Natural gas pressure energy multi-energy complementary differential pressure power generation system and control method thereof
Through the combination of low-temperature heat absorption circulation pipeline and two-stage adjustable expansion ratio differential power generation pipeline, the use of multiple sources of heat sources for natural gas pressure differential power generation is solved, and the low utilization hours of power generation and insufficient cooling capacity in winter are solved. The problem of this has achieved efficient thermal energy cascade utilization and improved system flexibility.
Patent Information
- Application Number
- CN202310506048.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-06
- Publication Date
- 2024-11-08
AI Technical Summary
The existing natural gas pressure differential power generation technology has decreased in the winter power generation hours in the north, and the cooling capacity is insufficient. The system investment is high and it is not suitable for water-deficient areas. The heat source stability is poor, the energy conversion rate is low, and it is difficult to efficiently utilize pressure energy resources. .
The low-temperature heat absorption circulation pipeline and two-stage adjustable expansion ratio differential power generation pipeline are used to realize the cascade utilization of the reheating heat source through a multi-stream composite heat exchanger and a gas-liquid separator, combining photothermal heat, waste heat, geothermal heat, etc. Multi-source heat sources are efficiently recycled and utilized, and the expansion ratio is adjusted to adapt to climate and operating conditions.
Improve the climate adaptability and power utilization rate of natural gas pressure differential power generation system, realize the cascade utilization of heat energy, improve the flexibility and energy efficiency of the system, increase the number of power generation utilization hours and the continuous supply stability of natural gas, and improve the resource utilization rate. 20-40%.
Smart Images

Figure CN118911956A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of oil and gas production and natural gas storage and transportation, and specifically relates to a natural gas pressure energy multi-energy complementary pressure difference power generation system and a control method thereof. Background Art
[0002] In the pipeline network and city gate stations downstream of the natural gas transmission trunk line, there are abundant pressure energy resources due to the pressure difference between the pipeline pressure and the end-user pressure. Using the pressure difference to generate electricity can provide clean electricity for the natural gas step-down station and surrounding production and living facilities.
[0003] Chinese patent application CN105736216A discloses a device for generating electricity by utilizing formation pressure energy during oil production and residual pressure energy during transportation, comprising: a device for generating electricity by utilizing formation pressure energy, comprising a single-inlet and double-outlet speed tuning valve and a speed control linkage actuator, a filtering and separating buffer, a multi-head spiral plate centrifugal impeller rotor type gas-liquid phase turbine, a high back pressure natural gas turbine and two generators; and a device for generating electricity by utilizing residual pressure energy, comprising a piston-type single-stroke natural gas engine unit and a piston-type two-stroke natural gas engine unit connected in parallel to the high-pressure gas outlet from the upper station; the present invention can utilize the pressure energy released by the formation during the production of oil and natural gas and the residual pressure energy of natural gas transported to the gas gathering and transmission station, the lower station, the branch station, and the terminal station to generate electricity.
[0004] Chinese patent application CN101245956A discloses a method for utilizing natural gas pressure energy, namely: the natural gas in the high-pressure pipeline network is reduced in pressure and temperature by an unpowered refrigeration machine to obtain low-temperature natural gas, which is then heat-exchanged with a normal-temperature refrigerant transported from a normal-temperature tank. The cooled low-temperature refrigerant enters a refrigerant storage tank for standby use, and is eventually transported to cold energy users, while the heated normal-temperature natural gas enters the pipeline network; the patent uses the natural gas pressure energy for expansion power generation, converts the pressure energy into mechanical energy at a relatively low operating cost, and then converts it into cold energy, which is supplied to cold storages, cold water air conditioners, deep cold crushing of waste rubber and other cold users around the pressure regulating station through the refrigerant, or is made into ice cubes and dry ice products for external transportation and sales.
[0005] Chinese patent application CN105114131A discloses an integrated device that utilizes natural gas pressure energy for expansion power generation and compression refrigeration, including a monitoring and control system, an expansion power generation system, and a refrigerant refrigeration system. The power balance is achieved through an expander-generator-compressor coupling to meet the requirements of power generation and load matching.
[0006] Chinese patent application CN108894836A discloses a multi-energy complementary system based on natural gas pressure energy recovery in the field of natural gas pressure energy recovery technology. By integrating multiple advanced technologies such as screw expander pressure difference power generation, ice making technology, and methane fuel cells, the system can fully utilize the natural gas pressure difference energy and use methane fuel cells and internal combustion engines to achieve cogeneration of heat and power.
[0007] However, the inventors of the present invention found that the above technology has at least the following technical problems and shortcomings during the process of implementing the technical solutions of the embodiments of the present invention:
[0008] (1) Since the expansion of natural gas consumes the internal energy of the medium, the outlet temperature drops sharply, which does not meet the low temperature resistance requirements of downstream users and pipelines. The existing technology mostly adopts air temperature / seawater reheating. Subject to factors such as geographical conditions and seasonal temperature changes, the heat source of this reheating method is not stable enough, resulting in a decrease in the number of hours of power generation in the northern region in winter, and even the inability to operate due to the low outlet temperature, making it difficult to efficiently utilize pressure energy resources;
[0009] (2) Existing pressure difference power generation technology often adopts turbine or screw expander process flow. In order to control the expansion ratio parameters and limit the temperature drop at the rear end, single-stage expansion equipment is often used. Before the single-stage expansion, the pressure energy is recovered after the pressure is adjusted by the JT valve. Generally, 20%-50% of the pressure energy will be lost after the pressure adjustment, and the energy conversion rate is low;
[0010] (3) The relevant technologies are insufficient in absorbing cold energy. Currently, many domestic technologies use natural gas supplementary combustion, methane fuel cells and internal combustion engine process waste heat, coupling with cold storage cooling / ice-making processes, and association with natural gas liquefaction (LNG) processes to absorb the cold energy associated with natural gas pressure difference power generation. However, the above-mentioned processes require the existence of a stable cold scene in the surrounding area and are not easy to decouple from the refrigeration / ice-making process. The system adjustment flexibility is poor and the system investment is high. It is not suitable for the working conditions in the north where the temperature is low in winter and there is a lack of water resources. Summary of the invention
[0011] The present invention aims to solve at least one technical problem existing in the background technology, and provides a natural gas pressure energy multi-energy complementary pressure difference power generation system and its control method, adopts a two-stage adjustable expansion ratio pressure difference power generation pipeline to enhance the climate and working condition adaptability of the pressure difference power generation system and improve the power generation utilization rate of the system; at the same time, a low-temperature heat absorption circulation pipeline is adopted to efficiently recover low-grade energy such as environmental heat, residual (waste) heat resources in the oil and gas production process and use it for natural gas reheating after pressure difference power generation, which can realize the cascade utilization of thermal energy, thereby improving the flexibility of device application.
