Interconnected power grid load frequency control method, device and product
By receiving the changing signals of the energy storage system and updating the load frequency control parameters using the Lyapunov stability theory, the impact of random access or exit of the energy storage system on the frequency stability of the power grid is solved, and the stability and adaptability of the power grid in extreme weather is improved. .
Patent Information
- Application Number
- CN202411002838.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-01
AI Technical Summary
The existing load frequency control system fails to effectively deal with the random access or exit of the energy storage system, resulting in the impact of the grid frequency stability under extreme weather conditions, and the uncertainty of the control structure may cause the risk of instability.
By receiving changing signals from the energy storage system, determining the operating status of the power grid, and using Lyapunov stability theory to calculate the control parameters of the load frequency control system, updating the control system to adapt to the access or exit behavior of the energy storage system, ensuring the output power and load of the power grid Power consumption balance.
It improves the frequency stability of the power grid under extreme weather conditions, enhances the adaptability to the random access or exit behavior of the energy storage system, reduces frequency deviation and control errors, and ensures the stable operation of the power grid.
Smart Images

Figure CN118889466A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of power system control technology, and in particular to a method, device and product for controlling load frequency of an interconnected power grid. Background Art
[0002] Load Frequency Control (LFC) is an important technical means to balance the power supply and demand in the power grid by adjusting the active power output of the generator set to ensure that the frequency of the power system is maintained at a predetermined stable level.
[0003] As intermittent renewable energy sources such as wind power and photovoltaic power continue to increase in the power system, the output of these renewable energy sources is highly uncertain, which is superimposed on the fluctuations in the load demand of the power system, resulting in frequent imbalances in power supply and demand in the interconnected power grid, causing frequency deviation problems. In addition, extreme weather conditions, such as typhoons and heavy rains, will further aggravate the fluctuations in renewable energy output, posing greater challenges to the power balance and frequency stability of the power system. In order to meet these challenges, the traditional LFC mechanism needs to be further improved and optimized.
[0004] By utilizing the fast response characteristics of energy storage systems (ESSs) to provide additional frequency regulation capacity to participate in LFC, the frequency stability of interconnected power grids under extreme weather conditions can be effectively enhanced, and thus has attracted widespread attention from scholars. However, energy storage systems are constrained by the state of charge (SoC). In order to avoid safety operation problems caused by overcharging / overdischarging, energy storage systems will not be able to continue to participate in the LFC process when their SoC exceeds the safety range. In addition, due to unplanned operation and maintenance, sudden failures, and other reasons, energy storage systems may also have problems with random access and exit. However, existing literature generally assumes that energy storage systems always participate in the LFC process for design, without considering the random access / exit of energy storage systems, and the uncertain changes in the control structure of the LFC system caused by this situation, which impacts the frequency deviation damping performance and even causes the risk of instability of the LFC system. Summary of the invention
[0005] The purpose of this application is to provide a method, device and product for load frequency control of an interconnected power grid, which can enable the load frequency control of the interconnected power grid to adapt to the random access or exit behavior of the energy storage system, and can effectively improve the frequency stability of the power grid under extreme weather conditions.
[0006] To achieve the above objectives, this application provides the following solutions:
[0007] In a first aspect, the present application provides a method for controlling load frequency of an interconnected power grid, the method comprising:
[0008] Receive a change signal of the energy storage system within the target range; the change signal includes a grid access signal and a grid exit signal; the target range is the range covered by the grid, and the target range includes several areas;
[0009] Determining the current operating state of the power grid according to the change signal of the energy storage system;
[0010] Determine the control parameters of the load frequency control system according to the current operation state of the power grid; the control parameters are calculated using the Lyapunov stability theory; the control parameters include control gain;
[0011] updating the load frequency control system according to the control parameters to obtain an updated load frequency control system;
[0012] According to the updated load frequency control system, the output of the power grid at the next moment is adjusted with the goal of achieving a balance between the output power of the power grid and the power consumption of the load.
[0013] In a second aspect, the present application provides a computer device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement any of the above-described methods for controlling the load frequency of an interconnected power grid.
[0014] In a third aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements any of the above-mentioned methods for controlling the load frequency of an interconnected power grid.
