An assembled work platform specially used for the construction of large structures such as ships
By setting slidable bottom beams and top beams on the foundation pits to form an assembled working platform, the problem of narrow use of the operating platform in the prior art is solved, multi-functional maintenance and construction of ships and other structures is realized, and the operation efficiency and platform flexibility are improved.
Patent Information
- Application Number
- CN202411412924.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-11
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2044-10-11
AI Technical Summary
In the prior art, the construction cost is higher due to the narrow use range of the working platform on the periphery of the foundation pit.
A assembled working platform specially designed for the construction of large structures such as ships. By setting bottom beams and top beams on the surface and above the foundation pit, a pressure-bearing platform and working platform are formed, and they are allowed to slide linearly to form a groove position for the base groove position that accommodates the ship and other structures.
The application scope of the operation platform has been expanded, allowing ships and other structures to be inspected and constructed at the same time, improving operational efficiency, and the rapid formation and storage platform has been achieved through the design of the retractable components and the retractable wall.
Smart Images

Figure CN118911398B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation pit platform operation, and in particular to an assembled operation platform specially used for the construction of large structures such as ships. Background Art
[0002] At present, the working platform buildings fixedly installed on the side of the foundation pit can often only be used to inspect and build ships in the foundation pit. For other structures such as test trolleys, mobile workshops, steel towers, etc., it is necessary to rebuild the working platform in the production unit for use. The setting of multiple working platforms makes the overall construction cost higher and the equipment occupies a large area. Summary of the invention
[0003] The purpose of the present invention is to provide an assembled work platform specially used for the construction of large structures such as ships, so as to solve the technical problem in the prior art that the construction cost is high due to the narrow use range of the work platform around the foundation pit.
[0004] In order to solve the above technical problems, the present invention specifically provides the following technical solutions:
[0005] An assembled work platform specially used for the construction of large structures such as ships, comprising two sets of mold columns, the mold columns can be lifted and lowered longitudinally, the two sets of mold columns are respectively fixedly arranged on both sides of a foundation pit, and two sets of work beams are arranged in parallel on the tops of the two sets of mold columns, the two sets of work beams extend in the same direction as the foundation pit and are arranged on both sides of the foundation pit;
[0006] Bottom beams, wherein a plurality of bottom beams are provided, and the bottom beams are movably arranged on the top opening of the foundation pit, and a plurality of the bottom beams are provided with detachable module bottom plates to form a pressure-bearing platform on the top of the foundation pit;
[0007] A top beam, wherein a plurality of top beams are provided, and the plurality of top beams are movably arranged between the two sets of the working cross beams and located directly above the pressure-bearing platform, and a detachable module bottom plate is provided on the plurality of top beams to form a working platform, and an accommodation gap is provided between the working platform and the end side of the working cross beam close to the foundation pit, and a groove for placing the structure to be constructed is formed between the accommodation gap and the pressure-bearing platform;
[0008] The bottom beam and the top beam can slide synchronously in a direction away from the foundation pit to form a foundation groove for accommodating a ship between the foundation pit and the working cross beam.
[0009] As a preferred embodiment of the present invention, an extension platform is arranged on the opposite side surfaces of the two sets of the working beams, a working position is arranged on the extension platform, the end side of the top beam is movably arranged on the working position, and the working positions on both sides and the working platform are jointly enclosed to form an operating platform.
[0010] As a preferred embodiment of the present invention, a spacing area is provided on one side of the epitaxial platform close to the working beam, and a gap compensation block and a locking strip block are sequentially placed in the spacing area in a direction extending from the working beam to the foundation pit position, and the length direction of the spacing area, the gap compensation block and the locking strip block is the same as the length direction of the working beam;
[0011] Among them, a plurality of engaging holes are equidistantly provided on the engaging long strip block for connecting with the end of the top beam, and the gap compensation block is used to fill the gap between the engaging long strip block and the working beam, and the width of the gap compensation block is greater than the depth of the top beam inserted into the engaging long strip block.
[0012] As a preferred embodiment of the present invention, the length of the top beam is smaller than the distance between the inner bottom surfaces of the two engaging holes on both sides of the end of the top beam, and when the end of the top beam is plugged into the engaging hole, there is a gap between the two end surfaces of the top beam and the inner bottom surfaces of the engaging hole;
[0013] A prying notch is provided on the side where the gap compensation block abuts against the engaging long strip block, and the prying notch includes an oblique notch located at the upper position of the gap compensation block, and the oblique notch is arranged toward the engaging long strip block, and the top of the oblique notch is an outward expansion opening, and the bottom is a contraction opening. When the lower position of the gap compensation block abuts against the engaging long strip block, there is a gap between the contraction opening of the oblique notch and the engaging long strip block, and an inward buckle notch is provided in the middle position of the gap compensation block, below the contraction opening of the oblique notch, and the inward buckle notch is recessed toward the direction of the gap compensation block.
[0014] As a preferred embodiment of the present invention, a spacing area is provided on one side of the extension platform close to the working beam, and a clamping strip is provided in the spacing area, one side of the clamping strip abuts against the working beam, and the other side is clamped and connected with the end of the top beam, and the clamping strip is slidably arranged in the spacing area along the length direction of the working beam;
[0015] A plurality of the top beams are connected in series through a connecting kit to form an overall top beam structure, and the overall top beam structure is connected to an external driving structure, and the external driving structure drives the overall top beam structure and the engaging long strips to slide linearly synchronously on the extension platform to expand or reduce the area of the groove position.
