Self-checking method and device for electric meter wiring of energy storage system
Through the communication between the meter and the energy storage inverter of the energy storage system, the phase sequence of the current transformer and voltage wiring is automatically inferred, which solves the problem of failure to locate wiring errors in the existing technology, and improves the operating efficiency and reliability of the system sex.
Patent Information
- Application Number
- CN202411247745.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-12
AI Technical Summary
The existing meter wiring detection methods can only determine whether the wiring is correct and cannot locate the specific cause of the error, resulting in manual inspection, affecting the normal operation of the system and increasing economic losses.
The metering data is transmitted through the communication between the energy storage system meter and the energy storage inverter, and the changes in the three-phase charging current and power are successively controlled, and the installation phase sequence and direction of the current transformer, as well as the phase sequence of the voltage wiring are inferred to avoid manual inspection of power outages. .
Automatic positioning of the meter wiring error is realized, cumbersome manual inspection process is avoided, and the system's operating efficiency and reliability are improved.
Smart Images

Figure CN118937825A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy storage systems, and in particular to a method and device for self-checking the connection of an electric meter in an energy storage system. Background Art
[0002] The meter's sampling wiring consists of two types: voltage and current. Voltage sampling directly connects the grid's A / B / C / N terminals to the meter's corresponding voltage signal ports. If the wiring phase sequence is incorrect, power calculation errors can occur. Current sampling typically uses current transformers, one per phase, and the outgoing wires from each transformer are connected to the meter's corresponding current signal ports. If the wiring phase sequence is incorrect, power calculation errors can also occur. Incorrect power feedback from the meter can disrupt the energy storage system's charging and discharging functions, impacting normal system operation.
[0003] Existing meter wiring detection methods can only determine whether the wiring is correct or incorrect, but cannot locate the specific cause of the error. To identify the error and correct the wiring, it takes manpower and time to check the error point from beginning to end. The troubleshooting process also requires system power outages, which not only affects normal electricity use but also causes economic losses. Summary of the Invention
[0004] In view of this, the present invention provides a method and device for self-checking the connection of an energy storage system electric meter, so as to solve the problem that the existing electric meter connection detection method can only determine whether the connection is correct or incorrect, but cannot locate the specific cause of the error.
[0005] In a first aspect, the present invention provides a method for self-checking the connection of an energy storage system electric meter, wherein the energy storage system electric meter and the energy storage inverter communicate with each other to transmit metering data. The method is executed when the fluctuation range of the load power in the energy storage system is less than a preset range, and the method includes:
[0006] Sequentially controlling the charging current change of each of the three phases A / B / C of the energy storage inverter, and inferring the installation phase sequence of the A / B / C three-phase current transformers based on the change of the three-phase current measured by the energy storage system meter;
[0007] The charging power change of each of the three phases A / B / C of the energy storage inverter is controlled in sequence. According to the change of the three-phase power measured by the energy storage system meter, the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection are inferred.
[0008] The present invention provides a self-check method for the connection of an energy storage system meter. The method sequentially controls the charging current change of each of the three phases A / B / C of the energy storage inverter, and infers the installation phase sequence of the A / B / C three-phase current transformers based on the change of the three-phase current measured by the energy storage system meter. The method also sequentially controls the charging power change of each of the three phases A / B / C of the energy storage inverter, and infers the installation direction and phase sequence of the voltage connection of the A / B / C three-phase current transformers based on the change of the three-phase power measured by the energy storage system meter. Following these two steps, the energy storage system can infer the specific connection conditions of the meter's voltage sampling connection and the current transformer, avoiding the tedious process of manually troubleshooting the circuit during a power outage.
[0009] In an optional embodiment, sequentially controlling the charging current change of each of the three phases A / B / C of the energy storage inverter, and inferring the installation phase sequence of the A / B / C three-phase current transformers based on the change of the three-phase current measured by the energy storage system meter, includes:
[0010] Controlling the change of the charging current of phase A of the energy storage inverter, recording the phase of the current change measured by the energy storage system ammeter, and determining the first parameter in the first calculation formula according to the phase;
[0011] Controlling the change of the B-phase charging current of the energy storage inverter, recording the phase of the current change measured by the energy storage system ammeter, and determining the second parameter in the first calculation formula according to the phase;
[0012] Controlling the change in the C-phase charging current of the energy storage inverter, recording the phase of the current change measured by the energy storage system ammeter, and determining the third parameter in the first calculation formula based on the phase;
[0013] Substituting the first parameter, the second parameter, and the third parameter into the first calculation formula to obtain a calculation result of the first calculation formula;
[0014] The installation phase sequence of the A / B / C three-phase current transformer is inferred based on the calculation results.
