Data processing method and device and electronic equipment

By depositing the data of each R&D management system into the data lake and integrating it, and using the data middle platform to generate inspection indicator records, the problem of poor data interoperability between software project management systems is solved, and efficient and accurate R&D inspection services are achieved. Reduced labor costs.

CN118939503APending Publication Date: 2024-11-12INDUSTRIAL AND COMMERCIAL BANK OF CHINA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410974158.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The data cannot be interconnected between existing software project management systems, resulting in poor timeliness, high labor costs and error-prone problems.

Method used

By obtaining data from each R&D management system, depositing it into the data lake and integrating it, using the data middle platform to generate inspection indicator records, regularly query and count relevant data, and push it to target users to realize personalized R&D inspection services.

Benefits of technology

It breaks the information barrier between various R&D management systems, improves the timeliness and accuracy of R&D inspections, reduces labor costs, and improves the service experience of R&D users.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118939503A_ABST
    Figure CN118939503A_ABST
Patent Text Reader

Abstract

The invention provides a data processing method and device and electronic equipment, and the method comprises the steps: storing all research and development management data into a data lake, and carrying out the data integration through a data center; obtaining an inspection index registration instruction, wherein the inspection index registration instruction comprises an inspection calendar and a logical item of an inspection index; generating an inspection index record according to the instruction and storing the inspection index record in a set; querying expired inspection index records from the inspection index set regularly, and collecting data from the integrated data of the data table according to logical items of the inspection index records, and performing statistics; and pushing the statistical result to the target user. According to the scheme, the user can initiate the inspection index registration instruction so as to customize the required inspection index record in a personalized manner, information is accurately pushed to the user, and the service experience feeling of the research and development user is improved; the information barrier among the research and development management systems can be broken through, and the inspection work of the information generated by the research and development management systems can be automatically provided for users.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of computer technology and can be used in the financial field, and in particular to a data processing method, device and electronic equipment. Background Art

[0002] Software project development usually involves the management of many aspects. From the perspective of the development life cycle, these management tasks include feedback collection, demand management, product route / version management, process management, progress tracking, test management, defect management, etc. From the perspective of enterprise managers, they may even include cost management, etc.

[0003] In order to manage software projects more comprehensively and accurately, the R&D department adopts multiple existing software management system products, each management system product is used to implement at least one of the above-mentioned R&D management tasks; alternatively, large R&D departments usually use multiple software management systems developed by themselves, each software management system is used to implement at least one of the above-mentioned R&D management tasks.

[0004] The functions implemented by the above-mentioned multiple software management systems are different, so they usually run independently, and the data between different software management systems cannot be accessed by each other. As a result, no software management system can "comprehensively" provide personalized R&D inspection services for R&D users. Instead, users can only use the simple statistical functions of each software management system to manually screen software R&D problems, and then summarize the problems screened by each software management system and present the summary results to R&D users. The whole process is cumbersome, time-sensitive, labor-intensive, and prone to errors. Summary of the invention

[0005] This specification provides a data processing method, device and electronic device to solve the problems of the prior art of manually screening and summarizing software development problems, which is cumbersome, time-consuming, high in labor cost and prone to errors.

[0006] To solve the above technical problems, the first aspect of this specification provides a data processing method, including: obtaining the R&D management data of each R&D management system, storing each R&D management data into a data lake, and integrating the R&D management data in the data lake through a data middle platform; obtaining an inspection indicator registration instruction, the inspection indicator registration instruction including an inspection calendar and logical items of inspection indicators; generating an inspection indicator record according to the inspection indicator registration instruction, and storing it in an inspection indicator set; regularly querying expired inspection indicator records from the inspection indicator set, and collecting relevant data from the integrated data of the data middle platform according to the logical items of the inspection indicators, and performing statistics on the relevant data to obtain statistical results; the data middle platform includes the R&D record data of each R&D management system; and pushing the statistical results to target users.

