Method executed by user equipment and user equipment

The user equipment determines the uplink TCI status and control resource set according to the activation command, calculates the downlink road loss reference signal, and solves the problem of determining the downlink road loss reference signal for PUCCH transmission under different TAs, ensuring the accuracy of transmission power.

CN118944829APending Publication Date: 2024-11-12SHARP KK
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310524080.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-10
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

When multiple TRPs correspond to different time advance amounts (TAs), it is difficult for user equipment to accurately determine the downlink path loss reference signal transmitted by PUCCH, resulting in possible errors in the path loss compensation, affecting the accuracy of the PUCCH transmission power.

Method used

According to the most recent or most recently received activation command, the user equipment determines at least one activated uplink TCI state, acquires the associated time advance packet TAG information, determines the control resource set, and then calculates the downlink path loss reference signal.

Benefits of technology

It effectively solves the problem of determining the downlink path loss reference signal of PUCCH transmission when multiple TRPs correspond to different TAs, ensuring the accuracy and effectiveness of PUCCH transmission power.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944829A_ABST
    Figure CN118944829A_ABST
Patent Text Reader

Abstract

The invention provides a method executed by user equipment and the user equipment. The method executed by user equipment (UE) comprises the following steps: the UE configured with a plurality of uplink transmission configuration indication states (TCI) states determines at least one activated uplink TCI state in the plurality of TCI states according to a latest or latest received activation command; the UE obtains time advance grouping TAG information associated with the activated uplink TCI state according to the at least one activated uplink TCI state; the UE determines information of a control resource set associated with the TAG information according to the TAG information; and the UE determines a reference signal for calculating the downlink path loss according to the control resource set.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of wireless communications, and more particularly, to a method executed by a user equipment and corresponding user equipment. Background Art

[0002] In order to further enhance the performance of uplink transmission and reception in NR technology, the Third Generation Partnership Project (3GPP) intends to study uplink transmission under multiple transmit and receive nodes (TRPs). In a service cell, more than one transmit and receive node TRP can be deployed, and each TRP provides service to the same UE. A service cell can be configured with one or more such TRPs.

[0003] According to the prior art, if a serving cell is configured with multiple TRPs, then no matter which TRP is configured for the serving cell, the timing advance (Timing Advance) used by the UE for uplink transmission is the same. And when performing uplink PUCCH transmission, it is necessary to determine the downlink path loss reference signal for calculating the transmit power of PUCCH. When there are multiple TRPs, the UE always determines the downlink path loss reference signal based on the first activated TCI state.

[0004] In practical applications, such as Figure 1 As shown, due to the different physical distances between different TRPs and UEs, the propagation delays are different, so the values ​​of the timing advance (Timing Advance) used by the UE when sending for different TRPs are different. If a service cell is configured with multiple TRPs, and different TRPs correspond to different TA values, it means that the physical distances between different TRPs and UEs are different. If the UE continues to determine the downlink path loss reference signal based on the first activated TCI state, the path loss compensation may be wrong, resulting in a deviation between the PUCCH transmission power and the actual demand. So how to determine the downlink path loss reference signal for PUCCH transmission in the case where multiple TRPs correspond to different TAs is a problem that needs to be solved. Summary of the invention

[0005] In order to solve the above problem, the present invention provides a method performed by a user equipment and the user equipment.

[0006] According to a first aspect of the present invention, a method performed by a user equipment UE is provided, comprising: the UE configured with multiple uplink transmission configuration indication states TCI states determines at least one activated uplink TCI state among multiple TCI states according to the most recent or most recently received activation command; the UE obtains timing advance group TAG information associated with the activated uplink TCI state according to at least one activated uplink TCI state; the UE determines information of a control resource set associated with the TAG information according to the TAG information; and the UE determines a reference signal for calculating a downlink path loss according to the control resource set.

[0007] In the method of the first aspect above, preferably, the UE can calculate the transmission power for PUCCH transmission according to the determined reference signal.

[0008] In the method of the first aspect above, preferably, the at least one activated uplink TCI state may be an uplink TCI state, and the UE acquires TAG information associated with the one activated uplink TCI state.

[0009] In the method of the above-mentioned first aspect, preferably, the at least one activated uplink TCI state may be multiple uplink TCI states. When the TAG information associated with the multiple activated uplink TCI states is the same, the UE determines the control resource set associated with the same TAG information based on the same TAG information.

[0010] In the method of the first aspect above, preferably, the at least one activated uplink TCI state may be multiple uplink TCI states. When the TAG information associated with the multiple activated uplink TCI states is different, the UE selects the specified TAG information to determine the reference signal for calculating the downlink path loss.

[0011] In the method of the above-mentioned first aspect, preferably, the at least one activated uplink TCI state may be multiple uplink TCI states. When the TAG information associated with the multiple activated uplink TCI states is different, the UE selects the TAG information associated with the first activated uplink TCI state among the multiple activated uplink TCI states to determine the reference signal for calculating the downlink path loss.

[0012] In the method of the above-mentioned first aspect, preferably, the at least one activated uplink TCI state may be multiple uplink TCI states. When the TAG information associated with the multiple activated uplink TCI states is different, the UE selects the TAG associated with the last one of the multiple activated uplink TCI states or the activated uplink TCI state that is closest in time to the PUCCH transmission, to determine the reference signal for calculating the downlink path loss.