[0015] In an optional implementation, determining the first parameter in the first calculation formula according to the phase includes:
[0016] When the phase of the current change measured by the energy storage system ammeter is phase A, determining that the first parameter in the first calculation formula is 1;
[0017] When the phase of the current change measured by the energy storage system ammeter is phase B, determining that the first parameter in the first calculation formula is 2;
[0018] When the phase of the current change measured by the energy storage system electric meter is phase C, the first parameter in the first calculation formula is determined to be 3.
[0019] In an optional implementation, determining the second parameter in the first calculation formula according to the phase includes:
[0020] When the phase of the current change measured by the energy storage system ammeter is phase A, determining that the second parameter in the first calculation formula is 1;
[0021] When the phase of the current measured by the energy storage system ammeter is phase B, determining that the second parameter in the first calculation formula is 2;
[0022] When the phase of the current change measured by the energy storage system electric meter is phase C, the second parameter in the first calculation formula is determined to be 3.
[0023] In an optional implementation, determining the third parameter in the first calculation formula according to the phase includes:
[0024] When the phase of the current change measured by the energy storage system electric meter is phase A, determining that the third parameter in the first calculation formula is 1;
[0025] When the phase of the current measured by the energy storage system electric meter is phase B, determining that the third parameter in the first calculation formula is 2;
[0026] When the phase of the current change measured by the energy storage system electric meter is phase C, the third parameter in the first calculation formula is determined to be 3.
[0027] In an optional implementation, the first calculation formula is as follows:
[0028] N=X1*k1+X2*k2+X3*k3
[0029] Where N is the calculation result, k1 is the first parameter, k2 is the second parameter, k3 is the third parameter, X1, X2, and X3 are constant coefficients, and the settings of X1, X2, and X3 must ensure that N is unique.
[0030] In an optional embodiment, sequentially controlling the charging power change of each of the three phases A / B / C of the energy storage inverter, and inferring the installation direction of the A / B / C three-phase current transformers and the phase sequence of the voltage connections based on the change in the three-phase power measured by the energy storage system meter, includes:
[0031] Controlling the change of the A-phase charging power of the energy storage inverter, calculating the A-phase power variable of the energy storage system electric meter, and calculating a first per-unit value of the A-phase power variable to the change of the A-phase charging power;
[0032] Controlling the change in the B-phase charging power of the energy storage inverter, calculating the B-phase power variable of the energy storage system electric meter, and calculating a second per-unit value of the B-phase power variable to the change in the B-phase charging power;
[0033] Controlling the change in the C-phase charging power of the energy storage inverter, calculating the C-phase power variable of the energy storage system electric meter, and calculating the third per-unit value of the C-phase power variable to the change in the C-phase charging power;
[0034] Substituting the first per-unit value, the second per-unit value, and the third per-unit value into a second calculation formula to obtain a calculation result of the second calculation formula;
[0035] The installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection are inferred based on the calculation results.
[0036] In an optional embodiment, inferring the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection according to the calculation result includes:
[0037] When the calculation result is unique, inferring the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection according to the calculation result;
[0038] When the calculation result is not unique, the reactive power of a specific phase of the energy storage system electric meter is calculated, and the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection are inferred based on the reactive power.
[0039] In a second aspect, the present invention provides a self-checking device for connecting an electric meter to an energy storage system, the device comprising:
[0040] A first self-test module is configured to sequentially control the charging current change of each of the three phases A / B / C of the energy storage inverter, and infer the installation phase sequence of the A / B / C three-phase current transformers based on the change of the three-phase current measured by the energy storage system meter;
[0041] The second self-test module is used to sequentially control the charging power changes of each of the three phases A / B / C of the energy storage inverter, and infer the installation direction of the A / B / C three-phase current transformers and the phase sequence of the voltage connections based on the changes in the three-phase power measured by the energy storage system meter.
