Vertical hoisting device for super high-rise building
By using a vertical lifting device connected by four fixed pulleys and hooks in high-rise building construction, the problem of instability of a single hook is solved, and more stable and efficient lifting is achieved, and safety is ensured through protective plates and support frames. and stability.
Patent Information
- Application Number
- CN202411301245.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-08
AI Technical Summary
In high-rise building construction, a single hook device is not stable enough when used to lift materials, which may lead to material damage and low lifting efficiency.
A vertical lifting device including high-rise floor slabs, load-bearing plates, pulley sets, hoist and metal wire are used to connect the wire through four fixed pulleys and hooks, and the pulley sets are used to realize the synchronous retraction and release of the metal wires to ensure the stability of the lifting process. , and a protective plate and support frame are provided on the carrier plate to prevent items from slipping and provide additional support.
Improves the stability and efficiency of the lifting process, enables more items to be lifted more stably, prevents material damage, and ensures safety and stability through protective panels and support frames.
Smart Images

Figure CN118908034A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of construction engineering hoisting, and in particular to a vertical hoisting device for super high-rise buildings. Background Art
[0002] During the construction of high-rise buildings, it is often necessary to lift building materials or tools to high floors for use; in existing production, a single hook device is usually used to lift the required items.
[0003] With respect to the above-mentioned related technologies, when a single hook device is used to lift materials such as glass plates that need to be stable and not shaken, the existing device is not stable enough and may cause damage to the materials. Summary of the invention
[0004] The purpose of this application is to provide a vertical lifting device for super high-rise buildings to improve the efficiency of high-rise lifting and the stability of the lifting process.
[0005] The present application provides a super high-rise building vertical lifting device adopts the following technical solution: A vertical lifting device for a super high-rise building comprises a high-rise floor and an upper floor in the building, a load-bearing plate fixed to the upper floor, a pulley block installed on the surface of the high-rise floor, a winch installed on one side of the pulley block, a metal wire coiled and placed in the winch, and a loading plate placed on the ground; the load-bearing plate and the upper floor are fixed by a fixing device, the load-bearing plate is provided with four fixed pulleys, four pulleys are arranged side by side in the pulley block, four metal wires in the winch are respectively connected to the four fixed pulleys through the four pulleys in the pulley block; four hooks are provided on the loading plate corresponding to the four fixed pulleys, and the metal wires are connected to the four hooks vertically downward through the four fixed pulleys.
[0006] By adopting the above technical solution, four fixed pulleys are arranged to lift the loading plate, and the lifting process is more stable compared with a single hook; the pulley block is used to connect the winch to make the metal wire synchronously retracted and released, so as to realize the synchronous lifting of the four fixed pulleys, and the pulley block can make the retraction and release of the metal wire more stable; the hooks on the loading plate are all installed corresponding to the fixed pulleys, so that the metal wire can be lifted vertically to avoid tilting during the lifting process.
[0007] Preferably, the fixing mechanism includes fastening screws and fixing ribs, and the load-bearing plate and the upper floor are connected and fixed using a plurality of fastening screws; the fixing ribs are arranged at the bottom of the load-bearing plate and abut against the outer side wall of the upper floor.
[0008] By adopting the above technical solution, the part where the load-bearing plate and the upper floor slab are in contact is fixed with a number of fastening screws to prevent the load-bearing plate from falling off due to insufficient bearing capacity. At the same time, fixing ribs are installed at the bottom of the load-bearing plate, and one side of the fixing ribs is against the side of the upper floor slab, thereby further enhancing the load-bearing capacity of the load-bearing plate. The fixing ribs can also play a role in positioning and installing, so that the load-bearing plate will not be tilted or misplaced during installation.
[0009] Preferably, a fixed base is provided on the side of the fixed rib abutting against the outer side wall of the upper floor slab.
[0010] By adopting the above technical solution, a fixed base is installed on the side where the fixed ribs abut against the upper floor slab, so as to increase the contact area between the fixed ribs and the upper floor slab, thereby further improving the bearing capacity of the load-bearing plate.
[0011] Preferably, two support frames are provided on one side of the high-rise floor slab close to the loading plate, the support frames are connected to the high-rise floor slab via a rotating mechanism, and the two support frames are provided with reinforcing ribs.
[0012] By adopting the above technical solution, a support frame is provided to provide support when the carrier plate is hoisted to the high-rise floor, so that the carrier plate can be parked more stably on the outside of the high-rise floor, which is convenient for carrying items; and in order to prevent the support frame from affecting the hoisting space of the carrier plate, a rotating mechanism is used to connect the support frame and the high-rise floor, and the support frame is rotated to both sides during the hoisting process of the carrier plate, and then rotated to the bottom of the carrier plate when support is needed; at the same time, the support frame is also provided with reinforcing ribs to improve the supporting capacity of the support frame.
