Digital scheduling method and system based on priority

Through the digital scheduling method and system based on priority, the problems of insufficient flexibility and inefficiency of traditional manual scheduling methods are solved, and a more fair and efficient scheduling is achieved, employee satisfaction and work efficiency are improved, and manpower is ensured. Rational use of resources.

CN118917634APending Publication Date: 2024-11-08南京凯奥思数据技术有限公司
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411405641.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The traditional manual scheduling methods are not flexible, incomplete, fair, and inefficient, resulting in low employee scheduling satisfaction, mismatch of workload and human resources, and insufficient staff.

Method used

Adopt priority-based digital shift scheduling methods and systems, and provide shift selection calendars by obtaining personnel, positions and duty location information, calculating the priority of the registered personnel according to the priority, automatically triggering shift scheduling, ensuring that shift requirements are matched, and supporting shift changes and apply for leave and optimize the scheduling results.

Benefits of technology

It improves the flexibility and fairness of scheduling, reduces human resources waste, improves work efficiency and employee happiness, ensures the willingness of staff to participate, and reduces the mismatch problem of human resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917634A_ABST
    Figure CN118917634A_ABST
Patent Text Reader

Abstract

The invention discloses a digital scheduling method and system based on priority, and the method comprises the following steps: 1), obtaining to-be-scheduled data information, including personnel information, post information and on-duty place information; 2) providing a class selection calendar, and receiving class selection and class selection canceling operations submitted by the personnel to be scheduled in a class selection period; (3) after the class selection period is finished, class selection registration is locked, and class arrangement is automatically triggered after locking; according to daily personnel demand constraints, scheduling is carried out, and a scheduling table is issued; 4) after the scheduling table is published, receiving shift change application intentions of all the personnel, matching the shift change application intentions, returning the unsuccessfully matched shift change application intentions, and publishing shift change information of successful shift change matching; according to the method, the flexibility and the fairness of the shift arrangement are considered through the shift selection design, the final shift arrangement result can be quickly obtained, and the efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to factory shift scheduling management technology, and in particular to a priority-based digital shift scheduling method and system. Background Art

[0002] In today's highly competitive business environment, companies are faced with the problem of how to organize human resources efficiently. The creation of employee schedules is often a complex and time-consuming task, especially when multiple variables and diverse needs are involved. Traditional manual scheduling methods are increasingly insufficient. This process usually needs to take into account employee work preferences, vacation arrangements, laws and regulations, business needs, and other human resource management factors. However, traditional scheduling methods have many limitations, which are specifically manifested in the following aspects: 1. Lack of flexibility: Manual scheduling processes are often not flexible enough to quickly respond to emergencies (such as employee vacations, leave, etc.), resulting in slow scheduling adjustments. According to research (Gupta, A., Sharma, S., & Jain, P. (2020). A flexible scheduling framework for improving employee satisfaction. Journal of Organizational Behavior), flexible scheduling can improve employee job satisfaction and retention rates.

[0003] 2. Incomplete consideration of factors: Manual scheduling cannot fully collect and analyze all relevant factors, and is usually a fixed shift format. Certain factors such as employees' job level (work ability), group they belong to, and work time preferences are often overlooked, resulting in unreasonable scheduling and employee dissatisfaction.

[0004] 3. Lack of fairness: A bad scheduling strategy may lead to inequality among employees. For example, some employees may be frequently assigned heavy shifts, while other employees do not have to bear the same workload. This not only affects the team atmosphere, but may also increase employee turnover.

[0005] 4. Inefficiency and waste of human resources: Manually made schedules often require a lot of manpower and time, affecting the overall operational efficiency of the organization. Studies have shown that inefficient scheduling can lead to project delays and increased costs, thus affecting the company's profitability.

[0006] 5. Insufficient staff: During peak business periods, traditional scheduling methods may not be able to accurately predict and allocate the required staff, resulting in employees being too tired or underworked. This mismatch not only reduces work efficiency, but also affects service quality.

[0007] In order to solve the problems of insufficient flexibility, incomplete considerations, insufficient fairness, low efficiency and labor consumption in manually made work schedules, and to address the problems of low staff satisfaction with work schedules, mismatch between workload and human resources, waste of manpower and shortage of manpower, a digital scheduling method is needed to truly achieve “more people for more tasks, fewer people for fewer tasks” and improve work efficiency and utilization of human resources. Summary of the invention

[0008] The technical problem to be solved by the present invention is to provide a priority-based digital scheduling method and system in view of the defects in the prior art.

