Optimal load transfer method and device considering dual power supply, medium and equipment
By splitting the dual-power supply user nodes and building a virtual network in the load transfer method, the problems of electrical islands and dual-power supply are solved, the accuracy and solution efficiency of the load transfer model are improved, and the safety and stability of the power grid are ensured. run.
Patent Information
- Application Number
- CN202411370773.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-09-29
AI Technical Summary
The existing load transfer method has island problems and low solution efficiency when dealing with the demand for electrical islands and dual power supply, especially in practical applications, it is difficult to obtain transfer results that meet the requirements within a limited time.
通过将待优化网络中的双电源供电用户节点拆分为孪生节点,形成虚拟网络A和虚拟网络B,并在虚拟网络中引入虚拟发电机,构建目标函数和约束条件以形成最优负荷转供模型,确保网络在负荷转供过程中保持辐射状且节点连通,直接考虑双电源约束。
A load transfer model with complete constraints and accurate results is realized, which improves solution efficiency and accuracy, reduces the time cost of repeated trials, and ensures the safe, stable and economical operation of the power grid.
Smart Images

Figure CN118889418A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power grid technology, and in particular to an optimal load transfer method, device, medium and equipment considering dual power supply. Background Art
[0002] Load transfer is an important part of the daily operation and maintenance of distribution networks. Its function is to adjust the load distribution in the network by changing the opening and closing states of switches in normal operation or fault maintenance scenarios, so as to restore the load rate of heavily overloaded equipment to the normal operating range or minimize the accompanying load caused by fault maintenance, thereby achieving the purpose of safe and reliable operation of the power grid.
[0003] At present, there are two main ways to generate load transfer schemes: rule-based method and optimization method. Among them, the rule-based method is based on manual experience and operating procedures, and uses graph search theory to form a transfer scheme, but the effect of the generated scheme is poor, it cannot consider complex operating conditions and it is difficult to meet the needs of large-scale real-time applications; compared with the rule-based method, the optimization method not only considers more comprehensive constraints, but also generates better transfer schemes, but it still faces two problems in practical application. First, the operation of the distribution system must strictly ensure that the network is radial and all nodes are connected. However, there are a large number of zero-load nodes in the actual system, which can easily lead to islands in the optimized transfer scheme, even if the network radial constraints are considered. To address this problem, a common practice is to introduce a small load on each zero-load node to ensure that all nodes are connected. However, due to the large number of zero-load nodes in the actual system, this method will cause a large cumulative error. Second, in actual operation, in order to meet the power supply reliability of important users, it is generally required to provide dual power supply to them. In this regard, the current optimization method fails to incorporate it into the constraints for unified solution, but instead performs scheme verification after optimization to exclude schemes that do not meet the dual power supply requirements. This process often requires repeated trials, making it impossible to obtain a transfer result that meets the requirements within a limited time, which seriously restricts the actual application effect of the optimization method. Summary of the invention
[0004] The present invention provides an optimal load transfer method, device, medium and equipment considering dual power supply, which can generate a load transfer plan that meets both the safe operation requirements of the power grid and the power supply reliability of important users, and solves the problem of electrical islanding and the problem of unsatisfied dual power supply requirements.
[0005] According to a first aspect of the present invention, there is provided an optimal load transfer method considering dual power supply, comprising the following steps: Collect the operation data of the network to be optimized; Splitting the node connected to the dual-power supply user in the network to be optimized into two twin nodes to form a first topology network, which is equivalent to the network to be optimized; Copy two of the first topology networks as virtual network A and virtual network B respectively, introduce virtual generators on the main transformer nodes in virtual network A and virtual network B, wherein the virtual loads of all nodes in virtual network A are the first value, and the virtual loads of all nodes in virtual network B are 0 except for the virtual load of the twin node which is the first value; For the first topology network, a corresponding objective function is established in combination with the operating state of the network to be optimized, and a first constraint condition is established. A second constraint condition is established for virtual network A, and a third constraint condition is established for virtual network B to form an optimal load transfer model; Among them, the objective function includes a first objective function and a second objective function, the operating state corresponding to the first objective function is a normal operating state, and the operating state corresponding to the second objective function is a fault state; the first objective function includes feeder load balancing, main transformer load balancing, minimum transfer load, minimum network loss and minimum number of switch actions; the second objective function includes minimum power-off load, minimum number of power-off households and minimum number of switch actions; the first constraint condition includes main transformer capacity constraint, feeder capacity constraint, switch action number constraint, node power-off / power guarantee constraint, power balance constraint and network radiation constraint; the second constraint condition includes anti-electrical islanding constraint; the third constraint condition includes anti-electrical islanding constraint and dual power supply constraint; The optimal load transfer model is solved by using the operating data to obtain an optimization result, and a load transfer plan is generated based on the optimization result.
[0006] In one possible implementation, the feeder load balancing is expressed as: ; In the formula, is the collection of feeders in the distribution network; For feeder f Head end load factor; is the average feeder load rate; where, ; ; In the formula, To connect nodes i, j Feeder f The active power at the head end of i Flow to Node j , For feeder f The maximum active capacity of is the number of feeders; Access Node i Load d Active power of The main transformer load balancing is expressed as: ; In the formula, is the main variable set; is the load rate of the main transformer; is the average load factor of the main transformer; ; ; In the formula, Main change g Active power flowing out of the low voltage side, Represents the main transformer that does not participate in the transfer calculation g The sum of the power of the remaining feeders on the low voltage side; Main change g The maximum active capacity of The number of main variables; The minimum transfer load is expressed as: ; In the formula, is the feeder load factor; is the initial load rate of the feeder; The minimum network loss is expressed as: ; In the formula, Represents a collection of branches in a distribution network; For branch ij The resistance value; The minimum power-off load is expressed as: ; In the formula, is the set of nodes in the distribution network; For load d The weight of the load, the larger the weight, the higher the importance of the load; Representation Node i Whether it is powered on, 0 means power off, 1 means power on; The minimum number of households without power is expressed as: ; In the formula, Access Node i Number of users; The minimum number of switching operations is expressed as: ; In the formula, To connect nodes i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; This is the initial state of the switch.
