Direct current side capacity expansion energy storage system and control method
By controlling the power conversion system in the DC-side expansion energy storage system before the bidirectional DC power system and calculating the corrected power adjustment step value, the problem of battery cells mutual charging is solved, ensuring that the system does not overload during startup and shutdown. Extend battery life.
Patent Information
- Application Number
- CN202411041351.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-08
AI Technical Summary
When the DC-side expansion energy storage system is started and shut down, battery mutual charging may occur between the original energy storage battery unit and the expansion battery unit, resulting in increased battery attenuation.
By controlling the power conversion system to execute before the bidirectional DC power supply system, and after the system enters standby state, the power adjustment step value is calculated and corrected to ensure that the power command shear rate does not exceed the actual charging and discharging capacity of the original energy storage system. Avoid mutual charging risks in timing and logic.
It effectively avoids the mutual charging between the original energy storage battery unit and the expansion battery unit, ensures that the system does not experience instantaneous overload conditions at the moment of starting and stopping, and extends the service life of the battery.
Smart Images

Figure CN118920651A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy storage control, and in particular to a DC side capacity expansion energy storage system and a control method. Background Art
[0002] As the service time increases, the electrochemical energy storage system will inevitably have the problem of attenuation of available power. In order to solve the above problem, the industry has proposed a solution for DC side expansion, that is, without changing the interface parameters of the AC side grid connection point (PCC), the new battery unit is connected to the DC system of the original energy storage system through a bidirectional DC power supply (DC-DC), so as to expand the energy storage system and compensate for the adverse effects of battery attenuation.
[0003] However, since the above system may have asynchronous power command execution during startup and shutdown, mutual charging may occur between the original energy storage battery unit and the expanded battery unit, which may lead to uncontrolled battery charging and discharging current, exacerbating the problem of battery degradation. Summary of the invention
[0004] In view of the shortcomings of the prior art, the present invention provides a DC side capacity expansion energy storage system and a control method, which solves the problem of battery mutual charging between the original energy storage battery unit and the expansion battery unit in the existing DC side capacity expansion energy storage system.
[0005] In order to solve the above technical problems, the present invention is solved by the following technical solutions:
[0006] A control method for a DC side expansion energy storage system comprises the following steps:
[0007] When the power conversion system and the bidirectional DC power supply system enter the standby state, an external given power command and current system parameters are obtained;
[0008] Calculating a value range of a first power adjustment step value based on the current system parameters, and correcting the power instructions of the original energy storage battery unit and the power expansion battery unit based on the value range and an externally given power instruction to obtain a first power adjustment step value;
[0009] Calculate a second power adjustment step value of the bidirectional DC power supply system and a third power adjustment step value of the power conversion system based on the first power adjustment step value;
[0010] The power conversion system is executed alternately based on the third power adjustment step value, and the bidirectional DC power supply system is executed alternately based on the second power adjustment step value, wherein the power conversion system is executed before the bidirectional DC power supply system.
[0011] Optionally, calculating a value range of the first power adjustment step value includes the following steps:
[0012] Obtaining the actual rated power of the original energy storage battery unit and the current execution power of the system in the current system parameters, and calculating the upper limit value of the first power adjustment step value based on the actual power of the original energy storage battery unit and the current execution power of the system;
[0013] Obtain the nominal rated power of the system after expansion and the maximum time allowed for completing a single power adjustment step value in the current system parameters, and calculate the lower limit of the first power adjustment step value based on the nominal rated power of the system after expansion and the maximum time allowed for completing a single first power adjustment step value;
[0014] A value range of the first power adjustment step value is obtained based on the upper limit value and the lower limit value.
[0015] Optionally, the upper limit value is P0-P feed , the lower limit is Wherein, P0 represents the actual rated power of the original energy storage battery unit; P feed Indicates the current execution power of the system; P N represents the nominal rated power of the system after expansion; t1 represents the maximum time allowed to complete a single first power adjustment step value; the value range of the first power adjustment step value is
[0016] Optionally, when the power conversion system and the bidirectional DC power supply system stop alternately, the power conversion system stops after the bidirectional DC power supply system.
[0017] Optionally, the calculation formula for the second power adjustment step value is: second power adjustment step value=first power adjustment step value / number of bidirectional DC power supplies; the third power adjustment step value is the first power adjustment step value.
[0018] Optionally, determining that the power conversion system enters a standby state comprises the following steps:
[0019] Start the original energy storage battery management unit to enter the power-on state, and set the battery side voltage threshold to one;
[0020] Monitor the battery side bus system voltage and determine whether the battery side bus system voltage reaches threshold 1, if reaching the threshold 1, the power conversion system performs a pre-charging action;
[0021] Threshold 2 is set, and the pre-charge voltage of the power conversion system is monitored. When the pre-charge voltage reaches threshold 2, the PCS enters a standby state.
