Control method after power-on of air conditioner and storage medium

By obtaining the air conditioner operation log and environmental data, the mode and settings before power outage are automatically restored, which solves the problem of restarting the air conditioner after power outage, and improves the user experience and the effectiveness of the air conditioner.

CN118912653APending Publication Date: 2024-11-08SICHUAN CHANGHONG AIR CONDITIONER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410974426.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

When the air conditioner is restarted after power outage, the user needs to re-select the operating mode and set the wind speed, angle, etc., which is more troublesome to use.

Method used

By obtaining the operating log of the air conditioner, we determine whether the power off signal is received before power off, and automatically control the air conditioner to restore the mode and settings before power off based on the interval between the power off time and the current time and the indoor ambient temperature and humidity. If the interval is The original mode will be restored within the preset time threshold, otherwise it will enter standby mode.

Benefits of technology

It solves the problem that the user needs to reset the mode and wind speed after the air conditioner is powered off, improves the user experience, and ensures that the air conditioner can accurately determine whether to continue to use and adjust appropriately to maintain a comfortable environment after power off.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118912653A_ABST
    Figure CN118912653A_ABST
Patent Text Reader

Abstract

The invention provides a control method after power-on of an air conditioner, and the method comprises the steps: obtaining an operation log before power-off of the air conditioner after monitoring that the air conditioner is powered on; wherein the operation log comprises operation mode data before the air conditioner is powered off; judging whether a shutdown signal is received or not before the air conditioner is powered off according to the running log; if yes, a power-on prompt is sent to a user, and the air conditioner is controlled to execute a standby mode; if not, the time interval between the power-off time of the air conditioner and the current time is calculated; and the air conditioner is controlled according to the time interval between the power-off time of the air conditioner and the current time and a preset time threshold value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of air-conditioning control, and in particular to a control method and a storage medium after an air-conditioning is powered on. Background Art

[0002] The air conditioner may encounter a sudden power outage during operation, but sometimes the reason for the power outage may be temporary, such as accidentally using a high-power electrical appliance or accidentally triggering a short circuit. If the user quickly eliminates the power outage, the user will need to restart the air conditioner and re-select the operating mode and set the wind speed, angle, etc., which is more inconvenient to use. Summary of the invention

[0003] In view of the deficiencies in the prior art, the present invention provides a control method for an air conditioner after it is powered on, which solves the problem in the prior art that after the air conditioner is powered off, the user needs to restart the air conditioner and reselect the operating mode and set the wind speed, angle, etc., which is more troublesome to use.

[0004] According to an embodiment of the present invention, a control method for an air conditioner after it is powered on includes:

[0005] When the air conditioner is powered on, the operation log before the air conditioner is powered off is obtained; wherein the operation log includes the operation mode data before the air conditioner is powered off;

[0006] Determine whether the air conditioner receives a shutdown signal before power failure based on the operation log; if received, issue a power-on prompt to the user and control the air conditioner to execute standby mode;

[0007] If not received, calculate the time interval between the air conditioner power-off time and the current time;

[0008] The air conditioner is controlled according to the time interval between the power off time of the air conditioner and the current time and the preset time threshold.

[0009] As an embodiment of the present invention, controlling the air conditioner according to the time interval Δt between the power-off time of the air conditioner and the current time and a preset time threshold includes:

[0010] If Δt≤t 1 , control the air conditioner to operate according to the operating mode data before the power failure;

[0011] If t 1 <Δt≤t 2 , obtain the indoor ambient temperature and indoor ambient humidity, and control the air conditioner according to the indoor ambient temperature, indoor ambient humidity and the operation mode data before the power failure;

[0012] If Δt>t 2 , a power-on prompt is issued to the user, and the air conditioner is controlled to execute the standby mode; among which, t 1<t 2 , t 1 and t 2 They are respectively the first preset time threshold and the second preset time threshold.

