High-speed train section working diagram quality comprehensive evaluation method based on transportation overall efficiency
Through a comprehensive evaluation method based on the overall efficiency of transportation, combined with the order relationship analysis method and the TOPSIS method, the problem of the high-speed railway train operation diagram evaluation method focusing on a single department is solved, and the network-wide collaborative evaluation is realized, and the quality of the operation diagram and transportation efficiency are improved.
Patent Information
- Application Number
- CN202410988435.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing high-speed railway train operation chart evaluation method focuses on the evaluation of a single department, lacks overall efficiency and departmental coordinated evaluation, and it is difficult to adapt to the rapid development of high-speed railway networks and changes in transportation demand.
The comprehensive evaluation method of high-speed train segment operation diagram based on the overall transportation efficiency is adopted. By collecting operation diagram data, first- and second-level evaluation indicators are set, and the sequence relationship analysis method and TOPSIS method are used for comprehensive analysis to calculate the evaluation indicators. Weight coefficients and evaluation scores, and a weighted matrix is constructed to evaluate the quality of the running graph.
It provides a decision-making basis for the whole network transportation operation and the coordinated sharing of departments, improves the quality and efficiency of the compilation, execution and adjustment of operation charts, and adapts to changes in high-speed railway transportation needs.
Smart Images

Figure CN118941146A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of railway train operation diagram evaluation, and in particular relates to a high-speed train section operation diagram quality comprehensive evaluation method based on overall transportation efficiency. Background Art
[0002] High-speed rail transportation organization is a comprehensive management work that involves a wide range of aspects, is highly planned, and has extremely high requirements. The train operation diagram is a comprehensive plan for high-speed rail transportation organization, which is related to the transportation capacity, efficiency, and safety of high-speed rail. The quality of the operation diagram has a significant impact on the safety and efficiency of high-speed rail transportation production.
[0003] The existing evaluation indicators and methods for high-speed railway train timetables mainly focus on the outline evaluation of train timetables by a single department, mainly evaluating the quantity, quality, stability, robustness and other indicators of the timetable. An effective evaluation indicator system has not been formed, and it cannot effectively support the decision-making analysis of various business departments. There is a lack of collaborative evaluation among departments, and the guidance for the compilation of timetables is not strong. It is difficult to adapt to the new requirements and changes in transportation products caused by the rapid development of my country's high-speed rail network and the rapid changes in transportation demand.
[0004] Therefore, it is urgent to establish a comprehensive evaluation method for train operation diagram based on the overall transportation efficiency. Summary of the invention
[0005] The purpose of the present invention is to provide a comprehensive evaluation method for the quality of high-speed train section operation diagram based on the overall transportation efficiency to solve the deficiencies in the prior art. To achieve the above purpose, the technical solution adopted is:
[0006] A comprehensive evaluation method for the quality of a high-speed train section operation diagram based on overall transportation efficiency comprises the following steps:
[0007] Step S1: for each high-speed train section to be evaluated, based on the collected operation diagram data, obtain the calculation results of each secondary rating index;
[0008] Step S2: Analyze the calculation results based on the TOPSIS method to clarify the direction of improvement.
[0009] Preferably, step S1 specifically includes the following steps:
[0010] Step S1.1, collecting and arranging operation diagram data, including: road network data, train operation diagram data, and EMU operation plan data;
[0011] Step S1.2, setting the first-level evaluation index and the second-level evaluation index, and obtaining the calculation results of each second-level rating index;
[0012] Among them, each first-level evaluation indicator includes several second-level evaluation indicators; the first-level evaluation indicators include transportation capacity indicators, operating efficiency indicators and service quality indicators.
[0013] Preferably, step S1.2 specifically includes the following steps:
[0014] Step S1.2.1, obtaining the calculation results of the secondary rating index under the transportation capacity index;
[0015] Step S1.2.2, obtaining the calculation results of the secondary rating indicators under the operating efficiency indicators;
[0016] Step S1.2.3, obtain the calculation results of the secondary rating indicators under the service quality indicators.
[0017] Preferably, step S2 specifically includes the following steps:
[0018] Step S2.1, calculating the weight coefficient of the first-level evaluation index and the weight coefficient of the second-level evaluation index;
[0019] Step S2.2: Based on the calculation results and weight coefficients, the TOPSIS evaluation method is used to calculate the evaluation scores of the primary evaluation indicators and the evaluation scores of different sections.