[0022] Optionally, determining that the bidirectional DC power supply system enters a standby state includes the following steps:
[0023] When the power conversion system enters the standby state, the expansion battery management unit is started to enter the power-on state, and the bidirectional DC power supply system is started at the same time for pre-charging;
[0024] Threshold three is set, and the supporting capacitor voltage of the bidirectional DC power supply system is monitored. When the voltage difference between the supporting capacitor voltage and the battery side bus system voltage is less than threshold three, the bidirectional DC power supply system enters the standby state, otherwise it remains in the on state.
[0025] Optionally, it also includes performing fault emergency stop control, which is applicable to a scenario where a fault signal feedback is received from any end of the power conversion system, the bidirectional DC power supply system or the BMS system.
[0026] Optionally, the fault emergency stop control comprises the following steps:
[0027] Based on the received fault signal feedback, the power conversion system, the bidirectional DC power supply system and the BMS system are reset to zero power command and enter a fault state.
[0028] A DC side capacity expansion energy storage system, the system executing the control method of the DC side capacity expansion energy storage system as described in any one of the above.
[0029] Compared with the prior art, the technical solution provided by the present invention has the following beneficial effects:
[0030] By controlling the power conversion system to execute before the bidirectional DC power supply system and to stop after the bidirectional DC power supply system, the possibility of mutual charging between the original energy storage battery unit and the expansion battery unit is avoided in terms of timing and logic; on the other hand, by limiting the value range and calculating the first power adjustment step value, it is ensured that at the moment of system start and stop, the power command shear rate will not exceed the actual charging and discharging capacity of the original energy storage system, ensuring that the original energy storage battery unit will not experience instantaneous overload conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0032] Figure 1 This is a flow chart of a startup control method for a DC side expansion energy storage system proposed in the first embodiment;
[0033] Figure 2 This is a normal shutdown control flow chart of a DC side expansion energy storage system proposed in the first embodiment;
[0034] Figure 3 This is a fault emergency stop control flow chart of a DC side expansion energy storage system proposed in the first embodiment;
[0035] Figure 4 This is a communication network topology diagram of a DC side expansion energy storage system proposed in the second embodiment. DETAILED DESCRIPTION
[0036] The present invention is further described in detail below in conjunction with embodiments. The following embodiments are for explanation of the present invention but the present invention is not limited to the following embodiments.
[0037] Embodiment 1
[0038] like Figure 1 As shown, a control method based on a DC side expansion energy storage system is mainly used for starting control of the DC side expansion energy storage system. First, the startup of the power conversion system is controlled, including the following steps: starting the original energy storage battery management unit to enter the power-on state, and setting a threshold value of the battery side voltage; monitoring the battery side bus system voltage and determining whether the battery side bus system voltage reaches the threshold value, if it reaches the threshold value, the power conversion system performs a pre-charging action; setting the threshold value, and monitoring the pre-charging voltage of the power conversion system. When the pre-charging voltage reaches the threshold value, the PCS enters the standby state.
[0039] Specifically, after the system receives the startup instruction from the host computer, the central controller first sends a startup instruction to the original energy storage battery management unit. After the original energy storage battery management unit receives the startup instruction, the central controller controls the closing of the battery side high-voltage box relay and puts the original energy storage battery management unit into the power-on state.
[0040] When the original energy storage battery management unit enters the startup state, it is also necessary to monitor the voltage of the battery side bus system in real time. At the same time, according to the threshold value 1 stored in the DC side expansion energy storage system, it is determined whether the voltage of the battery side bus system has reached the threshold value 1. After the voltage of the battery side bus system has reached the threshold value 1, the central controller can send a DC side pre-charging instruction to the power conversion system PCS. After receiving the pre-charging instruction, the power conversion system PCS executes the pre-charging action and enters the startup state.
[0041] After the power conversion system enters the startup state, it is necessary to monitor the voltage across the supporting capacitor in real time, that is, to detect the pre-charge voltage, and then compare the monitored pre-charge voltage with the threshold value 2 stored in the DC side expansion energy storage system to determine whether the pre-charge is completed. Specifically, when the DC bus voltage of the power conversion system reaches the threshold value 2, the power conversion system closes the DC side relay. After the DC side relay is closed, the power conversion system enters the standby state, otherwise it remains in the startup state.
