Storage battery control device, power storage system, and storage battery control method
By dynamically adjusting the number of battery strings performed for discharge or charging in the power storage system, ensuring that the load coefficient of the power converter is close to a predetermined value, the problem of reduced power conversion efficiency in the power storage system is solved, and efficient power conversion and reducing heat generation is achieved.
Patent Information
- Application Number
- CN202380028771.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-04-19
- Filing Date
- 2023-03-16
- Publication Date
- 2024-11-05
AI Technical Summary
In power storage systems, as the discharge or charging power decreases, the power conversion efficiency of the power converter decreases, resulting in an increase in total heat generation, and a fixed number of power converters operate inefficiently at low power.
The power conversion efficiency is maximized by dynamically adjusting the number of battery strings that perform discharge or charging, so that the corresponding power converter load coefficient is close to a predetermined load coefficient.
Regardless of the discharge or charging power of the power storage system, efficient power conversion efficiency can be maintained, total heat generation is reduced, and cooling costs can be reduced.
Smart Images

Figure CN118901177A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a battery control device, a power storage system and a battery control method. Background Art
[0002] A power storage system is known that includes a plurality of battery strings connected in parallel, and a plurality of DC power converters provided for each battery string, the plurality of DC power converters being configured to convert outputs of the battery strings into a set voltage of a load supply bus (for example, see Patent Document 1). In the power storage system disclosed in Patent Document 1, the number of battery modules in the battery string is selected to be an arbitrary number.
[0003] Citation List
[0004] Patent Literature
[0005] Patent document 1: JP2020-156200A Summary of the invention
[0006] Technical issues
[0007] Typically, the power conversion efficiency of a power converter is set according to the maximum output power, increases as the output power approaches the maximum output power, and decreases as the output power decreases. In contrast, in the above-mentioned power storage system, the number of battery strings that perform charging or discharging is constant. Therefore, in the power storage system, as the discharge power or charging power becomes smaller, the discharge power or charging power borne by each battery string becomes smaller, and the power conversion efficiency of the power converter decreases. In addition, in the power storage system, since a certain number of power converters operate regardless of the size of the power conversion efficiency, the total heat generation of the entire system may increase due to a certain number of power converters operating at low power conversion efficiency.
[0008] In view of the above situation, an object of the present invention is to provide a battery control device, a power storage system and a battery control method, which can maintain the power conversion efficiency of the power converter with high efficiency regardless of the size of the discharge power or the charging power of the power storage system including a plurality of battery strings and a plurality of power converters.
[0009] Solution to the problem
[0010] The battery control device of the present invention is a battery control device for controlling an electric power storage system, which includes multiple battery strings and multiple power converters, each battery string includes multiple batteries connected in series and connected through a power line, each power converter is arranged between the battery string and the power line and is configured to convert the input voltage and output voltage of the battery string, wherein the number of battery strings performing discharge or charging is variably set according to the size of the discharge power or charging power of the electric power storage system; and the number of battery strings performing discharge or charging is set so that the load factor of the power converter corresponding to the battery string performing discharge or charging is close to a predetermined load factor, and the power conversion efficiency of the power converter is maximized under the predetermined load factor.
[0011] The power storage system of the present invention is a power storage system, which includes multiple battery strings, multiple power converters and a battery control device, each battery string includes multiple batteries connected in series and connected through a power line, each power converter is arranged between the battery string and the power line, and is configured to convert the input voltage and output voltage of the battery string, and the battery control device is configured to control the multiple power converters, wherein the battery control device variably sets the number of battery strings performing discharge or charging according to the size of the discharge power or charging power of the power storage system, and sets the number of battery strings performing discharge or charging so that the load factor of the power converter corresponding to the battery string performing discharge or charging is close to a predetermined load factor, and the power conversion efficiency of the power converter is maximized under the predetermined load factor.
[0012] The battery control method of the present invention is a battery control method performed using a battery control device configured to control a power storage system, the power storage system comprising a plurality of battery strings and a plurality of power converters, each battery string comprising a plurality of batteries connected in series and connected via a power line, each power converter being arranged between the battery string and the power line and being configured to convert an input voltage and an output voltage of the battery string, the battery control method comprising: variably setting the number of battery strings performing discharge or charge according to the size of the discharge power or the charge power of the power storage system, and setting the number of battery strings performing discharge or charge so that the load factor of the power converter corresponding to the battery string performing discharge or charge is close to a predetermined load factor, and the power conversion efficiency of the power converter is maximized under the predetermined load factor.