[0042] The present invention provides a self-check device for the connection of an energy storage system electric meter, comprising: a first self-check module, for sequentially controlling the change in the charging current of each of the three phases A / B / C of the energy storage inverter, and inferring the installation phase sequence of the A / B / C three-phase current transformers based on the change in the three-phase current measured by the energy storage system electric meter; a second self-check module, for sequentially controlling the change in the charging power of each of the three phases A / B / C of the energy storage inverter, and inferring the installation direction of the A / B / C three-phase current transformers and the phase sequence of the voltage connection based on the change in the three-phase power measured by the energy storage system electric meter. By providing the first self-check module and the second self-check module and executing the above two modules in sequence, the energy storage system can infer the specific connection conditions of the voltage sampling connection of the electric meter and the current transformer, thus avoiding the tedious process of manually troubleshooting the circuit during a power outage.
[0043] In a third aspect, the present invention provides a computer device comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the computer instructions to thereby execute the energy storage system meter wiring self-test method according to the first aspect or any corresponding embodiment thereof.
[0044] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the energy storage system electric meter wiring self-test method of the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the specific embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0046] Figure 1 1 is a flow chart of a method for self-checking the connection of an electric meter in an energy storage system according to an embodiment of the present invention;
[0047] Figure 2 is a block diagram of an energy storage system according to an embodiment of the present invention;
[0048] Figure 3 is a voltage and current vector diagram according to an embodiment of the present invention;
[0049] Figure 4 is a structural block diagram of an energy storage system electric meter wiring self-test device according to an embodiment of the present invention;
[0050] Figure 5Schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0051] To make the purpose, technical solutions, and advantages of the embodiments of the present invention more clear, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative efforts shall fall within the scope of protection of the present invention.
[0052] The present invention provides a self-check method for the connection of an electric meter in an energy storage system, which avoids the tedious process of manually checking the connection lines during a power outage by inferring the specific connection conditions of the voltage sampling connection and the current transformer of the electric meter.
[0053] According to an embodiment of the present invention, an embodiment of a method for self-testing the wiring of an electric meter in an energy storage system is provided. It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system, such as a set of computer-executable instructions, and although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown.
[0054] This embodiment provides a method for self-testing the wiring of an energy storage system meter. The energy storage system meter communicates with an energy storage inverter to transmit metering data. The method is executed when the fluctuation range of the load power within the energy storage system is less than a preset range. Figure 1 FIG. 1 is a flow chart of a method for self-checking the connection of an electric meter in an energy storage system according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:
[0055] Step S1, sequentially controlling the charging current change of each phase of the A / B / C three-phase energy storage inverter, and inferring the installation phase sequence of the A / B / C three-phase current transformers based on the change of the three-phase current measured by the energy storage system meter.
[0056] Specifically, the energy storage system meter wiring self-test method is executed when the fluctuation range of the load power in the energy storage system is less than the preset range. At this time, due to the small fluctuation of the load power, the self-test is more accurate. The energy storage system meter is installed at the main incoming line port of the grid connection point, and communicates with the energy storage inverter to transmit metering data such as voltage, current, power, and frequency. The energy storage system meter wiring self-test first detects whether the installation phase sequence of the A / B / C three-phase current transformer is correct. By controlling only the charging current change of each phase of the A / B / C three-phase of the energy storage inverter each time, and then comparing the three-phase current measured by the meter, it can be determined whether the installation phase sequence of the three-phase current transformer is incorrect.
[0057] like Figure 2 As shown, the relationship between the current I2x of the energy storage inverter and the metered current I1x and the load current I3x (x: A / B / C three-phase sequence number) is I1x=I2x+I3x, and the load current I3x is approximately a constant. When only the charging current of a certain phase of the energy storage inverter is controlled to increase by Id, only one phase of the three-phase current measured by the meter will increase by Id synchronously. Therefore, the charging current of each phase of the three-phase A / B / C of the energy storage inverter is controlled to increase by Id in turn, and the phase (A / B / C) of the metered current increase by Id is recorded each time, and then the installation phase sequence of the A / B / C three-phase current transformer is inferred. In the embodiment of the present invention, the preset range is determined according to the operating conditions of the energy storage system.
[0058] Step S2: sequentially control the charging power change of each phase A / B / C of the energy storage inverter. Based on the change of the three-phase power measured by the energy storage system meter, the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection are inferred.
[0059] Specifically, after verifying the correct phase sequence of the transformer installation, the current transformer installation direction and voltage wiring phase sequence are then checked. The charging power of each of the three phases A, B, and C of the energy storage inverter is sequentially increased by dP. The current transformer installation direction and voltage wiring phase sequence can be determined based on the change in power per phase measured by the electric meter.