[0015] According to the specific embodiments provided in this application, this application discloses the following technical effects:
[0016] The present application provides a method, device and product for load frequency control of an interconnected power grid. The present application first receives a change signal of an energy storage system within a target range, and the change signal includes a grid access signal and a grid exit signal, which obviously takes into account the random access / exit of the energy storage system; secondly, the operating state of the power grid at the current moment is determined according to the change signal of the received energy storage system, and then the control parameters of the load frequency control system calculated by the Lyapunov stability theory are used to update the load frequency control system, and then the power output of the power grid is precisely adjusted according to the updated load frequency control system, so that the output power of the power grid and the power consumption of the load are balanced, and the stability of the power grid frequency is maintained. The above scheme of the present application can enable the load frequency control of the interconnected power grid to adapt to the random access or exit behavior of the energy storage system, and can effectively improve the frequency stability of the power grid under extreme weather conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 This is an application environment diagram of an interconnected power grid load frequency control method in one embodiment of the present application;
[0019] Figure 2 A schematic diagram of an interconnected power grid LFC system architecture considering energy storage assistance provided in an embodiment of the present application;
[0020] Figure 3 A schematic flow chart of a method for controlling load frequency of an interconnected power grid provided in one embodiment of the present application;
[0021] Figure 4 A schematic diagram of switching operation scenarios of an energy storage system provided in an embodiment of the present application;
[0022] Figure 5 A schematic flow chart of a method for controlling load frequency of an interconnected power grid provided in another embodiment of the present application;
[0023] Figure 6 A step disturbance simulation condition diagram provided in an embodiment of the present application;
[0024] Figure 7 This is a diagram of the dynamic response of LFC under a step disturbance provided in an embodiment of the present application;
[0025] Figure 8 A schematic diagram of the structure of a computer device provided in one embodiment of the present application. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0027] Considering the interconnected grid LFC system architecture with energy storage assistance Figure 1As shown. Among them, wind power, photovoltaic and other distributed power sources use the maximum power point tracking (MPPT) scheme to inject active power into the grid. In order to improve the inertial support of the grid, the energy storage system adopts the inversion strategy of the virtual synchronous generator (VSG) to simulate the rotational inertia and damping characteristics of the traditional synchronous generator.
[0028] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0029] The interconnected power grid load frequency control method provided in the embodiment of the present application can be applied to Figure 1 In the application environment shown. Among them, the terminal 102 communicates with the server 104 through the network. The data storage system can store the data that the server 104 needs to process. The data storage system can be set up separately, integrated on the server 104, or placed on the cloud or other servers. The terminal 102 can send a change signal of the energy storage system within the target range to the server 104. After the server 104 receives the change signal of the energy storage system within the target range, the server 104 determines the operating state of the power grid at the current moment according to the change signal of the energy storage system; determines the control parameters of the load frequency control system according to the operating state of the power grid at the current moment; updates the load frequency control system according to the control parameters to obtain an updated load frequency control system; according to the updated load frequency control system, the output of the power grid at the next moment is adjusted with the goal of achieving a balance between the output power of the power grid and the power consumption of the load. The server 104 can feedback the obtained control instructions to the terminal 102. In addition, in some embodiments, the interconnected power grid load frequency control method can also be implemented independently by the server 104 or the terminal 102. For example, the terminal 102 can directly calculate the change signal of the energy storage system within the target range, or the server 104 can obtain the change signal of the energy storage system within the target range from the data storage system and calculate the change signal of the energy storage system within the target range.
[0030] The terminal 102 may be, but is not limited to, various desktop computers, laptop computers, smart phones, tablet computers, IoT devices, and portable wearable devices. The IoT devices may be smart speakers, smart TVs, smart air conditioners, smart vehicle-mounted devices, etc. The portable wearable devices may be smart watches, smart bracelets, head-mounted devices, etc. The server 104 may be implemented as an independent server or a server cluster consisting of multiple servers, or may be a cloud server.
[0031] like Figure 2-Figure 3As shown, an interconnected power grid load frequency control method provided in an embodiment of the present application includes:
[0032] Step S01: receiving a change signal of an energy storage system within a target range; the change signal includes a grid access signal and a grid exit signal; the target range is the range covered by the grid, and the target range includes several areas;
[0033] Step S02: determining the current operating state of the power grid according to the change signal of the energy storage system;
[0034] Step S03: Determine the control parameters of the load frequency control system according to the current operation state of the power grid; the control parameters are calculated using the Lyapunov stability theory; the control parameters include control gain;
[0035] Step S04: updating the load frequency control system according to the control parameters to obtain an updated load frequency control system;
[0036] Step S05: According to the updated load frequency control system, the output of the power grid at the next moment is adjusted with the goal of achieving a balance between the output power of the power grid and the power consumption of the load.
[0037] In this article, control parameters are also called controller parameters, and control gains are also called controller gains.