[0042] After completing the startup control of the power conversion system, the bidirectional DC power supply system can be started and controlled, which specifically includes the following steps: when the power conversion system enters the standby state, the expansion battery management unit is started to enter the power-on state, and the bidirectional DC power supply system is started at the same time for pre-charging; threshold three is set, and the supporting capacitor voltage of the bidirectional DC power supply system is monitored, and when the voltage difference between the supporting capacitor voltage and the battery side bus system voltage is less than threshold three, the bidirectional DC power supply system enters the standby state, otherwise it remains in the power-on state.
[0043] Specifically, after the DC side relay of the power conversion system is closed, the central controller sends a startup instruction to the expansion battery management unit. After receiving the startup instruction, the expansion battery management unit closes the high-voltage box DC relay and enters the power-on state. After the high-voltage box DC relay is completely attracted, the central controller sends a startup instruction to the corresponding bidirectional DC power supply. After receiving the startup instruction, the bidirectional DC power supply performs a pre-charging action and enters the power-on state.
[0044] At the same time, the supporting capacitor voltage of the bidirectional DC power supply system is collected in real time. When the voltage difference between the battery side voltage of the bidirectional DC power supply and the battery side bus system is less than threshold value three, the DC switch is closed. At this time, the bidirectional DC power supply system enters the standby state, otherwise it returns to the power-on state. Threshold value three is a parameter stored in the DC side expansion energy storage system, and threshold value one, threshold value two, and threshold value three can be flexibly adjusted and set by the staff according to actual system requirements, and are not specifically limited in this embodiment.
[0045] Furthermore, when the power conversion system and the bidirectional DC power supply system enter the standby state, an externally given power rate instruction and current system parameters are obtained, wherein the externally given power instruction refers to an instruction received from an external EMS power dispatch, that is, a power instruction issued by the EMS or a superior dispatcher, and the current system parameters include the actual rated power of the original energy storage battery unit, the current execution power of the system, the nominal rated power of the system after expansion, and the maximum time allowed to complete a single power adjustment step value; then, a value range of the first power adjustment step value is calculated based on the current system parameters, and the power instructions of the original energy storage battery unit and the power expansion battery unit are corrected based on the value range and the externally given power instruction to obtain the first power adjustment step value, thereby preventing the first power adjustment step value after expansion from being too high to cause system overload, or the first power adjustment step value from being too low to cause slow active power response.
[0046] Specifically, calculating the value range of the first power adjustment step value includes the following steps: obtaining the actual rated power of the original energy storage battery unit and the current execution power of the system in the current system parameters, and calculating the upper limit value of the first power adjustment step value based on the actual power of the original energy storage battery unit and the current execution power of the system; obtaining the nominal rated power of the system after expansion and the maximum time allowed for completing a single power adjustment step value in the current system parameters, and calculating the lower limit value of the first power adjustment step value based on the nominal rated power of the system after expansion and the maximum time allowed for completing a single first power adjustment step value; obtaining the value range of the first power adjustment step value based on the upper limit value and the lower limit value.
[0047] From the above steps, the upper limit can be calculated as P0-P feed , the lower limit is Wherein, P0 represents the actual rated power of the original energy storage battery unit; P feed Indicates the current execution power of the system; P N Indicates the nominal rated power of the system after expansion; t1 indicates the maximum time allowed to complete a single first power adjustment step value; the value range of the first power adjustment step value is
[0048] More specifically, first obtain the actual rated power P0 of the original energy storage battery unit and the current execution power P feed , Nominal rated power of the system after expansion P N , the maximum time t1 allowed to complete a single power adjustment step value, the charge-discharge conversion time t at the rated power of the energy storage system after expansion, the number of bidirectional DC power supplies, that is, the number of expanded battery unit data n, and at the same time, the first power adjustment step value is expressed as P step express.
[0049] At this time, considering that the original energy storage battery management unit and each expansion battery management unit cannot be overloaded, the maximum value P given by a single battery power max The following conditions should be met: step +P feed ≤P0, and then we can get P step ≤P0-P feed , that is: obtain the upper limit value of the first power adjustment step value.
[0050] On the other hand, since the national standard requires that the charging and discharging conversion time of the energy storage system shall not exceed 100ms, according to the completion of the single power adjustment step value (the first power adjustment step value) P step The maximum allowed time t1 must satisfy: Substituting t=100, the lower limit of the first power adjustment step value can be obtained as follows:
[0051] After obtaining the value range, the power instructions of the original energy storage battery unit and the power expansion battery unit are corrected, which is specifically achieved in the following manner: judging whether the externally given power instruction is within the value range, if the externally given power instruction exceeds the upper limit value of the value range, then when correcting the power instructions of the original energy storage battery unit and the power expansion battery unit, the upper limit value of the value range is used as the first power adjustment step value; if the external power instruction is less than the lower limit value of the value range, then when correcting the power instructions of the original energy storage battery unit and the power expansion battery unit, the lower limit value of the value range is used as the first power adjustment step value; if the external power instruction is within the value range, there is no need to correct the power instructions of the original energy storage battery unit and the power expansion battery unit, and the externally given power instruction is used as the first power adjustment step value.
