Management method for automatic travel device, and

By managing the power outage signals and response signals of the automatic driving device in the building system, the dangerous problem of the automatic driving device colliding with people during power outages is solved, reducing the inspection work of the building manager and improving safety.

CN118891183AActive Publication Date: 2024-11-01MITSUBISHI ELECTRIC BUILDING SOLUTIONS CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202280093674.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2022-03-16
Publication Date
2024-11-01
Estimated Expiration
2042-03-16

AI Technical Summary

Technical Problem

During power outage, the automatic driving device cannot receive the power outage signal, resulting in a risk of collision with people when driving in the building. The building manager needs to conduct inspections, which increases labor and risks.

Method used

By setting up a management device in the building system, sending a power outage signal to the automatic driving device, and receiving a response signal to notify the building manager of the ID and status of the automatic driving device, ensuring that the automatic driving device performs a predetermined power outage action during a power outage, reducing management inspectors.

Benefits of technology

During power outages, the labor force for building managers to conduct inspections is reduced, safety is improved, and the risk of automatic driving devices colliding with people is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118891183A_ABST
    Figure CN118891183A_ABST
Patent Text Reader

Abstract

When a power failure occurs in a building (B101), a building management device (C101) transmits a power failure signal for notifying a designated automatic travel device (10) of the occurrence of the power failure to a plurality of management devices (20A, 20B, 20C, 20D), and each of the plurality of management devices (20A, 20B, 20C, 20D) transmits the power failure signal to the automatic travel device (10) in the building (B101). When receiving a power failure signal specifying the automatic travel device (10), the automatic travel device (10) transmits a power failure response signal to a management device (20) that manages the automatic travel device (10), and when the management device (20) does not receive the power failure response signal from a specified automatic travel device (10) among the managed automatic travel devices (10), the automatic travel device (10) transmits the power failure response signal to the management device (20). The ID of the designated automatic driving device (10) is notified to a building management device (C101), and the building management device (C101) notifies a building manager of the notified ID of the automatic driving device (10).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a management method of an automatic driving device and an automatic driving device. Background Art

[0002] In the past, there are known automatic driving devices that stop working when there is a power outage. For example, in the unmanned transport control system of Patent Document 1 (Japanese Patent Publication No. 2002-199511), when a power outage occurs, a power outage automatic detection device (installed on the factory side) sends a power outage signal to the unmanned transport vehicle, and if the unmanned transport vehicle has not completed the work (various pre-set works) instructed by the command received before the power is cut off, the power is cut off after completing the work.

[0003] Prior art literature

[0004] Patent Literature

[0005] Patent Document 1: Japanese Patent Application Publication No. 2002-199511 Summary of the invention

[0006] Problem that the invention aims to solve

[0007] However, in the system described in Patent Document 1 (Japanese Patent Application Laid-Open No. 2002-199511), if the automatic driving device installed in the building cannot receive the power failure signal, there is a risk of collision with people due to the automatic driving device running in the building during the power failure. To avoid this, during the power failure, the building manager needs to patrol the building to check the operating conditions of all the automatic driving devices in the building.

[0008] Therefore, an object of the present disclosure is to provide a management method of an autonomous driving device and an autonomous driving device that can reduce the labor of inspection work performed by a building manager during a power outage.

[0009] Means used to solve problems

[0010] The management method of automatic driving devices disclosed in the present invention is a management method of automatic driving devices in a building system, wherein the building system includes a building management device for managing equipment in the building, a plurality of automatic driving devices arranged in the building and each belonging to any of a plurality of types, and a plurality of management devices each managing automatic driving devices of a corresponding type, wherein the management method of automatic driving devices includes the following steps: when a power outage occurs in the building, the building management device sends a power outage signal for notifying a designated automatic driving device of the power outage to the plurality of management devices; the plurality of management devices each forwards the power outage signal to the automatic driving devices in the building; when the automatic driving device receives the power outage signal for the designated automatic driving device, the automatic driving device sends a power outage response signal to the management device that manages the automatic driving device; when the management device does not receive the power outage response signal from the designated automatic driving device among the managed automatic driving devices, the management device notifies the building management device of the ID of the designated automatic driving device; and the building management device notifies the building manager of the ID of the notified automatic driving device.

[0011] The automatic driving device disclosed in the present invention is an automatic driving device in a building system, the building system includes a building management device for managing a building, a plurality of automatic driving devices each belonging to an arbitrary type and arranged in the building, and a plurality of management devices each managing the automatic driving devices of a corresponding type, wherein the automatic driving device includes: a wireless communication device; a memory; and a processor that executes a program in the memory. When the processor receives a power outage signal from at least one of the plurality of management devices via the wireless communication device, the processor sends a power outage response signal to the management device that manages the automatic driving device via the wireless communication device, and executes an action in the event of a power outage that is predetermined according to the type of the automatic driving device.

[0012] Effects of the Invention

[0013] According to the present disclosure, it is possible to reduce the labor of inspection work performed by a building manager during a power outage. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a diagram showing the structure of a building system according to an embodiment.

[0015] Figure 2 1 is a diagram showing a configuration example of the automatic driving device 10 .