[0007] In one possible implementation, the main transformer capacity constraint is expressed as: ; In the formula, Main change g Active power flowing out of the low voltage side, Main change g The maximum active capacity of The feeder capacity constraint is expressed as: ; In the formula, is the feeder active power, is the maximum active capacity of the feeder, To connect nodes i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; The switch action times constraint is expressed as: ; In the formula, Represents a collection of branches in a distribution network; is the maximum permissible number of switching operations, is the number of switch actions; The node power failure / power supply guarantee constraint is expressed as: ; In the formula, M is a constant, Representation Node i Whether it is powered, 0 means power off, 1 means power on. i If power supply is required, Must be 1; if the node i If power outage is required, Must be 0; The power balance constraint is expressed as: ; In the formula, Main change g Low pressure side inflow node i The active power, Access Node i Load d Active power of The network radiation constraint is expressed as: ; In the formula, is the total number of network nodes, The number of main variables, is the set of nodes in the distribution network.
[0008] In one possible implementation, the anti-electrical islanding constraint includes a power balance constraint of virtual network A, a branch power constraint of virtual network A, and an association constraint between virtual network A and the network to be optimized; The power balance constraint of the virtual network A is expressed as: ; In the formula, For Node i The virtual load introduced is ; For virtual nodes i state variables; For the branch ij Virtual power of Main change g Connected virtual nodes i The virtual power flowing into the corresponding virtual generator; The power constraint of the virtual network A branch is expressed as: ; In the formula, To connect to a virtual node i , j The state variables of the virtual branch switch, is a constant; The association constraint between the virtual network A and the network to be optimized is expressed as: , ; The connection nodes in the network to be optimized i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; Represents the nodes in the network to be optimized i Whether it is powered on, 0 means power off, 1 means power on; The virtual network B also satisfies the anti-electrical islanding constraint and the dual power supply constraint. The dual power supply constraint is expressed as: ; Main change g Connected virtual nodes i The virtual power flowing into the corresponding virtual generator.
[0009] According to a second aspect of the present invention, there is provided an optimal load transfer device considering dual power supply, comprising: A collection unit, used for collecting operation data of the network to be optimized; A first topology network forming unit, used for splitting the node connected to the dual-power supply user in the network to be optimized into two twin nodes to form a first topology network, which is equivalent to the network to be optimized; A replication unit, used to replicate two of the first topology networks, respectively as virtual network A and virtual network B, and introduce virtual generators on the main transformer nodes in virtual network A and virtual network B, wherein the virtual loads of all nodes in virtual network A are the first value, and the virtual loads of all nodes in virtual network B are 0 except for the virtual load of the twin node which is the first value; An optimal load transfer model forming unit is used to establish a corresponding objective function for the first topology network in combination with the operating state of the network to be optimized, and establish a first constraint condition, establish a second constraint condition for virtual network A, and establish a third constraint condition for virtual network B to form an optimal load transfer model; wherein the objective function includes a first objective function and a second objective function, the operating state corresponding to the first objective function is a normal operating state, and the operating state corresponding to the second objective function is a fault state; the first objective function includes feeder load balancing, main transformer load balancing, minimum transfer load, minimum network loss and minimum number of switch actions; the second objective function includes minimum power-off load, minimum number of power-off households and minimum number of switch actions; the first constraint condition includes main transformer capacity constraint, feeder capacity constraint, switch action number constraint, node power-off / power-guarantee constraint, power balance constraint, and network radiation constraint; the second constraint condition includes anti-electrical islanding constraint; the third constraint condition includes anti-electrical islanding constraint and dual power supply constraint; A generating unit is used to solve the optimal load transfer model by using the operating data to obtain an optimization result, and generate a load transfer plan based on the optimization result.
[0010] In one possible implementation, the feeder load balancing is expressed as: ; In the formula, is the collection of feeders in the distribution network; For feeder f Head end load factor; is the average feeder load rate; where, ; ; In the formula, To connect nodes i, j Feeder f The active power at the head end of i Flow to Node j , For feeder f The maximum active capacity of is the number of feeders; Access Node i Load d Active power of The main transformer load balancing is expressed as: ; In the formula, is the main variable set; Main change g Load factor; is the average load factor of the main transformer; ; ; In the formula, Main change g Active power flowing out of the low voltage side, Represents the main transformer that does not participate in the transfer calculation g The sum of the power of the remaining feeders on the low voltage side; Main change g The maximum active capacity of The number of main variables; The minimum transfer load is expressed as: ; In the formula, is the feeder load factor; is the initial load rate of the feeder; The minimum network loss is expressed as: ; In the formula, Represents a collection of branches in a distribution network; For branch ij The resistance value; The minimum power-off load is expressed as: ; In the formula, is the set of nodes in the distribution network; For load d The weight of the load, the larger the weight, the higher the importance of the load; Representation Node i Whether it is powered on, 0 means power off, 1 means power on; The minimum number of households without power is expressed as: ; In the formula, Access Node i Number of users; The minimum number of switching operations is expressed as: ; In the formula, To connect nodes i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; This is the initial state of the switch.
[0011] In one possible implementation, the main transformer capacity constraint is expressed as: ; In the formula, Main change g Active power flowing out of the low voltage side, Main change g The maximum active capacity of The feeder capacity constraint is expressed as: ; In the formula, is the feeder active power, is the maximum active capacity of the feeder, To connect nodes i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; The switch action times constraint is expressed as: ; In the formula, Represents a collection of branches in a distribution network; is the maximum permissible number of switching operations, is the number of switch actions; The node power failure / power supply guarantee constraint is expressed as: ; In the formula, M is a constant, Representation Node i Whether it is powered, 0 means power off, 1 means power on. i If power supply is required, Must be 1; if the node i If power outage is required, Must be 0; The power balance constraint is expressed as: ; In the formula, Main change g Low pressure side inflow node i The active power, Access Node i Load d Active power of The network radiation constraint is expressed as: ; In the formula, is the total number of network nodes, The number of main variables, is the set of nodes in the distribution network.
