Fault early warning system for electric power communication network and power grid and working method

By constructing a fault early warning system between the power communication network and the power grid, and utilizing knowledge graph and data fusion technologies, the fault transmission mechanism is identified, enabling rapid fault location and risk control between the power communication network and the power grid. This solves the problem of difficulty in identifying the root cause of faults in existing technologies and improves the safety and stability of the power system.

CN118890255APending Publication Date: 2024-11-01INFORMATION COMM COMPANY STATE GRID SHANDONG ELECTRIC POWER
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410811546.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

Existing technologies are unable to effectively identify the root causes of faults between the power communication network and the power grid, resulting in the inability to locate fault warning events in a timely manner, which may lead to major accidents such as power grid collapse. Furthermore, existing systems cannot effectively analyze the correlation between alarm events, making it impossible for maintenance personnel to handle faults quickly.

Method used

A fault early warning system based on the fusion of primary and secondary professional data and knowledge graphs is constructed. The business analysis module identifies coupling relationships, the fault analysis module diagnoses fault points, the coupling analysis module pushes risk events, the information integration module builds a fault event knowledge base, and the risk control module assesses and prioritizes risks, and adopts a roundabout path to control the fault scope.

Benefits of technology

It improves fault handling efficiency, reduces the cascading effects of fault propagation, ensures the safe and stable operation of the power system, lowers the operation and maintenance threshold, and improves the accuracy of fault location and risk assessment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118890255A_ABST
    Figure CN118890255A_ABST
Patent Text Reader

Abstract

The invention relates to a fault early warning system for an electric power communication network and a power grid and a working method, and the method comprises the steps: determining a service coupling relation between the communication network and the power grid according to the operation state data of the power grid and the safety protection data of the communication network based on a communication event and a power grid event corresponding to a fault alarm event; combining a power grid event corresponding to a fault alarm event in the power grid and a communication event corresponding to the same fault alarm event in the communication network into an associated event chain, preprocessing the event chain, and carrying out fault diagnosis and fault point positioning according to the characteristics corresponding to the alarm sequence and the relationship between the characteristics; pushing risk items in the alarm event to designated workers in a power grid and a communication network; and determining key point faults in the power grid and the communication network according to the fault event knowledge base, and determining risk levels corresponding to the key point faults and corresponding roundabout paths according to a set sorting rule.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid fault early warning, and in particular to a fault early warning system and a working method for a power communication network and a power grid. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] The transmission network is coupled with the power communication network, so that various parameters in the power transmission process can be obtained, which facilitates the control of the power grid and provides early warning for various problems arising in the power transmission process. Therefore, the power communication network integrates power, communication, sensing, computing and control technologies. Its inherent complexity and heterogeneity make the safe operation and control of large power grids extremely complex.

[0004] Fault alarm (early warning) events are common situations in power communication networks. Since the power communication network is coupled with the transmission network, the fault early warning events generated may occur on the power grid side or the communication network side. It may be a problem on one side of the network itself, or a fault caused by some reasons (such as human error, etc.) due to its common dependent coupling relationship and spread to the other side of the network. These fault early warning events may induce a series of chain failures until major accidents such as power grid collapse occur.

[0005] In addition, when some important nodes and links in the power communication network fail, it is easy to cause the collapse of the local or entire power communication network, leading to or expanding the occurrence of power grid security incidents. It will also cause the power system to face a greater threat of instability. In most cases, the current power communication network can only output notifications of alarm events. Although the fault point where the alarm occurs can be located in some cases, the possible correlation between the alarm events has not been paid attention to, resulting in the inability of operation and maintenance personnel to promptly discover the root cause of the fault alarm, which is not conducive to the safe operation of the power communication network and the transmission network. Summary of the invention

[0006] In order to solve the technical problems existing in the above-mentioned background technology, the present invention provides a fault warning system and working method for electric power communication network and power grid. Based on the fusion of primary and secondary professional data and knowledge graph, a knowledge base of communication and power grid operation alarm and fault event is constructed, the key links and fault transmission mechanism of power grid and communication network are identified, and a joint diagnosis and prevention and control strategy is formulated.

[0007] In order to achieve the above object, the present invention adopts the following technical solution:

[0008] A first aspect of the present invention provides a fault early warning system for a power communication network and a power grid, comprising:

[0009] The service analysis module is configured to: determine the service coupling relationship between the communication network and the power grid based on the operation status data of the power grid and the security protection data of the communication network and the communication event and the power grid event corresponding to the fault alarm event;

[0010] The fault analysis module is configured to: merge the power grid event corresponding to the fault alarm event in the power grid and the communication event corresponding to the same fault alarm event in the communication network into a related event chain and pre-process it according to the business coupling relationship determined by the business analysis module; perform fault diagnosis and locate the fault point according to the relationship between the features corresponding to the alarm sequence in the event chain and the features;

[0011] The coupling analysis module is configured to: push the risk items in the alarm event to designated staff in the power grid and the communication network according to the event chain corresponding to the alarm event;

[0012] The information integration module is configured to: construct a knowledge base of fault events of the power grid and communication network through knowledge extraction, knowledge fusion and knowledge storage;

[0013] The risk control module is configured to: determine the key point faults in the power grid and the communication network according to the fault event knowledge base, and determine the risk level and corresponding detour path corresponding to the key point faults according to the set sorting rules.

[0014] Further, the preprocessing event chain includes:

[0015] Step 11, judging whether the alarms belong to the same alarm observation window according to the alarm reporting time, and extracting a group of alarms reported in the most recent alarm observation window;

[0016] Step 12: extract the alarm information that is the same as the typical alarm according to the alarm name, and delete other meaningless and redundant alarms;

[0017] Step 13, according to the different subnets to which the alarms belong, the alarms are grouped according to different subnets. Characteristic alarm groups are established and stored in the database;

[0018] Step 14, looping through steps 12 and 13 until all alarms reported in the alarm observation window are traversed.

[0019] Furthermore, after the preprocessing event chain, alarm compression is also included, specifically:

[0020] Step 21: determine whether the alarm reporting time in the characteristic alarm group is the same, extract characteristic alarms with the same alarm reporting time, and group them by time;

[0021] Step 22: Determine whether the alarm names are the same, and extract characteristic alarms with the same alarm names;

[0022] Step 23: determine whether the network element names reporting the alarm are the same, and extract characteristic alarms with the same network element names reporting the alarm;

[0023] Step 24: Determine whether the physical ports reporting the alarm are the same, and extract alarms with the same physical ports;

[0024] Step 25: compress multiple identical characteristic alarms into one alarm;

[0025] Step 26: Execute steps 22, 23, 24 and 25 in a loop until the alarm traversal grouped by time is completed.

[0026] Furthermore, after the preprocessing event chain, the alarm observation window confirmation is also included, specifically:

[0027] Step 31: In the initial operation stage of alarm collection, a larger initial alarm observation window is pre-set;

[0028] Step 32: In the alarm observation window, collect the alarm sequence reported in the network;

[0029] Step 33: During the alarm preprocessing analysis, the alarm filtering extracts each characteristic alarm group in the alarm sequence, and the alarm compression compresses multiple identical alarms occurring simultaneously in each characteristic alarm group;

[0030] Step 34: After the alarm preprocessing analysis process is completed, the reporting time of each characteristic alarm group and the maximum characteristic group reporting time are calculated;

[0031] Step 35: Calculate the size of a new alarm observation window; adjust the size of the alarm observation window, and collect the alarm sequence reported in the network at the beginning of the next new time window;

[0032] Step 36: Execute steps 32 to 35 in a loop until the size of the alarm observation window meets the requirement.

