Method for plugging tuyere of blast furnace
By infiltrating sodium silicate aqueous solution into the blast furnace tuyere layer, a well-sealed tuyere layer is formed, solving the problem of difficult control of the thickness of traditional tuyere and achieving efficient and safe blast furnace tuyere sealing and opening.
Patent Information
- Application Number
- CN202411344783.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-11-08
AI Technical Summary
In traditional blast furnace tuyeres sealing methods, the thickness of the sealing mud is difficult to control, and it is easily blown away by hot air or difficult to open, affecting production. Moreover, cleaning is difficult and can lead to blast furnace shutdown.
A sodium silicate aqueous solution is infiltrated into the plugging layer to form a plugging layer with good sealing properties and high strength. The sodium silicate is then melted by hot air from the blast furnace to achieve rapid disintegration, avoiding laborious operation.
It achieves long-term stable sealing of thin-layer plugging, is labor-saving to open and has no sticky substances, thus improving production efficiency and safety.
Smart Images

Figure CN118910345A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of blast furnace ironmaking, and in particular to a method for blocking a blast furnace tuyere. Background Art
[0002] In the process of blast furnace ironmaking, it is often necessary to temporarily or permanently block the blast furnace tuyere for various reasons to reduce the smelting intensity. The traditional method of blocking the tuyere is to embed a large amount of tuyere plugging mud in the tuyere small sleeve. In order to ensure that the tuyere is not blown open by the hot air of the blast furnace, the thickness of the plugging mud generally needs to reach 300㎜~600㎜. Sometimes, under the condition of poor plugging performance, it needs to be thicker, and the staff needs to use tools such as sledgehammers to repeatedly beat and pat the plugging mud. Even so, the plugging mud still has the risk of being blown open by hot air. Therefore, the thickness of the plugging mud is difficult to control. If it is too thin, it is afraid that it will be blown open by hot air. If the plugging mud is too thick, it can reduce the risk of being blown open by hot air. However, when it needs to be opened, it is too strong to open and it is difficult to open. Even if the tuyere is opened, the small sleeve channel often adheres to the plugging mud, which is difficult to clean. It is difficult to clean it under the conditions of blast furnace air supply production, affecting the area of the small sleeve air supply channel and having a negative impact on the blast furnace road conditions. In some cases, the mud blocking the tuyere is so thick and solid that the small sleeve cannot be opened, forcing the blast furnace to be shut down and ventilated to deal with the mud blockage. Summary of the invention
[0003] The object of the present invention is to provide a method for blocking tuyere of a blast furnace. In the method for blocking tuyere of a blast furnace, a sodium silicate aqueous solution is infiltrated into the blocking mud to form a blocking mud layer, which has a small thickness and a good sealing effect. In the absence of external force, the blocking mud layer can be stably maintained in a stable static state for a long time to maintain a good blocking effect. Moreover, when it is necessary to resume air supply at the tuyere sleeve in the future, when the tuyere is opened manually, it does not require much effort to disintegrate the blocking mud layer, and the blocking mud layer is clean and free of adhesives, which saves time and effort, and is quick and efficient.
[0004] In order to achieve the above object, the present invention provides the following technical solutions:
[0005] A method for blocking a blast furnace tuyere is applied to block the tuyere outlet of a tuyere sleeve of a blast furnace ironmaking equipment, wherein the blast furnace ironmaking equipment comprises a direct blowing pipe and the tuyere sleeve connected to the direct blowing pipe, and the method comprises:
[0006] Step 1, the blast furnace is shut down, and plugging mud is filled at the air outlet of the tuyere sleeve to block the air outlet of the tuyere sleeve, and the thickness of the plugging mud along the extension direction of the axis of the inner hole of the tuyere sleeve is greater than or equal to 80 mm and less than or equal to 150 mm;
[0007] Step 2, the blast furnace is re-aired, and at the initial stage of the blast furnace re-airing, a sodium silicate solution is sprayed onto the inner surface of the mud plugging on one side facing the inner hole of the tuyere sleeve, so that the sodium silicate solution penetrates into the mud plugging and dries the mud plugging to form a mud plugging layer composed of a mixture of dry gel-like sodium silicate and solid mud plugging.
