Prediction method for stratum additional stress caused by space curve shield construction load
By establishing a spatial rectangular coordinate system and calculating the excavation surface thrust, shield shell axial friction and grouting pressure, and correcting it with Mindlin solution, the problem of additional stress prediction of formations caused by the construction load of the space curve shield is solved, and the tunnel is realized The accurate prediction of construction provides a reference for actual construction.
Patent Information
- Application Number
- CN202411270255.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-11-12
AI Technical Summary
The prior art is difficult to effectively predict the additional stress of the formation caused by the construction load of the spatial curve shield, which affects the accuracy and safety of tunnel construction.
By establishing a spatial rectangular coordinate system, the formation additional stress caused by excavation surface thrust, shield shell axial friction and grouting pressure are calculated separately, and the formation additional stress caused by the excavation surface thrust, shield shell axial friction and grouting pressure are corrected in combination with Mindlin solution to achieve the prediction of the formation additional stress of the space curve shield construction load. .
Accurate prediction of the additional stress of the formation caused by the construction load of the spatial curve shield structure is achieved, providing reliable reference and guidance for actual tunnel construction.
Smart Images

Figure CN118934064A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel engineering, and in particular relates to a method for predicting additional stratum stress caused by a space curved shield construction load. Background Art
[0002] Shield construction has the advantages of little interference with urban ground traffic, short construction period, and adaptability to complex and changeable underground environments. It is currently the preferred construction method for urban tunnels. With the continuous development of underground space and the further improvement of tunnel selection requirements, more and more space arc shield tunnels are designed and constructed. The construction of space line shield tunnels is more difficult and the impact on the ground is more complicated. In order to ensure that the shield machine excavates according to the predetermined space axis, the attitude control requirements of the shield machine are also relatively high. These are the main problems in space line shield construction.
[0003] The main factors that affect soil settlement during shield construction are soil loss and construction load. Soil loss mainly comes from the integration gap at the shield tail, and there is also an over-excavation gap in the small radius turning section. The construction loads with greater influence include: additional front thrust, axial friction of the shield shell on the soil, and grouting pressure at the shield tail.
[0004] In view of the construction load, a prediction method for the additional stratum stress caused by the construction load of a spatial curved shield is needed. Summary of the invention
[0005] The purpose of the present invention is to provide a method for predicting additional stratum stress caused by construction load of a spatial curved shield based on the deficiencies of the above-mentioned prior art, to calculate the additional stratum stress caused by excavation face thrust, shield shell axial friction and grouting pressure respectively, and then obtain the additional stratum stress caused by construction load, thereby realizing the prediction of additional stratum stress caused by construction load of a spatial curved shield and providing a reference for actual tunnel construction.
[0006] The purpose of the present invention is achieved by the following technical solutions:
[0007] A method for predicting additional stratum stress caused by a space curved shield construction load, the method comprising the following steps:
[0008] S1: Establish a spatial rectangular coordinate system and construct a spatial curved shield tunnel calculation model based on the tunneling posture of the shield machine;
[0009] The coordinate origin O, the x-axis and the y-axis in the spatial rectangular coordinate system are all located on the surface of the earth, and the z-axis is vertically downward;
[0010] Assume that the shield machine is located at a depth of h underground, starts from the negative half-axis of the y-axis, and turns right to excavate; the shield machine excavates to the xOz surface, indicating that the shield machine enters the abnormal excavation section from the normal excavation section;
[0011] S2: Calculate the additional stratum stress caused by the excavation face thrust f1, the shield axial friction f2 and the grouting pressure f3 respectively;
[0012] Among them, the additional stress of the soil caused by the components of the excavation face thrust f1 acting on the tunnel face is:
[0013]