[0033] Furthermore, there is an alarm rule search before fault diagnosis, specifically: matching a pre-defined typical alarm sequence, determining whether all alarms defined in the typical alarm sequence are reported in the characteristic alarm subset, and establishing a related alarm group according to the fault diagnosis rules after matching with the typical alarm sequence.

[0034] Furthermore, fault diagnosis is specifically as follows: matching the preconditions in the alarm rules, matching the upstream and downstream nodes for each fault rule, extracting the alarms in the relevant alarm group, comparing them with the preconditions in the fault rules, and determining that all conditions are met, then diagnosing it as a fault.

[0035] Furthermore, the fault point is located, specifically: the location where the alarm occurs is determined by using the connection relationship and inclusion relationship between communication entities, the node and hardware port attributes of the reported alarm are extracted, and based on the known connection relationship, all alarms are connected according to the subnets to which they belong, and stored in different alarm subsets.

[0036] Furthermore, knowledge extraction is as follows: obtaining public documents on communication networks and power grids, dividing the knowledge source corpus in the documents into three types: structured, semi-structured and unstructured, and extracting the corresponding knowledge graph through data mapping technology, extraction algorithms and wrappers.

[0037] Furthermore, knowledge fusion is specifically as follows: preprocessing and segmenting the knowledge graph data obtained in knowledge extraction, that is, extracting possible matching objects as candidates from all entities in the database; recording links; setting corresponding thresholds for each attribute similarity, and if this value is exceeded, connecting the two entities to complete knowledge fusion.

[0038] A second aspect of the present invention provides a working method based on the above system, comprising the following steps:

[0039] Obtain the operation status data of the power grid and the security protection data of the communication network, and determine the business coupling relationship between the communication network and the power grid based on the communication events and power grid events corresponding to the fault alarm events;

[0040] According to the business coupling relationship determined by the business analysis module, the power grid event corresponding to the fault alarm event in the power grid and the communication event corresponding to the same fault alarm event in the communication network are combined into a related event chain and pre-processed; according to the relationship between the features corresponding to the alarm sequence in the event chain and the features, fault diagnosis is performed and the fault point is located;

[0041] According to the event chain corresponding to the alarm event, the risk items in the alarm event are pushed to the designated staff in the power grid and communication network;

[0042] Build a knowledge base of fault events in power grid and communication network through knowledge extraction, knowledge fusion and knowledge storage;

[0043] According to the fault event knowledge base, key point faults in the power grid and communication network are determined, and the risk level and corresponding detour path corresponding to the key point faults are determined according to the set sorting rules.

[0044] Compared with the prior art, one or more of the above technical solutions have the following beneficial effects:

[0045] 1. The data corresponding to the alarm (early warning) event can be divided into those from the communication network and those from the power grid. By pre-processing the alarm, the implicit correlation between the alarms can be discovered from a large amount of alarm data, and the root cause of the alarm of the network element or equipment can be found, which can assist the operation and maintenance personnel to promptly discover the root cause of the fault, and analyze the impact of the fault on the power grid through the fault transmission mechanism between the power grid and the communication network, so as to improve the efficiency of fault handling and ensure the safe and stable operation of the power grid.

[0046] 2. The alarm (early warning) caused by the fault event will have an impact on the power grid and the communication network. By identifying the coupled services of the power grid and the communication network, analyzing the mutual influence relationship between the services, studying the fault coupling event chain in the network, grasping the process of fault propagation in the interdependent coupled network, and analyzing the necessary coupling conditions, the cascading blackout problem caused by fault propagation can be avoided or alleviated.

[0047] 3. By applying the proposed knowledge extraction, knowledge fusion and knowledge storage to the fault alarm data set, transmission network fault handling work order and other data of the power communication network and the power grid, a knowledge base of fault events and association rules is constructed, thereby applying the fault knowledge base to lower the operation and maintenance threshold and improve the accuracy of fault location.

[0048] 4. Through the constructed communication network and the fault association rules and fault event knowledge base in the power grid, the alarm information collected in real time in the coupled network is analyzed according to the on-site phenomena and rules to determine the possible root cause of the fault, thereby realizing the identification of key point faults and further providing fault handling suggestions for operation and maintenance personnel.

[0049] 5. Through coupling analysis of power grid and communication network risks, risk assessment, risk assessment ranking, and analysis of business channel impact, a detour routing strategy is adopted to ensure continuous and reliable transmission of key services, avoid large-scale fault cascading, and control the scope of faults. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0051] Figure 1 is a schematic diagram of the architecture of a fault warning system provided by one or more embodiments of the present invention;

[0052] Figure 2 is a schematic diagram of business coupling association analysis between a power communication network and a power grid provided by one or more embodiments of the present invention;

[0053] Figure 3 is a schematic diagram of a coupled network fault event knowledge base construction process provided by one or more embodiments of the present invention;

[0054] Figure 4 is a schematic diagram of a failure mode provided by one or more embodiments of the present invention;

[0055] Figure 5 It is a schematic diagram of a coupled network fault knowledge graph extraction framework provided by one or more embodiments of the present invention;

[0056] Figure 6 is a schematic diagram of a named entity recognition model for fault corpus provided by one or more embodiments of the present invention;

[0057] Figure 7 is a schematic diagram of a fault semantic relationship extraction model based on BiGRU provided by one or more embodiments of the present invention;

[0058] Figure 8 is a schematic diagram of a knowledge fusion process provided by one or more embodiments of the present invention;

[0059] Fig. 9 It is a schematic diagram of a closed path provided by one or more embodiments of the present invention. DETAILED DESCRIPTION

[0060] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0061] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0062] As introduced in the background technology, the power communication network and the transmission network are highly coupled, and the fault warning (alarm) events that occur will affect each other, making it difficult for existing technologies to determine the root cause of the fault, resulting in a greater threat of instability in the power system.

[0063] Therefore, the following embodiment provides a fault warning system and working method for power communication network and power grid, which builds a knowledge base of communication and power grid operation alarm and fault event based on the fusion of primary and secondary professional data and knowledge graph, identifies the key links and fault transmission mechanism of power grid and communication network, and formulates joint diagnosis and prevention and control strategies.

[0064] Embodiment 1:

[0065] like Figure 1-Figure 9 As shown, a fault early warning system for a power communication network and a power grid comprises:

[0066] The business analysis module analyzes the coupled business of the power grid and the power communication network to determine their business coupling;

[0067] Fault analysis module, which analyzes the alarm association rules of the communication network and performs fault diagnosis;

[0068] The coupling analysis module performs coupling analysis when identifying dynamic coupling event chains and pushes risk items to secondary duty officers and power grid dispatchers;

[0069] Information integration module, which builds a knowledge base of power grid and communication network fault events through knowledge extraction, knowledge fusion and knowledge storage;

[0070] The risk control module identifies faults at key points in the power grid and communication network, evaluates and ranks fault risks, and takes corresponding detour paths for risk control.

[0071] Among them, the power grid and power communication network coupling services include:

[0072] 1. Electric power operation business, including dispatching production business and management information business.

[0073] Dispatching production services mainly use the power communication dedicated network, namely the optical cable transmission network, and mainly include relay protection services and dispatching automation services; relay protection services refer to remote signals transmitted between relay protection devices of high-voltage transmission lines, which are signals necessary for the safe operation of the power grid; dispatching automation services provide data information for real-time monitoring and control of the operating status of the power grid, realizing a series of functions of power grid application components such as power grid control, data collection and dispatcher online flow, breaking simulation and correction control.

[0074] The communication method for management information services is mainly private network communication with public network communication as an auxiliary supplement, which is mainly divided into protection management information (including traveling wave ranging, fault recording and other services), performance monitoring unit (PMU), etc.

