Battery power distribution method and device, equipment, storage medium and program product
By dividing the charging and discharging units according to the state of charge value of the battery energy storage unit, and optimizing the power distribution using the Sigmoid function, the battery life attenuation and SOC differences caused by improper power distribution in the electrochemical energy storage power station are solved, and the power station is improved Operating efficiency and battery utilization.
Patent Information
- Application Number
- CN202411352401.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-11-12
AI Technical Summary
Large-scale electrochemical energy storage systems lack experience in coordinated operation and regulation. Improper internal power distribution leads to battery life attenuation and SOC differences, affecting the safe operation of electrochemical energy storage power plants.
According to the state of charge value of the battery energy storage unit, it is divided into charging and discharging units, and charge or discharge is preferred. The power distribution weight is constructed using the Sigmoid function to ensure that the battery energy storage unit meets power requirements during adjustment and reduces the difference in state of charge.
It improves the operating efficiency of the power station, delays the attenuation of battery life, makes full use of energy storage units, reduces the number of responses of battery energy storage units in energy storage power stations, and improves the overall operating efficiency.
Smart Images

Figure CN118944248A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of battery technology, and in particular to a battery power distribution method, device, equipment, storage medium and program product. Background Art
[0002] Electrochemical energy storage systems have the advantages of fast response speed, independent adjustment of active and reactive power, wide site selection range, short construction period, and easy expansion. They can effectively solve the problem of power system instability caused by excessive proportion of renewable energy generation. However, large-scale electrochemical energy storage as an independent resource participating in grid regulation is still in its infancy, and there is insufficient experience in coordinated operation and regulation. Improper power distribution within electrochemical energy storage power stations will reduce operating efficiency, aggravate battery life degradation, and expand the SOC (State of Charge) differences between energy storage units, which is not conducive to the safe operation of electrochemical energy storage power stations.
[0003] At present, the power instruction allocation methods include average allocation, allocation according to the proportion of PCS (Power Conversion System) available capacity, or sorting according to the PCS available capacity and working at maximum power until the total power demand of the energy storage power station is met. Among them, the average allocation method will cause the PCS to be allocated power that does not match its own state, and expand the SOC difference between energy storage units. Allocation according to the proportion of PCS available capacity achieves SOC balance, but the balancing speed is slow. The allocation method sorting according to PCS available capacity will cause the battery energy storage unit to work at maximum power for a long time, accelerating the decay of the energy storage battery life. Summary of the invention
[0004] In view of this, the present invention provides a battery power allocation method, device, equipment, storage medium and program product to allocate power according to battery status, which can improve operating efficiency and delay the attenuation of battery life.
[0005] In a first aspect, the present invention provides a battery power allocation method, which includes: obtaining a state of charge value of each battery energy storage unit; dividing each battery energy storage unit into a charging energy storage unit and a discharging energy storage unit according to the state of charge value; when the charging energy storage unit meets the charging demand, allocating power to each charging energy storage unit according to the state of charge value, and charging the charging energy storage unit; when the charging energy storage unit does not meet the charging demand, allocating power to each battery energy storage unit according to the state of charge value, and charging the battery energy storage unit; when the discharging energy storage unit meets the discharging demand, allocating power to each discharging energy storage unit according to the state of charge value, and discharging the discharging energy storage unit; when the discharging energy storage unit does not meet the discharging demand, allocating power to each battery energy storage unit according to the state of charge value, and discharging the battery energy storage unit.
[0006] In this implementation, the charging energy storage unit and the discharging energy storage unit are divided according to the state of charge value, and the charging energy storage unit is charged first, and the discharging energy storage unit is discharged first. The power allocation can be performed considering the battery's own state, and the difference in the state of charge between the battery energy storage units can be reduced. When the charging energy storage unit meets the charging demand, the charging energy storage unit is used for charging, and when the discharging energy storage unit meets the discharging demand, the discharging energy storage unit is used for discharging, which can reduce the number of responses of the battery energy storage units in the energy storage power station and improve the overall operation efficiency of the power station. When the charging energy storage unit does not meet the charging demand, the battery energy storage unit is used for charging, and when the discharging energy storage unit does not meet the discharging demand, the battery energy storage unit is used for discharging, which can fully and effectively utilize all energy storage units and delay the attenuation of battery life.
[0007] In an optional embodiment, dividing each battery energy storage unit into a charging energy storage unit and a discharging energy storage unit according to the state of charge value includes: calculating an average state of charge value of the state of charge values of each battery energy storage unit; when the state of charge value of the battery energy storage unit is greater than or equal to the average state of charge value, dividing the battery energy storage unit into a discharging energy storage unit; when the state of charge value of the battery energy storage unit is less than the average state of charge value, dividing the battery energy storage unit into a charging energy storage unit.