[0012] In one possible implementation, the anti-electrical islanding constraint includes a power balance constraint of virtual network A, a branch power constraint of virtual network A, and an association constraint between virtual network A and the network to be optimized; The power balance constraint of the virtual network A is expressed as: ; In the formula, For Node i The virtual load introduced is ; For virtual nodes i state variables; For the branch ij Virtual power of Main change g Connected virtual nodes i The virtual power flowing into the corresponding virtual generator; The power constraint of the virtual network A branch is expressed as: ; In the formula, To connect to a virtual node i , j The state variables of the virtual branch switch, is a constant; The association constraint between the virtual network A and the network to be optimized is expressed as: , ; The connection nodes in the network to be optimized i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; Represents the nodes in the network to be optimized i Whether it is powered on, 0 means power off, 1 means power on; The virtual network B also satisfies the anti-electrical islanding constraint and the dual power supply constraint. The dual power supply constraint is expressed as: ; Main change g Connected virtual nodes i The virtual power flowing into the corresponding virtual generator.
[0013] According to a third aspect of the present invention, there is provided an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to execute the optimal load transfer method considering dual power supply described in the present invention.
[0014] According to a fourth aspect of the present invention, there is provided a non-transitory computer-readable storage medium storing computer instructions for causing the computer to execute the optimal load transfer method considering dual power supply as described in the present invention.
[0015] The present invention provides an optimal load transfer method, device, medium and equipment considering dual power supply, which comprehensively considers the two key issues of electrical island and dual power supply, constructs a load transfer model with complete constraints and accurate results, and provides strong support for the safe, stable and economical operation of the distribution network; by associating and solving the switching states of the virtual network and the original network, it ensures that the entire network remains radial and the nodes are connected during the load transfer process, thereby solving the problem of electrical island; by utilizing the method of node splitting and twin node construction, the power supply behavior of dual power users is accurately modeled while maintaining network equivalence, and the dual power supply constraints can be directly considered in the solution process without subsequent verification, which significantly improves the solution efficiency and accuracy and reduces the time cost of repeated trials.
[0016] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features disclosed in the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The above and other objects, features and advantages of the exemplary embodiments of the present invention will become readily understood by reading the detailed description below with reference to the accompanying drawings. In the accompanying drawings, several embodiments of the present invention are shown in an exemplary and non-limiting manner, in which: In the drawings, the same or corresponding reference numerals represent the same or corresponding parts.
[0018] Figure 1 A flow chart of an optimal load transfer method considering dual power supply provided by the first embodiment of the present invention is shown; Figure 2 A schematic diagram of a dual power supply method provided in Embodiment 1 of the present invention is shown; Figure 3 A schematic diagram of splitting a dual-power supply user node into two twin nodes provided in Embodiment 1 of the present invention is shown; Figure 4 A schematic diagram of a linear segmented diagram of active power flow squared provided by the first embodiment of the present invention is shown; Figure 5 A structural diagram of an optimal load transfer device considering dual power supply provided by the second embodiment of the present invention is shown; Figure 6 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0019] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0020] In order to solve the above problems existing in the prior art, the embodiments of the present invention provide an optimal load transfer method, device, medium and equipment considering dual power supply, which are described in detail below.
[0021] Embodiment 1: like Figure 1 As shown, Figure 1 A flowchart of an optimal load transfer method considering dual power supply is provided in Embodiment 1 of the present invention. The method comprises the following steps: Collect the operation data of the network to be optimized.
[0022] Through the automation system and monitoring system of the distribution network, the real-time operation data of the network to be optimized (hereinafter referred to as the "original network") is fully collected. These data include but are not limited to the voltage, current, power factor, load size, connection relationship of feeder branches, importance weight of users, capacity of main transformers and feeders, switch status, and access location of dual-power supply users. Ensuring the accuracy and completeness of the data is the basis for subsequent analysis and optimization.
[0023] The nodes connected to the dual-power supply users in the network to be optimized are split into two twin nodes to form a first topology network, which is equivalent to the network to be optimized.
[0024] After obtaining the detailed data of the original network, the nodes connected to the dual-power supply users in the original network are specially processed. Specifically, these nodes are split into two interrelated twin nodes to simulate the actual path of dual power supply. This split method ensures that the power supply of each power supply to the user can be considered separately during the optimization process, while keeping the topology and electrical characteristics of the original network unchanged.
[0025] For important users such as government, hospitals, and schools, dual power supply is generally used. Figure 2 As shown, Figure 2 A schematic diagram of a dual power supply method is provided in the first embodiment of the present invention. i An important user of the company is powered by two power circuits, namely i - j ……G1 (abbreviated as G1 power circuit, which means nodei Via Node j and other switch branches in the middle are ultimately connected to the power supply G1) and i - k ……G2 (abbreviated as G2 power circuit, which means node i Via Node k and other switch branches in the middle are finally connected to power supply G2), where G1 and G2 are two different power supplies. In normal operation, one of the power supplies supplies power to the user (such as the G1 power supply circuit). When a fault occurs and the power supply cannot supply power to the user, it switches to another power supply (such as the G2 power supply circuit) to continue supplying power, thereby ensuring the power supply reliability of important users. In the transfer calculation, the generated transfer plan should ensure that the node i Improve the power supply reliability and avoid switching from dual power supply to single power supply.
[0026] like Figure 3 As shown, Figure 3 A schematic diagram of splitting a dual-power supply user node into two twin nodes provided in Embodiment 1 of the present invention. i Split into 2 twin nodes i 1 and i 2. Among them i 1Connect to the node j , i 2Connect to the node k . Original node i Total load The twin node i 1 and i 2. The corresponding constraints can be expressed as: ; Where: , , The original nodes i , Twin Node i 1. i 2 Whether it is powered 0-1 variable, 0 means power off, 1 means power on; original node i The load can be expressed as .
[0027] The corresponding relationship between the network after node splitting and the network before splitting is: if the transfer calculation is obtained , , then the original node i The load is finally connected to the twin node i 1, while i 1 and j connected, it shows that the original network switch branch after optimization ij In closed state, ik is in the open state; if , , then the original node i The load is finally connected to the twin node i 2, while i 2 and k connected, it indicates that the original network switch branch ij In the open state, ik is in closed state; if , , then the original network node i Power outage. It can be seen that the network is equivalent before and after splitting.