[0007] In some embodiments, the logical items of the inspection indicators include at least one of the following: dimensions of inspection information, scope of inspection, and rules for displaying inspection results; the dimensions of the inspection information include selection from at least two of the following dimensions: inspection information according to department dimension, inspection information according to group dimension, inspection information according to project dimension, inspection information according to application dimension, inspection information according to requirement item dimension, and inspection information according to individual dimension; the scope of inspection includes selection from at least two of the following: inspection of the first R&D department, inspection of the target R&D group, inspection of the target R&D personnel, inspection of the target project, inspection of the target application, inspection of the target requirement item, and inspection of the target person; the rules for displaying inspection results include selection of designated display content from at least two of the following: the total number of problems, the number of rectified problems, the number of unrectified problems, the cumulative number of problems this quarter, the total number of overdue tasks, the total duration of overdue tasks, the average duration of overdue tasks, the overdue severity level, the risk level, and the average time to resolve the problem.

[0008] In some embodiments, the logical items of the inspection indicators include at least one selected from the following: inspection of unclosed-loop problems after production, and inspection of overdue finalization of demand items.

[0009] In some embodiments, the inspection calendar includes periodic reminder information, which includes a start reminder time and a reminder time interval; and / or, the inspection calendar includes single reminder information, which includes a target reminder time.

[0010] In some embodiments, the logic item includes a reminder of the inspection indicator.

[0011] In some embodiments, the data center aggregates information related to the entire life cycle of the problem based on the problem operation data of the R&D management system to form a wide table of problem dimensions, where each row of the problem dimension wide table is an instance of a problem; and forms a wide table of problem facts based on the problem operation data of the R&D management system, where the wide table of problem facts includes metrics formed by one or more operations on the problem.

[0012] In some embodiments, the data middle platform integrates the R&D management data in the data lake in the following ways: creating a problem dimension table and a problem fact table; obtaining a submit problem instruction under a functional test node in the R&D management system; the submit problem instruction carries context information; in response to the submit problem instruction, creating a record in the problem dimension table and the problem fact table respectively according to the context carried by the submit problem instruction, and establishing an association relationship between the two records in the two tables; obtaining a modify problem instruction in the R&D management system; the modify problem instruction carries context information; in response to the modify problem instruction, determining the associated target record in the problem dimension table; creating a record in the problem fact table, and establishing an association relationship between the newly created record and the target record.

[0013] In some embodiments, the context information carried in the submit problem instruction includes at least one of the following: submitter, problem information, handler, defect level, problem status; and / or, the context information carried in the modify problem instruction includes the identifier of the modified problem.

[0014] The second aspect of the present specification provides a data processing device, including: a first acquisition unit, used to acquire R&D management data of each R&D management system, store each R&D management data into a data lake, and integrate the R&D management data in the data lake through a data middle platform; a second acquisition unit, used to acquire an inspection indicator registration instruction, the inspection indicator registration instruction includes an inspection calendar and logical items of inspection indicators; a generation unit, used to generate an inspection indicator record according to the inspection indicator registration instruction, and store it in an inspection indicator set; a statistical unit, used to regularly query expired inspection indicator records from the inspection indicator set, and collect relevant data from the integrated data of the data middle platform according to the logical items of the inspection indicators, and perform statistics on the relevant data to obtain statistical results; the data middle platform includes the R&D record data of each R&D management system; a push unit, used to push the statistical results to target users.

[0015] In some embodiments, the logical items of the inspection indicators include at least one of the following: dimensions of inspection information, scope of inspection, and rules for displaying inspection results; the dimensions of the inspection information include selection from at least two of the following dimensions: inspection information according to department dimension, inspection information according to group dimension, inspection information according to project dimension, inspection information according to application dimension, inspection information according to requirement item dimension, and inspection information according to individual dimension; the scope of inspection includes selection from at least two of the following: inspection of the first R&D department, inspection of the target R&D group, inspection of the target R&D personnel, inspection of the target project, inspection of the target application, inspection of the target requirement item, and inspection of the target person; the rules for displaying inspection results include selection of designated display content from at least two of the following: the total number of problems, the number of rectified problems, the number of unrectified problems, the cumulative number of problems this quarter, the total number of overdue tasks, the total duration of overdue tasks, the average duration of overdue tasks, the overdue severity level, the risk level, and the average time to resolve the problem.

[0016] In some embodiments, the logical items of the inspection indicators include at least one selected from the following: inspection of unclosed-loop problems after production, and inspection of overdue finalization of demand items.

[0017] In some embodiments, the inspection calendar includes periodic reminder information, which includes a start reminder time and a reminder time interval; and / or, the inspection calendar includes single reminder information, which includes a target reminder time.