[0014] Where: ∑′ AT,x and ∑′ AT,y are the additional stresses in the x-direction and y-direction caused by the components of the excavation face thrust f1 acting on the tunnel face; f 1x 、f 1y and f 1z They represent the components of f1 in the x, y and z directions respectively; σ′ xx ,σ′ yx ,σ′ zx is the unit additional stress acting on the shield shell of the shield machine along the positive direction of the x-axis; σ′ xy ,σ′ yy ,σ′ zy is the unit additional stress acting on the shield shell of the shield machine along the positive direction of the y axis; r is the distance between point (x, y, z) and point (x0, y0, z0), point (x0, y0, z0) is the modified coordinate of the point (0, 0, c) of action of the concentrated force F; t is the arc of the circular surface; R is the radius of the shield machine;
[0015]
[0016] The additional stress of the soil caused by the components of the axial friction force f2 of the shield acting on the soil behind the shield is:
[0017]
[0018] Where: ∑′ AF,x and ∑′ AF,y are the additional stresses in the x-direction and y-direction caused by the components of the axial friction force f2 of the shield acting on the soil behind the shield; f 2,head,x 、f 2,head,y and f 2,head,z represents the components of f2 in the x, y and z directions when the central section of the shield head is taken as the control section; f 2,tail,x 、f 2,tail,y and f 2,tail,z It represents the components of f2 in the x, y and z directions when the central section of the shield tail is taken as the control section; is the angle between any point on the shield shell of the shield machine and the vertical line connecting the central axis of the shield machine and the x-axis; φ is the angle interval of the shield machine in the tunnel; α is the yaw angle of the shield machine; θ s is the rotation angle of the shield machine during the excavation of the abnormal excavation section; the length occupied by the shield machine is converted into an angle θ L for: L is the length of the shield machine, Q yaw is the curvature radius of the shield machine during the excavation process of the abnormal excavation section;
[0019]
[0020] The additional stress of the soil caused by the various components of the grouting pressure f3 acting on the soil behind the shield is:
[0021]
[0022] Where: ∑′ GP,x and ∑′ GP,y are the additional stresses in the x-direction and y-direction caused by the various components of the grouting pressure f3 acting on the soil behind the shield; f 3x 、f 3y and f 3z represents the component forces of f3 in the x, y and z directions; b is the width of the segment;
[0023]
[0024] S3: calculating the additional stratum stress caused by the construction load according to whether the shield machine is in a small radius turning condition during excavation;
[0025] Among them, when the shield machine makes a small radius turn during excavation, the analysis of additional stratum stress caused by construction load is corrected based on the rewritten Mindlin solution; when the shield machine does not make a small radius turn when excavating in an abnormal excavation section, the tunnel excavation curve is placed in a reasonable position in the three-dimensional coordinates for simplified calculation.
[0026] The rewritten Mindlin solution is as follows:
[0027] The unit additional stress acting on the shield shell of the shield machine along the positive direction of the x-axis is:
[0028]
[0029] is the distance between the point (x, y, z) and the point (x0, y0, –z0), and μ is the Poisson’s ratio.
[0030] The unit additional stress acting on the shield shell of the shield machine along the positive direction of the y-axis is:
[0031]
[0032]
[0033] The advantages of the present invention are: the additional stratum stress caused by the excavation face thrust, the axial friction of the shield shell and the grouting pressure are calculated respectively, and then the additional stratum stress caused by the construction load is obtained, so as to realize the prediction of the additional stratum stress caused by the construction load of the spatial curved shield and provide a reference for the actual tunnel construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 is a stress analysis diagram of the tunnel cross section in the present invention;
[0035] Figure 2 It is the relationship between the original stress value and the corrected stress value in the present invention. DETAILED DESCRIPTION
[0036] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art:
[0037] Example: Figure 1-2 As shown, this embodiment specifically relates to a method for predicting additional stratum stress caused by a space curved shield construction load, and the prediction method mainly includes the following steps:
[0038] S1: Establish a spatial rectangular coordinate system and construct a spatial curved shield tunnel calculation model based on the tunneling posture of the shield machine.
[0039] Among them, the coordinate origin O, the x-axis and the y-axis in the spatial rectangular coordinate system are all located on the surface, and the z-axis is vertically downward. Assume that the shield machine is located at a depth of h underground, starting from the negative half of the y-axis (normal excavation section), turning right to excavate; the shield machine excavates to the xOz surface, that is, when y=0, it reaches the end point of the normal excavation surface, indicating that the shield machine enters the abnormal excavation section from the normal excavation section.
[0040] S2: Calculate the additional stratum stress caused by the excavation face thrust f1, the shield axial friction f2 and the grouting pressure f3 respectively.
