Refrigerant charging method

By connecting the containers of high-boiling and medium-boiling refrigerant to the specific ports of the refrigerant, and charging with the pressure difference is used for filling, the problem of separation of non-zeotropic mixed refrigerant in the refrigerant is solved, and the reliable charging and charging of refrigerant is achieved. Evenly distributed, suitable for freezing devices such as ultra-low temperature freezers.

CN118891482APending Publication Date: 2024-11-01PHC HLDG CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380027850.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-03-29
Filing Date
2023-02-01
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

In the non-zeotropic mixed refrigerant, the plurality of refrigerants may have a separate state before being filled into the refrigerant circuit, making it difficult to reliably fill into the refrigerant circuit.

Method used

By connecting the container sealed with high boiling and medium boiling refrigerant to a specific port of the refrigerant, the pressure difference between the compressor and the throttling device is used to successively use the high boiling refrigerant in the liquid state and the medium boiling refrigerant in the wet gas state to successively use the pressure difference between the compressor and the throttling device. Charge into the freezing circuit to ensure reliable charging.

Benefits of technology

It realizes reliable filling of non-zeotropic mixed refrigerant into the refrigerant circuit, ensuring uniform distribution and efficient operation of refrigerant, and is suitable for refrigeration devices such as ultra-low temperature refrigerators.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118891482A_ABST
    Figure CN118891482A_ABST
Patent Text Reader

Abstract

This refrigerant charging method charges a refrigeration circuit provided with a compressor, a condenser, a throttle device, an evaporator, and a first port disposed at a high-pressure portion of the compressor or at a position downstream of the compressor and upstream of the throttle device. The refrigerant charging method includes: connecting, to the first port, an opening of a container in which a refrigerant containing a high-boiling-point refrigerant in a liquid state and a medium-boiling-point refrigerant in a wet gas state, the medium-boiling-point refrigerant having a boiling point lower than that of the high-boiling-point refrigerant is sealed; and filling at least a part of the refrigerant in the container into the freezing circuit from the container with the opening facing downwards through the first port.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a refrigerant charging method. Background Art

[0002] Patent Document 1 discloses a method of filling a refrigerant circuit with a non-azeotropic refrigerant mixture using a cylinder containing a non-azeotropic refrigerant mixture in an amount that can be filled at once. In this method, the refrigerant circuit is used in an air conditioner, and R407C is used as the non-azeotropic refrigerant mixture.

[0003] R407C is composed of HFC32 (boiling point: -51.7°C), HFC125 (boiling point: -48.5°C) and HFC134a (boiling point: -26.5°C). The boiling points of these three refrigerants are relatively close to each other. Therefore, it is believed that these three refrigerants are mixed relatively evenly in the cylinder at room temperature before filling the refrigerant circuit.

[0004] Prior art literature

[0005] Patent Literature

[0006] Patent Document 1: Japanese Patent Application Laid-Open No. 08-200897 Summary of the invention

[0007] Problem that the invention aims to solve

[0008] Among non-azeotropic refrigerant mixtures, there are also non-azeotropic refrigerant mixtures composed of multiple refrigerants with greatly different boiling points, such as non-azeotropic refrigerant mixtures filled in the refrigeration circuit of ultra-low temperature freezers that achieve extremely low temperatures below -80°C. Before being filled into the refrigeration circuit, the multiple refrigerants may exist in a state of being separated from each other in the sealed container. A method for reliably filling a non-azeotropic refrigerant mixture in such a state into a refrigeration circuit is desired.

[0009] The technical problem to be solved by the present disclosure is to provide a refrigerant charging method capable of reliably charging a non-azeotropic mixed refrigerant into a refrigeration circuit.

[0010] Solutions to the problem

[0011] The refrigerant charging method disclosed in the present invention is a refrigerant charging method for charging a refrigeration circuit having a compressor, a condenser, a throttling device, an evaporator and a first port, wherein the first port is arranged at a high-pressure part of the compressor or at a position downstream of the compressor and upstream of the throttling device, and the refrigerant charging method includes the following steps: connecting the mouth of a container sealed with the following refrigerant to the first port, wherein the refrigerant includes a high-boiling-point refrigerant in a liquid state and a medium-boiling-point refrigerant in a humid gas state, and the boiling point of the medium-boiling-point refrigerant is lower than that of the high-boiling-point refrigerant; and charging at least a portion of the refrigerant in the container from the container with the mouth facing downward into the refrigeration circuit via the first port.

[0012] Effects of the Invention

[0013] According to the present disclosure, a refrigerant charging method capable of reliably charging a non-azeotropic mixed refrigerant into a refrigeration circuit can be provided. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a diagram showing an example of a refrigeration circuit.

[0015] Figure 2 It is a schematic diagram showing the container and the refrigerant therein.

[0016] Figure 3 It is a schematic diagram showing the container and the refrigerant therein.

[0017] Figure 4 is a schematic diagram of the fixture.

[0018] Figure 5 It is a schematic diagram showing a container and the refrigerant and oil carrier therein.

[0019] Figure 6 It is a schematic diagram showing a modified example of a container and the refrigerant therein. DETAILED DESCRIPTION

[0020] Figure 1 1 is a schematic diagram of a refrigeration circuit 100 according to one embodiment of the present disclosure. The refrigeration circuit 100 is used in a refrigeration device such as a cryogenic refrigerator.