[0075] The main function of the protection management information system is to provide a scientific basis for accident analysis, fault location and setting calculation by collecting substation operation and fault information in real time, so that the dispatching management department can make correct analysis and decision to ensure the safe and stable operation of the power grid.

[0076] The main function of the PMU system is to use synchronous clock technology to monitor and stabilize the centralized phase angle, that is, to report the voltage phase angle information to the dispatching center, which will process the phase angle information and then monitor the phase angle; and under the condition of known phase angle information, use the phase angle information to analyze and control transient stability, so as to serve the stable operation of the power grid.

[0077] 2. Key services of the power communication network, including the relay protection service and safety and stability control service of the power communication network; the relay protection service is divided into line protection and main equipment protection. Line protection is an automatic device used to quickly and accurately cut off the fault or send a signal when a fault occurs in the transmission line. It is divided into overcurrent protection, distance protection, and pilot protection. Current protection determines whether to operate based on the current on this side; distance protection uses the voltage and current on this side as the judgment criteria, and determines the nature and location of the fault through quantitative measurement of impedance, and then decides whether to operate; pilot protection uses the communication channel to transmit the electrical quantity and action signal on this side to the opposite side, and determines whether to operate through judgment and calculation. From the perspective of communication, the power communication relay protection service describes the transmission of the electrical quantity and action signal of the pilot line protection carried by the communication channel. The interruption of the relay protection service means that the relay protection equipment cannot receive the data from the opposite end within the specified time. The safety and stability control service is a service carried on the system composed of the safety and stability control devices of two or more plants and stations connected through communication equipment.

[0078] The specific process of analyzing to determine the business coupling is as follows: For key businesses of the power communication network, such as relay protection business and safety and stability control business, business interruption may not only lead to communication security incidents, but also due to the delayed transmission of line protection signals and safety signals, it is very likely to cause the power grid to trigger protection measures, thereby causing power outages and other accidents.

[0079] For example, if all main protection channels of the 800kV DC lines in the communication network are interrupted, it will cause double-click locking of the 800kV DC transmission system in the power grid.

[0080] Grid failures can also affect the power communication network, causing the communication network to operate in NX mode, etc. For example, if the power outage and relocation of the power grid line causes the optical cable to be disconnected, it may cause the relay protection, safety automatic devices and other important transit services carried by the optical cable to operate in a single channel or be interrupted, which will lead to a power outage in the power grid.

[0081] Therefore, there is a coupling relationship between the services of the power communication network and the power grid, and they will affect each other. Communication network security incidents are usually caused by equipment failures, service unavailability, etc. due to communication optical cable failures or information network failures. These communication failures may further affect the normal operation of the power grid, leading to the occurrence of power grid incidents.

[0082] The power grid events related to communication events have been sorted out above. Specifically, they include interruption of protection channels, interruption of key service channels such as safety and stability, and relay protection, time asynchrony, resulting in bipolar blocking of the transmission system, failure of the safety and stability system, etc., which in turn lead to the occurrence of power grid events. Figure 2As shown, each event can be qualitatively analyzed and early warning can be issued when relevant communication security events occur to prevent power grid accidents, thereby truly establishing a business connection between the power communication network and the power grid.

[0083] The fault analysis module analyzes the alarm association rules of the communication network and performs fault diagnosis. Specifically:

[0084] Step 1: alarm preprocessing, specifically: Step 11: according to the alarm reporting time, determine whether the alarm belongs to the same alarm observation window, and extract a group of alarms reported in the most recent alarm observation window;

[0085] Step 12: According to the alarm name, extract the alarm information that is the same as the typical alarm, and delete some other meaningless and redundant alarms; Step 13: According to the different subnets to which the alarm belongs, group the alarms according to different subnets. Establish a characteristic alarm group and store it in the database; Step 14: Loop through steps 12 and 13 until the alarms reported in the alarm observation window are traversed;

[0086] Step 2: alarm compression, specifically: Step 21: determine whether the alarm reporting time in the characteristic alarm group is the same, extract the characteristic alarms with the same alarm reporting time, and group them by time; Step 22: determine whether the alarm names are the same, extract the characteristic alarms with the same alarm names; Step 23: determine whether the network element names reporting the alarms are the same, extract the characteristic alarms with the same network element names reporting the alarms; Step 24: determine whether the physical ports reporting the alarms are the same, extract the alarms with the same physical ports; Step 25: compress multiple identical characteristic alarms into one alarm; Step 26: loop through Step 22, Step 23, Step 24 and Step 25 until the traversal of the alarms grouped by time is completed;

[0087] Step 3: Alarm observation window confirmation, the specific steps are: Step 31: In the initial operation stage of alarm collection, a larger initial alarm observation window is pre-set; Step 32: In the alarm observation window, the alarm sequence reported in the network is collected; Step 33: In the alarm preprocessing analysis process, the alarm filtering extracts each characteristic alarm group in the alarm sequence, and the alarm compression compresses multiple identical alarms occurring simultaneously in each characteristic alarm group; Step 34: After the alarm preprocessing analysis process is completed, the reporting time of each characteristic alarm group is calculated; Step 35: Calculate the maximum characteristic group reporting time; Step 36: Calculate the size of the new alarm observation window; Adjust the size of the alarm observation window, and collect the alarm sequence reported in the network at the beginning of the next new time window; Step 37: Loop through steps 32-36 until the alarm observation window is stable.

[0088] In this embodiment, among the various fault alarms of the power communication network and the power grid, there are alarm associations inside the power communication network and the power grid respectively, and the alarms are aggregated to generate an event chain. For example, in the communication network, the fiber is disconnected -> R_LOS alarm, and other alarms may be derived. Secondly, the power communication network and the power grid are heterogeneously coupled with each other, and when a fault occurs, there will be mutual influence, and an event chain of faults and alarms will also be formed; the process of transmitting fault events between the communication network and the power grid is: first, the characteristic alarm group is obtained by pre-processing the communication network alarm by alarm filtering and compression, and then the characteristic alarm group is matched with the alarm conditions in the fault diagnosis rules to determine the fault point, and the relevant fault information of the faulty equipment is saved. When a power grid line fails, it will cause the communication network NX to run.

[0089] Alarm association rule analysis: Alarm association rule analysis refers to the merging and transformation of alarms, merging multiple alarms into a few or one alarm with more accurate information, and determining the root cause of the fault. Alarm association rule analysis can be divided into two parts: alarm preprocessing and fault diagnosis. Alarm preprocessing refers to the merging and transformation of alarms, merging multiple alarms into a few or one alarm with more accurate information, including: alarm filtering and alarm compression. Fault diagnosis refers to determining the root cause of the fault by analyzing the characteristic alarms after alarm preprocessing.

[0090] Alarm filtering: In the power communication network, a large number of alarm sequences may be generated when a fault occurs in the network. For example, a single fault may generate a continuous alarm sequence, which includes multiple different alarms. The same fault may also be detected by several different communication entities, resulting in different communication entities generating multiple alarms to indicate the same fault. Therefore, in the first step of alarm preprocessing, these alarm sequences need to be filtered to filter out those alarm information that are of great significance and helpful for fault diagnosis. The alarm filtering process extracts characteristic alarm groups from a large number of alarm sequences caused by faults based on known typical alarms, and filters out other meaningless and redundant alarms. Among them, characteristic alarms refer to alarms of certain significance caused by a certain fault in the subnet. Characteristic alarm groups refer to the combination of multiple characteristic alarms. Different characteristic alarm groups correspond to different subnet faults. Characteristic alarms mainly include five aspects of information about the fault: who, what, where, when, and why. Among them, who is the name of the network element that reports the alarm, including: the manufacturer, subnet, station, computer room, equipment name, etc. when is the time when the network management system detects the alarm, that is, the alarm reporting time.

