Wharf pile sinking construction technology
By conducting three-axis pressure chamber detection and water level change analysis on soil samples and adjusting the pile sinking method, the problem of water level changes in the pile sinking construction is solved, and the stability and efficiency of pile sinking are improved.
Patent Information
- Application Number
- CN202410903815.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction of pile sinking, the real-time water level changes are affected, resulting in a decrease in the stability of the column body and the reduction in the bearing capacity of the pile foundation. The soil is too low to increase the friction, affecting the progress and efficiency of pile sinking.
By conducting three-axis pressure chamber detection on the soil sample, the soil cohesion is determined, and the soil condition stability characterization parameters are calculated based on the water level change, the soil condition stability category is divided, the hammer force and load are adjusted, and the axial stress curve is analyzed in real time. Adaptability determines the way of pile sinking to alleviate the impact of water level changes.
The stability and efficiency of the sinking piles are improved, the risk of offset is reduced, the soil convergence meets the needs of sinking piles is optimized, and the construction process is optimized.
Smart Images

Figure CN118958284A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of pile driving construction, and in particular to a wharf pile driving construction process. Background Art
[0002] As an important part of port facilities, the wharf structure needs to bear the huge loads brought by ship berthing, cargo loading and unloading, etc. Therefore, with the development of coastal trade and the frequent entry and exit of ships, in order to ensure the smooth berthing of ships and cargo loading and unloading, the piles used as the foundation are required to have high bearing capacity, strong stability and anti-slip properties. The pile driving technology needs to be continuously developed to meet the above needs.
[0003] Chinese Patent Publication No.: CN114934509A discloses a PHC pipe pile sinking guide frame and a PHC pipe pile sinking method using the guide frame, which relates to the field of PHC pipe pile construction. The guide frame includes two buoys, and a movable guide frame is slidably connected to the two buoys. The movable guide frame includes a first guide plate and a second guide plate. The side walls of the first guide plate and the second guide plate close to each other are both provided with a semi-arc groove. The lower surface of the first guide plate is slidably connected to the first sliding plate, and the lower surface of the second guide plate is slidably connected to the second sliding plate. The first sliding plate and the second sliding plate are both slidably connected to a corresponding buoy along the length direction of the buoy. The first guide plate is connected to a limit assembly that locks the first guide plate and the first sliding plate, a driving assembly that drives the first guide plate to move in a direction away from the second guide plate, and a transmission assembly that drives the second guide plate to move in the opposite direction of the first guide plate through the movement of the first guide plate.
[0004] However, the prior art still has the following problems: during the pile driving construction process, it will be affected by the real-time water level changes, which may lead to reduced stability of the column body and reduced bearing capacity of the pile foundation. At the same time, the cohesion of the soil is too low, which will increase the friction between the column body and the surrounding soil, increase the resistance to pile driving, and thus affect the progress and efficiency of pile driving. Summary of the invention
[0005] To this end, the present invention provides a wharf pile driving construction process to overcome the problems in the prior art that the pile driving construction process will be affected by the real-time water level changes, which may lead to reduced stability of the column body and reduced bearing capacity of the pile foundation. At the same time, the cohesion of the soil is too low, which will increase the friction between the column body and the surrounding soil, increase the resistance to pile driving, and thus affect the progress and efficiency of pile driving.
[0006] To achieve the above object, the present invention provides a wharf pile sinking construction process, which comprises:
[0007] Step S1, determining the pile position, sampling and testing the soil in the pile position area, including placing the soil sample in a triaxial pressure chamber, applying different ambient pressures to the soil sample for axial compression, and determining the cohesion of the soil sample;
[0008] Step S2, obtaining the water level change within a predetermined period, and calculating the soil stability characterization parameter in combination with the cohesion of the soil sample to classify the soil stability category of the pile location area;
[0009] Step S3, determining the pile sinking method for construction according to the soil stability type of the pile sinking location area, including:
[0010] Hammering the pile body with a predetermined hammering force by a hydraulic hammer pile driver, detecting the maximum axial stress of the pile body during each hammering process, constructing an axial stress curve of the pile body as the number of hammering times changes, and analyzing in real time the average slope of each axial stress curve segment as the number of hammering times changes to determine whether the pile driving has entered a specific stage, and judging whether the pile driving has abnormality according to the discrete value of the axial stress curve segment as the number of hammering times corresponding to the specific stage, so as to adjust the hammering force and apply load according to soil stability characterization parameters;
[0011] Or, adjust the pile driving rate according to the soil stability characterization parameters.