[0013] As an embodiment of the present invention, the operation mode data includes: function mode, wind speed, set temperature and swing blade movement state; wherein the function mode includes: dehumidification mode, ventilation mode, cooling mode and heating mode;

[0014] According to the indoor ambient temperature T h , Indoor humidity S h The air conditioner is controlled based on the operating mode data before the power failure, including:

[0015] If the air conditioner is in heating mode before power failure, and T h ≥T s , S h ≥S 0 , sends a power-on prompt to the user and controls the air conditioner to execute the standby mode; among them, T s is the set temperature before the air conditioner is powered off, S 0 is the standard humidity;

[0016] If the air conditioner is in heating mode before power failure, and T h ≥T s , S h 0 , control the air conditioner to execute ventilation mode, adjust the air conditioner wind speed to be lower than the set wind speed before power failure, and adjust the swing blade movement state to be consistent with that before power failure;

[0017] If the air conditioner is in heating mode before power failure, and T h <T s , S h 0 , control the air conditioner to execute the heating mode, adjust the air conditioner wind speed to be lower than the set wind speed before the power outage, and adjust the swing blade movement state to be consistent with that before the power outage;

[0018] If the air conditioner is in heating mode before power failure, and T h <T s , S h ≥S 0 , control the air conditioner to execute the dehumidification mode, adjust the air conditioner wind speed to be lower than the set wind speed before the power failure, and adjust the swing blade movement state to the anti-direct blowing state.

[0019] As an embodiment of the present invention, if the function mode of the air conditioner before power failure is cooling mode, and T h <T s , S h ≥S 0 ​​, control the air conditioner to execute the dehumidification mode, adjust the air conditioner wind speed to be lower than the set wind speed before the power failure, and adjust the swing blade movement state to the anti-direct blowing state;

[0020] If the air conditioner is in cooling mode before power failure, and T h <T s , S h 0 , issue a power-on reminder to the user and control the air conditioner to execute standby mode;

[0021] If the air conditioner is in cooling mode before power failure, and T h ≥T s , S h ≥S 0 , control the air conditioner to execute cooling mode, adjust the air conditioner wind speed and swing blade movement state to be consistent with before the air conditioner is powered off;

[0022] If the air conditioner is in cooling mode before power failure, and T h ≥T s , S h 0 , control the air conditioner to execute cooling mode, the air conditioner wind speed is less than the set wind speed before power failure, and the swing blade movement state is consistent with that before power failure.

[0023] According to an embodiment of the present invention, a computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the processor executes the steps of the above method.

[0024] Compared with the prior art, the present invention has the following beneficial effects: by obtaining the shutdown signal in the operation log of the air conditioner, it is judged whether the air conditioner is powered off and then powered on in the working state, or powered off and then powered on in the standby mode, so as to more accurately understand whether the user needs the air conditioner to work; at the same time, the time interval between the last power-off time and the power-on time is used to judge whether the user needs to continue to use the air conditioner; when the time interval is within the preset time threshold, it is judged according to the current indoor environmental temperature and humidity obtained, and the air conditioner operation is controlled and corresponding adjustments are made, which solves the problem that the air conditioner needs to be restarted after power failure, requiring the user to turn on the air conditioner again and reselect the operating mode and set the wind speed, angle, etc., which is more troublesome to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 Schematic diagram of a flow chart of an embodiment of the present invention. DETAILED DESCRIPTION

[0026] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0027] like Figure 1 ​​As shown, the embodiment of the present invention proposes a control method after the air conditioner is powered on, including:

[0028] When the air conditioner is powered on, the operation log before the air conditioner is powered off is obtained; wherein the operation log includes the operation mode data before the air conditioner is powered off;

[0029] Determine whether the air conditioner receives a shutdown signal before power failure based on the operation log; if received, issue a power-on prompt to the user and control the air conditioner to execute standby mode;

[0030] If not received, calculate the time interval between the air conditioner power-off time and the current time;

[0031] The air conditioner is controlled according to the time interval between the power-off time of the air conditioner and the current time and the preset time threshold;

[0032] The air conditioner is controlled according to the time interval Δt between the power-off time of the air conditioner and the current time and the preset time threshold, including:

[0033] If Δt≤t 1 , control the air conditioner to operate according to the operating mode data before the power failure;

[0034] If t 1 <Δt≤t 2 , obtain the indoor ambient temperature and indoor ambient humidity, and control the air conditioner according to the indoor ambient temperature, indoor ambient humidity and the operation mode data before the power failure;

[0035] If Δt>t 2 , a power-on prompt is issued to the user, and the air conditioner is controlled to execute the standby mode; among which, t 1 <t 2 , t 1 and t 2 are respectively a first preset time threshold and a second preset time threshold;