[0013] In the method of the above-mentioned first aspect, preferably, the UE can determine the information of the control resource set associated with the TAGID, that is, the number coresetPoolIndex of the control resource set, based on the TAGID of the TAG information, and the UE determines the reference signal for calculating the downlink path loss based on the control resource set pointed to by the number coresetPoolIndex of the control resource set.

[0014] In the method of the first aspect above, preferably, the UE can determine the resources of the reference signal for calculating the downlink path loss based on the first activated downlink TCI state among the multiple downlink TCI states associated with the determined control resource set, or the most recently activated TCIstate.

[0015] In addition, according to a second aspect of the present invention, a user equipment is provided, comprising: a processor; and a memory storing instructions, wherein the instructions execute the method described above when executed by the processor.

[0016] Effects of the Invention

[0017] According to the present disclosure, a method and user equipment executed by a user equipment for effectively determining a downlink path loss reference signal transmitted by PUCCH when multiple TRPs correspond to different TAs can be provided. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram for explaining a situation where a user equipment is configured with multiple sending and receiving nodes.

[0019] Figure 2 This is a diagram for explaining the timing advance amount.

[0020] Figure 3 This is a flowchart showing a method executed by a user equipment as an example in Example 1.

[0021] Figure 4 This is a flowchart showing a method executed by a user equipment as a variation of the first embodiment.

[0022] Figure 5 It is a brief structural block diagram of the user equipment involved in the present invention. DETAILED DESCRIPTION

[0023] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the present invention should not be limited to the specific embodiments described below. In addition, for the sake of simplicity, detailed descriptions of known technologies that are not directly related to the present invention are omitted to prevent confusion in understanding the present invention.

[0024] Before the detailed description, some terms mentioned in the present invention are explained as follows. Unless otherwise specified, the terms involved in the present invention have the following meanings.

[0025] UE:User Equipment, user equipment;

[0026] NR: New Radio, a new generation of wireless technology;

[0027] LTE: Long Term Evolution, long-term evolution technology;

[0028] eLTE: Enhanced Long Term Evolution, enhanced long-term evolution technology;

[0029] RRC: Radio Resource Control, radio resource control (layer);

[0030] MAC: Medium Access Control, media access control (layer);

[0031] MAC CE: MAC Control Element, MAC control element;

[0032] PHY: physical layer, physical layer;

[0033] RB: radio bearer, wireless bearer;

[0034] DRB: Data Radio Bearer, data radio bearer;

[0035] SRB: Signalling Radio Bearer, signaling radio bearer;

[0036] TCI: Transmission Configuration Indicator, transmission configuration indication;

[0037] RSRP: Reference Signal Received Power, reference signal received power;

[0038] PRACH: Physical Random Access Channel, physical random access channel;

[0039] RA: Random Access, random access;

[0040] RAR: Random Access Response, random access response;

[0041] TRP: Transmit / Receive Point, sending and receiving node;

[0042] SS:Synchronization Signal,synchronization signal;

[0043] PBCH: Physical Broadcast Channel, physical broadcast channel;

[0044] SSB: SS / PBCH block, synchronized broadcast block;

[0045] CSI-RS: Channel State Information-Reference Signal, channel state information reference signal;

[0046] HARQ: Hybrid Automatic Repeat Request, hybrid automatic request for retransmission;

[0047] PUCCH: Physical Uplink Control Channel, physical uplink control channel;

[0048] SRS: Sounding Reference Signal, detection reference signal;

[0049] CSI: Channel-State Information, channel state information;

[0050] PDCCH: Physical Downlink Control Channel, physical downlink control channel.

[0051] PUSCH: Physical Uplink Shared Channel, physical uplink shared channel.

[0052] Hereinafter, a description is given of related art of the present invention.

[0053] Time advance N TA

[0054] Time advance N TA It can be used to calculate the timing advance between downlink and uplink.

[0055] like Figure 2 As shown in the figure below, in order to maintain uplink synchronization, the UE needs to start the i-th uplink frame (UplinkFrame i) transmission some time before the start position of the i-th downlink frame (Downlink Frame i). This time period can be determined by the time advance value T TA Characterization, T TA =(N TA +N TA,offset )*T c , where T c It is a time parameter related to the carrier frequency.

[0056] The Timing advance command contains an index value, which is denoted by T. A , used to calculate N TA When receiving the Timing Advance Command included in the random access response, the UE can calculate N based on the TA therein. TA Or T A Indirectly indicates N TA The specific calculation method can refer to the existing technology.

[0057] Timing Advance Group (TAG)

[0058] In the prior art, in order to maintain uplink time alignment, each serving cell is divided into a TAG, and serving cells with the same time advance belong to the same TAG. TAGs are identified and distinguished by TAG IDs. In order to manage the validity of TA values, each TAG can have its own timer timeAlignmentTimer, which is used to control the effective time of uplink synchronization of serving cells belonging to the TAG. During the operation of the timer timeAlignmentTimer, the TA value corresponding to the TAG can be considered to be valid, so that the time advance value T calculated using the TA value is TAIt is valid. When the TA value is updated, for example, the UE receives a Timing advance command that includes the TA, then the timeAlignmentTimer of the corresponding TAG will be started or restarted; when the timeAlignmentTimer of a TAG times out, it means that the uplink of the serving cell belonging to the TAG is no longer synchronized. Usually, the UE will release the PUSCH and PUCCH of the serving cell and clear the HARQ buffer.