[0013] Preferably, the rotating mechanism includes two fixed plates, a rotating shaft 1 arranged between the two fixed plates, and a cylindrical pin, and the two fixed plates are installed on the outer side wall of the high-rise floor; the support frame is provided with a rotating shaft 2 corresponding to the rotating shaft 1, and the rotating shaft 2 can be staggered and inserted in the rotating shaft 1, and the cylindrical pin is inserted in the rotating shaft 1 and the rotating shaft 2.
[0014] By adopting the above technical solution, the two fixed plates in the rotating mechanism are installed on the outside of the high-rise floor, a rotating shaft 1 is installed between the two fixed plates, and the supporting frame is correspondingly provided with a rotating shaft 2 which can be staggered with the rotating shaft 1; after aligning the rotating shaft 1 with the rotating shaft 2, the supporting frame and the fixed plate can be connected by inserting a cylindrical pin, and the rotation of the supporting frame can be realized.
[0015] Preferably, a protective plate is provided on the loading plate, two protective doors are provided on the side of the protective plate close to the high-rise floor, a plurality of hinges are provided between the protective doors and the protective plate, and a plug-in switch is provided between the two protective doors.
[0016] By adopting the above technical solution, a protective plate is installed on the loading plate to prevent items from slipping during lifting and causing safety accidents; in order to facilitate the transportation of items, two protective doors are installed on the side facing the high-rise floor, and the protective doors and the protective plates are connected with hinges to facilitate the opening and closing of the protective doors; at the same time, a plug-in switch is installed between the two protective doors to prevent the protective doors from opening and causing items to fall during lifting.
[0017] Preferably, the bottom surface of the loading plate is provided with two mounting grooves for inserting the support frame.
[0018] By adopting the above technical solution, when the loading board is hoisted to the high-rise floor, the support frame is rotated to the corresponding installation groove at the bottom of the loading board, and then the loading board is placed. The cooperation between the support frame and the installation groove makes the placement of the loading board more stable.
[0019] Preferably, a fixing groove is provided in each of the two installation grooves, and a magnetic member capable of magnetically attracting the support frame is provided in each of the fixing grooves.
[0020] By adopting the above technical solution, the magnetic member 1 is arranged to be magnetically attracted to the support frame when the support frame is inserted into the installation groove, thereby further improving the stability of the loading plate, and the magnetic member 1 can also facilitate the positioning and installation of the support frame.
[0021] Preferably, a positioning protrusion is provided on the upper surface of the support frame.
[0022] By adopting the above technical solution, when the carrier plate is to be placed on the support frame, the positioning protrusion is abutted against the carrier plate, and the positioning protrusion will drive the support frame to be perpendicular to the carrier plate, so that the support frame can be accurately placed in the installation slot.
[0023] Preferably, a positioning groove is provided on one side of the positioning protrusion close to the carrier plate, and a second magnetic member magnetically attracted to the carrier plate is provided in the positioning groove.
[0024] By adopting the above technical solution, a positioning groove is provided on the positioning protrusion, and a second magnetic component is installed in the positioning groove, so that when the positioning protrusion abuts against the loading plate, the support frame can be automatically and quickly driven to a direction perpendicular to the loading plate by relying on the magnetism of the second magnetic component, thereby improving the working efficiency.
[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. Using four fixed pulleys for lifting is more stable than a single hook, and by lifting the load plate, more items can be lifted, improving the lifting efficiency. At the same time, the use of pulleys allows the metal wire to be synchronously retracted and released by the winch, making the retraction and release of the metal wire more stable. 2. A support frame for placing the loading board is set on the outside of the high-rise floor, so that the loading board can be parked more stably and convenient for carrying items; at the same time, the support frame is connected to the high-rise floor through a rotating mechanism, which can make the support frame rotate to both sides to avoid the support frame affecting the lifting of the loading board; 3. Protective plates are installed around the loading plate to prevent items from slipping during lifting; a protective door is installed on the side facing the floor to facilitate the transportation of items. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the overall structure of a vertical lifting device for super high-rise buildings in the present application.
[0027] Figure 2 yes Figure 1 Enlarged view of part A in .
[0028] Figure 3 Schematic diagram of the bottom structure of the load-bearing plate in the embodiment.
[0029] Figure 4 Schematic diagram of the overall structure of the carrier plate in the embodiment.