[0008] The mud blocking layer prepared by the above-mentioned method for blocking the blast furnace tuyere can form a mud blocking layer with good sealing and high strength, which can play a good sealing effect at the air outlet of the tuyere sleeve. Compared with the traditional mud blocking in the prior art, the mud blocking thickness in this embodiment is greatly reduced and has a smaller thickness. In the absence of external force, the mud blocking layer is firm and reliable and can maintain a good sealing state. When the air supply at the tuyere sleeve needs to be restored in the future, the mud blocking layer can be easily destroyed by slightly hitting the mud blocking layer at the mud blocking layer without much effort. When the mud blocking layer is destroyed and cracks or holes appear, hot air from the blast furnace will pass through. The temperature of hot air from the blast furnace is generally above 1100°C, which is higher than the melting point of sodium silicate. Therefore, as long as the sealing of the mud blocking layer is slightly destroyed and a very small force is applied, and the sodium silicate melts under the action of the hot air from the blast furnace passing through the mud blocking layer, the mud blocking layer will immediately collapse and disintegrate, realizing the full opening of the tuyere, which is clean and free of adhesives.
[0009] Therefore, in the above-mentioned method for blocking the blast furnace tuyere, the blocking mud layer formed by infiltrating the sodium silicate aqueous solution into the blocking mud has a small thickness and a good sealing effect. In the absence of external force, it can stably maintain a stable and static state for a long time and maintain a good blocking effect. Moreover, when it is necessary to restore the air supply at the tuyere sleeve in the future, when the tuyere is opened manually, it does not require too much effort to disintegrate the blocking mud layer, and it is clean and free of adhesives, which saves time and effort, and is quick and efficient.
[0010] Optionally, in step 2, during the initial stage of blast furnace re-airing, when the sodium silicate solution is sprayed onto the inner surface of the mud blockage, the spraying pressure of the sodium silicate solution is 1 to 3 times the hot air pressure of the blast furnace hot air in the direct blowing pipe.
[0011] Optionally, at the initial stage of blast furnace re-airing, the sodium silicate solution is sprayed when the temperature of the blast furnace hot air is 280° C. to 330° C. and the hot air pressure of the blast furnace hot air is 400 kPa to 420 kPa.
[0012] Optionally, the spraying pressure of the sodium silicate solution is 500 kPa to 1000 kPa.
[0013] Optionally, in the sodium silicate solution, the volume ratio of sodium silicate to water is 1:(1-2).
[0014] Optionally, the spraying amount of the sodium silicate solution is 1L to 2L.
[0015] Optionally, the thickness of the mud plugging is greater than or equal to 90 mm and less than or equal to 120 mm.
[0016] Optionally, the sodium silicate solution is sprayed by a coal spray gun; the coal spray gun has a head and a tail relative to each other, the head of the coal spray gun is provided with an atomizing nozzle, the tail of the coal spray gun is provided with a coal spray hose, one end of the coal spray hose is used to connect with the tail of the coal spray gun, and the other end is used to connect with the injection pipeline, the tail of the coal spray gun is provided with a tail valve, and the injection pipeline is provided with a stop valve; wherein,
[0017] After the step 1 is completed, the tail valve is closed, the stop valve is closed, the connection between the injection pipeline and the coal injection hose is disconnected, the preset sodium silicate solution is poured into the coal injection hose, and then the coal injection hose and the injection pipeline are connected, and then the step 2 is performed.
[0018] Optionally, the pressure of the high-pressure gas in the injection pipe is 1 to 3 times the hot air pressure of the blast furnace hot air.
[0019] Optionally, the blowing pipe and the coal injection hose are connected via a quick-connect assembly, which includes a quick connector seat and a quick connector plug that can be connected to each other. One of the blowing pipe and the coal injection hose is provided with a quick connector seat, and the other is provided with a quick connector plug. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. Among them:
[0021] Figure 1 A schematic flow chart of a method for blocking a blast furnace tuyere provided in an embodiment of the present invention;
[0022] Figure 2 A schematic structural diagram of equipment for implementing a method for blocking tuyere of a blast furnace provided in an embodiment of the present invention.
[0023] Icons: 1-straight blowing pipe; 2-small air inlet sleeve; 3-mud plugging; 4-coal injection gun; 5-coal injection hose; 6-blowing pipe; 7-quick connection assembly; 41-tail valve; 61-stop valve; 71-quick connector seat; 72-quick connector plug. DETAILED DESCRIPTION
[0024] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments. Each example is provided by way of explanation of the present invention and does not limit the present invention. In fact, it will be clear to those skilled in the art that modifications and variations may be made in the present invention without departing from the scope or spirit of the present invention. For example, a feature shown or described as a part of one embodiment may be used in another embodiment to produce yet another embodiment. Therefore, it is desired that the present invention encompasses such modifications and variations within the scope of the appended claims and their equivalents.