[0038] In an exemplary embodiment, before the step of “updating the load frequency control system according to the control parameter”, the method further includes:
[0039] Determine the average residence time corresponding to the current moment; the average residence time is the value obtained by averaging all residence times recorded at the current moment and before the current moment; the residence time is the time from the start time to the end time when the energy storage system is connected to the power grid or exits the power grid;
[0040] Determine whether the average residence time satisfies a control parameter update criterion to obtain a first determination result;
[0041] If the first judgment result is yes, the process proceeds to step “updating the load frequency control system according to the control parameters”.
[0042] If the first judgment result is no, an alarm is issued.
[0043] In an exemplary embodiment, according to the current operating state of the power grid, the control parameters of the load frequency control system are determined, specifically including:
[0044] In a control parameter set, a control parameter matching the operating state of the power grid at the current moment is searched; wherein the control parameter set is pre-determined based on all possible energy storage system participation states in the power grid; the energy storage system participation states include the energy storage system access grid state and the energy storage system exit grid state; different control parameters in the control parameter set correspond to different energy storage system participation states.
[0045] In an exemplary embodiment, the open-loop model of the load frequency control system is:
[0046]
[0047] Where x(t)=[x1 T (t),x2 T (t),...,x n T (t),...,x N T (t)] T is the augmented vector, x n (t) = [Δf n ,ΔP tien ,ΔP mn ,ΔP vn ,∫ACE n ] T is the state vector of region n, n=1,2,3,...,N, Δf n is the frequency deviation in region n, ΔP tien is the power fluctuation of the tie line in area n; ΔP mn is the output mechanical power increment of the synchronous generator in area n; ΔP vn is the governor valve position increment of region n; ACEn is the regional control error of region n; u(t)=[u1(t),u2(t),...,u n (t),...,u N (t)] T The control command issued by the power control center, u n (t) is the control instruction of area n; w=[w1(t),w2(t),...,w n (t),...,w N (t)] T is the power disturbance vector, w n (t) = [ΔP dn ,ΔP RESn ] T is the power disturbance in region n, ΔP dn , ΔP RESn are load and renewable energy fluctuations respectively; A=[A ij ] N×N, B = diag{B n}、F=diag{F n} and C = diag{C n} are load frequency control system matrices respectively; The superscript symbol “·” represents the derivative, and the symbol “T” in the upper right corner represents the transpose of the matrix.
[0048] In an exemplary embodiment, in the open-loop model of the load frequency control system, the elements in each load frequency control system matrix are respectively:
[0049]
[0050]
[0051] in,
[0052]
[0053] S i =S SGi +ΣS ESSih ; (9)
[0054] The physical meaning of each symbol is as follows: R i , are the droop coefficients of synchronous generators and VSGs in region i; Tg i , Tt i are the time constants of the speed governor and prime mover in area i respectively; α i , β ih (0≤α i ,β ih ≤1,α i +Σβ ih =1) are the frequency regulation participation factors of synchronous generators and energy storage systems in region i, satisfying α i =S SGi / S i and β ih =S ESSih / S i ; S SGi , S ESSih are the capacities of the synchronous generator and the h-th energy storage system in region i, respectively; H is the number of energy storage systems in region i; Di and Mi are the equivalent damping coefficient and moment of inertia of region i, respectively; D SGi 、M SGi are the damping coefficient and moment of inertia of the synchronous generator in region i; D ESSih 、M ESSih are the damping coefficient and moment of inertia of the h-th energy storage system in region i when it adopts the VSG grid-connected strategy; γ i is the frequency deviation factor of region i.
[0055] When the energy storage system exits or participates in the LFC mechanism of the interconnected power grid for some reason, the impact on the LFC model is reflected in: the frequency regulation participation factor (α i , β ih ) and the equivalent damping coefficient and moment of inertia of the power grid (D i , H i ) changes.
[0056] In an exemplary embodiment, the process of calculating the control parameters using Lyapunov stability theory is:
[0057] The objective function is optimized and solved based on the closed-loop stability constraint condition to obtain the control gain of the load frequency control system; the objective function is determined according to the operation state of the power grid and the Lyapunov stability theory;
[0058] The closed-loop stability constraints include:
[0059] Given an external power disturbance damping coefficient δ, and scalars μ>0, λ>0, there exist positive definite matrices P, Q, W, X, and controller gains K that satisfy the following linear matrix equality (LMI):
[0060]
[0061] And satisfy the matrix inequality:
[0062]
[0063] Among them, 11 =λP+A T P+PA+Q-ζW;Ξ 12 =ζX T ;Ξ 13 =PBK-ζ(X T -W); 14 =PF;Ξ 15 =A T P;Ξ 16 =C T ; Ξ 23 = -ζ(-W+X); 33 =-ζ(2W-X T -X);Ξ 35 =K T B T P;Ξ 44 =-δ 2 I;Ξ 45 =F T P; Ξ 66 =-I, I is the unit matrix; P, Q and W are positive definite matrices in the objective function; λ is a parameter in the objective function; It is the upper limit of the difference between the time when the power control center receives the change signal of the energy storage system and the time when the energy storage system sends the change signal.