[0059] In the scenario of multiple TRPs, a service cell may contain more than one TRP, and each TRP has its own corresponding time advance. Then one implementation method may be that a service cell may belong to more than one TAG, for example, there may be two TAGs associated with the service cell, each TAG corresponds to a TRP, or each TRP has its own associated TAG or TAGID. Similarly, each TAG may have its own timeAlignmentTimer.

[0060] In addition, the TAG to which the primary serving cell (PCell) belongs is called the primary TAG (PTAG).

[0061] Synchronous Broadcast Block SSB

[0062] When the NR system operates in the high frequency band, the base station often cannot send multiple beams covering the entire cell at the same time. Therefore, beam scanning technology is introduced in the NR system to solve the problem of cell coverage.

[0063] Beam scanning means that the base station only sends one or several beam directions at a certain time, and sends different beams at multiple times to cover all directions required by the entire cell. The synchronized broadcast block set is designed for beam scanning, and is used to send the primary synchronization signal, secondary synchronization signal and physical broadcast channel required by the UE to search for the cell in each beam direction, and these signals constitute a synchronized broadcast block (SSB). The synchronized broadcast block set is a collection of multiple synchronized broadcast blocks within a certain time period. In the same period, each synchronized broadcast block corresponds to a beam direction, and the beam directions of each synchronized broadcast block in a synchronized broadcast block set cover the entire cell.

[0064] In the scenario of multiple TRPs, it can be considered that one TRP corresponds to some SSBs in the synchronous broadcast block set, and another TRP corresponds to some SSBs in the set. The SSBs corresponding to the two constitute the full set of the synchronous off-broadcast block set, that is, covering the entire cell. Therefore, in the random access process, when the UE selects the random access resource, it needs to first determine the random access beam direction, that is, determine the SSB.

[0065] In the multiple TRP scenario, there can also be a primary TRP (primary TRP) corresponding to all SSBs in the synchronized broadcast block set, achieving coverage of the entire cell. At the same time, there are one or more secondary TRPs (Secondary TRPs), and their corresponding beam directions can be partial SSBs, or more subdivided, which can be represented by CSI-RS, that is, corresponding to the beam direction of CSI-RS.

[0066] Therefore, it can be considered that there is a corresponding relationship between TRP and SSB or CSI-RS, or that they are related to each other.

[0067] This correspondence can be directly reflected in the RRC configuration information. For example, if a group of SSB sequence numbers are configured for a TRP, then these SSBs are associated with the TRP; for example, if a group of CSI-RS is configured for a TRP, then these CSI-RS are associated with the TRP.

[0068] Such a corresponding relationship may also be represented in an indirect manner, for example, by TCI states.

[0069] The UE detects PDCCH in the configured search space. The configuration information of each search space contains the information of the control resource set (ControlResourceSet, CORESET) used by the search space. The control resource set provides resource blocks in the frequency domain and time domain. Each control resource set is associated with a series of TCI states. Each TCI state contains information about at least one SSB or CSI-RS. The control resource set used for the same search space can be identified by its number coresetPoolIndex, where the number value 0 corresponds to the first TRP, the number value 1 corresponds to the second TRP, and so on. Therefore, one or more TCI states associated with the control resource set (or the control resource set number coresetPoolIndex) can correspond to the TRP corresponding to the control resource set (or the control resource set number coresetPoolIndex), thereby forming a corresponding relationship between TRP and SSB or CSI-RS.

[0070] In the present invention, network, base station and RAN can be used interchangeably, and the network can be a long-term evolution LTE network, a new radio access technology (New RAT, NR) network, an enhanced long-term evolution eLTE network, or other networks defined in subsequent evolution versions of 3GPP.

[0071] Furthermore, in this document, “associated with” and “corresponding to” can be used interchangeably.

[0072] Specific embodiments are listed below to illustrate the processing method of the present invention.

[0073] Example 1

[0074] In order to perform PUCCH transmission, the UE needs to determine the transmission power of the PUCCH. In the process of determining the transmission power, the UE needs to determine a reference signal for calculating the downlink path loss of the transmission power.

[0075] The specific formula for PUCCH transmission power can refer to the formula for calculating PUSCH transmission power in Section 2 of Chapter 7 of the existing 3rd Generation Partnership Project (3GPP) Technical Specification (TS) 38.231 version v17.3.0, which is excerpted as follows:

[0076]

[0077] For the meaning of each letter in the above formula, please refer to the above technical specifications.

[0078] Among them, PL b,f,c (q d ) is the downlink path loss estimate, which is calculated by the UE based on the determined reference signal (RS).

[0079] Figure 3 This is a flowchart showing a method (a method for determining a reference signal for calculating a downlink path loss of transmission power) performed by a user equipment as an example in Embodiment 1. Figure 3 , a method for determining a reference signal for calculating a downlink path loss of a transmission power in Embodiment 1 is described as an example.

[0080] In one case, when the UE is configured with more than one uplink TCI state, preferably, the TAGs associated with these uplink TCIstates are different, then the UE may perform the following operations (steps) to determine a reference signal for downlink path loss estimation:

[0081] Step 101: The UE may determine an activated uplink TCI state among multiple TCIstates according to the most recently or latest received activation command.

[0082] The activation command indicates the activated uplink TCI state to the UE.