[0020] Preferably, step S2.1 specifically includes the following steps:
[0021] Step S2.1.1, determining the sequence relationship;
[0022] Step S2.1.2, determine the relative importance of adjacent sequence indicators;
[0023] Step S2.1.3, based on the relative importance of adjacent indicators, first calculate the weight coefficient of the evaluation indicator indicated by the last sequence indicator, and then calculate the weight coefficients of the evaluation indicators indicated by the remaining sequence indicators in turn according to their relative importance;
[0024] When calculating the weight coefficient of the secondary evaluation indicator in the entire system, it is finally multiplied by the weight coefficient of the primary evaluation indicator where the secondary evaluation indicator is located.
[0025] Preferably, step S2.2 specifically includes the following steps:
[0026] Step S2.2.1, construct an initial decision matrix A;
[0027] Step S2.2.2: Normalize the initial decision matrix A to obtain the matrix R, and combine it with the weight matrix W to obtain the weighted matrix Y.
[0028] Step S2.2.3: Determine the positive ideal solution a of the weighted matrix Y + and negative ideal solution a- ;
[0029] Step S2.2.4, calculate the evaluation coefficient.
[0030] Compared with the prior art, the advantages of the present invention are:
[0031] Starting from the static macro indicators related to the train operation diagram, focusing on the whole network transportation operation and departmental collaborative sharing, comprehensively analyze the quality of the operation diagram compilation, and provide decision-making basis for the compilation, implementation and adjustment of the operation diagram BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a flow chart of the comprehensive evaluation method of high-speed train section operation diagram quality based on overall transportation efficiency;
[0033] Figure 2 It is an evaluation index system for train operation diagram. DETAILED DESCRIPTION
[0034] The following will be described in more detail with reference to the schematic diagram of the present invention, wherein the preferred embodiment of the present invention is shown, and it should be understood that those skilled in the art can modify the present invention described herein, while still achieving the advantageous effects of the present invention. Therefore, the following description should be understood as being widely known to those skilled in the art, and not as a limitation of the present invention.
[0035] like Figures 1-2 A comprehensive evaluation method for the quality of a high-speed train section operation diagram based on overall transportation efficiency comprises the following steps:
[0036] Step S1: for each high-speed train section to be evaluated, based on the collected operation diagram data, set the first-level evaluation index and the second-level evaluation index, and obtain the calculation results of each second-level rating index. Specifically, the following steps are included:
[0037] Step S1.1, collect and organize operation diagram data, including: road network data, train operation diagram data, and EMU operation plan data.
[0038] Among them, the road network data includes: line information, interval information, section information and station information;
[0039] The train operation diagram data includes: the starting and ending stations of each train, the number of train pairs running in the section, the direction of each train running in the section, the running path information of each train, the stop time of each train at each station, the departure and arrival time of each train at each station, and the section running time of each train;
[0040] EMU operation plan data includes: EMU information, EMU route information, EMU turnaround time, EMU daily mileage, EMU connection time;
[0041] Step S1.2, setting the first-level evaluation index and the second-level evaluation index, and obtaining the calculation results of each second-level rating index. Specifically including steps S1.2.1 to S1.2.3.
[0042] Among them, each first-level evaluation indicator includes several second-level evaluation indicators.
[0043] The first-level rating indicators include: transportation capacity indicators, operational efficiency indicators and service quality indicators.
[0044] The secondary indicators under the transport capacity index include: number of train runs, average daily train mileage and average crew turnover.
[0045] The number of train pairs refers to the total number of trains running in a section in one day;
[0046] Average daily vehicle kilometres refers to the average number of kilometres run per day by each EMU;
[0047] Average capacity turnover refers to the average number of passenger-kilometers completed by the EMU to complete its route mission.
[0048] The secondary indicators under the operational efficiency index include: average technical speed, average travel speed, average speed coefficient, average connection time, and average utilization coefficient.
[0049] The average connection time refers to the average time between the EMU completing one task in the route and starting the next task;
[0050] The average utilization factor refers to the average number of train trips included in the EMU route;
[0051] The secondary indicators under the service quality indicators include: reasonableness of arrival and departure times, average train stop rate, balance of arrival intervals and balance of departure intervals.
[0052] The arrival and departure time refers to the time when each train arrives at each station and the time when it departs from each station;
[0053] The arrival interval refers to the time interval between the arrivals of adjacent trains at the same station;
[0054] The departure interval refers to the time interval between the departures of adjacent trains at the same station.