[0013] Advantageous Effects of the Invention
[0014] According to the present invention, regardless of the magnitude of discharge power or charge power of an electric power storage system including a plurality of storage battery strings and a plurality of power converters, the power conversion efficiency of the power converter can be maintained at high efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 is a circuit diagram schematically illustrating a power storage system including a microcontroller unit (MCU) and a system controller according to one embodiment of the present invention.
[0016] Figure 2 It is shown Figure 1 Flowchart of the process of the MCU and system controller during discharge.
[0017] Figure 3 It is shown Figure 1 Flowchart of the process of the MCU and system controller during charging. DETAILED DESCRIPTION
[0018] Hereinafter, the present invention will be described with reference to preferred embodiments. The present invention is not limited to the embodiments described below, and the embodiments may be appropriately modified without departing from the scope of the present invention. In the embodiments to be described below, part of the configuration may not be described or shown in the figures, and with regard to the details of the omitted technology, as long as there is no contradiction with the content to be described below, the known or well-known technology will be appropriately applied.
[0019] Figure 1 1 is a circuit diagram showing an outline of a power storage system 1 including an MCU 10 and a system controller 100 according to an embodiment of the present invention. As shown in this figure, the power storage system 1 includes m groups (m is an integer of 2 or more) of battery strings STR1 to STRm, a string bus 3, m power converters PC1 to PCm, an MCU 10, and a system controller 100. The m groups of battery strings STR1 to STRm are connected to each other through the m power converters PC1 to PCm and the string bus 3, and are connected to an external system (not shown). The power storage system 1 is a fixed or vehicle-mounted power supply.
[0020] The battery strings STR1 to STRm each include n (n is an integer of 2 or more) battery modules M1 to Mn connected in series. Although not particularly limited, the battery strings STR1 to STRm according to the present embodiment are obtained by regenerating used batteries, and the degree of degradation of each battery module M1 to Mn is different. The battery modules M1 to Mn are secondary batteries such as lithium ion batteries or lithium ion capacitors.
[0021] The battery modules M1 to Mn are charged with power provided from an external system through the string bus 3 and the power converters PC1 to PCm. The battery modules M1 to Mn release the power used for charging through the power converters PC1 to PCm and the string bus 3 to supply power to the external system. The battery modules M1 to Mn can be charged by power from another battery string STR1 to STRm through the string bus 3 and the power converters PC1 to PCm. The battery modules M1 to Mn can release the charged power and charge the battery modules M1 to Mn of another battery string STR1 to STRm through the power converters PC1 to PCm and the string bus 3.
[0022] The external system includes loads, generators, etc. When the power storage system 1 is used for stationary use, the loads include household appliances, commercial power supply systems, liquid crystal indicators, communication modules, etc., and the generators include photovoltaic power generation systems, etc. In contrast, when the power storage system 1 is used for vehicle use, the loads include drive motors, air conditioners, various vehicle-mounted electrical components, etc. The drive motor acts as both a load and a generator.
[0023] The battery strings STR1 to STRm may include n battery cells or battery groups connected in series, instead of n battery modules M1 to Mn connected in series. The power storage system 1 may include a bypass circuit that bypasses each battery cell or each battery group.
[0024] The power converters PC1 to PCm are DC / DC converters or DC / AC converters, and are connected to the string bus 3. A positive electrode of the battery module M1 at the starting end and a negative electrode of the battery module Mn at the terminal end are connected to each of the power converters PC1 to PCm.
[0025] When the battery strings STR1 to STRm are charged, the power converters PC1 to PCm convert the voltage received from the string bus 3 and output the converted voltage to the plurality of battery modules M1 to Mn. In contrast, when the battery strings STR1 to STRm are discharged, the power converters PC1 to PCm convert the voltage received from the plurality of battery modules M1 to Mn and output the converted voltage to the string bus 3. When the current flowing through the string bus 3 is direct current, the power converters PC1 to PCm are DC / DC converters, and when the current flowing through the string bus 3 is alternating current, the power converters PC1 to PCm are DC / AC converters. When the current flowing through the string bus 3 is alternating current, each of the power converters PC1 to PCm includes a synchronization unit that follows the change in the instantaneous value.