[0012] In order to achieve the above technical objectives, the present invention adopts the following technical solutions:
[0013] A natural gas pressure energy multi-energy complementary pressure difference power generation system, comprising a low temperature heat absorption circulation pipeline and a two-stage adjustable expansion ratio pressure difference power generation pipeline; the low temperature heat absorption circulation pipeline is used to provide a reheating heat source for the two-stage adjustable expansion ratio pressure difference power generation pipeline circulation;
[0014] The low-temperature heat absorption circulation pipeline includes a multi-stream composite heat exchanger, a gas-liquid separator, a low-temperature energy storage heat exchange pipeline, a first working fluid compressor and a circulating first working fluid; the first working fluid outlet of the multi-stream composite heat exchanger is connected to the gas-liquid separator; the gas outlet of the gas-liquid separator is connected to the inlet of the first working fluid compressor, the liquid outlet of the gas-liquid separator is connected to the first working fluid inlet of the low-temperature energy storage heat exchange pipeline, the first working fluid outlet of the low-temperature energy storage heat exchange pipeline is connected to the inlet of the first working fluid compressor; the outlet of the first working fluid compressor is connected to the first working fluid inlet of the multi-stream composite heat exchanger;
[0015] The two-stage adjustable expansion ratio pressure difference power generation pipeline comprises a high-pressure natural gas pipeline, a first-stage expansion generator and a second-stage expansion generator. The high-pressure natural gas pipeline is connected to the natural gas inlet of the first-stage expansion generator through a multi-stream composite heat exchanger, the natural gas outlet of the first-stage expansion generator is connected to the natural gas inlet of the second-stage expansion generator through a multi-stream composite heat exchanger, and the natural gas outlet of the second-stage expansion generator is connected to the downstream user pipeline through a multi-stream composite heat exchanger. At the same time, a pressure regulating valve before the first-stage expansion machine is arranged on the natural gas inlet pipeline of the first-stage expansion generator, a pressure regulating valve before the second-stage expansion machine is arranged on the natural gas inlet pipeline of the second-stage expansion generator, and a system back pressure regulating valve is arranged on the natural gas outlet pipeline of the second-stage expansion generator. The pressure regulating valve before the first-stage expansion machine, the pressure regulating valve before the second-stage expansion machine and the system back pressure regulating valve constitute a two-stage expansion ratio regulating device.
[0016] Furthermore, the low-temperature energy storage heat exchange pipeline includes a low-temperature heat source evaporator, a multi-energy heat exchange device, a circulation pump, a three-way control valve and a circulating second working medium;
[0017] The liquid outlet of the gas-liquid separator is connected to the first working fluid inlet of the low-temperature heat source evaporator, and the first working fluid outlet of the low-temperature heat source evaporator is connected to the inlet of the first working fluid compressor; at the same time, the second working fluid outlet of the low-temperature heat source evaporator is connected to the multi-energy heat exchange device, the circulation pump and the three-way control valve in sequence, and the two outlets of the three-way control valve are respectively connected to the second working fluid inlet of the low-temperature heat source evaporator and the second working fluid inlet of the multi-stream composite heat exchanger; the second working fluid outlet of the multi-stream composite heat exchanger is connected to the second working fluid inlet of the multi-energy heat exchange device.
[0018] Furthermore, the multi-energy heat exchange device includes a photothermal collector and a waste heat / waste heat / geothermal heat exchanger. The second working fluid outlet of the multi-stream composite heat exchanger and the second working fluid outlet of the low-temperature heat source evaporator are converged into a mother pipe and are respectively connected to the second working fluid inlet of the photothermal collector and the waste heat / waste heat / geothermal heat exchanger; the second working fluid outlets of the photothermal collector and the waste heat / waste heat / geothermal heat exchanger are both connected to the inlet of the heat source multi-way control valve, and the outlet of the heat source multi-way control valve is connected to a circulation pump.
[0019] Furthermore, the photothermal collector is a plurality of groups of parallel-connected trough-type tube heat exchangers.
[0020] Furthermore, the multi-stream composite heat exchanger includes a first working fluid tube array and a second working fluid tube array;
[0021] The first working medium tubes include three tube groups, namely the first tube group, the second tube group and the third tube group; the first tube group exchanges heat with the natural gas inlet pipeline group of the second-stage expansion generator, the second tube group exchanges heat with the natural gas inlet pipeline group of the first-stage expansion generator; the third tube group exchanges heat with the natural gas outlet pipeline group of the second-stage expansion generator; after the first working medium enters the first working medium inlet of the multi-stream composite heat exchanger, it flows countercurrently through the first tube group, the second tube group and the third tube group in the opposite direction to the natural gas flow, and finally flows out through the first working medium outlet of the multi-stream composite heat exchanger;
[0022] The second working medium tubes are close to the inlet side of the natural gas pipeline for heat exchange with the natural gas inlet pipeline group of the first-stage expansion generator, and the second working medium flows through the second working medium tubes in a countercurrent direction opposite to the flow direction of the natural gas.
[0023] Furthermore, a JT throttle valve and an air temperature preheater are sequentially arranged on the pipeline between the liquid outlet of the gas-liquid separator and the first working medium inlet of the low-temperature heat source evaporator, and the JT throttle valve is arranged close to the liquid outlet of the gas-liquid separator;
[0024] The air-temperature waste heat device is provided with a first bypass pipeline; the two ends of the first bypass pipeline are respectively connected to the inlet pipeline and the outlet pipeline of the air-temperature waste heat device, and the first bypass pipeline is provided with an air-temperature preheater bypass valve.
[0025] Furthermore, the first working fluid is a halogenated hydrocarbon or a mixture thereof refrigerant or a hydrocarbon refrigerant; the second working fluid is water or a water-based heat transfer medium;
[0026] The air temperature preheater is of fin-tube type and is installed vertically or horizontally.
[0027] Furthermore, the halogenated hydrocarbon and its mixture refrigerant includes R134a and R410A, the hydrocarbon refrigerant includes R290 and R600a; and the water-based heat transfer medium includes ethylene glycol aqueous solution.
[0028] Furthermore, the high-pressure natural gas pipeline is provided with a second bypass pipeline;
[0029] The inlet of the second bypass pipeline is connected to the high-pressure natural gas pipeline, and the outlet of the second bypass pipeline is connected to the downstream user pipeline;
[0030] The second bypass pipeline is provided with a system bypass cross-line valve.
[0031] Furthermore, the pressure regulating valve before the first-stage expander is arranged on the pipeline of the high-pressure natural gas pipeline entering the multi-stream composite heat exchanger;
[0032] The pressure regulating valve before entering the secondary expansion machine is arranged on the pipeline exiting the multi-stream composite heat exchanger and entering the secondary expansion generator;
[0033] The system back pressure regulating valve is arranged on the pipeline exiting the secondary expansion generator and entering the multi-stream composite heat exchanger.
[0034] At the same time, the present invention also provides a control method for a natural gas pressure energy multi-energy complementary pressure difference power generation system, which is used to implement the above-mentioned system, and the control method comprises the following steps:
[0035] Step S1: Start the low-temperature energy storage heat exchange pipeline, open the inlet and outlet pipeline valves of the first working fluid compressor, and connect the circulation pipeline of the first working fluid;
[0036] Step S2: gradually opening the pressure regulating valve before the first-stage expander, the pressure regulating valve before the second-stage expander and the system back pressure regulating valve in the two-stage expansion ratio regulating device, connecting the two-stage adjustable expansion ratio pressure difference power generation pipeline, and regulating the flow through the first-stage expansion generator and the second-stage expansion generator;
[0037] Step S3: The first-stage expansion generator and the second-stage expansion generator are gradually loaded to realize stable power generation. At the same time, the temperature changes of the inlet and outlet flows of each pipeline in the multi-stream composite heat exchanger are monitored to ensure that the temperature field of the cold and hot sources tends to be stable;
[0038] When the temperature field of the cold and hot sources in the multi-stream composite heat exchanger fluctuates, the inlet and outlet pressure difference of the first-stage expansion generator and the second-stage expansion generator is adjusted through the two-stage expansion ratio adjustment device to re-establish the balance between the cold source and the heat source so that the final natural gas temperature out of the system meets the temperature requirements of downstream users.
[0039] Furthermore, the step S1 specifically includes:
[0040] Step S101: Open the heat source multi-way control valve and the three-way control valve, start the circulation pump, and connect the low-temperature energy storage heat exchange pipeline;
[0041] Step S102: Open the inlet and outlet pipeline valves of the first working fluid compressor and the JT throttle valve on the liquid outlet pipeline of the gas-liquid separator, gradually load the first working fluid compressor, adjust the suction and exhaust pressures of the first working fluid compressor to be stable, and synchronously adjust the opening of the JT throttle valve, open the air temperature preheater or the air temperature preheater bypass valve in time, and conduct the circulation pipeline of the first working fluid.