[0012] Furthermore, in step S2, the soil stability characteristic parameter is calculated according to formula (1):
[0013]
[0014] In formula (1), T represents the soil stability parameter, W represents the water level change within a predetermined period, W0 represents the preset water level change standard threshold, R represents cohesion, and R0 represents the preset cohesion standard threshold.
[0015] Furthermore, in step S2, the soil stability category of the pile location area is divided into:
[0016] If the soil stability characterization parameter is greater than or equal to the preset soil stability characterization parameter standard threshold, the soil condition in the pile sinking position area is determined to be a strong stability category;
[0017] If the soil stability characterization parameter is less than the preset soil stability characterization parameter standard threshold, the soil condition in the pile driving position area is determined to be a weak stability category.
[0018] Furthermore, in step S3, determining the pile sinking method for construction includes:
[0019] If the soil stability category is weak stability category, the pile body is hammered with a predetermined hammering force by a hydraulic hammer pile driver, the maximum axial stress of the pile body during each hammering process is detected, and the axial stress curve of the pile body that changes with the number of hammering is constructed. The average slope of each axial stress curve segment that changes with the number of hammering is analyzed in real time to determine whether the pile driving has entered a specific stage. According to the discrete value of the axial stress curve segment that changes with the number of hammering corresponding to the specific stage, it is determined whether the pile driving is abnormal, so as to adjust the hammering force and apply load according to the soil stability characterization parameter;
[0020] If the soil stability category is a strong stability category, the pile driving rate is adjusted based on the soil stability characterization parameters.
[0021] Furthermore, in step S3, the process of constructing the axial stress curve of the pile body as the number of hammer blows changes includes:
[0022] A rectangular coordinate system is constructed with the number as the horizontal axis and the maximum axial stress of the pile as the vertical axis;
[0023] Marking the coordinate point of the maximum axial stress of the pile body at each order in the rectangular coordinate system;
[0024] The coordinate points are connected with a smooth curve to obtain the axial stress curve varying with the number of hammer blows.
[0025] Furthermore, in step S3, determining whether the pile driving has entered a specific stage includes:
[0026] If the average slope of the axial stress curve segment that changes with the number of hammer blows is greater than or equal to the preset average slope standard threshold, it is determined that the pile driving has entered a specific stage.
[0027] Furthermore, in step S3, the discrete value of the axial stress curve segment corresponding to the change in the number of hammer blows in the specific stage is calculated according to formula (2).
[0028]
[0029] In formula (2), L represents the discrete value of the axial stress curve segment corresponding to the change of the number of hammering in the specific stage, Hi represents the maximum axial stress of the pile body after the i-th hammering, ΔH represents the mean value of the maximum axial stress of the pile body in the specific stage, and n represents the number of hammering in the specific stage.
[0030] Furthermore, in step S3, determining whether there is an abnormality in pile sinking includes:
[0031] If the discrete value of the axial stress curve segment corresponding to the change in the number of hammer blows in the specific stage is greater than the preset discrete value threshold, it is determined that the pile driving is abnormal.
[0032] Furthermore, in step S3, adjusting the hammering force and applying the load according to the soil stability characterization parameter includes:
[0033] Increasing the hammering force, the increase in hammering force is negatively correlated with the soil stability characterization parameter;
[0034] A load is applied, and the amount of load applied is negatively correlated with the soil stability characterization parameter.
[0035] Furthermore, in step S3, the pile sinking rate is adjusted according to the soil stability characterization parameter, including:
[0036] The pile sinking rate is positively correlated with the soil stability characterization parameters.