[0083] Step 102: If only one uplink TCI state is activated by the activation command, the UE can obtain the TAG information associated with the uplink TCI state, for example, the TAGID of the TAG associated with the activated uplink TCI state. Such association information (or mapping information) can be provided to the UE in the RRC configuration message.

[0084] Step 103: Based on the TAG information, such as TAGID, the UE can further determine the information of the control resource set associated with the TAG ID, such as the control resource set number coresetPoolIndex. Such association information (or mapping information) can also be provided to the UE in the RRC configuration message.

[0085] Step 104: Determine the reference signal for downlink path loss calculation according to the control resource set pointed to by the coresetPoolIndex. The UE can determine the reference signal for downlink path loss calculation according to the TCI state associated with the determined control resource set:

[0086] For example, determining the resource of the reference signal used for downlink path loss calculation according to the first activated downlink TCI state among the multiple downlink TCI states associated with the determined control resource set;

[0087] For another example, the resources of the reference signal for downlink path loss calculation are determined according to the most recently activated downlink TCI state among the multiple downlink TCI states associated with the determined control resource set.

[0088] Among them, the method for determining the reference signal resources for downlink path loss calculation according to the downlink TCI state can be implemented according to the existing technology.

[0089] Figure 4 This is a flowchart showing a method (a method of determining a reference signal for calculating a downlink path loss of transmission power) executed by a user equipment as a variation of the first embodiment.

[0090] As a variation of this embodiment, in one case, when the UE is configured with more than one uplink TCI state, the values ​​of the control resource sets associated with these uplink TCI states are different, and the UE may perform the following operations (steps) to determine the reference signal for downlink path loss estimation:

[0091] Step 201: The UE may determine an activated uplink TCI state among multiple TCIstates according to the most recently or latest received activation command.

[0092] The activation command indicates the activated uplink TCI state to the UE.

[0093] Step 202: If only one uplink TCI state is activated by the activation command, the UE can obtain the value of Coresetpoolindex associated with the uplink TCIstate according to the uplink TCIstate.

[0094] Step 203: The UE determines a reference signal for downlink path loss calculation according to the control resource set pointed to by the coresetPoolIndex.

[0095] Example 2

[0096] Based on Example 1, there is also a situation where more than one uplink TCI state is activated by the activation command. Example 2 describes this situation.

[0097] In one case, the TAGs associated with these activated uplink TCI states are the same, and the UE can determine the downlink path loss reference signal according to the operation in embodiment 1.

[0098] In another case, the tags associated with these activated uplink TCI states are different. If these associated tags are called involved tags, then when there are more than one involved tags, how to determine which TAG to use for subsequent determination of the reference signal for calculating the downlink path loss is a problem that needs to be solved.

[0099] The UE may always select a designated / specific TAG for subsequent determination of the downlink path loss reference signal. For example, a TAG is designated as a T-TAG. When a T-TAG exists in the TAG involved, this T-TAG is always selected, and then the downlink path loss reference signal is determined according to the method in Example 1. Preferably, this T-TAG may be a PTAG. Alternatively, if the TCI state corresponding to this T-TAG contains a reference signal, the resource for calculating the downlink path loss reference signal may be determined based on the resource of this reference signal, for example, it may be directly used as a resource for calculating the downlink path loss reference signal.

[0100] Alternatively, in the activated uplink TCI state, which is activated by multiple activation commands respectively, the UE selects the TAG associated with the first activated uplink TCI state among these activated uplink TCI states to determine the downlink path loss reference signal. Alternatively, the first activated uplink TCI state among these activated uplink TCI states is selected. If the TCI state contains a reference signal, the resource for calculating the downlink path loss reference signal can be determined based on the resource of this reference signal, for example, it can be directly used as the resource for calculating the downlink path loss reference signal.

[0101] Alternatively, in the activated uplink TCI state, it is activated by multiple activation commands respectively, and each activation command can only activate one TCI state, then the UE selects the last of these activated uplink TCI states, or the TAG associated with the activated uplink TCI state that is closest in time to the PUCCH transmission (the last activated) to determine the downlink path loss reference signal. Alternatively, the last of these activated uplink TCI states, or the activated uplink TCI state that is closest in time to the PUCCH transmission is selected. If the TCI state contains a reference signal, the resource for calculating the downlink path loss reference signal can be determined based on the resource of this reference signal, for example, it can be directly used as the resource for calculating the downlink path loss reference signal. Preferably, if the UE is configured with two uplink TCI states, the second activated TCI state among these activated uplink TCI states can be selected.

[0102] In this embodiment, the value of Coresetpoolindex may also be associated with the uplink TCI state. In one case, when the UE is configured with more than one uplink TCI state, the values ​​of Coresetpoolindex associated with these uplink TCI states are different, then the UE may perform the following operations to determine the reference signal for downlink path loss estimation:

[0103] First, the UE may determine the activated uplink TCI state among multiple TCIstates according to the most recently or latest received activation command.

[0104] The activation command indicates the activated uplink TCI state to the UE.

[0105] In particular, if the activation command is sent for different Coresetpoolindex values, then the most recently received activation command here is for different Coresetpoolindex values. That is, the first activation command activates at least one uplink TCI state associated with the uplink TCI state with a Coresetpoolindex value of 0; the second activation command activates at least one uplink TCI state associated with the uplink TCI state with a Coresetpoolindex value of 1. Then the UE needs to consider the uplink TCI state activated in both the first activation command and the second activation command.

