Construction method for controlling convergence deformation of hydraulic tunnel

CN118911725APending Publication Date: 2024-11-08CHINA RAILWAY 16TH BUREAU GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410954151.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-08

Smart Images

  • Figure CN118911725A_ABST
    Figure CN118911725A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for controlling convergence deformation of a hydraulic tunnel. The construction method comprises the following steps that S1, a plurality of sets of arched supporting steel beams arranged at equal intervals are adopted for supporting the tunnel; s2, steel plates are manufactured, through holes are formed in the middles of the steel plates, and the adjacent arched supporting steel beams are fixedly connected through the steel plates; s3, holes are correspondingly drilled in the side wall of the tunnel according to the positions of the through holes in the steel plate; s4, foot-locking large pipe sheds are manufactured, grouting holes are formed in the foot-locking large pipe sheds, the foot-locking large pipe sheds are inserted into the drill holes respectively, the ends of the foot-locking large pipe sheds are welded and fixed to the through holes in the steel plates, and grouting valves are welded to the ends of the foot-locking large pipe sheds; s5, cement paste is poured into the foot-locking large pipe shed through a grouting valve; and S6, the grouting condition is checked, and construction is completed. The bearing capacity of the arched supporting steel beams is shared through the arrangement of the foot-lock large pipe sheds, deformation of the arched supporting steel beams is avoided, and the service life of the arched supporting steel beams is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy and hydropower construction, and in particular to a construction method for controlling convergence and deformation of a hydraulic tunnel. Background Art

[0002] Hydraulic tunnels are widely used in water resource allocation, urban water supply, power generation, flood control and other fields, and play an important role in the construction of modern water conservancy projects. However, during the construction of hydraulic tunnels, due to the complex and changeable adverse geological conditions such as weak surrounding rock, high ground stress, fault fracture zone, groundwater, and other technical factors such as improper construction technology, the surrounding rock of the tunnel often undergoes large convergence deformation, which affects the construction efficiency and service life of the tunnel and may also cause serious safety accidents.

[0003] Arched support steel beams are widely used in the initial support of tunnels due to their good mechanical properties and convenient construction. The locking foot large pipe shed technology has significant advantages in controlling deformation by pre-burying large-diameter steel pipes around the tunnel to enhance the overall stability of the surrounding rock and reduce convergence deformation. However, under complex and changeable adverse geological conditions, the application of a single support method is difficult to meet the requirements for controlling the deformation of hydraulic tunnels. The effective combination of arched support steel beams and locking foot large pipe sheds is the top priority for controlling the convergence deformation of hydraulic tunnels.

[0004] Therefore, the present invention provides a construction method for controlling the convergence deformation of a hydraulic tunnel. By setting up a locking-foot large pipe shed, the bearing capacity of the arched support steel beams can be shared, deformation of the arched support steel beams can be avoided, and the service life of the arched support steel beams can be increased, thereby achieving more effective tunnel deformation control. Summary of the invention

[0005] The purpose of the present invention is to provide a construction method for controlling the convergence and deformation of a hydraulic tunnel, so as to solve the problems existing in the prior art.

[0006] To achieve the above object, the present invention provides the following solution: The present invention provides a construction method for controlling the convergence and deformation of a hydraulic tunnel, comprising the following steps:

[0007] S1, multiple groups of equally spaced arched support steel beams are used to support the tunnel;

[0008] S2, manufacturing a steel plate, opening a through hole in the middle of the steel plate, and fixing and connecting adjacent arched supporting steel beams through the steel plate;

[0009] S3, drilling a corresponding hole on the side wall of the tunnel according to the position of the through hole on the steel plate, with the axis of the drilling hole being collinear with the axis of the through hole;

[0010] S4, making a locking foot large pipe shed, and opening grouting holes at equal intervals on the locking foot large pipe shed, and inserting the locking foot large pipe shed into the drilled holes respectively, welding the ends of the locking foot large pipe shed to the through holes on the steel plate, and welding a grouting valve at the ends of the locking foot large pipe shed;

[0011] S5, pour cement slurry into the lock-foot large pipe shed through the grouting valve;

[0012] S6, check the grouting situation and complete the construction.

[0013] According to the construction method for controlling convergence and deformation of a hydraulic tunnel provided by the present invention, in S2, the thickness of the steel plate is 16 mm, the width of the steel plate is 300 mm, the diameter of the middle through hole of the steel plate is 108 mm, and adjacent steel plates are staggered.