[0009] The technical solution adopted by the present invention to solve the technical problem is: a digital scheduling method based on priority, comprising the following steps: 1) Obtain the data information to be scheduled, including personnel information, position information, duty location information and shift selection rules information; The personnel information includes the group information to which the staff member belongs and the position information that the group can hold; The combination of the position information and the duty location information determines the daily personnel demand; 2) Provide a shift selection calendar and receive shift selection and cancellation operations submitted by the personnel to be scheduled during the shift selection cycle; 3) After the class selection period ends, the class selection registration will be locked. After locking, you cannot add, modify or cancel the class selection. After locking, the class scheduling will be automatically triggered; According to the daily personnel demand constraints, the shifts are arranged as follows: When the number of applicants for a shift exceeds the shift demand, applicants will be removed until the number of applicants for the shift equals the shift demand, and the shift schedule will be published; According to the priority of the applicants, applicants with low priority will be eliminated; for applicants with the same priority, applicants whose application submission time is later will be eliminated; When the number of people who sign up for a shift is less than the shift demand, people with higher priority will be forced to wait for the shift according to the priority of the unregistered people. After receiving the consent or refusal information of the people with higher priority for forced waiting, the people who agree to wait for the shift will be changed to the normal scheduling status until the number of people who sign up for the shift is equal to the shift demand, and the shift schedule will be released. 4) After publishing the shift schedule, receive all personnel's shift application intentions, match them, return unmatched shift application intentions and publish shift information for successful matches; 5) After the shift scheduling result is determined, the leave application initiated by the receiving personnel will be cancelled after the leave application is approved; 6) Update the shift schedule based on the shift change information and leave information as the final scheduling result.

[0010] According to the above scheme, in step 3), the priority of the applicants is calculated by using the annual target of the comprehensive shifts and the completed shifts of the applicants, and the selection and waiting for shifts are based on the corresponding priority of the month; The priority of applicants is calculated as follows: 3.1) Set the initial priority value based on the annual target number of days for each person’s shift, and divide the initial value evenly into 12 months as the priority base for each month; 3.2) Every time a staff member works a production shift, the staff member's priority value for that month will be reduced by 1; 3.3) On the last day of each month, the current month's priority will be settled, and the settlement result will be added to the next month's priority as the correction value of the next month's priority; 3.4) On the last day of the business year, the unfinished annual targets or extra shifts will be incorporated into the next year’s annual targets according to the set conversion ratio, and the priorities of each month of the next year will be initialized based on the number of days in the next year’s annual targets.

[0011] When choosing classes and waiting for classes, it is based on the corresponding priority of the month. The larger the priority value, the higher the priority of the applicant.

[0012] The present invention also provides a priority-based digital scheduling system, comprising: Basic data module, used to save and modify personnel information, job information, and duty location information; The personnel information includes the group information to which the staff member belongs and the position information that the group can hold; The combination of the position information and the duty location information determines the daily personnel demand; The class selection module is used to provide a class selection calendar and receive users' class selection and cancellation operations according to the order in which they were submitted during the class selection cycle; The scheduling module is used to lock the class registration after the class selection period ends. After locking, you cannot add, modify or cancel the class selection. After locking, the scheduling is automatically triggered; According to the daily personnel demand constraints, the shifts are arranged as follows: When the number of applicants for a shift exceeds the shift demand, applicants will be removed until the number of applicants for the shift equals the shift demand, and the scheduling result will be released; According to the priority of the applicants, applicants with low priority will be eliminated; for applicants with the same priority, applicants whose application submission time is later will be eliminated; When the number of people who sign up for a shift is less than the shift demand, people with higher priority will be forced to wait for the shift according to the priority of the unregistered people. After receiving the consent or refusal information of the people with higher priority for forced waiting, the people who agree to wait for the shift will be changed to the normal scheduling status until the number of people who sign up for the shift is equal to the shift demand, and the scheduling result will be released. The priority of applicants is calculated by using the annual target of comprehensive shifts and the completed shifts of applicants. The corresponding priority of the month is used for selecting and waiting for shifts. The priority of applicants is calculated as follows: 1) Set the initial priority value based on the annual target number of days for each person's shift, and divide the initial value evenly into 12 months as the priority base for each month; 2) Every time a person works a production shift, his / her priority value for the month will be reduced by 1; 3) On the last day of each month, the current month's priority is settled, and the settlement result value is added to the next month's priority as the correction value of the next month's priority; 4) On the last day of the business year, the unfinished annual targets or extra shifts will be incorporated into the next year’s annual targets according to the set conversion ratio, and then the priorities of each month of the next year will be initialized based on the number of days in the next year’s annual targets.