[0055] For each high-speed train section to be evaluated, a train set is operated, including several stations.
[0056] Step S1.2.1, obtain the calculation results of the secondary rating index under the transportation capacity index.
[0057] The number of train pairs can be directly obtained based on the collected and organized train operation diagram data.
[0058] The average daily vehicle mileage can be obtained by performing relevant calculations on the collected and collated operation diagram data. The calculation formula is as follows:
[0059]
[0060] Among them, S represents the average daily vehicle kilometers;
[0061] l i represents the daily vehicle-kilometer of the i-th EMU, which is obtained based on the EMU information in the EMU operation plan data;
[0062] n represents the number of EMUs used, which is directly obtained based on the EMU information in the EMU operation plan data.
[0063] The average staff turnover can be obtained by performing relevant calculations on the collected and collated operation diagram data. The calculation formula is as follows:
[0064]
[0065] Where A represents the average staffing turnover;
[0066] C i represents the capacity of the i-th EMU, that is, the maximum number of passengers that the EMU can carry, which is directly obtained based on the EMU information in the EMU operation plan data;
[0067] l i represents the daily mileage of the i-th EMU;
[0068] n represents the number of applied EMUs, that is, the number of EMUs running in any high-speed train section to be evaluated, which is directly obtained based on the EMU information in the EMU operation plan data.
[0069] Step S1.2.2, obtain the calculation results of the secondary rating indicators under the operating efficiency indicators.
[0070] The average utilization coefficient is the number of trains included in an EMU route. An EMU needs to complete multiple train tasks when completing a route task. For example, an EMU route includes two tasks. The EMU needs to depart from Changzhou North and arrive at Kunming South as the G1377 train to complete one train task, and then depart from Kunming South and arrive at Changzhou North as the G1378 train to complete the second train task. Only then can it be considered to have completed the entire route task. The route task of this EMU includes two trains, so the utilization coefficient is 2, which can be directly obtained based on the collected and sorted EMU operation plan data.
[0071] The average technical speed can be obtained by performing relevant calculations on the collected operation diagram data. The calculation formula is as follows:
[0072]
[0073] Among them, v 技 represents the average technical speed;
[0074] ∑ml represents the sum of the travel distances of all trains in the evaluation section of the operation diagram (the high-speed train section to be evaluated);
[0075] l represents the travel distance of each train in the high-speed train section to be evaluated, which is obtained based on the road network data and the train operation diagram data, that is, the train starting and ending stations are obtained by querying the train operation diagram data, and then the travel distance is obtained by comparing the line information, section information, station information and interval information in the road network data.
[0076] For example, by obtaining the departure and arrival information of G163 train, we can know that its departure station is Nanjing South Station and its arrival station is Shanghai Hongqiao Station. By comparing it with the road network information, we can know that there are 9 sections between Shanghai Hongqiao Station and Nanjing South Station, and the total length of the sections is 255.6km, that is, the train travels 255.6km;
[0077] m represents the number of train pairs, which is directly obtained based on the train operation diagram data;
[0078] ∑mt 运 It represents the sum of the running time of all trains in the evaluation section of the operation diagram, including running time and additional time for starting and stopping, but excluding the stop time of the train at each station;
[0079] t 运 The running time of each train in the high-speed train section to be evaluated is obtained based on the train operation diagram data, that is, the section running time of each train;
[0080] m represents the number of train pairs;
[0081] EMU refers to a specific vehicle, while train here tends to be associated with the train number, representing a transport mission of the EMU. For example, the EMU in S1.2.2 is G1377 when it is traveling from Changzhou North to Kunming South, and G178 when it is traveling from Kunming South to Changzhou North.
[0082] The average travel speed can be obtained by performing relevant calculations on the collected operation diagram data. The calculation formula is as follows:
[0083]
[0084] v 旅 represents the average travel speed;
[0085] ∑ml represents the sum of train movements in the evaluation section of the operation diagram;
[0086] ∑mt 全 It indicates the total travel time of all trains in the evaluation section of the operation diagram, including running time, stop time and start-stop additional time;
[0087] m represents the number of train pairs;
[0088] t 全 The travel time of each train in the high-speed train section to be evaluated is obtained based on the train operation diagram data, that is, the time taken by the train from the departure station to the final station; that is, the difference between the arrival time of the final station and the departure time of the departure station;
[0089] The average speed coefficient can be obtained by performing relevant calculations on the collected and collated operation diagram data. The calculation formula is as follows:
[0090]
[0091] Where β represents the average travel speed, v 旅 represents the average travel speed, v 技 Indicates the average technical speed.