[0014] According to the construction method for controlling convergence and deformation of hydraulic tunnels provided by the present invention, arc welding is adopted between the steel plates and the arched supporting steel beams and between the steel plates and the locking foot pipe sheds in S2 and S4. The welding rod used is E5003 with a diameter of 4 mm, a welding current of 170 A, and a weld height of 2 to 4 mm.

[0015] According to the construction method for controlling convergence and deformation of a hydraulic tunnel provided by the present invention, in S3, the drilling depth is not less than 5.7 m, and the difference between the borehole diameter and the outer diameter of the locking foot large pipe rack is 20 to 30 mm.

[0016] According to the construction method for controlling convergence and deformation of hydraulic tunnels provided by the present invention, in S4, the length of the locking foot large pipe rack is 6m, the diameter of the grouting hole is 10cm, the spacing between adjacent grouting holes is 15cm, and one end of the locking foot large pipe rack located in the drilled hole is set to a cone, and a 1m length is left at the other end without drilling a grouting hole.

[0017] According to the construction method for controlling convergence and deformation of a hydraulic tunnel provided by the present invention, in S5, the initial grouting pressure is 0.3-0.5 MPa, and when the grouting volume is less than 10 L / min, the pressure is adjusted to 0.8 MPa and the grouting is continued for not less than 10 min.

[0018] According to the construction method for controlling convergence and deformation of a hydraulic tunnel provided by the present invention, in S5, the water-cement ratio in the cement slurry is 0.5:1 to 0.8:1, and the cement is used.

[0019] According to the construction method for controlling convergence and deformation of a hydraulic tunnel provided by the present invention, in S2, adjacent steel plates are arranged in a staggered manner.

[0020] The present invention discloses the following technical effects:

[0021] The present invention can achieve the connection between the arched support steel beam and the inner wall of the tunnel through the arrangement of the locking foot large pipe shed. When the arched support steel beam is subjected to force, the force can be transmitted to the tunnel through the locking foot large pipe shed, thereby sharing the bearing capacity of the arched support steel beam, avoiding deformation of the arched support steel beam, and improving the service life of the arched support steel beam. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1 It is a schematic diagram of the position relationship of the arched support steel beam of the present invention;

[0024] Figure 2 It is a schematic diagram of the matching relationship between the steel plate and the arched supporting steel beam of the present invention.

[0025] Among them, 1. Arched supporting steel beam; 2. Steel plate; 3. Lock-foot large pipe shed. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0028] Reference Figure 1-2 The present invention provides a construction method for controlling the convergence and deformation of a hydraulic tunnel, comprising the following steps:

[0029] S1, multiple groups of equally spaced arched support steel beams 1 are used to support the tunnel;

[0030] S2, manufacturing a steel plate 2, with a through hole in the middle of the steel plate 2, and fixing and connecting adjacent arched supporting steel beams 1 through the steel plate 2;

[0031] S3, drilling a corresponding hole on the side wall of the tunnel according to the position of the through hole on the steel plate 2, with the axis of the drilling hole being collinear with the axis of the through hole;

[0032] S4, making a locking foot large pipe shed 3, and opening grouting holes at equal intervals on the locking foot large pipe shed 3, and inserting the locking foot large pipe shed 3 into the drilled holes respectively, welding and fixing the ends of the locking foot large pipe shed 3 to the through holes on the steel plate 2, and welding a grouting valve at the ends of the locking foot large pipe shed 3;

[0033] S5, pouring cement slurry into the locking foot large pipe shed 3 through the grouting valve;

[0034] S6, check the grouting situation and complete the construction.

[0035] The present invention can achieve the connection between the arched support steel beam 1 and the inner wall of the tunnel through the setting of the locking foot large pipe shed 3. When the arched support steel beam 1 is subjected to force, the force can be transmitted to the tunnel through the locking foot large pipe shed 3, thereby sharing the bearing capacity of the arched support steel beam 1, avoiding deformation of the arched support steel beam 1, and improving the service life of the arched support steel beam 1.

[0036] In a further optimized solution, in S2, the thickness of the steel plate 2 is 16 mm, the width of the steel plate 2 is 300 mm, the diameter of the middle through hole of the steel plate 2 is 108 mm, and adjacent steel plates 2 are staggered.

[0037] To further optimize the plan, arc welding was used between the steel plate 2 and the arched supporting steel beam 1, and between the steel plate 2 and the locking foot large pipe shed 3 in S2 and S4. The welding rod used was E5003 with a diameter of 4 mm, the welding current was 170 A, and the weld height was 2 to 4 mm.