[0028] Copy two first topology networks as virtual network A and virtual network B respectively, introduce virtual generators on the main transformer nodes in virtual network A and virtual network B, wherein the virtual load of all nodes in virtual network A is the first value, and except for the twin node in virtual network B whose virtual load is the first value, the virtual load of other nodes is 0.
[0029] In order to more comprehensively consider various operating conditions and constraints, the first topology network is replicated twice, as virtual network A and virtual network B. In virtual network A, virtual loads are assigned to all nodes (including twin nodes) with a value of 1 to simulate the situation where all nodes need to be powered under normal operation. In virtual network B, virtual loads (value 1) are only assigned to twin nodes, and the virtual loads of the remaining nodes are set to 0 to evaluate the power supply reliability of dual power supply users separately.
[0030] It should be noted that the virtual load is set to 1 for example only, and can also be any other positive number, as long as the virtual load of all nodes in the same virtual network should use the same setting value to ensure the accuracy and comparability of the optimization results.
[0031] At the same time, virtual generators are introduced at the main transformer nodes of virtual networks A and B. These virtual generators do not actually generate electricity, but are used to simulate the output capacity of the main transformer under different load conditions so that the capacity limitation of the main transformer can be considered in the optimization process.
[0032] For the first topology network, the corresponding objective function is established in combination with the operating status of the network to be optimized, and the first constraint condition is established. The second constraint condition is established for virtual network A, and the third constraint condition is established for virtual network B to form an optimal load transfer model.
[0033] Based on the first topology network, virtual networks A and B, and combined with the operating status of the original network, an optimal load transfer model is constructed. The model includes an objective function and a series of constraints.
[0034] Objective function: The first objective function (for normal operation): consider feeder load balance, main transformer load balance, minimum transfer load, minimum network loss and minimum number of switch actions to optimize the operating efficiency and economy of the entire network.
[0035] 1) Feeder load balancing In normal operation, in order to leave enough safety margin and ensure the power supply quality, it is generally necessary to reasonably and evenly distribute the load to each branch to balance the line load. It can be expressed as: ; In the formula, is the collection of feeders in the distribution network; For feeder f Head end load factor; is the average feeder load rate; where, ; ; In the formula, To connect nodes i, j Feeder f The active power at the head end of i Flow to Node j , For feeder f The maximum active capacity of is the number of feeders; Access Node i Load d The active power.
[0036] 2) Main transformer load balancing Main transformer load balancing objective function It can be expressed as: ; In the formula, is the main variable set; Main change g Load factor; is the average load factor of the main transformer; ; ; In the formula, Main change g Active power flowing out of the low voltage side, Represents the main transformer that does not participate in the transfer calculation g The sum of the power of the remaining feeders on the low voltage side; Main change g The maximum active capacity of The number of main variables.
[0037] 3) Minimum transfer load When a feeder is overloaded, in order to reduce the impact on the opposite side of the transfer line, the load should be transferred as little as possible while meeting the feeder load rate requirements. The objective function It can be expressed as: ; In the formula, is the feeder load factor; is the initial load rate of the feeder.
[0038] 4) Minimum network loss The goal is to minimize active network loss, and the objective function is It can be expressed as: ; In the formula, Represents a collection of branches in a distribution network; For branch ij resistance value.
[0039] In the above formula As a square term, it is necessary to use piecewise linearization and convex optimization techniques for linear approximation. Figure 4 As shown, Figure 4 A schematic diagram of a linear segmented diagram of the square of active power flow provided in the first embodiment of the present invention. Divide into 2 L part( Figure 4 middle L =3), then the length of each segment is , No. l The slope of the segmented line is ,So A set of The linear constraint set representation is: ;represent Figure 4 Right half shaft part; ;represent Figure 4 Left half shaft part; In the formula, l =1,2,……, L .
[0040] 5) Minimum number of switching operations The goal is to minimize the number of switching actions, and the objective function It can be expressed as: ; In the formula, To connect nodes i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; This is the initial state of the switch.
[0041] The above formula contains absolute value operations. To facilitate the solution, auxiliary variables are generally introduced. and constraints: ; ; Convert it into equivalent: ; The weight is introduced in the above formula , which is used to distinguish the workload of different types of switch operations. Specifically, switches with remote control functions can be directly ordered to open and close from a distance, which requires less operation workload and high efficiency; switches without remote control functions need to be manually operated on-site, and the corresponding switch operation workload is large and the timeliness is poor (which means that the power outage time is longer in the event of a fault). In addition, different weights can be assigned based on the historical fault conditions of different switches / equipment, giving priority to switch equipment with high reliability and short commissioning time.
[0042] The second objective function (for fault conditions): consider the minimum power-off load, the minimum number of households without power, and the minimum number of switch actions to maximize the power supply to users when a fault occurs.
[0043] 1) Minimum power failure load / maximum power restoration load The objective is to minimize the total amount of weighted active power loss load, and the objective function is It can be expressed as: ; In the formula is the set of nodes in the distribution network; Access Node i Load d Active power of For load d The weight of the load, the larger the weight, the higher the importance of the load; Representation Node i Whether it is powered on, 0 means power off, 1 means power on.
[0044] 2) Minimum number of households without power The objective is to minimize the number of power-off load users, and the objective function It can be expressed as: ; In the formula, Access Node i The number of users.
[0045] 3) Minimum number of switching operations Same as the first objective function formula 5), so it will not be repeated here.
[0046] Constraints: The first constraint condition (for the first topology network): includes main transformer capacity constraint, feeder capacity constraint, switch action times constraint, node power failure / power supply constraint, power balance constraint and network radiation constraint, to ensure the feasibility and safety of the optimization scheme in actual operation.
[0047] 1) Main transformer capacity constraints The active power of each main transformer should be within its operating range, that is, ; In the formula, Main change g Active power flowing out of the low voltage side, Main change g The maximum active capacity.
[0048] To prevent power backflow, the lower limit should be 0.