[0052] Further, based on the first power adjustment step value, the second power adjustment step value of the bidirectional DC power supply system and the third power adjustment step value of the power conversion system are calculated. Specifically, since the DC side expansion energy storage system is composed of one power conversion system and a plurality of bidirectional DC power supplies and battery units, the calculation formula of the second power adjustment step value is: second power adjustment step value = first power adjustment step value / number of bidirectional DC power supplies; the third power adjustment step value is the first power adjustment step value, that is, the second power adjustment step value P of each bidirectional DC power supply step-DC =P step / n; the third power adjustment step value of the power conversion system is equal to the first power adjustment step value.
[0053] Then, the power conversion system is executed based on the third power adjustment step value, and the bidirectional DC power supply system is executed based on the second power adjustment step value alternately, wherein the power conversion system is executed before the bidirectional DC power supply system, and when the power conversion system and the bidirectional DC power supply system stop alternatingly, the power conversion system stops executing after the bidirectional DC power supply system, that is, the power conversion system is executed in the current communication cycle, and the bidirectional DC power supply system is executed in the next communication cycle, thereby avoiding the instantaneous overload of the original energy storage battery unit, and avoiding the risk of the expanded battery unit charging the original energy storage battery unit, so that there is no battery mutual charging between the original energy storage battery unit and the expanded battery unit.
[0054] More specifically, if Figure 2 As shown, when performing a normal shutdown, the control steps are as follows: when the central controller receives the "normal shutdown" command, it forwards the shutdown command to the power conversion system, the bidirectional DC system and the battery management unit at the first time. First, the central controller calculates the value range of the first power adjustment step value according to the above method, and corrects the power command according to the value range to obtain the "power adjustment step value P step ", "Power adjustment step value P of bidirectional DC power supply system step-DC ", "Power adjustment step value P of power conversion system step-AC ", and then alternately execute "DC-DC power adjustment step value P step-DC "PCS power adjustment step value P step-AC ” until the power command is zero, and then enters the shutdown state.
[0055] Furthermore, if Figure 3 As shown, the control method based on the DC side expansion energy storage system can also perform fault emergency stop control, and the fault emergency stop control is suitable for the scenario of receiving a fault signal feedback from any end of the power conversion system, the bidirectional DC power supply system or the BMS system.
[0056] Among them, the fault emergency stop control includes the following steps: based on the received fault signal feedback, the power conversion system, the bidirectional DC power supply system and the BMS system are reset to zero power instructions and enter a fault state.
[0057] Specifically, when the central controller receives any fault signal or communication data including but not limited to the power conversion system, the bidirectional DC power supply system, and the feedback of the battery management unit, it first sets the power instruction to zero, then sends a shutdown instruction to the battery management unit and enters a fault state; after the battery management unit receives the fault shutdown instruction, it sets the charging and discharging currents to zero, and then sends a fault shutdown request or instruction to the bidirectional DC power supply system and the power conversion system, and enters a fault state; after the bidirectional DC power supply system receives the fault emergency stop instruction from the battery management system, it sets the power instruction to zero and enters a fault state; to prevent mutual charging of batteries, the power conversion system receives the fault shutdown instruction from the battery management system and the fault state feedback of the bidirectional DC system before executing an emergency shutdown action and entering a fault state.
[0058] Embodiment 2
[0059] like Figure 4 As shown, a DC side expansion energy storage system is provided, and the system executes the control method based on the DC side expansion energy storage system as described in Example 1.
[0060] Among them, the DC side expansion energy storage system includes a central controller and its supporting host computer, a communication gateway and switch, a central controller, a power conversion system, a bidirectional DC power supply system corresponding to the expansion system, an original energy storage battery management unit, and an expansion battery management unit.
[0061] Among them, the central controller as the master station, PCS (power conversion system), BMS (battery management system), and DC-DC converter are connected in series through the CAN bus to form a control network, which is responsible for the execution of the following functions and strategies: system startup, shutdown control, system fault protection, and alternating execution of power instructions. The central controller and its supporting host computer, PCS, BMS, and DC / DC are networked through industrial Ethernet and switches to form a data network, which is responsible for remote monitoring and centralized data display.
