Electric power system transient and steady state detection method and system based on random matrix theory
Through the temporary steady state detection method of power system based on random matrix theory, the sample covariance matrix and correlation analysis are constructed, and the problem of identifying and positioning abnormal events in the existing technology is solved, real-time monitoring and operation safety of power system are realized. promote.
Patent Information
- Application Number
- CN202410942395.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-05
AI Technical Summary
The existing temporary steady-state detection methods of power systems are difficult to accurately identify and locate abnormal events, resulting in low diagnostic efficiency and system stability.
The transient steady state detection method of the power system based on the random matrix theory is adopted, and the sample covariance matrix and correlation analysis are constructed to quickly locate the transient occurrence and ending moments, improving the accuracy and efficiency of detection.
Real-time monitoring of temporary steady state of the power system and accurate identification of abnormal events are achieved, and the operational safety and diagnostic efficiency of the power system are improved.
Smart Images

Figure CN118897153A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power system dispatching automation, and in particular to a method and system for detecting transient and steady states of a power system based on random matrix theory. Background Art
[0002] The power system has an extremely complex structure, consisting of many different components, such as generators, transformers, conveyor belts, and loads. They all face challenges from internal or external sources, such as load fluctuations, equipment damage, or other factors. These disturbances may affect the stability of the system, so effective detection methods are needed to evaluate the transient performance of the system. At the same time, once a power system fails or becomes unstable, it may have a serious impact on people's production and life. Therefore, real-time monitoring and evaluation of the transient state of the power system can help to promptly discover and deal with potential problems and improve the safety of the power system. In addition, with the continuous development of the power market, higher requirements are placed on the stability, economy, and flexibility of the power system.
[0003] Wide-Area Measurement System (WAMS) has been widely deployed and applied in actual power grids. The synchronized phasor measurement unit (PMU) is the key equipment for data acquisition. It has the advantages of high accuracy, strict synchronization of the whole network, short update cycle, etc., and can realize direct measurement of node status. At present, PMU technology is used to detect abnormal events, among which electrical mutation quantity is widely used as a startup criterion. However, due to the possible presence of bad information or noise in the actual data, this method can easily lead to false startup and it is difficult to accurately locate the scope of abnormal events. In order to improve the reliability of PMU, we must develop a technology that can efficiently identify and locate abnormal events, thereby reducing the scope of diagnosis and greatly improving the efficiency of diagnosis. In recent years, with the continuous development of computer technology, signal processing technology, artificial intelligence and other technologies, more possibilities have been provided for the detection of transient steady state in power systems. Random Matrix Theory (RMT) is one of the big data analysis methods for statistical analysis of complex systems. It is an effective processing technology for large-scale integrated information, including multi-dimensional spatial models based on random matrices, which can effectively solve complex system problems, such as power grid fault diagnosis, parameter adjustment, optimization of control strategies, optimization of scheduling processes, improvement of scheduling efficiency, and improvement of scheduling accuracy. Some literature introduces the basic properties of random matrix theory, proposes a general big data analysis framework, and preliminarily verifies the feasibility of applying random matrix theory to power systems. There are also literatures that apply random matrix theory to distribution network data, analyze the correlation of different factors and their impact on the distribution network, and verify the feasibility of applying random matrix theory to multi-dimensional distribution network data. Summary of the invention
[0004] In response to the above technical problems, the present application provides a method and system for detecting transient states of power systems based on random matrix theory, which can quickly locate the transient occurrence time and transient end time of the system from massive monitoring data, realize transient state detection of the power system, and improve the safety of power system operation.
[0005] In a first aspect, the present application provides a method for detecting transient steady state of a power system based on random matrix theory, comprising:
[0006] Acquire monitoring data of the target power grid partition at each moment, wherein the monitoring data includes voltage, current, phase and power data of each power grid node in the target power grid partition;
[0007] Constructing a state monitoring matrix corresponding to each moment according to the monitoring data at each moment, wherein, at a first moment, constructing a first state monitoring matrix corresponding to the first moment according to the first monitoring data at the first moment and the historical monitoring data within a preset time period before the first moment;
[0008] Constructing a sample covariance matrix corresponding to each state monitoring matrix according to random matrix theory;
[0009] Extracting features from each sample covariance matrix, and determining the transient start time of the target power grid partition according to each extracted feature;
[0010] Correlation analysis is performed on the state monitoring matrix at each time to determine the operating state of the target power grid partition at each time, and then determine the transient end time of the target power grid partition.
[0011] The embodiment of the present application provides a method for detecting transient state of power system based on random matrix theory, and constructs a state monitoring matrix corresponding to each moment according to the monitoring data of each moment of the target power grid partition, so as to realize real-time monitoring of the power grid state. Then, based on the random matrix theory, the sample covariance matrix corresponding to each state monitoring matrix is constructed, and the feature extraction and feature analysis of each sample covariance matrix are performed, so as to effectively detect the occurrence time of abnormal events, that is, determine the transient start time of the target power grid partition. At the same time, the correlation analysis of the state monitoring matrix at each moment can further determine the transient end time of the target power grid partition, realize the transient state detection of the power system, provide data support for the subsequent maintenance and adjustment of the power system, and improve the safety of the power system operation.
[0012] Further, when constructing a first sample covariance matrix corresponding to the first state monitoring matrix according to random matrix theory, constructing a sample covariance matrix corresponding to each state monitoring matrix according to random matrix theory includes:
[0013] Normalizing and standardizing the first state monitoring matrix to obtain a first standardized matrix;
[0014] According to a preset sample covariance matrix definition formula, the first standardized matrix is converted into a corresponding first sample covariance matrix.
[0015] The embodiment of the present application provides a method for constructing a sample covariance matrix. Taking the construction of the first sample covariance matrix as an example, the first state monitoring matrix needs to be normalized and standardized to obtain a first standardized matrix. This is because the Marchenko-Pastur law in the random matrix theory describes the distribution of the eigenvalues of a random matrix under certain conditions. Its shape is similar to a semicircle or a semi-ellipse, with a clear boundary. Specifically, its analysis object is a Hermitian matrix, and the core idea is that the empirical spectrum distribution of the eigenvalues of an M×M-dimensional Hermitian matrix satisfies a certain function law. However, the first state monitoring matrix constructed by the monitoring data does not meet the characteristics of the Hermitian matrix, so it is necessary to normalize and standardize the first state monitoring matrix so that it can be better combined with the random matrix theory. Then, the first standardized matrix is converted into the corresponding first sample covariance matrix by the preset sample covariance matrix definition formula. The obtained first sample covariance matrix is more sensitive to abnormal changes in data than the first state monitoring matrix, and can more accurately capture the occurrence time of abnormal events, thereby improving the accuracy of transient steady state detection.