[0018] In some embodiments, the logic item includes a reminder of the inspection indicator.

[0019] In some embodiments, the data center aggregates information related to the entire life cycle of the problem based on the problem operation data of the R&D management system to form a wide table of problem dimensions, where each row of the problem dimension wide table is an instance of a problem; and forms a wide table of problem facts based on the problem operation data of the R&D management system, where the wide table of problem facts includes metrics formed by one or more operations on the problem.

[0020] In some embodiments, the data middle platform integrates the R&D management data in the data lake in the following ways: creating a problem dimension table and a problem fact table; obtaining a submit problem instruction under a functional test node in the R&D management system; the submit problem instruction carries context information; in response to the submit problem instruction, creating a record in the problem dimension table and the problem fact table respectively according to the context carried by the submit problem instruction, and establishing an association relationship between the two records in the two tables; obtaining a modify problem instruction in the R&D management system; the modify problem instruction carries context information; in response to the modify problem instruction, determining the associated target record in the problem dimension table; creating a record in the problem fact table, and establishing an association relationship between the newly created record and the target record.

[0021] In some embodiments, the context information carried in the submit problem instruction includes at least one of the following: submitter, problem information, handler, defect level, problem status; and / or, the context information carried in the modify problem instruction includes the identifier of the modified problem.

[0022] The third aspect of this specification provides an electronic device, comprising: a memory and a processor, the processor and the memory are communicatively connected to each other, the memory stores computer instructions, and the processor implements the data processing method described in any one of the first aspects by executing the computer instructions.

[0023] A fourth aspect of the present specification provides a computer storage medium, wherein the computer storage medium stores computer program instructions, and when the computer program instructions are executed by a processor, the data processing method described in any one of the first aspects is implemented.

[0024] A fifth aspect of the present specification provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the data processing method described in any one of the first aspects is implemented.

[0025] The data processing method, device and electronic device provided in this specification can generate inspection indicator records according to the inspection indicator registration instructions after obtaining the inspection indicator registration instructions, and store them in the inspection indicator set to regularly execute the inspection indicator records. Based on this, the user can initiate the inspection indicator registration instructions, and personalize the required inspection indicator records through the inspection indicator registration instructions, so as to accurately push information to the user, avoid pushing information with low relevance to the user, and improve the service experience of R&D users; store the R&D management data of each R&D management system in the data lake, integrate the R&D management data in the data lake through the data middle platform, and then inspect the data integrated by the data middle platform according to the inspection indicator records, which can break through the information barriers between the R&D management systems, automatically provide users with the inspection work of the information generated by each R&D management system, reshape the R&D service model, and realize the transformation from R&D management to R&D service. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the implementation methods of the present application or the technical solutions in the prior art, the drawings required for use in the implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some implementation methods recorded in this application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0027] Figure 1 A schematic diagram of a data processing method provided in this specification;

[0028] Figure 2 A schematic diagram of the inspection results presented by each group in the R&D department for inspection according to the group dimension;

[0029] Figure 3 A schematic diagram of the inspection indicator registration page;

[0030] Figure 4 A schematic diagram of a data processing device provided in this specification;

[0031] Figure 5 A schematic diagram of the structure of an electronic device provided in this specification is shown. DETAILED DESCRIPTION

[0032] In order to enable those skilled in the art to better understand the technical solutions in this application, the technical solutions in the embodiments of this application will be clearly and completely described below in conjunction with the drawings in the embodiments of this application. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this application.

[0033] This specification provides a data processing method, such as Figure 1 As shown, the method includes:

[0034] S10: Obtain the R&D management data of each R&D management system, store the R&D management data in the data lake, and integrate the R&D management data in the data lake through the data middle platform.

[0035] From the perspective of the R&D life cycle, software project R&D management includes feedback collection, demand management, product route / version management, process management, progress tracking, test management, defect management, etc. There are many R&D management systems in the prior art, and each R&D management system can achieve at least one of the above R&D management tasks.

[0036] The existing R&D management system can generate R&D management prompt information and statistical information, such as code defect reminders, defect processing time reminders, project document upload reminders, project approval task reminders, defect quantity statistics, task overdue statistics, etc. Usually, this information is stored in the storage path specified by the R&D management system, and the R&D management system will push the prompt information it generates to the user. The data between the R&D management systems are not interoperable.