[0092] The average connection time can be obtained by performing relevant calculations on the collected and collated operation diagram data. The calculation formula is as follows:
[0093]
[0094] represents the average connection time;
[0095] T 续 Indicates the total connection time, which is obtained based on the EMU operation plan data;
[0096] n represents the number of EMUs used.
[0097] Step S1.2.3, obtain the calculation results of the secondary rating indicators under the service quality indicators.
[0098] The reasonableness coefficient of arrival and departure time can be obtained by performing relevant calculations on the collected and collated operation diagram data. The calculation formula is as follows:
[0099]
[0100] in Indicates the rationality of the arrival and departure time of station k, represented by a coefficient;
[0101] It indicates the number of trains with reasonable arrival and departure times at station k, that is, the number of trains with arrival and departure times between 6:00 and 23:00, obtained based on the train operation diagram data;
[0102] n k It indicates the total number of trains arriving and departing from station k, that is, the sum of the number of arriving trains and the number of departing trains, which is obtained based on the train operation diagram data.
[0103] Specifically, the number of departure times at the station = the number of trains dispatched;
[0104] The number of arrival times at the station = the number of arriving trains;
[0105] The average train stop rate can be obtained by performing relevant calculations on the collected and collated operation diagram data. The calculation formula is as follows:
[0106]
[0107] Where α represents the average train stop rate;
[0108] ∑mk 停 Indicates the number of stops of all trains in the evaluation section of the operation diagram;
[0109] k 停 The number of stops for each train in the high-speed train section to be evaluated is obtained based on the train operation diagram data;
[0110] ∑mk represents the number of stations passed by all trains in the evaluation section of the operation diagram.
[0111] k represents the number of stations passed by each train in the high-speed train section to be evaluated, which is obtained based on the train operation diagram data and road network data.
[0112] That is, the train's starting and ending stations and running route information are obtained through the train timetable data, and by comparing with the line data and station data in the road network data, the stations where the train stops are excluded from all the stations on the route to obtain the stations where the train does not stop, thereby obtaining the number of stations on the train route that do not stop.
[0113] For example, for the G163 train, by querying the train operation diagram data, it can be known that its starting station is Nanjing South Station and its final station is Shanghai Hongqiao Station. By querying the route information and comparing it with the information in the road network data, it can be known that the stations it passes through are Nanjing South Station, Zhenjiang South Station, Danyang North Station, Changzhou North Station, Wuxi East Station, Suzhou North Station, Kunshan South Station and Shanghai Hongqiao Station, among which the stations it stops at are Nanjing South Station, Changzhou North Station and Shanghai Hongqiao Station. Therefore, the stations that the train does not stop at in its route are Zhenjiang South Station, Danyang North Station, Wuxi East Station, Suzhou North Station and Kunshan South Station, and the number of stations that it does not stop at is 5;
[0114] Then compare the road network data to obtain the number of stations it passes through (the number of stations where the train stops on the route).
[0115] Number of stations passed = number of stations where the train stops + number of stations where the train does not stop;
[0116] m represents the number of train pairs.
[0117] The arrival interval balance and departure interval balance can be obtained by performing relevant calculations on the collected and collated operation diagram data. The calculation method is as follows:
[0118] Suppose that in any high-speed train section to be evaluated, the set of arrival times of any k stations is XD = (xd 1 ,xd 2 ,…,xd N ), sort them in ascending order to ensure xd M ≤xd M+1 (M=1, 2, ... N-1), xd M represents the Mth arrival time, obtained based on the train operation diagram data;
[0119] xd represents the arrival time;
[0120] N represents the total number of arrival times in a section, that is, the number of trains passing through the station;
[0121] yd g =xd M+1 -xd M (M=1, 2, 3, ..., N-1)
[0122] d t Represents the sum of all arrival time intervals in a day.
[0123] g-time interval; t-moment;
[0124] yd g is the time interval between the arrival of adjacent trains at this station (station k), satisfying:
[0125] yd g ≥0
[0126]
[0127] Assume E d is the mean of the arrival time intervals, is the arrival balance of station k, and the calculation formula is as follows:
[0128]
[0129] Finally, the average of the arrival balance of all stations (k stations) in the entire section is taken to obtain the final arrival balance index σ 到 .