[0064] The above linear matrix equality (LMI) and matrix inequality are obtained based on Jensen's inequality, convex combination theorem and Schur's inequality.
[0065] In an exemplary embodiment, the objective function is:
[0066]
[0067] Wherein, V(t) represents the energy contained in the load frequency control system, t represents time; s and r are integral parameters.
[0068] The above objective function is a constructed Lyapunov function, which represents the energy contained in the LFC system.
[0069] In an exemplary embodiment, based on the average dwell time (ADT) technology, an update criterion for the control parameter when switching between any two scenes is derived, and the control parameter update criterion includes:
[0070] There exists a scalar ε>1 that satisfies the following inequality:
[0071]
[0072] And the average residence time satisfy:
[0073]
[0074] Wherein, M1 and M2 represent the first stage and the second stage respectively; the first stage is a stage in which the state of the energy storage system participating in the power grid has changed, and the control parameters of the load frequency control system have not been updated; the second stage is a stage in which the state of the energy storage system participating in the power grid has changed, and the control parameters of the load frequency control system have been updated; and The positive definite matrix and parameters in the objective function corresponding to the load frequency control system of the first stage are respectively obtained; and The positive definite matrix and parameters in the objective function corresponding to the load frequency control system in the second stage are divided into two parts.
[0075] The above control parameter update criterion is a sufficient condition for the LFC system state trajectory to be stable and non-divergent when randomly switching between operating scenarios G1 and G2 according to the switching control theory. Among them, the positive definite matrix P in the Lyapunov function corresponding to the load frequency control system in the first stage and the second stage is the same, and different operating scenarios correspond to different energy storage system participation states.
[0076] Based on the switching control theory, the present invention derives the average dwell time (ADT) required to ensure the stability of the running state trajectory when the LFC system randomly switches between any two running scenarios. Specifically, it is assumed that the LFC system switches between the running scenarios G1 and G2 Q times in the time period [T0, T1], and the switching times are t1, t2, …, t Q , so the average residence time T d,av The switching times satisfy Q≤1+(T1-T0) / T d,av .
[0077] Figure 4 The figure shows the updating process of controller parameters when the energy storage system switches from operation scenario G1 to operation scenario G2. The time period between t1 and t1+τ is the first stage, the time period between t1+τ and t2 is the second stage, and τ is the communication delay, also known as transmission delay.
[0078] In the first stage, the closed-loop dynamic characteristics of the LFC system are:
[0079]
[0080] The Lyapunov function corresponding to the LFC system is:
[0081]
[0082] In the second stage, the closed-loop dynamic characteristics of the LFC system are:
[0083]
[0084] The objective function corresponding to the LFC system is:
[0085]
[0086] in,
[0087] Even if the obtained controller parameters can ensure the stable operation of the LFC system of the interconnected power grid, the frequent access or exit of the energy storage system may also cause the frequency deviation to be unable to be effectively damped, and even cause the operating state trajectory of the LFC system to diverge. This means that the changed state of the energy storage system is required to continue to participate in the LFC process for at least a period of time, which is called the dwell time (DT).
[0088] The present invention assumes that the energy storage system immediately sends an access / exit signal to the control center when it accesses or exits the LFC mechanism; and that there is an upper limit on the transmission delay of the communication network between the energy storage system and the power control center, that is, in is the maximum transmission delay, which is the upper limit mentioned above.
[0089] In summary, in the present invention, the conditions that need to be met for the control parameter update are:
[0090] Given the external power disturbance damping coefficient δ, scalar Scalar Scalar and scalar ε>1, there exists a positive definite matrix P, a positive definite matrix Positive definite matrix Positive definite matrix Positive definite matrix matrix matrix Control parameters and control parameters The linear matrix inequality (10) and the matrix inequality (11) are satisfied (i.e., both the first-stage and second-stage load frequency control systems need to satisfy the closed-loop stability constraints), and the average residence time of the LFC system when randomly changing between the operating scenarios G1 and G2 satisfies the requirements of formula (14).
[0091] It should be noted that the controller parameter K to be optimized in matrix inequality (11) is in a multiplicative relationship with the unknown matrix P. Therefore, matrix inequality (11) is essentially a bilinear matrix inequality, which is difficult to solve directly using the commercial linear matrix inequality (LMI) toolbox. To this end, based on the matrix contract transformation technology, let Λ = P -1 , multiply both ends of (10) by diag{Λ,Λ}, and multiply both ends of the matrix inequality (11) by diag{Λ,Λ,Λ,I,Λ,I} to transform the form, and finally use the YALMIP toolbox to solve it.