[0025] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention. The terms "connected", "connected" and "set" used in the present invention should be understood in a broad sense. For example, they can be fixedly connected or detachably connected; they can be directly connected or indirectly connected through intermediate components. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0026] refer to Figure 1 and Figure 2 As shown, the present invention provides a method for blocking a blast furnace tuyere, which is applied to block the tuyere small sleeve 2 of a blast furnace ironmaking equipment, wherein the blast furnace ironmaking equipment comprises a direct blowing pipe 1 and a tuyere small sleeve 2 connected to the direct blowing pipe 1. Specifically, the method comprises:
[0027] First, perform step 1, stop the blast furnace, stop supplying air to the blast furnace, and no high-pressure air passes through the tuyere sleeve 2 to facilitate blocking. Prepare the blocking mud 3, fill the blocking mud 3 at the air outlet of the tuyere sleeve 2, and first use the blocking mud 3 to block the air outlet of the tuyere sleeve 2, wherein, in the extension direction of the axial centerline of the inner hole of the tuyere sleeve 2, the thickness of the blocking mud 3 is greater than or equal to 80㎜ and less than or equal to 150㎜. Preferably, the thickness of the blocking mud 3 can be selected to be greater than or equal to 90㎜ and less than or equal to 120㎜. Exemplarily, the thickness of the blocking mud 3 can be specifically selected to be 95㎜, 100㎜, 105㎜, or 110㎜. Other sizes can also be selected within the thickness selection range of the blocking mud 3 according to actual conditions, as long as the air outlet of the tuyere sleeve 2 can be blocked.
[0028] Then, step 2 is performed, the blast furnace is restored to air supply, and the blast furnace is restored to air supply. When the blast furnace is turned on to supply air, the air supply pressure and temperature are gradually increased until the preset air supply pressure and temperature. Specifically, at the initial stage of blast furnace restoration, the pressure and temperature of the blast furnace hot air have not reached the preset air supply pressure and temperature. The sodium silicate solution is sprayed during the small air volume period at the initial stage of restoration. Preferably, the temperature of the blast furnace hot air is 280°C to 330°C, and the hot air pressure of the blast furnace hot air is 400kPa to 420kPa. The mud blocking 3 is directed toward the tuyere small sleeve. 2. Sodium silicate solution is sprayed on the inner surface of one side of the inner hole, so that the sodium silicate solution penetrates into the mud plugging 3. In the early stage of re-airing, the pressure of the blast furnace hot air is not too large, and the temperature is not too high, so the mud plugging 3 will not be blown away, and the mud plugging 3 will also be dried. After the mud plugging infiltrated with the sodium silicate solution is dried, a mud plugging layer composed of a mixture of dry gel-like sodium silicate and solid mud plugging is formed. At this time, the sodium silicate plays a bonding and sealing role, so that the mud plugging layer forms a skeleton with high strength, and the mud plugging layer plays a good sealing role at the air outlet of the tuyere small sleeve 2. Since the air outlet of the tuyere sleeve 2 is completely sealed, the hot air from the blast furnace is intercepted at the air outlet of the tuyere sleeve 2, and there is no hot air flowing in the straight blowing pipe 1 and the tuyere sleeve 2, which blocks the flow of heat. Therefore, the surface temperature of the mud blocking layer toward the tuyere sleeve 2 will decrease, and it will decrease very low. The temperature of the straight blowing pipe 1 can be reduced to below 150°C. Therefore, the mud blocking layer will have a good working environment. As long as it is not affected by human or other external forces, the thinner mud blocking layer can maintain a stable and static state for a long time, and a good blocking state can be permanently maintained, which is conducive to long-term production. After spraying the sodium silicate solution at the initial stage of re-airing, normal production work can be carried out directly afterwards, which is convenient and reliable.