[0008] In this implementation, each battery energy storage unit is divided into a charging energy storage unit and a discharging energy storage unit according to the state of charge value of each battery energy storage unit and the overall average state of charge value. The charging energy storage unit is charged first, and the discharging energy storage unit is discharged first. This can reduce the number of responses of battery energy storage units in the energy storage power station, improve the overall operation efficiency of the power station, and delay the attenuation of battery life.
[0009] In an optional implementation, when the charging energy storage unit meets the charging demand, power is allocated to each charging energy storage unit according to the state of charge value, and charging using the charging energy storage unit includes: obtaining a maximum charging power of the charging energy storage unit; when the maximum charging power is greater than or equal to the required charging power, reconstructing a first state of charge value of the charging energy storage unit based on the state of charge value of the charging energy storage unit: in, is the first state of charge value of the i-th charging energy storage unit, S i1 is the state of charge value of the i-th charging energy storage unit, min(S 1 ) is the minimum state of charge value of the charging energy storage unit, max(S 1 ) is the maximum state of charge value of the charging energy storage unit; and the first weight of the charging energy storage unit is calculated based on the first state of charge value: Among them, f dis (S i1 ) is the first weight of the i-th charging energy storage unit; based on the first weight and the required charging power, the charging power is allocated to each charging energy storage unit, and the charging energy storage unit is used to charge according to the charging power.
[0010] In an optional implementation, when the charging energy storage unit does not meet the charging demand, power is allocated to each battery energy storage unit according to the state of charge value, and charging using the battery energy storage unit includes: when the maximum charging power is less than the required charging power, charging the charging energy storage unit according to the maximum charging power, and obtaining the remaining required charging power; reconstructing a second state of charge value of the discharging energy storage unit based on the state of charge value of the discharging energy storage unit: in, is the second state of charge value of the i-th discharging energy storage unit, S i2 is the state of charge value of the i-th discharging energy storage unit, min(S 2 ) is the minimum state of charge value of the discharge energy storage unit, max(S 2 ) is the maximum state of charge value of the discharging energy storage unit; and the second weight of the discharging energy storage unit is calculated based on the second state of charge value: Among them, f dis (S i2 ) is the second weight of the i-th discharging energy storage unit; based on the second weight and the remaining required charging power, the charging power is allocated to each discharging energy storage unit, and the discharging energy storage unit is charged according to the charging power.
[0011] In an optional implementation, when the discharging energy storage unit meets the discharging demand, power is allocated to each discharging energy storage unit according to the state of charge value, and discharging using the discharging energy storage unit includes: obtaining the maximum discharge power of the discharging energy storage unit; when the maximum discharge power is greater than or equal to the required discharge power, reconstructing a third state of charge value of the discharging energy storage unit based on the state of charge value of the discharging energy storage unit: in, is the third state of charge value of the i-th discharging energy storage unit, S i3 is the state of charge value of the i-th discharging energy storage unit, min(S 3 ) is the minimum state of charge value of the discharge energy storage unit, max(S 3 ) is the maximum state of charge value of the discharging energy storage unit; and the third weight of the discharging energy storage unit is calculated based on the third state of charge value: Among them, f dis (S i3 ) is the third weight of the i-th discharging energy storage unit; based on the third weight and the maximum discharging power, the discharging power is allocated to each discharging energy storage unit, and the discharging energy storage unit is used to discharge according to the discharging power.
[0012] In an optional implementation, when the discharging energy storage unit does not meet the discharging demand, power is allocated to each battery energy storage unit according to the state of charge value, and discharging using the battery energy storage unit includes: when the maximum discharge power is less than the required discharge power, the discharging energy storage unit is used to discharge according to the maximum discharge power, and the remaining required discharge power is obtained; based on the state of charge value of the charging energy storage unit, a fourth state of charge value of the charging energy storage unit is reconstructed: in, is the fourth state of charge value of the i-th charging energy storage unit, S i4 is the state of charge value of the i-th charging energy storage unit, min(S 4 ) is the minimum state of charge value of the charging energy storage unit, max(S 4 ) is the maximum state of charge value of the charging energy storage unit; and the fourth weight of the charging energy storage unit is calculated based on the fourth state of charge value: Among them, f dis (S i4 ) is the fourth weight of the i-th charging energy storage unit; based on the fourth weight and the remaining required discharge power, the discharge power is allocated to each charging energy storage unit, and the battery energy storage unit is used to discharge according to the discharge power.