[0042] Furthermore, the step S2 specifically includes:
[0043] Step S201: Open the system bypass cross-line valve on the bypass pipeline of the two-stage adjustable expansion ratio pressure difference power generation pipeline to adjust the pressure difference between the upstream and downstream pipelines to be stable;
[0044] Step S202: gradually opening the pressure regulating valve before the first-stage expander, the pressure regulating valve before the second-stage expander and the system back pressure regulating valve in the two-stage expansion ratio regulating device, connecting the two-stage adjustable expansion ratio pressure difference power generation pipeline, and regulating the natural gas flow passing through the first-stage expansion generator and the second-stage expansion generator;
[0045] Step S203: gradually reduce the opening of the system bypass cross-line valve until it is completely closed, so that the entire amount of natural gas passes through the primary expansion generator and the secondary expansion generator.
[0046] Furthermore, the control method also includes a seasonal operating condition control method, specifically:
[0047] When the system is in summer working condition, if the average ambient temperature is ≥20℃, the air temperature preheater is opened and the bypass valve of the air temperature preheater is closed; if the average ambient temperature is <20℃, the air temperature preheater is closed and the bypass valve of the air temperature preheater is opened;
[0048] When the system is in winter working condition, if the average temperature is ≥0℃, the air temperature preheater is opened and the air temperature preheater bypass valve is closed; if the average ambient temperature is <0℃, the air temperature preheater is closed and the air temperature preheater bypass valve is opened;
[0049] When the system is in spring and autumn working conditions, if the daytime temperature is higher than the first working fluid temperature at the first working fluid outlet of the multi-stream composite heat exchanger, the air temperature preheater is opened, and the air temperature preheater bypass valve is used to adjust the first working fluid flow through the air temperature preheater to adapt to the temperature change.
[0050] Furthermore, the control method also includes a day and night working condition control method, specifically:
[0051] When the system is in sunny daytime, the flow ratio of the heat source multi-way control valve is adjusted to increase the flow of the second working medium passing through the solar thermal collector. At the same time, the pipeline from the three-way control valve to the multi-stream composite heat exchanger is opened, and the pipeline from the three-way control valve to the low-temperature heat source evaporator is closed, so that the second working medium is directly transported to the multi-stream composite heat exchanger and reaches the solar thermal collector and the waste heat / waste heat / geothermal heat exchanger through the second working medium outlet of the multi-stream composite heat exchanger;
[0052] When the system is in nighttime operation or there is no sunshine during the day, the flow ratio of the heat source multi-way control valve is adjusted to increase the flow of the second working fluid through the residual heat / waste heat / geothermal heat exchanger. At the same time, the pipeline from the three-way control valve to the multi-stream composite heat exchanger is closed, and the pipeline from the three-way control valve to the low-temperature heat source evaporator is opened, so that the second working fluid circulates in the low-temperature energy storage heat exchange pipeline to exchange heat for the first working fluid.
[0053] Furthermore, the control method also includes an ultra-low temperature working condition control method, specifically:
[0054] When the system is in a low-temperature environment and the various regulating capabilities on the heat source side can no longer meet the requirements of downstream users for the natural gas outlet temperature to meet the requirements of downstream users, by adjusting the openings of the pressure regulating valve before the first-stage expansion machine, the pressure regulating valve before the second-stage expansion machine and the system back-pressure regulating valve in the two-stage expansion ratio regulating device, while ensuring that the pressure of the downstream natural gas after decompression meets the requirements, the pressure values before and after the first-stage expansion generator and the second-stage expansion generator are respectively reduced, and the expansion ratio of each stage of the expansion generator is reduced to reduce the system's power generation output, reduce the output of associated cooling, rebalance the cold and heat sources, restore the natural gas outlet temperature to meet downstream requirements, and ensure continuous operation of the system.
[0055] Furthermore, the control method also includes a fault condition control method, specifically: when a system fault occurs, the system bypass cross-line valve is opened to maintain the system.
[0056] Compared with the prior art, the beneficial effects of the present invention are:
[0057] (1) The system of the present invention adopts a dual working medium of a first working medium (such as R600a, etc.) and a second working medium (such as ethylene glycol aqueous solution, etc.), and multiple sources complementarily absorb low-grade heat sources (such as waste heat / waste heat / geothermal heat, solar heat, air source heat, etc.), and efficiently recovers low-temperature energy in the oil and gas production process and uses it for natural gas reheating after pressure difference power generation, which can realize the cascade utilization of thermal energy, and can maintain the operation of the pressure difference power generation system without coupling with traditional cold energy consumption methods such as ice making and refrigeration, which is not only conducive to the comprehensive utilization of resources, but also improves the adaptability and energy efficiency level of the pressure difference power generation system to changes in heat sources, and is more flexible in application;
[0058] (2) The system of the present invention adopts a multi-stream composite heat exchanger, wherein the multi-stream composite heat exchanger includes a first working medium tube and a second working medium tube; the first working medium tube includes three tube groups paired with a natural pipeline gradient, wherein the first tube group is paired with a natural gas inlet pipeline of a secondary expansion generator, the second tube group is paired with a natural gas inlet pipeline of a first-stage expansion generator; the third tube group is paired with a natural gas inlet pipeline of a secondary expansion generator; after the first working medium enters through the first working medium inlet of the multi-stream composite heat exchanger, it flows in a direction opposite to the natural gas flow direction. The first tube group, the second tube group and the third tube group are countercurrently flowed in sequence, and finally flowed out through the first working medium outlet of the multi-stream composite heat exchanger; the second working medium tube group is close to the inlet side of the natural gas pipeline and is paired with the natural gas inlet pipeline group of the first-stage expansion generator, and the second working medium flows countercurrently through the second working medium tube group in the direction opposite to the flow direction of the natural gas; through the above arrangement, the multi-stream composite heat exchanger can effectively utilize the temperature field with different temperature gradients to realize segmented countercurrent heat exchange, improve the heat exchange efficiency with natural gas, and the efficiency is improved by about 10% compared with the heat exchangers respectively arranged before and after the expansion generator;
[0059] (3) The system of the present invention adopts a two-stage adjustable expansion ratio pressure difference power generation pipeline, which enables the system to flexibly adjust the cooling output associated with power generation to adapt to the temperature change of the heat source end, thereby overcoming the situation where the downstream natural gas temperature is too low due to the low temperature in winter in the north and the insufficient heat source, and the pressure difference power generation system is forced to shut down, thereby increasing the system power generation utilization hours and the continuous supply stability of natural gas;
[0060] (4) Compared with the surplus energy utilization technologies disclosed at home and abroad, the system and control method of the present invention increase the utilization rate of surplus pressure resources in oil and gas production and natural gas storage and transportation scenarios by 20-40%. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] Figure 1 It is a structural schematic diagram of a natural gas pressure energy multi-energy complementary pressure difference power generation system according to an embodiment of the present invention;
[0062] Figure 2 This is a schematic diagram of the structure of composite step heat exchange of the first working fluid and the second working fluid according to an embodiment of the present invention;
[0063] Figure 3 This is a schematic diagram of the structure of parallel step heat exchange of the first working fluid and the second working fluid in an embodiment of the present invention;
[0064] Markings in the figure: 1-high-pressure natural gas pipeline; 2-multi-stream composite heat exchanger, 201-first working fluid inlet, 202-first working fluid outlet, 203-second working fluid inlet, 204-second working fluid outlet, 205-first tube group, 206-second tube group, 207-third tube group, 208-second working fluid tube; 3-first expansion generator; 4-two-stage expansion ratio adjustment device; 5-secondary expansion generator; 6-gas-liquid separator; 7-J T throttle valve; 8-air temperature preheater bypass valve; 9-air temperature preheater; 10-low-temperature heat source evaporator; 11-first working fluid compressor; 12-waste heat / waste heat / geothermal heat exchanger; 13-photothermal collector; 14-heat source multi-way control valve; 15-circulation pump; 16-three-way control valve; 17-pressure regulating valve before entering the first-stage expansion machine; 18-pressure regulating valve before entering the second-stage expansion machine; 19-system back pressure regulating valve; 20-system bypass cross-line valve; 21-downstream user pipeline. DETAILED DESCRIPTION
[0065] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0066] Example 1
[0067] Combination Figure 1 As shown, an embodiment of the present invention provides a natural gas pressure energy multi-energy complementary pressure difference power generation system, including a low-temperature heat absorption circulation pipeline and a two-stage adjustable expansion ratio pressure difference power generation pipeline; the low-temperature heat absorption circulation pipeline is used to provide a reheating heat source for the two-stage adjustable expansion ratio pressure difference power generation pipeline circulation.