[0016] As a preferred embodiment of the present invention, a storage device for rolling up the top beam is provided between the two working cross beams, the storage device comprises a cross plate fixedly connected to the end of the extension platform and a longitudinal plate connected to the cross plate and extending downward, an arc-shaped bending profile is provided at the connection position between the cross plate and the longitudinal plate, a lintel gap is provided between the bottom of the longitudinal plate and the foundation pit, an installation area is provided on the longitudinal plate, an opening is provided at the lower end of the installation area, and a rolling assembly is provided in the installation area;
[0017] The reeling assembly comprises a rotating roller rotatably mounted in the mounting area, a chain plate rotatably mounted on the rotating roller, a clamping sleeve for receiving the top beam is disposed on the outer wall of the chain plate, the clamping sleeve is located below the extension platform, a one-way limiter is disposed on the clamping sleeve, the one-way limiter opens toward the inner side of the clamping sleeve under the pressure of the top beam's own gravity to allow the top beam to enter the clamping sleeve, and the one-way limiter opens toward the outer side of the clamping sleeve under the pressure of a traction force greater than the top beam's gravity to allow the top beam to escape from the clamping sleeve;
[0018] The engaging strip block and the connecting kit are both chain-type structures that can be bent along the bending contour of the connecting position of the transverse plate and the longitudinal plate, and a limiting top plate is provided on the spacer area, and the limiting top plate is arranged directly above the engaging strip block, and the limiting top plate is used to limit the engaging strip block from convexly bending upward when sliding on the extension platform;
[0019] The top beam on the top beam overall structure falls into the clamping sleeve in sequence and is received by the winding assembly when linearly moving to the tail end of the epitaxial platform.
[0020] As a preferred embodiment of the present invention, a transverse through hole is provided on the inner side of the working crossbeam, and one end of the transverse through hole close to the storage device is connected to a vertical through hole, and the vertical through hole is located outside the end of the extension platform, and the end of the top beam extends into the interior of the working crossbeam through the transverse through hole and is connected to the external driving structure arranged in the working crossbeam;
[0021] The external driving structure includes two transmission rollers rotatably mounted on the inner wall of the working beam, the transmission rollers are meshedly connected with a chain belt, a push plate is provided on the chain belt, the push plate abuts against the end side of the top beam, the chain belt or the transmission rollers are connected to a power source, and the power source drives the push plate to drive the top beam to move through the transverse hole and the vertical hole and fall into the sleeve.
[0022] As a preferred embodiment of the present invention, the transmission roller close to the storage device side passes through the side wall of the working beam and extends outwardly and is connected to a driving gear, the driving gear is meshedly connected to a driven gear, and the driven gear is coaxially fixedly mounted on the end of the rotating roller.
[0023] As a preferred embodiment of the present invention, a slide groove is arranged on the periphery of the foundation pit, a plurality of the bottom beams are connected by the chain-moving block to form an integral structure and are integrally slidably arranged in the slide groove, and the chain-moving block is arranged at an end position of the bottom beam located in the slide groove;
[0024] A winding wall is arranged at one end of the slide away from the ship entrance, an opening is arranged at the bottom of the winding wall, the opening is communicated with the slide, an arc-shaped guide wall is arranged inside the winding wall, and the arc-shaped guide wall is inclined toward the opening to guide the chain-driven block to drive the bottom beam to be arranged longitudinally inside the winding wall.
[0025] As a preferred embodiment of the present invention, a transmission kit is provided on the working crossbeam, and the transmission kit is respectively connected to the top beam and the bottom beam, and driven by a power source, drives the top beam and the bottom beam to move synchronously and in the same direction into the winding assembly and the winding wall;
[0026] The transmission kit includes a first sprocket coaxially fixedly connected to the transmission roller, the first sprocket is meshedly connected with a first annular chain belt, the first annular chain belt extends downward and is meshedly connected with a second sprocket, the second sprocket is arranged on the side of the bottom beam, and the second sprocket is meshedly connected with a second annular chain belt, a plurality of blocks are arranged on the second annular chain belt, the second sprocket is arranged at the bottom of the bottom beam and is movably engaged with the chain blocks on the bottom beam through the plurality of blocks to push the bottom beam to slide into the winding wall;
[0027] Wherein, the first annular chain belt is movably connected to the second sprocket by a disconnectable connection mode, the first annular chain belt is disconnected from the second sprocket when the mold column is longitudinally raised or lowered, and the first annular chain belt is connected to the second sprocket when the mold column rises to a specified position.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] 1. The present invention forms a pressure-bearing platform and an operating platform by respectively arranging a bottom beam and a top beam on the surface of the foundation pit and above the foundation pit, and allows the bottom beam and the top beam in the device to slide linearly, thereby forming a groove position that can accommodate other structures and a base groove position that can accommodate ships, respectively, so that the overall device can inspect and construct ships and other structures, respectively, so that the application range of the construction platform is wider;
[0030] 2. After the top beam in the device is disconnected from the engaging long strip at its end, it can be autonomously mobilized and combined to form a surrounding gap set around the side of the structure to be constructed, forming a construction method of synchronous construction on all sides, thereby improving the working efficiency;
[0031] 3. The device is provided with a reeling assembly and a reeling wall, and uses a transmission kit to connect the top beam and the bottom beam, so that under the action of a power source, the top beam and the bottom beam can be moved backward synchronously, and the top beam and the bottom beam can be stored in an orderly manner while quickly forming the base slot. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the drawings required for the implementation methods or the description of the prior art are briefly introduced below. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.