[0016] Figure 3 The diagram shows an example of a communication API from the building management device C to the management device 20 for traveling devices and an example of a communication API from the management device 20 for traveling devices to the automatic traveling device 10 .

[0017] Figure 4 It is a diagram showing examples of types of automatic driving devices.

[0018] Figure 5 It is a diagram showing an example of the position of an automatic driving device.

[0019] Figure 6 This is a diagram showing an example of the power supply status of a building.

[0020] Figure 7 This is a diagram showing an example of the business status of a building.

[0021] Figure 8 1 is a diagram showing an example of a communication API from the automatic driving device 10 to the driving device management device 20 .

[0022] Fig. 9 It is a diagram showing an example of the state of the automatic driving device.

[0023] Fig.10 1 is a diagram showing an example of a communication API from the management device 20 of the traveling device to the building management device C.

[0024] Fig.11 It is a diagram showing an example of the state of the automatic driving device.

[0025] Fig.12 It is a flowchart showing the operation procedure of the building management device C.

[0026] Fig.13 It is a flowchart showing the operation procedure of the traveling device management device 20 .

[0027] Fig.14 It is a flowchart showing the operation procedure of the automatic driving device 10 .

[0028] Fig.15 This is a diagram showing the first operation example.

[0029] Fig.16 1 is a diagram showing an example of a power outage signal S1 transmitted in the first operation example.

[0030] Fig.17 1 is a diagram showing an example of a power failure response signal R1 transmitted in the first operation example.

[0031] Fig.18 This is a diagram showing the second operation example.

[0032] Fig.19 It is a diagram showing the third operation example.

[0033] Fig. 20 1 is a diagram showing an example of the non-responding device notification signal R2 transmitted in the third operation example. DETAILED DESCRIPTION

[0034] Hereinafter, embodiments will be described with reference to the drawings.

[0035] Implementation method.

[0036] Figure 1 It is a diagram showing the structure of a building system according to an embodiment.

[0037] The building system includes automatic driving devices 10A, 10B, 10C, and 10D, building management devices C101, C102, and an automatic driving device management system 120.

[0038] Building management device C101 manages and controls the equipment of building B101. Building management device C102 manages and controls the equipment of building B102. When building management devices C101, C102, etc. are collectively referred to, they are recorded as building management device C. When buildings B101, B102, etc. are collectively referred to, they are recorded as building B.

[0039] The automatic driving devices 10A, 10B, 10C, and 10D are respectively arranged in the buildings B101, B102, etc. The automatic driving device 10A is an automatic driving device for security, and performs security duties in the building. The automatic driving device 10B is an automatic driving device for cleaning, and performs cleaning duties in the building. The automatic driving device 10C is an automatic driving device for delivery, and performs delivery duties in the building. The automatic driving device 10D is an automatic driving device for guidance, and performs guidance duties in the building. When these automatic driving devices 10A, 10B, 10C, and 10D are collectively referred to, they are recorded as the automatic driving device 10.

[0040] The management system 120 of the automatic driving device includes a management device 20A for automatic driving devices for warning, a management device 20B for automatic driving devices for cleaning, a management device 20C for automatic driving devices for delivery, and a management device 20D for automatic driving devices for guidance. The management device 20A for automatic driving devices for warning manages the automatic driving devices 10A for warning arranged in multiple buildings B101, B102, etc. The management device 20B for automatic driving devices for cleaning manages the automatic driving devices 10B for cleaning arranged in multiple buildings B101, B102, etc. The management device 20C for automatic driving devices for delivery manages the automatic driving devices 10C for delivery arranged in multiple buildings B101, B102, etc. The management device 20D for automatic driving devices for guidance manages the automatic driving devices 10D for guidance arranged in multiple buildings B101, B102, etc. When collectively referring to these automatic driving device management devices 20A, 20B, 20C, and 20D, they are described as a driving device management device 20 .

[0041] The above-mentioned components of the building system can communicate via the Internet, etc. The building management devices C101, C102, etc. can be configured on the cloud, or can be installed in the corresponding buildings B101, B102, and can be operated by emergency power supply during power outage. The management system 120 of the automatic driving device can also be configured on the cloud.

[0042] When a power outage occurs in building B, the following processing is performed.

[0043] When a power outage occurs in building B, the building management device C will send a power outage signal used to notify the designated automatic driving device 10 of the occurrence of the power outage, and will also send the power outage signal to the management device 20A of the warning automatic driving device, the management device 20B of the cleaning automatic driving device, the management device 20C of the delivery automatic driving device, and the management device 20D of the guidance automatic driving device.

[0044] Afterwards, the management device 20 of the plurality of driving devices transmits the power outage signal to the automatic driving devices 10 in the building B respectively.

[0045] Thereafter, upon receiving a power outage signal specifying the automatic driving device 10 , the automatic driving device 10 transmits a power outage response signal to the driving device management device 20 that manages the automatic driving device 10 , and executes a power outage operation predetermined according to the type of the automatic driving device.

[0046] Thereafter, when the driving device management device 20 does not receive a power failure response signal from a designated automatic driving device 10 among the managed automatic driving devices 10 , the driving device management device 20 notifies the building management device C of the ID of the designated automatic driving device.