[0060] If the discharge direction is positive, the energy storage inverter will discharge, the AC active power will be positive, and the three-phase power of the meter will be positive. Figure 3 Voltage-current vector diagram: Single-phase active power P = V*I*cosθ, single-phase reactive power Q = V*I*sinθ. θ is the angle between voltage and current. During pure active charging, θ = -180°, resulting in a negative active power value. When voltage leads current, Q is positive, indicating inductive reactive power. When voltage lags current, Q is negative, indicating capacitive reactive power.
[0061] By controlling the change of the single-phase active power of the energy storage inverter, the voltage connection phase sequence of the meter and the installation direction of the current transformer can be determined through the relationship between the power variables of the three-phase active and reactive power of the meter.
[0062] The present invention provides a self-check method for the connection of an energy storage system meter. The method sequentially controls the charging current change of each of the three phases A / B / C of the energy storage inverter, and infers the installation phase sequence of the A / B / C three-phase current transformers based on the change of the three-phase current measured by the energy storage system meter. The method also sequentially controls the charging power change of each of the three phases A / B / C of the energy storage inverter, and infers the installation direction and phase sequence of the voltage connection of the A / B / C three-phase current transformers based on the change of the three-phase power measured by the energy storage system meter. Following these two steps, the energy storage system can infer the specific connection conditions of the meter's voltage sampling connection and the current transformer, avoiding the tedious process of manually troubleshooting the circuit during a power outage.
[0063] In an optional embodiment, the above step S1 includes:
[0064] Step S11, controlling the charging current change of phase A of the energy storage inverter, recording the phase of the current change measured by the energy storage system electric meter, and determining the first parameter in the first calculation formula according to the phase.
[0065] Specifically, step S11 includes:
[0066] Step S111: When the phase of the current change measured by the energy storage system electric meter is phase A, determine that the first parameter in the first calculation formula is 1.
[0067] Step S112: When the phase of the current change measured by the energy storage system electric meter is phase B, determine that the first parameter in the first calculation formula is 2.
[0068] Step S113: When the phase of the current change measured by the energy storage system electric meter is phase C, determine that the first parameter in the first calculation formula is 3.
[0069] In this embodiment of the present invention, the charging current of phase A of the energy storage inverter is controlled to increase by Id, and the phase of the current measured by the energy storage system's ammeter is recorded. When the phase of the current measured by the energy storage system's ammeter increases by Id is phase A, the first parameter k1 in the first calculation formula is determined to be 1. When the phase of the current measured by the energy storage system's ammeter increases by Id is phase B, the first parameter k1 in the first calculation formula is determined to be 2. When the phase of the current measured by the energy storage system's ammeter increases by Id is phase C, the first parameter k1 in the first calculation formula is determined to be 3.
[0070] Step S12: Control the change of the B-phase charging current of the energy storage inverter, record the phase of the current change measured by the energy storage system meter, and determine the second parameter in the first calculation formula according to the phase.
[0071] Specifically, step S12 includes:
[0072] Step S121: When the phase of the current change measured by the energy storage system electric meter is phase A, determine that the second parameter in the first calculation formula is 1.
[0073] Step S122: When the phase of the current change measured by the energy storage system electric meter is phase B, determine that the second parameter in the first calculation formula is 2.
[0074] Step S123: When the phase of the current change measured by the energy storage system electric meter is phase C, determine that the second parameter in the first calculation formula is 3.
[0075] In this embodiment of the present invention, the charging current of phase B of the energy storage inverter is controlled to increase by Id, and the phase of the current measured by the energy storage system's ammeter is recorded. When the phase of the current measured by the energy storage system's ammeter increases by Id is phase A, the second parameter k2 in the first calculation formula is determined to be 1. When the phase of the current measured by the energy storage system's ammeter increases by Id is phase B, the second parameter k2 in the first calculation formula is determined to be 2. When the phase of the current measured by the energy storage system's ammeter increases by Id is phase C, the second parameter k2 in the first calculation formula is determined to be 3.
[0076] Step S13: Control the change of the C-phase charging current of the energy storage inverter, record the phase of the current change measured by the energy storage system meter, and determine the third parameter in the first calculation formula according to the phase.
[0077] Specifically, step S13 includes:
[0078] Step S131: When the phase of the current change measured by the energy storage system electric meter is phase A, determine that the third parameter in the first calculation formula is 1.
[0079] Step S132: When the phase of the current change measured by the energy storage system electric meter is phase B, determine that the third parameter in the first calculation formula is 2.
[0080] Step S133: When the phase of the current change measured by the energy storage system electric meter is phase C, determine that the third parameter in the first calculation formula is 3.