[0030] Figure 5 It is a cross-sectional schematic diagram used to show the internal structure of the specimen carrier.
[0031] In the figure, 1. high-rise floor; 2. upper floor; 3. load-bearing plate; 31. fixed pulley; 4. pulley block; 41. pulley; 5. winch; 6. metal wire; 7. loading plate; 71. hook; 72. protective plate; 73. protective door; 731. plug-in switch; 74. hinge; 75. mounting slot; 751. fixing slot; 752. magnetic part 1; 8. fixing mechanism; 81. fastening screw; 82. fixing rib; 821. fixing base; 9. support frame; 91. reinforcing rib; 92. rotating shaft 2; 93. positioning protrusion; 931. positioning slot; 932. magnetic part 2; 10. rotating mechanism; 101. fixing plate; 102. rotating shaft 1; 103. cylindrical pin. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1 -Attached Figure 5 , further details of this application are given.
[0033] A vertical lifting device for super high-rise buildings, referring to Figure 1, including a bearing plate 3 fixed to the upper floor 2 by a fixing mechanism 8, a pulley block 4 installed on the surface of the high-rise floor 1, and a winch 5 installed on the same plane as the pulley block 4, wherein sufficient metal wires 6 are placed in the winch 5, and the metal wires 6 are steel wires, and a loading board 7 to be lifted is placed on the ground 11; four fixed pulleys 31 are installed on the bearing plate 3, and the four metal wires 6 start from the winch 5 and are horizontally connected to the four fixed pulleys 31 through the four pulleys 41 in the pulley block 4, respectively, and the four pulleys 41 are horizontally installed so that the four metal wires 6 do not interfere with each other, and then pass through the four fixed pulleys 31 to be vertically downward to be connected to the hook 71 on the loading board 7, at this time, the loading board 7 can be lifted by controlling the winch 5 to synchronously retract and release the four metal wires 6, and more objects can be lifted at one time through the loading board 7, so as to realize stable and efficient lifting of high-rise buildings.
[0034] Reference Figure 1 and Figure 3 The load-bearing plate 3 is fixed to the surface of the upper floor 2 by a fixing mechanism 8, and the fixing mechanism 8 is composed of a fastening screw 81 and a fixing rib 82; the fixing rib 82 is installed on the same side as the fixed pulley 31, and one side of the fixing rib 82 is first abutted against the outer wall of the upper floor 2, and then the fastening screw 81 is used to fix the part of the load-bearing plate 3 that is in contact with the upper floor 2 to complete the fixing of the load-bearing plate 3; the fixing rib 82 abuts against the outer wall of the upper floor 2 to play a supporting role, and the fixing rib 82 arranged in the fixed position can also help position the load-bearing plate 3 to avoid the load-bearing plate 3 from being installed tilted and misplaced, causing unstable lifting; a fixed base 821 is also provided on the side where the fixing rib 82 abuts against the upper floor 2, which increases the contact area between the fixing rib 82 and the upper floor 2, thereby further enhancing the supporting effect of the fixing rib 82.
[0035] Reference Figure 2 Two support frames 9 are installed on the outer wall of the high-rise floor 1, and the support frames 9 are fixed to the outer wall of the high-rise floor 1 through a rotating mechanism 10; the rotating mechanism 10 is composed of two fixed plates 101, a rotating shaft 102 arranged between the two fixed plates 101, and a cylindrical pin 103, and the two fixed plates 101 are fixedly installed on the outer wall of the high-rise floor by screws; the support frame 9 is provided with a rotating shaft 2 92 corresponding to the rotating shaft 1 102, and the rotating shaft 2 92 can be staggered with the rotating shaft 1 102, and then the cylindrical pin 103 is inserted into the staggered rotating shaft 1 102 and the rotating shaft 2 92 for fixed connection, so as to realize the rotation and fixation of the support frame 9, and the support frame 9 can be rotated to both sides during the lifting process to avoid it affecting the movement of the loading plate 7.
[0036] Reference Figure 2A positioning protrusion 93 is provided on the upper surface of the support frame 9. When the carrier plate 7 is to be placed on the support frame 9, the outer wall of the carrier plate 7 will abut against the positioning protrusion 93, and the positioning protrusion 93 will drive the support frame 9 to be positioned in a direction perpendicular to the carrier plate 7, so that the support frame 9 can be accurately inserted into the installation groove 75; at the same time, a positioning groove 931 is provided on the side where the positioning protrusion 93 abuts against the carrier plate 7, and a second magnetic member 932 is installed in the positioning groove 931. The second magnetic member 932 is a magnet. The positioning protrusion 93 is adsorbed on the outer wall of the carrier plate 7 and abuts against the carrier plate 93 through the magnetism of the second magnetic member 932, thereby realizing the rapid positioning of the support frame 9.