[0026] When the output power is at its maximum value P MAXWhen operating at a predetermined load factor Lr, the power converters PC1 to PCm are set to maximize the power conversion efficiency. Therefore, the power conversion efficiency of the power converters PC1 to PCm increases as the output power increases from the maximum value P MAX When a large number of power converters PC1 to PCm having low power conversion efficiency are operated to ensure required output power, the total heat generation of the entire power storage system 1 increases.
[0027] Each of the battery strings STR1 to STRm includes n voltage sensors 12, current sensors 13, and n bypass circuits B1 to Bn. The voltage sensor 12 is connected between the positive terminal and the negative terminal of each battery module M1 to Mn. The voltage sensor 12 measures the terminal voltage of each battery module M1 to Mn.
[0028] The current sensor 13 is provided in the current path of the battery strings STR1 to STRm. The current sensor 13 measures the charge and discharge current of the battery strings STR1 to STRm.
[0029] A bypass circuit B1 to Bn is provided for each battery module M1 to Mn. Each bypass circuit B1 to Bn includes a bypass line BL and switches S1 and S2. The bypass line BL is a power line that bypasses each battery module M1 to Mn. The switch S1 is provided on the bypass line BL. The switch S1 is, for example, a mechanical switch. The switch S2 is provided between the positive electrode of each battery module M1 to Mn and one end of the bypass line BL. The switch S2 is, for example, a semiconductor switch or a relay.
[0030] The battery module M1 at the start end and the battery module Mn at the end end are connected to the external system through each of the power converters PC1 to PCm and the string bus 3. When the switch S1 is opened and the switch S2 is closed in all the bypass circuits B1 to Bn, all the battery modules M1 to Mn are connected in series to the external system. On the contrary, when the switch S2 is opened and the switch S1 is closed in any one of the bypass circuits B1 to Bn, the battery modules M1 to Mn corresponding to the bypass circuits B1 to Bn are bypassed.
[0031] The system controller 100 is connected to the battery strings STR1 to STRm, the bypass circuits B1 to Bn, and the power converters PC1 to PCm. The system controller 100 performs monitoring and control of the battery modules M1 to Mn, switching control of the bypass circuits B1 to Bn, and charge and discharge control by the power converters PC1 to PCm.
[0032] When the power storage system 1 is discharged, the voltage of the battery strings STR1 to STRm fluctuates according to the state of charge (SOC) or the bypass state (the number of connected battery modules M1 to Mn) of the battery modules M1 to Mn. Therefore, the power converters PC1 to PCm adjust the output voltage so that the voltage of the battery strings STR1 to STRm performing the discharge matches. In contrast, when the power storage system 1 is charged, the voltage of the battery strings STR1 to STRm fluctuates according to the SOC or the bypass state of the battery modules M1 to Mn. Therefore, the power converters PC1 to PCm adjust the voltage received from the string bus 3 to the voltage of the corresponding battery strings STR1 to STRm. That is, the system controller 100 controls the power converters PC1 to PCm according to the voltage magnitude of the STR1 to STRm battery strings.
[0033] In addition, the MCU 10 sets the number of storage battery strings STR1 to STRm that perform discharging or charging, and determines the storage battery strings STR1 to STRm that perform discharging or charging, according to the magnitude of the input and output power of the power storage system 1. The MCU 10 sets the number of storage battery strings STR1 to STRm that perform discharging or charging, and determines the storage battery strings STR1 to STRm that perform discharging or charging, based on battery temperature information and battery state information such as SOC information received from the system controller 100.
[0034] The system controller 100 controls the power converters PC1 to PCm to operate the number of battery strings STR1 to STRm set by the MCU 10 and to operate the battery strings STR1 to STRm determined by the MCU 10. Hereinafter, a control method of the power converters PC1 to PCm by the MCU 10 and the system controller 100 will be described.
[0035] In response to a command from the MCU 10, the system controller 100 controls the power converters PC1 to PCm to output or receive power required by the power storage system 1. Prior to this, the MCU 10 sets the number of storage battery strings STR1 to STRm that perform discharging according to the size of the output power required by the power storage system 1. In addition, the MCU 10 sets the number of storage battery strings STR1 to STRm that perform charging according to the size of the input power required by the power storage system 1.