[0130]
[0131] The number of k stations is obtained based on the road network data.
[0132] Suppose that in any high-speed train section to be evaluated, the set of departure times of any k stations is XF = (xf 1 , xf 2 ,…,xf F ), sort them in ascending order to ensure that xf F ≤xf F+1 (F=1, 2,…, N-1).
[0133] xf F represents the Fth departure time, obtained based on the train operation diagram data;
[0134] xf indicates the departure time;
[0135] Let yf g =xf F+1 -xf F (F = 1, 2, 3, ... N-1)
[0136] Then yf g is the time interval between the departures of adjacent trains at this station (station k), satisfying:
[0137] yf g ≥0,
[0138]
[0139] where f t It is the sum of all departure time intervals in a day.
[0140] Assume E f is the mean of the departure time intervals, The distribution balance of station k is calculated as follows:
[0141]
[0142] Finally, the average of the dispatch balance of all stations (k stations) in the entire section is taken to obtain the final arrival balance index σ 发 .
[0143] Three sections (high-speed train sections to be evaluated) were selected for evaluation in this implementation. The evaluation indicators of the operation diagrams of the three sections (a to c) are shown in Table 1:
[0144] Table 1 Calculation results of operation diagram evaluation indicators
[0145]
[0146]
[0147] Among them, take section a as an example:
[0148] The calculation result of the interval balance is 347, that is, σ 到 =347.
[0149] The calculation result of the uniformity of the transmission interval is 364, that is, σ 发 =364.
[0150] Step S2: Analyze the calculation results based on the order relationship analysis method to clarify the direction of improvement.
[0151] Step S2.1: Use the ordinal relationship analysis method (G1-method) to assign weights to the evaluation indicators (primary evaluation indicators and secondary evaluation indicators).
[0152] How to determine the weight coefficient is one of the core issues in conducting multi-index comprehensive evaluation. The determination methods are mainly divided into three categories: the weighting method based on the "function-driven" principle, the weighting method based on the "difference-driven" principle, and the comprehensive integrated weighting method.
[0153] The importance of each indicator in the operation diagram evaluation system depends on the analysis of each department of the railway bureau based on its own needs. Under different circumstances, different inclinations will be produced for certain indicators, so it is more appropriate to use a subjective weighting method.
[0154] Compared with the eigenvalue method used in general subjective weighting methods, the sequential relationship analysis method (G1-method) does not require consistency testing, has a smaller amount of calculation, and can be applied to a large number of comparative indicators. It is particularly handy for actual work departments and is a relatively excellent subjective weighting method. Its idea is to determine the sequence relationship of the indicator set, analyze the mutual importance of adjacent sequences, and thus derive the weight of each indicator.
[0155] The specific steps of weighting by the order relationship analysis method (G1-method) are as follows:
[0156] Step S2.1.1, determine the sequence relationship.
[0157] When an indicator x i The importance under a certain evaluation standard (or goal) is greater than (or not less than) x j When, denoted as x i >x j The decision maker has a set of indicators X = {x 1 ,x 2 ,…,xm} Select the most important indicator under a certain evaluation standard (or goal) and record it as Then delete the selected indicators from X, and then select the most important indicators under a certain evaluation standard (or goal) from X and record them as And so on, record the indicators to The sequence relationship of all indicators is obtained, then
[0158] The sequence relationship of the three-dimensional indicators (first-level evaluation indicators) and the indicators of each dimension (second-level evaluation indicators) is determined as shown in Table 2 and Table 3:
[0159] Table 2 Index-symbol comparison table
[0160]
[0161] Table 3 Sequence relationship table
[0162]
[0163] Step S2.1.2: Determine the relative importance of adjacent sequence indicators.
[0164] Comparison of sequence indicators s), denoted by r L (L=s,s-1,…,2) is Relative to The importance of r L Please refer to Table 4 for the value assignment.
[0165] L-the number of the first-level indicator, or the number of the second-level evaluation indicator under the same first-level evaluation indicator;
[0166] s-the number of first-level indicators, or the number of second-level evaluation indicators under the same first-level evaluation indicator;
[0167] - Lth sequence index;
[0168] Table 4 r L Assignment reference table
[0169]
[0170] r L-1 With r L The constraints must be met:
[0171]
[0172] Comparing the importance of any two adjacent indicators in each sequence, the relative importance table is shown in Table 5:
[0173] Table 5 Relative importance table
[0174]
[0175] Step S2.1.3: Based on the relative importance of adjacent indicators, first calculate the weight coefficient of the evaluation indicator pointed to by the last sequence indicator, and then calculate the weight coefficients of the evaluation indicators pointed to by the remaining sequence indicators in turn according to their relative importance.