[0106] Another situation is that an activation command simultaneously activates at least one TCI state in the uplink TCI state associated with the Coresetpoolindex value of 0 and at least one TCI state in the uplink TCI state associated with the Coresetpoolindex value of 1. In this case, the UE only needs to consider the most recently received activation command.

[0107] If there are at least two uplink TCI states activated by the aforementioned activation command, and their associated Coresetpoolindex values ​​are different, then the UE can always select a specific Coresetpoolindex value, such as a Coresetpoolindex value of 0 or a Coresetpoolindex value of 1, and then determine the reference signal for downlink path loss calculation based on the control resource set corresponding to or pointed to by the value.

[0108] Example 3

[0109] The uplink TCI state and downlink TCI state considered in Examples 1 and 2 may be unrelated, or decoupled. In another case, the uplink TCI state and the downlink TCI state are joint. That is, the UE can determine the uplink TCI state through the downlink TCI state. Then, when the base station activates the TCI state of the UE, it can determine the uplink TCI state by activating only the downlink TCI state. Or, the UE can determine the downlink TCI state through the uplink TCI state. Then, when the base station activates the TCI state of the UE, it can determine the downlink TCI state by activating only the uplink TCI state.

[0110] To distinguish from the decoupled case, such a TCI state can be called a joint TCI state.

[0111] When the joint TCI state is configured, the aforementioned problem still exists and needs to be solved.

[0112] The UE may determine the activated joint TCI state among multiple joint TCI states according to the most recent or latest received activation command. If only one joint TCI state is activated by the activation command, the UE determines the downlink path loss reference signal resource according to the joint TCI state.

[0113] If multiple joint TCI states are activated, the UE determines the resource of the downlink path loss reference signal according to the first activated joint TCI state among these joint TCI states.

[0114] Alternatively, if multiple joint TCI states are activated, the UE determines the resources of the downlink path loss reference signal, etc. according to the TCI states specified in these joint TCI states.

[0115] The specific determination method can refer to the contents described in Example 2.

[0116] Example 4

[0117] Based on the foregoing embodiment, since a TCI state can be associated with a TAG, if the timeAlignmentTimer timer of the TAG times out or stops running, then one or more TCI states associated with the TAG can be considered to be deactivated. Preferably, a TCIstate that has been activated or is in an activated state is considered to be in a deactivated state (deactivated) when the timeAlignmentTimer timer of the TAG associated with it times out or stops running.

[0118] This embodiment may also be implemented independently to determine the status of the TCI state.

[0119] Example 5

[0120] On the basis of the above-mentioned embodiment, when the MAC layer indicates to the lower layer that the PUCCH resource is used for the transmission scheduling request (signal Scheduling Request), the TAG ID may also be indicated. The characteristic of the TAG corresponding to the indicated TAG ID is that the timeAlignmentTimer timer of the TAG is running. Preferably, the indicated PUCCH resource may be associated with more than one TCI state, or may be used for all configured TCI states. The indicated TAG is a TAG associated with one or more TCI states.

[0121] Based on the above indication, when determining the transmission of PUCCH, the lower layer of the MAC layer, such as the physical layer, when judging whether TCIstate is in an activated state, in addition to receiving the activation command mentioned above, it can also consider whether its associated TAG ID is indicated.

[0122] If a TCI state is activated in an activation command, or is instructed to be activated, but its associated TAGID is not indicated by the upper layer, it indicates that the TCI state is still in the deactivated state;

[0123] If a TCI state is activated in an activation command, or is indicated to be activated, and its associated TAGID is indicated, then it can be determined that the TCI state is in the active state.

[0124] This embodiment may also be implemented independently to determine the status of the TCI state.

[0125] Example 6

[0126] The "uplink TCI state" involved in the aforementioned embodiment can also be represented by PUCCH-SpatialRelationInfo. The reference signal of PUCCH is configured in PUCCH-SpatialRelationInfo, and the reference signal can be associated with TAG. If the identifier of the activated PUCCH-SpatialRelationInfo is indicated in the activation command, the UE can determine the TAG associated with it, and then determine the resources of the reference signal used to calculate the downlink path loss as shown in Example 1.

[0127] Example 7

[0128] The UE receives an RRC message containing scheduling request configuration information (e.g., SchedulingRequestConfig) sent from the network side. In the scheduling request configuration information, each scheduling request identifier can be associated with at least two PUCCH resources. Such an association operation can be to include a scheduling request identifier in the configuration related to the scheduling request resource, and to include at least two PUCCH resources at the same time. Each PUCCH resource is associated with a Coreset, specifically, the first PUCCH resource can be configured to be associated with a coresetPoolIndex with a value of 0, and the second PUCCH resource can be configured to be associated with a coresetPoolIndex with a value of 1. Such an association can be achieved by the following method: a coresetPoolIndex with a value of 0 can be included in the configuration information of the first PUCCH resource, or information corresponding to a coresetPoolIndex with a value of 0 can be included, so that the two are considered to be associated.

[0129] Since a coresetPoolIndex with a value of 0 can be associated with the first uplink TCI state, and a coresetPoolIndex with a value of 1 can be associated with the second uplink TCI state, it can be determined that the first uplink TCI state is applied when PUCCH is sent on the first PUCCH resource, and the second uplink TCI state is applied when PUCCH is sent on the second PUCCH resource. The first or second uplink TCI state can be a TCI state or a TCI state group containing more than one TCI state.