[0021] The refrigeration circuit 100 includes a compressor 1, a condenser 2, a gas-liquid separator 3, a first heat exchanger 4, an auxiliary throttling device 5, a throttling device 6, a second heat exchanger 7, and an evaporator 8. In addition, the refrigeration circuit 100 may also include a refrigerant tank 9 and a throttling device 10 for connecting the refrigerant tank.

[0022] exist Figure 1 In FIG. 1 , the lines connecting the above-mentioned elements constituting the refrigeration circuit 100 represent pipes. Figure 1The arrows in the figure indicate the flow of the refrigerant in the pipe. The refrigerant flowing in the refrigeration circuit 100 is a mixture of refrigerants having different boiling points, i.e., a non-azeotropic mixed refrigerant. The non-azeotropic mixed refrigerant includes a high-boiling-point refrigerant, a medium-boiling-point refrigerant having a boiling point lower than that of the high-boiling-point refrigerant, and a low-boiling-point refrigerant having a boiling point lower than that of the medium-boiling-point refrigerant. Hereinafter, the non-azeotropic mixed refrigerant may be referred to simply as a refrigerant.

[0023] The compressor 1 compresses the sucked refrigerant and discharges it to the pipe. The discharged refrigerant flows into the condenser 2 through the pipe. The compressor 1 has a low-pressure portion (a portion where the refrigerant before compression exists) between the suction port for sucking the refrigerant and the portion (e.g., cylinder) for compressing the refrigerant, and a high-pressure portion (a portion where the refrigerant after compression exists) between the portion for compressing the refrigerant and the discharge port for discharging the refrigerant.

[0024] The condenser 2 is a heat exchanger having a fan that rotates by means of a fan motor. The condenser 2 is a heat exchanger that cools the refrigerant by heat exchange with the surrounding air sent by the fan, and condenses at least a part of the refrigerant. The refrigerant that has passed through the condenser 2 flows into the gas-liquid separator 3.

[0025] The gas-liquid separator 3 is a container for separating the refrigerant into gas and liquid. The refrigerant in a gaseous state (i.e., the component (the component with a lower boiling point) not condensed in the condenser 2) flows out of the gas-liquid separator 3 while maintaining the gaseous state, and flows into the inner tube 4a of the first heat exchanger 4. In addition, the refrigerant in a liquid state (i.e., the component (the component with a higher boiling point) condensed in the condenser 2) flows out of the gas-liquid separator 3 and flows into the auxiliary throttling device 5.

[0026] The auxiliary throttling device 5 is, for example, a capillary tube. When passing through the auxiliary throttling device 5, the refrigerant is throttled and expanded, and the pressure and temperature of the refrigerant are reduced. The refrigerant flowing out of the auxiliary throttling device 5 flows into the outer tube 4b of the first heat exchanger 4.

[0027] The first heat exchanger 4 is a heat exchanger including an inner tube 4a and an outer tube 4b surrounding the inner tube 4a. The refrigerant flowing through the inner tube 4a exchanges heat with the refrigerant flowing through the outer tube 4b to remove heat.

[0028] The refrigerant flowing out of the inner tube 4a of the first heat exchanger 4 flows into the throttle device 6. The throttle device 6 is, for example, a capillary tube. When passing through the throttle device 6, the refrigerant is throttled and expanded, and the pressure and temperature of the refrigerant are reduced.

[0029] The throttling device 6 and the outer tube 7b of the second heat exchanger 7 constitute the second heat exchanger 7. The throttling device 6 is surrounded by the outer tube 7b. Therefore, the refrigerant passing through the throttling device 6 exchanges heat with the refrigerant passing through the outer tube 7b and loses heat, thereby further lowering the temperature.

[0030] The refrigerant passing through the inner tube 4a of the first heat exchanger 4 and the throttle device 6 is condensed during the passage.

[0031] The refrigerant flowing out of the expansion device 6 flows into the evaporator 8 and evaporates. At this time, the surroundings of the evaporator 8, that is, the cooling target, are cooled.

[0032] The refrigerant flowing out of the evaporator 8 flows into the outer tube 7b of the second heat exchanger 7, takes heat from the refrigerant flowing in the throttle device 6, and flows out from the outer tube 7b.

[0033] The refrigerant flowing out of the outer tube 7b flows into the outer tube 4b of the first heat exchanger 4, and merges and mixes with the refrigerant flowing out of the auxiliary throttling device 5. The mixed refrigerant takes heat from the refrigerant flowing in the inner tube 4a of the first heat exchanger 4, evaporates completely, and flows out of the outer tube 4b.

[0034] The refrigerant flowing out of the outer tube 4b is sucked into the compressor 1, compressed again, and discharged.

[0035] The refrigerant tank 9 may be connected to the pipe located on the downstream side of the outer tube 4 b and the upstream side of the compressor 1 via a refrigerant tank connecting throttle device 10 .

[0036] In the refrigeration circuit 100 constructed as described above, the compressor 1 and the throttling device 6 are divided into a high-pressure circuit in which high-pressure refrigerant exists and a low-pressure circuit in which low-pressure refrigerant exists. Figure 1 In the figure, the portion constituting the high-pressure circuit is indicated by a bold line. The high-pressure circuit includes the high-pressure portion of the compressor 1, and a portion located further downstream than the compressor 1 and further upstream than the throttling device 6. The high-pressure circuit also includes a portion between the gas-liquid separator 3 and the auxiliary throttling device 5. In addition, the low-pressure circuit includes the low-pressure portion of the compressor 1, and a portion located further upstream than the compressor 1 and further downstream than the throttling device 6. The low-pressure circuit also includes a refrigerant tank 9 and a throttling device 10 for connecting the refrigerant tank.