[0016] In a possible implementation, the extracting features of the sample covariance matrices and determining the transient start time of the target power grid partition according to the extracted features includes:
[0017] Calculate all eigenvalues of each sample covariance matrix;
[0018] Divide the maximum eigenvalue of each sample covariance matrix by the minimum eigenvalue to obtain the fusion eigenvalue index corresponding to each sample covariance matrix;
[0019] Performing a sliding T test on each of the fusion feature value indicators with a sliding window of a preset length to obtain multiple test values and corresponding reference moments;
[0020] Each test value is compared with the first preset threshold value, and the reference time corresponding to the test value that exceeds the first preset threshold value earliest is the transient start time of the target power grid partition.
[0021] The embodiment of the present application provides a method for determining the transient start time of the target power grid partition according to the eigenvalue. First, the maximum eigenvalue of each sample covariance matrix is divided by the minimum eigenvalue to obtain a plurality of corresponding fused eigenvalue indicators. However, it is impossible to accurately determine the occurrence time of the abnormal event based solely on the change of the fused eigenvalue indicator. Therefore, a detection indicator must be constructed separately. The present embodiment uses a sliding T test to construct a detection indicator. The sliding T test is a statistical method for detecting the difference between two groups of samples. It can help us determine which variables have mutated. Therefore, the present embodiment performs a sliding T test on each of the fused eigenvalue indicators with a sliding window of a preset length to obtain a plurality of test values and corresponding reference moments. These test values can intuitively reflect the mutation of each fused eigenvalue indicator and improve the accuracy of transient steady state detection.
[0022] In a possible implementation, the performing correlation analysis on the state monitoring matrix at each time to determine the operating state of the target power grid partition at each time, and then determining the transient end time of the target power grid partition, includes:
[0023] According to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition;
[0024] According to the correlation coefficients between adjacent nodes in the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated;
[0025] Comparing each average correlation coefficient with a second preset threshold value, determining the operating state of the target power grid partition at each moment, wherein when the first average correlation coefficient corresponding to the first moment is less than the second preset threshold value, the target power grid partition is in a stable stage, otherwise, the target power grid partition is in a transient transition stage;
[0026] When the target power grid partition changes from the transient transition stage to the stable stage, the corresponding moment is the transient end moment.
[0027] The embodiment of the present application provides a method for determining the transient end time of the target power grid partition. Although the sliding T test method based on the fusion characteristic value index can accurately locate the occurrence time of the abnormal event, it is not effective for the transient end time of the positioning system. Therefore, the embodiment of the present application determines the transient end time of the target power grid partition by performing correlation analysis on the state monitoring matrix at each moment. Since the measurement values of adjacent nodes will fluctuate in the same direction in the transient stage, the correlation between the measurement values of the two nodes is greatly improved at this time, and the correlation slowly decreases with the transition to the steady state; when the transient fluctuation ends, there will be no more fluctuations in the same direction, leaving only uncertain errors, and the correlation between the measurement values of the two nodes is reduced to the minimum at this time, and the Spearman rank correlation coefficient method has strong robustness for data with abnormal values. Therefore, the embodiment of the present application uses the Spearman rank correlation coefficient method to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition, and then calculates the average correlation coefficient of the target power grid partition at each moment, and finally determines the transient end time of the target power grid partition according to each average correlation coefficient and the second preset threshold, combined with the transient start time obtained before, to achieve the transient and steady state detection of the power system and improve the safety of the power system operation.
[0028] Furthermore, according to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition. The specific formula is:
[0029]
[0030] Among them, ρ represents the correlation coefficient between any two adjacent nodes of the state monitoring matrix corresponding to a certain moment, T represents the data length of the state monitoring matrix, and r t It represents the level difference of the measured values at both ends of adjacent nodes at time t, where the measured value is the voltage, current or phase value in the monitoring data, the level refers to the position of the measured values of each node after being arranged in order of size, and j is the time corresponding to the state monitoring matrix;
[0031] According to the correlation coefficients between the adjacent nodes of the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated, and the specific formula is:
[0032]
[0033] Among them, ρ mean Represents the average correlation coefficient of the state monitoring matrix corresponding to a certain moment, ρ H is the correlation coefficient between the two ends of the Hth branch, and h is the total number of branches in the target power grid partition;
[0034] The specific formula for comparing each average correlation coefficient with the second preset threshold value to determine the operating state of the target power grid partition at each moment is:
[0035]
[0036] Among them, when S t =1, it means that the target power grid partition is in the transient transition stage at time t. t =0, it means that the target power grid partition is in a stable stage at time t.
[0037] In the second aspect, accordingly, the present application provides a power system transient state detection system based on random matrix theory, including an acquisition module, a first construction module, a second construction module, a feature extraction module and an analysis module;
[0038] The acquisition module is used to acquire monitoring data of the target power grid partition at each moment, and the monitoring data includes voltage, current, phase and power data of each power grid node in the target power grid partition;
[0039] The first construction module is used to construct a state monitoring matrix corresponding to each moment according to the monitoring data at each moment, wherein, at a first moment, a first state monitoring matrix corresponding to the first moment is constructed according to the first monitoring data at the first moment and the historical monitoring data within a preset time period before the first moment;
[0040] The second construction module is used to construct a sample covariance matrix corresponding to each state monitoring matrix according to random matrix theory;
[0041] The feature extraction module is used to extract features from the sample covariance matrices and determine the transient start time of the target power grid partition according to the extracted features;
[0042] The analysis module is used to perform correlation analysis on the state monitoring matrix at each moment, determine the operating state of the target power grid partition at each moment, and then determine the transient end moment of the target power grid partition.