[0047] After that, the building management device C notifies the building manager of the ID of the notified automatic driving device.

[0048] When power restoration occurs in building B, the following processing is performed.

[0049] When power restoration occurs in building B, the building management device C will send a power restoration signal for notifying the designated automatic driving device 10 of the power restoration, and will also send the power restoration signal to the management device 20A of the warning automatic driving device, the management device 20B of the cleaning automatic driving device, the management device 20C of the delivery automatic driving device, and the management device 20D of the guidance automatic driving device.

[0050] Afterwards, the management device 20 of multiple driving devices transmits the power restoration signal to the automatic driving device 10 in building B respectively.

[0051] Thereafter, upon receiving a power restoration signal specifying the automatic driving device 10 , the automatic driving device 10 sends a power restoration response signal to the management device 20 that manages the driving device of the automatic driving device 10 , and executes a power restoration action predetermined according to the type of the automatic driving device.

[0052] Thereafter, when the driving device management device 20 does not receive the power supply restoration response signal from the designated automatic driving device 10 among the managed automatic driving devices 10 , the driving device management device 20 notifies the building management device C of the ID of the designated automatic driving device.

[0053] After that, the building management device C notifies the building manager of the ID of the notified automatic driving device. The notification may be made by displaying a message on a display device or outputting a voice message from a speaker.

[0054] Figure 2 1 is a diagram showing a configuration example of the automatic driving device 10 .

[0055] The automatic driving device 10 includes a wireless communication device 11, a control device 12, and a drive unit 15. The control device 12 includes a memory 13 and a processor 14.

[0056] The memory 13 stores a program. The processor 14 executes the program in the memory 13. The operation of the control device 12 described below is performed by the processor 14 executing the program in the memory 13.

[0057] The wireless communication device 11 communicates with the management device 20A of the automatic driving device for warning, the management device 20B of the automatic driving device for cleaning, the management device 20C of the automatic driving device for delivery, and the management device 20D of the automatic driving device for guidance in the management system 120 of the automatic driving device through the Internet or the intranet in the building. For example, even when the automatic driving device 10 is the automatic driving device 10A for warning, the wireless communication device 11 can communicate not only with the management device 20A of the automatic driving device for warning, but also with the management device 20B of the automatic driving device for cleaning, the management device 20C of the automatic driving device for delivery, and the management device 20D of the automatic driving device for guidance.

[0058] The driving unit 15 generates a driving force for the autonomous driving device 10 to travel. The driving unit 15 includes, for example, wheels for moving the autonomous driving device 10 and a motor for driving the wheels. The motor can be operated by receiving power supplied from the battery 18.

[0059] The battery 18 supplies electric power for operating each device constituting the automatic driving device 10 .

[0060] When the control device 12 receives a power outage signal from at least one of the management devices 20A, 20B, 20C, and 20D of multiple driving devices via the wireless communication device 11, the control device 12 sends a power outage response signal to the management device 20 of the driving device that manages the automatic driving device 10 via the wireless communication device 11, and performs an action during a power outage that is predetermined according to the type of the automatic driving device 10.

[0061] When the control device 12 receives a power restoration signal from at least one of the management devices 20A, 20B, 20C, and 20D of multiple driving devices via the wireless communication device 11, the control device 12 sends a power restoration response signal to the management device 20 of the driving device that manages the automatic driving device 10 via the wireless communication device 11, and performs the power restoration action predetermined according to the type of the automatic driving device 10.

[0062] The communication between the building management device C and the management device 20 for the traveling device and the communication between the management device 20 for the traveling device and the automatic traveling device 10 are performed by signals in accordance with a communication API (Application Programming Interface).

[0063] Figure 3 The diagram shows an example of a communication API from the building management device C to the management device 20 for traveling devices and an example of a communication API from the management device 20 for traveling devices to the automatic traveling device 10 .

[0064] The communication API includes a building ID indicating a building at a destination, a type of an automatic driving device at a destination, a position of an automatic driving device at a destination, a power supply status of a building at a destination, and a business status of a building at a destination.

[0065] Figure 4 1 is a diagram showing examples of types of automatic driving devices. The types of automatic driving devices include general, guard, cleaning, delivery, and guidance.

[0066] Figure 5 The figure shows an example of the position of the automatic driving device. The position of the automatic driving device includes all, the office area on the first floor, the store area on the first floor, the public area on the first floor, the office area on the second floor, the store area on the second floor, and the public area on the second floor.

[0067] Figure 6This is a diagram showing an example of the power supply status of a building. The power supply status of a building generally includes power outage and power restoration. When normal is specified as the power supply status of the building, the signal sent through the communication API is a normal signal. When power outage is specified as the power supply status of the building, the signal sent through the communication API is a power outage signal. When power restoration is specified as the power supply status of the building, the signal sent through the communication API is a power restoration signal.

[0068] Figure 7 2 is a diagram showing an example of the business status of a building. The business status of a building includes opening and closing.

[0069] The communication API from the travel device management device 20 to the automatic travel device 10 may not include the building ID. This is because the travel device management device 20 sends a signal only to the automatic travel device 10 in a designated building.