[0037] A first port 11 is provided on the high pressure circuit. In addition, a second port 12 is provided on the low pressure circuit. Figure 1 As shown, the first port 11 is provided on the pipe located on the downstream side of the condenser 2 and the upstream side of the gas-liquid separator 3. Figure 1As shown, the second port 12 is provided on the low-pressure part of the compressor 1 and the refrigerant tank 9. These ports are usually closed, and when the refrigerant is first charged to the refrigeration circuit 100, or when the refrigerant is charged for replenishment, the ports are connected to the refrigerant supply source. Then, the refrigerant is charged from the refrigerant supply source into the refrigeration circuit 100 through these ports. Of course, the number of the first port 11 and the second port 12 is not limited to the number shown in the figure.

[0038] Figure 2 This is a schematic cross-sectional view of a container 20 filled with refrigerant as a refrigerant supply source. The container 20 includes a container body 21 and a mouth 22. The container body 21 has a cylindrical side wall, and a bottom and a top that seal both ends of the side wall. The mouth 22 is provided at the top. The container 20 is, for example, a steel cylinder. The container 20 does not include a siphon. Therefore, the container 20 can be easily manufactured. In addition, the container 20 may also include a short siphon that does not reach the bottom of the container 20. In this case, a side hole may be formed near the root (top side end) of the siphon. By forming the side hole, when the container 20 is in a posture with the mouth 20 facing downward as described later, the liquid high-boiling-point refrigerant 23 can be discharged from the container 20 via the siphon.

[0039] The container 20 has a shape that can be stably placed on a horizontal surface with the bottom of the container body 21 at the bottom and the top, that is, the mouth 22 at the top. In other words, the container 20 can stand upright on a horizontal surface. Figure 2 , the container 20 is shown in a posture in which the mouth 22 is facing upward (ie, standing posture). In addition, the container 20 may be in any shape as long as it has the mouth 22.

[0040] The container 20 contains a non-azeotropic refrigerant mixture including a high boiling point refrigerant 23 , a medium boiling point refrigerant 24 having a boiling point lower than that of the high boiling point refrigerant 23 , and a low boiling point refrigerant 25 having a boiling point lower than that of the medium boiling point refrigerant.

[0041] When the container 20 is left at room temperature, the high boiling point refrigerant 23 is in a liquid state, the medium boiling point refrigerant 24 is in a humid gas state, and the low boiling point refrigerant 25 is in a gas state inside the container 20. Therefore, in the container 20, the three refrigerants exist roughly separately.

[0042] When the container 20 is in an upright position, the high-boiling-point refrigerant 23 in a liquid state exists near the bottom of the container body 21, the low-boiling-point refrigerant 25 in a gaseous state exists near the mouth 22, and the medium-boiling-point refrigerant 24 in a wet gaseous state exists between the high-boiling-point refrigerant 23 and the low-boiling-point refrigerant 25.

[0043] In addition, when the container 20 is in an upside-down position, that is, the mouth 22 is facing downward, as shown in FIG. Figure 3 As shown, the high boiling point refrigerant 23 in a liquid state exists near the mouth 22, the low boiling point refrigerant 25 in a gaseous state exists near the bottom of the container body 21, and the medium boiling point refrigerant 24 in a wet gaseous state exists between the high boiling point refrigerant 23 and the low boiling point refrigerant 25.

[0044] The high boiling point refrigerant 23, the medium boiling point refrigerant 24, and the low boiling point refrigerant 25 can be any refrigerant as long as they are in a liquid state, a humid gas state, and a gas state respectively inside the container 20 placed in a normal temperature environment. For example, the high boiling point refrigerant 23 is n-butane, the medium boiling point refrigerant 24 is ethane, and the low boiling point refrigerant 25 is methane. The high boiling point refrigerant 23 can be n-butane or isobutane, the medium boiling point refrigerant 24 can be ethane, ethylene, or xenon, and the low boiling point refrigerant 25 can be methane or krypton.

[0045] When the non-azeotropic refrigerant mixture is composed of hydrocarbons, the total weight of the non-azeotropic refrigerant mixture may be 150 g or less. By making the total weight less than 150 g, the standard of IEC (International Electrotechnical Commission) can be met. In addition, hydrocarbon gas and rare gas can suppress environmental load.

[0046] If the total amount of the sealed material (i.e., the non-azeotropic mixed refrigerant) in the container 20 is 100% by weight, the ratio of each refrigerant sealed in the container 20 is, for example, 50% by weight or more and 80% by weight or less of the high boiling point refrigerant 23, 10% by weight or more and less than 50% by weight of the medium boiling point refrigerant 24, and 20% by weight or less of the low boiling point refrigerant 25. In other words, the total amount of the medium boiling point refrigerant 24 and the low boiling point refrigerant 25 is less than 50% by weight. In addition, all low boiling point refrigerants may be replaced with medium boiling point refrigerants.

[0047] The refrigerant from the container 20 as the refrigerant supply source is charged to the refrigeration circuit 100 in the following manner. It should be noted that the charging of the refrigerant is performed before the refrigeration circuit 100 starts operating, or when a refrigerant leak occurs after the operation starts. For example, the charging is performed when the lubricating oil used to lubricate the compressor 1 tends to accumulate in the evaporator 8 for a certain period of time (for example, when a power outage occurs at low temperature and the evaporator is left for a period of time), and then the refrigerant leaks.