[0130] When a scheduling request is triggered, it can be considered as pending. For each pending scheduling request, the MAC layer of the UE can instruct the lower layer to send a scheduling request (Signal Scheduling Request, Signal SR) on the PUCCH resource. Since the pending SR has its corresponding scheduling request configuration or scheduling request resource configuration, and contains at least two PUCCH resources, the question of which PUCCH resource the UE sends the scheduling request on is a problem that needs to be solved.

[0131] In the first case, the uplink TCI state corresponding to the first PUCCH resource is in an activated state, and the uplink TCI state corresponding to the second PUCCH resource is in a deactivated state, or is not activated, then the UE sends a PUCCH for a scheduling request on the first PUCCH resource.

[0132] Specifically, the MAC layer of the UE determines that in this case, the first PUCCH resource is a valid PUCCH resource (valid PUCCH), and instructs a lower layer, such as a physical layer, to send a scheduling request on the valid PUCCH resource.

[0133] It is also possible that the MAC layer of the UE indicates both the first PUCCH resource and the second PUCCH resource to the physical layer for sending a scheduling request; accordingly, at the physical layer, the UE selects the PUCCH resource in which the TCIstate is in an activated state, that is, the first PUCCH resource, based on the status of the TCI states corresponding to the two resources, and then sends a scheduling request on the resource.

[0134] In the second case, the uplink TCI state corresponding to the first PUCCH resource is in a deactivated state, or is not activated, and the uplink TCI state corresponding to the second PUCCH resource is in an activated state, then the UE sends a PUCCH for a scheduling request on the second PUCCH resource.

[0135] Specifically, the MAC layer of the UE determines that in this case, the second PUCCH resource is a valid PUCCH resource, and instructs a lower layer, such as a physical layer, to send a scheduling request on the valid PUCCH resource.

[0136] It is also possible that the MAC layer of the UE indicates both the first PUCCH resource and the second PUCCH resource to the physical layer for sending a scheduling request; accordingly, at the physical layer, the UE selects a PUCCH resource in which the TCIstate is in an activated state, that is, the second PUCCH resource, based on the status of the TCI states corresponding to the two resources, and then sends the PUCCH for the scheduling request on the resource.

[0137] In the third case, the uplink TCI states corresponding to the first PUCCH resource and the second PUCCH are both in an activated state.

[0138] In this case, the UE may arbitrarily select (or randomly select) one of the PUCCH resources and send a scheduling request on the resource.

[0139] Specifically, the MAC layer of the UE determines that in this case, the first and second PUCCH resources are valid PUCCH resources, and arbitrarily selects (or randomly selects) one PUCCH resource from them, and instructs the lower layer, such as the physical layer, to send a scheduling request on the selected PUCCH resource.

[0140] It is also possible that the MAC layer of the UE indicates both the first PUCCH resource and the second PUCCH resource to the physical layer for sending a scheduling request; accordingly, at the physical layer, the UE randomly selects a PUCCH resource according to the status of the TCI state corresponding to the two resources, and then sends the PUCCH for the scheduling request on the selected resource.

[0141] In this case, the scheduling request may be sent on the first PUCCH resource or the second PUCCH resource through network configuration or pre-setting. Alternatively, the scheduling request may be sent on the PUCCH resource associated with the first TCIstate (or the coresetPoolIndex with a value of 0), or the scheduling request may be sent on the PUCCH resource associated with the second TCI state (or the coresetPoolIndex with a value of 1).

[0142] Take "specify to send a scheduling request on the first PUCCH resource" as an example:

[0143] Specifically, the MAC layer of the UE determines that in this case, the first PUCCH resource is a valid PUCCH resource, and instructs a lower layer, such as a physical layer, to send a scheduling request on the PUCCH resource.

[0144] It is also possible that the MAC layer of the UE indicates both the first PUCCH resource and the second PUCCH resource to the physical layer for sending a scheduling request; accordingly, at the physical layer, the UE sends a PUCCH for the scheduling request on the first PUCCH resource.

[0145] Take "sending a scheduling request on a PUCCH resource associated with the first TCI state (or a coresetPoolIndex with a value of 0)" as an example:

[0146] Specifically, the MAC layer of the UE determines that in this case, the PUCCH resource associated with the first TCI state (or the coresetPoolIndex with a value of 0), that is, the first PUCCH resource is a valid PUCCH resource, and instructs the lower layer, such as the physical layer, to send a scheduling request on the PUCCH resource.

[0147] It may also be that the MAC layer of the UE indicates both the first PUCCH resource and the second PUCCH resource to the physical layer for sending a scheduling request; accordingly, at the physical layer, the UE selects a PUCCH resource associated with the first TCI state, i.e., the first PUCCH resource, and then sends a PUCCH for a scheduling request on the PUCCH resource.

[0148] In the fourth case, the uplink TCI states corresponding to the first PUCCH resource and the second PUCCH are both in a deactivated state.

[0149] In this case, the MAC layer of the UE may determine that there are no valid PUCCH resources, thereby triggering and executing a random access process.

[0150] Another implementation of the above operation may be as follows.