[0013] In this implementation, the overall status of all battery energy storage units is re-evaluated, the power allocation weight is constructed using the Sigmoid function, the charging and discharging power and the state of charge value of the battery energy storage unit are designed as a Sigmoid function, and then the state of charge value is remapped. The state of charge value of the battery energy storage unit is recalculated according to the maximum difference principle, and the energy storage unit that actually participates in power regulation is selected, so that the energy storage unit can meet the power demand during regulation and accelerate the speed at which the state of charge of the battery energy storage units in the battery energy storage power station tends to be consistent.
[0014] In a second aspect, the present invention provides an electric power distribution device, which includes: an acquisition module, which is used to acquire the state of charge value of each battery energy storage unit; a division module, which is used to divide each battery energy storage unit into a charging energy storage unit and a discharging energy storage unit according to the state of charge value; a charging module, which is used to allocate power to each charging energy storage unit according to the state of charge value when the charging energy storage unit meets the charging demand, and use the charging energy storage unit for charging; when the charging energy storage unit does not meet the charging demand, allocate power to each battery energy storage unit according to the state of charge value, and use the battery energy storage unit for charging; a discharging module, which is used to allocate power to each discharging energy storage unit according to the state of charge value when the discharging energy storage unit meets the discharging demand, and use the discharging energy storage unit for discharging; when the discharging energy storage unit does not meet the discharging demand, allocate power to each battery energy storage unit according to the state of charge value, and use the battery energy storage unit for discharging.
[0015] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the battery power allocation method of the first aspect or any corresponding embodiment thereof by executing the computer instructions.
[0016] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the battery power allocation method of the first aspect or any corresponding embodiment thereof.
[0017] In a fifth aspect, the present invention provides a computer program product, comprising computer instructions for causing a computer to execute the battery power allocation method of the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 is a flow chart of a battery power allocation method according to an embodiment of the present invention;
[0020] Figure 2 is a flow chart of another battery power allocation method according to an embodiment of the present invention;
[0021] Figure 3 is a structural block diagram of a battery power distribution device according to an embodiment of the present invention;
[0022] Figure 4 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0024] Large-scale electrochemical energy storage is still in its infancy as an independent resource participating in grid regulation, and there is insufficient experience in coordinated operation and regulation. Improper power distribution within an electrochemical energy storage power station will reduce operating efficiency, aggravate battery life decay, and increase SOC differences between energy storage units. The present application provides a battery power distribution method that can consider the battery's own state for power distribution and reduce the difference in state of charge between battery energy storage units.
[0025] According to an embodiment of the present invention, a battery power distribution method embodiment is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0026] In this embodiment, a battery power distribution method is provided. Figure 1is a flow chart of a battery power allocation method according to an embodiment of the present invention. It should be noted that if there are substantially the same results, this embodiment does not use Figure 1 The process sequence shown is limited. Figure 1 As shown, the process includes the following steps:
[0027] Step S101, obtaining the state of charge value of each battery energy storage unit.
[0028] Among them, the state of charge (SOC) represents the ratio of the remaining power of the battery to its rated capacity, usually expressed as a percentage. It is an important parameter for measuring the battery charging state.
[0029] The state of charge of each battery energy storage unit is detected respectively to determine the state of charge value of each battery energy storage unit. The specific detection method is not limited in this application.
[0030] Step S102, dividing each battery energy storage unit into a charging energy storage unit and a discharging energy storage unit according to the state of charge value.
[0031] It can be understood that a battery energy storage unit with a higher state of charge value can release more electricity, and a battery energy storage unit with a lower state of charge value can receive more electricity.
[0032] The present application divides each battery energy storage unit into a charging energy storage unit and a discharging energy storage unit according to the size relationship of the state of charge value. Among them, the state of charge value of the discharging energy storage unit is greater than the state of charge value of the charging energy storage unit.
[0033] Furthermore, different battery energy storage units are selected to work according to the current charging and discharging requirements. For example, when there is a charging requirement, the charging energy storage unit is used for charging first, and when there is a discharging requirement, the discharging energy storage unit is used for discharging first. For details, please refer to step S103 and step S104.
[0034] Step S103, when there is a charging demand, charging is performed using a charging energy storage unit or a battery energy storage unit.
[0035] When there is a charging demand, that is, the total power instruction received by the battery energy storage unit is less than 0, it is determined whether the charging energy storage unit can meet the charging demand alone.
[0036] When the charging energy storage unit can meet the charging demand alone, only the charging energy storage unit is used for charging.
[0037] Specifically, charging power is allocated to each charging energy storage unit according to the magnitude relationship of the state of charge values of the charging energy storage units, and the charging energy storage units are used for charging.
[0038] Among them, the smaller the charge state value of the charging energy storage unit, the greater the allocated charging power.