[0048] First, the first port 11 is connected to the mouth 22 via a valve and a pipe. It should be noted that the container 20 may also include a valve mounted on the mouth 22. At the same time or before and after this, the container 20 becomes Figure 3 The posture shown is a posture in which the mouth 22 is facing downward.

[0049] Next, the valve is opened. In addition, the interior of the refrigeration circuit 100 may be depressurized before the valve is opened. For example, the interior of the refrigeration circuit 100 may be depressurized by sucking the interior of the refrigeration circuit 100 with a vacuum pump through at least one of the first port 11 and the second port 12. When the valve is opened, the refrigerant sealed in the container 20 is filled into the refrigeration circuit 100 through the first port 11. Specifically, at the beginning, the high-boiling-point refrigerant 23 present near the mouth 22 is filled, then the medium-boiling-point refrigerant is filled, and finally, the low-boiling-point refrigerant is filled.

[0050] The high boiling point refrigerant 23 charged at the beginning first spreads in the high pressure circuit. Then, the high boiling point refrigerant 23 enters the throttling device 6 and the auxiliary throttling device 5 with large pipe resistance, passes through them, and then enters the low pressure circuit. In addition, due to the structural reasons of the compressor 1, the refrigerant cannot flow from the high pressure part of the compressor 1 to the low pressure part in the compressor 1.

[0051] The force that pushes the high boiling point refrigerant 23 that has entered the throttle device 6 and the auxiliary throttle device 5 with large piping resistance toward the low-pressure circuit side is provided by the medium boiling point refrigerant 24 and the low boiling point refrigerant 25 in the container 20. This is because the medium boiling point refrigerant 24 and the low boiling point refrigerant 25 have a lower boiling point than the high boiling point refrigerant 23 and therefore have a higher pressure than the high boiling point refrigerant 23 in the same temperature environment. That is, the high boiling point refrigerant 23 that spreads throughout the high-pressure circuit is pressed by the medium boiling point refrigerant 24 and the low boiling point refrigerant 25 in the container 20, so that it can enter the throttle device 6 and the auxiliary throttle device 5 and pass through the throttle device 6 and the auxiliary throttle device 5. Then, following the high boiling point refrigerant 23, the medium boiling point refrigerant 24 and the low boiling point refrigerant 25 can enter the high-pressure circuit.

[0052] Almost all of the high-boiling-point refrigerant 23 is charged into the refrigeration circuit 100, then the medium-boiling-point refrigerant 24 is charged into the refrigeration circuit 100, and finally, the low-boiling-point refrigerant 25 is charged into the refrigeration circuit 100. The pressure of the refrigerant in the refrigeration circuit 100 increases as the charging of the refrigerant progresses, but the low-boiling-point refrigerant 25 charged last is the refrigerant with the highest pressure when in the same temperature environment, so almost all of the refrigerant in the container 20 can be charged.

[0053] However, during the charging of the refrigerant, the refrigerant pressure of at least the high-pressure circuit portion gradually increases. Therefore, sometimes, when there is still refrigerant remaining in the container 20, the refrigerant cannot or is difficult to enter the refrigeration circuit 100 from the first port 11. In this case, the following process can be performed.

[0054] That is, after the refrigerant in the container 20 is charged into the refrigeration circuit 100 via the first port 11, at least a portion of the remaining refrigerant in the container 20 is charged into the refrigeration circuit 100 via the second port 12. From the first port 11, the low-pressure circuit provided with the second port 12 is located downstream of the throttling device 6 and the auxiliary throttling device 5 having large pipeline resistance. Therefore, even if the high-boiling-point refrigerant 23 is charged into the high-pressure circuit on the upstream side of the throttling device 6 and the auxiliary throttling device 5, the high-boiling-point refrigerant 23 will not immediately flow into the low-pressure circuit. That is, the low pressure state of the low-pressure circuit will continue for at least a period of time after the refrigerant charging starts. Therefore, even if the remaining refrigerant in the container 20 can no longer enter the refrigeration circuit 100 (specifically, the high-pressure circuit) from the first port 11, the remaining low-boiling-point refrigerant and the medium-boiling-point refrigerant in the container 20 can enter the refrigerant circuit (specifically, the low-pressure circuit) from the second port 12.

[0055] At this time, the posture of the container 20 can be either a posture with the mouth 22 facing upward or a posture with the mouth 22 facing downward. In either case, the entire amount remaining in the container 20 can be reliably filled into the refrigeration circuit 100.

[0056] In addition, when the refrigerant charged from the first port 11 alone is sufficient, the refrigeration circuit 100 may not include the second port 12 .

[0057] The refrigerant inlet port can be switched from the first port 11 to the second port 12 by connecting the container 20 to the second port 12 via a pipe and a valve after disconnecting the container 20 from the first port 11. Alternatively, the jig 30 described below can be used.

[0058] Figure 4 3 is a schematic diagram of a jig 30. The jig 30 includes a container connection port 31, a branch pipe 32, two port connection ports 33, and two valves 34. The two valves 34 constitute a path switching device.

[0059] The container connection port 31 is a connection component connected to the mouth 22 of the container 20. The branch pipe 32 is a pipe having a shape in which one pipe is branched into two pipes, and the container connection port 31 is installed at the end of one pipe before the branch. In addition, the port connection ports 33 are respectively installed at the ends of the two pipes after the branch of the branch pipe 32. The port connection port 33 is a connection component connected to the first port 11 or the second port 12. Valves 34 are respectively installed on the two pipes after the branch of the branch pipe 32.