[0013] When choosing classes and waiting for classes, it is based on the corresponding priority of the month. The larger the priority value, the higher the priority of the applicant.

[0014] The shift leave module is used to receive the shift application intentions of all personnel after the shift scheduling results are determined, match them, return the unmatched shift application intentions and publish the shift information of the successfully matched shifts; The leave module is used to receive leave applications initiated by personnel after the scheduling results are determined. After approval, the corresponding shift arrangement will be cancelled.

[0015] The beneficial effects produced by the present invention are: 1. Automatic scheduling by the system replaces manual scheduling. The flexibility and fairness of scheduling are taken into account through the shift selection design. The final scheduling result can be obtained quickly, which improves efficiency and reduces manpower consumption; 2. The method and system of the present invention improve the participation of staff in the scheduling results, while ensuring normal work production, taking into account the wishes of staff and improving the happiness of staff. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which: Figure 1 It is a flow chart of a method according to an embodiment of the present invention. DETAILED DESCRIPTION

[0017] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0018] like Figure 1 As shown, a priority-based digital scheduling method includes the following steps: 1) Obtain the data information to be scheduled, including personnel information, position information, and duty location information; The personnel information includes the group information to which the staff member belongs and the position information that the group can hold; Group information shows the positions that personnel can take up; The combination of the position information and the duty location information determines the daily personnel demand; 2) Provide a shift selection calendar based on the data information to be scheduled, and receive shift selection and cancellation operations submitted by the scheduled personnel during the shift selection cycle; 3) After the class selection period ends, the class selection registration will be locked. After locking, you cannot add, modify or cancel the class selection. After locking, the class scheduling will be automatically triggered; According to the daily personnel demand constraints, the shifts are arranged as follows: When the number of applicants for a shift exceeds the shift demand, applicants will be removed until the number of applicants for the shift equals the shift demand, and the shift schedule will be published; According to the priority of the applicants, applicants with low priority will be eliminated; for applicants with the same priority, applicants whose application submission time is later will be eliminated; When the number of people who sign up for a shift is less than the shift demand, people with higher priority will be forced to wait for the shift according to the priority of the unregistered people. After receiving the consent or refusal information of the people with higher priority for forced waiting, the people who agree to wait for the shift will be changed to the normal scheduling status until the number of people who sign up for the shift is equal to the shift demand, and the shift schedule will be released. In actual implementation, in order to prevent excessive refusals to wait for work, which will cause annual targets to pile up indefinitely, the number of opportunities to cancel waiting for work can be limited each year, for example, to 5 times.

[0019] The priority of applicants is calculated by using the annual target of comprehensive shifts and the completed shifts of applicants. The corresponding priority of the month is used for selecting and waiting for shifts. The priority of applicants is calculated as follows: 3.1) Set the initial priority value based on the annual target number of days for each person’s shift, and divide the initial value evenly into 12 months as the priority base for each month; The annual target number of days for employees in their first year of employment is set at 250 days; 3.2) Every time a staff member works a production shift, the staff member's priority value for that month will be reduced by 1; 3.3) On the last day of each month, the current month's priority will be settled, and the settlement result will be added to the next month's priority as the correction value of the next month's priority; 3.4) On the last day of the business year, the unfinished annual targets or extra shifts will be incorporated into the next year’s annual targets according to the set conversion ratio, and the priorities of each month of the next year will be initialized based on the number of days in the next year’s annual targets.

[0020] When choosing classes and waiting for classes, it is based on the corresponding priority of the month. The larger the priority value, the higher the priority of the applicant.

[0021] 4) After publishing the shift schedule, receive all personnel's shift application intentions, match them, return unmatched shift application intentions and publish shift information for successful matches; 5) After the shift scheduling result is determined, the leave application initiated by the receiving personnel will be cancelled after the leave application is approved; 6) Update the shift schedule based on the shift change information and leave information as the final scheduling result.