[0037] A data lake is a storage system where data is stored in its original format. The data lake can be seamlessly connected to a variety of computing and analysis platforms. Depending on the business scenario, you can select the corresponding computing engine to process and analyze the data stored in the data lake, thereby breaking down silos and tapping into business value. Since the prompt information and statistical information generated by each R&D management system are in a variety of formats, S10 stores the prompt information and statistical information of each R&D management system in the data lake, which can accurately retain the original information and facilitate the data center to update the data in a more reasonable way to integrate the data.

[0038] In addition to the prompt information generated by each R&D management system, the files stored by each R&D management platform (such as demand approval information table, etc.) can also be stored in the data lake.

[0039] The data center can integrate data through data construction, wide table aggregation, etc., and finally provide data services through the data center, centralize the R&D management data of various R&D management systems throughout the R&D process, and establish the infrastructure for R&D measurement data. The data center provides a unified data service API, stores the rapid circulation and reuse of data, and supports the rapid development and iteration of new business applications.

[0040] The R&D management systems in this specification may be independent systems or subsystems integrated into a larger system.

[0041] S20: Acquire an inspection index registration instruction, wherein the inspection index registration instruction includes an inspection calendar and logical items of inspection indicators.

[0042] The inspection calendar is used to determine the time to execute inspection tasks and push inspection results to users.

[0043] The inspection calendar may include periodic reminder information, which may include a start reminder time and a reminder interval. The start reminder time may be, for example, June 25 (Tuesday), and the reminder interval may be, for example, weekly. The inspection indicator is to conduct inspections and push inspection results every Tuesday starting from June 25.

[0044] The inspection calendar may also include single reminder information, and the single reminder information includes a target reminder time. For example, if the target reminder time is June 25 (Tuesday), the inspection indicator will be inspected once on June 25 (Tuesday) and the inspection result will be pushed to the user.

[0045] By using the inspection calendar as a user-specifiable inspection indicator logic item, users can personalize inspection indicator records based on their different habits for R&D time management, push information at the precise time required by users, and improve the service experience of R&D users.

[0046] The logical items of inspection indicators are used to determine the dimensions of inspection information, the scope of inspection, and the rules for displaying inspection results.

[0047] The dimensions of inspection information can be, for example, inspection information by department dimension, inspection information by group dimension, inspection information by project dimension, inspection information by application dimension, inspection information by requirement dimension, and inspection information by individual dimension. By using the dimensions of inspection information as user-specifiable inspection indicator logical items, users can personalize the dimensions of inspections, thereby accurately pushing information to users and improving the service experience of R&D users.

[0048] The scope of the inspection can be, for example: the first R&D department of the inspection, the R&D group of the inspection target, the R&D personnel of the inspection target, the project of the inspection target, the application of the inspection target, the demand item of the inspection target, and the person of the inspection target. By using the scope of the inspection as a logical item of the inspection indicator that can be specified by the user, the user can personalize the inspection indicator record to avoid unnecessary push to users outside the inspection scope, so as to accurately push information to users and improve the service experience of R&D users.

[0049] Figure 2 This is a schematic diagram of the inspection results presented by each group in the R&D department according to the group dimension.

[0050] The rules for displaying inspection information results can, for example, specify to display at least one of the following: the total number of problems, the number of rectified problems, the number of unrectified problems, the cumulative number of problems in this quarter, the total number of overdue tasks, the total duration of overdue tasks, the average duration of overdue tasks, the severity level of overdue tasks, the risk level, the average time to solve problems, etc. By using the rules for displaying inspection information results as user-specifiable inspection indicator logic items, users can personalize inspection indicator records, thereby accurately pushing information to users and improving the service experience of R&D users.

[0051] In some embodiments, the logic of the inspection indicator includes selecting at least one of the following: inspection of unclosed loop problems after production, inspection of overdue finalization of demand items. That is, the rule for displaying the inspection information results specifies displaying the content.

[0052] In some embodiments, the logical item of the inspection indicator includes a reminder of the inspection indicator. The reminder refers to the target user to whom the inspection result is pushed. By using the reminder as a user-specifiable inspection indicator logical item, the user can customize the inspection indicator record for the target user, thereby accurately pushing information to the user and improving the service experience of the R&D user.