[0068] Specifically, the low-temperature heat absorption circulation pipeline includes a multi-stream composite heat exchanger 2, a gas-liquid separator 6, a low-temperature energy storage heat exchange pipeline, a first working fluid compressor 11 and a circulating first working fluid.
[0069] The first working fluid may be a halogenated hydrocarbon or a mixture thereof refrigerant or a hydrocarbon refrigerant, wherein the halogenated hydrocarbon or a mixture thereof refrigerant includes R134a and R410A, and the hydrocarbon refrigerant includes R290 and R600a. In this embodiment, R600a refrigerant is selected.
[0070] The first working fluid outlet 202 of the multi-stream composite heat exchanger 2 is connected to the gas-liquid separator 6; the gas outlet of the gas-liquid separator 6 is connected to the inlet of the first working fluid compressor 11, the liquid outlet of the gas-liquid separator 6 is connected to the first working fluid inlet of the low-temperature energy storage heat exchange pipeline, and the first working fluid outlet of the low-temperature energy storage heat exchange pipeline is connected to the inlet of the first working fluid compressor 11; the outlet of the first working fluid compressor 11 is connected to the first working fluid inlet 201 of the multi-stream composite heat exchanger 2, thereby forming a circulating flow pipeline for the first working fluid, and its processes are respectively: "multi-stream composite heat exchanger 2-gas-liquid separator 6-first working fluid compressor 11-multi-stream composite heat exchanger 2" and "multi-stream composite heat exchanger 2-gas-liquid separator 6-low-temperature energy storage heat exchange pipeline-first working fluid compressor 11-multi-stream composite heat exchanger 2".
[0071] In some embodiments, a JT throttle valve 7 and an air temperature preheater 9 are sequentially arranged on the pipeline between the liquid outlet of the gas-liquid separator 6 and the first working fluid inlet of the low-temperature heat source evaporator 10, and the JT throttle valve 7 is arranged close to the liquid outlet of the gas-liquid separator 6; when the ambient temperature is high, the air temperature preheater 9 can be opened to utilize the air heat for heat exchange with the first working fluid; at the same time, the air temperature waste heat device 9 is provided with a first bypass pipeline; the two ends of the first bypass pipeline are respectively connected to the inlet pipeline and the outlet pipeline of the air temperature waste heat device, and the first bypass pipeline is provided with an air temperature preheater bypass valve 8, so that when the ambient temperature is low, the air temperature waste heat device 9 can be closed to prevent the first working fluid from performing reverse heat exchange with the air, thereby reducing the energy consumption of the system.
[0072] In some embodiments, the low-temperature energy storage heat exchange pipeline includes a low-temperature heat source evaporator 10, a multi-energy heat exchange device, a circulation pump 15, a three-way control valve 16 and a circulating second working fluid.
[0073] The second working fluid is water or a water-based heat-conducting medium. In this embodiment, the second working fluid is a water-based heat-conducting medium, ethylene glycol aqueous solution, to prevent the device pipeline from freezing in winter.
[0074] The liquid outlet of the gas-liquid separator 16 is connected to the first working fluid inlet of the low-temperature heat source evaporator 10, and the first working fluid outlet of the low-temperature heat source evaporator 10 is connected to the inlet of the first working fluid compressor 11; at the same time, the second working fluid outlet of the low-temperature heat source evaporator 10 is connected to the multi-energy heat exchange device, the circulating pump 15 and the three-way control valve 16 in sequence, and the two outlets of the three-way control valve 16 are respectively connected to the second working fluid inlet of the low-temperature heat source evaporator 10 and the second working fluid inlet 203 of the multi-stream composite heat exchanger 2; the second working fluid outlet 204 of the multi-stream composite heat exchanger 2 is connected to the second working fluid inlet of the multi-energy heat exchange device, thereby forming a circulating flow pipeline for the second working fluid, and its processes are respectively: "multi-stream composite heat exchanger 2-multi-energy heat exchange device-circulating pump 15-three-way control valve 16-multi-stream composite heat exchanger 2" and "low-temperature heat source evaporator 10-multi-energy heat exchange device-circulating pump 15-three-way control valve 16-low-temperature heat source evaporator 10".
[0075] The multi-energy heat exchange device includes a photothermal collector 13 and a waste heat / waste heat / geothermal heat exchanger 12. The second working fluid outlet 204 of the multi-stream composite heat exchanger 2 and the second working fluid outlet of the low-temperature heat source evaporator 10 are connected to the mother pipe and then connected to the second working fluid inlet of the photothermal collector 12 and the waste heat / waste heat / geothermal heat exchanger 12 respectively; the second working fluid outlets of the photothermal collector 13 and the waste heat / waste heat / geothermal heat exchanger 12 are both connected to the inlet of the heat source multi-way control valve 14, and the outlet of the heat source multi-way control valve 14 is connected to a circulation pump.
[0076] In some embodiments, the solar thermal collector is a plurality of parallel-connected trough-type tube heat exchangers.
[0077] In some embodiments, see Figure 2 and Figure 3 As shown, the multi-stream composite heat exchanger includes a first working medium tube and a second working medium tube 208; the first working medium tube includes three tube groups, namely a first tube group 205, a second tube group 206 and a third tube group 207; the first tube group 205 exchanges heat with the natural gas inlet pipeline group of the secondary expansion generator 5, and the second tube group 206 exchanges heat with the natural gas inlet pipeline group of the first expansion generator 3; the third tube group 207 exchanges heat with the natural gas outlet pipeline group of the secondary expansion generator 5; after the first working medium enters through the first working medium inlet 201 of the multi-stream composite heat exchanger 2, it flows countercurrently through the first tube group 205, the second tube group 206 and the third tube group 207 in the opposite direction to the natural gas flow, and finally flows out through the first working medium outlet 202 of the multi-stream composite heat exchanger 2;
[0078] The second working medium tubes 208 are close to the inlet side of the natural gas pipeline for heat exchange with the natural gas inlet pipeline group of the first-stage expansion generator 3, and the second working medium flows through the second working medium tubes 208 in a countercurrent direction opposite to the flow direction of the natural gas.
[0079] Through the above arrangement, the multi-stream composite heat exchanger 2 can effectively utilize the temperature field with different temperature gradients to realize segmented countercurrent heat exchange, make the temperature field evenly distributed, and improve the heat exchange efficiency with natural gas. Compared with setting heat exchangers before and after the expansion generator, the efficiency can be improved by about 10%.
[0080] When in use, the first working fluid and the second working fluid exchange heat in the low-temperature heat source evaporator 10, and the heat energy from the waste heat / waste heat / geothermal heat exchanger 12 and the solar thermal collector 13 and the air temperature preheater 9 is extracted and stored in the vaporization latent heat of the first working fluid (R600a, etc.) through the evaporation phase change endothermic process; the second working fluid (ethylene glycol aqueous solution) is circulated in the collector end through the circulation pump 15, and the flow rate of each group of heat sources is controlled by the heat source multi-way control valve 14 to adapt to different working conditions. and low-temperature heat source supply under climatic conditions; at the same time, after the first working fluid absorbs heat and vaporizes in the low-temperature heat source evaporator 10, it enters the first working fluid compressor 11 for approximately adiabatic compression to obtain a first working fluid gas with a relatively high temperature and pressure. The first working fluid gas is subjected to countercurrent segmented heat exchange with the low-temperature natural gas at the inlet and outlet of the first expansion generator 3 and the outlet of the second expansion generator 5 in the multi-stream composite heat exchanger 2. The first working fluid condenses in the tube side of the multi-stream composite heat exchanger 2 to release the latent heat of vaporization. At this time, the composite step heat exchange process formed by the first working fluid and the second working fluid is as follows: Figure 2 shown.
[0081] Subsequently, the first working medium gas-liquid two-phase flow after condensation by the multi-stream composite heat exchanger 2 enters the gas-liquid separator 6, wherein the separated part of the non-condensable gas flows back to the front end or between stages of the first working medium compressor 11 for recompression; the first working medium compressor 6 generally selects a single-stage oil-injected screw compressor, and a centrifugal compressor can also be selected according to the scale of the organic working medium circulation volume. The first working medium at the liquid phase outlet of the gas-liquid separator 6 is throttled, expanded, and depressurized by the JT throttle valve 7 to generate a gas-liquid two-phase flow, which enters the air temperature preheater 9 for heat exchange with the air of the external environment; the organic working medium preheated by the air temperature preheater 9 returns to the low-temperature heat source evaporator 10 for heat exchange again to absorb the latent heat of vaporization.
[0082] Among them, the air temperature preheater 9 is generally of fin-in-tube type, and can be installed vertically or horizontally according to the site conditions. When the winter temperature is lower than the temperature of the first working medium after the JT throttle valve 7, the air temperature preheater bypass valve 8 is opened to stop the reverse heat exchange between the first working medium and the air, thereby reducing the energy consumption of the system.
[0083] In addition, when it is in summer working conditions and the ambient heat such as solar heat and air heat sources is sufficient, the system will control the liquid flow rate of each group of heat sources through the heat source multi-way control valve 14. At the same time, the pipeline between the three-way control valve 16 and the low-temperature heat source evaporator 10 is closed, and the pipeline between the three-way control valve 16 and the multi-stream composite heat exchanger 2 is opened, and the second working fluid is directly input into the multi-stream composite heat exchanger 2 for direct heat exchange with the low-temperature natural gas, so that the second working fluid circulation pipeline and the first working fluid circulation pipeline are operated in parallel at the same time, reducing the power load of the first working fluid compressor 11, and the second working fluid after heat exchange is discharged through the second working fluid outlet 204 of the multi-stream composite heat exchanger 2 and refluxed to the second working fluid inlet of the solar thermal collector 12 and the waste heat / waste heat / geothermal heat exchanger 12; at this time, the parallel step heat exchange process formed by the first working fluid and the second working fluid is as follows Figure 3 shown.
[0084] The two-stage adjustable expansion ratio pressure difference power generation pipeline includes a high-pressure natural gas pipeline 1, a first-stage expansion generator 3 and a second-stage expansion generator 5. The high-pressure natural gas pipeline 1 is connected to the natural gas inlet of the first-stage expansion generator 3 through a multi-stream composite heat exchanger 2, the natural gas outlet of the first-stage expansion generator 3 is connected to the natural gas inlet of the second-stage expansion generator 5 through the multi-stream composite heat exchanger 2, and the natural gas outlet of the second-stage expansion generator 5 is connected to the downstream user pipeline 21 through the multi-stream composite heat exchanger 2. At the same time, a pressure regulating valve 17 before entering the first-stage expansion machine is arranged on the natural gas inlet pipeline of the first-stage expansion generator 3, and the pressure regulating valve 17 before entering the first-stage expansion machine is specifically arranged on the pipeline of the high-pressure natural gas pipeline 1 entering the multi-stream composite heat exchanger 2; a pressure regulating valve 18 before entering the second-stage expansion machine is arranged on the natural gas inlet pipeline of the second-stage expansion generator 5, and the pressure regulating valve 18 before entering the second-stage expansion machine is specifically arranged on the pipeline exiting the multi-stream composite heat exchanger 2 and entering the second-stage expansion generator 5; a system back pressure regulating valve 19 is arranged on the natural gas outlet pipeline of the second-stage expansion generator 5, and the system back pressure regulating valve 19 is specifically arranged on the pipeline exiting the second-stage expansion generator 5 and entering the multi-stream composite heat exchanger 2, serving as a pressure zone boundary valve between the pressure difference power generation system and the downstream user pipeline 21, and is used to stabilize the downstream gas supply pressure when the regulation capacity of the expansion generator fluctuates.
[0085] The pressure regulating valve 17 before the first-stage expander, the pressure regulating valve 18 before the second-stage expander and the system back pressure regulating valve 19 constitute a two-stage expansion ratio regulating device 4, and the single valve opening range is 0-100%. The two-stage expansion ratio regulating device 4 adopts appropriate PID control logic or manual operation mode, and realizes automatic control of valve opening by collecting parameters such as natural gas pressure at the inlet and outlet of the first-stage expansion generator 3 and the second-stage expansion generator 5, the back pressure of the downstream pipeline network and the temperature, so as to adjust the expansion ratio of the first-stage expansion generator 3 and the second-stage expansion generator 5.
[0086] When in use, the first-stage expansion generator 3 expands the low-temperature and high-pressure natural gas from the upstream high-pressure natural gas pipeline to a certain pressure, and then the second-stage expansion generator 5 expands the natural gas to the terminal back pressure; the first-stage expansion generator 3 and the second-stage expansion generator 5 are designed as separate bodies, and the two-stage expansion generators respectively convert the pressure potential energy into the mechanical energy of the rotating shaft, and then respectively convert the mechanical energy into the electrical energy of alternating current through the coupling, gear box and asynchronous generator and other equipment, so as to achieve the purpose of generating electricity by using the pressure difference of natural gas; at the same time, the pressure difference distribution between the two-stage expansion generators is adjusted by the two-stage expansion ratio adjustment device 4 to change the system power generation output and the natural gas temperature drop at the natural gas outlet of the first-stage expansion generator 3 and the natural gas outlet of the second-stage expansion generator 5, so as to adapt to the working condition changes on the heat source side caused by seasons, light, temperature, etc., and realize the comprehensive utilization of multiple energy sources and the overall stable operation of the power generation system.
[0087] In addition, the high-pressure natural gas pipeline is provided with a second bypass pipeline; the inlet of the second bypass pipeline is connected to the high-pressure natural gas pipeline, and the outlet of the second bypass pipeline is connected to the downstream user pipeline 21; the second bypass pipeline is provided with a system bypass cross-line valve 20, which is used to open when a system failure occurs, to conduct the second bypass pipeline, and to facilitate maintenance of the system.
[0088] Example 2
[0089] This embodiment provides a control method for a natural gas pressure energy multi-energy complementary power generation system, using the system described in Example 1, and the control method specifically includes the following steps:
[0090] Step S1: starting the low-temperature energy storage heat exchange pipeline, opening the inlet and outlet pipeline valves of the first working fluid compressor 11, and connecting the circulation pipeline of the first working fluid; specifically including:
[0091] Step S101: Open the heat source multi-way control valve 14 and the three-way control valve 16, start the circulation pump 15, and connect the low-temperature energy storage heat exchange pipeline;
[0092] Step S102: Open the inlet and outlet pipeline valves of the first working fluid compressor 11 and the JT throttle valve on the liquid outlet pipeline of the gas-liquid separator, gradually load the first working fluid compressor 11, adjust the suction and exhaust pressures of the first working fluid compressor 11 to be stable, and synchronously adjust the opening of the JT throttle valve, open the air temperature preheater 9 or the air temperature preheater bypass valve 8 in time, and conduct the circulation pipeline of the first working fluid.