[0033] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0034] Figure 2 It is one of the schematic diagrams of the component structure of the present invention, specifically a schematic diagram of the structure of the epitaxial platform;
[0035] Figure 3 This is a schematic diagram of the structure of the prying notch of the present invention;
[0036] Figure 4 This is a second schematic diagram of the component structure of the present invention, specifically a schematic diagram of the structure of the overall structure of the top beam;
[0037] Figure 5 This is a third schematic diagram of the component structure of the present invention, specifically a schematic diagram of the structure of the storage device;
[0038] Figure 6 It is a structural schematic diagram of the external driving structure of the present invention;
[0039] Figure 7 For the present invention Figure 6 The enlarged view of point A in the middle;
[0040] Figure 8 The fourth schematic diagram of the component structure of the present invention is specifically an enlarged diagram of the driving gear and the driven gear;
[0041] Fig. 9 It is a cross-sectional schematic diagram of the present invention;
[0042] Fig.10 For the present invention Fig. 9 Enlarged view of point B in the middle.
[0043] The numbers in the figure represent the following:
[0044] 1. Formwork column; 2. Foundation pit; 3. Bottom beam; 4. Pressure platform; 5. Slide; 6. Top beam; 7. Module bottom plate; 8. Working platform; 9. Rolling wall; 10. Arc guide wall; 11. First sprocket; 12. First ring chain belt; 13. Second sprocket; 14. Second ring chain belt; 15. Step ladder; 16. Working beam; 17. Extension platform; 18. Working position; 19. Gap compensation block; 20. Snap-fit strip block; 21. Snap-fit hole; 22. Oblique notch; 23 , inner buckle notch; 24, top beam overall structure; 25, storage device; 26, block; 27, opening; 28, winding assembly; 29, horizontal plate; 30, vertical plate; 31, beam gap; 32, installation area; 33, roller; 34, chain plate; 35, sleeve; 36, one-way limiter; 37, connecting kit; 38, limit top plate; 39, horizontal through hole; 40, vertical through hole; 41, transmission roller; 42, chain belt; 43, push plate; 44, driving gear; 45, driven gear. DETAILED DESCRIPTION
[0045] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0046] like Figures 1 to 10 As shown, the present invention provides an assembled work platform specially used for the construction of large structures such as ships, including mold columns 1. Two sets of mold columns 1 are provided. The mold columns 1 can be lifted and lowered longitudinally. The two sets of mold columns 1 are respectively fixedly arranged on both sides of a foundation pit 2, and two sets of working beams 16 are arranged in parallel on the tops of the two sets of mold columns 1. The extension direction of the two sets of working beams 16 is the same as that of the foundation pit 2 and are arranged on both sides of the foundation pit 2.
[0047] A plurality of bottom beams 3 are provided, and the bottom beams 3 are movably arranged on the top opening of the foundation pit 2 . A detachable module bottom plate 7 is provided on the plurality of bottom beams 3 to form a pressure-bearing platform 4 on the top of the foundation pit 2 .
[0048] A top beam 6, wherein a plurality of top beams 6 are provided, wherein the plurality of top beams 6 are movably arranged between two sets of working beams 16 and located directly above the pressure-bearing platform 4, and a detachable module bottom plate 7 is provided on the plurality of top beams 6 to form a working platform 8, and an accommodating gap is provided between the working platform 8 and the end side of the working beam 16 close to the foundation pit 2, and a groove position for placing the structure to be constructed is formed between the accommodating gap and the pressure-bearing platform 4.
[0049] The bottom beam 3 and the top beam can slide synchronously in a direction away from the foundation pit 2 to form a foundation groove for accommodating a ship between the foundation pit 2 and the working cross beam 16 .
[0050] This device is mainly used to set up a construction work platform on the side of the foundation pit 2 for the construction of large structures such as ships. Specifically, a pressure-bearing platform 4 for carrying structures is formed by setting a bottom beam 3 and a module bottom plate 7 above the foundation pit 2, and a work platform 8 is further set on the pressure-bearing platform 4 to construct the structures set on the pressure-bearing platform 4. In addition, after the module bottom plate 7 on the pressure-bearing platform 4 and the work platform 8 is taken down, the top opening of the foundation pit 2 is opened and the top beam 6 is retracted by moving the top beam 6 and the bottom beam 3, thereby forming a foundation slot that can accommodate ships. At this time, workers can construct ships on the work beams 16 on both sides of the foundation slot. The length of the work beam 16 and the work platform 8 in this device can be set shorter to mainly construct the bow position.
[0051] Further, such as Figure 1 As shown, a step ladder 15 leading to the work platform 8 is provided on the side of the work beam 16 .