[0037] Compared with the prior art, the present invention determines the pile position, samples and detects the soil in the pile position area, determines the cohesion of the soil sample, obtains the water level change within a predetermined period, and calculates the soil stability characterization parameter in combination with the cohesion of the soil sample to classify the soil stability category of the pile position area. According to the soil stability type of the pile position area, the pile driving method is adaptively determined for construction, thereby alleviating the impact of water level changes on the pile driving process and improving the efficiency of pile driving.
[0038] In particular, the present invention calculates soil stability characterization parameters by obtaining the amount of water level change within a predetermined period and combining it with the cohesion of soil samples. During the pile sinking process, real-time water level changes affect the stability of the column body and the bearing capacity of the pile foundation. For example, large fluctuations in water level changes may increase the resistance of the pile sinking process, reduce the stability of the column body and the bearing capacity of the pile foundation. At the same time, the cohesion of the soil will not only be affected by the water level changes, but also the cohesion of the soil itself is too low. During the pile sinking process, the stress in the soil is uneven, the pile sinking is unstable, and it is easy to deviate. Furthermore, the present application calculates soil stability characterization parameters to characterize the stability tendency of the soil conditions during the pile sinking process, provides data support for the subsequent classification of soil stability categories in the pile sinking pile position area, adaptively determines the pile sinking method for construction, and thereby alleviates the impact of water level changes on the pile sinking process and improves the efficiency of pile sinking.
[0039] In particular, the present invention detects the maximum axial stress of the pile body during each hammering process under the weak soil condition in the pile driving position area, constructs an axial stress curve of the pile body that varies with the number of hammering, and uses the axial stress generated on the pile body during pile driving by a hydraulic hammer pile driver to reflect the resistance encountered during the pile driving process and the stability of the column body. At the same time, the abnormal tendency of the pile driving process is characterized by the discrete values of the curve segments corresponding to the specific stages. Furthermore, the present application adjusts the hammering force according to the soil stability characterization parameters for abnormal situations, so that the pile body remains relatively stable during the pile driving process and the pile driving displacement is reduced. At the same time, a load is applied to the pile driving position area to adaptively ensure that the cohesion of the soil can complete the pile driving construction, thereby alleviating the impact of water level changes on the pile driving process and improving the efficiency of pile driving. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 A flowchart of the steps of the wharf pile sinking construction process according to an embodiment of the invention;
[0041] Figure 2 A logical decision diagram for classifying soil stability categories in a pile sinking position area according to an embodiment of the invention;
[0042] Figure 3 A logic decision diagram for determining whether pile driving has entered a specific stage in an embodiment of the invention;
[0043] Figure 4 This is a logical decision diagram for determining whether pile driving is abnormal according to an embodiment of the present invention. DETAILED DESCRIPTION
[0044] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0045] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0046] See also Figures 1 to 4 As shown, Figure 1 This is a flowchart of the steps of the wharf pile sinking construction process according to an embodiment of the present invention. Figure 2 The logical decision diagram for classifying the soil stability category of the pile sinking position area according to the embodiment of the invention is as follows: Figure 3 To determine whether the pile driving has entered a specific stage, a logical decision diagram is provided. Figure 4 The logical determination diagram for determining whether pile driving is abnormal is provided in the embodiment of the invention. The construction process for pile driving of a wharf pile in the embodiment of the invention includes:
[0047] Step S1, determining the pile position, sampling and testing the soil in the pile position area, including placing the soil sample in a triaxial pressure chamber, applying different ambient pressures to the soil sample for axial compression, and determining the cohesion of the soil sample;
[0048] Step S2, obtaining the water level change within a predetermined period, and calculating the soil stability characterization parameter in combination with the cohesion of the soil sample to classify the soil stability category of the pile location area;
[0049] Step S3, determining the pile sinking method for construction according to the soil stability type of the pile sinking location area, including:
[0050] Hammering the pile body with a predetermined hammering force by a hydraulic hammer pile driver, detecting the maximum axial stress of the pile body during each hammering process, constructing an axial stress curve of the pile body as the number of hammering times changes, and analyzing in real time the average slope of each axial stress curve segment as the number of hammering times changes to determine whether the pile driving has entered a specific stage, and judging whether the pile driving has abnormality according to the discrete value of the axial stress curve segment as the number of hammering times corresponding to the specific stage, so as to adjust the hammering force and apply load according to soil stability characterization parameters;
[0051] Or, adjust the pile driving rate according to the soil stability characterization parameters.