[0093] Step S2: gradually opening the pressure regulating valve before the first-stage expander, the pressure regulating valve before the second-stage expander and the system back pressure regulating valve in the two-stage expansion ratio regulating device, connecting the two-stage adjustable expansion ratio pressure difference power generation pipeline, and regulating the flow through the first-stage expansion generator and the second-stage expansion generator; specifically including:
[0094] Step S201: Open the system bypass cross-line valve 20 on the bypass pipeline of the two-stage adjustable expansion ratio pressure difference power generation pipeline to adjust the pressure difference between the upstream and downstream pipelines to be stable;
[0095] Step S202: gradually opening the pressure regulating valve 17 before the first-stage expander, the pressure regulating valve 18 before the second-stage expander and the system back pressure regulating valve 19 in the two-stage expansion ratio regulating device 4, connecting the two-stage adjustable expansion ratio pressure difference power generation pipeline, and regulating the natural gas flow through the first-stage expansion generator 3 and the second-stage expansion generator 5;
[0096] Step S203: gradually reduce the opening of the system bypass cross-line valve 20 until it is completely closed, so that the entire amount of natural gas passes through the primary expansion generator 3 and the secondary expansion generator 5.
[0097] Step S3: The primary expansion generator 3 and the secondary expansion generator 5 are gradually loaded to realize stable power generation. At the same time, the temperature changes of the inlet and outlet flows of each pipeline in the multi-stream composite heat exchanger 2 are monitored to ensure that the temperature field of the cold and hot sources tends to be stable;
[0098] When the temperature field of the cold and hot sources in the multi-stream composite heat exchanger fluctuates, the inlet and outlet pressure difference between the first-stage expansion generator 3 and the second-stage expansion generator 5 is adjusted through the two-stage expansion ratio adjustment device 4 to re-establish the balance between the cold source and the hot source so that the final natural gas temperature out of the system meets the temperature requirements of downstream users.
[0099] In some embodiments, the control method further includes a seasonal operating condition control method, specifically:
[0100] When the system is in summer working condition, if the average ambient temperature is ≥20℃, the air temperature preheater 9 is opened and the air temperature preheater bypass valve 8 is closed to increase the system's absorption of air source heat energy; if the average ambient temperature is <20℃, the air temperature preheater 9 is closed and the air temperature preheater bypass valve 8 is opened to stop the reverse heat exchange between the first working fluid and the air, thereby reducing the system energy consumption;
[0101] When the system is in winter working condition, if the average temperature is ≥0℃, the air temperature preheater 9 is opened and the air temperature preheater bypass valve 8 is closed to increase the system's absorption of air source heat energy; if the average ambient temperature is <0℃, the air temperature preheater 9 is closed and the air temperature preheater bypass valve 8 is opened to stop the reverse heat exchange between the first working fluid and the air, thereby reducing the system energy consumption;
[0102] When the system is in spring and autumn working conditions, if the daytime temperature is higher than the first working fluid temperature at the first working fluid outlet of the multi-stream composite heat exchanger, the air temperature preheater 9 is opened, and the first working fluid flow passing through the air temperature preheater 9 is adjusted by the air temperature preheater bypass valve 8 to adapt to the temperature change.
[0103] In some embodiments, the control method further includes a day and night working condition control method, specifically:
[0104] When the system is in a sunny day with sufficient sunshine, the flow ratio of the heat source multi-way control valve 14 is adjusted to increase the flow of the second working medium passing through the solar thermal collector 13. At the same time, the pipeline from the three-way control valve 16 to the multi-stream composite heat exchanger 2 is opened, and the pipeline from the three-way control valve 16 to the low-temperature heat source evaporator 10 is closed, so that the second working medium is directly transported to the multi-stream composite heat exchanger 2 and reaches the solar thermal collector 13 and the waste heat / waste heat / geothermal heat exchanger 12 through the second working medium outlet 204 of the multi-stream composite heat exchanger;
[0105] When the system is in nighttime operation or there is no sunshine during the day, the flow ratio of the heat source multi-way control valve 14 is adjusted to increase the flow of the second working fluid through the residual heat / waste heat / geothermal heat exchanger 12. At the same time, the pipeline from the three-way control valve 16 to the multi-stream composite heat exchanger 2 is closed, and the pipeline from the three-way control valve 16 to the low-temperature heat source evaporator 2 is opened, so that the second working fluid circulates in the low-temperature energy storage heat exchange pipeline to exchange heat for the first working fluid.
[0106] In some embodiments, the control method further includes an ultra-low temperature working condition control method, specifically:
[0107] When the system is in a low temperature environment (such as when the temperature is below 0°C in winter, or when the incoming gas temperature is below 10°C), and the various regulating capabilities on the heat source side can no longer meet the requirements of the natural gas outlet temperature to meet the requirements of downstream users, by adjusting the openings of the pressure regulating valve 17 before the first-stage expansion machine, the pressure regulating valve 18 before the second-stage expansion machine and the system back pressure regulating valve 19 in the two-stage expansion ratio regulating device 4, while ensuring that the pressure of the downstream natural gas after decompression meets the requirements, the pressure values before and after the first-stage expansion generator 3 and the second-stage expansion generator 5 are respectively reduced, and the expansion ratio of each stage of the expansion generator is reduced to reduce the system power generation output, reduce the output of the associated cooling capacity, rebalance the cold and heat sources, restore the natural gas outlet temperature to meet the downstream requirements, and ensure the continuous operation of the system.
[0108] In some embodiments, the control method further includes a fault condition control method, specifically: when a system fault occurs, the system bypass cross-line valve 20 is opened to perform maintenance on the system.
[0109] Example 3
[0110] This embodiment adopts the system described in Example 1 and the control method described in Example 2, and further describes the working process of the natural gas pressure energy multi-energy complementary power generation system and its control method of the present invention in combination with a natural gas secondary gas distribution station:
[0111] At a natural gas secondary distribution station, the average daily flow of natural gas is 900,000 cubic meters, the natural gas inlet temperature is 20℃ in summer and 10℃ in winter, and the inlet pressure is 2.5MPa. After the natural gas is cooled by work in the two-stage expansion generator and reheated in two stages of the multi-stream composite heat exchanger, the acceptable natural gas temperature range downstream is ≥5℃, and the downstream gas supply pressure is 0.4MPa.
[0112] The site has waste heat resources with a temperature of 55°C and a circulating water flow of 400t / day. The area has good solar thermal resources and an annual total solar radiation of 5000MJ / m 2 , using 3m single-slot solar thermal collector, with a total collection area of 6250m 2 (Annual average heat collection power 400kW), the annual average solar thermal water temperature is 53℃, and the highest solar thermal water temperature in summer can reach 76℃. The annual average temperature in the area is 10℃, the highest temperature in summer is 45℃, and the lowest temperature in winter is -42℃.
[0113] The first-stage expansion generator 3 and the second-stage expansion generator 5 in the system are both selected as turbine expansion generators; the multi-stream composite heat exchanger 2 adopts five-stream cross heat exchange, selects a tube-fin type internal structure design, and the outer wall is covered with an insulating material; the air-temperature preheater 9 selects a horizontal structure type; the low-temperature heat source evaporator 10 selects a U-shaped shell and tube evaporator, in which the first working fluid (R600a)) passes through the shell side, and the second working fluid (ethanol aqueous solution) passes through the tube side, and the circulation pump 15 selects a 37kW single-stage centrifugal pump; the first working fluid compressor 11 is selected as an oil-injected single-stage twin-screw compressor, a load slide valve is used to adjust the equipment load, and the motor power is selected to be 160kW.