[0052] like Figure 2 As shown, an extension platform 17 is arranged on the opposite side surfaces of the two sets of working beams 16, and a working position 18 is arranged on the extension platform 17. The end side of the top beam 6 is movably arranged on the working position 18, and the working positions 18 on both sides and the working platform 8 together form an operating platform.
[0053] By forming an operating platform by the working position 18 and the working platform 8 together, the operator's working range can be expanded, and construction can be carried out from three sides of the object to be constructed simultaneously, rather than being limited to a single side or double side position.
[0054] In this device, the movement of the top beam 6 can be divided into two modes: overall movement and individual movement, which are suitable for different application scenarios.
[0055] Among them, as an embodiment, a spacing area is provided on one side of the epitaxial platform 17 close to the working beam 16, and a gap compensation block 19 and a locking long strip block 20 are sequentially placed in the spacing area in the direction extending from the working beam 16 to the position of the foundation pit 2. The length direction of the spacing area, the gap compensation block 19 and the locking long strip block 20 is the same as the length direction of the working beam 16.
[0056] Among them, a plurality of engaging holes 21 are equidistantly provided on the engaging long strip block 20 for connecting with the end of the top beam 6, and the gap compensation block 19 is used to fill the gap between the engaging long strip block 20 and the working beam 16, and the width of the gap compensation block 19 is greater than the depth of the top beam 6 inserted into the engaging long strip block 20.
[0057] After the work platform 8 is assembled and turned, when the device is used to construct a part of the structure, in order to enable the whole work platform 8 to be framed around the side of the object to be constructed in a sleeved manner for synchronous construction, the top beam 6 is detachably connected through the engaging strip block 20. After the gap compensation block 19 is pulled out from the spacing area, the engaging strip block 20 is moved toward the working cross beam 16, so that the top beam 6 is separated from the engaging strip block 20, and the top beam 6 can be installed by self-adjusting and mobilizing, and the object to be constructed can be framed.
[0058] In addition, another advantage of this method is that the construction location of the building to be constructed may be irregular in shape and outward-expanding, such as the cabin location in the middle of the hull, the circular tower top location on the top of the steel structure, and workers may need to move backwards adaptively during continuous construction. Therefore, by moving the top beam 6 near the location to be constructed backwards a slightly smaller distance and then laying a module bottom plate 7 of corresponding width (a plurality of grooves with different spacings can be set on the bottom surface of the module bottom plate 7, and different grooves are selected to be mounted on the top beam 6 to match different widths), there is no need to move the entire top beam 6 at the rear, so it can be completed by manual operation, achieving the purpose of reducing the frequency of starting the power source and reducing energy consumption. This method is a way of manually operating a top beam 6 to adapt to smaller displacement situations, thereby improving the flexibility and accuracy of the device.
[0059] like Figure 3 As shown, further, the length of the top beam 6 is smaller than the distance between the inner bottom surfaces of the two engaging holes 21 on both sides of its end. When the ends of the top beam are plugged into the engaging holes 21, there is a gap between the two end surfaces of the top beam and the inner bottom surfaces of the engaging holes 21.
[0060] A prying notch is provided on the side where the gap compensation block 19 abuts against the engaging long strip block 20, and the prying notch includes an oblique notch 22 located at the upper position of the gap compensation block 19, and the oblique notch 22 is arranged toward the engaging long strip block 20, and the top of the oblique notch 22 is an outward expansion opening, and the bottom is a contraction opening. When the lower position of the gap compensation block 19 abuts against the engaging long strip block 20, there is a gap between the contraction opening of the oblique notch 22 and the engaging long strip block 20, and an inward buckle notch 23 is provided in the middle position of the gap compensation block 19, below the contraction opening of the oblique notch 22, and the inward buckle notch 23 is recessed toward the gap compensation block 19.
[0061] During the specific operation, since the squeezing of the engaging strip block 20 may make it more difficult to pull out the gap compensation block 19, the device is provided with a prying notch. During the specific operation, the worker inserts the crowbar into the prying notch, first moves the engaging strip block 20 to the side away from the gap compensation block 19 in the oblique notch 22, so that there is a certain gap between it and the gap compensation block 19, and then pries it in the opposite direction, using the end of the crowbar to deeply insert into the inner buckle notch 23, and pry the gap compensation block 19 with the engaging strip block 20 as the pad fulcrum, so that it is easier to tilt the gap compensation block 19, so as to move the engaging strip block 20 and disengage it from the top beam 6. When the previous top beam 6 moves to fit the adjacent top beam 6, it can be removed and taken out, and then the operation is repeated.
[0062] In addition, the device provides another implementation method, specifically connecting multiple top beams to form an integral structure for movement, specifically:
[0063] like Figure 4 As shown, a spacing area is provided on one side of the epitaxial platform 17 close to the working beam 16, and a locking long strip block 20 is provided in the spacing area. One side of the locking long strip block 20 is abutted against the working beam 16, and the other side is locked and connected with the end of the top beam 6. The locking long strip block 20 is slidably set in the spacing area along the length direction of the working beam 16.
[0064] Multiple top beams 6 are connected in series through a connecting kit 37 to form a top beam overall structure 24, and the top beam overall structure 24 is connected to an external driving structure. The external driving structure drives the top beam overall structure 24 and the engaging long strip block 20 to slide linearly on the epitaxial platform 17 synchronously to expand or reduce the area of the groove position.