[0036] The working principle of the above technical solution is as follows: in actual use, when the air conditioner is powered off and then powered on again, the operation log of the air conditioner before the power off is obtained; wherein the operation log contains data such as operation mode data, specific operation time, mode switching time, shutdown signal and power off time; then, it is determined whether the shutdown signal is received before the air conditioner is powered off. If it is received, a power-on prompt is issued to the user to control the air conditioner to execute the standby mode; if it is not received, the time interval between the power off time of the air conditioner and the current time is calculated; wherein, the time interval between the power off time of the air conditioner and the current time is equal to the difference between the current time and the power off time in the operation log; then, the time interval is determined, and the air conditioner is controlled according to the determination result. If Δt≤t 1 , control the air conditioner to run according to the operating mode data before power failure; if t 1 <Δt≤t2 , obtain the indoor ambient temperature and indoor ambient humidity, and control the air conditioner according to the indoor ambient temperature, indoor ambient humidity and the operation mode data before the power failure; if Δt <t 2 , a power-on prompt is issued to the user, and the air conditioner is controlled to execute standby mode.

[0037] The beneficial effects of the above technical solution are as follows: by obtaining the shutdown signal in the operation log of the air conditioner, it is determined whether the air conditioner is powered off and then powered on in the working state, or powered off and then powered on in the standby mode, so as to more accurately understand whether the user needs the air conditioner to work; at the same time, the time interval between the last power-off time and the power-on time is used to determine whether the user needs to continue using the air conditioner; when the time interval is within the preset time threshold, the current indoor ambient temperature and humidity are obtained to make a judgment, control the operation of the air conditioner and make corresponding adjustments, which solves the problem that the air conditioner needs to be restarted after power failure and requires the user to turn on the air conditioner again and reselect the operating mode and set the wind speed, angle, etc., which is more troublesome to use.

[0038] In one embodiment, the operation mode data includes: function mode, wind speed, set temperature and swing blade movement state; wherein the function mode includes: dehumidification mode, ventilation mode, cooling mode and heating mode;

[0039] According to the indoor ambient temperature T h , Indoor humidity S h The air conditioner is controlled based on the operating mode data before the power failure, including:

[0040] If the air conditioner is in heating mode before power failure, and T h ≥T s , S h ≥S 0 , sends a power-on prompt to the user and controls the air conditioner to execute the standby mode; among them, T s is the set temperature before the air conditioner is powered off, S 0 is the standard humidity;

[0041] If the air conditioner is in heating mode before power failure, and T h ≥T s , S h 0 , control the air conditioner to execute ventilation mode, adjust the air conditioner wind speed to be lower than the set wind speed before power failure, and adjust the swing blade movement state to be consistent with that before power failure;

[0042] If the air conditioner is in heating mode before power failure, and T h <T s , S h 0 , control the air conditioner to execute the heating mode, adjust the air conditioner wind speed to be lower than the set wind speed before the power outage, and adjust the swing blade movement state to be consistent with that before the power outage;​​

[0043] If the air conditioner is in heating mode before power failure, and T h <T s , S h ≥S 0 , control the air conditioner to execute the dehumidification mode, adjust the air conditioner wind speed to be lower than the set wind speed before the power failure, and adjust the swing blade movement state to the anti-direct blowing state;

[0044] If the air conditioner is in cooling mode before power failure, and T h <T s , S h ≥S 0 , control the air conditioner to execute the dehumidification mode, adjust the air conditioner wind speed to be lower than the set wind speed before the power failure, and adjust the swing blade movement state to the anti-direct blowing state;

[0045] If the air conditioner is in cooling mode before power failure, and T h <T s , S h 0 , issue a power-on reminder to the user and control the air conditioner to execute standby mode;

[0046] If the air conditioner is in cooling mode before power failure, and T h ≥T s , S h ≥S 0 , control the air conditioner to execute cooling mode, adjust the air conditioner wind speed and swing blade movement state to be consistent with before the air conditioner is powered off;

[0047] If the air conditioner is in cooling mode before power failure, and T h ≥T s , S h 0 , the air conditioner is controlled to execute cooling mode, the air conditioner wind speed is less than the set wind speed before power failure, and the swing blade movement state is consistent with that before power failure;

[0048] The working principle and beneficial effects of the above technical solution are as follows: based on the comparison and judgment between the current indoor ambient temperature and indoor ambient humidity obtained and the set temperature before the power outage of the user and the standard humidity value stored in the air conditioner, the user's demand for continuing to use the air conditioner after the air conditioner has been powered off for a period of time can be accurately grasped, that is, the functional mode, swing blade movement state, wind speed, etc. of the air conditioner can be adjusted; at the same time, the purpose of maintaining a comfortable temperature indoors is achieved, which not only improves the efficacy and commercial value of the product, but also improves the convenience and comfort of part-time users in using the air conditioner.