[0037] Reference Figure 4 In order to prevent the articles on the loading board 7 from slipping off during the lifting process, a protective plate 72 is installed around the loading board 7, and two protective doors 73 are provided on the side close to the high-rise floor. The two protective doors 73 are connected to the protective plate 72 by hinges 74, and the protective doors 73 can be opened and closed by the hinges 74, so as to facilitate the transportation of articles. At the same time, a plug-in switch 731 is installed between the two protective doors 73. The plug-in switch 731 blocks the opening of the protective door (73) by inserting the plug block into the slot, so as to prevent the protective door 73 from opening and causing the articles to fall off during the lifting process.
[0038] Reference Figure 5 A mounting groove 75 is provided on the bottom surface of the loading board 7 corresponding to the support frame 9. When the loading board 7 is hoisted to the high-rise floor, the support frame 9 is rotated and placed in the mounting groove 75 to further stabilize the loading board 7 and facilitate the transportation of items. A fixing groove 751 is provided in the mounting groove 75, and a magnetic member 752 is installed in the fixing groove 751. The magnetic member 752 is a magnet. The magnetic member 752 is attracted to the support frame 9 inserted into the mounting groove 75 by magnetism to further stabilize the loading board 7. The magnetic member 752 can also facilitate the installation and positioning of the support frame 9.
[0039] The implementation principle of the embodiment of the present application is: First, install the load-bearing plate 3, and install the fixing rib 82 on one side of the load-bearing plate 3 where the fixed pulley 31 is installed. Press one side of the fixing rib 82 against the outer wall of the upper floor slab 2, and then use the fastening screws 81 to fix the part where the load-bearing plate 3 and the upper floor slab 2 fit together. The installation and fixation of the load-bearing plate 3 is completed.
[0040] After the four metal wires 6 are pulled out from the winch 5, they are horizontally passed through the four pulleys 41 in the pulley block 4 respectively. The four horizontally installed pulleys 41 can prevent the four metal wires 6 from interfering with each other during operation, making it more stable for the winch 5 to retract and release the metal wires 6; then the four metal wires 6 are respectively passed through the four fixed pulleys 31, and then vertically downwardly connected to the corresponding four hooks on the loading plate 7. At this time, by controlling the winch 5 to synchronously retract and release the four metal wires 6, stable lifting of the loading plate 7 can be achieved; and by using the loading plate 7, more items can be transported at one time, thereby improving efficiency.
[0041] A support frame 9 is installed on one side of the high-rise floor 1 close to the loading board 7 through a rotating mechanism 10. The support frame 9 supports the loading board 7 and ensures that the loading board 7 is parked stably. The rotating mechanism 10 includes two fixed plates 101, a rotating shaft 102 installed between the two fixed plates 101, and a cylindrical pin 103. The support frame 9 is provided with a rotating shaft 2 92 corresponding to the rotating shaft 1 102. The rotating shaft 1 102 and the rotating shaft 2 92 are inserted alternately, and then the cylindrical pin 103 is inserted into the rotating shaft 1 102 and the rotating shaft 2 92 after the insertion to complete the fixed connection, so that the rotation of the support frame 9 can be realized, and the support frame 9 can be prevented from blocking the loading board 7 during the lifting process.
[0042] Protective plates 72 are installed around the loading board 7 to prevent items from slipping during lifting. Two protective doors 73 are installed on the side close to the high-rise floor 1. The protective doors 73 are opened and closed by hinges 74 installed between the protective plates 72, which is convenient for placing or removing items on the loading board 7. At the same time, a plug switch 731 is installed between the two protective doors 73. After the items are placed, the plug switch 731 is closed to prevent the protective door 73 from opening and causing the items to fall during lifting.
[0043] A mounting groove 75 is provided on the bottom surface of the carrier plate 7 corresponding to the support frame 9. When the carrier plate 7 is hoisted to the high-rise floor 1, the support frame 9 is rotated to the bottom of the mounting groove 75, so that when the carrier plate 7 is placed on the support frame 9, the support frame 9 can be placed in the mounting groove 75, so that the placement of the carrier plate 7 is more stable; a fixing groove 751 is also provided in the mounting groove 75, and a magnetic member 752 is installed in the fixing groove 751. The carrier plate is further stabilized by the magnetic attraction between the magnetic member 752 and the support frame 9, and when the support frame 9 is placed in the mounting groove 75, the magnetic member 752 can also facilitate the rapid installation and positioning of the support frame 9.