[0022] According to the above method, the present invention also provides a priority-based digital scheduling system, which adopts a B / S WEB architecture and includes: Basic data module, used to save and modify personnel information, job information, and duty location information; The personnel information includes the group information to which the staff member belongs and the position information that the group can hold; The combination of the position information and the duty location information determines the daily personnel demand; The shift selection module is used to provide a shift selection calendar based on the data information to be scheduled, and receive users' shift selection and cancellation operations according to the user's submission order during the shift selection cycle; The scheduling module is used to lock the class registration after the class selection period ends. After locking, you cannot add, modify or cancel the class selection. After locking, the scheduling is automatically triggered; According to the daily personnel demand constraints, the shifts are arranged as follows: When the number of applicants for a shift exceeds the shift demand, applicants will be removed until the number of applicants for the shift equals the shift demand, and the scheduling result will be released; According to the priority of the applicants, applicants with low priority will be eliminated; for applicants with the same priority, applicants whose application submission time is later will be eliminated; When the number of people who sign up for a shift is less than the shift demand, people with higher priority will be forced to wait for the shift according to the priority of the unregistered people. After receiving the consent or refusal information of the people with higher priority for forced waiting, the people who agree to wait for the shift will be changed to the normal scheduling status until the number of people who sign up for the shift is equal to the shift demand, and the scheduling result will be released. The priority of applicants is calculated by using the annual target of comprehensive shifts and the completed shifts of applicants. The corresponding priority of the month is used for selecting and waiting for shifts. The priority of applicants is calculated as follows: 1) Set the initial priority value based on the annual target number of days for each person's shift, and divide the initial value evenly into 12 months as the priority base for each month; 2) Every time a person works a production shift, his / her priority value for the month will be reduced by 1; 3) On the last day of each month, the current month's priority is settled, and the settlement result value is added to the next month's priority as the correction value of the next month's priority; 4) On the last day of the business year, the unfinished annual targets or extra shifts will be incorporated into the next year’s annual targets according to the set conversion ratio, and then the priorities of each month of the next year will be initialized based on the number of days in the next year’s annual targets.

[0023] When choosing classes and waiting for classes, it is based on the corresponding priority of the month. The larger the priority value, the higher the priority of the applicant.

[0024] According to the provided class selection calendar, users can select a date and then perform operations such as class selection, cancel class selection, apply for shift changes and apply for leave; they can also view the number of requests and registrations for each class on any day.

[0025] In this embodiment, class selection is opened 12 days in advance, and a new round of class selection is opened every 9 days. 9 days of classes are open at a time. The class selection range is 9 days between 12 and 20 days after the class selection date, plus 4 days that have not been locked in the previous round of class selection. The class selection registration result is locked 7 days in advance. After locking, it cannot be modified, and automatic scheduling is started.

[0026] The shift change module is used to receive the shift change application intentions of all personnel after the shift scheduling results are determined, match them, return the unmatched shift change application intentions and publish the shift change information of the successfully matched shift change; Shift change can only be carried out after the automatic shift scheduling is completed. The system operation of shift change is as follows: Step 1: Click the locked class selection calendar date on the class selection page, and click the "Apply for Shift Change" button in the pop-up operation button, or click the "Apply for Shift Change" button on the Shift Change Application page; Step 2: Select or modify the shift date in the pop-up window for initiating a shift change, and confirm the shift information you want to change; Step 3: Click the "OK" button to add a shift application record; Step 4: After other people see the shift change application in the shift change notice, they can click "Intended shift change" behind the record, and the intended shift change pop-up window will pop up; the system can also match multiple shift change applications in chronological order.

[0027] The leave module is used to receive leave applications initiated by personnel after the scheduling results are determined. After approval, the shift arrangement will be cancelled.

[0028] If the number of people taking leave exceeds the set value, the scheduling module can be triggered to force standby again and add more people.

[0029] It should be understood that those skilled in the art can make improvements or changes based on the above description, and all these improvements and changes should fall within the scope of protection of the appended claims of the present invention.

Claims

1. A digital scheduling method based on priority, characterized in that: The following steps are involved: 1) Obtain the data information to be scheduled, including personnel information, position information, and duty location information; The personnel information includes the group information to which the staff member belongs and the position information that the group can hold; The combination of the position information and the duty location information determines the daily personnel demand; 2) Provide a shift selection calendar and receive shift selection and cancellation operations submitted by the personnel to be scheduled during the shift selection cycle; 3) After the class selection period ends, the class selection registration will be locked, and the class scheduling will be automatically triggered after locking; Arrange shifts according to daily personnel demand constraints and publish the shift schedule; 4) After publishing the shift schedule, receive all personnel's shift application intentions, match them, return unmatched shift application intentions and publish shift information for successful matches; 5) After the shift scheduling result is determined, the leave application initiated by the receiving personnel will be cancelled after the leave application is approved; 6) Update the shift schedule based on the shift change information and leave information as the final scheduling result.