[0039] When the charging energy storage unit cannot meet the charging demand alone, the charging energy storage unit and the discharging energy storage unit are used in combination for charging.
[0040] Specifically, charging power is allocated to each battery energy storage unit according to the magnitude relationship of the state of charge values of the battery energy storage units, and the battery energy storage units are used for charging.
[0041] In one implementation, the charging energy storage unit and the discharging energy storage unit can be combined to meet the charging demand, and the charging power allocated to the charging energy storage unit is the maximum charging power. The smaller the state of charge value of the discharging energy storage unit, the greater the charging power allocated.
[0042] In another implementation, the charging energy storage unit and the discharging energy storage unit cannot be combined to meet the charging demand, and the charging power allocated to the charging energy storage unit and the discharging energy storage unit is the maximum charging power.
[0043] Step S104, when there is a discharge demand, discharge is performed using a discharge energy storage unit or a battery energy storage unit.
[0044] When there is a discharge demand, that is, the total power instruction received by the battery energy storage unit is greater than 0, it is determined whether the discharge energy storage unit can meet the discharge demand alone.
[0045] When the discharge energy storage unit can meet the discharge demand alone, only the discharge energy storage unit is used for discharge.
[0046] Specifically, the discharge power is allocated to each charging energy storage unit according to the magnitude relationship of the charge state values of the discharging energy storage units, and the discharging energy storage units are used for discharging.
[0047] The greater the state of charge value of the discharge energy storage unit, the greater the allocated discharge power.
[0048] When the discharging energy storage unit cannot meet the discharging demand alone, the charging energy storage unit and the discharging energy storage unit are used in combination to discharge.
[0049] Specifically, the discharge power is allocated to each battery energy storage unit according to the magnitude relationship of the state of charge values of the battery energy storage units, and the battery energy storage units are used for discharge.
[0050] In one implementation, the charging energy storage unit and the discharging energy storage unit can be combined to meet the discharge demand, and the discharge power allocated to the discharging energy storage unit is the maximum discharge power. The larger the state of charge value of the charging energy storage unit, the larger the allocated discharge power.
[0051] In another implementation, the charging energy storage unit and the discharging energy storage unit cannot be combined to meet the discharge demand, and the discharge power allocated to the charging energy storage unit and the discharging energy storage unit is the maximum discharge power.
[0052] The battery power allocation method provided in this embodiment divides the charging energy storage unit and the discharging energy storage unit according to the state of charge value, and the charging energy storage unit is charged first, and the discharging energy storage unit is discharged first. The power allocation can be performed considering the battery's own state, and the difference in the state of charge between the battery energy storage units can be reduced. When the charging energy storage unit meets the charging demand, the charging energy storage unit is used for charging, and when the discharging energy storage unit meets the discharging demand, the discharging energy storage unit is used for discharging, which can reduce the number of responses of the battery energy storage units in the energy storage power station and improve the overall operation efficiency of the power station. When the charging energy storage unit does not meet the charging demand, the battery energy storage unit is used for charging, and when the discharging energy storage unit does not meet the discharging demand, the battery energy storage unit is used for discharging, which can fully and effectively utilize all energy storage units and delay the attenuation of battery life.
[0053] In this embodiment, a battery power allocation method is provided, which can be used in the above-mentioned mobile terminals, such as mobile phones, tablet computers, etc. Figure 2 is a flow chart of another battery power allocation method according to an embodiment of the present invention. It should be noted that if there are substantially the same results, this embodiment does not use Figure 2 The process sequence shown is limited. Figure 2 As shown, the process includes the following steps:
[0054] Step S201, obtaining the state of charge value of each battery energy storage unit.
[0055] For details, please see Figure 1 Step S101 of the illustrated embodiment will not be described in detail here.
[0056] Step S202, dividing each battery energy storage unit into a charging energy storage unit and a discharging energy storage unit according to the state of charge value.
[0057] The present application divides each battery energy storage unit into a charging energy storage unit and a discharging energy storage unit according to the size relationship of the state of charge value. Among them, the state of charge value of the discharging energy storage unit is greater than the state of charge value of the charging energy storage unit.
[0058] Specifically, the above step S202 includes:
[0059] Step S2021, calculating the average state of charge value of the state of charge values of each battery energy storage unit.
[0060] Step S2022: when the state of charge value of the battery energy storage unit is greater than or equal to the average state of charge value, the battery energy storage unit is divided into a discharging energy storage unit.
[0061] The average state of charge value is used as an evaluation benchmark, and the battery energy storage units with a state of charge value greater than or equal to the average state of charge value are used as a discharge group. When there is a discharge demand, the discharge energy storage units in the discharge group are preferentially used for discharge.