[0081] In this embodiment of the present invention, the C-phase charging current of the energy storage inverter is controlled to increase by Id, and the phase of the current measured by the energy storage system meter is recorded. When the phase of the energy storage system meter current increase Id is phase A, the third parameter k3 in the first calculation formula is determined to be 1. When the phase of the energy storage system meter current increase Id is phase B, the third parameter k3 in the first calculation formula is determined to be 2. When the phase of the energy storage system meter current increase Id is phase C, the third parameter k3 in the first calculation formula is determined to be 3.
[0082] Step S14: Substitute the first parameter, the second parameter, and the third parameter into the first calculation formula to obtain a calculation result of the first calculation formula.
[0083] Specifically, the first calculation formula is as follows:
[0084] N=X1*k1+X2*k2+X3*k3
[0085] Where N is the calculation result, k1 is the first parameter, k2 is the second parameter, k3 is the third parameter, X1, X2, and X3 are constant coefficients, and the settings of X1, X2, and X3 must ensure that N is unique.
[0086] For example, if X1=1, X2=2, and X3=4, the first calculation formula is N=1*k1+2*k2+4*k3. The settings of X1, X2, and X3 are only used as an example and are not limited to this. As long as N is unique, it can be used.
[0087] Let N = 1*k1+2*k2+4*k3, substitute the first parameter k1, the second parameter k2, and the third parameter k3 into the first calculation formula to obtain the value of N.
[0088] Step S15: inferring the installation phase sequence of the A / B / C three-phase current transformers based on the calculation results.
[0089] Specifically, since the N value is unique and different N values correspond to different phase sequences, the installation phase sequence of the A / B / C three-phase current transformer can be inferred based on the N value.
[0090] Different phase sequences can be calculated using Table 1. If the recorded meter phases are also A / B / C, the transformer installation phase sequence is correct. If it is other combinations, the specific error conditions can be determined based on the N value.
[0091] Table 1 Installation phase sequence combination of A / B / C three-phase current transformer
[0092]
[0093] In an optional embodiment, the above step S2 includes:
[0094] Step S21 , controlling the change of the phase A charging power of the energy storage inverter, calculating the phase A power variable of the energy storage system electric meter, and calculating the first per-unit value of the phase A power variable to the change of the phase A charging power.
[0095] Specifically, the energy storage inverter's Phase A charging power is controlled to increase by dP, the corresponding Phase A power variable dMPa of the electric meter is calculated, and the first per-unit value t1 of the Phase A power variable dMPa relative to the Phase A charging power change dP is calculated. If the first per-unit value t1 is a positive value, the energy storage inverter is in a discharging state; if the first per-unit value t1 is a negative value, the energy storage inverter is in a charging state.
[0096] Step S22: Control the B-phase charging power change of the energy storage inverter, calculate the B-phase power variable of the energy storage system meter, and calculate the second per-unit value of the B-phase power variable to the B-phase charging power change.
[0097] Specifically, the energy storage inverter's B-phase charging power is controlled to increase by dP, the corresponding B-phase power variable dMPa of the electric meter is calculated, and the second per-unit value t2 of the B-phase power variable dMPa relative to the B-phase charging power change dP is calculated. If the second per-unit value t2 is a positive value, the energy storage inverter is in a discharging state; if the second per-unit value t2 is a negative value, the energy storage inverter is in a charging state.
[0098] Step S23: Control the C-phase charging power change of the energy storage inverter, calculate the C-phase power variable of the energy storage system meter, and calculate the third per-unit value of the C-phase power variable to the C-phase charging power change.
[0099] Specifically, the energy storage inverter's C-phase charging power is controlled to increase by dP, the corresponding C-phase power variable dMPa of the electric meter is calculated, and the third per-unit value t3 of the C-phase power variable dMPa to the C-phase charging power change dP is calculated. If the third per-unit value t3 is a positive value, the energy storage inverter is in a discharging state; if the third per-unit value t3 is a negative value, the energy storage inverter is in a charging state.
[0100] Step S24: Substitute the first per-unit value, the second per-unit value, and the third per-unit value into the second calculation formula to obtain a calculation result of the second calculation formula.
[0101] Specifically, the second calculation formula is as follows:
[0102] M=X4*t1+X5*t2+X6*t3
[0103] Wherein, M is the calculation result, t1 is the first per-unit value, t2 is the second per-unit value, t3 is the third per-unit value, X4, X5, and X6 are constant coefficients, and the setting requirement of X4, X5, and X6 is to ensure that M is as unique as possible.