[0060] When such a clamp 30 is used, the refrigerant is charged from the container 20 to the refrigeration circuit 100 in the following manner. First, the two valves 34 are closed. Then, the mouth 22 of the container 20 is connected to the container connection port 31, one of the port connection ports 33 is connected to the first port 11, and the other of the port connection ports 33 is connected to the second port 12. At the same time as these connections or before and after these connections, the container 20 is placed in a posture with the mouth 22 facing downward.

[0061] Next, the valve 34 installed on the pipe connected to the first port 11 among the two pipes branched from the branch pipe 32 is opened. Then, the refrigerant sealed in the container 20 is charged into the refrigeration circuit 100 through the first port 11. Specifically, at the beginning, the high boiling point refrigerant 23 present near the port 22 is charged.

[0062] After a certain period of time, the valve 34 installed on the pipe connected to the first port 11 is closed, and then the valve 34 installed on the pipe connected to the second port 12 is opened. That is, the path is switched by the path switching device. Then, the remaining refrigerant in the container 20 is charged into the refrigerant circuit from the second port 12. In addition, the switching can be performed while measuring the weight of the container 20, and the opening and closing of the valve 34 can be switched when the weight reaches a specified value, or the opening and closing of the valve 34 can be switched when the pressure gauge installed in the refrigeration circuit 100, the fixture 30 or the container 20 shows a specified pressure.

[0063] By using the jig 30 , the position at which the refrigerant is charged from the container 20 to the refrigeration circuit 100 can be easily changed, and the refrigerant in the container 20 can be reliably charged to the refrigeration circuit 100 .

[0064] Alternatively, the mouth 22 of the container 20 may be connected to the second port 12 instead of the first port 11, and the refrigerant may be charged into the refrigeration circuit 100 from the beginning through the second port 12. In this case, the container 20 is placed in a posture with the mouth 22 facing upward (i.e., standing posture). That is, at the beginning, the low-boiling-point refrigerant 25 existing in the upper part of the container 20 is charged into the refrigeration circuit 100 (specifically, the low-pressure circuit). Then, the medium-boiling-point refrigerant 24 is charged into the refrigeration circuit 100.

[0065] When the container 20 is in the upright position, the high boiling point refrigerant 23 in a liquid state is located at the bottom of the container 20, so it cannot enter the refrigeration circuit 100. Therefore, after the low boiling point refrigerant 25 and the medium boiling point refrigerant 24 are charged into the refrigeration circuit 100 through the second port 12, the position of the container 20 is changed to a position where the mouth 22 faces downward. Thus, the high boiling point refrigerant 23 in the container 20 is charged into the refrigeration circuit 100 through the second port 12.

[0066] Since the molecular weight of the low-boiling-point refrigerant 25 and the medium-boiling-point refrigerant 24 is small, they can pass through the throttling device 6 and the auxiliary throttling device 5 relatively easily. Therefore, the low-boiling-point refrigerant 25 and the medium-boiling-point refrigerant 24 charged into the low-pressure circuit from the second port 12 can pass through the throttling device 6 and the auxiliary throttling device 5 and flow into the high-pressure circuit. In addition, the total ratio of the medium-boiling-point refrigerant 24 and the low-boiling-point refrigerant 25 to the total weight of the refrigerant sealed in the container 20 is less than 50% by mass. In addition, the low-pressure circuit has components with a large volume (i.e., the evaporator 8, the outer tube 4b of the first heat exchanger 4, the outer tube 7b of the second heat exchanger 7, and the refrigerant tank 12). Therefore, even if the low-boiling-point refrigerant 25 and the medium-boiling-point refrigerant 24 are charged into the low-pressure circuit from the second port 12, the pressure rise of the low-pressure circuit is relatively suppressed. Therefore, after charging the low-boiling-point refrigerant 25 and the medium-boiling-point refrigerant 24 into the low-pressure circuit from the second port 12, the high-boiling-point refrigerant 23 can be charged into the low-pressure circuit from the second port 12. That is, substantially all the refrigerant in the container 20 can be charged from the second port 12 instead of the first port 11. In addition, in some types of compressors 1, the low-pressure portion of the compressor 1 has a relatively large volume. In this case, the compressor 1 also becomes a relatively large volume component constituting the low-pressure circuit.

[0067] Furthermore, by sequentially charging the low boiling point refrigerant 25, the medium boiling point refrigerant 24, and the high boiling point refrigerant 23 from the second port 12, the stagnation of the lubricating oil can be effectively eliminated, and the startability of the compressor 1 can be improved. This point will be described below.

[0068] When the refrigeration circuit 100 is stopped before the refrigerant is charged, the lubricating oil used to lubricate the compressor 1 may be retained in the low-temperature and large-volume part (such as the evaporator 8) in a state where the temperature drops and the viscosity becomes high. In the case where the medium-boiling-point refrigerant is a hydrocarbon (such as ethane), the medium-boiling-point refrigerant 24 that is compatible with the lubricating oil used to lubricate the compressor 1 can be charged into the low-pressure circuit. Thus, the viscosity of the lubricating oil can be reduced by bringing the medium-boiling-point refrigerant 24 into contact with the lubricating oil retained in the evaporator 8. Next, when the high-boiling-point refrigerant 23 is charged, the low-boiling-point refrigerant 25 and the medium-boiling-point refrigerant 24 that are charged first will pass through the throttling device 6 and the auxiliary throttling device 5 more easily and flow into the high-pressure circuit side. At this time, the lubricating oil with reduced viscosity diffuses to the entire area of ​​the refrigeration circuit 100 together with the refrigerant. That is, the lubricating oil can be spread throughout the refrigeration circuit.