[0062] Step S2023, when the state of charge value of the battery energy storage unit is less than the average state of charge value, the battery energy storage unit is divided into a charging energy storage unit.
[0063] The average state of charge value is used as the evaluation benchmark, and the battery energy storage units with a state of charge value less than the average state of charge value are used as the charging group. When there is a charging demand, the charging energy storage units of the charging group are used for charging first.
[0064] Step S203, when there is a charging demand, charging is performed using a charging energy storage unit or a battery energy storage unit.
[0065] When the total power command received by the battery energy storage unit is less than 0, it means that there is a current charging demand, and the charging energy storage unit is used for charging first.
[0066] It can be understood that when the battery energy storage unit is being charged, the total power is less than zero, and the actual power is also less than zero, and its value is negative. For the convenience of description and understanding, the subsequent charging power is the absolute value of the actual power.
[0067] Specifically, the above step S203 includes:
[0068] Step S2031, obtaining the maximum charging power of the charging energy storage unit.
[0069] Step S2032: When the maximum charging power is greater than or equal to the required charging power, the charging energy storage unit is used to charge according to the allocated charging power.
[0070] It is determined whether the maximum charging power of the charging energy storage unit is greater than or equal to the required charging power. If the maximum charging power is greater than or equal to the required charging power, it means that the charging energy storage unit can meet the charging demand alone, and only the charging energy storage unit is used for charging.
[0071] Specifically, based on the state of charge value of the charging energy storage unit, a first state of charge value of the charging energy storage unit is reconstructed:
[0072]
[0073] in, is the first state of charge value of the i-th charging energy storage unit, Si1 is the state of charge value of the i-th charging energy storage unit, min(S 1 ) is the minimum state of charge value of the charging energy storage unit, max(S 1 ) is the maximum state of charge value of the charging energy storage unit.
[0074] Calculate a first weight of the charging energy storage unit based on the first state of charge value:
[0075]
[0076] Among them, f dis (S i1 ) is the first weight of the i-th charging energy storage unit.
[0077] Based on the first weight and the required charging power, charging power is allocated to each charging energy storage unit, and the charging energy storage unit is used to charge according to the charging power.
[0078] Specifically, the first weight of each charging energy storage unit is multiplied by the required charging power to obtain the charging power of each charging energy storage unit, and the charging energy storage unit is used to charge according to the charging power.
[0079] Step S2033: when the maximum charging power is less than the required charging power, the charging energy storage unit is charged according to the maximum charging power, and the discharging energy storage unit is charged according to the allocated charging power.
[0080] It is determined whether the maximum charging power of the charging energy storage unit is greater than or equal to the required charging power. If the maximum charging power is less than the required charging power, it means that the charging energy storage unit cannot meet the charging demand alone, and the charging energy storage unit and the discharging energy storage unit are used in combination for charging.
[0081] Specifically, the charging energy storage unit is preferentially used to charge according to the maximum charging power, and the remaining required charging power is obtained. The discharging energy storage unit is used to bear the remaining required charging power.
[0082] In one implementation, the discharging energy storage unit can meet the remaining required charging power. Based on the charge state value of the discharging energy storage unit, a second charge state value of the discharging energy storage unit is reconstructed:
[0083]
[0084] in, is the second state of charge value of the i-th discharging energy storage unit, S i2 is the state of charge value of the i-th discharging energy storage unit, min(S 2 ) is the minimum state of charge value of the discharge energy storage unit, max(S 2) is the maximum state of charge value of the discharge energy storage unit.
[0085] Calculate the second weight of the discharging energy storage unit based on the second state of charge value:
[0086]
[0087] Among them, f dis (S i2 ) is the second weight of the i-th discharging energy storage unit.
[0088] Based on the second weight and the remaining required charging power, the charging power is allocated to each discharging energy storage unit, and the discharging energy storage unit is used to charge according to the charging power.
[0089] Specifically, the second weight of each discharging energy storage unit is multiplied by the remaining required charging power to obtain the charging power of each discharging energy storage unit, and the discharging energy storage unit is charged according to the charging power.
[0090] In another implementation, the discharging energy storage unit cannot meet the remaining required charging power, and the discharging energy storage unit is used to charge according to the maximum charging power.
[0091] Step S204, when there is a discharge demand, discharge is performed using a discharge energy storage unit or a battery energy storage unit.
[0092] When the total power command received by the battery energy storage unit is greater than 0, it indicates that there is a current discharge demand, and the discharge energy storage unit is used for discharge first.
[0093] Specifically, the above step S204 includes:
[0094] Step S2041, obtaining the maximum discharge power of the discharge energy storage unit.
[0095] Step S2042: when the maximum discharge power is greater than or equal to the required discharge power, the discharge energy storage unit is discharged according to the allocated discharge power.