[0053] In some cases, S20 may be woken up by the user clicking on the page. Figure 3 The inspection indicator registration page is shown, and then select the inspection calendar on the inspection indicator registration page to enter the logical items of the inspection indicators.

[0054] In other cases, S20 may also be generated by other systems.

[0055] S30: Generate an inspection indicator record according to the inspection indicator registration instruction and store it in the inspection indicator set.

[0056] Inspection indicator collection is used to store inspection indicator records. Inspection indicator records refer to tasks created by users for regular inspection of various R&D management systems.

[0057] S40: Regularly query the expired inspection indicator records from the inspection indicator set, and collect relevant data from the integrated data of the data center according to the logical items of the inspection indicators, and perform statistics on the relevant data to obtain statistical results; the data center includes the R&D record data of each R&D management system.

[0058] The data center aggregates information related to the entire life cycle of a problem based on the problem operation data of the R&D management system to form a wide table of problem dimensions, where each row of the problem dimension table is an instance of a problem; and forms a wide table of problem facts based on the problem operation data of the R&D management system, where the wide table of problem facts includes measurements formed by one or more operations on the problem.

[0059] In some embodiments, the data middle platform described in S10 integrates the R&D management data in the data lake through the following S11 to S16.

[0060] S11: Create problem dimension table and problem fact table.

[0061] S12: Obtain a submit problem instruction under the function test node in the R&D management system; the submit problem instruction carries context information.

[0062] Functional testing nodes refer to the process nodes in the R&D management system that verify the functions of software products. At functional testing nodes, testers are usually required to upload (or test components automatically upload) problems in the test results so that they can be followed up and solved. The information carried by the uploaded problem is the context information carried in the submit problem instruction.

[0063] The context information includes at least one of the following: submitter, problem information, handler, defect level, and problem status.

[0064] S13: In response to the submit question instruction, a record is created in the question dimension table and the question fact table respectively according to the context carried by the submit question instruction, and an association relationship is established between the two records in the two tables.

[0065] S14: Obtaining a modification problem instruction in the R&D management system; the modification problem instruction carries context information.

[0066] The context information carried in the modify question instruction may include the identifier of the modified question. When the tester submits the modified question information, he usually submits the modification under a certain question item, so the modify question instruction usually carries the identifier of the modified question.

[0067] S15: In response to the modify question instruction, determine the associated target record in the question dimension table.

[0068] S16: Create a record in the problem fact table, and establish an association relationship between the newly created record and the target record.

[0069] There can be one or more problem fact tables. The problem fact wide table is obtained by expanding the data of the problem fact table. The problem fact wide table contains the metrics formed by one or more operations on the problem, including the problem processing time, the number of problem modifications, etc.

[0070] S20 can perform data statistics based on the problem fact table according to the logical items of the inspection indicators to obtain statistical results.

[0071] When S20 obtains the inspection index registration instruction, the user can click the page to wake up Figure 3 The inspection indicator registration page shown in the figure, then select the inspection calendar on the inspection indicator registration page, and select the logical item of the inspection indicator. The page can present optional logical items to the user based on the metrics contained in the problem fact wide table. That is to say, after the user clicks to wake up the inspection indicator registration page, the various metrics contained in the problem fact wide table can be obtained, and then the various metrics are presented on the inspection indicator registration page for the user to select as the logical item of the inspection indicator.

[0072] S50: Push the statistical results to the target users.

[0073] The target user can be a predetermined set of users (which can be all users), or can be determined based on the inspection indicator logical items contained in the inspection indicator records corresponding to the statistical results. For example, the target user is determined based on the inspection scope and / or the reminder of the inspection indicator in the inspection indicator logical items.

[0074] The data processing method provided in this specification can generate inspection indicator records according to the inspection indicator registration instructions after obtaining the inspection indicator registration instructions and store them in the inspection indicator collection to regularly execute the inspection indicator records. Based on this, users can initiate inspection indicator registration instructions and personalize the required inspection indicator records through inspection indicator registration instructions, so as to accurately push information to users, avoid pushing information with low relevance to users, and improve the service experience of R&D users; store the R&D management data of each R&D management system into the data lake, integrate the R&D management data in the data lake through the data middle platform, and then inspect the data integrated by the data middle platform according to the inspection indicator records, which can break through the information barriers between the R&D management systems, automatically provide users with the inspection work of the information generated by each R&D management system, reshape the R&D service model, and realize the transformation from R&D management to R&D service.