[0052] Specifically, the determination of the pile position needs to be considered in combination with a variety of factors and conditions, including the use function of the wharf, the structural design of the wharf, geological conditions, surrounding facilities and the impact on the surrounding environment. Technical personnel in this field can make specific selections based on construction requirements, which will not be elaborated here.
[0053] Specifically, there is no limitation on the method of sampling and testing the soil in the pile location area. For example, in the triaxial compression test, the soil in the pile location area is sampled and made into a cylindrical sample, which is placed in a triaxial pressure chamber and subjected to constant ambient pressure for consolidation. After the consolidation is completed, axial pressure is added to the sample until the sample undergoes shear failure to obtain the cohesion of the soil sample. Of course, other forms can also be used, which will not be elaborated here.
[0054] Specifically, there is no limitation on the specific equipment for detecting the water level, and it only needs to have the function of detecting the water level in the pile sinking area, for example, a water level meter, which will not be elaborated.
[0055] Specifically, there is no limitation on the specific method for detecting the axial stress on the pile body. For example, the axial stress can be characterized by setting a pressure sensor to measure the reaction force on the hydraulic hammer pile driver during the pile driving process. Of course, other methods can also be used, which will not be repeated here.
[0056] Specifically, in step S2, the soil stability characteristic parameter is calculated according to formula (1):
[0057]
[0058] In formula (1), T represents the soil stability parameter, W represents the water level change within a predetermined period, W0 represents the preset water level change standard threshold, R represents cohesion, and R0 represents the preset cohesion standard threshold.
[0059] Specifically, in this embodiment, the water level change W within a predetermined period is obtained by real-time detection of the water level by a water level gauge, the cohesion standard threshold R0 and the water level change standard threshold W0 are obtained in advance, and relevant data of cohesion detection of several soil samples and relevant water level data of several completed pile driving constructions are obtained to solve the cohesion mean ΔR and the water level change mean ΔW, and set R0=c1×ΔR, W0=c2×ΔW, wherein c1 is the first accuracy coefficient, c2 is the second accuracy coefficient, 0.75<c1<0.9, 1.25<c2<1.35.
[0060] Specifically, the predetermined period is determined according to the abnormal tendency and degree of the pile driving construction process, which will not be elaborated here, and the difference between the water level at the last moment of the period and the water level at the initial moment of the period is determined as the water level change.
[0061] Specifically, the standard threshold value T0 of the soil stability characterization parameter is selected within the interval [1.1, 1.2].
[0062] The present invention obtains the water level change within a predetermined period and calculates the soil condition stability characterization parameter in combination with the cohesion of the soil sample. During the pile sinking process, the real-time water level change affects the stability of the column body and the bearing capacity of the pile foundation. For example, large fluctuations in the water level change may increase the resistance of the pile sinking process, reduce the stability of the column body and the bearing capacity of the pile foundation. At the same time, the cohesion of the soil will not only be affected by the water level change, but also the cohesion of the soil itself is too low, the stress in the soil body is uneven during the pile sinking process, the pile sinking is unstable and prone to deviation. Furthermore, the present application calculates the soil condition stability characterization parameter to characterize the stability tendency of the soil condition during the pile sinking process, provides data support for the subsequent classification of the soil condition stability category of the pile sinking pile position area, adaptively determines the pile sinking method for construction, and thereby alleviates the impact of water level changes on the pile sinking process and improves the efficiency of pile sinking.