[0092] It is particularly important to note that since the energy storage system and the power grid control center rely on the communication network for information exchange, the control center will update the corresponding control gain only after the energy storage system enters / exits the LFC process. Prior to this, there is an asynchronous operating state where the control gain does not match the current LFC control architecture. The communication network inevitably has the problem of uncertain transmission delay. The existence of communication delay will cause the frequency deviation damping performance of the LFC system to deteriorate or even cause the risk of instability. Therefore, the LFC instruction satisfies u(t) = Kx(t-τ), that is, the influence of delay is considered when designing the control parameters, thereby eliminating the adverse effects caused by communication delays, where K is the control gain and τ is the communication delay.
[0093] The design concept of this embodiment is to design the controller specifically according to a series of preset energy storage system access / exit scenarios. When the energy storage is accessed or exited, the corresponding controller parameters (i.e., controller gain) are updated as long as the residence time is met, rather than online calculation of the controller parameters. Of course, in some embodiments, online calculation can also be used to calculate the controller parameters in real time.
[0094] In an exemplary embodiment, the number of operating scenarios of the energy storage system is 2 N , the number of switches between any two running scenes is 2 N (2 N -1) / 2, where N is the number of regions in the interconnected power grid, that is, the energy storage systems in each region are connected or exited as a whole at the same time.
[0095] In an exemplary embodiment, the interconnected power grid load frequency control method further includes: reporting to the power control center when the grid operating conditions (SoC of the energy storage system and grid frequency deviation) are not met or a new energy storage system is connected.
[0096] In an exemplary embodiment, Figure 5 As shown, the interconnected power grid load frequency control method can also be as follows:
[0097] Step S11: construct a load frequency control (LFC) model of the interconnected power grid that takes into account the random access and exit behavior of the energy storage system, and preset a series of possible scenarios in which the energy storage system participates in the load frequency control (LFC).
[0098] Step S12: Based on the average dwell time (ADT) technology, derive the update criteria of the control parameters when switching between any two scenes.
[0099] Step S13: When the energy storage system is randomly connected or exited, the control parameters are adjusted according to the update criteria to adapt to the changes in the LFC system structure. The overall steps are as follows:
[0100] 1. Monitor the status of the energy storage system: Monitor the operating status of the energy storage system in real time, including its state of charge (SoC) and physical health, to determine whether it can participate in the LFC process.
[0101] 2. Receive access / exit signal: When the energy storage system decides to access or exit the LFC system, the system will receive the corresponding signal.
[0102] 3. Evaluate the current scenario: Based on the energy storage system’s access or exit behavior, determine the current LFC operation scenario and the scenario to switch to.
[0103] 4. Control parameter update: Based on the preset control parameter set, select the control parameters that match the current scene. If the scene changes, determine whether to update the control parameters based on the update criteria derived from the average dwell time (ADT) technology.
[0104] This embodiment calculates control parameters, namely control gains, corresponding to different energy storage system operation scenarios in advance according to preset energy storage system operation scenarios, thereby obtaining a set of control parameters corresponding to all operation scenarios. When necessary, direct matching and searching can be performed.
[0105] 5. Asynchronous switching: After determining the new control parameters, perform asynchronous switching to update the control parameters to the LFC control system.
[0106] The present invention proposes an adaptive LFC scheme in which the controller gain K is asynchronously and dynamically updated following the access / exit behavior of the energy storage system. Its asynchronous characteristics are reflected in that, due to the existence of a communication network between the energy storage system and the power control center, when the energy storage system accesses / exits the LFC mechanism, the power grid control center updates the controller gain K according to the operating information reported by the energy storage system.
[0107] 6. Transition period management: During the control parameter update process, appropriate measures can be taken to manage the transition period to minimize the system performance fluctuations caused by parameter switching.
[0108] 7. Stability confirmation: After the control parameters are updated, monitor the system performance to confirm that the stability and frequency deviation control performance of the LFC system meet the predetermined requirements.
[0109] Such repeated parameter updates can ensure that the random access or exit of the energy storage system will not adversely affect the stability and performance of the LFC system, while improving the adaptability and flexibility of the system.
[0110] Step S14: Verify the effectiveness of the method proposed in this application in a simulation environment, and demonstrate the superior performance of the scheme proposed in this application under the random access / exit behavior of the energy storage system by comparing different control schemes. Construct a simulation model in the MATLAB / Simulink environment, which is based on the LFC system architecture of the two-region interconnected power grid, including distributed power sources such as wind power and photovoltaics, and energy storage systems. Set the parameters of the simulation model according to the simulation parameters in Table 1, including the governor time constant, frequency deviation factor, parameters of the synchronous generator and energy storage system, etc.