[0049] 2) Feeder capacity constraints Each feeder in the distribution network has a certain transmission capacity. If the actual transmission power is too large, the line heat will increase sharply, resulting in increased losses and damage to the line. The feeder capacity constraint can be expressed as: ; In the formula, is the feeder active power, is the maximum active capacity of the feeder, To connect nodes i, j The opening and closing status of the branch switch, 0 means the switch is open, and 1 means the switch is closed.
[0050] For the switch branch, The maximum value of the feeder capacity can be taken.
[0051] 3) Switch action constraints The number of switching actions should not exceed the given value, i.e. ; In the formula, is the maximum permissible number of switching operations, is the number of switch actions.
[0052] 4) Node power failure / power supply constraints node i Power failure( ), then with the node i The power of the relevant branch is 0, that is, ; In the formula, M is a constant, it can be taken ; Representation Node i Whether it is powered on, 0 means power off, 1 means power on; If the access node i The load needs to be powered. should be forced to 1, i.e. ; If the access node i The load needs to be powered off (maintenance power outage, fault power outage and cannot be transferred), then Should be forced to 0, i.e. .
[0053] 5) Power balance constraints The power flowing into and out of each node should be equal, that is, ; In the formula, Main change g Low pressure side inflow node i The active power, Access Node i Load d The active power, Representation Node i Whether it is powered on, 0 means power off, 1 means power on; For the branch ij The active power.
[0054] 6) Network Radiation Constraints In order to protect the setting and reduce the short-circuit current, the distribution network is generally required to operate in a radial manner, that is, there is no ring topology in the network. It can be expressed as: ; In the formula, is the total number of network nodes, The number of main variables, is the set of nodes in the distribution network, Representation Node i Whether it is powered on, 0 means power off, 1 means power on.
[0055] The second constraint condition (for virtual network A): mainly adds anti-electrical islanding constraints to prevent node islanding from occurring during the optimization process.
[0056] There are a large number of zero-load nodes in the actual network, and the nodes cannot be guaranteed to be connected only by relying on the network radial constraints. In order to solve this problem, the method of the present invention first builds a virtual network A based on the original network by copying nodes and branches. Then, a virtual load is introduced at each node of the virtual network A, and a virtual generator is introduced at each main transformer node. The node virtual flow balance condition is used to ensure the connectivity of the virtual network A. Finally, the switch state and node state in the virtual network A and the original network are associated and solved to achieve the connectivity of the original network.
[0057] The power balance constraint of virtual network A can be expressed as: ; Where: For Node i The virtual load introduced is ; For virtual nodes i state variables; For the branch ij Virtual power of Main change g Connected virtual nodes i The virtual power flowing into the corresponding virtual generator.
[0058] The power constraint of virtual network A branch can be expressed as: ; Where: To connect to a virtual node i , j The state variables of the virtual branch switch, is a larger constant; The association constraint between virtual network A and the original network can be expressed as: ; ; Since there are no zero-load nodes in virtual network A (the virtual load of each node is 1), in order to meet the power balance condition of virtual network nodes, the optimized virtual network nodes must be connected. And because virtual network A and the original network share the same set of switching schemes, there will be no electrical islands in the optimized original network. Compared with the previous practice of adding load to the original network to avoid islands, the present invention adds virtual loads to virtual network A without changing the load parameters of the original network, ensuring the accuracy of the model.
[0059] The third constraint condition (for virtual network B): On the basis of the anti-electrical islanding constraint, a dual power supply constraint is added to ensure that dual power supply users always meet the power supply reliability requirements during the optimization process.
[0060] like Figure 3 As shown, the twin nodes i 1. i 2 are not directly connected. If the node i 1. i 2 have different power supplies, then the original node is ensured i The main method is: refer to the practice of preventing electrical islands, copy the first topology network, and i 1. i 2 respectively introduces a virtual load with a value of 1, introduces a virtual generator at each main transformer node, and constructs a virtual network B. Different from virtual network A, in virtual network B, except for node i 1. i 2, the virtual load values of the other nodes are all 0.
[0061] Virtual network B also needs to meet the same constraints as virtual network A, which can be expressed as follows: ; ; ; ; Where: Node B of the virtual network i The virtual load introduced is , the virtual load of other nodes is 0; For virtual nodes i state variables; For the branch ij Virtual power of Main change g Connected virtual nodes i The virtual power flowing into the corresponding virtual generator; To connect to a virtual node i , j The state variables of the virtual branch switch.
[0062] node i 1. i The virtual load of 2 should be powered by different power supplies, and the load carried by each power supply should not exceed 1, which can meet the dual power supply constraint. The dual power supply constraint can be expressed as: ; Ensures twin nodes after splitting i 1. i 2 has different power supplies. According to the equivalence relationship before and after the network split, the original network nodes i Meet the requirements of dual power supply.
[0063] The operating data is used to solve the optimal load transfer model and obtain the optimization results. Based on the optimization results, a load transfer plan is generated.
[0064] Using intelligent optimization algorithms (such as genetic algorithms, particle swarm optimization algorithms, etc.) or operations research optimization theories (such as linear programming, mixed integer programming, etc.), such as branch and bound method and cutting plane method, combined with the collected operation data, the constructed optimal load transfer model is solved. Through multiple iterative calculations, a solution that satisfies all constraints and has the optimal objective function value is found.
[0065] Based on the optimization results obtained by solving, a load transfer plan is automatically generated. The plan lists in detail the equipment that needs to adjust the switch status, the transfer path, the load distribution and other information. Operation and maintenance personnel can implement load transfer operations according to the plan to improve the operation status of the network or respond to faults. At the same time, the plan can also serve as a reference and basis for future operation and maintenance work to further improve the operation efficiency and reliability of the distribution network.
[0066] An optimal load transfer method considering dual power supply provided in Example 1 of the present invention comprehensively considers the two key issues of electrical island and dual power supply, constructs a load transfer model with complete constraints and accurate results, and provides strong support for the safe, stable and economical operation of the distribution network; by associating and solving the switching states of the virtual network and the original network, it is ensured that the entire network remains radial and the nodes are connected during the load transfer process, thereby solving the problem of electrical island; by utilizing the method of node splitting and twin node construction, the power supply behavior of dual power users is accurately modeled while maintaining network equivalence, and the dual power supply constraints can be directly considered in the solution process without the need for subsequent verification, which significantly improves the solution efficiency and accuracy and reduces the time cost of repeated trials.