2. The priority-based digital scheduling method according to claim 1 is characterized in that: In the step 3), Arrange shifts according to daily personnel demand constraints and publish the shift schedule; The details are as follows: When the number of applicants for a shift exceeds the shift demand, applicants will be removed until the number of applicants for the shift equals the shift demand, and the shift schedule will be published; According to the priority of the applicants, applicants with low priority will be eliminated; for applicants with the same priority, applicants whose application submission time is later will be eliminated; When the number of people who sign up for a shift is less than the shift demand, people with higher priority will be forced to wait for the shift based on the priority of the unregistered people. After receiving the consent or refusal information from the people with higher priority for forced waiting, the people who agree to wait for the shift will be changed to the normal scheduling status until the number of people who sign up for the shift is equal to the shift demand, and the shift schedule will be released.

3. The priority-based digital scheduling method according to claim 2 is characterized in that: In the step 3), the priority of the applicants is calculated by using the annual target of the comprehensive shifts and the completed shifts of the applicants.

4. The priority-based digital scheduling method according to claim 3 is characterized in that: The priority of applicants is calculated by using the annual target of comprehensive shifts and the completed shifts of applicants. The corresponding priority of the month is used for selecting and waiting for shifts. The priority of applicants is calculated as follows: 3.1) Set the initial priority value based on the annual target number of days for each person’s shift, and divide the initial value evenly into 12 months as the priority base for each month; 3.2) Every time a staff member works a production shift, the staff member's priority value for that month will be reduced by 1; 3.3) On the last day of each month, the current month's priority will be settled, and the settlement result will be added to the next month's priority as the correction value of the next month's priority; 3.4) On the last day of the business year, the unfinished annual targets or extra shifts will be incorporated into the next year’s annual targets according to the set conversion ratio, and the priorities of each month of the next year will be initialized based on the number of days in the next year’s annual targets.

5. A priority-based digital scheduling system, characterized in that: include: Basic data module, used to save and modify personnel information, job information, and duty location information; The personnel information includes the group information to which the staff member belongs and the position information that the group can hold; The combination of the position information and the duty location information determines the daily personnel demand; The class selection module is used to provide a class selection calendar and receive users' class selection and cancellation operations according to the order in which they were submitted during the class selection cycle; The scheduling module is used to lock the class registration after the class selection period ends. After locking, you cannot add, modify or cancel the class selection. After locking, the scheduling is automatically triggered; According to the daily personnel demand constraints, the shifts are arranged as follows: When the number of applicants for a shift exceeds the shift demand, applicants will be removed until the number of applicants for the shift equals the shift demand, and the scheduling result will be released; According to the priority of the applicants, applicants with low priority will be eliminated; for applicants with the same priority, applicants whose application submission time is later will be eliminated; When the number of people who sign up for a shift is less than the shift demand, people with higher priority will be forced to wait for the shift according to the priority of the unregistered people. After receiving the consent or refusal information of the people with higher priority for forced waiting, the people who agree to wait for the shift will be changed to the normal scheduling status until the number of people who sign up for the shift is equal to the shift demand, and the scheduling result will be released. The shift leave module is used to receive the shift application intentions of all personnel after the shift scheduling results are determined, match them, return the unmatched shift application intentions and publish the shift information of the successfully matched shifts; The leave module is used to receive leave applications initiated by personnel after the scheduling results are determined. After approval, the corresponding shift arrangement will be cancelled.

6. The priority-based digital scheduling system according to claim 5, characterized in that: The priority of the enrolled personnel is calculated by using the annual target for comprehensive shifts and the completed shifts of the enrolled personnel.

7. The priority-based digital scheduling system according to claim 5, characterized in that: The priority of applicants is calculated by using the annual target of comprehensive shifts and the completed shifts of applicants. The corresponding priority of the month is used for selecting and waiting for shifts. The priority of applicants is calculated as follows: 1) Set the initial priority value based on the annual target number of days for each person's shift, and divide the initial value evenly into 12 months as the priority base for each month; 2) Every time a person works a production shift, his / her priority value for the month will be reduced by 1; 3) On the last day of each month, the current month's priority is settled, and the settlement result value is added to the next month's priority as the correction value of the next month's priority; 4) On the last day of the business year, the unfinished annual targets or extra shifts will be incorporated into the next year’s annual targets according to the set conversion ratio, and then the priorities of each month of the next year will be initialized based on the number of days in the next year’s annual targets.

8. An electronic device, characterized in that: include: one or more processors; as well as a storage device for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors are caused to execute the method according to any one of claims 1 to 4.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Intelligent scheduling system

    CN103325024A

  • Automatic staff scheduling system

    CN106296022A

  • Electric power dispatching duty scheduling system

    CN109872073A

  • Scheduling table processing method and system, electronic equipment and storage medium

    CN115456566A

  • Employee scheduling management system and method for enterprise

    CN118839805A