[0176] When calculating the weight of a secondary evaluation indicator in the entire system, multiply it by the weight coefficient of the primary indicator to which this secondary evaluation indicator belongs.
[0177] The last sequence index in each index sequence The weight coefficient w s The values are:
[0178]
[0179] The weight coefficients of other indicators in the indicator sequence are:
[0180] w L-1 =r L w L ,L=s,s-1,...,2
[0181] In actual work, department personnel can change the sequence and r at any time according to evaluation needs. L value, thus obtaining different weighting results.
[0182] The above formula is a general formula for calculating the weight coefficient within a layer. If you want to calculate the weight of a secondary indicator in the entire system, you can multiply it by the weight coefficient of the primary indicator where this secondary indicator is located.
[0183] That is, for the first-level evaluation index, the calculation result is the final weight coefficient;
[0184] For the secondary indicators, the calculation result is the weight coefficient within the primary indicator. To obtain its weight coefficient in the entire indicator system, multiply the result by the weight coefficient of the primary indicator to which it belongs.
[0185] The values of the calculated weight coefficient w are shown in Table 6.
[0186] Table 6 Weight coefficient w value
[0187]
[0188] Among them, the stratification (first-level evaluation indicators and second-level rating indicators) is for the convenience of the empowerment stage. If there is no first-level evaluation indicator, the indicator selection will not be purposeful and the order of the indicators will be difficult to determine.
[0189] In order to explain the calculation process of the weight coefficient of the first-level evaluation index in detail, the transportation capacity of 0.434 is taken as an example.
[0190] The weight coefficient of transport capacity is 0.434, and its calculation process is as follows:
[0191] Among the first-level evaluation indicators, x 3 The service quality index is the last index in the sequence relationship, so the weight coefficient for calculating the service quality is:
[0192] w 3 =(1+1.2×1.4+1.2) -1 =0.258
[0193] Then the values of other indicators in the indicator sequence are:
[0194] w 2 =0.258×1.2=0.310
[0195] w 1 =0.310×1.4=0.434
[0196] Among them, r 3 =1.2, r 2 =1.4.
[0197] Therefore, the weight coefficient of transportation capacity is 0.434.
[0198] In order to explain the calculation process of the weight coefficient of the secondary evaluation index in detail, the number of train operations 0.184 is taken as an example.
[0199] The weight coefficient of the number of train runs is 0.184, and its calculation process is as follows:
[0200] The train operation logarithm index belongs to the transport capacity layer, so the index weight coefficient is calculated first within the transport capacity layer. 3 The average daily vehicle mileage index is the last index in the sequence relationship, so the weight coefficient for calculating the average daily vehicle mileage is:
[0201] w 3 =(1+1.2*1.6+1.6) -1 =0.221
[0202] Then the values of other indicators in the indicator sequence are:
[0203] w 2 =0.221×1.6=0.354
[0204] w 1 =0.354×1.2=0.425
[0205] The weight coefficient of the logarithmic index of train operation in the transport capacity layer is 0.425. Then the weight coefficient of the logarithmic index of train operation in the transport capacity layer is multiplied by the weight coefficient of transport capacity to obtain the weight coefficient of the logarithmic index of train operation in the index system:
[0206] w 11 =0.425×0.434=0.184
[0207] Therefore, the weight coefficient of the logarithmic index of train operation in the index system is 0.184.
[0208] Step S2.2: Use the TOPSIS evaluation method to comprehensively evaluate the quality of the operation diagram of the high-speed railway section.
[0209] The TOPSIS evaluation method evaluates the quality of a solution by the relative closeness of the solution to the optimal ideal solution and the worst solution. This method has a wide range of applications, has no strict restrictions on data distribution, sample size, and the number of indicators, has simple mathematical calculations, and has intuitive geometric meaning, and is suitable as a comprehensive evaluation method of the present invention.
[0210] Step S2.2.1, construct the initial decision matrix A.
[0211] This comprehensive evaluation involves p sections (high-speed train sections to be evaluated), which are recorded as A = {a 1 ,a 2 ,…,a p}, there are q secondary evaluation indicators in each section of the evaluation operation diagram or in a primary evaluation indicator, and its initial decision matrix X is recorded as X = (x ij ) p×q .