[0043] Further, when the first sample covariance matrix corresponding to the first state monitoring matrix is constructed according to random matrix theory, the second construction module constructs the sample covariance matrices corresponding to the respective state monitoring matrices according to random matrix theory, including:
[0044] Normalizing and standardizing the first state monitoring matrix to obtain a first standardized matrix;
[0045] According to a preset sample covariance matrix definition formula, the first standardized matrix is converted into a corresponding first sample covariance matrix.
[0046] In a possible implementation, the feature extraction module extracts features from the sample covariance matrices and determines the transient start time of the target power grid partition according to the extracted features, including:
[0047] Calculate all eigenvalues of each sample covariance matrix;
[0048] Divide the maximum eigenvalue of each sample covariance matrix by the minimum eigenvalue to obtain the fusion eigenvalue index corresponding to each sample covariance matrix;
[0049] Performing a sliding T test on each of the fusion feature value indicators with a sliding window of a preset length to obtain multiple test values and corresponding reference moments;
[0050] Each test value is compared with the first preset threshold value, and the reference time corresponding to the test value that exceeds the first preset threshold value earliest is the transient start time of the target power grid partition.
[0051] In a possible implementation, the analysis module performs correlation analysis on the state monitoring matrix at each time, determines the operating state of the target power grid partition at each time, and then determines the transient end time of the target power grid partition, including:
[0052] According to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition;
[0053] According to the correlation coefficients between adjacent nodes in the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated;
[0054] Comparing each average correlation coefficient with a second preset threshold value, determining the operating state of the target power grid partition at each moment, wherein when the first average correlation coefficient corresponding to the first moment is less than the second preset threshold value, the target power grid partition is in a stable stage, otherwise, the target power grid partition is in a transient transition stage;
[0055] When the target power grid partition changes from the transient transition stage to the stable stage, the corresponding moment is the transient end moment.
[0056] Furthermore, according to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition. The specific formula is:
[0057]
[0058] Among them, ρ represents the correlation coefficient between any two adjacent nodes of the state monitoring matrix corresponding to a certain moment, T represents the data length of the state monitoring matrix, and r t It represents the level difference of the measured values at both ends of adjacent nodes at time t, where the measured value is the voltage, current or phase value in the monitoring data, the level refers to the position of the measured values of each node after being arranged in order of size, and j is the time corresponding to the state monitoring matrix;
[0059] According to the correlation coefficients between the adjacent nodes of the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated, and the specific formula is:
[0060]
[0061] Among them, ρ mean Represents the average correlation coefficient of the state monitoring matrix corresponding to a certain moment, ρ H is the correlation coefficient between the two ends of the Hth branch, and h is the total number of branches in the target power grid partition;
[0062] The specific formula for comparing each average correlation coefficient with the second preset threshold value to determine the operating state of the target power grid partition at each moment is:
[0063]
[0064] Among them, when S t =1, it means that the target power grid partition is in the transient transition stage at time t. t =0, it means that the target power grid partition is in a stable stage at time t. BRIEF DESCRIPTION OF THE DRAWINGS
[0065] Figure 1 : A flow chart of an embodiment of a method for detecting transient steady state of a power system based on random matrix theory provided in this application.
[0066] Figure 2 : Schematic diagram of the system partition network structure during the experiment of a power system transient state detection method based on random matrix theory provided in this application.
[0067] Figure 3 : A schematic diagram of the changes in the sliding T test indicators when the system is short-circuited during the experiment of a power system transient state detection method based on random matrix theory provided in this application.
[0068] Figure 4 : A schematic diagram of the changes in the sliding T test indicators when the system is open during the experiment of a power system transient state detection method based on random matrix theory provided in this application.
[0069] Figure 5 : A schematic diagram of the changes in the sliding T test indicators when the system is disturbed during the experiment of a power system transient state detection method based on random matrix theory provided in this application.
[0070] Figure 6 : A schematic diagram of the change in average correlation coefficient when the system is short-circuited during the experiment of a power system transient state detection method based on random matrix theory provided in this application.
[0071] Figure 7 : A schematic diagram of the change in average correlation coefficient when the system is open during the experiment of a power system transient state detection method based on random matrix theory provided in this application.
[0072] Figure 8 : A schematic diagram of the change in average correlation coefficient of a power system transient state detection method based on random matrix theory provided in this application when the system is disturbed during the experiment.
[0073] Fig. 9 : A structural schematic diagram of an embodiment of a power system transient state detection system based on random matrix theory provided in this application. DETAILED DESCRIPTION
[0074] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0075] It should be noted that the step numbers in the text are only for the convenience of explanation of the specific embodiments and do not serve to limit the order in which the steps are executed. In the description of this application, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features.
[0076] Throughout the specification, the random matrix theory described in this specification is a generalized matrix analysis method, which can be used to study complex systems and processes. Matrix theory is widely used in many fields such as statistics, finance, physics and mathematics. Random matrix theory can reflect the properties and characteristics of complex systems by analyzing the statistical characteristics of the eigenvalues of high-dimensional random matrices. With the emergence of infinite-dimensional random matrices, its concept has been widely recognized and applied to more fields. For example, as the ratio of the row dimension and column dimension of infinite-dimensional random matrices approaches a fixed threshold, they can be considered to be suitable for finite-dimensional random matrices, thereby providing more references for solving special cases. In random matrix theory, the Marchenko-Pastur law can be regarded as an important concept of random matrices, which is based on the empirical spectral distribution (ESD), describes the characteristic distribution of the matrix, and has clear mathematical laws.
[0077] Embodiment 1:
[0078] like Figure 1 As shown, the first embodiment provides a method for detecting transient steady state of a power system based on random matrix theory, including steps S1-S5:
[0079] Step S1, acquiring monitoring data of the target power grid partition at each moment, wherein the monitoring data includes voltage, current, phase and power data of each power grid node in the target power grid partition;
[0080] Step S2, constructing a state monitoring matrix corresponding to each moment according to the monitoring data at each moment, wherein, at a first moment, a first state monitoring matrix corresponding to the first moment is constructed according to the first monitoring data at the first moment and the historical monitoring data within a preset time period before the first moment;
[0081] Step S3, constructing a sample covariance matrix corresponding to each state monitoring matrix according to random matrix theory;
[0082] Step S4, extracting features from the sample covariance matrices, and determining the transient start time of the target power grid partition according to the extracted features;
[0083] Step S5: performing correlation analysis on the state monitoring matrix at each time, determining the operating state of the target power grid partition at each time, and then determining the transient end time of the target power grid partition.