[0067] Embodiment 2: like Figure 5 As shown, Figure 5 A structural diagram of an optimal load transfer device considering dual power supply provided in the second embodiment of the present invention. The device includes: A collection unit, used for collecting operation data of the network to be optimized; A first topology network forming unit, used for splitting the node connected to the dual-power supply user in the network to be optimized into two twin nodes to form a first topology network, which is equivalent to the network to be optimized; A replication unit, used for replicating two first topology networks, respectively serving as virtual network A and virtual network B, introducing virtual generators on main transformer nodes in virtual network A and virtual network B, wherein virtual loads of all nodes in virtual network A are the first value, and virtual loads of all nodes in virtual network B are 0 except for the virtual load of the twin node whose virtual load is the first value; The optimal load transfer model forming unit is used to establish a corresponding objective function for the first topology network in combination with the operating state of the network to be optimized, and establish a first constraint condition, establish a second constraint condition for virtual network A, and establish a third constraint condition for virtual network B to form an optimal load transfer model; wherein the objective function includes a first objective function and a second objective function, the operating state corresponding to the first objective function is a normal operating state, and the operating state corresponding to the second objective function is a fault state; the first objective function includes feeder load balancing, main transformer load balancing, minimum transfer load, minimum network loss and minimum number of switch actions; the second objective function includes minimum power-off load, minimum number of power-off households and minimum number of switch actions; the first constraint condition includes main transformer capacity constraint, feeder capacity constraint, switch action number constraint, node power-off / power-guarantee constraint, power balance constraint, and network radiation constraint; the second constraint condition includes anti-electrical islanding constraint; the third constraint condition includes anti-electrical islanding constraint and dual power supply constraint; The generation unit is used to solve the optimal load transfer model by using the operation data, obtain the optimization result, and generate the load transfer plan based on the optimization result.
[0068] Specifically, feeder load balancing is expressed as: ; In the formula, is the collection of feeders in the distribution network; For feeder f Head end load factor; is the average feeder load rate; where, ; ; In the formula, To connect nodes i, j Feeder f The active power at the head end of i Flow to Node j , For feeder f The maximum active capacity of is the number of feeders; The load balancing of the main transformer is expressed as: ; In the formula, is the main variable set; Main change g Load factor; is the average load factor of the main transformer; ; ; In the formula, Main change gActive power flowing out of the low voltage side, Represents the main transformer that does not participate in the transfer calculation g The sum of the power of the remaining feeders on the low voltage side; Main change g The maximum active capacity of The number of main variables; The minimum transfer load is expressed as: ; In the formula, is the initial load rate of the feeder; The minimum network loss is expressed as: ; In the formula, Represents a collection of branches in a distribution network; For branch ij The resistance value; The minimum power-off load is expressed as: ; In the formula, is the set of nodes in the distribution network; Access Node i Load d Active power of For load d The weight of the load, the larger the weight, the higher the importance of the load; Representation Node i Whether it is powered on, 0 means power off, 1 means power on; The minimum number of households losing power is expressed as: ; In the formula, Access Node i Number of users; The minimum number of switching operations is expressed as: ; In the formula, To connect nodes i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; This is the initial state of the switch.
[0069] Specifically, the main transformer capacity constraint is expressed as: ; In the formula, Main change g Active power flowing out of the low voltage side, Main change g The maximum active capacity of The feeder capacity constraint is expressed as: ; In the formula, is the feeder active power, is the maximum active capacity of the feeder, To connect nodes i, jThe opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; The switch action times constraint is expressed as: ; In the formula, is the maximum permissible number of switching operations, is the number of switch actions; The node power failure / power supply guarantee constraint is expressed as: ; In the formula, M is a constant, Representation Node i Whether it is powered, 0 means power off, 1 means power on. i If power supply is required, Must be 1; if the node i If power outage is required, Must be 0; The power balance constraint is expressed as: ; In the formula, Main change g Low pressure side inflow node i The active power, Access Node i Load d The active power, Representation Node i Whether it is powered on, 0 means power off, 1 means power on; For the branch ij Active power of The network radiation constraint is expressed as: ; In the formula, is the total number of network nodes, The number of main variables, is the set of nodes in the distribution network, Representation Node i Whether it is powered on, 0 means power off, 1 means power on.
[0070] Specifically, the electrical island prevention constraints include power balance constraints of virtual network A, power constraints of branches of virtual network A, and association constraints between virtual network A and the network to be optimized; The power balance constraint of virtual network A is expressed as: ; In the formula, For Node i The virtual load introduced is ; For virtual nodes i state variables; For the branch ij Virtual power of Main change g Connected virtual nodes iThe virtual power flowing into the corresponding virtual generator; The power constraint of virtual network A branch is expressed as: ; In the formula, To connect to a virtual node i , j The state variables of the virtual branch switch, is a constant; The association constraints between virtual network A and the network to be optimized are expressed as: , ; Virtual network B also meets the anti-electrical islanding constraint and the dual power supply constraint. The dual power supply constraint is expressed as: ; Main change g Connected virtual nodes i The virtual power flowing into the corresponding virtual generator.
[0071] The optimal load transfer device considering dual power supply provided in the second embodiment of the present invention has the same implementation principle and technical effects as those of the aforementioned method embodiment 1. For the sake of brief description, for matters not mentioned in the device embodiment, reference can be made to the corresponding contents in the aforementioned method embodiment 1.
[0072] According to an embodiment of the present invention, the present invention also provides an electronic device and a readable storage medium.
[0073] Figure 6 A schematic block diagram of an example electronic device 600 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0074] like Figure 6 As shown, the device 600 includes a computing unit 601, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 602 or a computer program loaded from a storage unit 608 into a random access memory (RAM) 603. In the RAM 603, various programs and data required for the operation of the device 600 can also be stored. The computing unit 601, the ROM 602, and the RAM 803 are connected to each other via a bus 604. An input / output (I / O) interface 605 is also connected to the bus 604.