[0038] According to the specific situation, before the steel bar welding construction, the rust, oil stains, and debris on the surface of the welding part should be removed; when the steel plate 2 is bent or twisted, it should be straightened or replaced. The flux should be stored in a dry warehouse. If it is damp, it should be baked at 250℃~350℃ for 2h before use. The flux recovered during use should be cleaned of slag and debris, and should be mixed with new flux before use. When welding under ambient temperature below -5℃, it is advisable to increase the welding current and reduce the welding speed. There is water seepage in the hole, and effective shielding measures should be taken during welding. The uncooled joint after welding must not touch water, and effective anti-slip and anti-electric shock measures should be taken to ensure personal safety. When the welding wind speed exceeds 8m / s, wind shielding measures should be taken when arc welding is carried out on site. The welding machine should be regularly maintained and overhauled to ensure normal use. The weld surface should be smooth without any depressions or weld nodules; there should be no cracks visible to the naked eye in the weld joint area; the weld excess height should be 2 to 4 mm; the allowable values ​​for defects such as undercut depth, pores, slag inclusions, and the allowable deviations of joint dimensions.

[0039] Further optimization scheme, in S3, the drilling depth is not less than 5.7m, and the difference between the borehole diameter and the outer diameter of the locking foot large pipe rack 3 is 20 to 30mm.

[0040] Further optimization scheme, in S4, the length of the locking foot large pipe shed 3 is 6m, the diameter of the grouting hole is 10cm, the spacing between adjacent grouting holes is 15cm, and one end of the locking foot large pipe shed 3 located in the drilled hole is set to be conical, and the other end is left with a length of 1m without drilling a grouting hole.

[0041] To further optimize the scheme, in S5, the initial grouting pressure is 0.3-0.5 MPa. When the grouting volume is less than 10 L / min, the pressure is adjusted to 0.8 MPa and the grouting is continued for not less than 10 min.

[0042] More specifically, the slurry mix ratio needs to be strictly controlled during grouting. The amount of water and cement should be configured according to the volume of the on-site mixing barrel. The mixed slurry tester will test the slurry consistency, and put it into the lower mixing barrel through the filter screen after it is qualified. The slurry mix ratio must be tested and prepared and approved before it can be used. The quality inspection results of the raw materials used for the slurry soil ratio should meet the requirements. The grouting sequence should be strictly implemented in accordance with the design requirements, following the principle of "single number first, double number later, from low to high, from bottom to top", and strictly controlled by on-site technicians and quality inspectors. The grouting pressure gauge must be a qualified product and must be inspected and calibrated by the laboratory. The maximum value of the pressure gauge is easy to be 2 to 2.5 times the grouting pressure. The grouting device between the pressure gauge and the pipeline should transmit pressure sensitively and without obstacles. On-site technicians, quality inspectors, and testers strictly control and frequently check the accuracy of the grouting pressure gauge. Grouting pressure: Grouting pressure is generally 1.0-2.0MPa, initial pressure 0.5-1.0MPa, final pressure 2.0MPa. After the slurry is filled, the pressure should be maintained for 10 minutes before stopping grouting. During the grouting process, the construction site manager should check whether there is any slurry leakage at the hole mouth, the air, and the thin cover layer at any time. If slurry leakage occurs, the grouting should be stopped immediately, and intermittent grouting should be used to block the slurry leakage hole. Hemp and anchoring agent can also be used to block until there is no slurry leakage. The grouting end standard is strictly implemented in accordance with the design requirements: the grouting pressure is gradually increased, and when it reaches the design final pressure and continues to stabilize for 10 minutes; the grouting volume is not less than 80% of the theoretical volume; the slurry feeding speed is 1 / 4 of the initial slurry feeding speed. The configured slurry must be used up within the specified time. If it exceeds the time, it must be treated as waste slurry. The cement slurry should not exceed 4 hours.

[0043] After grouting is completed, check the grouting quality and perform additional grouting if it does not meet the design requirements.

[0044] To further optimize the scheme, in S5, the water-cement ratio in the cement slurry is 0.5:1 to 0.8:1, and cement is used.

[0045] In a further optimized solution, in S2, adjacent steel plates 2 are arranged in a staggered manner.

[0046] In this embodiment, the construction site needs to comply with the following precautions:

[0047] The construction site should be under unified command by a dedicated person, and a full-time safety officer should be appointed to be responsible for on-site safety work, and a safety education system should be implemented before the shift.

[0048] Warning signs are set up in the construction area and non-staff are strictly prohibited from entering or leaving.

[0049] During construction, mechanical equipment should be inspected, maintained and repaired regularly.