[0084] The embodiment of the present application provides a method for detecting transient state of power system based on random matrix theory, and constructs a state monitoring matrix corresponding to each moment according to the monitoring data of each moment of the target power grid partition, so as to realize real-time monitoring of the power grid state. Then, based on the random matrix theory, the sample covariance matrix corresponding to each state monitoring matrix is constructed, and the feature extraction and feature analysis of each sample covariance matrix are performed, so as to effectively detect the occurrence time of abnormal events, that is, determine the transient start time of the target power grid partition. At the same time, the correlation analysis of the state monitoring matrix at each moment can further determine the transient end time of the target power grid partition, realize the transient state detection of the power system, provide data support for the subsequent maintenance and adjustment of the power system, and improve the safety of the power system operation.
[0085] In a preferred embodiment, in step S1, the monitoring data of the target power grid partition at each moment is obtained through the wide area measurement system of the power grid monitoring point, and the system measures and uploads the monitoring data in real time. The monitoring data of the power grid consists of directly measured voltage, current, phase and indirectly calculated power.
[0086] In step S2, in order to construct a high-dimensional matrix, it is necessary to splice the monitoring data at the current moment with the monitoring data in the previous period of time to construct a state monitoring matrix corresponding to the current moment. As time goes by, the monitoring data obtained at each moment can be used to construct a corresponding state monitoring matrix with the monitoring data in the previous period of time, so as to monitor the power grid state in real time and provide basic data for subsequent transient state detection. For example, for a power grid partition with n PMU monitoring nodes, each node has k state variables. At the tth moment, the monitoring system of the power grid can collect N = n × k data, and these N data are formed into a column vector in a certain order as the monitoring data at the current moment t. In order to construct a high-dimensional matrix, it is necessary to splice the monitoring data at the current moment with the monitoring data in the previous certain period of time T to obtain X N×T , T is the preset value, then X N×T That is, the state monitoring matrix corresponding to time t. The internal elements of the state monitoring matrix are as follows:
[0087]
[0088] Further, in step S3, when constructing a first sample covariance matrix corresponding to the first state monitoring matrix according to random matrix theory, the sample covariance matrix corresponding to each state monitoring matrix according to random matrix theory is constructed, including:
[0089] Normalizing and standardizing the first state monitoring matrix to obtain a first standardized matrix;
[0090] According to the predefined formula for the sample covariance matrix, convert the first standardized matrix into the corresponding first sample covariance matrix.
[0091] In a preferred embodiment, normalize and standardize the N×T-dimensional monitoring matrix to obtain a first standardized matrix with N rows and T columns (N < T) in which the matrix elements are independently and identically distributed and satisfy μ(x) = 0, σ 2 (x) = d distribution. Subsequently, according to the predefined formula for the sample covariance matrix, convert the first standardized matrix into the corresponding first sample covariance matrix. The predefined formula for the sample covariance matrix is:
[0092]
[0093] where S is the first sample covariance matrix and X is the first standardized matrix.
[0094] According to the M-P law (Marchenko-Pastur law), the empirical spectral distribution of the sample covariance matrix S has obvious probability density characteristics, which are manifested as:
[0095]
[0096] In the formula, c is the matrix row-column ratio, σ 2 is the matrix variance, and x is the eigenvalue of the first sample covariance matrix S.
[0097] The embodiment of the present application provides a method for constructing a sample covariance matrix. Taking the construction of the first sample covariance matrix as an example, first, it is necessary to normalize and standardize the first state monitoring matrix to obtain the first standardized matrix. This is because the Marchenko-Pastur law in random matrix theory describes the distribution of the eigenvalues of a random matrix under certain conditions. Its shape is similar to a semi-circle or semi-ellipse and has a clear boundary. Specifically, its analysis object is a Hermitian matrix, and the core idea is that the empirical spectral distribution of the eigenvalues of an M×M-dimensional Hermitian matrix satisfies a certain functional law. However, the first state monitoring matrix constructed from the monitoring data does not satisfy the characteristics of a Hermitian matrix. Therefore, it is necessary to normalize and standardize the first state monitoring matrix so that it can be better combined with random matrix theory. Then, through the predefined formula for the sample covariance matrix, convert the first standardized matrix into the corresponding first sample covariance matrix. Compared with the first state monitoring matrix, the obtained first sample covariance matrix is more sensitive to abnormal changes in the data, can more accurately capture the occurrence time of abnormal events, and improve the accuracy of transient and steady-state detection.
[0098] In a possible implementation, in step S4, extracting features from the sample covariance matrices and determining the transient start time of the target power grid partition according to the extracted features includes:
[0099] Calculate all eigenvalues of each sample covariance matrix;
[0100] Divide the maximum eigenvalue of each sample covariance matrix by the minimum eigenvalue to obtain the fusion eigenvalue index corresponding to each sample covariance matrix;
[0101] Performing a sliding T test on each of the fusion feature value indicators with a sliding window of a preset length to obtain multiple test values and corresponding reference moments;
[0102] Each test value is compared with the first preset threshold value, and the reference time corresponding to the test value that exceeds the first preset threshold value earliest is the transient start time of the target power grid partition.
[0103] According to the MP law of random matrix theory, the eigenvalues of the sample covariance matrix that meets the random matrix conditions are distributed in an interval. The size of the interval is related to the dimension ratio of the matrix and satisfies a certain probability distribution law. According to the statistics of the eigenvalues, the eigenvalues that exceed the interval are focused on when creating indicators. When the power system encounters an abnormal situation, the randomness of the system will be seriously affected, and the changes in statistical data will be far beyond expectations, especially the gap between the maximum and minimum values of the matrix will be significantly widened. In addition, the more serious the deterioration of the system state, the more obvious this gap will be. Therefore, this application uses the eigenvalues of the sample covariance matrix to quantitatively describe the changes in the system, calculates all the eigenvalues of each sample covariance matrix, and extracts the maximum eigenvalue and minimum eigenvalue of each covariance matrix:
[0104] λ max =max(λ1,λ2,...,λ n )
[0105] λ min =min(λ1,λ2,...,λ n )
[0106] Among them, λ1,λ2,…,λ n is all the eigenvalues of a sample covariance matrix.