[0029] The mud blocking layer prepared by the above-mentioned method for blocking the blast furnace tuyere is simple to implement, and can form a mud blocking layer with good sealing and high strength, which can play a good sealing effect at the air outlet of the tuyere sleeve. Compared with the traditional mud blocking in the prior art, the mud blocking thickness in this embodiment is greatly reduced and has a smaller thickness. In the absence of external force, the mud blocking layer is firm and reliable, and can maintain a long-term and good sealing state. When the air supply at the tuyere sleeve needs to be restored in the future, the mud blocking layer can be easily destroyed by slightly hitting the mud blocking layer at the mud blocking layer without much effort. After the mud blocking is destroyed and cracks or holes appear, hot air from the blast furnace will pass through. The temperature of the hot air from the blast furnace is generally above 1100°C, which is higher than the melting point of sodium silicate. Therefore, as long as the sealing of the mud blocking layer is slightly destroyed and a very small force is applied, and the sodium silicate melts under the action of the hot air from the blast furnace passing through the mud blocking layer, the mud blocking layer will immediately collapse and disintegrate, realizing the full opening of the tuyere, which is clean and free of adhesives.
[0030] Therefore, in the above-mentioned method for blocking the blast furnace tuyere, the blocking mud layer formed by infiltrating the sodium silicate aqueous solution into the blocking mud has a small thickness and a good sealing effect. In the absence of external force, it can stably maintain a stable and static state for a long time and maintain a good blocking effect. Moreover, when it is necessary to restore the air supply at the tuyere sleeve in the future, when the tuyere is opened manually, it does not require too much effort to disintegrate the blocking mud layer, and it is clean and free of adhesives, which saves time and effort, and is quick and efficient.
[0031] In step 2 of the above-mentioned method for plugging tuyere of blast furnace, in the process of spraying sodium silicate solution onto the inner surface of plugging mud at the initial stage of blast furnace re-airing, the injection pressure of sodium silicate solution is 1 to 3 times of the hot blast pressure of blast furnace hot blast in the direct blowing pipe, which is conducive to the penetration of sodium silicate solution into the plugging mud. Exemplarily, the injection pressure of sodium silicate solution can be selected to be more than 1 times, for example, 1.5 times or 2 times, of the hot blast pressure of blast furnace hot blast.
[0032] Specifically, the spray pressure of the sodium silicate solution can be selected within the range of 500 kPa to 1000 kPa. For example, the spray pressure of the sodium silicate solution can be selected to be 600 kPa, 800 kPa, or 900 kPa, or other spray pressure values, which are not limited in this embodiment.
[0033] Regarding the concentration of the sodium silicate solution in the above-mentioned method for plugging tuyere of a blast furnace, in a possible implementation, the volume ratio of sodium silicate to water in the sodium silicate solution used is 1:(1-2). Preferably, the volume ratio of sodium silicate to water can be 1:1.
[0034] Furthermore, when the sodium silicate solution is sprayed, the amount of the sodium silicate solution sprayed toward the mud plugging is 1 L to 2 L. The amount of the sodium silicate solution sprayed can be selected according to the thickness of the mud plugging, so that the sodium silicate solution can better penetrate into the mud plugging to form a firm and reliable mud plugging layer.
[0035] In the above-mentioned method for blocking the tuyere of a blast furnace, reference is made to Figure 1 and Figure 2 As shown, for the injection of sodium silicate solution, existing tools in blast furnace equipment can be directly applied, which is convenient and saves tools. Specifically, a coal injection gun 4 is used to inject the sodium silicate solution; the coal injection gun 4 has a relative head and tail, the head of the coal injection gun 4 is provided with an atomizing nozzle, the tail of the coal injection gun 4 is connected to a coal injection hose 5, one end of the coal injection hose 5 is connected to the tail of the coal injection gun 4, and the other end is connected to a blowing pipe 6, the tail of the coal injection gun 4 is provided with a tail valve 41, and the blowing pipe 6 is provided with a stop valve 61, and the blowing pipe 6 is used to provide high-pressure gas with a certain pressure, so that the coal injection gun 4 can inject the sodium silicate solution.
[0036] After step 1 is completed, the tail valve 41 is closed, and the stop valve 61 is closed, the connection between the injection pipe 6 and the coal injection hose 5 is disconnected, and the preset sodium silicate solution is poured into the coal injection hose 5, and then the coal injection hose 5 and the injection pipe 6 are connected, and then step 2 is performed to complete the injection of the sodium silicate solution.
[0037] Specifically, a coal injection gun 4 is used, and the pressure of the high-pressure gas in the injection pipe 6 provides injection pressure for the sodium silicate. Therefore, the pressure of the high-pressure gas in the injection pipe 6 is set to 1 to 3 times the hot air pressure of the blast furnace hot air to ensure the injection pressure of the sodium silicate solution, so that the sodium silicate solution can be well sprayed onto the mud blockage and penetrate into the mud blockage.