[0096] It is determined whether the maximum discharge power of the discharge energy storage unit is greater than or equal to the required discharge power. If the maximum discharge power is greater than or equal to the required discharge power, it means that the discharge energy storage unit can meet the discharge demand alone, and only the discharge energy storage unit is used for discharge.
[0097] Specifically, the third state of charge value of the discharging energy storage unit is reconstructed based on the state of charge value of the discharging energy storage unit:
[0098]
[0099] in, is the third state of charge value of the i-th discharging energy storage unit, S i3 is the state of charge value of the i-th discharging energy storage unit, min(S 3 ) is the minimum state of charge value of the discharge energy storage unit, max(S 3 ) is the maximum state of charge value of the discharge energy storage unit.
[0100] The third weight of the discharging energy storage unit is calculated based on the third state of charge value:
[0101]
[0102] Among them, f dis (S i3 ) is the third weight of the i-th discharging energy storage unit.
[0103] Discharging power is allocated to each discharging energy storage unit based on the third weight and the required discharging power, and the discharging energy storage unit is used to discharge according to the discharging power.
[0104] Specifically, the third weight of each discharging energy storage unit is multiplied by the required discharging power to obtain the discharging power of each discharging energy storage unit, and the discharging energy storage unit is used to discharge according to the discharging power.
[0105] Step S2043: when the maximum discharge power is less than the required discharge power, the discharge energy storage unit is used to discharge according to the maximum discharge power, and the battery energy storage unit is discharged according to the allocated discharge power.
[0106] It is determined whether the maximum discharge power of the discharge energy storage unit is greater than or equal to the required discharge power. If the maximum discharge power is less than the required discharge power, it means that the discharge energy storage unit cannot meet the discharge demand alone, and the discharge energy storage unit and the charging energy storage unit are used in combination for discharge.
[0107] Specifically, the discharging energy storage unit is preferentially used to discharge according to the maximum discharge power, and the remaining required discharge power is obtained. The charging energy storage unit is used to bear the remaining required discharge power.
[0108] In one implementation, the charging energy storage unit can meet the remaining required discharge power. The fourth state of charge value of the charging energy storage unit is reconstructed based on the state of charge value of the charging energy storage unit:
[0109]
[0110] in, is the fourth state of charge value of the i-th charging energy storage unit, S i4 is the state of charge value of the i-th charging energy storage unit, min(S 4 ) is the minimum state of charge value of the charging energy storage unit, max(S4 ) is the maximum state of charge value of the charging energy storage unit.
[0111] The fourth weight of the charging energy storage unit is calculated based on the fourth state of charge value:
[0112]
[0113] Among them, f dis (S i4 ) is the fourth weight of the i-th charging energy storage unit.
[0114] Based on the fourth weight and the remaining required discharge power, the discharge power is allocated to each charging energy storage unit, and the charging energy storage unit is used to discharge according to the discharge power.
[0115] Specifically, the fourth weight of each charging energy storage unit is multiplied by the remaining required discharge power to obtain the discharge power of each charging energy storage unit, and the charging energy storage unit is used to discharge according to the discharge power.
[0116] In another implementation, the charging energy storage unit cannot meet the remaining required discharge power, and the charging energy storage unit is used to discharge according to the maximum discharge power.
[0117] The battery power allocation method provided in this embodiment divides each battery energy storage unit into a charging energy storage unit and a discharging energy storage unit according to the state of charge value of each battery energy storage unit and the overall average state of charge value. The charging energy storage unit is given priority for charging, and the discharging energy storage unit is given priority for discharging. The power allocation can be performed considering the battery's own state, and the difference in state of charge between the battery energy storage units can be reduced. When the charging energy storage unit meets the charging demand, the charging energy storage unit is used for charging, and when the discharging energy storage unit meets the discharging demand, the discharging energy storage unit is used for discharging, which can reduce the number of responses of the battery energy storage units in the energy storage power station and improve the overall operation efficiency of the power station. When the charging energy storage unit does not meet the charging demand, the battery energy storage unit is used for charging, and when the discharging energy storage unit does not meet the discharging demand, the battery energy storage unit is used for discharging, which can fully and effectively utilize all energy storage units and delay the attenuation of battery life. Specifically, the overall status of all battery energy storage units is re-evaluated, the power allocation weight is constructed using the Sigmoid function, the charging and discharging power and the state of charge value of the battery energy storage unit are designed as a Sigmoid function, and then the state of charge value is remapped. The state of charge value of the battery energy storage unit is recalculated according to the maximum difference principle, and the energy storage unit that actually participates in power regulation is selected, so that the energy storage unit can meet the power demand during regulation and accelerate the speed at which the state of charge of the battery energy storage units in the battery energy storage power station tends to be consistent.