[0091] Alarm filtering mainly filters a large number of alarm sequences caused by faults based on the content of who and when contained in the alarm information, filters other meaningless and redundant alarms, and groups alarms according to different subnets to establish characteristic alarm groups.

[0092] The specific steps of the alarm filtering process are as follows:

[0093] Step 1: According to the alarm reporting time, determine whether the alarms belong to the same alarm observation window. Extract a group of alarms reported in the most recent alarm observation window.

[0094] Step 2: Extract the alarm information that is the same as the typical alarm based on the alarm name, and delete other meaningless and redundant alarms.

[0095] Step 3: According to the different subnets to which the alarms belong, group the alarms according to different subnets, establish characteristic alarm groups, and store them in the database.

[0096] Step 4: Execute steps 2 and 3 repeatedly until all alarms reported in the alarm observation window are traversed.

[0097] Alarm compression: After the alarm sequence caused by the network failure is processed by alarm filtering, characteristic alarm groups corresponding to different network failures are filtered out. However, there may be multiple identical alarms in the characteristic alarm group, so these identical alarms need to be compressed to improve the efficiency of subsequent fault diagnosis. This process is called alarm compression. The alarm compression process is to compress multiple identical alarms that occur simultaneously in the characteristic alarm group, further reducing the number of alarms in the characteristic alarm group. According to the content contained in the alarm information, only when the alarm name, the name of the network element reporting the alarm, and the physical port reporting the alarm are consistent, are they the same alarm.

[0098] The input of the alarm compression process is the characteristic alarm group established after alarm filtering, and the output is the characteristic alarm group that compresses the same alarms that occur simultaneously. The steps of alarm compression are as follows:

[0099] Step 1: Determine whether the alarm reporting time in the characteristic alarm group is the same, extract characteristic alarms with the same alarm reporting time, and group them by time.

[0100] Step 2: Determine whether the alarm names are the same, and extract characteristic alarms with the same alarm names.

[0101] Step 3: Determine whether the network element names reporting the alarm are the same, and extract characteristic alarms with the same network element names reporting the alarm.

[0102] Step 4: Determine whether the physical ports reporting the alarm are the same, and extract the alarms with the same physical ports.

[0103] Step 5: Compress multiple alarms with the same characteristics into one alarm.

[0104] Step 6: Loop through steps 2-5 until all alarms grouped by time are traversed.

[0105] (3) Confirmation of alarm observation window: In the power communication network, the time efficiency of alarm correlation analysis is high, and it is required to complete the alarm correlation analysis in a short time to determine the cause of the fault. There are two main ways to trigger alarm correlation analysis. One is real-time alarm triggering, which triggers correlation analysis when a typical alarm occurs; the other is timed triggering, which triggers correlation analysis at fixed intervals. In practical applications, the timed triggering method is often used, that is, a period of alarm observation is defined. The system collects the alarm sequence reported by the network at the beginning of the alarm observation period until the end of the alarm observation period. This alarm observation period is called the alarm observation window Wa. The alarm correlation analysis starts when the alarm observation window reaches the end, and alarm preprocessing and fault diagnosis are performed on the alarm sequence collected in the alarm observation window.

[0106] Since different network failures will report different alarm sequences, the time required is also different. Therefore, it is necessary to set a suitable alarm observation window in the alarm collection stage to ensure that a complete feature alarm group is collected in the shortest possible time, so as to quickly diagnose the cause of the alarm. The main idea is: first, pre-set a larger initial time window to collect as many alarm sequences as possible to ensure that the collected alarm sequence contains a complete feature alarm group. Then analyze the collected feature alarm group to determine the reporting time T of the feature alarm group. During the system operation, the size of the alarm observation window Wa is continuously adjusted to ensure that a complete feature alarm group is collected in the shortest possible time window.

[0107] The specific steps for confirming the alarm observation window are as follows:

[0108] Step 1: In the initial operation stage of alarm collection, a larger initial alarm observation window is pre-set, usually set to 30 minutes.

[0109] Step 2: In the alarm observation window, collect the alarm sequence reported in the network.

[0110] Step 3: Alarm preprocessing and analysis process: Alarm filtering is responsible for extracting each characteristic alarm group in the alarm sequence, and alarm compression is responsible for compressing multiple identical alarms that occur simultaneously in each characteristic alarm group.

[0111] Step 4: After the alarm preprocessing analysis process ends, calculate the reporting time |Tg| of each characteristic alarm group, where |Tg| = Alarm_timemax - Alarm_timemin. g = 1, 2, ……, n1; n1 represents the total number of reporting times of the characteristic alarm groups.

[0112] Step 5: Calculate the maximum characteristic group reporting time |T| = Max(|T1|, |T2|, …, |Tg|, …, |Tn1|).

[0113] Step 6: Calculate the size |Wa| of the new alarm observation window, where |Wa| = α * |Wa’| + β * |T|. Adjust the size of the alarm observation window. α and β are the weights of the previous alarm observation window |Wa’| and the maximum characteristic group reporting time |T|. At the beginning of the next new time window, collect the alarm sequence reported in the network.

[0114] Step 7: Loop through Steps 2 - 6 until the alarm observation window is stable, that is, ||Wa| - |Wa’|| < Yt, where Yt is the set threshold.

[0115] Fault diagnosis: The fault diagnosis process is based on the characteristic alarm groups, and uses dependency relationships and causal relationships to determine the cause of the fault, including:

[0116] (1) Locate the fault point: Use the connection relationship and inclusion relationship between communication entities to determine the location where the alarm occurs. Extract the attributes of the node, board, port, etc. that report the alarm. According to the known connection relationship, connect all the alarms according to their affiliated subnets and store them in different alarm subsets respectively.

[0117] (2) Alarm rule search: Complete the matching of the typical alarm sequences defined in the rules, and judge whether all the alarms defined in the typical alarm sequences are reported in the characteristic alarm subset. According to the fault diagnosis rules, establish relevant alarm groups through matching with the typical alarm sequences.

[0118] (3) Fault diagnosis: Complete the matching of the preconditions in the rules. For each fault rule, it is necessary to match the upstream and downstream nodes. Extract the alarms in the relevant alarm groups and compare them with the preconditions in the fault rules. If all the conditions are met, it is diagnosed as a fault.

[0119] By mining the alarm association rules in the communication network, the implicit association relationships between alarms can be discovered as soon as possible from a large amount of irregular and unassociated alarm data. Then, the mined alarm association rules are used to analyze and find the root causes of alarms in network elements or devices, assist the operation and maintenance personnel to discover the root faults in time, improve the efficiency of fault handling in the power communication network, reduce the grid security incidents caused by communication network faults, and ensure the safe and stable operation of the power system.

[0120] The coupling analysis module performs coupling analysis when identifying dynamic coupling event chains, and pushes risk items to secondary duty officers and power grid dispatchers. Specifically: first, the device reports abnormal alarms of protection channels and security channels, and the communication network manager reports LOS alarms. Then the alarms are merged into the rule base according to the communication network alarm association rules, and then the fault is located and the root cause analysis of the alarm data is performed to deduce the corresponding fault, and the business and corresponding customers affected by the fault are analyzed; secondly, the communication is evented and the information is reported to SMS, which gives handling suggestions. At the same time, after the fault occurs, the power grid strategy is changed; NX analysis and risk warning are performed; finally, the risk items are pushed to secondary duty officers and power grid dispatchers, thereby realizing panoramic coupling monitoring between the power communication network and the power grid.