[0151] When there is a pending scheduling request, the UE determines whether there are valid PUCCH resources:

[0152] Case 1: The uplink TCI state corresponding to the first PUCCH resource is in an activated state, while the uplink TCI state corresponding to the second PUCCH resource is in a deactivated state, or is not activated, then the UE determines that the first PUCCH resource is a valid PUCCH resource; then the physical layer can be instructed to send a scheduling request on the PUCCH resource;

[0153] Case 2: The uplink TCI state corresponding to the second PUCCH resource is in an activated state, while the uplink TCI state corresponding to the first PUCCH resource is in a deactivated state, or is not activated, then the UE determines that the second PUCCH resource is a valid PUCCH resource; then the physical layer can be instructed to send a scheduling request on the PUCCH resource;

[0154] Case 3: The uplink TCI state corresponding to the first PUCCH resource and the second PUCCH are both in the activated state. The UE can consider both resources as valid PUCCH resources, and then randomly select a PUCCH resource to instruct the physical layer to send a scheduling request on the PUCCH resource; the UE can also always select a specified PUCCH resource to instruct the physical layer to send a scheduling request on the PUCCH resource. The specified PUCCH resource can be the first or second PUCCH resource pre-set or configured by the network, or a PUCCH resource associated with the first / second TCI state (or a coresetPoolIndex with a value of 0 / 1);

[0155] Case 4: If the uplink TCI states corresponding to the first PUCCH resource and the second PUCCH are both in a deactivated state, it is considered that there are no valid PUCCH resources and the UE can trigger a random access procedure.

[0156] Example 8

[0157] On the basis of Embodiment 7, a first counting variable COUNT-1 may be set for the first PUCCH resource, and a second counting variable COUNT-2 may be set for the second PUCCH resource.

[0158] After the MAC layer of the UE indicates to the lower layer that a scheduling request is to be transmitted on the first PUCCH resource, the value of COUNT-1 is increased by one;

[0159] After the MAC layer of the UE indicates to the lower layer that a scheduling request is to be transmitted on the first PUCCH resource, the value of COUNT-2 is increased by one;

[0160] When it is determined that the value of COUNT-1 exceeds the maximum threshold value / threshold value set in advance or configured by the network, it can be determined that the first PUCCH resource is invalid. The UE can also further determine the value of COUNT-2 and whether the second PUCCH resource is valid:

[0161] -If the COUNT-2 value is not less than the maximum threshold value at this time, it can be considered that the second PUCCH resource is invalid, and the UE triggers and performs a random access process.

[0162] -If the COUNT-2 value is less than the maximum threshold value / threshold value at this time, but the TCIstate associated with the second PUCCH resource is not in an activated state (or is in a deactivated state), then the second PUCCH resource can be considered invalid, and the UE can trigger and perform a random access procedure;

[0163] - As compensation, if the COUNT-2 value is less than the maximum threshold value, the second PUCCH resource is still valid and there is no need to perform a random access procedure. In this case, the UE can wait for the next judgment. Preferably, the TCI state associated with the second PUCCH resource is still in an activated state;

[0164] When it is determined that the value of COUNT-2 exceeds the maximum threshold value, the second PUCCH resource may be determined to be invalid. The UE may further determine the value of COUNT-1 and whether the second PUCCH resource is valid:

[0165] -If the value of COUNT-1 is not less than the maximum threshold value at this time, it can be considered that the first PUCCH resource is invalid, and the UE triggers and performs a random access process.

[0166] -If the COUNT-1 value is less than the maximum threshold value / threshold at this time, but the TCIstate associated with the second PUCCH resource is not in an activated state (or is in a deactivated state), then it can be considered that the first PUCCH resource is invalid, and the UE can trigger and perform a random access procedure;

[0167] - As a supplement, if the COUNT-1 value is less than the maximum threshold value / threshold at this time, the first PUCCH resource is still valid and there is no need to perform a random access procedure. In this case, the UE can wait for the next judgment. Preferably, the TCI state associated with the second PUCCH resource is still in an activated state;

[0168] Example 9

[0169] Embodiments 1 to 8 of the present disclosure have been described above, but the above embodiments may be combined for implementation.

[0170] Embodiments 1-6 are used to solve the power calculation during PUCCH transmission, while embodiments 7 and 8 are used to determine PUCCH resources. As embodiment 9, for example, embodiments 7 and 8 can be combined with the above-mentioned embodiments 1-6 to determine PUCCH resources before transmitting PUCCH.

[0171] Figure 5 It is a brief structural block diagram of the user equipment involved in the present invention.

[0172] like Figure 5As shown, the user equipment 500 includes at least a processor 501 and a memory 502. The processor 501 may include, for example, a microprocessor, a microcontroller, an embedded processor, etc. The memory 502 may include, for example, a volatile memory (such as a random access memory RAM), a hard disk drive (HDD), a non-volatile memory (such as a flash memory), or other memory systems, etc. The memory 502 stores program instructions. When the instructions are executed by the processor 501, one or more steps of the processing method of the UE disclosed in the present invention may be executed.

[0173] The method and the related equipment of the present disclosure have been described above in conjunction with the preferred embodiments. It can be understood by those skilled in the art that the method shown above is only exemplary, and the embodiments described above can be combined with each other without contradiction. The method of the present invention is not limited to the steps and sequence shown above.

[0174] The user equipment shown above may include more modules, for example, modules that can be developed or developed in the future and can be used for base stations, MMEs, or UEs, etc. The various identifiers shown above are only exemplary and not restrictive, and the present disclosure is not limited to the specific information elements used as examples of these identifiers. Those skilled in the art may make many changes and modifications based on the teachings of the illustrated embodiments.