[0114] Using Aspen HYSYS process software to assist in simulation, the following results were obtained through steady-state calculation of the system:
[0115] In summer, the sunshine is sufficient, the natural gas inlet temperature is 20℃, the output power of the first-stage expansion generator 3 is 727kW, and the output power of the second-stage expansion generator 5 is 740kW. At this time, the interstage pressure of the expansion generator is 1.04MPa. The temperature of the natural gas before entering the first-stage expansion generator 3 after preheating is 56.26℃. The natural gas temperature after reheating by the first-stage expansion generator 3 is 40.53℃, and the natural gas temperature after reheating by the second-stage expansion generator 5 is 13.65℃. Under this condition, the three-way control valve 16 is opened to introduce the second working medium into the multi-stream composite heat exchanger 2, and the reheating input heat is 1.41×10 3 MJ / h, of which the direct heat supply from the solar thermal collector 13 accounts for about 60%, and the heat provided by the air temperature preheater 9 accounts for about 10%; under this working condition, the average operating power of the first working fluid booster 11 unit is 50kW, and the comprehensive power meter of the circulating pump 15 in the system is 35kW, then the total external output power of the system is 1382kW.
[0116] In winter, the air temperature and sunshine temperature are both reduced, and the natural gas inlet temperature is 10°C. Since the heat supply from the air temperature preheater 9 and the solar thermal collector 13 is reduced, the total heat source input is set to be reduced by about 50% compared with summer. At this time, close the three-way control valve 16 to the passage of the multi-stream heat exchanger 2, and adjust the heat source multi-way control valve 14 to increase the second working medium flow from the waste heat / waste heat / geothermal heat exchanger 12; at the same time, close the air preheater 9 and open the air temperature preheater bypass valve 8; at this time, the expansion ratio adjustment device 4 is used to adjust the expansion ratio of the first-stage expansion generator 3 and the second-stage expansion generator 5, and the pressure drop before and after the pressure regulating valve 17 before the first-stage expansion machine is adjusted to 0.4MPa, the pressure drop before and after the pressure regulating valve 18 before the second-stage expansion machine is adjusted to 0.2MPa, and the pressure drop before and after the system back pressure regulating valve 19 is adjusted to 0.17MPa. According to calculation, the output power of the first expansion generator under this condition is 450.6kW, and the output power of the second expansion generator 3 is 407.8kW. At this time, the pressure before the second expansion generator is 0.98MPa, the natural gas temperature at the inlet of the first expansion generator 3 is 33.62℃, the natural gas temperature after reheating at the outlet of the first expansion generator 3 is 18.4℃, and the natural gas temperature after reheating at the outlet of the second expansion generator 5 is 7.6℃. Under this condition, the operating power of the first working fluid booster 11 unit is 150kW. Considering that the comprehensive power meter of the circulating pump 15 in the system is 35kW, the comprehensive external output power of the system is 673.4kW.
[0117] Compared with the surplus energy utilization technologies disclosed at home and abroad, the system and method of this embodiment improves the utilization rate of surplus pressure resources in oil and gas production and natural gas storage and transportation scenarios by 20-40%.
[0118] The above description is only an embodiment of the present invention and is not intended to limit the present invention. Any modification, equivalent replacement and improvement made within the application scope of the present invention shall be included in the protection scope of the present invention.
Claims
1. A natural gas pressure energy multi-energy complementary pressure difference power generation system, characterized in that: It includes a low-temperature heat absorption circulation pipeline and a two-stage adjustable expansion ratio pressure difference power generation pipeline; the low-temperature heat absorption circulation pipeline is used to provide a reheating heat source for the two-stage adjustable expansion ratio pressure difference power generation pipeline circulation; The low-temperature heat absorption circulation pipeline includes a multi-stream composite heat exchanger, a gas-liquid separator, a low-temperature energy storage heat exchange pipeline, a first working fluid compressor and a circulating first working fluid; the first working fluid outlet of the multi-stream composite heat exchanger is connected to the gas-liquid separator; the gas outlet of the gas-liquid separator is connected to the inlet of the first working fluid compressor, the liquid outlet of the gas-liquid separator is connected to the first working fluid inlet of the low-temperature energy storage heat exchange pipeline, the first working fluid outlet of the low-temperature energy storage heat exchange pipeline is connected to the inlet of the first working fluid compressor; the outlet of the first working fluid compressor is connected to the first working fluid inlet of the multi-stream composite heat exchanger; The two-stage adjustable expansion ratio pressure difference power generation pipeline comprises a high-pressure natural gas pipeline, a first-stage expansion generator and a second-stage expansion generator. The high-pressure natural gas pipeline is connected to the natural gas inlet of the first-stage expansion generator through a multi-stream composite heat exchanger, the natural gas outlet of the first-stage expansion generator is connected to the natural gas inlet of the second-stage expansion generator through a multi-stream composite heat exchanger, and the natural gas outlet of the second-stage expansion generator is connected to the downstream user pipeline through a multi-stream composite heat exchanger. At the same time, a pressure regulating valve before the first-stage expansion machine is arranged on the natural gas inlet pipeline of the first-stage expansion generator, a pressure regulating valve before the second-stage expansion machine is arranged on the natural gas inlet pipeline of the second-stage expansion generator, and a system back pressure regulating valve is arranged on the natural gas outlet pipeline of the second-stage expansion generator. The pressure regulating valve before the first-stage expansion machine, the pressure regulating valve before the second-stage expansion machine and the system back pressure regulating valve constitute a two-stage expansion ratio regulating device.
2. The system according to claim 1, characterized in that The low-temperature energy storage heat exchange pipeline includes a low-temperature heat source evaporator, a multi-energy heat exchange device, a circulation pump, a three-way control valve and a circulating second working medium; The liquid outlet of the gas-liquid separator is connected to the first working fluid inlet of the low-temperature heat source evaporator, and the first working fluid outlet of the low-temperature heat source evaporator is connected to the inlet of the first working fluid compressor; at the same time, the second working fluid outlet of the low-temperature heat source evaporator is connected to the multi-energy heat exchange device, the circulation pump and the three-way control valve in sequence, and the two outlets of the three-way control valve are respectively connected to the second working fluid inlet of the low-temperature heat source evaporator and the second working fluid inlet of the multi-stream composite heat exchanger; the second working fluid outlet of the multi-stream composite heat exchanger is connected to the second working fluid inlet of the multi-energy heat exchange device.
3. The system according to claim 2, characterized in that The multi-energy heat exchange device includes a photothermal collector and a waste heat / waste heat / geothermal heat exchanger. The second working fluid outlet of the multi-stream composite heat exchanger and the second working fluid outlet of the low-temperature heat source evaporator are converged into a mother pipe and are respectively connected to the second working fluid inlet of the photothermal collector and the waste heat / waste heat / geothermal heat exchanger; the second working fluid outlets of the photothermal collector and the waste heat / waste heat / geothermal heat exchanger are both connected to the inlet of a heat source multi-way control valve, and the outlet of the heat source multi-way control valve is connected to a circulating pump.
4. The system according to claim 3, characterized in that The photothermal collector is a plurality of parallel-connected trough-type tube heat exchangers.
5. The system according to claim 1, characterized in that The multi-stream composite heat exchanger includes a first working fluid tube array and a second working fluid tube array; The first working medium tubes include three tube groups, namely the first tube group, the second tube group and the third tube group; the first tube group exchanges heat with the natural gas inlet pipeline group of the second-stage expansion generator, the second tube group exchanges heat with the natural gas inlet pipeline group of the first-stage expansion generator; the third tube group exchanges heat with the natural gas outlet pipeline group of the second-stage expansion generator; after the first working medium enters the first working medium inlet of the multi-stream composite heat exchanger, it flows countercurrently through the first tube group, the second tube group and the third tube group in the opposite direction to the natural gas flow, and finally flows out through the first working medium outlet of the multi-stream composite heat exchanger; The second working medium tubes are close to the inlet side of the natural gas pipeline for heat exchange with the natural gas inlet pipeline group of the first-stage expansion generator, and the second working medium flows through the second working medium tubes in a countercurrent direction opposite to the flow direction of the natural gas.