[0121] In this embodiment, the device first reports abnormal alarms of the protection channel and the security channel, and the communication network management reports the LOS alarm. Then the alarm association rules are merged into the rule base. On the one hand, it is necessary to locate the fault and analyze the root cause of the fault on the alarm data. It is deduced that the root cause is the 2.5G optical board failure. On the other hand, it is necessary to analyze the services and corresponding customers affected by the circuit failure, and process it from the following two aspects:

[0122] The first is to turn communication into an event, that is, the operation of a single set of protection causes the loss of security and control functions from station A to station B, and reports the information to SMS. SMS gives a disposal suggestion, that is, to control the corresponding section not to exceed 4 million kilowatts. At the same time, after the fault occurs, the power grid strategy changes, and the three lines of defense push disposal suggestions such as limits to SMS for reference by power grid dispatchers.

[0123] The second is to conduct NX analysis, such as N-1 analysis, that is, when the channel of protection device No. 1 is abnormal, only the single set of protection No. 2 is in operation. Secondly, risk warning is carried out, that is, if a fault affecting the protection channel No. 2 occurs again, it will lead to the loss of double protection. Finally, risk items are pushed to the secondary duty officer and the power grid dispatcher, thereby realizing panoramic coupling monitoring between the power communication network and the power grid.

[0124] The specific process of pushing risk items to secondary duty officers and power grid dispatchers is as follows: obtain the fault location corresponding to the risk item, take the fault location as the center, and then draw a circle with a preset radius to obtain a screening area, and obtain all secondary duty officers or power grid dispatchers in the screening area; and obtain their location, input the location and the fault location into the preset map of the computer, and draw the shortest path between the two, identify the shortest path to obtain the total path distance, the number of path turns and the path height; the path height is composed of the sum of the vertical heights of several points on the path and the ground. If the point on the path is on the fifth floor, then the calculation Calculate the vertical distance between the fifth floor and the ground. If a point on the path is perpendicular to the ground, the vertical height is taken as zero. Extract the values ​​of the total path distance, the number of path turns and the path height and mark them as the total path value, the path turning value and the path height value. Construct a triangle with the total path value and the path turning value as the two right-angled sides, select any point on the edge of the triangle, use the path height value as the height of the triangle, construct a triangular pyramid, extract the volume of the triangular pyramid and mark the volume value as the path value. If the values ​​of the number of path turns and the path height are zero, the path turning value and the path height value directly take the preset fixed values.

[0125] Obtain the employment time and age of the secondary duty officer or grid dispatcher, normalize the route push value LT1, employment time RT2 and age NL3, and take the values ​​of the three, and substitute them into the event push model Get the event push value, where WJ4 is the total number of times the secondary duty officer or power grid dispatcher has not dealt with it; η1, η2, η3 and η4 are preset weight factors; the values ​​are set by technicians in this field according to actual use; push the risk event to the smart terminal of the secondary duty officer or power grid dispatcher with the largest event push value. If the execution instruction fed back by the secondary duty officer or power grid dispatcher through the smart terminal is not received within the preset time range, it will be sent to the smart terminal of the secondary duty officer or power grid dispatcher with the second largest event push value, and the total number of times the secondary duty officer or power grid dispatcher with the largest event push value has not dealt with it will increase once. Analyze through the secondary duty officer and power grid dispatcher so as to reasonably push the risk event to the secondary duty officer and power grid dispatcher, so as to better handle and deal with the risk event.

[0126] The information integration module constructs a knowledge base of power grid and communication network fault events through knowledge extraction, knowledge fusion and knowledge storage. The specific process is as follows:

[0127] The construction process of network fault knowledge graph is as follows: Figure 3As shown in the figure, in the telecommunications field, a knowledge graph with events as the core is defined as "entity-attribute-attribute value" and "concept-relationship-concept". Graph representation technology realizes the representation of network concepts, entities, and attributes. It can also represent dynamic time series data, such as communication processes, fault handling procedures, fault event combinations and other field knowledge. Fault events are described through the knowledge representation method of "noun + verb". Figure 4 As shown, in the "optical cable break" event, the noun entity object is the optical cable and the verb is break; "optical cable break" causes "security control system channel break" to form a fault event combination.

[0128] Knowledge extraction: The telecommunications field contains a large number of domain literature and proprietary terms. These corpora are roughly divided into three types: structured, semi-structured, and unstructured. Structured data extraction is relatively mature, and data mapping D2R technology can be used to directly extract data based on metadata and graph patterns. For semi-structured and unstructured data, it is necessary to design corresponding extraction algorithms and wrappers based on the content and structure of the corpus. For the latter two types of data, the more commonly used knowledge extraction technologies include named entity recognition technology and relationship extraction technology.

[0129] Taking the collected transmission network alarm processing work order as an example, a certain section of corpus is "'PM_PIP8_SD' is the optical channel data unit (ODU) layer PM segment error degradation alarm, that is, the board generates this alarm when it detects that the number of BIP8 check errors in the PM segment of the optical channel data unit layer exceeds the degradation threshold. The alarm level is a level 2 alarm, and the equipment type is WDM. The cause of the alarm is a single board failure at the upstream station...". Named entity recognition is performed on this section of corpus: [PM_BIP8_SD]: entity; [single board failure]: entity; [PM_BIP8_SD]: alarm; [single board failure]: failure. The alarm level, equipment type and related explanations of the alarm can be extracted in attribute extraction, and the relationship extraction is [single board failure] <cause> [PM_BIP8_SD]. The overall framework of knowledge extraction is as follows: Figure 5 shown.

[0130] The BiLSTM-CRF model is used to perform named entity recognition on network fault work orders and other expected data. First, the original annotation method is used to annotate each character in the collected network fault data, using the five-tag BIOES annotation, where B represents the beginning of an entity, I represents the middle part of an entity, E represents the end of the entity, S refers to a single character, and O represents an irrelevant character. Next, in the BiLSTM-CRF model, sentences are used as units, and sentences containing q words (sequences of words) are denoted as x = (x1, x2, ..., xq), where xq represents the id of the qth word in the sentence in the dictionary, and then the unique hot encoding vector of each word can be obtained. The dimension of the vector is the size of the dictionary. The specific structure of the named entity recognition model is as follows: Figure 6shown.

[0131] Fault semantic relationship extraction based on bidirectional GRU model: Construct a bidirectional GRU model that combines sentence-level and word-level attention models, namely BiGRU-Attention, to extract semantic relationships based on power communication network and power grid fault fields. This solution proposes a BiGRU-based fault semantic relationship extraction model, such as Figure 7 As shown in the figure, first, in the input layer, the relation-extracted corpus is processed into a sequence vectorized form that can be accepted and processed by the BiGRU model. Specifically, the sentences and relation labels of the fault corpus are preprocessed to obtain the corresponding sentence dictionary and label dictionary. The encoding method is set to UTF-8 encoding, and the repeated text is cleaned, the punctuation marks in the sentences are removed, and the fault text is segmented using NLTK.

[0132] Next, we vectorize the words and transform the corpus obtained after the NLTK word segmentation in the previous step using the pre-trained ELMo model. The input sentence is represented as {w1, w2, ..., wn}, and the vector of the relative position of each word and entity pair is represented as {p1ej, p2ej, ..., pnej}. The ELMo pre-training process uses the cross entropy loss function for calculation, which is defined as:

[0133]

[0134] Where |D| is the size of the training set, (S (f) ,y (f) ) is the fth sample in the dataset, and the parameter θ is calculated by the AdaDelta optimizer using the loss function.