[0075] A number of components in the device 600 are connected to the I / O interface 605, including: an input unit 606, such as a keyboard, a mouse, etc.; an output unit 607, such as various types of displays, speakers, etc.; a storage unit 608, such as a disk, an optical disk, etc.; and a communication unit 609, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 609 allows the device 600 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0076] The computing unit 601 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 601 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 601 performs the various methods and processes described above, such as the optimal load transfer method considering dual power supply. For example, in some embodiments, the optimal load transfer method considering dual power supply may be implemented as a computer software program, which is tangibly included in a machine-readable medium, such as a storage unit 608. In some embodiments, part or all of the computer program may be loaded and / or installed on the device 600 via the ROM 602 and / or the communication unit 609. When the computer program is loaded into the RAM 603 and executed by the computing unit 601, one or more steps of the optimal load transfer method considering dual power supply described above may be performed. Alternatively, in other embodiments, the computing unit 601 may be configured in any other appropriate manner (eg, by means of firmware) to execute the optimal load transfer method considering dual power supply.
[0077] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0078] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.
[0079] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0080] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0081] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.
[0082] A computer system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship with each other. The server may be a cloud server, a server of a distributed system, or a server combined with a blockchain.
[0083] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution disclosed in the present invention can be achieved, and this document does not limit this.
[0084] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0085] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. An optimal load transfer method considering dual power supply, characterized in that: The following steps are involved: Collect the operation data of the network to be optimized; Splitting the node connected to the dual-power supply user in the network to be optimized into two twin nodes to form a first topology network, which is equivalent to the network to be optimized; Copy two of the first topology networks as virtual network A and virtual network B respectively, introduce virtual generators on the main transformer nodes in virtual network A and virtual network B, wherein the virtual loads of all nodes in virtual network A are the first value, and the virtual loads of all nodes in virtual network B are 0 except for the virtual load of the twin node which is the first value; For the first topology network, a corresponding objective function is established in combination with the operating state of the network to be optimized, and a first constraint condition is established. A second constraint condition is established for virtual network A, and a third constraint condition is established for virtual network B to form an optimal load transfer model; Among them, the objective function includes a first objective function and a second objective function, the operating state corresponding to the first objective function is a normal operating state, and the operating state corresponding to the second objective function is a fault state; the first objective function includes feeder load balancing, main transformer load balancing, minimum transfer load, minimum network loss and minimum number of switch actions; the second objective function includes minimum power-off load, minimum number of power-off households and minimum number of switch actions; the first constraint condition includes main transformer capacity constraint, feeder capacity constraint, switch action number constraint, node power-off / power guarantee constraint, power balance constraint and network radiation constraint; the second constraint condition includes anti-electrical islanding constraint; the third constraint condition includes anti-electrical islanding constraint and dual power supply constraint; The optimal load transfer model is solved by using the operating data to obtain an optimization result, and a load transfer plan is generated based on the optimization result.
2. The optimal load transfer method considering dual power supply according to claim 1, characterized in that: The feeder load balancing is expressed as: ; In the formula, is the collection of feeders in the distribution network; For feeder f Head end load factor; is the average feeder load rate; where, ; ; In the formula, To connect nodes i, j Feeder f The active power at the head end of i Flow to Node j , For feeder f Maximum active capacity; is the number of feeders; Access Node i Load d Active power of The main transformer load balancing is expressed as: ; In the formula, is the main variable set; Main change g Load factor; is the average load factor of the main transformer; ; ; In the formula, Main change g Active power flowing out of the low voltage side, Represents the main transformer that does not participate in the transfer calculation g The sum of the power of the remaining feeders on the low voltage side; Main change g Maximum active capacity; The number of main variables; The minimum transfer load is expressed as: ; In the formula, is the feeder load factor; is the initial load rate of the feeder; The minimum network loss is expressed as: ; In the formula, Represents a collection of branches in a distribution network; For branch ij The resistance value; The minimum power-off load is expressed as: ; In the formula, is the set of nodes in the distribution network; For load d The weight of the load, the larger the weight, the higher the importance of the load; Representation Node i Whether it is powered on, 0 means power off, 1 means power on; The minimum number of households without power is expressed as: ; In the formula, Access Node i Number of users; The minimum number of switching operations is expressed as: ; In the formula, To connect nodes i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; This is the initial state of the switch.
3. The optimal load transfer method considering dual power supply according to claim 1, characterized in that: The main transformer capacity constraint is expressed as: ; In the formula, Main change g Active power flowing out of the low voltage side, Main change g Maximum active capacity; The feeder capacity constraint is expressed as: ; In the formula, is the feeder active power, is the maximum active capacity of the feeder, To connect nodes i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; The switch action times constraint is expressed as: ; In the formula, Represents a collection of branches in a distribution network; is the maximum permissible number of switching operations, is the number of switch actions; The node power failure / power supply guarantee constraint is expressed as: ; In the formula, M is a constant, Representation Node i Whether it is powered, 0 means power off, 1 means power on. i If power supply needs to be guaranteed, Must be 1; if the node i If power outage is required, Must be 0; The power balance constraint is expressed as: ; In the formula, Main change g Low pressure side inflow node i The active power, Access Node i Load d Active power of The network radiation constraint is expressed as: ; In the formula, is the total number of network nodes, The number of main variables, is the set of nodes in the distribution network.
4. The optimal load transfer method considering dual power supply according to claim 1, characterized in that: The anti-electrical islanding constraints include virtual network A power balance constraints, virtual network A branch power constraints, and association constraints between virtual network A and the network to be optimized; The power balance constraint of the virtual network A is expressed as: ; In the formula, For Node i The virtual load introduced is ; For virtual nodes i state variables; For the branch ij Virtual power of Main change g Connected virtual nodes i The virtual power flowing into the corresponding virtual generator; The power constraint of the virtual network A branch is expressed as: ; In the formula, To connect to a virtual node i , j The state variables of the virtual branch switch, is a constant; The association constraint between the virtual network A and the network to be optimized is expressed as: , ; The connection nodes in the network to be optimized i , j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; Represents the nodes in the network to be optimized i Whether it is powered on, 0 means power off, 1 means power on; The virtual network B also satisfies the anti-electrical islanding constraint and the dual power supply constraint. The dual power supply constraint is expressed as: ; Main change g Connected virtual nodes i The virtual power flowing into the corresponding virtual generator.