[0175] It should be understood that the above embodiments of the present disclosure can be implemented by software, hardware, or a combination of software and hardware. For example, the various components inside the base station and user equipment in the above embodiments can be implemented by a variety of devices, including but not limited to: analog circuit devices, digital circuit devices, digital signal processing (DSP) circuits, programmable processors, application specific integrated circuits (ASICs), field programmable gate arrays (FPGAs), programmable logic devices (CPLDs), and the like.

[0176] In addition, the program running on the device according to the present invention can be a program that enables a computer to implement the functions of the embodiments of the present invention by controlling a central processing unit (CPU). The program or the information processed by the program can be temporarily stored in a volatile memory (such as a random access memory RAM), a hard disk drive (HDD), a non-volatile memory (such as a flash memory), or other memory systems.

[0177] The program for realizing the functions of various embodiments of the present invention can be recorded on a computer-readable recording medium. The corresponding functions can be realized by making a computer system read the program recorded on the recording medium and executing these programs. The so-called "computer system" herein can be a computer system embedded in the device, and can include an operating system or hardware (such as a peripheral device). "Computer-readable recording medium" can be a semiconductor recording medium, an optical recording medium, a magnetic recording medium, a recording medium of a short-term dynamic storage program, or any other recording medium that is computer-readable.

[0178] The various features or functional modules of the devices used in the above embodiments can be implemented or executed by circuits (e.g., single-chip or multi-chip integrated circuits). Circuits designed to perform the functions described in this specification may include general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic, discrete hardware components, or any combination of the above devices. The general-purpose processor may be a microprocessor, or any existing processor, controller, microcontroller, or state machine. The above circuits may be digital circuits or analog circuits. In the case where new integrated circuit technologies have emerged to replace existing integrated circuits due to advances in semiconductor technology, one or more embodiments of the present invention may also be implemented using these new integrated circuit technologies.

[0179] In addition, the present invention is not limited to the above-mentioned embodiments. Although various examples of the embodiments have been described, the present invention is not limited thereto. Fixed or non-mobile electronic devices installed indoors or outdoors can be used as terminal devices or communication devices, such as AV equipment, kitchen equipment, cleaning equipment, air conditioners, office equipment, vending machines, and other household appliances.

[0180] As mentioned above, the embodiments of the present invention have been described in detail with reference to the accompanying drawings. However, the specific structure is not limited to the above embodiments, and the present invention also includes any design changes that do not deviate from the main purpose of the present invention. In addition, the present invention can be modified in various ways within the scope of the claims, and the embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present invention. In addition, the components with the same effect described in the above embodiments can be replaced with each other.

Claims

1. A method performed by a user equipment UE, comprising: The UE configured with multiple uplink transmission configuration indication states TCIstate determines at least one activated uplink TCI state among the multiple TCIstates according to the most recently or most recently received activation command; The UE obtains, according to at least one activated uplink TCI state, timing advance group TAG information associated with the activated uplink TCI state; The UE determines, according to the TAG information, information of a control resource set associated with the TAG information; and The UE determines a reference signal for calculating a downlink path loss according to the control resource set.

2. The method according to claim 1, wherein: The UE calculates transmission power for PUCCH transmission according to the determined reference signal.

3. The method according to claim 1 or 2, wherein: The at least one activated uplink TCI state is an uplink TCI state, The UE obtains TAG information associated with the activated uplink TCI state.

4. The method according to claim 1 or 2, wherein: The at least one activated uplink TCI state is a plurality of uplink TCI states, In a case where the TAG information associated with multiple activated uplink TCI states is the same, the UE determines a control resource set associated with the same TAG information according to the same TAG information.

5. The method according to claim 1 or 2, wherein: The at least one activated uplink TCI state is a plurality of uplink TCI states, In the case where the TAG information associated with multiple activated uplink TCI states is different, the UE selects the specified TAG information to determine the reference signal for calculating the downlink path loss.

6. The method according to claim 1 or 2, wherein: The at least one activated uplink TCI state is a plurality of uplink TCI states, In the case where the TAG information associated with multiple activated uplink TCI states is different, the UE selects the TAG information associated with the first activated uplink TCIstate among the multiple activated uplink TCIstates to determine the reference signal for calculating the downlink path loss.

7. The method according to claim 1 or 2, wherein: The at least one activated uplink TCI state is a plurality of uplink TCI states, When the TAG information associated with multiple activated uplink TCI states is different, the UE selects the TAG associated with the last one of the multiple activated uplink TCIstates, or the TAG associated with an activated uplink TCIstate that is closest in time to the PUCCH transmission, to determine the reference signal for calculating the downlink path loss.

8. The method according to claim 1 or 2, wherein: The UE determines, according to the TAG ID of the TAG information, information of a control resource set associated with the TAG ID, that is, an index of the control resource set coresetPoolIndex, The UE determines a reference signal for calculating a downlink path loss according to the control resource set pointed to by the control resource set index coresetPoolIndex.

9. The method according to claim 1 or 2, wherein: The UE determines a resource of a reference signal for calculating a downlink path loss according to a first activated downlink TCI state or a most recently activated TCI state among multiple downlink TCI states associated with the determined control resource set.

10. A user equipment, comprising: processor; as well as Memory, which stores instructions, Wherein, the above instructions, when executed by the above processor, execute the method according to any one of claims 1 to 9.