[0135] Next, the word vector obtained in the previous step is input into the GRU model. GRU is a variant of LSTM, and is an improved model of recurrent neural network (RNN) like LSTM. As a variant of LSTM, GRU is also very suitable for sequence data processing. It uses a "gate mechanism" to memorize the information of the previous node to solve the gradient disappearance problem; the two gates of the GRU model are the update gate and the reset gate. The smaller the value of the reset gate, the more forgotten. The update gate is used to control the degree to which the state information of the previous moment is passed into the current state. The larger the value of the update gate, the more state information of the previous moment is passed in. The bidirectional GRU neural network, that is, it obtains context information from the front and back to the top at the same time to improve the accuracy of feature extraction. And BiGRU has the advantages of low dependence on word vectors, low complexity, and fast response time.

[0136] A two-layer attention model, namely word-level and sentence-level attention, is introduced to assign different weights to different words and sentences, so as to highlight the words and sentences that are important for fault corpus relation extraction and reduce the impact of irrelevant words and sentences on the model.

[0137] By using the word-level attention model to select words that are important to the relationship, the specific formula for obtaining the sentence vector using the word-level attention model is as follows:

[0138] u t =tanh(w w h t +b w )

[0139]

[0140] Among them, W w is the weight coefficient, h t is the output vector of the BiGRU neural network layer, b w is the bias coefficient, u w represents the randomly initialized attention matrix, β t is the word-level attention weight.

[0141] Assume that a fault document B contains m sentences, that is, B = {sp1, sp2, ..., spm}, and its corresponding triple (e1, e2, r), the initialization of the sentence spm is represented in the form of a vector. The sentence-level attention model is used to select a sentence in a document that is important to the relationship to the representation vector of document B. The specific formula is as follows: m =sp m Ar, Among them, A is a diagonal matrix, r represents the relationship vector, α m is the sentence-level attention weight.

[0142] The input of the final output layer is the output of the double-layer attention mechanism layer, which is calculated using the softmax function to achieve the goal of relationship extraction.

[0143] In a text, not all words and sentences make the same contribution to the meaning of the text. Therefore, a two-layer attention model is introduced, namely, word-level and sentence-level attention, to assign different weights to different words and sentences, so as to highlight the words and sentences that are important for fault corpus relation extraction and reduce the impact of irrelevant words and sentences on the model.

[0144] The main task of knowledge fusion is entity alignment, that is, aligning entities from multiple constructed subgraphs and establishing connections between entities in different subgraphs. The primary goal of entity alignment is to remove conflicts and redundancies. Conflict refers to the fact that entities in multiple source graphs may have the same name but multiple different meanings. Redundancy refers to the fact that the same meaning of an entity may correspond to multiple different names. The process of knowledge fusion is as follows: Figure 8 As shown. In knowledge fusion, the data is first preprocessed. The quality of the data will directly affect the effect of the final record link. Therefore, it is necessary to perform data normalization and other operations on the data, such as replacing the abbreviation with the official name of the fault. Then the data is divided into blocks, that is, possible matching objects are extracted from all entities in the database as candidates, and they are reduced as much as possible, otherwise it is impossible to compare them one by one due to too much data. Secondly, the data is physically divided into blocks to achieve the effect of load balancing, ensuring that the amount of data in each block is equivalent, so as to improve the computing efficiency by using parallel computing. Thirdly, record linking. This process is based on attribute similarity to calculate entity similarity. Finally, a corresponding threshold is set for each attribute similarity. If this value is exceeded, the two entities are connected to complete knowledge fusion.

[0145] The knowledge graph of fault events of the power communication network and the power grid is stored in Neo4j; there are two types of entity nodes in the knowledge graph model to be constructed in this scheme, namely fault nodes and alarm nodes, where the fault node has four attributes, namely fault number, fault name, fault manifestation and fault processing; the alarm node has six attributes, namely alarm number, alarm name, alarm classification, alarm level, alarm cause and alarm preprocessing. In addition, there are two types of relationships in the fault graph, namely <fault, cause, alarm> and <alarm, derivative, alarm>. That is, there is a causal relationship between faults and alarms, and there is a derivative relationship between alarms. After knowledge fusion, some entity and relationship data contained in the fault graph.

[0146] The risk control module is used to identify key faults in the power grid and communication network, evaluate and sort fault risks, and take corresponding detour paths for risk control. Specifically, if the fault is difficult to repair and cannot be restored in a short time, the service detour is carried out according to the principle of first opening and then repairing, and a detour routing plan is formulated using redundant paths; after the risk is eliminated, the original route is restored to continue transmission. This includes:

[0147] Determine the key points: Before fault identification, the key points must be determined first. Only by ensuring that the key point faults in the network are restored as soon as possible can the impact of the cascading faults be reduced. Here, node risk is used to define the impact of node failures, considering the node failure probability, node importance, and the services carried;

[0148] 1. Node failure probability: As some equipment in the existing communication system is old and the failure rate is rising, and some equipment models are discontinued and after-sales service is terminated, reliability is reduced and risks are increased; in addition, factors such as manufacturing defects and human damage also increase the probability of node failure. The node failure probability can be calculated by collecting historical data from the network management system, which is the ratio of the number of node failures in a time period to the period T. In practice, statistics are calculated based on years, months, weeks, etc.

[0149] 2. Node importance: Node importance is related to node degree and node betweenness. Node betweenness is a global characteristic that describes the importance and influence of nodes in complex networks. It can be expressed by the ratio of the number of shortest paths passing through a node to the total number of shortest paths between any pair of nodes in the network. The larger the node degree, the stronger the node connectivity, which corresponds to a wider range of fault propagation after a fault occurs; the larger the node betweenness, the faster the fault will affect the network performance. Therefore, the node degree-betweenness correlation index is introduced to eliminate the situation where the difference between node betweenness and degree is too large, which can be adjusted according to actual conditions. In addition, communication equipment such as switches and routers in the communication network are deployed in substations and dispatching centers with different voltage levels. Therefore, the importance of the substation site where the node is located is used to approximate the importance of the communication node. The importance of the substation site is related to the site voltage level and site scale. The higher the site voltage level and the wider the site jurisdiction area, the higher the control level. In particular, the communication equipment in the dispatching center is the most important in the network. During the calculation, several different voltage values ​​in the network are normalized first and then the node importance is calculated.

[0150] 3. Node-borne services: The more services a node carries, the greater the node load, and the greater the loss or impact caused by a node failure. Finally, the node risk calculation is performed by comprehensively considering the three aspects.

[0151] Identification of key fault points: When analyzing network fault problems, you first need to restore the fault site, check the network elements and versions, whether there are high-risk operations on site, and whether there have been major upgrades, because these operations may be the root cause of the fault. After the on-site investigation in the previous step, the next step is to look at the specific phenomenon of the fault, mainly to check whether there are high-risk alarms, abnormal performance indicators and other fault events. After determining the key fault events, combined with the fault site data and fault knowledge, automatically derive and generate a coupled fault event propagation chain to derive the root cause event of the fault. If the current root cause event is not sufficient to express the true root cause of the fault, you can also query the relevant basic knowledge and cases in the knowledge base to find possible causes and further obtain solutions to the fault.

[0152] The specific process of fault risk assessment and ranking is as follows: first, the power grid and communication network should be coupled and analyzed to assess risks and impacts, and then corresponding countermeasures should be taken to reduce the impact of fault cascading. The communication network uses risk assessment indicators to rank dangerous points, judge the impact of service channels, and take measures such as service adjustment (detour, etc.), maintenance, and emergency repair. The communication network can also conduct risk assessment through the importance of a line. After discovering the risk, it pushes risk warnings to the power grid, telling the power grid which channels are interrupted and which services of the power grid may need to run on a single channel. After the power grid assesses that a certain line has risks, it pushes risk warnings to the communication network. If the risk reason comes from the communication network side, the communication network will take measures such as detour routing. If the risk reason does not come from the communication network, the communication network should focus on protecting the communication channel of this line and the communication channel of another line corresponding to this line. In order to avoid or suppress the propagation of faults and control the scope of fault propagation, a detour routing strategy can be used to restore key services as soon as possible.