[0111] Table 1 Simulation parameters
[0112]
[0113] At the same time, two scenarios are preset: in scenario 1, all synchronous generators and energy storage systems participate in LFC; in scenario 2, only synchronous generators participate in LFC. On this basis, the proposed asynchronous switching LFC control scheme is designed and implemented, and compared with the existing fixed control gain scheme. Since the existing fixed control gain scheme does not take into account the access / exit behavior of the energy storage system, the controller parameter solution of this scheme is based on the following three schemes:
[0114] 1) Scheme 1: Design controller parameters based on scenario 1 only;
[0115] 2) Scheme 2: Design controller parameters based on scenario 2 only;
[0116] 3) Solution 3: The controller parameters are designed for scenarios 1 and 2 respectively, but the asynchronous update process when the energy storage is exited is not considered.
[0117] Simulate the sudden drop and recovery of renewable energy output under extreme weather conditions, such as Figure 6 As shown, suppose that the occurrence of region 1 and region 2 is as follows Figure 6 The step power disturbance (renewable energy fluctuation) shown in (a) simulates two scenarios: a sudden drop in renewable energy output under extreme weather (such as wind turbine cut-out under typhoon weather, low-level operation of photovoltaic under heavy rain / haze weather, etc.) and the recovery of renewable energy output after extreme weather. The case of energy storage system participating in LFC is shown in Figure 2. Figure 6 (b) (where 0 indicates withdrawal and 1 indicates participation).
[0118] On the basis of random fluctuations in load demand, the control performance of the proposed scheme is further analyzed when random disturbances of load are superimposed under extreme weather conditions. The final dynamic response and control performance are shown in Figure 7 As shown, Figure 7 (a) Figure 7 (c) and Figure 7(e) shows the responses of regional control error, tie line power deviation and frequency deviation of region 1 when the energy storage system is randomly connected / exited; Figure 7 (b) Figure 7 (d) and Figure 7 (f) respectively represent the responses of regional control error, tie line power deviation and frequency deviation of region 2 when the energy storage system is randomly connected / exited.
[0119] Table 2-1 and Table 2-2 show the average control performance of the LFC system in different scenarios. Figure 7 As shown in Table 2, although all control schemes can ensure the closed-loop stability of the LFC system under time-varying delay and restore the frequency deviation and regional control error to zero under external power disturbance, there are differences in dynamic performance between different control schemes.
[0120] Table 2-1 Average control performance under step disturbance
[0121]
[0122] Table 2-2 Average control performance under step disturbance
[0123]
[0124] First, from the perspective of the entire control period, the proposed solution of the present invention has better overall frequency deviation damping performance for power disturbances under extreme weather conditions than the other three design solutions because it designs targeted controllers for both scenarios with and without energy storage participation in LFC. Specifically:
[0125] Compared with Scheme 1, the average amplitudes of ACE, interconnection line power and frequency deviation in the two regions under the asynchronous switching design scheme proposed in the present invention decreased by 8.58%, 9.38% and 8.13% respectively, indicating that the LFC system has a lower oscillation amplitude after applying the scheme proposed in the present invention. For the absolute value error integral index of each state quantity, compared with Scheme 1, the absolute value error integral index of the regional control error and frequency deviation decreased by -1.06%, 4.18% and -1.24% respectively after applying the method described in this article. Although the absolute value error integral index of the regional control error and frequency deviation increased slightly, the absolute value integral index of the interconnection line power deviation decreased significantly, indicating that when the output of new energy fluctuates due to extreme weather in each region, the power change on the interconnection line will be smoother. Scheme 2 can draw a similar conclusion.
[0126] Compared with Scheme 3, the average amplitudes of ACE, tie line power and frequency deviation in the two regions under the design scheme proposed by the present invention decreased by 0.26%, 17.72% and 1.11% respectively, while the corresponding absolute value error integral index decreased by 6.38%, 24.81% and 7.84% respectively. This shows that although the controllers designed for energy storage access or exit scenarios can ensure the stability of the LFC system in the corresponding operating scenarios, the randomness of the energy storage system's participation behavior may still have a significant impact on the operating state of the LFC system.
[0127] After simulation verification, the control strategy proposed in this invention can effectively reduce the impact of the access / exit behavior of the energy storage system on the dynamic behavior of the LFC system, improve frequency stability, and enhance the operational flexibility and frequency resilience of the interconnected power grid under extreme weather conditions.