[0104] For example, if X4=10, X5=100, and X6=1000, the second calculation formula is M=10*t1+100*t2+1000*t3. The settings of X4, X5, and X6 are only used as an example and are not limited to this. As long as M is as unique as possible, the calculation formula is sufficient.
[0105] Let M = 10*t1 + 100*t2 + 1000*t3, and substitute the first per-unit value t1, the second per-unit value t2, and the third per-unit value t3 into the second calculation formula to obtain the value of M.
[0106] Step S25: Inferring the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection according to the calculation result.
[0107] Specifically, different M values correspond to different installation directions and voltage wiring phase sequences. Based on the M value, the installation direction and voltage wiring phase sequence of the A / B / C three-phase current transformer can be inferred. The following table shows the installation direction and voltage wiring phase sequence combinations of the A / B / C three-phase current transformer and the corresponding M value:
[0108] Table 2 Installation direction and voltage connection phase sequence combination of A / B / C three-phase current transformer
[0109]
[0110]
[0111]
[0112] Take the voltage phase sequence in Table 2 as an example to illustrate only the CT direction:
[0113] t1 is the per-unit value of the meter's corresponding A-phase power variable dMPa relative to dP when controlling the energy storage inverter's A-phase charging power increase by dP. If the A-phase direction is correct, θ = -180° and cosθ = -1. Combined with the single-phase active power calculation formula (P = V*I*cosθ), t1 = dMPa / dP = V*I*cosθ / V*I = cosθ = -1. If the A-phase direction is reversed, t1 = 1. Reversal of the current transformer occurs when either the CT installation direction is reversed or the polarity of the CT lead to the meter connection port is reversed.
[0114] t2 is the per-unit value of the meter's corresponding B-phase power variable dMPb relative to dP when the B-phase charging power of the energy storage inverter is increased by dP. If the B-phase direction is correct, then θ = -180° and cosθ = -1. Combined with the single-phase active power calculation formula P = V*I*cosθ, at this time t2 = dMPb / dP = V*I*cosθ / V*I = cosθ = -1. If the B-phase direction is reversed, then t2 = 1.
[0115] t3 is the per-unit value of the meter's corresponding C-phase power variable dMPc relative to dP when the C-phase charging power of the energy storage inverter is increased by dP. If the C-phase direction is correct, then θ = -180° and cosθ = -1. Combined with the single-phase active power calculation formula P = V*I*cosθ, at this time t3 = dMPc / dP = V*I*cosθ / V*I = cosθ = -1. If the C-phase direction is reversed, then t3 = 1.
[0116] In an optional embodiment, step S15 includes:
[0117] Step S151: When the calculation result is unique, the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection are inferred based on the calculation result.
[0118] Step S152: When the calculation result is not unique, the reactive power of a specific phase of the energy storage system meter is calculated, and the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection are inferred based on the reactive power.
[0119] Specifically, Table 2 shows that, except for the case where the three-phase voltage leads or lags by 120°, a unique M value can be calculated for all other wiring conditions. When the M value is unique, different M values correspond to different phase sequence installation directions and voltage wiring phase sequences. The M value can be used to infer the installation direction of the A / B / C three-phase current transformers and the voltage wiring phase sequence. When the three-phase voltage leads or lags by 120°, the M value is not unique. In this case, the wiring condition can be further determined based on the reactive power value of the specific phase of the meter. The reactive power value is calculated based on the single-phase reactive power.
[0120] This embodiment also provides an energy storage system meter wiring self-test device, which is used to implement the above-mentioned embodiments and preferred implementations. Details already described will not be repeated here. As used below, the term "module" may refer to a combination of software and / or hardware that implements a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, implementation using hardware, or a combination of software and hardware, is also possible and contemplated.
[0121] This embodiment provides a self-check device for connecting an electric meter to an energy storage system. Figure 4 Shown, including:
[0122] The first self-test module 41 is used to sequentially control the charging current changes of each of the three phases A / B / C of the energy storage inverter, and infer the installation phase sequence of the A / B / C three-phase current transformers based on the changes in the three-phase current measured by the energy storage system meter.
[0123] The second self-test module 42 is used to sequentially control the charging power changes of each of the three phases A / B / C of the energy storage inverter. Based on the changes in the three-phase power measured by the energy storage system meter, it infers the installation direction of the A / B / C three-phase current transformers and the phase sequence of the voltage connections.