[0065] like Figure 5 As shown, in this embodiment, a plurality of top beams 6 are connected by a connection kit 37 to form a top beam overall structure 24, so that it can be moved as a whole. On the one hand, it can adapt to the requirements of continuous construction of the structure to the rear, and on the other hand, the working platform 8 can be quickly folded up to form a base slot to accommodate ships.
[0066] The connection kit 37 is a mature structure in the prior art, which can be provided with a circle ring on the chain structure, and the circle ring is set outside the top beam 6 and fixedly connected to the top beam 6, so as to ensure that the distance between the top beams 6 does not change while connecting the top beams 6. The chain structure is used between adjacent circle rings, which makes the subsequent storage process more convenient.
[0067] In addition, the connection kit 37 can be bent as a chain structure, and the chain structure is formed by rotating and splicing a plurality of component units similar to a chain.
[0068] The advantage of forming a top beam overall structure 24 with multiple top beams 6 through a connection kit 37 is that all top beams 6 can be moved as a whole. By moving the top beam overall structure 24 as a whole, not only is the standardization better and the requirements for the module base plate 7 are low, but the operation is also easy and simple.
[0069] like Figure 1 and Figure 6 As shown, further, a storage device 25 for retracting the top beam 6 is provided between the two working beams 16, and the storage device 25 includes a transverse plate 29 fixedly connected to the end of the extension platform 17 and a longitudinal plate 30 connected to the transverse plate 29 and extending downward, an arc-shaped bending profile is provided at the connection position between the transverse plate 29 and the longitudinal plate 30, a lintel gap 31 is provided between the bottom of the longitudinal plate 30 and the foundation pit 2, an installation area 32 is provided on the longitudinal plate, an opening is provided at the lower end of the installation area 32, and a retracting assembly 28 is provided in the installation area 32.
[0070] The winding assembly 28 includes a roller 33 rotatably installed in the installation area 32, a chain plate 34 is rotatably arranged on the roller 33, a clamping sleeve 35 for receiving the top beam 6 is arranged on the outer wall of the chain plate 34, the clamping sleeve 35 is located below the extension platform 17, a one-way limiter 36 is arranged on the clamping sleeve 35, the one-way limiter 36 opens toward the inner side of the clamping sleeve 35 under the pressure of the self-weight of the top beam 6 to allow the top beam 6 to enter the clamping sleeve 35, and the one-way limiter 36 opens toward the outer side of the clamping sleeve 35 under the pressure of the traction force greater than the weight of the top beam 6 to allow the top beam 6 to escape from the clamping sleeve 35.
[0071] Both the engaging long strip block 20 and the connecting kit 37 are chain-type structures that can be bent along the bending contour of the connecting position of the horizontal plate 29 and the vertical plate 30, and a limiting top plate 38 is arranged on the spacing area. The limiting top plate 38 is arranged directly above the engaging long strip block 20. The limiting top plate 38 is used to limit the upward convex bending of the engaging long strip block 20 when sliding on the extension platform 17.
[0072] When the top beam 6 on the top beam overall structure 24 moves linearly to the rear end of the epitaxial platform 17 , it falls into the clamping sleeve 35 in sequence and is received by the winding assembly 28 .
[0073] By setting up the storage device 25, the top beam overall structure 24 can be directly stored under the operating platform, and when the bending sections of the horizontal plate 29 and the longitudinal plate 30 are at the same height as the top of the vertical through hole 40, the top beam overall structure 24 can be fully laid on the extension platform 17 at one time by applying reverse force, making the storage and laying of the overall device more convenient.
[0074] Specifically, since the engaging strip block 20 and the connecting kit 37 are both chain-type structures that can bend along the bending contours of the transverse plate 29 and the longitudinal plate 30, when external force drives the top beam overall structure 24 and the engaging strip block 20 to move toward the mold column 1, the engaging strip block 20 and the connecting kit 37 will bend downward due to the gravity of the top beam 6 when passing through the bending section of the bending contour. When the top beam 6 falls downward after passing the tail end of the transverse plate 29, it will fall onto the clamping sleeve 35 of the reeling assembly 28 directly below, and be received by the reeling assembly 28. As the top beam overall structure 24 continues to move, the reeling assembly 28 synchronously rotates in a loop, causing the clamping sleeve 35 to move downward and replace it with a new clamping sleeve 35, so that the top beam 6 can fall into the clamping sleeve 35 alone, and the engaging strip block 20 and the connecting kit 37 are separated on both sides of the reeling assembly 28 to form a storage state. Among them, the gap between adjacent clamping sleeves 35 on the chain plate 34 can be smaller than the gap between adjacent top beams 6 to set as many clamping sleeves 35 as possible, and the different gaps are compensated by the rotation rate to ensure that the top beam 6 can fall into the clamping sleeve synchronously.
[0075] The rotation of the reel assembly 28 can be driven by a separate driving source. Furthermore, a beam gap 31 is provided below the reel assembly 28, and a one-way stopper 36 is provided on the clamping sleeve 35. This allows the reel assembly 28 to pass through the beam gap 31 (and due to the one-way stopper 36, the top beam 6 will not fall out of the clamping sleeve 35 due to the top beam 6) when driving the top beam 6 to pass through the curved section below it, and reach the other side of the reel assembly 28 for storage. Thereby, the storage capacity of the reel assembly 28 is improved.