[0069] In addition, at this time, the high boiling point refrigerant 23 exists in the low-pressure circuit, and the low boiling point refrigerant 25 and the medium boiling point refrigerant 24 exist in the high-pressure circuit. When the compressor 1 is started in this state, the refrigerant sucked in and compressed is mainly the high boiling point refrigerant 23. The high boiling point refrigerant 23 has a higher boiling point than the low boiling point refrigerant 25 and the medium boiling point refrigerant 24, so when it is in the same temperature environment, the pressure is lower than the low boiling point refrigerant 25 and the medium boiling point refrigerant 24. That is, since the discharge pressure at the time of startup is not high, the compressor 1 can be easily started with a relatively low load.

[0070] As described above, the port initially connected to the container 20 may be the first port 11 or the second port 12. The state of the refrigeration circuit 100 or a refrigeration device having the refrigeration circuit 100 may be detected, and the port initially used when charging the refrigerant from the container 20 may be determined based on the detected state.

[0071] That is, the state of the refrigeration circuit 100 or the refrigeration device of the refrigeration circuit 100 may be detected, and based on the detected state, the port 22 may be connected to the second port 12 instead of connecting the port 22 to the first port 11. In this case, at least a part of the refrigerant in the container 20 is charged into the refrigeration circuit 100 from the container 20 with the port 22 facing upward through the second port 12. Then, the position of the container 20 is changed to the position with the port 22 facing downward, and the remaining refrigerant in the container 20 is charged.

[0072] Before charging of the refrigerant is performed, when the refrigeration circuit 100 is in operation, the state of the refrigeration circuit 100 or the refrigeration device including the refrigeration circuit 100 is detected by a temperature sensor installed in the refrigeration circuit 100 or the refrigeration device.

[0073] An example of the relationship between the installation position of the temperature sensor, the detection result of the temperature sensor, and the port to which the refrigerant is charged is shown in Table 1. In addition, when the refrigeration circuit 100 is used for a cold storage such as an ultra-low temperature freezer, a temperature sensor that detects the temperature inside the storage is also used for judgment in addition to the temperature sensors shown in Table 1. Next, the case where the refrigeration circuit 100 is used for a cold storage such as an ultra-low temperature freezer is described.

[0074] [Table 1]

[0075] Temperature sensor location Test results port Condenser outlet Abnormally high temperatures First Port Evaporator inlet Abnormally high temperatures First Port Evaporator outlet Abnormally high temperatures Second Port First heat exchanger outer tube inlet / outlet Abnormally high temperatures First Port Inner tube of the first heat exchanger Abnormally high temperatures Second Port

[0076] When the refrigerant temperature at the outlet of the condenser 2 is higher than a preset specified value, and the temperature inside the storage is higher than a preset specified value, that is, when the detection results of the temperature sensor at the outlet of the condenser 2 and the temperature sensor inside the storage show abnormally high temperatures, the following abnormalities may have occurred. That is, there may be a blockage of lubricating oil or impurities that causes poor condensation in the inner tube 4a of the first heat exchanger 4. In other words, there may be an abnormality in the high-pressure circuit (especially the inner tube 4a of the first heat exchanger). In addition, the cause of the blockage of lubricating oil or impurities may be poor condensation in the condenser 2 (for example, a failure of the fan motor). Therefore, in this case, the first port 11 is used for the charging of the refrigerant. By charging the refrigerant from the first port 11, the above-mentioned undesirable conditions can be eliminated.

[0077] In addition, when the refrigerant temperature at the inlet of the evaporator 8 is higher than a preset specified value, and the temperature inside the storage is higher than a preset specified value, that is, when the detection results of the temperature sensor at the inlet of the evaporator 8 and the temperature sensor inside the storage show abnormally high temperature, the following abnormality may have occurred. That is, it is possible that lubricating oil or impurities are blocked in the throttling device 6 or the high-pressure circuit. In other words, it is possible that an abnormality has occurred in the high-pressure circuit. Therefore, in this case, the first port 11 is used for charging the refrigerant. By charging the refrigerant from the first port 11, the above-mentioned undesirable situation can be eliminated.

[0078] In addition, when the refrigerant temperature at the outlet of the evaporator 8 is higher than a preset specified value, and the temperature inside the storage is higher than a preset specified value, that is, when the detection results of the temperature sensor at the outlet of the evaporator 8 and the temperature sensor inside the storage show abnormally high temperatures, the following abnormalities may have occurred. That is, it is possible that lubricating oil or impurities are blocked inside the evaporator 8 or other parts of the low-pressure circuit. Or, lubricating oil may be retained inside the evaporator 8. In other words, an abnormality may have occurred in the low-pressure circuit. Therefore, in this case, the second port 12 is used for charging the refrigerant. By charging the refrigerant from the second port 12, the above-mentioned undesirable situation can be eliminated.