[0124] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0125] The energy storage system meter wiring self-test device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0126] The present invention provides a self-check device for the connection of an energy storage system electric meter, comprising: a first self-check module, for sequentially controlling the change in the charging current of each of the three phases A / B / C of the energy storage inverter, and inferring the installation phase sequence of the A / B / C three-phase current transformers based on the change in the three-phase current measured by the energy storage system electric meter; a second self-check module, for sequentially controlling the change in the charging power of each of the three phases A / B / C of the energy storage inverter, and inferring the installation direction of the A / B / C three-phase current transformers and the phase sequence of the voltage connection based on the change in the three-phase power measured by the energy storage system electric meter. By providing the first self-check module and the second self-check module and executing the above two modules in sequence, the energy storage system can infer the specific connection conditions of the voltage sampling connection of the electric meter and the current transformer, thus avoiding the tedious process of manually troubleshooting the circuit during a power outage.
[0127] The embodiment of the present invention also provides a computer device having the above Figure 4 The energy storage system meter wiring self-test device shown.
[0128] See also Figure 5 , Figure 5 is a structural diagram of a computer device provided by an optional embodiment of the present invention, such as Figure 5 As shown, the computer device includes: one or more processors 10, memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components utilize different buses to communicate with each other and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in the memory or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Equally, multiple computer devices can be connected, and each device provides part of the necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 5 A processor 10 is taken as an example.
[0129] The processor 10 may be a central processing unit, a network processor, or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be an application-specific integrated circuit, a programmable logic device, or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic, or any combination thereof.
[0130] The memory 20 stores instructions that can be executed by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.
[0131] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and application programs required for at least one function; the data storage area may store data created based on the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely located relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0132] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid-state drive; the memory 20 may also include a combination of the above types of memory.
[0133] The computer device further includes an input device 30 and an output device 40. The processor 10, the memory 20, the input device 30 and the output device 40 may be connected via a bus or other means. Figure 5 The bus connection is taken as an example.
[0134] The input device 30 can receive input digital or character information and generate key signal input related to user settings and function control of the computer device, such as a touch screen, a keypad, a mouse, a trackpad, a touch pad, an indicator stick, one or more mouse buttons, a trackball, a joystick, etc. The output device 40 can include a display device, an auxiliary lighting device (e.g., an LED), and a tactile feedback device (e.g., a vibration motor). The above-mentioned display device includes but is not limited to a liquid crystal display, a light emitting diode, a display, and a plasma display. In some optional embodiments, the display device can be a touch screen.
[0135] The embodiment of the present invention also provides a computer-readable storage medium. The above-mentioned method according to the embodiment of the present invention can be implemented in hardware, firmware, or implemented as a computer code that can be recorded in a storage medium, or implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and downloaded through a network and will be stored in a local storage medium, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state drive, etc.; further, the storage medium can also include a combination of the above-mentioned types of memory. It can be understood that a computer, a processor, a microprocessor controller or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor or hardware, the method shown in the above embodiment is implemented.
[0136] Although the embodiments of the present invention have been described with reference to the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention. Such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A method for self-checking the connection of an electric meter in an energy storage system, characterized in that: The energy storage system electric meter and the energy storage inverter communicate with each other to transmit metering data. The method is performed when the fluctuation range of the load power in the energy storage system is less than a preset range. The method includes: Controlling the charging current change of each phase of the A / B / C three-phase of the energy storage inverter in turn, and inferring the installation phase sequence of the A / B / C three-phase current transformer according to the change of the three-phase current measured by the energy storage system meter; The charging power change of each phase of the three-phase A / B / C of the energy storage inverter is controlled in sequence, and the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection are inferred according to the change of the three-phase power measured by the energy storage system meter.
2. The energy storage system meter wiring self-check method according to claim 1, characterized in that: The method sequentially controls the charging current change of each phase of the A / B / C three-phase current transformer of the energy storage inverter, and infers the installation phase sequence of the A / B / C three-phase current transformer according to the change of the three-phase current measured by the energy storage system meter, including: Controlling the change of the charging current of phase A of the energy storage inverter, recording the phase of the current change measured by the energy storage system electric meter, and determining the first parameter in the first calculation formula according to the phase; Controlling the change of the B-phase charging current of the energy storage inverter, recording the phase of the current change measured by the energy storage system electric meter, and determining the second parameter in the first calculation formula according to the phase; Controlling the change of the C-phase charging current of the energy storage inverter, recording the phase of the current change measured by the energy storage system electric meter, and determining the third parameter in the first calculation formula according to the phase; Substituting the first parameter, the second parameter and the third parameter into the first calculation formula to obtain a calculation result of the first calculation formula; The installation phase sequence of the A / B / C three-phase current transformer is inferred based on the calculation results.