[0212] Among them, x ij represents the value of the jth secondary evaluation index corresponding to the i-th section, that is, the calculation result in Table 1;
[0213] Step S2.2.2: Normalize the initial decision matrix A to obtain the matrix R, and combine it with the weight W to obtain the weighted matrix Y.
[0214] The values of the indicators in X are made consistent, that is, each indicator is converted into a very large indicator.
[0215] The indicator system contains extremely large indicators and extremely small indicators.
[0216] For the TOPSIS method, the extremely small index only needs to take the positive ideal solution as the minimum value and the negative ideal solution as the maximum value, and no conversion is required.
[0217] Among them, the extremely large index, that is, the extremely large attribute, means that the decision maker hopes that the value of a certain attribute (evaluation index) in all alternative plans will be as large as possible. The extremely small index, that is, the extremely small attribute, is the opposite.
[0218] The vector norm method is used to simultaneously normalize and dimensionless the indicators, and each indicator is transformed according to the following formula to obtain the weighted matrix:
[0219]
[0220] Y=R·diag(w 1 ,w 2 ,…,w s )
[0221] R=(r ij ) p×q
[0222] Step S2.2.3: Determine the positive ideal solution a of the weighted matrix Y + and negative ideal solution a - .
[0223] Let the positive ideal point a + and negative ideal point a - The j-th index values are and
[0224] For benefit indicators, is the maximum value, is the minimum value; for cost-based indicators, is the minimum value, is the maximum value.
[0225] in,
[0226]
[0227] The solution formula is:
[0228]
[0229] The solution formula is:
[0230]
[0231] Step S2.2.4, calculate y ij To the positive ideal solution Euclidean distance L i 、c ij To negative ideal solution The Euclidean distance D i , and finally calculate the evaluation coefficient Ci , the formula is:
[0232]
[0233] C i As the coefficient for the final evaluation of the operation quality of the section operation diagram, the larger the value and the closer it is to 1, the closer it is to the ideal solution and the better the quality of the operation diagram. i That is the evaluation score.
[0234] That is, after normalizing and weighting the indicator values (calculation results), the positive ideal point and negative ideal point are found, and finally the three dimensions and comprehensive evaluation coefficients are calculated as shown in Table 7.
[0235] Table 7 Three dimensions and comprehensive evaluation coefficient values
[0236]
[0237] For the three sections evaluated, the comprehensive scores of Section A and Section C are similar, the operation diagram quality of Section A is the best, and the comprehensive score of Section B is lower.
[0238] Section a has advantages in terms of transport capacity and service quality, while section c has advantages in terms of operational efficiency.
[0239] If the operation diagram is to be improved, efforts should be made to improve the operating efficiency indicators of section a and the transportation capacity and service quality indicators of section c. For section b, a careful analysis should be conducted to consider whether a major and comprehensive adjustment to the operation diagram is needed.
[0240] In order to specifically explain the calculation process of the evaluation coefficient of the first-level evaluation index, the transportation capacity of 0.738 is taken as an example.
[0241] The evaluation coefficient of transport capacity is 0.738, and its calculation process is as follows. The calculation process takes 8 decimal places, but only 3 decimal places are shown in the description:
[0242] The initial decision matrix for evaluation is:
[0243]
[0244] First, the initial evaluation matrix is normalized, taking the number of train runs in section a as an example:
[0245]
[0246] Then multiply the normalized index value by the weight coefficient to obtain the weighted matrix. Take the number of train runs in section a as an example:
[0247] y 11 =0.654×0.425=0.278
[0248] Then the weight matrix is:
[0249]
[0250] Determine the positive ideal solution a of the weighted matrix Y + and negative ideal solution a - for:
[0251] a + =[0.278, 0.134, 0.211]
[0252] a - =[0.209, 0.118, 0.193]
[0253] Calculate y ij To the positive ideal solution Euclidean distance L i 、c ij To negative ideal solution The Euclidean distance D i , and finally calculate the evaluation coefficient C i ,but
[0254]
[0255] In order to specifically explain the calculation process of the segment evaluation coefficient, the segment evaluation coefficient of 0.636 is taken as an example.