[0118] In this embodiment, a battery power distribution device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0119] This embodiment provides a battery power distribution device. Figure 3 is a structural block diagram of a battery power distribution device according to an embodiment of the present invention. Figure 3 As shown, including:
[0120] The acquisition module 301 is used to acquire the state of charge value of each battery energy storage unit.
[0121] The division module 302 is used to divide each battery energy storage unit into a charging energy storage unit and a discharging energy storage unit according to the state of charge value.
[0122] The charging module 303 is used to allocate power to each charging energy storage unit according to the state of charge value when the charging energy storage unit meets the charging demand, and use the charging energy storage unit for charging; when the charging energy storage unit does not meet the charging demand, allocate power to each battery energy storage unit according to the state of charge value, and use the battery energy storage unit for charging.
[0123] The discharge module 304 is used to allocate power to each discharge energy storage unit according to the charge state value when the discharge energy storage unit meets the discharge demand, and use the discharge energy storage unit to discharge; when the discharge energy storage unit does not meet the discharge demand, allocate power to each battery energy storage unit according to the charge state value, and use the battery energy storage unit to discharge.
[0124] The further functional description of each of the above modules is the same as that of the above corresponding embodiments and will not be repeated here.
[0125] The battery power distribution device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0126] The embodiment of the present invention also provides a computer device having the above Figure 3 The battery power distribution device shown.
[0127] See also Figure 4 , Figure 4is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 4 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 4 A processor 10 is taken as an example.
[0128] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0129] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.
[0130] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0131] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0132] The computer device also includes an input device 30 and an output device 40. The processor 10, the memory 20, the input device 30 and the output device 40 may be connected via a bus or other means. Figure 4 The example of connecting through bus is taken in the following.
[0133] The input device 30 can receive input digital or character information, and generate key signal input related to the user settings and function control of the computer device, such as a touch screen, a keypad, a mouse, a track pad, a touch pad, an indicator bar, one or more mouse buttons, a trackball, a joystick, etc. The output device 40 may include a display device, an auxiliary lighting device (e.g., an LED) and a tactile feedback device (e.g., a vibration motor), etc. The above-mentioned display device includes but is not limited to a liquid crystal display, a light emitting diode, a display and a plasma display. In some optional embodiments, the display device can be a touch screen.
[0134] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0135] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.
[0136] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A battery power distribution method, characterized in that: The method comprises: Obtain the state of charge value of each battery energy storage unit; Dividing each of the battery energy storage units into a charging energy storage unit and a discharging energy storage unit according to the state of charge value; When the charging energy storage unit meets the charging demand, power is allocated to each of the charging energy storage units according to the state of charge value, and the charging energy storage unit is used for charging; when the charging energy storage unit does not meet the charging demand, power is allocated to each of the battery energy storage units according to the state of charge value, and the battery energy storage unit is used for charging; When the discharging energy storage unit meets the discharging demand, power is allocated to each of the discharging energy storage units according to the state of charge value, and the discharging energy storage unit is used for discharging; when the discharging energy storage unit does not meet the discharging demand, power is allocated to each of the battery energy storage units according to the state of charge value, and the battery energy storage unit is used for discharging.
2. The battery power distribution method according to claim 1, characterized in that: The dividing each of the battery energy storage units into a charging energy storage unit and a discharging energy storage unit according to the state of charge value comprises: Calculating an average state of charge value of the state of charge values of each of the battery energy storage units; When the state of charge value of the battery energy storage unit is greater than or equal to the average state of charge value, the battery energy storage unit is divided into a discharging energy storage unit; When the state of charge value of the battery energy storage unit is less than the average state of charge value, the battery energy storage unit is divided into a charging energy storage unit.
3. The battery power distribution method according to claim 1 or 2, characterized in that: When the charging energy storage unit meets the charging demand, allocating power to each of the charging energy storage units according to the state of charge value, and charging by using the charging energy storage unit includes: Obtaining the maximum charging power of the charging energy storage unit; When the maximum charging power is greater than or equal to the required charging power, a first state of charge value of the charging energy storage unit is reconstructed based on the state of charge value of the charging energy storage unit: Among them, the is the first state of charge value of the i-th charging energy storage unit, the S i1 is the state of charge value of the i-th charging energy storage unit, min(S1) is the minimum state of charge value of the charging energy storage unit, and max(S1) is the maximum state of charge value of the charging energy storage unit; Calculate a first weight of the charging energy storage unit based on the first state of charge value: Among them, the f dis (S i1 ) is the first weight of the i-th charging energy storage unit; Based on the first weight and the required charging power, charging power is allocated to each of the charging energy storage units, and the charging energy storage units are used to charge according to the charging power.