[0050] During the grouting construction, the grouting should be carried out in strict accordance with the grouting machine operating procedures, and be careful to prevent the grouting pipe from being disengaged, bursting, and other injuries. Operators must wear protective masks to prevent slurry splashing and injuring people, especially the eyes and other parts that are prone to injury. It is strictly forbidden to aim the grouting pipe at the operator to avoid high-pressure slurry from harming the human body. During the operation, the grouting pipe should also be prevented from bursting and causing harm to the construction personnel.

[0051] The safety officer should observe the surrounding geological changes at any time. If any loose slider is found, all personnel should be evacuated to a safe area immediately.

[0052] During the construction process, all construction electricity must meet the standard of "one machine, one switch, one box, one protection".

[0053] Fire-fighting measures should be taken in hot work areas, fire extinguishers should be provided, and the distance between oxygen and acetylene cylinders should be no less than 5m.

[0054] In this embodiment, the construction site needs to meet the following environmental protection requirements:

[0055] Set up a sedimentation tank to precipitate and filter the sewage and oily water generated during construction. Treat the dirty oily water in the sedimentation tank. It can only be discharged after meeting the emission standards required by the environmental protection department. Oily water and sewage are discharged separately.

[0056] The cement used for grouting should comply with relevant specifications, the water used for construction should meet the application water standards, and natural clean river sand should be used as fine aggregate. The use of sea sand is strictly prohibited to ensure that the slurry meets the requirements of being non-toxic and pollution-free.

[0057] Waste from production should be handled in a timely manner and transported to the location designated by the local environmental protection department for disposal.

[0058] Garbage is cleared away in a timely manner, and cement bags and other garbage are transported to centralized garbage disposal stations.

[0059] During the construction process, cement and other dust-prone materials should be handled with care and are prohibited from being scattered.

[0060] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0061] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A construction method for controlling the convergence and deformation of a hydraulic tunnel, characterized in that: The steps include: S1, using a plurality of groups of equally spaced arched support steel beams (1) to support the tunnel; S2, manufacturing a steel plate (2), a through hole being provided in the middle of the steel plate (2), and fixing and connecting adjacent arched supporting steel beams (1) through the steel plate (2); S3, drilling a corresponding hole on the side wall of the tunnel according to the position of the through hole on the steel plate (2), with the axis of the drilling hole being collinear with the axis of the through hole; S4, making a locking foot large pipe shed (3), and opening grouting holes at equal intervals on the locking foot large pipe shed (3), and inserting the locking foot large pipe shed (3) into the drilled holes respectively, welding and fixing the ends of the locking foot large pipe shed (3) to the through holes on the steel plate (2), and welding a grouting valve at the ends of the locking foot large pipe shed (3); S5, pouring cement slurry into the locking foot large pipe shed (3) through the grouting valve; S6, check the grouting situation and complete the construction.

2. A construction method for controlling convergence and deformation of a hydraulic tunnel according to claim 1, characterized in that: In S2, the thickness of the steel plate (2) is 16 mm, the width of the steel plate (2) is 300 mm, the diameter of the middle through hole of the steel plate (2) is 108 mm, and adjacent steel plates (2) are staggered.

3. A construction method for controlling convergence and deformation of a hydraulic tunnel according to claim 1, characterized in that: Arc welding is used between the steel plate (2) and the arch support steel beam (1) and between the steel plate (2) and the locking foot large pipe shed (3) in S2 and S4. The welding rod used is E5003 with a diameter of 4 mm. The welding current is 170A and the weld height is 2 to 4 mm.

4. A construction method for controlling convergence and deformation of a hydraulic tunnel according to claim 1, characterized in that: In S3, the drilling depth is not less than 5.7 m, and the difference between the borehole diameter and the outer diameter of the locking foot large pipe rack (3) is 20 to 30 mm.

5. A construction method for controlling convergence and deformation of a hydraulic tunnel according to claim 1, characterized in that: In S4, the length of the locking foot large pipe shed (3) is 6m, the diameter of the grouting hole is 10cm, the spacing between adjacent grouting holes is 15cm, and one end of the locking foot large pipe shed (3) located in the drilled hole is set to be conical, and the other end is left with a length of 1m without drilling a grouting hole.

6. A construction method for controlling convergence and deformation of a hydraulic tunnel according to claim 1, characterized in that: In S5, the initial grouting pressure is 0.3-0.5 MPa. When the grouting volume is less than 10 L / min, the pressure is adjusted to 0.8 MPa and grouting is continued for not less than 10 min.

7. A construction method for controlling convergence and deformation of a hydraulic tunnel according to claim 1, characterized in that: In S5, the water-cement ratio in the cement paste is 0.5:1 to 0.8:1, and cement is used.