[0063] Specifically, in step S2, the soil stability category of the pile location area is divided into:
[0064] If the soil stability characterization parameter is greater than or equal to the preset soil stability characterization parameter standard threshold, the soil condition in the pile sinking position area is determined to be a strong stability category;
[0065] If the soil stability characterization parameter is less than the preset soil stability characterization parameter standard threshold, the soil condition in the pile driving position area is determined to be a weak stability category.
[0066] Specifically, in step S3, determining the pile sinking method for construction includes:
[0067] If the soil stability category is weak stability category, the pile body is hammered with a predetermined hammering force by a hydraulic hammer pile driver, the maximum axial stress of the pile body during each hammering process is detected, and the axial stress curve of the pile body that changes with the number of hammering is constructed. The average slope of each axial stress curve segment that changes with the number of hammering is analyzed in real time to determine whether the pile driving has entered a specific stage. According to the discrete value of the axial stress curve segment that changes with the number of hammering corresponding to the specific stage, it is determined whether the pile driving is abnormal, so as to adjust the hammering force and apply load according to the soil stability characterization parameter;
[0068] If the soil stability category is a strong stability category, the pile driving rate is adjusted based on the soil stability characterization parameters.
[0069] Specifically, in step S3, the process of constructing the axial stress curve of the pile body as the number of hammer blows changes includes:
[0070] A rectangular coordinate system is constructed with the number as the horizontal axis and the maximum axial stress of the pile as the vertical axis;
[0071] Marking the coordinate point of the maximum axial stress of the pile body at each order in the rectangular coordinate system;
[0072] The coordinate points are connected with a smooth curve to obtain the axial stress curve varying with the number of hammer blows.
[0073] Specifically, in step S3, determining whether the pile driving has entered a specific stage includes:
[0074] If the average slope of the axial stress curve segment that changes with the number of hammer blows is greater than or equal to the preset average slope standard threshold, it is determined that the pile driving has entered a specific stage.
[0075] Specifically, the average slope standard threshold is selected in the interval [0.15, 0.45].
[0076] Specifically, in step S3, the discrete value of the axial stress curve segment corresponding to the change in the number of hammer blows in the specific stage is calculated according to formula (2):
[0077]
[0078] In formula (2), L represents the discrete value of the axial stress curve segment corresponding to the change of the number of hammering in the specific stage, Hi represents the maximum axial stress of the pile body after the i-th hammering, ΔH represents the mean value of the maximum axial stress of the pile body in the specific stage, and n represents the number of hammering in the specific stage.
[0079] Specifically, in this example, the average value ΔH of the maximum axial stress on the pile body in the specific stage is obtained by averaging the maximum axial stress on the pile body at each hammering number in the real-time specific stage.
[0080] Specifically, the specific stage is a time period corresponding to a predetermined time starting from entering the specific stage, and the predetermined time is selected within the interval [5min, 10min].
[0081] Specifically, the discrete value standard threshold value L0 of the axial stress curve segment corresponding to the specific stage as the number of hammer blows changes is selected in the interval [0.1, 0.3].
[0082] Specifically, in step S3, determining whether there is an abnormality in pile sinking includes:
[0083] If the discrete value of the axial stress curve segment corresponding to the change in the number of hammer blows in the specific stage is greater than the preset discrete value threshold, it is determined that the pile driving is abnormal.
[0084] The present invention detects the maximum axial stress of the pile body during each hammering process under the weak soil condition in the pile driving position area, constructs an axial stress curve of the pile body that varies with the number of hammering, and the axial stress generated on the pile body during pile driving by a hydraulic hammer pile driver reflects the resistance encountered during the pile driving process and the stability of the column body. At the same time, the abnormal tendency of the pile driving process is characterized by the discrete value of the curve segment corresponding to the specific stage. Furthermore, the present application adjusts the hammering force according to the soil stability characterization parameter for abnormal situations, so that the pile body remains relatively stable during the pile driving process and the pile driving deviation is reduced. At the same time, a load is applied to the pile driving position area to adaptively ensure that the cohesion of the soil can complete the pile driving construction, thereby alleviating the influence of water level changes on the pile driving process and improving the efficiency of pile driving.