[0075] It should be noted that the user-related information and data involved in the embodiments of this specification are all information and data authorized by the user or fully authorized by relevant parties, and the collection, storage, use, processing, transmission, provision, disclosure and application of the relevant data comply with relevant laws, regulations and standards, take necessary confidentiality measures, do not violate public order and good morals, and provide corresponding operation entrances for users or relevant parties to choose to authorize or refuse.

[0076] It should also be noted that in the embodiments of this specification, certain software, components, models and other existing solutions in the industry may be mentioned. They should be regarded as exemplary. Their purpose is only to illustrate the feasibility of implementing the technical solution of this application, but it does not mean that the applicant has or will necessarily use the solution.

[0077] This specification provides a data processing device that can be used to implement Figure 1 The data processing method shown in Figure 4 As shown, the device includes a first acquisition unit 10, a second acquisition unit 20, a generation unit 30, a statistical unit 40 and a push unit 50.

[0078] The first acquisition unit 10 is used to acquire the R&D management data of each R&D management system, store each R&D management data into a data lake, and integrate the R&D management data in the data lake through a data middle platform.

[0079] The second acquisition unit 20 is used to acquire an inspection index registration instruction, wherein the inspection index registration instruction includes an inspection calendar and logical items of inspection indicators.

[0080] The generating unit 30 is used to generate an inspection indicator record according to the inspection indicator registration instruction, and store it in the inspection indicator set.

[0081] The statistical unit 40 is used to regularly query expired inspection indicator records from the inspection indicator set, and collect relevant data from the integrated data of the data center according to the logical items of the inspection indicators, and perform statistics on the relevant data to obtain statistical results; the data center includes the R&D record data of each R&D management system.

[0082] The push unit 50 is used to push the statistical results to the target user.

[0083] In some embodiments, the logical items of the inspection indicators include at least one of the following: dimensions of inspection information, scope of inspection, and rules for displaying inspection results; the dimensions of the inspection information include selection from at least two of the following dimensions: inspection information according to department dimension, inspection information according to group dimension, inspection information according to project dimension, inspection information according to application dimension, inspection information according to requirement item dimension, and inspection information according to individual dimension; the scope of inspection includes selection from at least two of the following: inspection of the first R&D department, inspection of the target R&D group, inspection of the target R&D personnel, inspection of the target project, inspection of the target application, inspection of the target requirement item, and inspection of the target person; the rules for displaying inspection results include selection of designated display content from at least two of the following: the total number of problems, the number of rectified problems, the number of unrectified problems, the cumulative number of problems this quarter, the total number of overdue tasks, the total duration of overdue tasks, the average duration of overdue tasks, the overdue severity level, the risk level, and the average time to resolve the problem.

[0084] In some embodiments, the logical items of the inspection indicators include at least one selected from the following: inspection of unclosed-loop problems after production, and inspection of overdue finalization of demand items.

[0085] In some embodiments, the inspection calendar includes periodic reminder information, which includes a start reminder time and a reminder time interval; and / or, the inspection calendar includes single reminder information, which includes a target reminder time.

[0086] In some embodiments, the logic item includes a reminder of the inspection indicator.

[0087] In some embodiments, the data center aggregates information related to the entire life cycle of the problem based on the problem operation data of the R&D management system to form a wide table of problem dimensions, where each row of the problem dimension wide table is an instance of a problem; and forms a wide table of problem facts based on the problem operation data of the R&D management system, where the wide table of problem facts includes metrics formed by one or more operations on the problem.

[0088] In some embodiments, the data middle platform integrates the R&D management data in the data lake in the following ways: creating a problem dimension table and a problem fact table; obtaining a submit problem instruction under a functional test node in the R&D management system; the submit problem instruction carries context information; in response to the submit problem instruction, creating a record in the problem dimension table and the problem fact table respectively according to the context carried by the submit problem instruction, and establishing an association relationship between the two records in the two tables; obtaining a modify problem instruction in the R&D management system; the modify problem instruction carries context information; in response to the modify problem instruction, determining the associated target record in the problem dimension table; creating a record in the problem fact table, and establishing an association relationship between the newly created record and the target record.

[0089] In some embodiments, the context information carried in the submit problem instruction includes at least one of the following: submitter, problem information, handler, defect level, problem status; and / or, the context information carried in the modify problem instruction includes the identifier of the modified problem.

[0090] The description and functions of the above-mentioned devices can be understood by referring to the content of the data processing method part, and will not be repeated here.

[0091] The embodiment of the present invention further provides an electronic device, such as Figure 5 As shown, the electronic device may include a processor 501 and a memory 502, wherein the processor 501 and the memory 502 may be connected via a bus or other means. Figure 5 The example of connecting through bus is taken in the following.

[0092] The processor 501 may be a central processing unit (CPU). The processor 501 may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a combination of the above chips.

[0093] The memory 502 is a non-transitory computer-readable storage medium that can be used to store non-transitory software programs, non-transitory computer executable programs and modules, such as program instructions / modules corresponding to the data processing method in the embodiment of the present invention (for example, Figure 4 The processor 501 executes various functional applications and data processing of the processor by running the non-transient software programs, instructions and modules stored in the memory 502, that is, the data processing method in the above method embodiment is implemented.

[0094] The memory 502 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required by at least one function; the data storage area may store data created by the processor 501, etc. In addition, the memory 502 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the memory 502 may optionally include a memory remotely arranged relative to the processor 501, and these remote memories may be connected to the processor 501 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0095] The one or more modules are stored in the memory 502, and when executed by the processor 501, the following is performed: Figure 1 The data processing method in the illustrated embodiment.

[0096] The specific details of the above electronic device can be understood by referring to the corresponding descriptions and effects in the method embodiment, and will not be repeated here.

[0097] The present specification also provides a computer storage medium, wherein the computer storage medium stores computer program instructions, and when the computer program instructions are executed by a processor, the steps of the above-mentioned data processing method are implemented.

[0098] The present specification also provides a computer program product, comprising a computer program, wherein the computer program implements the steps of the above data processing method when executed by a processor.

[0099] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, the storage medium can be a disk, an optical disk, a read-only memory (ROM), a random access memory (RAM), a flash memory, a hard disk drive (HDD) or a solid-state drive (SSD), etc.; the storage medium can also include a combination of the above-mentioned types of memory.

[0100] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

[0101] The systems, devices, modules or units described in the above embodiments may be implemented by computer chips or entities, or by products with certain functions.

[0102] For the convenience of description, the above device is described in various units according to their functions. Of course, when implementing the present application, the functions of each unit can be implemented in the same or multiple software and / or hardware.

[0103] It can be known from the description of the above implementation methods that those skilled in the art can clearly understand that the present application can be implemented by means of software plus a necessary general hardware platform. Based on such an understanding, the technical solution of the present application can be essentially or partly contributed to the prior art in the form of a software product, which can be stored in a storage medium such as ROM / RAM, a magnetic disk, an optical disk, etc., and includes several instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute certain parts of the methods of each implementation method of the present application.

[0104] The present application can be used in many general or special computer system environments or configurations, such as personal computers, server computers, handheld or portable devices, tablet devices, multiprocessor systems, microprocessor-based systems, set-top boxes, programmable consumer electronic devices, network PCs, minicomputers, mainframe computers, distributed computing environments including any of the above systems or devices, etc.

[0105] The present application may be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. The present application may also be practiced in distributed computing environments where tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules may be located in local and remote computer storage media, including storage devices.

[0106] Although the present application has been described through embodiments, those skilled in the art will appreciate that there are many modifications and variations to the present application without departing from the spirit of the present application, and it is intended that the appended claims include these modifications and variations without departing from the spirit of the present application.

Claims

1. A data processing method, It is characterized in that include: Obtain R&D management data from each R&D management system, store the R&D management data in the data lake, and integrate the R&D management data in the data lake through the data center; Obtaining an inspection index registration instruction, wherein the inspection index registration instruction includes an inspection calendar and logical items of inspection indicators; Generate an inspection indicator record according to the inspection indicator registration instruction and store it in the inspection indicator set; Regularly query the expired inspection indicator records from the inspection indicator set, and collect relevant data from the integrated data of the data center according to the logical items of the inspection indicators, and perform statistics on the relevant data to obtain statistical results; the data center includes the R&D record data of each R&D management system; Push the statistical results to target users.

2. The method according to claim 1, It is characterized in that The logical items of the inspection indicators include at least one of the following: the dimension of inspection information, the scope of inspection, and the rules for displaying inspection results; The dimension of the inspection information includes selecting from at least two of the following dimensions: inspection information according to department dimension, inspection information according to group dimension, inspection information according to project dimension, inspection information according to application dimension, inspection information according to requirement dimension, and inspection information according to individual dimension; The scope of the inspection includes selecting at least two of the following: the first R&D department of the inspection, the R&D group of the inspection target, the R&D personnel of the inspection target, the project of the inspection target, the application of the inspection target, the requirement item of the inspection target, and the person of the inspection target; The rules for displaying the inspection results include selecting the designated content to be displayed from at least two of the following: the total number of problems, the number of rectified problems, the number of unrectified problems, the cumulative number of problems this quarter, the total number of overdue tasks, the total duration of overdue tasks, the average duration of overdue tasks, the overdue severity level, the risk level, and the average time to resolve the problem.

3. The method according to claim 1, It is characterized in that The logical items of the inspection indicators include at least one selected from the following: inspection of unclosed-loop problems after production, and inspection of overdue finalization of demand items.

4. The method according to claim 1, It is characterized in that The inspection calendar includes periodic reminder information, and the periodic reminder information includes the start reminder time and the reminder time interval; and / or, The inspection calendar includes single reminder information, and the single reminder information includes a target reminder time.

5. The method according to claim 1, It is characterized in that The logic items include reminders of inspection indicators.

6. The method according to claim 1, It is characterized in that The data center aggregates information related to the entire life cycle of a problem based on the problem operation data of the R&D management system to form a wide table of problem dimensions, where each row of records in the wide table of problem dimensions is an instance of a problem; A problem fact wide table is formed according to the problem operation data of the R&D management system, wherein the problem fact wide table includes metrics formed by one or more operations on the problem.

7. The method according to claim 1, It is characterized in that The data center integrates the R&D management data in the data lake in the following ways: Create problem dimension table and problem fact table; Obtaining a submit problem instruction under a functional test node in a research and development management system; the submit problem instruction carries context information; In response to a submit question instruction, a record is created in the question dimension table and the question fact table respectively according to the context carried by the submit question instruction, and an association relationship is established between the two records in the two tables; Obtaining a modification problem instruction in the R&D management system; the modification problem instruction carries context information; In response to the modify question instruction, determining an associated target record in the question dimension table; A record is created in the problem fact table, and an association relationship is established between the newly created record and the target record.

8. The method according to claim 7, It is characterized in that The context information carried in the submit problem instruction includes at least one of the following: submitter, problem information, handler, defect level, problem status; and / or, the context information carried in the modify problem instruction includes an identifier of the modified problem.

9. A data processing device, It is characterized in that include: The first acquisition unit is used to acquire the R&D management data of each R&D management system, store the R&D management data in the data lake, and integrate the R&D management data in the data lake through the data middle platform; A second acquisition unit is used to acquire an inspection index registration instruction, wherein the inspection index registration instruction includes an inspection calendar and logical items of the inspection index; A generating unit, used for generating an inspection indicator record according to the inspection indicator registration instruction, and storing it in the inspection indicator set; A statistical unit, used to regularly query the expired inspection indicator records from the inspection indicator set, and collect relevant data from the integrated data of the data center according to the logical items of the inspection indicators, and perform statistics on the relevant data to obtain statistical results; the data center includes the R&D record data of each R&D management system; The push unit is used to push the statistical results to the target users.

10. An electronic device, It is characterized in that include: A memory and a processor, wherein the processor and the memory are communicatively connected to each other, the memory stores computer instructions, and the processor implements the data processing method according to any one of claims 1 to 8 by executing the computer instructions.

11. A computer storage medium, It is characterized in that The computer storage medium stores computer program instructions, and when the computer program instructions are executed by a processor, the data processing method according to any one of claims 1 to 8 is implemented.