[0079] In addition, when the refrigerant temperature at the inlet or outlet of the inner tube 4a of the first heat exchanger 4 is higher than a preset specified value, and the temperature in the storage is higher than a preset specified value, that is, when the detection results of the temperature sensor at the inlet or outlet of the inner tube 4a of the first heat exchanger 4 and the temperature sensor of the temperature in the storage show abnormally high temperature, the following abnormality may have occurred. That is, there may be a blockage of lubricating oil or impurities that causes poor condensation of the refrigerant in the inner tube 4a of the first heat exchanger 4. In other words, there may be an abnormality in the high-pressure circuit (especially the inner tube 4a of the first heat exchanger). Therefore, in this case, the first port 11 is used for charging the refrigerant. By charging the refrigerant from the first port 11, the above-mentioned undesirable situation can be eliminated.

[0080] In addition, when the refrigerant temperature at the inlet or outlet of the outer tube 4b of the first heat exchanger 4 is higher than a preset specified value, and the temperature inside the storage is higher than a preset specified value, that is, when the detection results of the temperature sensor at the inlet or outlet of the outer tube 4b of the first heat exchanger 4 and the temperature sensor of the temperature inside the storage show abnormally high temperature, the following abnormality may have occurred. That is, there may be a blockage of lubricating oil or impurities that causes poor evaporation of the refrigerant in the outer tube 4b of the first heat exchanger 4. In other words, there may be an abnormality in the low-pressure circuit (especially the outer tube 4b of the first heat exchanger). Therefore, in this case, the second port 12 is used for charging the refrigerant. By charging the refrigerant from the second port 12, the above-mentioned undesirable situation can be eliminated.

[0081] That is, when the temperature of the refrigerant flowing from the compressor 1 to the throttle device 6 is abnormal, the mouth 22 of the container 20 is connected to the first port 11 to charge the refrigerant. In addition, when the temperature of the refrigerant flowing from the throttle device 6 to the compressor 1 is abnormal, the mouth 22 of the container 20 is connected to the second port 12 to charge the refrigerant. In other words, instead of connecting the mouth 22 of the container 20 to the first port 11, the mouth 22 of the container 20 is connected to the second port 12.

[0082] In addition, the detection results of the temperature sensor are recorded as a log in the control device of the refrigeration device. The control device can determine the port to charge the refrigerant based on the log, and display the determination result on the display device provided in the refrigeration device. The staff can charge the refrigerant from the appropriate port by looking at the display.

[0083] The present disclosure is not limited to the embodiments described above, and various modified embodiments are also included in the present disclosure without departing from the spirit of the present disclosure.

[0084] For example, it can also be, Figure 5As shown, the oil carrier 26 for charging the refrigeration circuit 100 together with the non-azeotropic mixed refrigerant is sealed in the container 20. If the total amount of the sealed contents of the container 20 (i.e., the total amount of the non-azeotropic mixed refrigerant and the oil carrier 26) is 100% by weight, the oil carrier 26 is sealed in the container 20 at a rate of 0.14% to 14% by weight. The oil carrier may be, for example, n-pentane or propane.

[0085] The oil carrier agent is liquid in the container 20 at room temperature. The oil carrier agent is in a liquid state, so it is mixed with the liquid high-boiling-point refrigerant 23. Therefore, when the container 20 is in a posture with the mouth 22 facing downward, the oil carrier agent is charged into the refrigeration circuit 100 together with the liquid high-boiling-point refrigerant 23. Therefore, by connecting the mouth 22 of the container 20 to the second port 12 and charging the refrigerant from the second port, the oil carrier agent can be brought into contact with the refrigerant retained in the low-pressure circuit at the very beginning. Thus, the retained refrigerant can be quickly spread throughout the refrigeration circuit 100. In addition, by using the container 20 in which the oil carrier agent is sealed in addition to the non-azeotropic mixed refrigerant, the oil carrier agent can be charged into the refrigeration circuit 100 in the process of charging the refrigerant without performing a special process of charging the oil carrier agent.

[0086] In addition, the compressor 1 can also be a compressor that does not require lubricating oil. In this case, the high-boiling-point refrigerant 23 is first charged from the first port 11, and then the low-boiling-point refrigerant 25 and the medium-boiling-point refrigerant 24 are charged from the second port 12. Since the volume of the low-pressure circuit is relatively large, the pressure rise of the low-pressure circuit is suppressed to a certain extent. In addition, since the volume of the high-pressure circuit is relatively small, the high-boiling-point refrigerant 23 will pass through the throttling device 6 and the auxiliary throttling device 5 and flow from the high-pressure circuit into the low-pressure circuit. That is, the pressure rise of the high-pressure circuit is suppressed to a certain extent. In this way, since the discharge pressure at startup is not high, the compressor 1 can be easily started with a relatively low load even without lubricating oil.

[0087] In addition, the container 20 can also be Figure 6 As shown in the figure, the container 20 is provided with a skirt 27. By providing the skirt 27, even in a posture where the mouth 22 is facing downward, the container 20 can stand up stably on a horizontal plane. Figure 6 The same mouth 22 is formed at the bottom of the container. By providing the skirt 27, the workability of charging the refrigerant to the refrigeration circuit 100 can be improved.

[0088] In addition, the path switching device included in the clamp 30 may be constituted by a single three-way valve instead of the two valves 34 .

[0089] In addition, the refrigeration device may include two refrigeration circuits 100 .

[0090] In addition, when the performance of the refrigeration circuit 100 can be exerted, the low-boiling-point refrigerant 23 may not be sealed in the container 20, and only the medium-boiling-point refrigerant 24 and the high-boiling-point refrigerant 25 may be sealed as refrigerants constituting the non-azeotropic mixed refrigerant.

[0091] The disclosure contents of the specification, claims, drawings and abstract contained in Japanese patent application No. 2022-54135 filed on March 29, 2022 are all cited in this application.