[0085] Specifically, in step S3, adjusting the hammering force and applying the load according to the soil stability characterization parameter includes:
[0086] Increasing the hammering force, the increase in hammering force is negatively correlated with the soil stability characterization parameter;
[0087] A load is applied, and the amount of load applied is negatively correlated with the soil stability characterization parameter.
[0088] Specifically, the purpose of increasing the hammering force is to increase the axial pressure, hammer the pile body with greater pressure, and reduce the radial displacement of the pile body.
[0089] Specifically, the load application is the load applied to the soil where the piles are driven to compact the soil and reduce the displacement of the piles.
[0090] In this embodiment, optionally,
[0091] The soil stability characteristic parameter T is compared with the first soil stability characteristic parameter comparison threshold value T1 and the second soil stability characteristic parameter comparison threshold value T2.
[0092] If T>T2, the hammer force increase is determined to be the first hammer force increase p1, and p1=0.15p0;
[0093] If T1≤T≤T2, the hammer force increase is determined to be the second hammer force increase p2, and p2=0.25p0;
[0094] If T<T1, the hammer force increase is determined to be the third hammer force increase p3, and p3=0.3p0;
[0095] Among them, p0 represents the initial hammer force, T1=0.7T0, T2=0.85T0.
[0096] There is no limitation on the method of increasing the hammer force. For example, the hammer force can be increased by increasing the pressure of the hydraulic system, which will not be elaborated here.
[0097] The soil stability characteristic parameter T is compared with the first soil stability characteristic parameter comparison threshold value T1 and the second soil stability characteristic parameter comparison threshold value T2.
[0098] If T>T2, the load increase is determined to be the first load increase k1, and k1=0.3k0;
[0099] If T1≤T≤T2, the load increase is determined to be the second load increase k2, and k2=0.45k0;
[0100] If T<T1, the load increase is determined to be the third load increase k3, and k3=0.6k0;
[0101] Among them, k0 represents the initial load, T1=0.7T0, T2=0.85T0.
[0102] There is no limitation on the method of applying the load. For example, a vertical or horizontal static load may be directly applied to the soil by a static pile driver or a crane or other equipment, which will not be elaborated herein.
[0103] Specifically, in step S3, the pile sinking rate is adjusted according to the soil stability characterization parameter, including:
[0104] The pile sinking rate is positively correlated with the soil stability characterization parameters.
[0105] The soil stability characteristic parameter T is compared with the first soil stability characteristic parameter comparison threshold value T1 and the second soil stability characteristic parameter comparison threshold value T2.
[0106] If T>T2, the first pile driving rate s1 is determined, and s1=1.5s0 is set;
[0107] If T1≤T≤T2, the second pile driving rate s2 is determined, and s2=1.3s0;
[0108] If T<T1, the third pile driving rate s3 is determined, and s3=1.1s0 is set;
[0109] Among them, s0 represents the initial pile driving rate, T1=1.1T0, T2=1.2T0.
[0110] There is no limitation on the method of adjusting the pile driving rate. Preferably, it can be achieved by adjusting the hammering frequency, which will not be described in detail.
[0111] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
Claims
1. A wharf pile sinking construction process, characterized in that: include: Step S1, determining the pile position, sampling and testing the soil in the pile position area, including placing the soil sample in a triaxial pressure chamber, applying different ambient pressures to the soil sample for axial compression, and determining the cohesion of the soil sample; Step S2, obtaining the water level change within a predetermined period, and calculating the soil stability characterization parameter in combination with the cohesion of the soil sample to classify the soil stability category of the pile location area; Step S3, determining the pile sinking method for construction according to the soil stability type of the pile sinking location area, including: Hammering the pile body with a predetermined hammering force by a hydraulic hammer pile driver, detecting the maximum axial stress of the pile body during each hammering process, constructing an axial stress curve of the pile body as the number of hammering times changes, and analyzing in real time the average slope of each axial stress curve segment as the number of hammering times changes to determine whether the pile driving has entered a specific stage, and judging whether the pile driving has abnormality according to the discrete value of the axial stress curve segment as the number of hammering times corresponding to the specific stage, so as to adjust the hammering force and apply load according to soil stability characterization parameters; Or, adjust the pile driving rate according to the soil stability characterization parameters.