3. The energy storage system meter wiring self-check method according to claim 2, characterized in that: Determining a first parameter in a first calculation formula according to the phase includes: When the phase of the current change measured by the energy storage system electric meter is phase A, determining that the first parameter in the first calculation formula is 1; When the phase of the current change measured by the energy storage system electric meter is phase B, determining that the first parameter in the first calculation formula is 2; When the phase of the current change measured by the energy storage system electric meter is phase C, the first parameter in the first calculation formula is determined to be 3.
4. The energy storage system electric meter wiring self-check method according to claim 2, characterized in that: Determining a second parameter in the first calculation formula according to the phase includes: When the phase of the current change measured by the energy storage system electric meter is phase A, determining that the second parameter in the first calculation formula is 1; When the phase of the current change measured by the energy storage system electric meter is phase B, determining that the second parameter in the first calculation formula is 2; When the phase of the current change measured by the energy storage system electric meter is phase C, the second parameter in the first calculation formula is determined to be 3.
5. The energy storage system meter wiring self-check method according to claim 2, characterized in that: Determining a third parameter in the first calculation formula according to the phase includes: When the phase of the current change measured by the energy storage system electric meter is phase A, determining that the third parameter in the first calculation formula is 1; When the phase of the current change measured by the energy storage system electric meter is phase B, determining that the third parameter in the first calculation formula is 2; When the phase of the current change measured by the energy storage system electric meter is phase C, the third parameter in the first calculation formula is determined to be 3.
6. The energy storage system meter wiring self-check method according to claim 2, characterized in that: The first calculation formula is as follows: N=X1*k1+X2*k2+X3*k3 Wherein, N is the calculation result, k1 is the first parameter, k2 is the second parameter, k3 is the third parameter, X1, X2, X3 are constant coefficients, and the setting requirement of X1, X2, X3 is to ensure that N is unique.
7. The energy storage system electric meter wiring self-check method according to claim 1, characterized in that: The method sequentially controls the charging power change of each phase of the three-phase A / B / C of the energy storage inverter, and infers the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection according to the change of the three-phase power measured by the energy storage system meter, including: Controlling the change of the A-phase charging power of the energy storage inverter, calculating the A-phase power variable of the energy storage system electric meter, and calculating the first per-unit value of the A-phase power variable to the change of the A-phase charging power; Control the B-phase charging power change of the energy storage inverter, calculate the B-phase power variable of the energy storage system electric meter, and calculate the second per-unit value of the B-phase power variable to the B-phase charging power change; Controlling the change of the C-phase charging power of the energy storage inverter, calculating the C-phase power variable of the energy storage system electric meter, and calculating the third per-unit value of the C-phase power variable to the change of the C-phase charging power; Substituting the first per-unit value, the second per-unit value, and the third per-unit value into a second calculation formula to obtain a calculation result of the second calculation formula; The installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection are inferred based on the calculation results.
8. The energy storage system electric meter wiring self-check method according to claim 7, characterized in that: The installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection are inferred based on the calculation results, including: When the calculation result is unique, inferring the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection according to the calculation result; When the calculation result is not unique, the reactive power of a specific phase of the energy storage system electric meter is calculated, and the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection are inferred based on the reactive power.
9. A self-checking device for connecting an electric meter of an energy storage system, characterized in that: The device comprises: The first self-test module is used to sequentially control the charging current change of each phase of the A / B / C three-phase of the energy storage inverter, and infer the installation phase sequence of the A / B / C three-phase current transformer according to the change of the three-phase current measured by the energy storage system meter; The second self-test module is used to control the charging power change of each phase of the three-phase A / B / C of the energy storage inverter in turn, and infer the installation direction of the A / B / C three-phase current transformer and the phase sequence of the voltage connection according to the change of the three-phase power measured by the energy storage system meter.
10. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the energy storage system electric meter wiring self-check method according to any one of claims 1 to 8 by executing the computer instructions.
Citation Information
Cited By
Phase sequence detection method and device of inverter electric meter, computer equipment and storage medium
CN120761720A
Current sensor adaptive adjustment method, device and medium
CN121027636A