[0070] Figure 8 1 is a diagram showing an example of a communication API from the automatic driving device 10 to the driving device management device 20. The communication API includes the ID of the automatic driving device, the type of the automatic driving device, the position of the automatic driving device, and the state of the automatic driving device.

[0071] Fig. 9 1 is a diagram showing an example of the state of the automatic driving system. The state of the automatic driving system includes a power failure mode and a power supply recovery mode.

[0072] When the power failure mode is specified as the state of the automatic driving device, the signal sent by the communication API is a power failure response signal. When the power supply recovery mode is specified as the state of the automatic driving device, the signal sent by the communication API is a power supply recovery response signal.

[0073] Fig.10 1 is a diagram showing an example of a communication API from the driving device management device 20 to the building management device C. The communication API includes the ID of the automatic driving device, the type of the automatic driving device, the position of the automatic driving device, and the state of the automatic driving device.

[0074] Regarding the unresponsive automatic driving device 10 , the position of the automatic driving device is the final confirmed position of the automatic driving device.

[0075] Fig.11: is a diagram showing an example of the state of an automatic driving device. The state of the automatic driving device includes a power failure mode, a power recovery mode, and no response. When the state of the automatic driving device includes a power failure mode, the signal sent through the communication API is a power failure response signal. When the state of the automatic driving device includes a power recovery mode, the signal sent through the communication API is a power recovery response signal. When the state of the automatic driving device includes no response, the signal sent through the communication API is a non-responding device notification signal.

[0076] Fig.12 It is a flowchart showing the operation procedure of the building management device C.

[0077] In step S201, when the building management device C receives a notification of a power outage from the equipment in the managed building B, the process proceeds to step S202.

[0078] In step S202, the building management device C sends a power outage signal (at Figure 3 The communication API of the building (including power outage as the power supply status of the building) is sent to the management device 20A of the warning automatic driving device, the management device 20B of the cleaning automatic driving device, the management device 20C of the delivery automatic driving device, and the management device 20D of the guidance automatic driving device.

[0079] In step S207, when the building management device C receives the notification of power restoration, the process proceeds to step S208.

[0080] In step S208, the building management device C will restore the power supply signal (at Figure 3 The communication API includes power restoration as the power supply status of the building) and sends it to the management device 20A of the warning automatic driving device, the management device 20B of the cleaning automatic driving device, the management device 20C of the delivery automatic driving device, and the management device 20D of the guidance automatic driving device.

[0081] In step S203, the building management device C receives a non-responding device notification signal (in step S204) from one of the management device 20A for the alarm automatic driving device, the management device 20B for the cleaning automatic driving device, the management device 20C for the delivery automatic driving device, and the management device 20D for the guidance automatic driving device. Fig.10 If the communication API includes no response as the state of the automatic driving device, the processing enters step S204.

[0082] In step S204, the building management device C notifies the building manager of the building management device C of the alarm together with the ID of the automatic driving device, the type of the automatic driving device, and the position of the automatic driving device (final confirmed position) included in the non-response device notification signal. As a result, the building manager can dispatch a worker to the position determined based on the position of the automatic driving device of the building B to perform a check on the state of the automatic driving device 10 determined based on the ID of the automatic driving device.

[0083] In step S205, the building management device C receives a power failure response signal (at the time of receiving the power failure response signal) from one of the management device 20A for the alarm automatic driving device, the management device 20B for the cleaning automatic driving device, the management device 20C for the delivery automatic driving device, and the management device 20D for the guidance automatic driving device. Figure 8 The communication API includes a power failure mode as the state of the automatic driving device) or a power recovery response signal (in Figure 8 In the case where the communication API includes the recovery power supply mode as the state of the automatic driving device, the processing enters step S206.

[0084] In step S206, the building management device C sends a power outage response signal (in Fig.10 The communication API includes a power failure mode as the state of the automatic driving device) or a power recovery response signal (in Fig.10 The ID of the automatic driving device, the type of the automatic driving device, and the location of the automatic driving device contained in the communication API as the status of the automatic driving device (including the recovery power supply mode) are notified to the building manager of the building management device C.

[0085] In step S209, when an instruction to end the control is received, the process ends, and when an instruction to end the control is not received, the process returns to step S201.

[0086] Fig.13 It is a flowchart showing the operation procedure of the traveling device management device 20 .

[0087] In step S301, the management device 20A of the warning automatic driving device, the management device 20B of the cleaning automatic driving device, the management device 20C of the delivery automatic driving device, and the management device 20D of the guidance automatic driving device receive a power failure signal from the building management device C (in Figure 3 If the communication API includes a power outage as the power supply condition of the building, the processing enters step S302.

[0088] In step S302, the management device 20A of the automatic driving device for warning, the management device 20B of the automatic driving device for cleaning, the management device 20C of the automatic driving device for delivery, and the management device 20D of the automatic driving device for guidance forward the power outage signal to the automatic driving device 10 located in the building of the building ID included in the power outage signal. The management device 20A of the automatic driving device for warning, the management device 20B of the automatic driving device for cleaning, the management device 20C of the automatic driving device for delivery, and the management device 20D of the automatic driving device for guidance each forward the power outage signal to the automatic driving device 10 managed by the management device of other driving devices, in addition to forwarding the power outage signal to the automatic driving device 10 managed by the management device of other driving devices. Thus, for example, even if an abnormality occurs in the management device 20A of the warning automatic driving device and a power outage signal cannot be forwarded to the warning automatic driving device 10, a power outage signal is forwarded to the warning automatic driving device 10 from the management device 20B of the cleaning automatic driving device, the management device 20C of the delivery automatic driving device, and the management device 20D of the guidance automatic driving device where no abnormality exists.

[0089] In step S306, the management device 20A of the alarm automatic driving device, the management device 20B of the cleaning automatic driving device, the management device 20C of the delivery automatic driving device, and the management device 20D of the guidance automatic driving device receive the power restoration signal (at the time of Figure 3 If the communication API includes power restoration as the power supply status of the building, the processing enters step S307.

[0090] In step S307, the management device 20A of the automatic driving device for warning, the management device 20B of the automatic driving device for cleaning, the management device 20C of the automatic driving device for delivery, and the management device 20D of the automatic driving device for guidance forward the power restoration signal to the automatic driving device 10 located in the building of the building ID included in the power restoration signal. The management device 20A of the automatic driving device for warning, the management device 20B of the automatic driving device for cleaning, the management device 20C of the automatic driving device for delivery, and the management device 20D of the automatic driving device for guidance each forward the power restoration signal to the automatic driving device 10 managed by the management device, and also forward the power restoration signal to the automatic driving devices 10 managed by other management devices. Thus, for example, even if an abnormality occurs in the management device 20A of the warning automatic driving device and a power outage signal cannot be transmitted to the warning automatic driving device 10, a power restoration signal is transmitted to the warning automatic driving device 10 from the management device 20B of the cleaning automatic driving device, the management device 20C of the delivery automatic driving device, and the management device 20D of the guidance automatic driving device where no abnormality exists.

[0091] In step S303, the driving device management device 20 receives a power outage response signal (at the time of receiving the power outage response signal) from the managed automatic driving device 10 located at the position of the automatic driving device included in the power outage signal or the power restoration signal, when the type of the automatic driving device included in the power outage signal or the power restoration signal is the type of the managed automatic driving device. Figure 8 The communication API includes a power failure mode as the state of the automatic driving device) or a power recovery response signal (in Figure 8 When the communication API includes the recovery power supply mode as the state of the automatic driving device, the process proceeds to step S304. That is, when any of the following four conditions is satisfied, the process proceeds to step S304.

[0092] (a) The management device 20A of the warning automatic driving device receives a power outage response signal or a power supply restoration response signal from the warning automatic driving device 10 located at the position of the automatic driving device included in the power outage signal or the power supply restoration signal when the type of the automatic driving device included in the power outage signal or the power supply restoration signal is "all" or "warning".

[0093] (b) The management device 20B for automatic cleaning devices receives a power outage response signal or a power restoration response signal from the automatic cleaning device 10 located at the position of the automatic cleaning device included in the power outage signal or the power restoration signal when the type of the automatic cleaning device included in the power outage signal or the power restoration signal is "all" or "cleaning".

[0094] (c) The management device 20C of the delivery automatic driving device receives a power outage response signal or a power restoration response signal from the delivery automatic driving device 10 located at the position of the automatic driving device included in the power outage signal or the power restoration signal when the type of the automatic driving device included in the power outage signal or the power restoration signal is "all" or "delivery".

[0095] (d) The management device 20D for guiding automatic driving devices receives a power outage response signal or a power supply restoration response signal from the guiding automatic driving device 10 located at the position of the automatic driving device included in the power outage signal or the power supply restoration signal when the type of automatic driving device included in the power outage signal or the power supply restoration signal is "all" or "guidance".

[0096] In step S304 , the management device 20 of the traveling device forwards the received power outage response signal or power restoration response signal to the building management device C.

[0097] When the type of the automatic driving device included in the power failure signal or the power supply restoration signal is the type of the automatic driving device to be managed, the driving device management device 20 does not receive the power failure response signal or the power supply restoration response signal from the managed automatic driving device 10 located at the position of the automatic driving device included in the power failure signal or the power supply restoration signal, and the processing proceeds to step S305. That is, when any of the following four conditions is met, the processing proceeds to step S305.

[0098] (a) The management device 20A for the warning automatic driving device does not receive a power outage response signal or a power supply restoration response signal from the warning automatic driving device 10 located at the position of the automatic driving device included in the power outage signal or the power supply restoration signal when the type of the automatic driving device included in the power outage signal or the power supply restoration signal is "all" or "warning".

[0099] (b) The management device 20B for automatic cleaning devices does not receive a power outage response signal or a power supply restoration response signal from the automatic cleaning device 10 located at the position of the automatic cleaning device included in the power outage signal or the power supply restoration signal when the type of the automatic cleaning device included in the power outage signal or the power supply restoration signal is "all" or "cleaning".

[0100] (c) The management device 20C of the delivery automatic driving device does not receive a power outage response signal or a power supply restoration response signal from the delivery automatic driving device 10 located at the position of the automatic driving device included in the power outage signal or the power supply restoration signal when the type of the automatic driving device included in the power outage signal or the power supply restoration signal is "all" or "delivery".

[0101] (d) The management device 20D for guiding automatic driving devices does not receive a power outage response signal or a power supply restoration response signal from the guiding automatic driving device 10 located at the position of the automatic driving device included in the power outage signal or the power supply restoration signal when the type of the automatic driving device included in the power outage signal or the power supply restoration signal is "all" or "guidance".

[0102] In step S305, the management device 20 of the traveling device sends a non-response device notification signal (in Fig.10 The communication API includes no response as the status of the automatic driving device) and sends it to the building management device C. The non-responding device notification signal includes the ID, type and location of the automatic driving device for determining the automatic driving device that has not sent a power outage response signal or a power restoration response signal.

[0103] In step S308, when an instruction to end the control is received, the process ends, and when an instruction to end the control is not received, the process returns to step S301.

[0104] Fig.14 It is a flowchart showing the operation procedure of the automatic driving device 10 .

[0105] In step S101, when the control device 12 of the automatic driving device 10 receives a power outage signal from at least one of the management device 20A of the warning automatic driving device, the management device 20B of the cleaning automatic driving device, the management device 20C of the delivery automatic driving device, and the management device 20D of the guidance automatic driving device through the wireless communication device 11, the processing enters step S102.

[0106] In step S102, when the automatic driving device 10 is designated as the destination in the power outage signal, that is, when the "type of automatic driving device" and "position of automatic driving device" contained in the power outage signal are consistent with the type and position of the automatic driving device 10, the processing enters step S103.

[0107] In step S103, the control device 12 of the automatic driving device 10 sends a power outage response signal to the management device 20 of the driving device that manages the automatic driving device 10 through the wireless communication device 11. In the case where the automatic driving device 10 is an automatic driving device for warning, the power outage response signal is sent to the management device 20A of the automatic driving device for warning. In the case where the automatic driving device 10 is an automatic driving device for cleaning, the power outage response signal is sent to the management device 20B of the automatic driving device for cleaning. In the case where the automatic driving device 10 is an automatic driving device for delivery, the power outage response signal is sent to the management device 20C of the automatic driving device for delivery. In the case where the automatic driving device 10 is an automatic driving device for guidance, the power outage response signal is sent to the management device 20D of the automatic driving device for guidance.

[0108] In step S104 , the control device 12 of the automatic driving device 10 shifts to the power outage mode.

[0109] In step S105, the control device 12 of the automatic driving device 10 causes the automatic driving device 10 to execute the determined task in the power outage mode. For example, the automatic driving device 10A for warning may illuminate the surroundings with the lighting device while driving at a low speed in the power outage mode. The automatic driving device 10B for cleaning may also stop in the power outage mode and illuminate the automatic driving device 10B itself with the lighting device to prevent people from colliding with the automatic driving device 10B.

[0110] In step S106, when the control device 12 of the automatic driving device 10 receives a power restoration signal from at least one of the management device 20A of the automatic driving device for warning, the management device 20B of the automatic driving device for cleaning, the management device 20C of the automatic driving device for delivery, and the management device 20D of the automatic driving device for guidance through the wireless communication device 11, the processing enters step S107.

[0111] In step S107, when the automatic driving device 10 is designated as the destination in the restoration power supply signal, that is, when the "type of automatic driving device" and "location of automatic driving device" contained in the restoration power supply signal are consistent with the type and location of the automatic driving device 10, the processing enters step S108.

[0112] In step S108, the control device 12 of the automatic driving device 10 sends a power restoration response signal to the management device 20 of the driving device that manages the automatic driving device 10 through the wireless communication device 11. In the case where the automatic driving device 10 is an automatic driving device for warning, the power restoration response signal is sent to the management device 20A of the automatic driving device for warning. In the case where the automatic driving device 10 is an automatic driving device for cleaning, the power restoration response signal is sent to the management device 20B of the automatic driving device for cleaning. In the case where the automatic driving device 10 is an automatic driving device for delivery, the power restoration response signal is sent to the management device 20C of the automatic driving device for delivery. In the case where the automatic driving device 10 is an automatic driving device for guidance, the power restoration response signal is sent to the management device 20D of the automatic driving device for guidance.

[0113] In step S109 , the control device 12 of the automatic driving device 10 shifts to the recovery power supply mode.

[0114] In step S110 , the control device 12 of the automatic driving device 10 causes the automatic driving device 10 to execute the determined task in the restoration power supply mode.

[0115] In step S111 , when an instruction to end the control is received, the process ends, and when an instruction to end the control is not received, the process returns to step S101 .

[0116] Fig.15 This is a diagram showing the first operation example. Fig.161 is a diagram showing an example of a power outage signal S1 sent in the first operation example. The power outage signal S1 includes "102" as the building ID, "all" as the type of the automatic driving device, "office area on the second floor" as the location of the automatic driving device, "power outage" as the power supply status of the building, and "open" as the business status of the building. It is assumed that the automatic driving device 10 for warning is located in the office area on the second floor of the building with the building ID 102. Fig.17 This is a diagram showing an example of a power outage response signal R1 sent in the first action example. The power outage response signal R1 includes "289" as the ID of the automatic driving device, "alert" as the type of the automatic driving device, "office area on the second floor" as the location of the automatic driving device, and "power outage mode" as the state of the automatic driving device.

[0117] The building management device C102 of the building B102 sends a message to the management device 20A of the automatic driving device for warning, the management device 20B of the automatic driving device for cleaning, the management device 20C of the automatic driving device for delivery, and the management device 20D of the automatic driving device for guidance. Fig.16 The power failure signal S1 is shown.

[0118] The management device 20A for the automatic driving device for warning, the management device 20B for the automatic driving device for cleaning, the management device 20C for the automatic driving device for delivery, and the management device 20D for the automatic driving device for guidance forward the automatic driving device 10 of the building B102 whose building ID is "102". Fig.16 The power failure signal S1 is shown.

[0119] The automatic driving device 10 for warning in the office area on the second floor specified by the power outage signal S1 sends a signal to the management device 20A for warning automatic driving devices. Fig.17 The power failure response signal R1 is shown.

[0120] The management device 20A of the alarm automatic driving device that receives the power failure response signal R1 forwards the signal to the building management device C102 of the building B102. Fig.17 The power failure response signal R1 is shown.

[0121] Fig.18 2 is a diagram showing the second action example. The power outage signal S1 and the power outage response signal R1 of the second action example are the same as the power outage signal S1 and the power outage response signal R1 of the first action example. In the second action example, as in the first action example, it is assumed that the automatic driving device 10 for warning is located in the office area on the second floor of the building with the building ID 102.

[0122] The building management device C102 of the building B102 sends a message to the management device 20A of the automatic driving device for warning, the management device 20B of the automatic driving device for cleaning, the management device 20C of the automatic driving device for delivery, and the management device 20D of the automatic driving device for guidance. Fig.16 The power failure signal S1 is shown.

[0123] Since the management device 20A for warning automatic driving device, the management device 20B for cleaning automatic driving device, and the management device 20C for delivery automatic driving device have abnormalities, the power failure signal S1 is not forwarded. The management device 20D for guiding automatic driving device forwards the power failure signal S1 to the automatic driving device 10 of building B102 with building ID "102". Fig.16 The power failure signal S1 is shown.

[0124] The automatic driving device 10 for warning in the office area on the second floor specified by the power outage signal S1 sends a signal to the management device 20A for warning automatic driving devices. Fig.17 The power failure response signal R1 is shown.

[0125] The management device 20A of the alarm automatic driving device that receives the power failure response signal R1 forwards the signal to the building management device C102 of the building B102. Fig.17 The power failure response signal R1 is shown.

[0126] Fig.19 3 is a diagram showing the third action example. The power failure signal S1 of the third action example is the same as the power failure signal S1 of the first action example. In the third action example, as in the first action example, it is assumed that the automatic driving device 10 for warning is located in the office area on the second floor of the building with the building ID 102. Fig. 20 : is a diagram showing an example of the unresponsive device notification signal R2 transmitted in the third operation example. The unresponsive device notification signal R2 includes "289" as the ID of the automatic driving device, "alert" as the type of the automatic driving device, "office area on the second floor" as the final confirmed position of the automatic driving device, and "no response" as the state of the automatic driving device.

[0127] The building management device C102 of the building B102 sends a message to the management device 20A of the automatic driving device for warning, the management device 20B of the automatic driving device for cleaning, the management device 20C of the automatic driving device for delivery, and the management device 20D of the automatic driving device for guidance. Fig.16 The power failure signal S1 is shown.

[0128] The management device 20A for the automatic driving device for warning, the management device 20B for the automatic driving device for cleaning, the management device 20C for the automatic driving device for delivery, and the management device 20D for the automatic driving device for guidance forward the automatic driving device 10 of the building B102 whose building ID is "102". Fig.16 The power failure signal S1 is shown.

[0129] Since an abnormality has occurred in the automatic driving device 10 for warning in the office area on the second floor specified by the power outage signal S1, the power outage response signal R1 is not transmitted to the management device 20A for automatic driving devices for warning.

[0130] The management device 20A of the warning automatic driving device that has not received the power failure response signal R1 forwards the signal to the building management device C102 of the building B102. Fig. 20 The unresponsive device notification signal R2 is shown.

[0131] Variation example.

[0132] The following modifications are also within the scope of the present disclosure.

[0133] (1) Power outage signal

[0134] When the business status of the building included in the power outage signal is "closed", the automatic driving device 10 will not collide with a person, and therefore, the normal mode may be maintained even if the power outage signal is received.

[0135] (2) In the embodiment, the management device 20 of the driving device not only forwards the power outage signal and the power restoration signal to the managed type of automatic driving device 10, but also forwards the power outage signal and the power restoration signal to the unmanaged type of automatic driving device 10, but the present invention is not limited thereto. The management device 20 of the driving device may also forward the power outage signal and the power restoration signal only to the managed type of automatic driving device 10.