[0044] A positioning protrusion 93 is provided on the upper surface of the support frame 9. Before the carrier plate 7 is placed on the support frame 9, the positioning protrusion 93 is first abutted against the outer wall of the carrier plate 7. At this time, the positioning protrusion 93 will drive the support frame 9 to be perpendicular to the carrier plate 7, so that the support frame 9 can be accurately placed in the installation groove 75; and a positioning groove 931 is provided on the side where the positioning protrusion 93 and the carrier plate 7 are in contact, and a second magnetic member 932 that is magnetically attracted to the carrier plate 7 is installed in the positioning groove 931. The magnetism of the second magnetic member 932 is used to make the positioning protrusion 93 automatically abut against the carrier plate 7, so that the support frame 9 can be quickly positioned.
[0045] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A vertical lifting device for a super high-rise building, comprising a high-rise floor (1) and an upper floor (2) in the building, a bearing plate (3) fixed to the upper floor (2), a pulley block (4) installed on the surface of the high-rise floor (1), a winch (5) installed on one side of the pulley block (4), a metal wire (6) coiled and placed in the winch (5), and a loading plate (7) placed on the ground (11), characterized in that: The load-bearing plate (3) is fixed to the upper floor (2) via a fixing mechanism (8); the load-bearing plate (3) is provided with four fixed pulleys (31); four pulleys (41) are arranged side by side in the pulley block (4); four metal wires (6) in the hoist (5) are respectively connected to the four fixed pulleys (31) via the four pulleys (41) in the pulley block (4); four hooks (71) are provided on the loading plate (7) corresponding to the four fixed pulleys (31); the metal wires (6) are connected to the four hooks (71) vertically downward via the four fixed pulleys (31).
2. A super high-rise building vertical lifting device according to claim 1, characterized in that: The fixing mechanism (8) comprises a fixing screw (81) and a fixing rib (82); the load-bearing plate (3) and the upper floor slab (2) are connected and fixed using a plurality of fixing screws (81); the fixing rib (82) is arranged at the bottom of the load-bearing plate (3) and abuts against the outer side wall of the upper floor slab (2).
3. A super high-rise building vertical lifting device according to claim 2, characterized in that: A fixing base (821) is provided on the side of the fixing rib (82) that abuts against the outer side wall of the upper floor slab (2).
4. A super high-rise building vertical lifting device according to claim 1, characterized in that: Two support frames (9) are arranged on one side of the high-rise floor (1) close to the loading plate (7); the support frames (9) and the high-rise floor (1) are connected via a rotating mechanism (10); and the two support frames (9) are both provided with reinforcing ribs (91).
5. The vertical lifting device for super high-rise buildings according to claim 3, characterized in that: The rotating mechanism (10) comprises two fixed plates (101), a rotating shaft (102) arranged between the two fixed plates (101), and a cylindrical pin (103); the two fixed plates (101) are installed on the outer side wall of the high-rise floor (1); the support frame (9) is provided with a rotating shaft (92) corresponding to the rotating shaft (102); the rotating shaft (92) can be inserted in the rotating shaft (102) in an interlaced manner; the cylindrical pin (103) is inserted in the rotating shaft (102) and the rotating shaft (92).
6. A super high-rise building vertical lifting device according to claim 1, characterized in that: The loading plate (7) is provided with protective plates (72) on all sides, and two protective doors (73) are provided on one side of the protective plate (72) close to the high-rise floor (1). A plurality of hinges (74) are provided between the protective doors (73) and the protective plate (72), and a plug-in switch (731) is provided between the two protective doors (73).
7. A super high-rise building vertical lifting device according to claim 4, characterized in that: The bottom surface of the object carrier plate (7) is provided with two mounting grooves (75) for inserting the support frame (9).
8. The vertical lifting device for super high-rise buildings according to claim 6, characterized in that: Both of the two installation grooves (75) are provided with a fixing groove (751), and both of the fixing grooves (751) are provided with a magnetic member (752) capable of magnetically attracting the support frame (9).
9. A super high-rise building vertical lifting device according to claim 4, characterized in that: The upper surface of the support frame (9) is provided with a positioning protrusion (93).
10. A super high-rise building vertical lifting device according to claim 9, characterized in that: A positioning groove (931) is provided on one side of the positioning protrusion (93) close to the object carrier plate (7), and a second magnetic member (932) magnetically attracted to the object carrier plate (7) is provided in the positioning groove (931).
Citation Information
Cited By
Vertical hoisting device for super high-rise building
CN120229648A