[0128] The present application also provides an application scenario, which applies the above-mentioned interconnected power grid load frequency control method. Specifically: the interconnected power grid load frequency control method provided in the embodiment of the present application can be applied in the power grid control scenario. The power grid control scenario includes data uploading, control instruction generation and power grid equipment control links; the equipment operating parameters in the power grid enter the control instruction generation link after the data uploading link, and are calculated according to the constructed mathematical model to obtain the control instructions, and then enter the power grid equipment control link. The interconnected power grid load frequency control method provided in this embodiment belongs to the mathematical model updating link in the control instruction generation link. Specifically, according to the power grid operating parameters after the state of the energy storage system changes, the Lyapunov stability theory is used to calculate the control parameters of the mathematical model of the load frequency control system, and the mathematical model of the load frequency control system is updated to obtain a new mathematical model of the load frequency control system.
[0129] In an exemplary embodiment, a computer device is provided. The computer device may be a server or a terminal. The internal structure diagram thereof may be as follows: Figure 8As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data related to the operation status of the power grid. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the above-mentioned method for controlling the load frequency of an interconnected power grid is implemented.
[0130] Those skilled in the art will understand that Figure 8 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0131] In an exemplary embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program.
[0132] In an exemplary embodiment, a computer-readable storage medium is provided, storing a computer program, and when the computer program is executed by a processor, the steps in the above method embodiments are implemented.
[0133] In an exemplary embodiment, a computer program product is provided, including a computer program, and when the computer program is executed by a processor, the steps in the above method embodiments are implemented.
[0134] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.
[0135] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM may be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).
[0136] The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. The non-relational database may include a distributed database based on blockchain, etc., but is not limited thereto. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but is not limited thereto.
[0137] The present invention has the following beneficial effects:
[0138] Taking full account of the active power output constraints of energy storage equipment and the uncertain delay problems in the communication interaction process, the frequency control system of the interconnected power grid is described as a nonlinear model with a saturation term. On this basis, based on the Lyapunov stability theory, the design criteria of the control parameters are strictly derived. Through these criteria, the present invention can achieve precise control of the frequency of the interconnected power grid, and can ensure the stability and reliability of the power grid even when the energy storage system is randomly connected and exited. In addition, the control strategy proposed in the present invention is highly adaptable and flexible, and can cope with the challenges of power grid operation under extreme weather conditions, especially when the output uncertainty of new energy such as wind power and photovoltaic power is high, the frequency of the power grid can still be kept stable. The simulation verifies that the present invention improves the power grid's ability to regulate new energy fluctuations and frequency stability, and proves its effectiveness and superiority in actual power grid operation.
[0139] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0140] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and core ideas of this application. At the same time, for those skilled in the art, according to the ideas of this application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting this application.
Claims
1. A method for controlling load frequency of an interconnected power grid, characterized in that: The interconnected power grid load frequency control method comprises: Receive a change signal of the energy storage system within the target range; the change signal includes a grid access signal and a grid exit signal; the target range is the range covered by the grid, and the target range includes several areas; Determining the current operating state of the power grid according to the change signal of the energy storage system; Determine the control parameters of the load frequency control system according to the current operation state of the power grid; the control parameters are calculated using the Lyapunov stability theory; the control parameters include control gain; updating the load frequency control system according to the control parameters to obtain an updated load frequency control system; According to the updated load frequency control system, the output of the power grid at the next moment is adjusted with the goal of achieving a balance between the output power of the power grid and the power consumption of the load.
2. The interconnected power grid load frequency control method according to claim 1, characterized in that: Before the step of "updating the load frequency control system according to the control parameters", it also includes: Determine the average residence time corresponding to the current moment; the average residence time is the value obtained by averaging all residence times recorded at the current moment and before the current moment; the residence time is the time from when the energy storage system is connected to the grid to when it is disconnected from the grid, or the time from when the energy storage system is disconnected from the grid to when it is connected to the grid; Determine whether the average residence time satisfies a control parameter update criterion to obtain a first determination result; If the first judgment result is yes, then enter the step of "updating the load frequency control system according to the control parameters"; If the first judgment result is no, an alarm is issued.
3. The interconnected power grid load frequency control method according to claim 1, characterized in that: According to the current operating status of the power grid, the control parameters of the load frequency control system are determined, including: In a control parameter set, a control parameter matching the operating state of the power grid at the current moment is searched; wherein the control parameter set is pre-determined based on all possible energy storage system participation states in the power grid; the energy storage system participation states include the energy storage system access grid state and the energy storage system exit grid state; different control parameters in the control parameter set correspond to different energy storage system participation states.
4. The interconnected power grid load frequency control method according to claim 2, characterized in that: The open-loop model of the load frequency control system is: Where x(t)=[x1 T (t),x2 T (t),...,x n T (t),...,x N T (t)] T is the augmented vector, x n (t) = [Δf n ,ΔP tien ,ΔP mn ,ΔP vn ,∫ACE n ] T is the state vector of region n, n=1,2,3,...,N, Δf n is the frequency deviation in region n, ΔP tien is the power fluctuation of the tie line in area n; ΔP mn is the output mechanical power increment of the synchronous generator in area n; ΔP vn is the governor valve position increment for zone n; ACE n is the regional control error of region n; The control command issued by the power control center, u n (t) is the control instruction of area n; w=[w1(t),w2(t),...,w n (t),...,w N (t)] T is the power disturbance vector, w n (t) = [ΔP dn ,ΔP RESn ] T is the power disturbance in region n, ΔP dn , ΔP RESn are load and renewable energy fluctuations respectively; A=[A ij ] N×N , B = diag{B n }、F=diag{F n } and C = diag{C n } are load frequency control system matrices respectively; The superscript symbol "·" represents the derivative, and the symbol "T" in the upper right corner represents the transpose of the matrix.
5. The interconnected power grid load frequency control method according to claim 4, characterized in that: In the open-loop model of the load frequency control system, the elements in each load frequency control system matrix are: in, S i =S SGi +ΣS ESSih ; The physical meaning of each symbol is as follows: R i , are the droop coefficients of synchronous generators and VSGs in region i; Tg i , Tt i are the time constants of the speed governor and prime mover in area i respectively; α i , β ih (0≤α i ,β ih ≤1,α i +Σβ ih =1) are the frequency regulation participation factors of synchronous generators and energy storage systems in region i, satisfying α i =S SGi / S i and β ih =S ESSih / S i ; S SGi , S ESSih are the capacities of the synchronous generator and the h-th energy storage system in region i, respectively; H is the number of energy storage systems in region i; Di and Mi are the equivalent damping coefficient and moment of inertia of region i, respectively; D SGi 、M SGi are the damping coefficient and moment of inertia of the synchronous generator in region i; D ESSih 、M ESSih are the damping coefficient and moment of inertia of the h-th energy storage system in region i when it adopts the VSG grid-connected strategy; γ i is the frequency deviation factor of region i.
6. The interconnected power grid load frequency control method according to claim 5, characterized in that: The process of calculating the control parameters using Lyapunov stability theory is: The objective function is optimized and solved based on the closed-loop stability constraint condition to obtain the control gain of the load frequency control system; the objective function is determined according to the operation state of the power grid and the Lyapunov stability theory; The closed-loop stability constraints include: Given an external power disturbance damping coefficient δ, and scalars μ>0, λ>0, there exist positive definite matrices P, Q, W, X, and controller gains K that satisfy the following linear matrix inequality: And satisfy the matrix inequality: Among them,X 11 =λP+A T P+PA+Q-ζW;Ξ 12 =ζX T ; X 13 =PBK-ζ(X T -W);Ξ 14 =PF;Ξ 15 =A T P;Ξ 16 =C T ; Ξ 23 =-ζ(-W+X); 33 =-ζ(2W-X T -X); 35 =K T B T P;Ξ 44 =-δ 2 I;Ξ 45 =F T P; Ξ 66 =-I, I is the unit matrix; P, Q and W are positive definite matrices in the objective function; λ is the decay exponent in the objective function; It is the upper limit of the difference between the time when the power control center receives the change signal of the energy storage system and the time when the energy storage system sends the change signal.
7. The interconnected power grid load frequency control method according to claim 6, characterized in that: The objective function is: Wherein, V(t) represents the energy contained in the load frequency control system, t represents time; s and r are integration factors.
8. The interconnected power grid load frequency control method according to claim 7, characterized in that: The control parameter update criteria include: There exists a scalar ε>1 that satisfies the following inequality: And the average residence time satisfy: Wherein, M1 and M2 represent the first stage and the second stage respectively; the first stage is a stage in which the state of the energy storage system participating in the power grid has changed, and the control parameters of the load frequency control system have not been updated; the second stage is a stage in which the state of the energy storage system participating in the power grid has changed, and the control parameters of the load frequency control system have been updated; and The positive definite matrix and parameters in the objective function corresponding to the load frequency control system of the first stage are respectively obtained; and The positive definite matrix and parameters in the objective function corresponding to the load frequency control system in the second stage are divided into two parts.
9. A computer device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the interconnected power grid load frequency control method according to any one of claims 1 to 8.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the interconnected power grid load frequency control method described in any one of claims 1 to 8 is implemented.
Citation Information
Cited By
Interconnected power grid load frequency control method considering energy storage random access exit behavior
CN120454109A