[0076] Further, such as Figure 7 and Figure 8 As shown, a transverse hole 39 is opened on the inner side of the working beam 16, and the end of the transverse hole 39 close to the storage device 25 is connected to a vertical hole 40. The vertical hole 40 is located on the outer side of the end of the extension platform 17, and the end of the top beam 6 extends into the interior of the working beam 16 through the transverse hole 39 and is connected to the external driving structure arranged in the working beam 16.
[0077] The external driving structure includes two transmission rollers 41 rotatably mounted on the inner wall of the working beam 16, the transmission rollers 41 are meshedly connected with a chain belt 42, the chain belt 42 is provided with a push plate 43, the push plate 43 abuts against the end side of the top beam 6, the chain belt 42 or the transmission rollers 41 are connected to a power source, and the power source drives the push plate 43 to drive the top beam 6 to move through the transverse hole 39 and the vertical hole 40 and fall into the sleeve 35.
[0078] Among them, the power source for driving the driving roller 41 or the chain belt 42 to move can be an electric, hydraulic or other power source in the prior art (not shown in the figure). When the driving roller 41 rotates, the chain belt 42 moves to drive the push plate 43 to move toward the mold column 1, thereby pushing the top beam 6 to move in the transverse hole 39 until it enters the vertical hole 40 and falls. When the driving roller 41 rotates in the reverse direction, it drives the chain belt 42 to move in the reverse direction, thereby pushing the top beam 6 from the reverse direction, and the top beam 6 can be automatically pushed back for laying.
[0079] Furthermore, by using a linkage gear set to connect the transmission roller 41 and the rotating roller 33, the rotation of the two can be well synchronized, so that the consistency of the rotation of the two can be higher, so that the falling of the top beam 6 and the receiving of the clamping sleeve 35 can be matched with each other, and the engagement performance is better. One end of the transmission roller 41 passes through the side wall of the working beam 16 and extends outward to be connected to a driving gear 44, and the driving gear 44 is meshed with a driven gear 45, and the driven gear 45 is coaxially fixedly installed on the end of the rotating roller 33.
[0080] Further, such as Figure 1 and Fig. 9 As shown, a slide groove 5 is arranged on the periphery of the foundation pit 2, and a plurality of bottom beams 3 are connected by a chain-moving block to form an integral structure and are integrally slidably arranged in the slide groove 5, and the chain-moving block is arranged at the end position of the bottom beam 3 in the slide groove 5.
[0081] like Figure 1 As shown, a winding wall 9 is provided at one end of the chute 5 away from the ship entrance, an opening 27 is provided at the bottom of the winding wall 9, the opening 27 is connected to the chute 5, and an arc-shaped guide wall 10 is provided inside the winding wall 9, and the arc-shaped guide wall 10 is inclined toward the opening to guide the chain-driven block to drive the bottom beam 3 to be arranged longitudinally inside the winding wall 9. In this device, the winding wall 9 can also serve as a rear protective fence to provide protection for workers.
[0082] A transmission kit is provided on the working beam 16 , which is respectively connected to the top beam 6 and the bottom beam 3 , and driven by a power source, drives the top beam 6 and the bottom beam 3 to move synchronously and in the same direction into the winding assembly 28 and the winding wall 9 .
[0083] like Fig. 9 and Fig.10 As shown, the transmission kit includes a first sprocket 11 coaxially fixedly connected to the transmission roller 41, the first sprocket 11 is meshedly connected to the first annular chain belt 12, the first annular chain belt 12 extends downward and is meshedly connected to the second sprocket 13, the second sprocket 13 is arranged on the side of the bottom beam 3, and the second sprocket 13 is meshedly connected to the second annular chain belt 14, the second annular chain belt 14 is provided with a plurality of blocks 26, the second sprocket 13 is arranged at the bottom of the bottom beam 3 and is movably engaged with the chain blocks on the bottom beam 3 through a plurality of blocks 26 to push the bottom beam 3 to slide into the winding wall 9.
[0084] Among them, the first annular chain belt 12 is movably connected to the second sprocket 13 through a disconnectable connection mode, the first annular chain belt 12 is disconnected from the second sprocket 13 when the mold column 1 is longitudinally raised or lowered, and the first annular chain belt 12 is connected to the second sprocket 13 when the mold column 1 rises to a specified position.
[0085] Among them, the chain-driven card block can be arranged in the same structure as the above-mentioned chain-structured card-engaging long strip block 20, which is connected to the bottom beam 3 with multiple card blocks of the same unit, and multiple card blocks of the same unit are connected by rotating pins, so that they can be bent when entering the rolling wall 9.
[0086] The selective connection between the first annular chain belt 12 and the second sprocket 13 for rotation can be realized by using the spring sheath section in the prior art. By inserting and pulling out the spring sheath section, the first annular chain belt 12 can be disconnected, thereby disconnecting from the second sprocket 13 (the first annular chain belt 12 is preferably disconnected from the second sprocket 13), so as to facilitate the rise and fall of the overall structure. When the overall device needs to construct a ship, the mold column is raised to the specified position, and then the spring sheath section is inserted to connect the first annular chain belt 12 with the second sprocket 13, and then the power input of the power source (the power source can be a rotating motor, and the output end of the motor is connected to the transmission roller) drives the top beam 6 and the bottom beam 3 to move synchronously and be stored to form a base slot through the transmission structure.