[0136] (3) In the embodiment, the automatic driving device 10 always sends a power outage response signal or a power restoration response signal to the management device 20 that manages the automatic driving device 10, regardless of which driving device management device 20 the automatic driving device 10 receives the power outage signal or the power restoration signal from, but the present invention is not limited thereto. The automatic driving device 10 may also send a power outage response signal or a power restoration response signal to the management device 20 of the driving device that is the source of the power outage signal or the power restoration signal when receiving the power outage signal or the power restoration signal.

[0137] The embodiments disclosed this time are illustrative in all aspects and should not be construed as restrictive. The scope of the present disclosure is indicated by the claims rather than the above description, and includes all modifications within the meaning and scope equivalent to the claims.

[0138] Description of Reference Numerals

[0139] 10, 10A, 10B, 10C, 10D automatic driving device, 11 wireless communication device, 12 control device, 13 memory, 14 processor, 15 driving unit, 18 battery, 20, 20A, 20B, 20C, 20D driving device management device, 120 automatic driving device management system, B, B101, B102, ID building, C, C101, C102 building management device.

Claims

1. A method for managing an automatic driving device, which is a method for managing an automatic driving device in a building system, the building system comprising a building management device for managing equipment in a building, a plurality of automatic driving devices arranged in the building and each belonging to any of a plurality of types, and a plurality of management devices each managing the automatic driving device of a corresponding type, wherein: The management method of the automatic driving device comprises the following steps: When a power outage occurs in the building, the building management device sends a power outage signal for notifying the designated automatic driving device of the power outage to the plurality of management devices at the same time; The plurality of management devices each forward the power outage signal to the automatic driving device in the building; The automatic driving device, upon receiving the power failure signal specifying the automatic driving device, sends a power failure response signal to the management device that manages the automatic driving device; The management device, when not receiving the power failure response signal from the designated automatic driving device among the managed automatic driving devices, notifies the building management device of the ID of the designated automatic driving device; as well as The building management device notifies the building manager of the ID of the notified automatic driving device.

2. The management method of the automatic driving device according to claim 1, wherein: The management method of the automatic driving device further comprises the following steps: The automatic driving device, when receiving the power failure signal designating the automatic driving device, executes an operation at the time of power failure that is predetermined according to the type of the automatic driving device.

3. The management method of the automatic driving device according to claim 1 or 2, wherein: The power failure signal includes the type of the automatic driving device and the position of the automatic driving device to specify the automatic driving device.

4. The method for managing an automatic driving device according to any one of claims 1 to 3, wherein: The power failure response signal includes the ID of the automatic driving device, the type of the automatic driving device, and the position of the automatic driving device.

5. The management method of an automatic driving device according to any one of claims 1 to 4, wherein: The management method of the automatic driving device further comprises the following steps: When power supply to the building is restored, the building management device sends a power restoration signal for notifying the designated automatic driving device of power restoration to the multiple management devices; The multiple management devices each forward the power restoration signal to the multiple automatic driving devices in the building; The automatic driving device, when receiving the power restoration signal specifying the automatic driving device, sends a power restoration response signal to the management device that manages the automatic driving device; When the management device does not receive the power restoration response signal from the designated automatic driving device among the managed automatic driving devices, the management device notifies the building management device of the ID of the designated automatic driving device; as well as The building management device notifies the building manager of the ID of the notified automatic driving device.

6. The management method of the automatic driving device according to claim 5, wherein: The power restoration signal includes the type of the automatic driving device and the position of the automatic driving device to specify the automatic driving device.

7. The management method of an automatic driving device according to claim 5 or 6, wherein: The power restoration response signal includes the ID of the automatic driving device, the type of the automatic driving device, and the location of the automatic driving device.

8. The method for managing an automatic driving device according to any one of claims 1 to 7, wherein: The step of forwarding the power outage signal comprises the following steps: Each of the plurality of management devices transfers the power outage signal to managed and unmanaged automatic driving devices in the building.

9. An automatic driving device, which is an automatic driving device in a building system, the building system comprises a building management device for managing a building, a plurality of automatic driving devices arranged in the building and each belonging to an arbitrary type, and a plurality of management devices each managing the automatic driving devices of a corresponding type, wherein: The automatic driving device comprises: Wireless communication equipment; Memory; as well as a processor that executes the program in the memory, When the processor receives a power outage signal from at least one of the multiple management devices via the wireless communication device, it sends a power outage response signal to the management device that manages the automatic driving device via the wireless communication device, and performs an action during the power outage that is predetermined based on the type of the automatic driving device.

10. The automatic driving device according to claim 9, wherein: The processor also sends a power restoration response signal to the management device that manages the automatic driving device through the wireless communication device when a power restoration signal is received from at least one of the multiple management devices through the wireless communication device, and performs a power restoration action predetermined according to the type of the automatic driving device.

Citation Information

Patent Citations

  • Vehicle travel control assistance device

    CN104271418A

  • Power utilization emergency management system

    CN112101707A

  • Device and method of power failure automatic detection and power supply automatic cutoff for automated guided vehicle

    JP2002199511A

  • Mobile body, controller, mobile body system, and control method of mobile body

    JP2018170596A

  • Emergency stop system for work machine

    JP2019016296A