[0092] Industrial Applicability

[0093] The present disclosure can be used for various refrigeration devices that use non-azeotropic mixed refrigerants as refrigerants, such as ultra-low temperature storage, ultra-low temperature freezer, cold storage for medicine, cold storage for blood, or thermostat. In addition, a refrigeration device used in a gravity-free environment (such as a space environment) such as a zero-gravity space or a micro-gravity space has a compressor that does not require lubricating oil. The present disclosure can also be used for a refrigeration device having such a compressor, and can therefore be used extremely effectively in the industrial field.

[0094] Description of Reference Numerals

[0095] 100 Refrigeration Circuits

[0096] 1 compressor

[0097] 2 Condenser

[0098] 3 Gas-liquid separator

[0099] 4First heat exchanger

[0100] 4a Inner tube

[0101] 4b outer tube

[0102] 5 Auxiliary throttling device

[0103] 6. Throttle device

[0104] 7. Second heat exchanger

[0105] 7b outer tube

[0106] 8 Evaporator

[0107] 9 Refrigerant tank

[0108] 10Throttling device for refrigerant tank connection

[0109] 11First Port

[0110] 12 Second Port

[0111] 20 containers

[0112] 21 Container body

[0113] 22 Mouth

[0114] 23 High boiling point refrigerant

[0115] 24 Medium boiling point refrigerant

[0116] 25 Low boiling point refrigerant

[0117] 26 Oil carrier

[0118] 27 Skirt

[0119] 30 clamps

[0120] 31 Container connection port

[0121] 32 branch pipes

[0122] 33-port connector

[0123] 34 valves.

Claims

1. A refrigerant charging method, which is a refrigerant charging method for charging a refrigeration circuit having a compressor, a condenser, a throttling device, an evaporator and a first port, wherein the first port is arranged at a high-pressure part of the compressor or at a position downstream of the compressor and upstream of the throttling device, and the refrigerant charging method is characterized in that it comprises the following steps: connecting the mouth of a container sealed with the following refrigerant to the first port, the refrigerant containing a high-boiling-point refrigerant in a liquid state and a medium-boiling-point refrigerant in a humid gas state, wherein the boiling point of the medium-boiling-point refrigerant is lower than that of the high-boiling-point refrigerant; as well as At least a portion of the refrigerant in the container is charged into the refrigeration circuit from the container with the mouth facing downward through the first port.

2. The refrigerant charging method according to claim 1, wherein: The refrigeration circuit further includes a second port disposed at a low-pressure portion of the compressor or at a position upstream of the compressor and downstream of the throttle device.

3. The refrigerant charging method according to claim 2, wherein: The method further includes the step of, after charging the refrigerant in the container into the refrigeration circuit via the first port, charging at least a portion of the refrigerant remaining in the container from the container into the refrigeration circuit via the second port.

4. The refrigerant charging method according to claim 3, wherein: The method further includes the step of connecting the mouth of the container, the first port, and the second port using a fixture having a branch pipe and a path switching device. The step of charging at least a portion of the refrigerant remaining in the container into the refrigeration circuit via the second port is performed by switching the path using the path switching device.

5. The refrigerant charging method according to claim 2, wherein: The following steps are also included: Detecting the state of the refrigeration circuit or a refrigeration device equipped with the refrigeration circuit; connecting the mouth to the second port instead of connecting the mouth to the first port according to the detected state; as well as At least a portion of the refrigerant in the container is charged into the refrigeration circuit through the second port from the container in a posture in which the mouth portion faces upward.

6. The refrigerant charging method according to claim 5, wherein: It also includes the step of, after at least a portion of the refrigerant in the container is filled into the refrigeration circuit via the second port, filling at least a portion of the remaining refrigerant in the container into the refrigeration circuit from the container with the mouth facing downward via the second port.

7. The refrigerant charging method according to claim 5 or 6, wherein: The detected state is the temperature of the refrigerant flowing from the throttling device to the compressor, When the temperature is higher than a preset predetermined value, the step of connecting the port to the second port is performed instead of the step of connecting the port to the first port.

8. The refrigerant charging method according to any one of claims 3 to 7, wherein: The following steps are also included: By charging at least a portion of the refrigerant in the container through the second port, the lubricating oil retained in the evaporator comes into contact with at least a portion of the charged refrigerant, thereby reducing the viscosity of the lubricating oil and allowing the lubricating oil to spread throughout the refrigeration circuit.

9. The refrigerant charging method according to any one of claims 1 to 8, wherein: The container further contains a low-boiling-point refrigerant in a gaseous state having a boiling point lower than that of the medium-boiling-point refrigerant.

10. The refrigerant charging method according to claim 9, wherein: The container contains 50% by weight or more and 80% by weight or less of the high boiling point refrigerant, 10% by weight or more and less than 50% by weight of the medium boiling point refrigerant, and 20% by weight or less of the low boiling point refrigerant.

11. The refrigerant charging method according to claim 9 or 10, wherein: The high boiling point refrigerant is n-butane or isobutane, The medium boiling point refrigerant is ethane, ethylene or xenon, The low boiling point refrigerant is methane or krypton.

12. The refrigerant charging method according to claim 11, wherein: The high boiling point refrigerant is n-butane, The medium boiling point refrigerant is ethane, The low boiling point refrigerant is methane.

13. The refrigerant charging method according to any one of claims 1 to 12, wherein: The container further contains an oil carrier for charging the refrigeration circuit together with the refrigerant.