4. The battery power distribution method according to claim 3, characterized in that: When the charging energy storage unit does not meet the charging demand, allocating power to each of the battery energy storage units according to the state of charge value, and charging the battery energy storage unit includes: When the maximum charging power is less than the required charging power, the charging energy storage unit is used to charge according to the maximum charging power, and the remaining required charging power is obtained; The second state of charge value of the discharging energy storage unit is reconstructed based on the state of charge value of the discharging energy storage unit: Among them, the is the second state of charge value of the i-th discharging energy storage unit, the S i2 is the state of charge value of the i-th discharging energy storage unit, min(S2) is the minimum state of charge value of the discharging energy storage unit, and max(S2) is the maximum state of charge value of the discharging energy storage unit; Calculate the second weight of the discharging energy storage unit based on the second state of charge value: Among them, the f dis (S i2 ) is the second weight of the i-th discharging energy storage unit; Based on the second weight and the remaining required charging power, charging power is allocated to each of the discharging energy storage units, and the discharging energy storage units are used to charge according to the charging power.
5. The battery power distribution method according to claim 1 or 2, characterized in that: When the discharging energy storage unit meets the discharging demand, allocating power to each of the discharging energy storage units according to the state of charge value, and using the discharging energy storage unit for discharging includes: Obtaining the maximum discharge power of the discharge energy storage unit; When the maximum discharge power is greater than or equal to the required discharge power, a third state of charge value of the discharge energy storage unit is reconstructed based on the state of charge value of the discharge energy storage unit: Among them, the is the third state of charge value of the i-th discharging energy storage unit, the S i3 is the state of charge value of the i-th discharging energy storage unit, min(S3) is the minimum state of charge value of the discharging energy storage unit, and max(S3) is the maximum state of charge value of the discharging energy storage unit; Calculate a third weight of the discharging energy storage unit based on the third state of charge value: Among them, the f dis (S i3 ) is the third weight of the i-th discharging energy storage unit; Discharging power is allocated to each of the discharging energy storage units based on the third weight and the maximum discharging power, and the discharging energy storage units are used to discharge according to the discharging power.
6. The battery power distribution method according to claim 5, characterized in that: When the discharging energy storage unit does not meet the discharging demand, allocating power to each of the battery energy storage units according to the state of charge value, and using the battery energy storage unit for discharging includes: When the maximum discharge power is less than the required discharge power, the discharge energy storage unit is used to discharge according to the maximum discharge power, and the remaining required discharge power is obtained; The fourth state of charge value of the charging energy storage unit is reconstructed based on the state of charge value of the charging energy storage unit: Among them, the is the fourth state of charge value of the i-th charging energy storage unit, the S i4 is the state of charge value of the i-th charging energy storage unit, min(S4) is the minimum state of charge value of the charging energy storage unit, and max(S4) is the maximum state of charge value of the charging energy storage unit; Calculate a fourth weight of the charging energy storage unit based on the fourth state of charge value: Among them, the f dis (S i4 ) is the fourth weight of the i-th charging energy storage unit; Based on the fourth weight and the remaining required discharge power, the discharge power is allocated to each of the charging energy storage units, and the battery energy storage unit is used to discharge according to the discharge power.
7. An electric power distribution device, characterized in that: The device comprises: An acquisition module, used to obtain the state of charge value of each battery energy storage unit; A division module, used for dividing each of the battery energy storage units into a charging energy storage unit and a discharging energy storage unit according to the state of charge value; A charging module, configured to allocate power to each of the charging energy storage units according to the state of charge value when the charging energy storage unit meets the charging demand, and use the charging energy storage unit for charging; when the charging energy storage unit does not meet the charging demand, allocate power to each of the battery energy storage units according to the state of charge value, and use the battery energy storage unit for charging; The discharge module is used to allocate power to each of the discharge energy storage units according to the state of charge value when the discharge energy storage unit meets the discharge demand, and use the discharge energy storage unit to discharge; when the discharge energy storage unit does not meet the discharge demand, allocate power to each of the battery energy storage units according to the state of charge value, and use the battery energy storage unit to discharge.
8. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the battery power distribution method according to any one of claims 1 to 6 by executing the computer instructions.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the battery power distribution method according to any one of claims 1 to 6.
10. A computer program product, characterized in that The method comprises computer instructions for causing a computer to execute the battery power distribution method according to any one of claims 1 to 6.
Citation Information
Cited By
Active power distribution network optimal scheduling method and system considering multi-agent cooperative game
CN120087714A
Active distribution network optimal scheduling method and system considering multi-agent cooperative game
CN120087714B