[0153] Risk assessment and ranking: When controlling the scope of faults, it is necessary to conduct a coupling analysis of the risks of the power grid and the communication network to assess the risks. First, obtain various event information such as communication network and power grid faults, maintenance, and re-protection. According to the event information, obtain the event-related resource information of various types. According to the relationship between the protection and stabilization control devices and the business channels, obtain the business channel information related to the power grid. For the above resources, carry out NX analysis under event superposition, analyze the scope and degree of business impact, and generate risk assessment results. Then, on the communication network side, sort the dangerous points according to the communication risk assessment indicators, and analyze the impact of the business channels; on the power grid side, perform a line risk identification through the power grid risk assessment indicators, and sort the importance of the power grid lines.

[0154] 1. Single channel danger point - protection channel reliability ranking: Principle:

[0155] (1) Sort by communication channel reliability;

[0156] (2) Analyze the impact on the protection devices: rank the consequences such as 1 / 2 / 3 / 4 channels of the two devices being unavailable, single / double sets of protection being out of service, etc.;

[0157] (3) Analyze the impact ranking of the withdrawal of primary lines in the power grid (voltage level / impact degree, etc.);

[0158] Steps: Considering factors such as optical cables, equipment, and alarms, static sorting of communication side reliability is performed according to thresholds; thresholds are dynamically adjusted based on sorting principles, and the final sorting is performed.

[0159] Countermeasures: (1) Communications take measures such as business adjustment (detour, etc.), maintenance, and emergency repairs; (2) Based on the results of the reliability ranking of the protection business channels, the risks are transmitted to the power grid, and the power grid prepares corresponding plans.

[0160] 2. Major danger points - ranking of impact on communication network service channels: Principle:

[0161] (1) Analyze the impact on the protection device: sort the consequences such as 1 / 2 / 3 / 4 channels of the two sets of devices being unavailable, single / double sets of protection being out of service, etc.;

[0162] (2) Analyze the impact of the withdrawal of primary power lines in the power grid and rank them (voltage level / impact degree, etc.).

[0163] Steps: Consider various major dangerous situations, and statically sort dangerous points on the communication side according to thresholds; combine sorting principles with protection channel sorting results, dynamically adjust thresholds, and finally sort.

[0164] Countermeasures: (1) Communications take measures such as business adjustment (detour, etc.), maintenance, and emergency repairs; (2) Based on the results of the reliability ranking of the protection business channels, the risks are transmitted to the power grid, and the power grid prepares corresponding plans.

[0165] 3. Grid primary lines - Line importance ranking: Principle:

[0166] (1) Voltage level: within the same voltage level and between different voltages;

[0167] (2) Impact degree: Analysis of the scope and degree of impact on the power grid after the withdrawal of the primary line;

[0168] (3) Important protection: major events and important places (government agencies / research institutions / social activity venues, etc.).

[0169] Countermeasures: (1) The power grid takes measures such as mode adjustment, maintenance, and emergency repair; (2) The power grid provides feedback on security requirements to the communications network, and the communications network formulates emergency plans or takes measures such as mode adjustment, maintenance, and emergency repair as needed.

[0170] Detour routing strategy: Under normal circumstances, the power failure handling process is as follows. When a substation fails, such as site S3, according to the PFP model, capacity s3 At the same time, the information indicating that the node has failed will be sent to the control center CC in the communication network. When the control center receives the information indicating the failure, it calculates the current distribution through the control center CC and forwards the calculation result instruction to the substation through routing. Substation Ge performs machine cutting or load shedding operation according to the transmitted instruction to change the rated capacity so that the capacity of site S3 is controlled within its maximum capacity range, thereby avoiding further fault cascading.

[0171] Cascade time dimension: For cascade mode, there is at least one fault pair in the interdependent coupling network at the same time. Cascade space dimension: For cascade mode, the fault pair is limited to a specific path in the interdependent coupling network. At the same time, in the interdependent coupling network, if the node type is not considered, the fault pair must be located in a closed path.

[0172] For example: for fault i,j =(S i ,R j ), there are two scenarios that need to be examined in detail. First, suppose there is a faulty site S i Directly communicate with the faulty router node R j connected, then the fault is i,j =(S i ,R j ) is obviously located in a closed path information. Another case is that if R j Located from corr{S i} to CC (the correlation function corr is defined as, Then we can construct a line from corr{S i} to CC via node R j Path Since the communication network is connected, three paths can be used as reference path corr{Si},CC and (S i ,corr{S i})∈E pc , and then draw the above conclusions, such as Fig. 9 shown.

[0173] For the cascade mode, both the time dimension and the space dimension must be satisfied at the same time. Since the purpose of the study is to slow down or avoid the formation of the cascade mode, we can get inspiration from the necessary conditions for the formation of the cascade mode obtained above, that is, as long as the necessary conditions for the cascade are destroyed as much as possible, the occurrence of the cascade can be slowed down;

[0174] In an interdependent coupling network, making necessary redundancy in the communication path can mitigate the occurrence of cascading mode. Assume that the fault pair is f i,j =(S i ,R j ), and S i ∈V p ,R j ∈V c According to the cascade space dimension, there must be a related closed path path = (S i ,corr{S i},…R j …,CC,…corr{Ge},Ge,…Si-1 ,S i From the perspective of the communication network, it can be inferred that the subpath spath = (corr{S i},…R j ,...,CC,…corr{Ge}) is very critical. According to the time dimension of the cascade, R j ∈subpath. In order to slow down the formation of the cascade mode, the redundant path rpath=(corr{S i},...R j r ,...,CC,…corr{Ge}) and satisfy subpath∩rpath={CC} to destroy one of the necessary conditions for the generation of cascade mode, the cascade space dimension. After risk analysis, if the fault repair is difficult and cannot be restored in a short time, business detours should be carried out according to the principle of first opening and then repairing. Use redundant paths to formulate detour routing plans to ensure continuous and reliable transmission of key services, avoid large-scale fault cascading, and control the scope of the fault. After the risk is eliminated, restore to the original route to continue transmission.

[0175] By filtering, compressing and other pre-processing of alarms, the implicit correlation between alarms can be discovered from a large amount of alarm data, and the root cause of the alarm of the network element or equipment can be found, assisting operation and maintenance personnel to promptly discover the root cause of the fault, and analyzing the impact of the fault on the power grid through the fault transmission mechanism between the power grid and the communication network, thereby improving the efficiency of fault handling and ensuring safe and stable operation of the power grid.

[0176] By identifying coupled services in the power grid and communication network, analyzing the mutual influence relationship between services, studying the fault coupling event chain in the network, grasping the process of fault propagation in the interdependent coupled network, and analyzing the necessary coupling conditions, we can avoid or alleviate the problem of cascading blackouts caused by fault propagation.

[0177] By applying the proposed knowledge extraction, knowledge fusion and knowledge storage to the fault alarm data set, transmission network fault handling work order and other data of the power communication network and the power grid, a knowledge base of fault events and association rules is constructed, thereby applying the fault knowledge base to lower the operation and maintenance threshold and improve the accuracy of fault location.

[0178] Through the fault association rules and fault event knowledge base constructed in the power communication network and power grid, the alarm information collected in real time in the coupled network is analyzed according to the on-site phenomena and rules, and the possible root causes of the faults are determined, thereby realizing the identification of key point faults and further providing fault handling suggestions for operation and maintenance personnel.