[0087] The above embodiments are only exemplary embodiments of the present application and are not intended to limit the present application. The protection scope of the present application is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present application within the essence and protection scope of the present application, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present application.
Claims
1. An assembled work platform specially used for the construction of large ship structures, characterized in that: include: Mould columns (1), wherein two sets of the mould columns (1) are provided, and the mould columns (1) can be lifted and lowered longitudinally, and the two sets of the mould columns (1) are respectively fixedly arranged on both sides of the foundation pit (2), and two sets of working beams (16) are arranged in parallel on the tops of the two sets of the mould columns (1), and the two sets of the working beams (16) extend in the same direction as the foundation pit (2) and are arranged on both sides of the foundation pit (2); A bottom beam (3), wherein a plurality of the bottom beams (3) are provided, and the bottom beams (3) are movably arranged on the top opening of the foundation pit (2), and a detachable module bottom plate (7) is arranged on the plurality of the bottom beams (3) to form a pressure-bearing platform (4) on the top of the foundation pit (2); A top beam (6), wherein a plurality of the top beams (6) are provided, and the plurality of the top beams (6) are movably arranged between two sets of the working cross beams (16) and located directly above the pressure-bearing platform (4); a detachable module bottom plate (7) is provided on the plurality of the top beams (6) to form a working platform (8); an accommodation gap is provided between the working platform (8) and the end side of the working cross beam (16) close to the foundation pit (2); a groove for placing a structure to be constructed is formed between the accommodation gap and the pressure-bearing platform (4); The bottom beam (3) and the top beam are capable of synchronously sliding in a direction away from the foundation pit (2) to form a foundation slot for accommodating a ship between the foundation pit (2) and the working cross beam (16).
2. The assembled work platform specially used for the construction of large ship structures according to claim 1, characterized in that: An extension platform (17) is arranged on opposite side surfaces of the two sets of the working cross beams (16), a working position (18) is arranged on the extension platform (17), the end side of the top beam (6) is movably arranged on the working position (18), and the working positions (18) on both sides and the working platform (8) are together enclosed to form an operating platform.
3. The assembled work platform specially used for the construction of large ship structures according to claim 2, characterized in that: A spacing area is provided on one side of the epitaxial platform (17) close to the working beam (16), and a gap compensation block (19) and a locking strip block (20) are sequentially placed in the spacing area in a direction extending from the working beam (16) to the position of the foundation pit (2), and the length direction of the spacing area, the gap compensation block (19) and the locking strip block (20) is the same as the length direction of the working beam (16); The engaging long strip (20) is provided with a plurality of engaging holes (21) at equal intervals for connecting with the end of the top beam (6); the gap compensation block (19) is used to fill the gap between the engaging long strip (20) and the working cross beam (16); and the width of the gap compensation block (19) is greater than the depth of the top beam (6) inserted into the engaging long strip (20).
4. The assembled work platform specially used for the construction of large ship structures according to claim 3 is characterized by: The length of the top beam (6) is smaller than the distance between the inner bottom surfaces of the two engaging holes (21) on both sides of the end of the top beam (6); when the end of the top beam (6) is plugged into the engaging hole (21), there is a gap between the two end surfaces of the top beam (6) and the inner bottom surface of the engaging hole (21); A prying notch is provided on the side surface where the gap compensation block (19) abuts against the engaging long strip block (20), and the prying notch includes an oblique notch (22) located at the upper position of the gap compensation block (19), the oblique notch (22) is arranged toward the engaging long strip block (20), the top of the oblique notch (22) is an outward expansion opening, and the bottom is a contraction opening, and when the lower position of the gap compensation block (19) abuts against the engaging long strip block (20), there is a gap between the contraction opening of the oblique notch (22) and the engaging long strip block (20), and an inner buckle notch (23) is provided at the middle position of the gap compensation block (19) below the contraction opening of the oblique notch (22), and the inner buckle notch (23) is recessed toward the gap compensation block (19).
5. The assembled work platform specially used for the construction of large ship structures according to claim 2, characterized in that: A spacing area is provided on one side of the epitaxial platform (17) close to the working beam (16), and a locking strip (20) is provided in the spacing area. One side of the locking strip (20) abuts against the working beam (16), and the other side is locked and connected with the end of the top beam (6). The locking strip (20) is slidably provided in the spacing area along the length direction of the working beam (16); A plurality of the top beams (6) are connected in series via a connection kit (37) to form a top beam overall structure (24), the top beam overall structure (24) being connected to an external drive structure, the external drive structure driving the top beam overall structure (24) and the engaging long strip (20) to synchronously slide linearly on the epitaxial platform (17) to expand or reduce the area of the groove position.