[0036] For example, suppose the power converters PC1 to PCm are at the maximum output power P MAX =10kW and a predetermined load factor Lr=80% under the condition of maximum power conversion efficiency. In addition, it is assumed that the number of groups of storage battery strings STR1 to STRm is 10 (m=10). Under these assumptions, a case will be described in which the output P of the power storage system 1 is OUTThe load factor of each power converter PC1 to PCm is 40 kW, and all ten battery strings STR1 to STRm are discharged. In this case, the discharge power of each battery string STR1 to STRm is 4 kW, and the load factor of each power converter PC1 to PCm is 40 %. Therefore, the power converter PC1 to PCm cannot operate at the maximum power conversion efficiency.
[0037] On the contrary, under the above assumption, a case will be described in which the output P of the power storage system 1 OUT Similarly, it is 40kW, and five groups of battery strings STR1 to STRm are made to perform discharge. In this case, the discharge power of each battery string STR1 to STRm performing discharge is 8kW, and the load factor of the power converter PC1 to PCm corresponding to the battery string STR1 to STRm performing discharge is 80%. Therefore, the power converter PC1 to PCm corresponding to the battery string STR1 to STRm performing discharge can operate at the maximum power conversion efficiency.
[0038] Under the same assumption, a case will be described in which the input P of the power storage system 1 is IN The charging power of each battery string STR1 to STRm is 40kW, and all ten battery strings STR1 to STRm are charged. In this case, the charging power of each battery string STR1 to STRm is 4kW, and the load factor of each power converter PC1 to PCm is 40%. Therefore, the power converters PC1 to PCm cannot operate at the maximum power conversion efficiency.
[0039] On the contrary, under the above assumption, a case will be described in which the input P of the power storage system 1 is IN The power of each battery string STR1 to STRm is 8 kW, and the load factor of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm is 80%. Therefore, the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm can operate at the maximum power conversion efficiency.
[0040] On the contrary, for example, under the above assumption, a case will be described in which the output P of the power storage system 1 is OUT The load factor of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm is 80 kW, and all the ten battery strings STR1 to STRm are discharged. In this case, the discharge power of each battery string STR1 to STRm that performs discharge is 8 kW, and the load factor of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform discharge is 80%. Therefore, all the power converters PC1 to PCm can operate at the maximum power conversion efficiency.
[0041] Furthermore, a case will be described in which the input P of the power storage system 1 is IN The charging power of each battery string STR1 to STRm is 80kW, and all ten battery strings STR1 to STRm are charged. In this case, the charging power of each battery string STR1 to STRm is 8kW, and the load factor of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform charging is 80%. Therefore, all power converters PC1 to PCm can operate at the maximum power conversion efficiency.
[0042] Therefore, the MCU 10 variably sets the number of the storage battery strings STR1 to STRm that perform discharging or charging according to the magnitude of the input and output power required by the power storage system 1. Specifically, the number of the storage battery strings STR1 to STRm that perform discharging or charging is set so that the load factors of the power converters PC1 to PCm corresponding to the storage battery strings STR1 to STRm that perform discharging or charging are close to a predetermined load factor Lr that maximizes the power conversion efficiency.
[0043] Here, the discharge current or charge current of the battery modules M1 to Mn of each battery string STR1 to STRm may be limited. Examples of the limitation include a case where the temperature of the battery modules M1 to Mn is equal to or higher than a predetermined temperature, a case where the battery modules M1 to Mn are discharged in a state close to being fully discharged (when the SOC is equal to or less than a predetermined value), and a case where the battery modules M1 to Mn are charged in a state close to being fully charged (when the SOC is equal to or greater than a predetermined value).
[0044] When limiting the discharge current or charge current of the battery modules M1 to Mn in this manner, the MCU 10 receives the current limit value from the system controller 100. For the battery strings STR1 to STRm where the discharge current or charge current is not limited, the MCU 10 sets the discharge power or charge power so that the load factor of the corresponding power converters PC1 to PCm is a predetermined load factor Lr at which the power conversion efficiency is maximized. In contrast, for the battery strings STR1 to STRm where the discharge current or charge current is limited, the MCU 10 sets the discharge power or charge power by limiting the discharge current or charge current to the current limit value or less in priority to increasing the load factor of the corresponding power converters PC1 to PCm.