[0038] Furthermore, in order to improve work efficiency, Figure 2 As shown, the blowing pipe 6 and the coal injection hose 5 are connected by a quick-connect assembly 7. The quick-connect assembly 7 includes a quick connector seat 71 and a quick connector plug 72 that can be connected to each other. One of the blowing pipe 6 and the coal injection hose 5 is provided with a quick connector seat 71, and the other is provided with a quick connector plug 72. The quick connector seat 71 and the quick connector plug 72 can be quickly plugged in and out, which facilitates the connection and disassembly between the blowing pipe 6 and the coal injection hose 5, and can improve the working efficiency of filling the sodium silicate solution.
[0039] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for blocking a blast furnace tuyere, which is applied to block the tuyere outlet of a tuyere sleeve of a blast furnace ironmaking equipment, wherein the blast furnace ironmaking equipment comprises a straight blowing pipe and the tuyere sleeve connected to the straight blowing pipe, It is characterized in that The method comprises: Step 1, the blast furnace is shut down, and plugging mud is filled at the air outlet of the tuyere sleeve to block the air outlet of the tuyere sleeve, and the thickness of the plugging mud along the extension direction of the axis of the inner hole of the tuyere sleeve is greater than or equal to 80 mm and less than or equal to 150 mm; Step 2, the blast furnace is re-aired, and at the initial stage of the blast furnace re-airing, a sodium silicate solution is sprayed onto the inner surface of the mud plugging on one side facing the inner hole of the tuyere sleeve, so that the sodium silicate solution penetrates into the mud plugging and dries the mud plugging to form a mud plugging layer composed of a mixture of dry gel-like sodium silicate and solid mud plugging.
2. The method for blocking tuyere of a blast furnace according to claim 1, It is characterized in that In the step 2, during the process of spraying the sodium silicate solution onto the inner surface of the mud plugging at the initial stage of blast furnace re-airing, the spraying pressure of the sodium silicate solution is 1 to 3 times the hot air pressure of the blast furnace hot air in the direct blowing pipe.
3. The method for blocking tuyere of a blast furnace according to claim 2, It is characterized in that In the initial stage of blast furnace re-airing, the sodium silicate solution is sprayed when the temperature of the blast furnace hot air is 280° C. to 330° C. and the hot air pressure of the blast furnace hot air is 400 kPa to 420 kPa.
4. The method for blocking tuyere of a blast furnace according to claim 2, It is characterized in that The spraying pressure of the sodium silicate solution is 500 kPa to 1000 kPa.
5. The method for blocking tuyere of a blast furnace according to claim 1, It is characterized in that In the sodium silicate solution, the volume ratio of sodium silicate to water is 1:(1-2).
6. The method for blocking tuyere of a blast furnace according to claim 5, It is characterized in that The spraying amount of the sodium silicate solution is 1L to 2L.
7. The method for blocking tuyere of a blast furnace according to claim 1, It is characterized in that The thickness of the mud plugging is greater than or equal to 90 mm and less than or equal to 120 mm.
8. The method for blocking tuyere of a blast furnace according to any one of claims 1 to 7, It is characterized in that The sodium silicate solution is sprayed by a coal spray gun; the coal spray gun has a head and a tail relative to each other, the head of the coal spray gun is provided with an atomizing nozzle, the tail of the coal spray gun is provided with a coal spray hose, one end of the coal spray hose is used to connect with the tail of the coal spray gun, and the other end is used to connect with the injection pipeline, the tail of the coal spray gun is provided with a tail valve, and the injection pipeline is provided with a stop valve; wherein, After the step 1 is completed, the tail valve is closed, the stop valve is closed, the connection between the injection pipeline and the coal injection hose is disconnected, the preset sodium silicate solution is poured into the coal injection hose, and then the coal injection hose and the injection pipeline are connected, and then the step 2 is performed.
9. The method for blocking tuyere of a blast furnace according to claim 8, It is characterized in that The pressure of the high-pressure gas in the injection pipe is 1 to 3 times the hot air pressure of the blast furnace hot air.
10. The method for blocking tuyere of a blast furnace according to claim 8, It is characterized in that The injection pipe and the coal injection hose are connected via a quick-connect assembly, which includes a quick connector seat and a quick connector plug that can be connected to each other. One of the injection pipe and the coal injection hose is provided with a quick connector seat, and the other is provided with a quick connector plug.