[0049] The present invention also provides a computer-readable storage medium storing a computer program, wherein when the computer program is executed by a processor, the processor executes the steps of any one of the above methods. ​​

[0050] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A control method for an air conditioner after it is powered on. It is characterized in that include: When the air conditioner is powered on, the operation log before the air conditioner is powered off is obtained; wherein the operation log includes the operation mode data before the air conditioner is powered off; Determine whether the air conditioner receives a shutdown signal before power failure based on the operation log; if received, issue a power-on prompt to the user and control the air conditioner to execute standby mode; If not received, calculate the time interval between the air conditioner power-off time and the current time; The air conditioner is controlled according to the time interval between the power off time of the air conditioner and the current time and the preset time threshold.

2. A control method for an air conditioner after power-on as claimed in claim 1, It is characterized in that The air conditioner is controlled according to the time interval Δt between the power-off time of the air conditioner and the current time and the preset time threshold, including: If Δt≤t 1 , control the air conditioner to operate according to the operating mode data before the power failure; If t 1 <Δt≤t 2 , obtain the indoor ambient temperature and indoor ambient humidity, and control the air conditioner according to the indoor ambient temperature, indoor ambient humidity and the operation mode data before the power failure; If Δt>t 2 , a power-on prompt is issued to the user, and the air conditioner is controlled to execute the standby mode; among which, t 1 <t 2 , t 1 and t 2 They are respectively the first preset time threshold and the second preset time threshold.

3. A control method for an air conditioner after power-on as claimed in claim 2, It is characterized in that The operation mode data includes: function mode, wind speed, set temperature and swing blade movement state; wherein the function mode includes: dehumidification mode, ventilation mode, cooling mode and heating mode; According to the indoor ambient temperature T h , Indoor humidity S h The air conditioner is controlled based on the operating mode data before the power failure, including: If the air conditioner is in heating mode before power failure, and T h ≥T s , S h ≥S 0 , sends a power-on prompt to the user and controls the air conditioner to execute the standby mode; among them, T s is the set temperature before the air conditioner is powered off, S 0 is the standard humidity; If the air conditioner is in heating mode before power failure, and T h ≥T s , S h 0 , control the air conditioner to execute ventilation mode, adjust the air conditioner wind speed to be lower than the set wind speed before power failure, and adjust the swing blade movement state to be consistent with that before power failure;​ If the air conditioner is in heating mode before power failure, and T h <T s , S h 0 , control the air conditioner to execute the heating mode, adjust the air conditioner wind speed to be lower than the set wind speed before the power outage, and adjust the swing blade movement state to be consistent with that before the power outage;​ If the air conditioner is in heating mode before power failure, and T h <T s , S h ≥S 0 , control the air conditioner to execute the dehumidification mode, adjust the air conditioner wind speed to be lower than the set wind speed before the power failure, and adjust the swing blade movement state to the anti-direct blowing state.

4. A control method after the air conditioner is powered on as claimed in claim 3, It is characterized in that According to the indoor ambient temperature T h , Indoor humidity S h The air conditioner is controlled based on the operating mode data before the power failure, and also includes: If the air conditioner is in cooling mode before power failure, and T h <T s , S h ≥S 0 , control the air conditioner to execute the dehumidification mode, adjust the air conditioner wind speed to be lower than the set wind speed before the power failure, and adjust the swing blade movement state to the anti-direct blowing state; If the air conditioner is in cooling mode before power failure, and T h <T s , S h 0 , issue a power-on reminder to the user and control the air conditioner to execute standby mode;​ If the air conditioner is in cooling mode before power failure, and T h ≥T s , S h ≥S 0 , control the air conditioner to execute cooling mode, adjust the air conditioner wind speed and swing blade movement state to be consistent with before the air conditioner is powered off; If the air conditioner is in cooling mode before power failure, and T h ≥T s , S h 0 , control the air conditioner to execute cooling mode, the air conditioner wind speed is less than the set wind speed before power failure, and the swing blade movement state is consistent with that before power failure.​ 5. A computer-readable storage medium storing a computer program, wherein when the computer program is executed by a processor, the processor is caused to perform the steps of the method according to any one of claims 1 to 4.