[0045] Figure 2 It is shown Figure 1 FIG. 1 is a flowchart of the process of the MCU 10 and the system controller 100 during the discharge period. When the MCU 10 receives the output command, it starts Figure 2 The process shown in the flowchart.
[0046] In step S1, the MCU 10 determines whether there is any storage battery string STR1 to STRm having current limitation. If it is determined to be YES in step S1, the process proceeds to step S3, and if it is determined to be NO in step S1, the process proceeds to step S2.
[0047] In step S2, the MCU 10 determines the number of battery strings STR1 to STRm to perform discharging and the battery strings STR1 to STRm to perform discharging according to the requested output power. In this step, the number of battery strings STR1 to STRm to perform discharging is set so that the load factor of the power converter PC1 to PCm corresponding to the battery strings STR1 to STRm to perform discharging is a predetermined load factor Lr that maximizes the power conversion efficiency. Then, the process proceeds from step S2 to step S6.
[0048] In contrast, in step S3, the MCU 10 determines whether there is any storage battery string STR1 to STRm without current limitation. If the determination in step S3 is YES, the process proceeds to step S4, and if the determination in step S3 is NO, the process proceeds to step S5.
[0049] In step S4, the MCU 10 determines the number of battery strings STR1 to STRm that perform discharge and the battery strings STR1 to STRm that perform discharge according to the requested output power. In this step, the number of battery strings STR1 to STRm that perform discharge without current limitation is set so that the load factor of the power converter PC1 to PCm corresponding to the battery strings STR1 to STRm that perform discharge is a predetermined load factor Lr that maximizes the power conversion efficiency. On the other hand, for the battery strings STR1 to STRm that perform discharge in a state with current limitation, the discharge current is set to be equal to or less than the current limit value, and the load factor of the corresponding power converter PC1 to PCm is also set according to the current limit value. Then, the process proceeds from step S4 to step S6.
[0050] On the contrary, in step S5, the MCU 10 determines the number of the battery strings STR1 to STRm to be discharged and the battery strings STR1 to STRm to be discharged according to the requested output power. In this step, for the battery strings STR1 to STRm to be discharged, the discharge current is set to be equal to or less than the current limit value, and the load factor of the corresponding power converter PC1 to PCm is set according to the current limit value. Then, the process proceeds from step S5 to step S6.
[0051] In step S6, the system controller 100 controls the power converters PC1 to PCm so that the storage battery strings STR1 to STRm determined by the MCU 10 perform discharge. This completes the process.
[0052] Figure 3 It is shown Figure 1 FIG. 1 is a flowchart of the process of the MCU 10 and the system controller 100 during charging. When the MCU 10 receives an input command, it starts Figure 3 The process is shown in the flowchart in .
[0053] In step S11, the MCU 10 determines whether there is any storage battery string STR1 to STRm having current limitation. If it is determined to be YES in step S11, the process proceeds to step S13, and if it is determined to be NO in step S11, the process proceeds to step S12.
[0054] In step S12, the MCU 10 determines the number of battery strings STR1 to STRm to be charged and the battery strings STR1 to STRm to be charged according to the requested input power. In this step, the number of battery strings STR1 to STRm to be charged is set so that the load factor of the power converter PC1 to PCm corresponding to the battery strings STR1 to STRm to be charged is a predetermined load factor Lr that maximizes the power conversion efficiency. Then, the process proceeds from step S12 to step S16.
[0055] In contrast, in step S13, the MCU 10 determines whether there is any storage battery string STR1 to STRm without current limitation. If the determination in step S13 is YES, the process proceeds to step S14, and if the determination in step S13 is NO, the process proceeds to step S15.
[0056] In step S14, the MCU 10 determines the number of battery strings STR1 to STRm to be charged and the battery strings STR1 to STRm to be charged according to the requested input power. In this step, the number of battery strings STR1 to STRm to be charged is set so that the load factor of the power converter PC1 to PCm corresponding to the battery strings STR1 to STRm to be charged in a state without current limitation is a predetermined load factor Lr that maximizes the power conversion efficiency. On the other hand, for the battery strings STR1 to STRm to be charged in a state with current limitation, the charging current is set to be equal to or less than the current limit value, and the load factor of the corresponding power converter PC1 to PCm is also set according to the current limit value. Then, the process proceeds from step S14 to step S16.
[0057] On the contrary, in step S15, the MCU 10 determines the number of battery strings STR1 to STRm to be charged and the battery strings STR1 to STRm to be charged according to the requested input power. In this step, for the battery strings STR1 to STRm to be charged, the charging current is set to be equal to or less than the current limit value, and the load factor of the corresponding power converter PC1 to PCm is set according to the current limit value. Then, the process proceeds from step S15 to step S16.
[0058] In step S16, the system controller 100 controls the power converters PC1 to PCm so that the storage battery strings STR1 to STRm determined by the MCU 10 perform charging. This completes the process.
[0059] As described above, the MCU 10 of the present embodiment variably sets the number of storage battery strings STR1 to STRm that perform discharge according to the size of the discharge power of the power storage system 1. Specifically, the MCU 10 sets the number of storage battery strings STR1 to STRm that perform discharge so that the load factor of the power converters PC1 to PCm corresponding to the storage battery strings STR1 to STRm that perform discharge is close to the predetermined load factor Lr that maximizes the power conversion efficiency of the power converters PC1 to PCm. Therefore, regardless of the size of the discharge power of the power storage system 1, the power conversion efficiency of the power converters PC1 to PCm corresponding to the storage battery strings STR1 to STRm that perform discharge can be maintained at a high efficiency. Therefore, the efficiency of the power storage system 1 during discharge can be improved. In addition, the total heat generation of the entire power storage system 1 during discharge can be reduced, and the cost of cooling the power storage system 1 can be reduced.
[0060] The MCU 10 of this embodiment variably sets the number of battery strings STR1 to STRm that perform charging according to the size of the charging power of the power storage system 1. Specifically, the MCU 10 sets the number of battery strings STR1 to STRm that perform charging so that the load factor of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform charging is close to the predetermined load factor Lr that maximizes the power conversion efficiency of the power converters PC1 to PCm. Therefore, regardless of the size of the charging power of the power storage system 1, the power conversion efficiency of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform charging can be maintained at a high efficiency. Therefore, the efficiency of the power storage system 1 when charging can be improved. In addition, the total heat generation of the entire power storage system 1 during charging can be reduced, and the cost of cooling the power storage system 1 can be reduced.
[0061] The MCU 10 of this embodiment sets the number of battery strings STR1 to STRm that perform discharge so that the load factor of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform discharge under the condition that the discharge current is not limited is close to the predetermined load factor Lr that maximizes the power conversion efficiency. At the same time, the MCU 10 sets the load factor of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform discharge under the condition that the discharge current is limited to be lower than the load factor of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform discharge under the condition that the discharge current is not limited. Therefore, it is possible to efficiently maintain the power conversion efficiency of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform discharge current without limitation, while preventing the degradation of the battery modules M1 to Mn that are limited in discharge current.
[0062] The MCU 10 of this embodiment sets the number of battery strings STR1 to STRm that perform charging so that the load factor of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform charging under the condition that the charging current is not limited is close to the predetermined load factor Lr that maximizes the power conversion efficiency. At the same time, the MCU 10 sets the load factor of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform charging under the condition that the charging current is limited to be lower than the load factor of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform charging under the condition that the charging current is not limited. Therefore, it is possible to efficiently maintain the power conversion efficiency of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform charging current without limiting, while preventing the degradation of the battery modules M1 to Mn that are limited in charging current.
[0063] In the power storage system 1 of the present embodiment, the battery strings STR1 to STRm each include a bypass circuit B1 to Bn, and the bypass circuit B1 to Bn bypasses the battery modules M1 to Mn. Since the bypass of the battery modules M1 to Mn is generated by the bypass circuit B1 to Bn, the voltage of the battery strings STR1 to STRm fluctuates. For this reason, based on the control of the power converters PC1 to PCm, the system controller 100 matches the output voltages of the plurality of battery strings STR1 to STRm regardless of the voltage variation of the battery strings STR1 to STRm. In contrast, by controlling the power converters PC1 to PCm, the system controller 100 matches the voltage input to each battery string STR1 to STRm with the voltage of each battery string STR1 to STRm regardless of the voltage fluctuation of each battery string STR1 to STRm.
[0064] Although the present invention has been described above based on the above embodiments, the present invention is not limited to the above embodiments, and modifications may be made without departing from the gist of the present invention, and known or well-known technologies may be appropriately combined.