6. The assembled work platform specially used for the construction of large ship structures according to claim 5, characterized in that: A storage device (25) for rolling up the top beam (6) is provided between the two working cross beams (16), the storage device (25) comprising a cross plate (29) fixedly connected to the end of the extension platform (17) and a longitudinal plate (30) connected to the cross plate (29) and extending downward, an arc-shaped bending profile is provided at the connection position between the cross plate (29) and the longitudinal plate (30), a lintel gap (31) is provided between the bottom of the longitudinal plate (30) and the foundation pit (2), an installation area (32) is provided on the longitudinal plate, an opening is provided at the lower end of the installation area (32), and a rolling assembly (28) is provided in the installation area (32); The reeling assembly (28) comprises a roller (33) rotatably mounted in the mounting area (32), a chain plate (34) rotatably mounted on the roller (33), a sleeve (35) for receiving the top beam (6) being mounted on the outer wall of the chain plate (34), the sleeve (35) being located below the extension platform (17), a one-way stopper (36) being mounted on the sleeve (35), the one-way stopper (36) opening toward the inside of the sleeve (35) under the pressure of the self-weight of the top beam (6) to allow the top beam (6) to enter the sleeve (35), and the one-way stopper (36) opening toward the outside of the sleeve (35) under the pressure of a pulling force greater than the weight of the top beam (6) to allow the top beam (6) to escape from the sleeve (35); The engaging long strip (20) and the connecting kit (37) are both chain-type structures capable of being bent along the bending contour of the connecting position between the transverse plate (29) and the longitudinal plate (30), and a limiting top plate (38) is provided on the spacing area, the limiting top plate (38) being arranged directly above the engaging long strip (20), and the limiting top plate (38) is used to limit the engaging long strip (20) from convexly bending upward when sliding on the extension platform (17); The top beam (6) on the top beam overall structure (24) falls into the clamping sleeve (35) in sequence and is received by the reeling assembly (28) when linearly moving to the tail end of the epitaxial platform (17).
7. The assembled work platform specially used for the construction of large ship structures according to claim 6, characterized in that: A transverse through hole (39) is provided on the inner side of the working crossbeam (16); an end of the transverse through hole (39) close to the storage device (25) is connected to a vertical through hole (40); the vertical through hole (40) is located outside the end of the extension platform (17); the end of the top beam (6) extends into the interior of the working crossbeam (16) through the transverse through hole (39) and is connected to an external driving structure arranged in the working crossbeam (16); The external driving structure comprises two transmission rollers (41) rotatably mounted on the inner wall of the working cross beam (16), the transmission rollers (41) being meshingly connected with a chain belt (42), the chain belt (42) being provided with a push plate (43), the push plate (43) being in contact with the end side of the top beam (6), the chain belt (42) or the transmission rollers (41) being connected to a power source, the power source driving the push plate (43) to drive the top beam (6) to move so as to pass through the transverse through hole (39) and the vertical through hole (40) and fall into the clamping sleeve (35).
8. The assembled work platform specially used for the construction of large ship structures according to claim 7, characterized in that: The transmission roller (41) on one side close to the storage device passes through the side wall of the working beam (16) and extends outwardly to be connected to a driving gear (44). The driving gear (44) is meshingly connected to a driven gear (45). The driven gear (45) is coaxially fixedly mounted on the end of the rotating roller (33).
9. The assembled work platform specially used for the construction of large ship structures according to claim 8, characterized in that: A slide groove (5) is arranged on the periphery of the foundation pit (2); a plurality of the bottom beams (3) are connected by a chain-moving block to form an integral structure and are integrally slidably arranged in the slide groove (5); the chain-moving block is arranged at an end position of the bottom beam (3) located in the slide groove (5); A winding wall (9) is arranged at one end of the chute (5) away from the ship entrance, an opening (27) is provided at the bottom of the winding wall (9), the opening (27) is communicated with the chute (5), and an arc-shaped guide wall (10) is arranged inside the winding wall (9), the arc-shaped guide wall (10) is inclined toward the opening and is used to guide the chain-driven block to drive the bottom beam (3) to be arranged longitudinally inside the winding wall (9).
10. The assembled work platform specially used for the construction of large ship structures according to claim 9, characterized in that: The operating crossbeam (16) is provided with a transmission kit, the transmission kit being connected to the top beam (6) and the bottom beam (3) respectively, and driven by a power source, driving the top beam (6) and the bottom beam (3) to move synchronously and in the same direction into the reeling assembly (28) and the reeling wall (9); The transmission kit comprises a first sprocket (11) coaxially fixedly connected to the transmission roller (41), the first sprocket (11) being meshedly connected to a first annular chain belt (12), the first annular chain belt (12) extending downward and being meshedly connected to a second sprocket (13), the second sprocket (13) being arranged on a side of the bottom beam (3), and the second sprocket (13) being meshedly connected to a second annular chain belt (14), a plurality of clamping blocks (26) being arranged on the second annular chain belt (14), the second sprocket (13) being arranged at the bottom of the bottom beam (3) and being movably meshedly connected to the chain clamping blocks on the bottom beam (3) through the plurality of clamping blocks (26) so as to push the bottom beam (3) to slide into the winding wall (9); The first annular chain belt (12) is movably connected to the second sprocket (13) in a disconnectable connection manner; the first annular chain belt (12) is disconnected from the second sprocket (13) when the mold column (1) is longitudinally raised or lowered; and the first annular chain belt (12) is connected to the second sprocket (13) when the mold column (1) rises to a specified position.
Citation Information
Patent Citations
Self-moving folding scaffold with adjustable accommodating space
CN113482307A
Workbench
KR1020100017055A