[0062] The above is only a preferred embodiment of the present invention, and is not any formal or substantial limitation of the present invention. It should be pointed out that ordinary technicians in this technical field can make several improvements and supplements without departing from the method of the present invention, and these improvements and supplements should also be regarded as the protection scope of the present invention. Any technician familiar with this profession, without departing from the spirit and scope of the present invention, can make some changes, modifications and evolutions of the technical content disclosed above, which are equivalent embodiments of the present invention; at the same time, any changes, modifications and evolutions of any equivalent changes made to the above embodiments based on the essential technology of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A control method for a DC side expansion energy storage system, characterized in that: The following steps are involved: When the power conversion system and the bidirectional DC power supply system enter the standby state, an external given power command and current system parameters are obtained; Calculating a value range of a first power adjustment step value based on the current system parameters, and correcting the power instructions of the original energy storage battery unit and the power expansion battery unit based on the value range and an externally given power instruction to obtain a first power adjustment step value; Calculate a second power adjustment step value of the bidirectional DC power supply system and a third power adjustment step value of the power conversion system based on the first power adjustment step value; The power conversion system is executed alternately based on the third power adjustment step value, and the bidirectional DC power supply system is executed alternately based on the second power adjustment step value, wherein the power conversion system is executed before the bidirectional DC power supply system.
2. A control method for a DC side expansion energy storage system according to claim 1, characterized in that: Calculating a value range of a first power adjustment step value includes the following steps: Obtaining the actual rated power of the original energy storage battery unit and the current execution power of the system in the current system parameters, and calculating the upper limit value of the first power adjustment step value based on the actual power of the original energy storage battery unit and the current execution power of the system; Obtain the nominal rated power of the system after expansion and the maximum time allowed for completing a single power adjustment step value in the current system parameters, and calculate the lower limit of the first power adjustment step value based on the nominal rated power of the system after expansion and the maximum time allowed for completing a single first power adjustment step value; A value range of the first power adjustment step value is obtained based on the upper limit value and the lower limit value.
3. A control method for a DC side expansion energy storage system according to claim 2, characterized in that: The upper limit is P0-P feed , the lower limit is Wherein, P0 represents the actual rated power of the original energy storage battery unit; P feed Indicates the current execution power of the system; P N represents the nominal rated power of the system after expansion; t1 represents the maximum time allowed to complete a single first power adjustment step value; the value range of the first power adjustment step value is 4. A control method for a DC side expansion energy storage system according to any one of claims 1 to 3, characterized in that: When the power conversion system and the bidirectional DC power supply system stop alternately, the power conversion system stops after the bidirectional DC power supply system.
5. A control method for a DC side expansion energy storage system according to claim 4, characterized in that: The calculation formula of the second power adjustment step value is: second power adjustment step value=first power adjustment step value / number of bidirectional DC power supplies; the third power adjustment step value is the first power adjustment step value.
6. A control method for a DC side expansion energy storage system according to claim 1, characterized in that: Determining whether the power conversion system enters the standby state includes the following steps: Start the original energy storage battery management unit to enter the power-on state, and set the battery side voltage threshold to one; Monitor the battery side bus system voltage and determine whether the battery side bus system voltage reaches threshold 1, if reaching the threshold 1, the power conversion system performs a pre-charging action; Threshold 2 is set, and the pre-charge voltage of the power conversion system is monitored. When the pre-charge voltage reaches threshold 2, the PCS enters a standby state.
7. A control method for a DC side expansion energy storage system according to claim 1, characterized in that: Determining whether the bidirectional DC power supply system enters the standby state includes the following steps: When the power conversion system enters the standby state, the expansion battery management unit is started to enter the power-on state, and the bidirectional DC power supply system is started at the same time for pre-charging; Threshold three is set, and the supporting capacitor voltage of the bidirectional DC power supply system is monitored. When the voltage difference between the supporting capacitor voltage and the battery side bus system voltage is less than threshold three, the bidirectional DC power supply system enters the standby state, otherwise it remains in the on state.
8. A control method for a DC side expansion energy storage system according to claim 1, characterized in that: It also includes fault emergency stop control, which is applicable to a scenario where a fault signal feedback is received from any end of a power conversion system, a bidirectional DC power supply system or a BMS system.
9. A control method for a DC side expansion energy storage system according to claim 8, characterized in that: The fault emergency stop control comprises the following steps: Based on the received fault signal feedback, the power conversion system, the bidirectional DC power supply system and the BMS system are reset to zero power command and enter a fault state.
10. A DC side expansion energy storage system, characterized in that: The system executes the control method of the DC side expansion energy storage system as described in any one of claims 1-9.