[0065] For example, in the above-mentioned embodiment, the number of battery strings STR1 to STRm that perform discharge or charge is set so that the power conversion efficiency of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform discharge or charge is maximized. Here, preferably, the power conversion efficiency of the power converters PC1 to PCm corresponding to the battery strings STR1 to STRm that perform discharge or charge is as close to the maximum power conversion efficiency as possible. Preferably, the load factor of the power converters PC1 to PCm is as close to the predetermined load factor Lr as possible, which is the optimal value. However, the power conversion efficiency of the power converters PC1 to PCm is not necessarily close to the maximum value, and can be appropriately set according to the required performance of the power storage system 1. In addition, the load factor of the power converters PC1 to PCm is not necessarily close to the predetermined load factor Lr as the optimal value, and can be appropriately set according to the required performance of the power storage system 1.
[0066] In the above-described embodiment, the battery strings STR1 to STRm each include the bypass circuits B1 to Bn. However, for example, when the battery characteristics of the battery modules M1 to Mn are highly uniform, the bypass circuits B1 to Bn are substantially not included.
[0067] Here, the following [1] to [5] will briefly summarize and list the features of the embodiments of the storage battery control device, the power storage system, and the storage battery control method according to the present invention as described above. [1]
[0069] A battery control device (10, 100) for controlling a power storage system (1), comprising:
[0070] a plurality of battery strings (STR1 to STRm), each battery string comprising a plurality of batteries (M1 to Mn) connected in series and connected by a power line (3); and
[0071] A plurality of power converters (PC1 to PCm), each of which is disposed between the battery strings (STR1 to STRm) and the power line (3) and is configured to convert input and output voltages of the battery strings (STR1 to STRm), wherein
[0072] The number of the storage battery strings (STR1 to STRm) that perform discharge or charge is variably set according to the size of the discharge power or the charge power of the power storage system (1); and
[0073] The number of battery strings (STR1 to STRm) performing discharging or charging is set so that the load factor of the power converter (PC1 to PCm) corresponding to the battery strings (STR1 to STRm) performing discharging or charging is close to a predetermined load factor, at which the power conversion efficiency of the power converter (PC1 to PCm) is maximized. [2]
[0075] The battery control device (10, 100) according to [1], wherein:
[0076] The number of storage battery strings (STR1 to STRm) performing discharge or charge is set so that the load factor of the power converter (PC1 to PCm) corresponding to the storage battery strings (STR1 to STRm) performing discharge or charge is close to a predetermined load factor (Lr) under the condition that the discharge current or the charge current is not limited; and
[0077] The load factor of the power converter (PC1 to PCm) corresponding to the battery string (STR1 to STRm) performing discharge or charging under the condition that the discharge current or charging current is limited is set to be lower than the load factor of the power converter (PC1 to PCm) corresponding to the battery string (STR1 to STRm) performing discharge or charging under the condition that the discharge current or charging current is not limited. [3]
[0079] The battery control device according to [1] or [2], wherein the battery strings (STR1 to STRm) include bypass circuits (B1 to Bn) configured to bypass the batteries (M1 to Mn). [4]
[0081] An electric power storage system, comprising:
[0082] A plurality of battery strings (STR1 to STRm), each battery string comprising a plurality of batteries (M1 to Mn) connected in series and connected by a power line (3),
[0083] A plurality of power converters (PC1 to PCm), each of which is disposed between the battery strings (STR1 to STRm) and the power line (3) and is configured to convert input and output voltages of the battery strings (STR1 to STRm); and
[0084] A battery control device (10, 100) is configured to control a plurality of power converters (PC1 to PCm), wherein:
[0085] A storage battery control device (10, 100) variably sets the number of storage battery strings (STR1 to STRm) that perform discharge or charge according to the size of the discharge power or charge power of the power storage system (1); and
[0086] The number of battery strings (STR1 to STRm) performing discharging or charging is set so that the load factor of the power converter (PC1 to PCm) corresponding to the battery strings (STR1 to STRm) performing discharging or charging is close to a predetermined load factor, at which the power conversion efficiency of the power converter (PC1 to PCm) is maximized. [5]
[0088] A storage battery control method performed using a storage battery control device (10, 100) configured to control a power storage system (1), comprising:
[0089] a plurality of battery strings (STR1 to STRm), each battery string comprising a plurality of batteries (M1 to Mn) connected in series and connected by a power line (3); and
[0090] A plurality of power converters (PC1 to PCm), each of which is disposed between the battery strings (STR1 to STRm) and the power line (3) and is configured to convert input and output voltages of the battery strings (STR1 to STRm),
[0091] The battery control method includes:
[0092] The number of storage battery strings (STR1 to STRm) that perform discharge or charge is variably set according to the size of the discharge power or charge power of the power storage system (1); and
[0093] The number of battery strings (STR1 to STRm) performing discharging or charging is set so that the load factor of the power converter (PC1 to PCm) corresponding to the battery strings (STR1 to STRm) performing discharging or charging is close to a predetermined load factor, at which the power conversion efficiency of the power converter (PC1 to PCm) is maximized.