2. The wharf pile sinking construction process according to claim 1 is characterized in that: In step S2, the soil stability characteristic parameter is calculated according to formula (1): In formula (1), T represents the soil stability parameter, W represents the water level change within a predetermined period, W0 represents the preset water level change standard threshold, R represents cohesion, and R0 represents the preset cohesion standard threshold.
3. The wharf pile sinking construction process according to claim 1 is characterized in that: In the step S2, the soil stability category of the pile location area is divided into: If the soil stability characterization parameter is greater than or equal to the preset soil stability characterization parameter standard threshold, the soil condition in the pile sinking position area is determined to be a strong stability category; If the soil stability characterization parameter is less than the preset soil stability characterization parameter standard threshold, the soil condition in the pile driving position area is determined to be a weak stability category.
4. The wharf pile sinking construction process according to claim 1, characterized in that: In step S3, determining the pile sinking method for construction includes: If the soil stability category is weak stability category, the pile body is hammered with a predetermined hammering force by a hydraulic hammer pile driver, the maximum axial stress of the pile body during each hammering process is detected, and the axial stress curve of the pile body that changes with the number of hammering is constructed. The average slope of each axial stress curve segment that changes with the number of hammering is analyzed in real time to determine whether the pile driving has entered a specific stage. According to the discrete value of the axial stress curve segment that changes with the number of hammering corresponding to the specific stage, it is determined whether the pile driving is abnormal, so as to adjust the hammering force and apply load according to the soil stability characterization parameter; If the soil stability category is a strong stability category, the pile driving rate is adjusted based on the soil stability characterization parameters.
5. The wharf pile sinking construction process according to claim 1 is characterized in that: In step S3, the process of constructing the axial stress curve of the pile body as the number of hammer blows changes includes: A rectangular coordinate system is constructed with the number as the horizontal axis and the maximum axial stress of the pile as the vertical axis; Marking the coordinate point of the maximum axial stress of the pile body at each order in the rectangular coordinate system; The coordinate points are connected with a smooth curve to obtain the axial stress curve varying with the number of hammer blows.
6. The wharf pile sinking construction process according to claim 1, characterized in that: In step S3, it is determined whether the pile driving has entered a specific stage. include, If the average slope of the axial stress curve segment that changes with the number of hammer blows is greater than or equal to the preset average slope standard threshold, it is determined that the pile driving has entered a specific stage.
7. The wharf pile sinking construction process according to claim 1, characterized in that: In step S3, the discrete value of the axial stress curve segment corresponding to the change in the number of hammer blows in the specific stage is calculated according to formula (2). In formula (2), L represents the discrete value of the axial stress curve segment corresponding to the change of the number of hammering in the specific stage, Hi represents the maximum axial stress of the pile body after the i-th hammering, ΔH represents the mean value of the maximum axial stress of the pile body in the specific stage, and n represents the number of hammering in the specific stage.
8. The wharf pile sinking construction process according to claim 1, characterized in that: In step S3, determining whether there is an abnormality in pile sinking includes: If the discrete value of the axial stress curve segment corresponding to the change in the number of hammer blows in the specific stage is greater than the preset discrete value threshold, it is determined that the pile driving is abnormal.
9. The wharf pile sinking construction process according to claim 1, characterized in that: In step S3, adjusting the hammering force and applying the load according to the soil stability characterization parameter includes: Increasing the hammering force, the increase in hammering force is negatively correlated with the soil stability characterization parameter; A load is applied, and the amount of load applied is negatively correlated with the soil stability characterization parameter.
10. The wharf pile sinking construction process according to claim 1, characterized in that: In the step S3, the pile sinking rate is adjusted according to the soil stability characterization parameter, including: The pile sinking rate is positively correlated with the soil stability characterization parameters.