[0179] Through coupling analysis of power grid and communication network risks, risk assessment, risk assessment ranking, and analysis of business channel impact, a detour routing strategy is adopted to ensure continuous and reliable transmission of key businesses, avoid large-scale fault cascading, and control the scope of faults.

[0180] Embodiment 2:

[0181] The working method of the system in the first embodiment includes the following steps:

[0182] Obtain the operation status data of the power grid and the security protection data of the communication network, and determine the business coupling relationship between the communication network and the power grid based on the communication events and power grid events corresponding to the fault alarm events;

[0183] According to the business coupling relationship determined by the business analysis module, the power grid event corresponding to the fault alarm event in the power grid and the communication event corresponding to the same fault alarm event in the communication network are combined into a related event chain and pre-processed; according to the relationship between the features corresponding to the alarm sequence in the event chain and the features, fault diagnosis is performed and the fault point is located;

[0184] According to the event chain corresponding to the alarm event, the risk items in the alarm event are pushed to the designated staff in the power grid and communication network;

[0185] Build a knowledge base of fault events in power grid and communication network through knowledge extraction, knowledge fusion and knowledge storage;

[0186] According to the fault event knowledge base, key point faults in the power grid and communication network are determined, and the risk level and corresponding detour path corresponding to the key point faults are determined according to the set sorting rules.

[0187] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A fault warning system for power communication network and power grid, characterized in that: include: The service analysis module is configured to: determine the service coupling relationship between the communication network and the power grid based on the operation status data of the power grid and the security protection data of the communication network and the communication event and the power grid event corresponding to the fault alarm event; The fault analysis module is configured to: according to the service coupling relationship determined by the service analysis module, merge the power grid event corresponding to the fault alarm event occurring in the power grid and the communication event corresponding to the same fault alarm event occurring in the communication network into a related event chain and pre-process it; According to the features corresponding to the alarm sequence in the event chain and the relationship between the features, fault diagnosis is performed and the fault point is located; The coupling analysis module is configured to: push the risk items in the alarm event to designated staff in the power grid and the communication network according to the event chain corresponding to the alarm event; The information integration module is configured to: construct a knowledge base of fault events of the power grid and communication network through knowledge extraction, knowledge fusion and knowledge storage; The risk control module is configured to: determine the key point faults in the power grid and the communication network according to the fault event knowledge base, and determine the risk level and corresponding detour path corresponding to the key point faults according to the set sorting rules.

2. A fault early warning system for electric power communication network and power grid as claimed in claim 1, characterized in that: Preprocessing event chain, including: Step 11, judging whether the alarms belong to the same alarm observation window according to the alarm reporting time, and extracting a group of alarms reported in the most recent alarm observation window; Step 12: extract the alarm information that is the same as the typical alarm according to the alarm name, and delete other meaningless and redundant alarms; Step 13, according to the different subnets to which the alarms belong, the alarms are grouped according to different subnets. Characteristic alarm groups are established and stored in the database; Step 14, looping through steps 12 and 13 until all alarms reported in the alarm observation window are traversed.

3. A fault early warning system for electric power communication network and power grid as claimed in claim 1, characterized in that: After the preprocessing event chain, alarm compression is also included, specifically: Step 21: determine whether the alarm reporting time in the characteristic alarm group is the same, extract characteristic alarms with the same alarm reporting time, and group them by time; Step 22: Determine whether the alarm names are the same, and extract characteristic alarms with the same alarm names; Step 23: determine whether the network element names reporting the alarm are the same, and extract characteristic alarms with the same network element names reporting the alarm; Step 24: Determine whether the physical ports reporting the alarm are the same, and extract alarms with the same physical ports; Step 25: compress multiple identical characteristic alarms into one alarm; Step 26: Execute steps 22, 23, 24 and 25 in a loop until the alarm traversal grouped by time is completed.

4. A fault early warning system for electric power communication network and power grid as claimed in claim 1, characterized in that: After the preprocessing event chain, it also includes alarm observation window confirmation, specifically: Step 31: In the initial operation stage of alarm collection, a larger initial alarm observation window is pre-set; Step 32: In the alarm observation window, collect the alarm sequence reported in the network; Step 33: During the alarm preprocessing analysis, the alarm filtering extracts each characteristic alarm group in the alarm sequence, and the alarm compression compresses multiple identical alarms occurring simultaneously in each characteristic alarm group; Step 34: After the alarm preprocessing analysis process is completed, the reporting time of each characteristic alarm group and the maximum characteristic group reporting time are calculated; Step 35: Calculate the size of a new alarm observation window; adjust the size of the alarm observation window, and collect the alarm sequence reported in the network at the beginning of the next new time window; Step 36: Execute steps 32 to 35 in a loop until the size of the alarm observation window meets the requirement.

5. A fault early warning system for electric power communication network and power grid as claimed in claim 1, characterized in that: Before fault diagnosis, there is also an alarm rule search, specifically: matching a pre-defined typical alarm sequence, determining whether all alarms defined in the typical alarm sequence are reported in the characteristic alarm subset, and establishing a related alarm group according to the fault diagnosis rules after matching with the typical alarm sequence.

6. A fault early warning system for electric power communication network and power grid as claimed in claim 1, characterized in that: Fault diagnosis is specifically as follows: matching the prerequisites in the alarm rules, matching the upstream and downstream nodes for each fault rule, extracting the alarms in the relevant alarm group, comparing them with the prerequisites in the fault rules, and determining that all conditions are met, then diagnosing it as a fault.

7. A fault warning system for electric power communication network and power grid as claimed in claim 1, characterized in that: Locate the fault point, specifically: use the connection relationship and inclusion relationship between communication entities to determine the location where the alarm occurs, extract the node and hardware port attributes that report the alarm, and based on the known connection relationship, connect all alarms according to the subnet they belong to, and store them in different alarm subsets.

8. A fault early warning system for electric power communication network and power grid as claimed in claim 1, characterized in that: Knowledge extraction, specifically: obtaining public documents on communication networks and power grids, dividing the knowledge source corpus in the documents into three types: structured, semi-structured and unstructured, and extracting the corresponding knowledge graph through data mapping technology, extraction algorithms and wrappers.

9. A fault early warning system for electric power communication network and power grid as claimed in claim 1, characterized in that: Knowledge fusion is specifically as follows: preprocessing and segmenting the knowledge graph data obtained in knowledge extraction, that is, extracting possible matching objects from all entities in the database as candidates; recording links; setting corresponding thresholds for each attribute similarity, and if this value is exceeded, connecting the two entities to complete knowledge fusion.

10. A working method of the fault warning system according to any one of claims 1 to 9, characterized in that: The following steps are involved: Obtain the operation status data of the power grid and the security protection data of the communication network, and determine the business coupling relationship between the communication network and the power grid based on the communication events and power grid events corresponding to the fault alarm events; According to the business coupling relationship determined by the business analysis module, the power grid event corresponding to the fault alarm event in the power grid and the communication event corresponding to the same fault alarm event in the communication network are combined into a related event chain and pre-processed; According to the features corresponding to the alarm sequence in the event chain and the relationship between the features, fault diagnosis is performed and the fault point is located; According to the event chain corresponding to the alarm event, the risk items in the alarm event are pushed to the designated staff in the power grid and communication network; Build a knowledge base of fault events in power grid and communication network through knowledge extraction, knowledge fusion and knowledge storage; According to the fault event knowledge base, key point faults in the power grid and communication network are determined, and the risk level and corresponding detour path corresponding to the key point faults are determined according to the set sorting rules.

Citation Information

Cited By

  • Electric power communication system fault positioning method and system

    CN121173663A

  • Fault location methods and systems for power communication systems

    CN121173663B