6. The system according to any one of claims 2 to 5, characterized in that: A JT throttle valve and an air temperature preheater are sequentially arranged on the pipeline between the liquid outlet of the gas-liquid separator and the first working medium inlet of the low-temperature heat source evaporator, and the JT throttle valve is arranged close to the liquid outlet of the gas-liquid separator; The air-temperature waste heat device is provided with a first bypass pipeline; the two ends of the first bypass pipeline are respectively connected to the inlet pipeline and the outlet pipeline of the air-temperature waste heat device, and the first bypass pipeline is provided with an air-temperature preheater bypass valve.
7. The system according to claim 6, characterized in that The first working fluid is a halogenated hydrocarbon or a mixture thereof refrigerant or a hydrocarbon refrigerant; the second working fluid is water or a water-based heat transfer medium; The air temperature preheater is of fin-tube type and is installed vertically or horizontally.
8. The system according to claim 7, characterized in that The halogenated hydrocarbon and its mixture refrigerant include R134a and R410A, the hydrocarbon refrigerant includes R290 and R600a; the water-based heat transfer medium includes ethylene glycol aqueous solution.
9. The system according to claim 6, characterized in that The high-pressure natural gas pipeline is provided with a second bypass pipeline; The inlet of the second bypass pipeline is connected to the high-pressure natural gas pipeline, and the outlet of the second bypass pipeline is connected to the downstream user pipeline; The second bypass pipeline is provided with a system bypass cross-line valve.
10. The system according to any one of claims 2 to 5, characterized in that: The pressure regulating valve before the first-stage expander is arranged on the pipeline of the high-pressure natural gas pipeline entering the multi-stream composite heat exchanger; The pressure regulating valve before entering the secondary expansion machine is arranged on the pipeline exiting the multi-stream composite heat exchanger and entering the secondary expansion generator; The system back pressure regulating valve is arranged on the pipeline exiting the secondary expansion generator and entering the multi-stream composite heat exchanger.
11. A control method for a natural gas pressure energy multi-energy complementary pressure difference power generation system, used to implement the system as claimed in any one of claims 1 to 10, characterized in that: The control method comprises the following steps: Step S1: Start the low-temperature energy storage heat exchange pipeline, open the inlet and outlet pipeline valves of the first working fluid compressor, and connect the circulation pipeline of the first working fluid; Step S2: gradually opening the pressure regulating valve before the first-stage expander, the pressure regulating valve before the second-stage expander and the system back pressure regulating valve in the two-stage expansion ratio regulating device, connecting the two-stage adjustable expansion ratio pressure difference power generation pipeline, and regulating the flow through the first-stage expansion generator and the second-stage expansion generator; Step S3: The first-stage expansion generator and the second-stage expansion generator are gradually loaded to realize stable power generation. At the same time, the temperature changes of the inlet and outlet flows of each pipeline in the multi-stream composite heat exchanger are monitored to ensure that the temperature field of the cold and hot sources tends to be stable; When the temperature field of the cold and hot sources in the multi-stream composite heat exchanger fluctuates, the inlet and outlet pressure difference of the first-stage expansion generator and the second-stage expansion generator is adjusted through the two-stage expansion ratio adjustment device to re-establish the balance between the cold source and the heat source so that the final natural gas temperature out of the system meets the temperature requirements of downstream users.
12. The control method according to claim 11, characterized in that: The step S1 specifically includes: Step S101: Open the heat source multi-way control valve and the three-way control valve, start the circulation pump, and connect the low-temperature energy storage heat exchange pipeline; Step S102: Open the inlet and outlet pipeline valves of the first working fluid compressor and the JT throttle valve on the liquid outlet pipeline of the gas-liquid separator, gradually load the first working fluid compressor, adjust the suction and exhaust pressures of the first working fluid compressor to be stable, and synchronously adjust the opening of the JT throttle valve, open the air temperature preheater or the air temperature preheater bypass valve in time, and conduct the circulation pipeline of the first working fluid.
13. The control method according to claim 11, characterized in that: The step S2 specifically includes: Step S201: Open the system bypass cross-line valve on the bypass pipeline of the two-stage adjustable expansion ratio pressure difference power generation pipeline to adjust the pressure difference between the upstream and downstream pipelines to be stable; Step S202: gradually opening the pressure regulating valve before the first-stage expander, the pressure regulating valve before the second-stage expander and the system back pressure regulating valve in the two-stage expansion ratio regulating device, connecting the two-stage adjustable expansion ratio pressure difference power generation pipeline, and regulating the natural gas flow passing through the first-stage expansion generator and the second-stage expansion generator; Step S203: gradually reduce the opening of the system bypass cross-line valve until it is completely closed, so that the entire amount of natural gas passes through the primary expansion generator and the secondary expansion generator.
14. The control method according to any one of claims 11 to 13, characterized in that: The control method also includes a seasonal operating condition control method, specifically: When the system is in summer working condition, if the average ambient temperature is ≥20℃, the air temperature preheater is opened and the bypass valve of the air temperature preheater is closed; if the average ambient temperature is <20℃, the air temperature preheater is closed and the bypass valve of the air temperature preheater is opened; When the system is in winter working condition, if the average temperature is ≥0℃, the air temperature preheater is opened and the air temperature preheater bypass valve is closed; if the average ambient temperature is <0℃, the air temperature preheater is closed and the air temperature preheater bypass valve is opened; When the system is in spring and autumn working conditions, if the daytime temperature is higher than the first working fluid temperature at the first working fluid outlet of the multi-stream composite heat exchanger, the air temperature preheater is opened, and the air temperature preheater bypass valve is used to adjust the first working fluid flow through the air temperature preheater to adapt to the temperature change.
15. The control method according to claim 14, characterized in that: The control method also includes a day and night working condition control method, which is specifically: When the system is in sunny daytime, the flow ratio of the heat source multi-way control valve is adjusted to increase the flow of the second working medium passing through the solar thermal collector. At the same time, the pipeline from the three-way control valve to the multi-stream composite heat exchanger is opened, and the pipeline from the three-way control valve to the low-temperature heat source evaporator is closed, so that the second working medium is directly transported to the multi-stream composite heat exchanger and reaches the solar thermal collector and the waste heat / waste heat / geothermal heat exchanger through the second working medium outlet of the multi-stream composite heat exchanger; When the system is in nighttime operation or there is no sunshine during the day, the flow ratio of the heat source multi-way control valve is adjusted to increase the flow of the second working fluid through the residual heat / waste heat / geothermal heat exchanger. At the same time, the pipeline from the three-way control valve to the multi-stream composite heat exchanger is closed, and the pipeline from the three-way control valve to the low-temperature heat source evaporator is opened, so that the second working fluid circulates in the low-temperature energy storage heat exchange pipeline to exchange heat for the first working fluid.
16. The control method according to claim 15, characterized in that: The control method also includes an ultra-low temperature working condition control method, specifically: When the system is in a low-temperature environment and the various regulating capabilities on the heat source side can no longer meet the requirements of downstream users for the natural gas outlet temperature to meet the requirements of downstream users, by adjusting the openings of the pressure regulating valve before the first-stage expansion machine, the pressure regulating valve before the second-stage expansion machine and the system back-pressure regulating valve in the two-stage expansion ratio regulating device, while ensuring that the pressure of the downstream natural gas after decompression meets the requirements, the pressure values before and after the first-stage expansion generator and the second-stage expansion generator are respectively reduced, and the expansion ratio of each stage of the expansion generator is reduced to reduce the system's power generation output, reduce the output of associated cooling, rebalance the cold and heat sources, restore the natural gas outlet temperature to meet downstream requirements, and ensure continuous operation of the system.
17. The control method according to claim 16, characterized in that: The control method also includes a fault condition control method, which is specifically: when a system fault occurs, the system bypass cross-line valve is opened to maintain the system.
Citation Information
Cited By
Superhigh-temperature waste heat steam production system
CN119879174A