[0094] Although the invention has been described in detail and with reference to the specific embodiments, it will be apparent to one skilled in the art that various changes and modifications can be made without departing from the spirit and scope of the invention.
[0095] This application is based on the Japanese patent application filed on April 19, 2022 (Japanese Patent Application No. 2022-068747), the contents of which are incorporated herein by reference.
[0096] Industrial Applicability
[0097] According to the present invention, a battery control device, a power storage system, and a battery control method can maintain the power conversion efficiency of a power converter at a high efficiency regardless of the magnitude of the discharge power or the charge power of a power storage system including a plurality of battery strings and a plurality of power converters. The present invention having such an effect is useful for a battery control device, a power storage system, and a battery control method.
[0098] Reference numerals list
[0099] 1: Power storage system
[0100] 3: Serial bus (power line)
[0101] 10: MCU (battery control unit)
[0102] 100: System controller (battery control device)
[0103] B1 to Bn: Bypass circuit
[0104] Lr: Predetermined load factor
[0105] M1 to Mn: Battery modules (batteries)
[0106] PC1 to PCm: Power Converter
[0107] STR1 to STRm: battery string.
Claims
1. A battery control device for controlling a power storage system, comprising: a plurality of battery strings, each battery string comprising a plurality of batteries connected in series and connected by a power line, and a plurality of power converters, each of which is disposed between the battery string and the power line and configured to convert an input voltage and an output voltage of the battery string, wherein: The number of the storage battery strings that perform discharge or charge is variably set according to the size of the discharge power or the charge power of the power storage system; and The number of the battery strings that perform discharging or charging is set so that a load factor of the power converter corresponding to the battery strings that perform discharging or charging approaches a predetermined load factor at which a power conversion efficiency of the power converter is maximized.
2. The battery control device according to claim 1, wherein: The number of the battery strings that perform discharging or charging is set so that the load factor of the power converter corresponding to the battery strings that perform discharging or charging is close to the predetermined load factor under the condition that the discharging current or the charging current is not limited; as well as The load factor of the power converter corresponding to the battery string that performs discharging or charging under the condition that the discharging current or the charging current is limited is set to be lower than the load factor of the power converter corresponding to the battery string that performs discharging or charging under the condition that the discharging current or the charging current is not limited.
3. The battery control device according to claim 1 or 2, wherein: The battery string includes a bypass circuit configured to bypass the battery.
4. An electric power storage system comprising: a plurality of battery strings, each battery string comprising a plurality of batteries connected in series and connected via power lines; a plurality of power converters, each power converter being disposed between the battery string and the power line and configured to convert an input voltage and an output voltage of the battery string; as well as a battery control device configured to control the plurality of power converters, wherein: The storage battery control device variably sets the number of the storage battery strings that perform discharging or charging according to the size of the discharge power or the charge power of the power storage system; and The number of the battery strings that perform discharging or charging is set so that the load factor of the power converter corresponding to the battery strings that perform discharging or charging approaches a predetermined load factor at which the power conversion efficiency of the power converter is maximized.
5. A battery control method performed using a battery control device, the battery control device being configured to control a power storage system, the power storage system comprising: a plurality of battery strings, each battery string comprising a plurality of batteries connected in series and connected by a power line, and a plurality of power converters, each of which is disposed between the battery string and the power line and is configured to convert an input voltage and an output voltage of the battery string, The battery control method comprises: variably setting the number of the storage battery strings that perform discharging or charging according to the size of the discharging power or charging power of the power storage system; and The number of the battery strings that perform discharging or charging is set so that the load factor of the power converter corresponding to the battery strings that perform discharging or charging approaches a predetermined load factor at which the power conversion efficiency of the power converter is maximized.