[0107] Define the fusion maximum and minimum eigenvalue indicators (Maximum-Minimum Eigenvalue, MME):
[0108]
[0109] However, it is impossible to directly determine the mutation time and mutation time from the MME curve alone, so it is necessary to construct additional detection indicators.
[0110] The sliding T test is a statistical method used to detect the difference between two groups of samples. It can help us determine which variables have mutated. The basis of this method is: given a time series of n samples {X1, X2, ..., X n}, the mean of the two subsequences is used as a reference, and their variance is used as a reference. This method can help us better understand the difference between the two groups of samples, so as to better predict future trends. After obtaining several fused maximum and minimum eigenvalue indicators, each fused maximum and minimum eigenvalue indicator has a corresponding moment, and a sliding T test is performed on each fused eigenvalue indicator with a sliding window of a preset length of T. In each test, a certain moment is selected as the reference point. The number of samples of the two subsequences x1 and x2 before and after the reference point are n1 and n2 respectively, and the average value of the two subsequences is The variance is n1+n2≤T, the statistic is defined as:
[0111]
[0112] Among them, t is the test value corresponding to a certain reference moment. In order to realize the online real-time detection of the system, a larger n1 and a smaller n2 are set. Under normal circumstances, n2=2 and n1=T-2 are set. For the local sliding window before and after the reference point, the former can use a large amount of historical data to smooth the curve, and the latter can use only a small amount of the latest data to quickly detect abnormal events. After obtaining multiple test values t and corresponding reference moments through the sliding T test, each test value is compared with the first preset threshold, and the reference moment corresponding to the test value t that first exceeds the first preset threshold is the transient start moment of the target power grid partition. Further, in the same power grid system, the transient and steady state detection method of the power system provided by the present application is used for each power grid partition, and the transient start moment corresponding to each power grid partition can be obtained, wherein the power grid partition corresponding to the earliest transient start moment is the area where the abnormal event occurs; or if each power grid partition exceeds the first preset threshold at the same time, then compare the t values of each power grid partition at this moment, and the power grid partition with the largest absolute value of the t value is the area where the abnormal event occurs. Therefore, the present application can not only perform transient and steady state detection on a single power grid partition, but also combine the transient and steady state detection data of multiple power grid partitions to quickly locate the area where the abnormal event occurs, so that the staff can respond quickly and carry out targeted repairs or adjustments to the area where the abnormal event occurs, thereby further improving the safety of the power system operation.
[0113] The embodiment of the present application provides a method for determining the transient start time of the target power grid partition according to the eigenvalue. First, the maximum eigenvalue of each sample covariance matrix is divided by the minimum eigenvalue to obtain a plurality of corresponding fused eigenvalue indicators. However, it is impossible to accurately determine the occurrence time of the abnormal event based solely on the change of the fused eigenvalue indicator. Therefore, a detection indicator must be constructed separately. The present embodiment uses a sliding T test to construct a detection indicator. The sliding T test is a statistical method for detecting the difference between two groups of samples. It can help us determine which variables have mutated. Therefore, the present embodiment performs a sliding T test on each of the fused eigenvalue indicators with a sliding window of a preset length to obtain a plurality of test values and corresponding reference moments. These test values can intuitively reflect the mutation of each fused eigenvalue indicator and improve the accuracy of transient steady state detection.
[0114] In a possible implementation, in step S5, the performing of correlation analysis on the state monitoring matrix at each time to determine the operating state of the target power grid partition at each time, and then determining the transient end time of the target power grid partition, includes:
[0115] According to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition;
[0116] According to the correlation coefficients between adjacent nodes in the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated;
[0117] Comparing each average correlation coefficient with a second preset threshold value, determining the operating state of the target power grid partition at each moment, wherein when the first average correlation coefficient corresponding to the first moment is less than the second preset threshold value, the target power grid partition is in a stable stage, otherwise, the target power grid partition is in a transient transition stage;
[0118] When the target power grid partition changes from the transient transition stage to the stable stage, the corresponding moment is the transient end moment.
[0119] The embodiment of the present application provides a method for determining the transient end time of the target power grid partition. Although the sliding T test method based on the fusion characteristic value index can accurately locate the occurrence time of the abnormal event, it is not effective for the transient end time of the positioning system. Therefore, the embodiment of the present application determines the transient end time of the target power grid partition by performing correlation analysis on the state monitoring matrix at each moment. Since the measurement values of adjacent nodes will fluctuate in the same direction in the transient stage, the correlation between the measurement values of the two nodes is greatly improved at this time, and the correlation slowly decreases with the transition to the steady state; when the transient fluctuation ends, there will be no more fluctuations in the same direction, leaving only uncertain errors, and the correlation between the measurement values of the two nodes is reduced to the minimum at this time, and the Spearman rank correlation coefficient method has strong robustness for data with abnormal values. Therefore, the embodiment of the present application uses the Spearman rank correlation coefficient method to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition, and then calculates the average correlation coefficient of the target power grid partition at each moment, and finally determines the transient end time of the target power grid partition according to each average correlation coefficient and the second preset threshold, combined with the transient start time obtained before, to achieve the transient and steady state detection of the power system and improve the safety of the power system operation.
[0120] Furthermore, according to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition. The specific formula is:
[0121]
[0122] Among them, ρ represents the correlation coefficient between any two adjacent nodes of the state monitoring matrix corresponding to a certain moment, T represents the data length of the state monitoring matrix, and r t It represents the level difference of the measured values at both ends of adjacent nodes at time t, where the measured value is the voltage, current or phase value in the monitoring data, the level refers to the position of the measured values of each node after being arranged in order of size, and j is the time corresponding to the state monitoring matrix;
[0123] According to the correlation coefficients between the adjacent nodes of the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated, and the specific formula is:
[0124]
[0125] Among them, ρ mean Represents the average correlation coefficient of the state monitoring matrix corresponding to a certain moment, ρ H is the correlation coefficient between the two ends of the Hth branch, and h is the total number of branches in the target power grid partition;
[0126] The specific formula for comparing each average correlation coefficient with the second preset threshold value to determine the operating state of the target power grid partition at each moment is:
[0127]
[0128] Among them, when S t =1, it means that the target power grid partition is in the transient transition stage at time t. t =0, it means that the target power grid partition is in a stable stage at time t.
[0129] Specifically, this embodiment uses the IEEE 39 node system for simulation verification experiments. The method proposed in this application is implemented and run in MATLAB 2020a. The partitioned network structure of the IEEE 39 node system is as follows Figure 2 As shown in the figure, PMU devices are deployed on all 39 nodes of the system for online monitoring. The sampling time interval ΔT = 0.01s is set, and Gaussian distribution noise of σ = 0.005pu is added to the simulation data. The noise is added because in the measured data of the power grid, the collected time series data approximately meets the requirements of the random matrix due to random fluctuations and measurement errors in the power grid. However, in the standard IEEE 39 node system, the data is stable and there is no measurement error during the simulation process. Therefore, the time series data does not meet the randomness of the Gaussian distribution. The monitoring data needs to be preprocessed, that is, noise with a suitable signal-to-noise ratio of the same dimension is added to the matrix composed of the collected monitoring data, so that the elements in the matrix have a certain randomness. In this way, the simulation data is converted into data that meets the characteristics of the random matrix. Assume that n1 = 200 and n2 = 2 in the sliding T test. When the t value is less than the threshold -15, it is the time when the abnormal event occurs.
[0130] For the IEEE39 node system, multiple abnormal events are set at 4.0s, and the mutation detection of abnormal events is simulated and tested:
[0131] (1) For partition 2, node 6 is short-circuited:
[0132] like Figure 3 As shown, at 4.02s, t values exceeding the threshold were detected in the four regions at the same time, from which it can be judged that the mutation time is 4.02s; at the same time, the t value of -73.6375 at 4.02s in partition 2 is the smallest, so partition 2 is the area where the abnormal event occurred.
[0133] (2) For partition 1, the circuit between nodes 16 and 24 is open:
[0134] like Figure 4As shown, since the open circuit has little impact on the system, only the t value exceeding the threshold is detected at 4.03s in partition 1, from which it can be judged that the mutation time is 4.03s; at the same time, partition 1 is the area where abnormal events occur.
[0135] (3) For partition 3, node 1 experiences a load disturbance and the power increases by 1.8 times:
[0136] like Figure 5 As shown in the figure, since the power of node 1 has increased by 1.8 times, the impact of load disturbance on the system is greater than that of an open circuit, so abnormal events can be detected in all four partitions. However, its impact on the system is not as strong as when a short circuit occurs. Therefore, when the fluctuations in the PMU data caused by the abnormal event are transmitted to other partitions and detected, there will be a slight time lag. Based on this, the partition where the abnormal event is first detected can be determined as the area where the abnormal event occurred. Figure 5 In the figure, partition 1 detected t values exceeding the threshold at 4.04s, partition 2 at 4.1s, partition 3 at 4.02s, and partition 4 at 4.03s, respectively. The earliest abnormal event in partition 3 was 4.02s, so partition 3 is the area where abnormal events occurred.
[0137] The above experiments prove that the method provided in this application can quickly and accurately determine the time and area where an abnormal event occurs.
[0138] In addition, a variety of abnormal events are set for the IEEE39 node system at 4.0s, and the transient steady state detection of the test system is simulated, and the average correlation coefficient is set to 0.1 when the transient termination time is:
[0139] (1) For partition 2, node 6 is short-circuited:
[0140] like Figure 6 As shown, the transient transition phase of partition 1 is 4.02-7.28s, the transient transition phase of partition 2 is 4.02-7.31s, the transient transition phase of partition 3 is 4.02-7.01s, and the transient transition phase of partition 4 is 4.02-7.21s. Partition 2 is the area where the abnormal event occurred and is also the area most affected by the abnormal event. Its transient transition phase lasts the longest.
[0141] (2) For partition 1, the circuit between nodes 16 and 24 is open:
[0142] like Figure 7 As shown, the transient transition stage of partition 1 is 4.04-4.84s, and the transient process lasts for a short time.
[0143] (3) For partition 3, node 1 experiences a load disturbance and the power increases by 1.8 times:
[0144] like Figure 8 As shown, the transient transition phase of partition 1 is 4.09-5.26s, the transient transition phase of partition 2 is 4.1-5.03s, the transient transition phase of partition 3 is 4.02-5.3s, and the transient transition phase of partition 4 is 4.02-5.17s. Partition 3 is the area where the abnormal event occurred and is also the area most affected by the abnormal event. Its transient transition process lasts the longest.
[0145] The above experiments prove that the method provided by the present application can quickly and accurately determine the transient state of each partition. In the embodiment of the present application, the sliding T test method can effectively detect the occurrence of abnormal events; at the same time, based on the correlation coefficient of adjacent nodes, it can detect whether the system is in a transient stage at a certain moment; the combination of the two parts can effectively and accurately perform transient state detection, which helps to improve the performance and safety of the power system.
[0146] Embodiment 2:
[0147] like Fig. 9 As shown, accordingly, the present application provides a power system transient state detection system based on random matrix theory, including an acquisition module 10, a first construction module 20, a second construction module 30, a feature extraction module 40 and an analysis module 50;
[0148] The acquisition module 10 is used to acquire monitoring data of the target power grid partition at each moment, and the monitoring data includes voltage, current, phase and power data of each power grid node in the target power grid partition;
[0149] The first construction module 20 is used to construct a state monitoring matrix corresponding to each moment according to the monitoring data at each moment, wherein, at a first moment, a first state monitoring matrix corresponding to the first moment is constructed according to the first monitoring data at the first moment and the historical monitoring data within a preset time period before the first moment;
[0150] The second construction module 30 is used to construct a sample covariance matrix corresponding to each state monitoring matrix according to random matrix theory;
[0151] The feature extraction module 40 is used to extract features from the sample covariance matrices and determine the transient start time of the target power grid partition according to the extracted features;
[0152] The analysis module 50 is used to perform correlation analysis on the state monitoring matrix at each moment, determine the operating state of the target power grid partition at each moment, and further determine the transient end moment of the target power grid partition.
[0153] Further, when the first sample covariance matrix corresponding to the first state monitoring matrix is constructed according to the random matrix theory, the second construction module 30 constructs the sample covariance matrix corresponding to each state monitoring matrix according to the random matrix theory, including:
[0154] Normalizing and standardizing the first state monitoring matrix to obtain a first standardized matrix;
[0155] According to a preset sample covariance matrix definition formula, the first standardized matrix is converted into a corresponding first sample covariance matrix.
[0156] In a possible implementation, the feature extraction module 40 extracts features from the sample covariance matrices and determines the transient start time of the target power grid partition according to the extracted features, including:
[0157] Calculate all eigenvalues of each sample covariance matrix;
[0158] Divide the maximum eigenvalue of each sample covariance matrix by the minimum eigenvalue to obtain the fusion eigenvalue index corresponding to each sample covariance matrix;
[0159] Performing a sliding T test on each of the fusion feature value indicators with a sliding window of a preset length to obtain multiple test values and corresponding reference moments;
[0160] Each test value is compared with the first preset threshold value, and the reference time corresponding to the test value that exceeds the first preset threshold value earliest is the transient start time of the target power grid partition.
[0161] In a possible implementation, the analysis module 50 performs correlation analysis on the state monitoring matrix at each time, determines the operation state of the target power grid partition at each time, and then determines the transient end time of the target power grid partition, including:
[0162] According to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition;
[0163] According to the correlation coefficients between adjacent nodes in the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated;
[0164] Comparing each average correlation coefficient with a second preset threshold value, determining the operating state of the target power grid partition at each moment, wherein when the first average correlation coefficient corresponding to the first moment is less than the second preset threshold value, the target power grid partition is in a stable stage, otherwise, the target power grid partition is in a transient transition stage;
[0165] When the target power grid partition changes from the transient transition stage to the stable stage, the corresponding moment is the transient end moment.
[0166] Furthermore, according to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition. The specific formula is:
[0167]
[0168] Among them, ρ represents the correlation coefficient between any two adjacent nodes of the state monitoring matrix corresponding to a certain moment, T represents the data length of the state monitoring matrix, and r t It represents the level difference of the measured values at both ends of adjacent nodes at time t, where the measured value is the voltage, current or phase value in the monitoring data, the level refers to the position of the measured values of each node after being arranged in order of size, and j is the time corresponding to the state monitoring matrix;
[0169] According to the correlation coefficients between the adjacent nodes of the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated, and the specific formula is:
[0170]
[0171] Among them, ρ mean Represents the average correlation coefficient of the state monitoring matrix corresponding to a certain moment, ρ H is the correlation coefficient between the two ends of the Hth branch, and h is the total number of branches in the target power grid partition;
[0172] The specific formula for comparing each average correlation coefficient with the second preset threshold value to determine the operating state of the target power grid partition at each moment is:
[0173]
[0174] Among them, when S t =1, it means that the target power grid partition is in the transient transition stage at time t. t =0, it means that the target power grid partition is in a stable stage at time t.
[0175] The embodiment of the present application provides a power system transient state detection system based on random matrix theory, which constructs a state monitoring matrix corresponding to each moment according to the monitoring data of the target power grid partition at each moment, so as to realize real-time monitoring of the power grid state. Then, based on the random matrix theory, the sample covariance matrix corresponding to each state monitoring matrix is constructed, and the feature extraction and feature analysis of each sample covariance matrix are performed, so as to effectively detect the occurrence time of the abnormal event, that is, determine the transient start time of the target power grid partition. At the same time, the correlation analysis of the state monitoring matrix at each moment can further determine the transient end time of the target power grid partition, realize the transient state detection of the power system, provide data support for the subsequent maintenance and adjustment of the power system, and improve the safety of the power system operation.
[0176] The more detailed working principle and step flow of this embodiment can refer to, but are not limited to, the relevant records of Embodiment 1.
[0177] The specific embodiments described above further describe the purpose, technical solutions and beneficial effects of the present application in detail. It should be understood that the above description is only a specific embodiment of the present application and is not intended to limit the scope of protection of the present application. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of protection of the present application.
Claims
1. A method for detecting transient state of power system based on random matrix theory, characterized in that: include: Acquire monitoring data of the target power grid partition at each moment, wherein the monitoring data includes voltage, current, phase and power data of each power grid node in the target power grid partition; Constructing a state monitoring matrix corresponding to each moment according to the monitoring data at each moment, wherein, at a first moment, constructing a first state monitoring matrix corresponding to the first moment according to the first monitoring data at the first moment and the historical monitoring data within a preset time period before the first moment; Constructing a sample covariance matrix corresponding to each state monitoring matrix according to random matrix theory; Extracting features from each sample covariance matrix, and determining the transient start time of the target power grid partition according to each extracted feature; Correlation analysis is performed on the state monitoring matrix at each time to determine the operating state of the target power grid partition at each time, and then determine the transient end time of the target power grid partition.
2. A method for detecting transient state of power system based on random matrix theory as claimed in claim 1, characterized in that: When the first sample covariance matrix corresponding to the first state monitoring matrix is constructed according to random matrix theory, the sample covariance matrix corresponding to each state monitoring matrix is constructed according to random matrix theory, including: Normalizing and standardizing the first state monitoring matrix to obtain a first standardized matrix; According to a preset sample covariance matrix definition formula, the first standardized matrix is converted into a corresponding first sample covariance matrix.
3. A method for detecting transient state of power system based on random matrix theory as claimed in claim 1, characterized in that: The step of extracting features from the sample covariance matrices and determining the transient start time of the target power grid partition according to the extracted features includes: Calculate all eigenvalues of each sample covariance matrix; Divide the maximum eigenvalue of each sample covariance matrix by the minimum eigenvalue to obtain the fusion eigenvalue index corresponding to each sample covariance matrix; Performing a sliding T test on each of the fusion feature value indicators with a sliding window of a preset length to obtain multiple test values and corresponding reference moments; Each test value is compared with the first preset threshold value, and the reference time corresponding to the test value that exceeds the first preset threshold value earliest is the transient start time of the target power grid partition.
4. A method for detecting transient state of power system based on random matrix theory as claimed in claim 1, characterized in that: The performing correlation analysis on the state monitoring matrix at each time to determine the operation state of the target power grid partition at each time, and then determining the transient end time of the target power grid partition, includes: According to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition; According to the correlation coefficients between each adjacent node in the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated; Comparing each average correlation coefficient with a second preset threshold value, determining the operating state of the target power grid partition at each moment, wherein when the first average correlation coefficient corresponding to the first moment is less than the second preset threshold value, the target power grid partition is in a stable stage, otherwise, the target power grid partition is in a transient transition stage; When the target power grid partition changes from the transient transition stage to the stable stage, the corresponding moment is the transient end moment.
5. A method for detecting transient state of power system based on random matrix theory as claimed in claim 4, characterized in that: According to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment in the target power grid partition. The specific formula is: Among them, ρ represents the correlation coefficient between any two adjacent nodes of the state monitoring matrix corresponding to a certain moment, T represents the data length of the state monitoring matrix, and r t It represents the level difference of the measured values at both ends of adjacent nodes at time t, where the measured value is the voltage, current or phase value in the monitoring data, the level refers to the position of the measured values of each node after being arranged in order of size, and j is the time corresponding to the state monitoring matrix; According to the correlation coefficients between the adjacent nodes of the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated, and the specific formula is: Among them, ρ mean Represents the average correlation coefficient of the state monitoring matrix corresponding to a certain moment, ρ H is the correlation coefficient between the two ends of the Hth branch, and h is the total number of branches in the target power grid partition; The specific formula for comparing each average correlation coefficient with the second preset threshold value to determine the operating state of the target power grid partition at each moment is: Among them, when S t =1, it means that the target power grid partition is in the transient transition stage at time t. t =0, it means that the target power grid partition is in a stable stage at time t.
6. A power system transient state detection system based on random matrix theory, characterized in that: It includes an acquisition module, a first construction module, a second construction module, a feature extraction module and an analysis module; The acquisition module is used to acquire monitoring data of the target power grid partition at each moment, and the monitoring data includes voltage, current, phase and power data of each power grid node in the target power grid partition; The first construction module is used to construct a state monitoring matrix corresponding to each moment according to the monitoring data at each moment, wherein, at a first moment, a first state monitoring matrix corresponding to the first moment is constructed according to the first monitoring data at the first moment and the historical monitoring data within a preset time period before the first moment; The second construction module is used to construct a sample covariance matrix corresponding to each state monitoring matrix according to random matrix theory; The feature extraction module is used to extract features from the sample covariance matrices and determine the transient start time of the target power grid partition according to the extracted features; The analysis module is used to perform correlation analysis on the state monitoring matrix at each moment, determine the operating state of the target power grid partition at each moment, and then determine the transient end moment of the target power grid partition.
7. A power system transient state detection system based on random matrix theory as claimed in claim 6, characterized in that: When the first sample covariance matrix corresponding to the first state monitoring matrix is constructed according to random matrix theory, the second construction module constructs the sample covariance matrices corresponding to the respective state monitoring matrices according to random matrix theory, including: Normalizing and standardizing the first state monitoring matrix to obtain a first standardized matrix; According to a preset sample covariance matrix definition formula, the first standardized matrix is converted into a corresponding first sample covariance matrix.
8. The power system transient state detection system based on random matrix theory as claimed in claim 6, characterized in that: The feature extraction module extracts features from the sample covariance matrices and determines the transient start time of the target power grid partition according to the extracted features, including: Calculate all eigenvalues of each sample covariance matrix; Divide the maximum eigenvalue of each sample covariance matrix by the minimum eigenvalue to obtain the fusion eigenvalue index corresponding to each sample covariance matrix; Performing a sliding T test on each of the fusion feature value indicators with a sliding window of a preset length to obtain multiple test values and corresponding reference moments; Each test value is compared with the first preset threshold value, and the reference time corresponding to the test value that exceeds the first preset threshold value earliest is the transient start time of the target power grid partition.
9. A power system transient state detection system based on random matrix theory as claimed in claim 6, characterized in that: The analysis module performs correlation analysis on the state monitoring matrix at each time, determines the operation state of the target power grid partition at each time, and then determines the transient end time of the target power grid partition, including: According to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment of the target power grid partition; According to the correlation coefficients between each adjacent node in the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated; Comparing each average correlation coefficient with a second preset threshold value, determining the operating state of the target power grid partition at each moment, wherein when the first average correlation coefficient corresponding to the first moment is less than the second preset threshold value, the target power grid partition is in a stable stage, otherwise, the target power grid partition is in a transient transition stage; When the target power grid partition changes from the transient transition stage to the stable stage, the corresponding moment is the transient end moment.
10. A power system transient state detection system based on random matrix theory as claimed in claim 9, characterized in that: According to the state monitoring matrix at each moment, the Spearman rank correlation coefficient method is used to calculate the correlation coefficient between each adjacent node at each moment in the target power grid partition. The specific formula is: Among them, ρ represents the correlation coefficient between any two adjacent nodes of the state monitoring matrix corresponding to a certain moment, T represents the data length of the state monitoring matrix, and r t It represents the level difference of the measured values at both ends of adjacent nodes at time t, where the measured value is the voltage, current or phase value in the monitoring data, the level refers to the position of the measured values of each node after being arranged in order of size, and j is the time corresponding to the state monitoring matrix; According to the correlation coefficients between the adjacent nodes of the target power grid partition at each time, the average correlation coefficient of the target power grid partition at each time is calculated, and the specific formula is: Among them, ρ mean Represents the average correlation coefficient of the state monitoring matrix corresponding to a certain moment, ρ H is the correlation coefficient between the two ends of the Hth branch, and h is the total number of branches in the target power grid partition; The specific formula for comparing each average correlation coefficient with the second preset threshold value to determine the operating state of the target power grid partition at each moment is: Among them, when S t =1, it means that the target power grid partition is in the transient transition stage at time t. t =0, it means that the target power grid partition is in a stable stage at time t.