in the area to be assessed based on the first revised assessment data and the second revised assessment data.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the method for evaluating the horizontal regional distribution of infrastructure construction as described in any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the steps of a method for evaluating the horizontal regional distribution of infrastructure construction as described in any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Territorial space planning data acquisition system and method

    CN113506085A

  • Rural and town public service facility comprehensive evaluation method based on multi-source data

    CN117610962A

  • Emergency shelter adaptability evaluation method based on open source data

    CN118195424A

  • Method for analyzing regional characteristics and updating urban planning layout based on GIS (Geographic Information System) technology

    CN118536735A