[0041] Among them, the additional stress of the soil caused by the components of the excavation face thrust f1 acting on the tunnel face is:
[0042]
[0043] Where: ∑′ AT,x and ∑′ AT,y are the additional stresses in the x-direction and y-direction caused by the components of the excavation face thrust f1 acting on the tunnel face; f 1x 、f1y and f 1z They represent the components of f1 in the x, y and z directions respectively; σ′ xx ,σ′ yx ,σ′ zx is the unit additional stress acting on the shield shell of the shield machine along the positive direction of the x-axis; σ′ xy ,σ′ yy ,σ′ zy is the unit additional stress acting on the shield shell of the shield machine along the positive direction of the y axis; r is the distance between point (x, y, z) and point (x0, y0, z0), point (x0, y0, z0) is the modified coordinate of the point (0, 0, c) of the concentrated force F; t is the arc of the circular surface; R is the radius of the shield machine;
[0044]
[0045] The additional stress of the soil caused by the components of the axial friction force f2 of the shield acting on the soil behind the shield is:
[0046]
[0047] Where: ∑′ AF,x and ∑′ AF,y are the additional stresses in the x-direction and y-direction caused by the components of the shield axial friction force f2 acting on the soil behind the shield; f 2,head,x 、f 2,head,y and f 2,head,z represents the components of f2 in the x, y and z directions when the central section of the shield head is taken as the control section; f 2,tail,x 、f 2,tail,y and f 2,tail,z It represents the components of f2 in the x, y and z directions when the central section of the shield tail is taken as the control section; is the angle between any point on the shield shell of the shield machine and the vertical line connecting the central axis of the shield machine and the x-axis; φ is the angle range of the shield machine in the tunnel; α is the yaw angle of the shield machine; θ s is the rotation angle of the shield machine during the excavation of the abnormal excavation section; the length occupied by the shield machine is converted into an angle θ L for: L is the length of the shield machine, Q yaw is the curvature radius of the shield machine during the excavation process in the abnormal excavation section;
[0048]
[0049] The additional stress of the soil caused by the various components of the grouting pressure f3 acting on the soil behind the shield is:
[0050]
[0051] Where: ∑′ GP,x and ∑′ GP,y are the additional stresses in the x-direction and y-direction caused by the various components of the grouting pressure f3 acting on the soil behind the shield; f 3x 、f 3y and f 3z represents the component forces of f3 in the x, y and z directions; b is the width of the segment;
[0052]
[0053] S3: Calculate the additional stratum stress caused by the construction load based on whether the shield machine is in a small radius turning condition during excavation.
[0054] Among them, Figure 1 and Figure 2 As shown in the figure, σ x , σ y , σ z are the original stresses acting along the positive directions of the x, y, and z axes, respectively, and σ′ x ,σ′ y are the corrected stresses acting in the positive direction of the x and y axes, respectively. In actual curved shield engineering, on the one hand, the research focuses on the stress distribution in the direction parallel to and perpendicular to a certain cross section of the tunnel; on the other hand, it is basically impossible for any cross section of a curved tunnel to satisfy the three-axis direction being the same as the required stress calculation direction. Therefore, the analytical solution calculated according to the above formula must be corrected in direction.
[0055] When the shield machine makes a small radius turn during excavation, the analysis of additional stratum stress caused by construction load is corrected based on the rewritten Mindlin solution; when the shield machine does not make a small radius turn during excavation in an abnormal excavation section (the tunnel is a straight tunnel or a large radius turn tunnel that is approximately straight), the tunnel excavation curve is placed in a reasonable position in the three-dimensional coordinates for simplified calculation.
[0056] The rewritten Mindlin solution is as follows:
[0057] The unit additional stress acting on the shield shell of the shield machine along the positive direction of the x-axis is:
[0058]
[0059] is the distance between the point (x, y, z) and the point (x0, y0, –z0), and μ is the Poisson’s ratio.
[0060] The unit additional stress acting on the shield shell of the shield machine along the positive direction of the y-axis is:
[0061]
[0062] The beneficial effects of this embodiment are: the additional stratum stress caused by the excavation face thrust, the axial friction of the shield shell and the grouting pressure are calculated respectively, and then the additional stratum stress caused by the construction load is obtained, thereby realizing the prediction of the additional stratum stress caused by the construction load of the spatial curved shield, and providing a reference for actual tunnel construction.