5. An optimal load transfer device considering dual power supply, characterized in that: include: A collection unit, used for collecting operation data of the network to be optimized; A first topology network forming unit, used for splitting the node connected to the dual-power supply user in the network to be optimized into two twin nodes to form a first topology network, which is equivalent to the network to be optimized; A replication unit, used to replicate two of the first topology networks, respectively as virtual network A and virtual network B, and introduce virtual generators on the main transformer nodes in virtual network A and virtual network B, wherein the virtual loads of all nodes in virtual network A are the first value, and the virtual loads of all nodes in virtual network B are 0 except for the virtual load of the twin node which is the first value; An optimal load transfer model forming unit is used to establish a corresponding objective function for the first topology network in combination with the operating state of the network to be optimized, and establish a first constraint condition, establish a second constraint condition for virtual network A, and establish a third constraint condition for virtual network B to form an optimal load transfer model; wherein the objective function includes a first objective function and a second objective function, the operating state corresponding to the first objective function is a normal operating state, and the operating state corresponding to the second objective function is a fault state; the first objective function includes feeder load balancing, main transformer load balancing, minimum transfer load, minimum network loss and minimum number of switch actions; the second objective function includes minimum power-off load, minimum number of power-off households and minimum number of switch actions; the first constraint condition includes main transformer capacity constraint, feeder capacity constraint, switch action number constraint, node power-off / power-guarantee constraint, power balance constraint, and network radiation constraint; the second constraint condition includes anti-electrical islanding constraint; the third constraint condition includes anti-electrical islanding constraint and dual power supply constraint; A generating unit is used to solve the optimal load transfer model by using the operating data to obtain an optimization result, and generate a load transfer plan based on the optimization result.
6. The optimal load transfer device considering dual power supply according to claim 5, characterized in that: The feeder load balancing is expressed as: ; In the formula, is the collection of feeders in the distribution network; For feeder f Head end load factor; is the average feeder load rate; where, ; ; In the formula, To connect nodes i, j Feeder f The active power at the head end of i Flow to Node j , For feeder f Maximum active capacity; is the number of feeders; Access Node i Load d Active power of The main transformer load balancing is expressed as: ; In the formula, is the main variable set; Main change g Load factor; is the average load factor of the main transformer; ; ; In the formula, Main change g Active power flowing out of the low voltage side, Represents the main transformer that does not participate in the transfer calculation g The sum of the power of the remaining feeders on the low voltage side; Main change g Maximum active capacity; The number of main variables; The minimum transfer load is expressed as: ; In the formula, is the feeder load factor; is the initial load rate of the feeder; The minimum network loss is expressed as: ; In the formula, Represents a collection of branches in a distribution network; For branch ij The resistance value; The minimum power-off load is expressed as: ; In the formula, is the set of nodes in the distribution network; For load d The weight of the load, the larger the weight, the higher the importance of the load; Representation Node i Whether it is powered on, 0 means power off, 1 means power on; The minimum number of households without power is expressed as: ; In the formula, Access Node i Number of users; The minimum number of switching operations is expressed as: ; In the formula, To connect nodes i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; This is the initial state of the switch.
7. The optimal load transfer device considering dual power supply according to claim 5, characterized in that: The main transformer capacity constraint is expressed as: ; In the formula, Main change g Active power flowing out of the low voltage side, Main change g The maximum active capacity of The feeder capacity constraint is expressed as: ; In the formula, is the feeder active power, is the maximum active capacity of the feeder, To connect nodes i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; The switch action times constraint is expressed as: ; In the formula, Represents a collection of branches in a distribution network; is the maximum permissible number of switching operations, is the number of switch actions; The node power failure / power supply guarantee constraint is expressed as: ; In the formula, M is a constant, Representation Node i Whether it is powered, 0 means power off, 1 means power on. i If power supply is required, Must be 1; if the node i If power outage is required, Must be 0; The power balance constraint is expressed as: ; In the formula, Main change g The active power flowing into node i from the low voltage side, Access Node i Load d Active power of The network radiation constraint is expressed as: ; In the formula, is the total number of network nodes, The number of main variables, is the set of nodes in the distribution network.
8. The optimal load transfer device considering dual power supply according to claim 5, characterized in that: The anti-electrical islanding constraints include virtual network A power balance constraints, virtual network A branch power constraints, and association constraints between virtual network A and the network to be optimized; The power balance constraint of the virtual network A is expressed as: ; In the formula, For Node i The virtual load introduced is ; For virtual nodes i state variables; For the branch ij Virtual power of Main change g Connected virtual nodes i The virtual power flowing into the corresponding virtual generator; The power constraint of the virtual network A branch is expressed as: ; In the formula, To connect to a virtual node i , j The state variables of the virtual branch switch, is a constant; The association constraint between the virtual network A and the network to be optimized is expressed as: , ; The connection nodes in the network to be optimized i, j The opening and closing state of the branch switch, 0 means the switch is open, and 1 means the switch is closed; Represents the nodes in the network to be optimized i Whether it is powered on, 0 means power off, 1 means power on; The virtual network B also satisfies the anti-electrical islanding constraint and the dual power supply constraint. The dual power supply constraint is expressed as: ; Main change g Connected virtual nodes i The virtual power flowing into the corresponding virtual generator.
9. An electronic device, characterized in that: include: at least one processor; as well as a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the method according to any one of claims 1 to 4.
10. A non-transitory computer-readable storage medium storing computer instructions, characterized in that: The computer instructions are used to cause the computer to execute the method according to any one of claims 1-4.
Citation Information
Patent Citations
Active power distribution network fault load transfer method based on intelligent particle swarm optimization algorithm
CN110086153A
Virtual power plant energy collaborative optimization method considering source-load-storage interaction
CN113326994A
Power distribution network fault recovery rolling optimization method considering load photovoltaic randomness
CN115133573A
Non-fault area power supply recovery method and system considering distributed power supply access
CN116316570A
Voltage optimization control method for digital twin-driven power distribution system
CN117277326A
Cited By
Automatic compilation method and system of distribution network transfer strategy based on reinforcement learning
CN121436732A