[0256] The evaluation coefficient of segment a is 0.636, and its calculation process is as follows. The calculation process takes 8 decimal places, but only 3 decimal places are shown in the description:
[0257] The initial decision matrix for evaluation is:
[0258]
[0259] First, the initial evaluation matrix is normalized, taking the number of train runs in section a as an example:
[0260]
[0261] Then multiply the normalized index value by the weight coefficient to obtain the weighted matrix. Take the number of train runs in section a as an example:
[0262] y 11 =0.654×0.184=0.120
[0263] Then the weight matrix is:
[0264]
[0265] Determine the positive ideal solution a of the weighted matrix Y+ and negative ideal solution a - for:
[0266] a + =[0.120, 0.058, 0.091, 0.021, 0.040, 0.056, 0.037, 0.026, 0.054, 0.043, 0.016, 0.023]
[0267] a - =[0.091, 0.051, 0.084, 0.017, 0.034, 0.053, 0.049, 0.021, 0.054, 0.030, 0.029, 0.040]
[0268] Calculate y ij To the positive ideal solution Euclidean distance L i 、c ij To negative ideal solution The Euclidean distance D i , and finally calculate the evaluation coefficient C i ,but
[0269]
[0270] The above is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any technician in the relevant technical field, without departing from the scope of the technical solution of the present invention, makes any form of equivalent replacement or modification to the technical solution and technical content disclosed in the present invention, which does not depart from the content of the technical solution of the present invention and still falls within the protection scope of the present invention.
Claims
1. A comprehensive evaluation method for the quality of high-speed train section operation diagram based on overall transportation efficiency, characterized in that: The following steps are involved: Step S1: for each high-speed train section to be evaluated, based on the collected operation diagram data, obtain the calculation results of each secondary rating index; Step S2: Analyze the calculation results based on the topological relationship analysis method (TOPSIS) to clarify the direction of improvement.
2. The high-speed train section operation diagram quality comprehensive evaluation method based on transportation overall efficiency according to claim 1 is characterized in that: Step S1 specifically includes the following steps: Step S1.1, collecting and arranging operation diagram data, including: road network data, train operation diagram data, and EMU operation plan data; Step S1.2, setting the first-level evaluation index and the second-level evaluation index, and obtaining the calculation results of each second-level rating index; Among them, each first-level evaluation indicator includes several second-level evaluation indicators; the first-level evaluation indicators include transportation capacity indicators, operating efficiency indicators and service quality indicators.
3. The comprehensive evaluation method for the quality of high-speed train section operation diagram based on overall transportation efficiency according to claim 2 is characterized in that: Step S1.2 specifically includes the following steps: Step S1.2.1, obtaining the calculation results of the secondary rating index under the transportation capacity index; Step S1.2.2, obtaining the calculation results of the secondary rating indicators under the operating efficiency indicators; Step S1.2.3, obtain the calculation results of the secondary rating indicators under the service quality indicators.
4. The comprehensive evaluation method for the quality of high-speed train section operation diagram based on overall transportation efficiency according to claim 1 is characterized in that: Step S2 specifically includes the following steps: Step S2.1, calculating the weight coefficient of the first-level evaluation index and the weight coefficient of the second-level evaluation index; Step S2.2: Based on the calculation results and weight coefficients, the TOPSIS evaluation method is used to calculate the evaluation scores of the primary evaluation indicators and the evaluation scores of different sections.
5. The comprehensive evaluation method for the quality of high-speed train section operation diagram based on overall transportation efficiency according to claim 4 is characterized in that: Step S2.1 specifically includes the following steps: Step S2.1.1, determining the sequence relationship; Step S2.1.2, determine the relative importance of adjacent sequence indicators; Step S2.1.3, based on the relative importance of adjacent indicators, first calculate the weight coefficient of the evaluation indicator indicated by the last sequence indicator, and then calculate the weight coefficients of the evaluation indicators indicated by the remaining sequence indicators in turn according to their relative importance; When calculating the weight coefficient of the secondary evaluation indicator in the entire system, it is finally multiplied by the weight coefficient of the primary evaluation indicator where the secondary evaluation indicator is located.
6. The comprehensive evaluation method for the quality of high-speed train section operation diagram based on overall transportation efficiency according to claim 4 is characterized in that: Step S2.2 specifically includes the following steps: Step S2.2.1, construct an initial decision matrix A; Step S2.2.2: Normalize the initial decision matrix A to obtain the matrix T, and combine it with the weight matrix W to obtain the weighted matrix Y. Step S2.2.3: Determine the positive ideal solution a of the weighted matrix Y + and negative ideal solution a - ; Step S2.2.4, calculate the evaluation coefficient.