Claims
1. A method for predicting additional stratum stress caused by space curved shield construction load, characterized in that The prediction method comprises the following steps: S1: Establish a spatial rectangular coordinate system and construct a spatial curved shield tunnel calculation model based on the tunneling posture of the shield machine; The coordinate origin O, the x-axis and the y-axis in the spatial rectangular coordinate system are all located on the surface of the earth, and the z-axis is vertically downward; Assume that the shield machine is located at a depth of h underground, starts from the negative half-axis of the y-axis, and turns right to excavate; the shield machine excavates to the xOz surface, indicating that the shield machine enters the abnormal excavation section from the normal excavation section; S2: Calculate the additional stratum stress caused by the excavation face thrust f1, the shield axial friction f2 and the grouting pressure f3 respectively; Among them, the additional stress of the soil caused by the components of the excavation face thrust f1 acting on the tunnel face is: Where: ∑′ AT,x and ∑′ AT,y are the additional stresses in the x-direction and y-direction caused by the components of the excavation face thrust f1 acting on the tunnel face; f 1x 、f 1y and f 1z They represent the components of f1 in the x, y and z directions respectively; σ′ xx ,σ′ yx ,σ′ zx is the unit additional stress acting on the shield shell of the shield machine along the positive direction of the x-axis; σ′ xy ,σ′ yy ,σ′ zy is the unit additional stress acting on the shield shell of the shield machine along the positive direction of the y axis; r is the distance between point (x, y, z) and point (x0, y0, z0), point (x0, y0, z0) is the modified coordinate of the point (0, 0, c) of action of the concentrated force F; t is the arc of the circular surface; R is the radius of the shield machine; The additional stress of the soil caused by the components of the axial friction force f2 of the shield acting on the soil behind the shield is: Where: ∑′ AF,x and ∑′ AF,y are the additional stresses in the x-direction and y-direction caused by the components of the shield axial friction force f2 acting on the soil behind the shield; f 2,head,x 、f 2,head,y and f 2,head,z represents the components of f2 in the x, y and z directions when the central section of the shield head is taken as the control section; f 2,tail,x 、f 2,tail,y and f 2,tail,z It represents the components of f2 in the x, y and z directions when the central section of the shield tail is taken as the control section; is the angle between any point on the shield shell of the shield machine and the vertical line connecting the central axis of the shield machine and the x-axis; φ is the angle interval of the shield machine in the tunnel; α is the yaw angle of the shield machine; θ s is the rotation angle of the shield machine during the excavation of the abnormal excavation section; the length occupied by the shield machine is converted into the angle θ L for: L is the length of the shield machine, Q yaw is the curvature radius of the shield machine during the excavation process of the abnormal excavation section; The additional stress of the soil caused by the various components of the grouting pressure f3 acting on the soil behind the shield is: Where: ∑′ GP,x and ∑′ GP,y are the additional stresses in the x-direction and y-direction caused by the various components of the grouting pressure f3 acting on the soil behind the shield; f 3x 、f 3y and f 3z represents the component forces of f3 in the x, y and z directions; b is the width of the segment; S3: calculating the additional stratum stress caused by the construction load according to whether the shield machine is in a small radius turning condition during excavation; Among them, when the shield machine makes a small radius turn during excavation, the analysis of additional stratum stress caused by construction load is corrected based on the rewritten Mindlin solution; when the shield machine does not make a small radius turn when excavating in an abnormal excavation section, the tunnel excavation curve is placed in a reasonable position in the three-dimensional coordinates for simplified calculation.
2. A method for predicting additional stratum stress caused by space curved shield construction load according to claim 1, characterized in that The rewritten Mindlin solution is as follows: The unit additional stress acting on the shield shell of the shield machine along the positive direction of the x-axis is: is the distance between the point (x, y, z) and the point (x0, y0, –z0), and μ is the Poisson’s ratio.
3. The method for predicting additional stratum stress caused by space curved shield construction load according to claim 2 is characterized in that The unit additional stress acting on the shield shell of the shield machine along the positive direction of the y-axis is: