Method for stoping remaining pillars of metal mine by adopting efficient static crushing agent
By using high-efficiency static crushing agent in metal mines, suitable water-cement ratio and charge hole parameters are designed, the problems of poor safety and low ore recovery caused by blasting rocks are solved, and safe recovery of legacy ore columns are achieved and Efficient resource recycling.
Patent Information
- Application Number
- CN202411326980.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-11-15
AI Technical Summary
In metal mines, during the mining process of legacy ore columns, the blasting and rock breaking method leads to poor safety and low ore recovery rate, which can easily lead to goaf collapse and mining site instability, which will affect the safety and resource recovery efficiency of the mine.
Use high-efficiency static crushing agent instead of explosives. By designing the appropriate water-cement ratio, charging hole diameter, hole depth and hole spacing, the annular tensile stress is greater than 5 times the tensile strength of the rock body. Use lime series high-efficiency static crushing agent for Recover the mine column to avoid blasting vibration and improve the safety and efficiency of retrieval.
It has achieved safe mining of the legacy mine columns in metal mines, expanded the mining scope, improved the ore recovery rate, and avoided safety risks and resource losses caused by blasting operations.
Smart Images

Figure CN118958975A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of mining, and in particular relates to a method for recovering ore pillars left in metal mines by using a high-efficiency static crushing agent. Background Art
[0002] The main underground metal mines in my country are mined by open-pit method, caving method and filling method. In order to limit the ground pressure activities in the mine and tunnel, isolate the upper and surrounding waste rocks or filling materials, and form the bottom structure of the ore discharge, it is inevitable to leave various types of pillars, mainly including: top pillars, bottom pillars, intermediate pillars, point pillars and open-pit to underground boundary pillars. According to statistics, the amount of residual pillars accounts for about 15% to 60% of the mine volume according to different mining processes. The "China Mineral Resources Report 2023" (Ministry of Natural Resources) and the "Research Report on Scientific and Technological Innovation in the Resources Field" (China 21st Century Agenda Management Center, 2019) show that my country's major mineral species are highly dependent on foreign countries, and deep mining and mining of residual mines are the main ways to obtain mineral resources in the future. Therefore, timely and safe mining of various types of residual pillars can not only effectively solve the loss of ore volume caused by the backlog of pillars, but also extend the service life of mines and improve the economic and social benefits of mines.
[0003] According to the occurrence conditions of the ore body, the stability of the ore rock, the grade and preciousness of the ore, whether the surface is allowed to collapse, the mining method, the type of pillar and the state of the goaf, the main methods for mining the pillars include pillar extraction, pillar cutting, replacement, segmented empty field, segmented or staged collapse, filling and VCR. The above-mentioned rock-breaking method for mining the remaining pillars is blasting. In view of the fact that the remaining pillars have been frequently disturbed by mining during their formation, and the influence of the rheological properties of the rock, compared with the ore body mined normally, their joints and fissures are more developed and their mechanical properties have been greatly reduced. Therefore, in the process of mining the remaining pillars by blasting, the blasting vibration can easily cause large-scale re-damage to the ore rock, and then induce ground pressure activities represented by goaf collapse and instability of the mining area, causing a large amount of surrounding rock, filling media, etc. to mix into the mined ore, and even causing the mining area to be unfit for mining. Engineering practice shows that the use of blasting to break rock is the main reason for the safety of the pillars left behind in metal mines and the low ore recovery rate. Summary of the invention
[0004] In order to solve the above problems, this application will replace explosives with high-efficiency static crushers with vibration-free characteristics and apply them to the recovery of legacy pillars in metal mines. By designing the water-cement ratio of high-efficiency static crushers, the diameter of charging holes and the depth of charging drill holes, and the spacing between charging holes, the problems of poor safety and low ore recovery rate in the recovery of legacy pillars by blasting and breaking rocks can be solved.
[0005] In order to achieve the above-mentioned effects, the technical solution of the present application is: a method for recovering the pillars left over from metal mines using high-efficiency static crushers, using a lime series of high-efficiency static crushers, designing a minimum resistance line w, and using charging holes to charge the high-efficiency static crushers to recover the pillars left over from metal mines.
[0006] Furthermore, in order to ensure that the lime series high-efficiency static crusher has good rock breaking ability, the water-cement ratio of the lime series high-efficiency static crusher is adjusted so that the circumferential tensile stress measured in the external tube method is not less than 5 times the tensile strength of the rock mass, and in order to ensure efficient injection of the slurry, the slurry fluidity needs to be greater than 170 mm.
[0007] Furthermore, the minimum resistance line w is determined according to the GSI surrounding rock classification system. When the GSI value is between 30 and 50, the minimum resistance line is 30 to 50 cm; when the GSI value is less than 30, the minimum resistance line is 50 to 65 cm.
[0008] Furthermore, the charging hole has a diameter of less than 90 mm and a hole depth of 2.5 m.
[0009] Furthermore, the relationship between the charging hole spacing a and the minimum resistance line w is: the charging hole spacing a should be 1.0 to 1.5 times the minimum low resistance line w, that is, a = (1.0 to 1.5) w.
[0010] Furthermore, the charging length L of the charging hole is: when the GSI value is between 30 and 50, the charging length L is 0.9 to 1.0 times the hole depth l of the charging hole, that is, L = (0.9 to 1.0) l; when the GSI value is less than 30, the charging length L is 0.8 to 0.9 times the hole depth l of the charging hole, that is, L = (0.8 to 0.9) l.
[0011] The beneficial effects of the present invention are as follows: in view of the problems of poor safety and low ore recovery rate in the recovery of legacy pillars using blasting rocks, the advantages of using high-efficiency static crushers to recover legacy pillars in metal mines are: on the one hand, the recovery of legacy ore does not require blasting operations, which is conducive to ensuring the safe recovery of legacy ore; on the other hand, the recovery range of legacy pillars is expanded to improve the recovery rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Attached Figure 1 This is the horizontal projection diagram of the remaining ore pillar in Example 1;
[0013] Attached Figure 2 Design route layout for the remaining pillars in Example 1;
[0014] Attached Figure 3 This is a schematic diagram of the mining route for the remaining pillars in Example 1;
[0015] Attached Figure 4This is the collapse diagram of the roof ore body in the 6# access mining;
[0016] Attached Figure 5 This is the fluidity test of high-efficiency static crushing agent: (a) is the water-cement ratio of 0.225, (b) is the water-cement ratio of 0.225, and (c) is the water-cement ratio of 0.225;
[0017] Attached Figure 6 It is the hoop tensile stress test;
[0018] Attached Figure 7 The stable hoop tensile stress curves for different water-cement ratios;
[0019] Attached Figure 8 It is a static rock breaking test;
[0020] Attached Fig. 9 It is the process of macroscopic fracture surface formation;
[0021] Attached Fig.10 It is the macro fracture surface opening-time curve;
[0022] Attached Fig.11 Design the charging holes for the first stope;
[0023] Attached Fig.12 Design charging holes for the second stope;
[0024] Attached Fig.13 Design charging holes for the second stope;
[0025] Attached Fig.14 Before mining of the 6# access road;
[0026] Attached Fig.15 After mining through the 6# access road. DETAILED DESCRIPTION
[0027] The scheme of the present invention is explained below in conjunction with embodiments. Those skilled in the art will understand that the following embodiments are only used to further illustrate the present invention and cannot be understood as limiting the scope of protection of the present invention.
[0028] The first embodiment of the present application discloses a method for recovering the pillars left over from metal mines using a high-efficiency static crusher. The method uses a lime series of high-efficiency static crushers, designs a minimum resistance line w, and uses charging holes to charge the high-efficiency static crushers before recovering the pillars left over from metal mines.
[0029] The reason why the lime series high-efficiency static crushing agent is used in this embodiment is that the lime series high-efficiency static crushing agent has the characteristics of high reaction rate and relatively stable reaction compared with the magnesium oxide series and the calcium aluminate series high-efficiency static crushing agent.
[0030] In order to ensure the recovery effect of remaining pillars, for metal mines in high-altitude and cold areas, the applicable ambient temperature for efficient static crushing is between -10℃ and 10℃, and for metal mines in non-altitude and cold areas, the applicable ambient temperature for efficient static crushing is between 10℃ and 40℃.
[0031] In a further embodiment of the present application, in order to realize the mining of the ore pillars left over from metal mines by using efficient static crushers, it is necessary to ensure that the annular tensile stress at the wall of the charging hole is greater than the tensile strength of the rock mass during the actual mining process. The present invention uses the outer tube method to calculate the radial tensile stress and annular tensile stress of the efficient static crusher, and uses the Hoek-Brown strength criterion to calculate the tensile strength of the rock.
[0032] ① Calculation of the hoop tensile stress of the high-efficiency static crusher
[0033] Calculate the radial tensile stress of the high-efficiency static crusher according to formula (1):
[0034] p=E S (K 2 -1)[ε θ / (2-μ)] (1)
[0035] Where: p is the radial expansion compressive stress, MPa; E S is the elastic modulus of Q235 cold-worked steel pipe, taking 2.060×10 5 MPa; K is the ratio of inner and outer diameters of Q235 cold-worked steel pipe; ε θ is the radial strain of Q235 cold-worked steel pipe; μ is the Poisson's ratio of Q235 cold-worked steel pipe, which is taken as 0.3.
[0036] The hoop tensile stress is calculated by formula (2):
[0037] σ θ = p(R 2 / ρ 2 +1)(R 2 / r 2 )-1 (2)
[0038] Where: θ is the hoop tensile stress, MPa; p is the expansion pressure, MPa; ρ is the arbitrary radius of the cylinder, mm; R, r are the outer diameter and inner diameter of Q235 cold-processed steel pipe, mm.
[0039] In the actual calculation process, the inner diameter of Q235 cold-processed steel pipe should be consistent with the inner diameter of the drill hole commonly used in mines. At the same time, the parameter ρ is taken as 1 / 2 of the inner diameter of the drill hole commonly used in mines.
[0040] ② Calculation of tensile strength of rock mass of the remaining ore pillars
[0041] According to the Geological and Mineral Industry Standard of the People's Republic of China "Engineering Geological Survey Code" (ZB D14002-1989) and the National Standard of the People's Republic of China "Engineering Rock Test Method Standard" (GB / T50266-2013), the geological structure, rock type, rock structure, rock deformation and other characteristics of the area where the remaining pillars are located are identified, and the geological strength index GSI value is calculated. On this basis, the tensile strength of the rock mass of the remaining pillars is calculated according to the Hoek-Brown strength criterion:
[0042] σ t =σ c s α (3)
[0043]
[0044] Where: t is the tensile strength of the rock mass of the ore pillar, MPa; σ c is the uniaxial compressive strength of the rock block measured by the uniaxial compressive strength test, MPa; s and α are parameters in the Hoek-Brown strength criterion; GSI geological strength index value; D is the disturbance parameter in the Hoek-Brown strength criterion that takes into account the impact of blasting and stress release, and is taken as 1.
[0045] ③Selection of water-cement ratio for efficient static crushing agent
[0046] In view of the significant difference in stiffness between Q235 steel pipe and rock mass, and the different boundary conditions between the crusher in the external pipe method and the crusher in the charge hole during the actual mining of the legacy pillars, in order to ensure that the high-efficiency crusher has the ability to crush the legacy pillars, in actual applications, the external pipe method should be used to carry out the circumferential tensile stress test under different water-cement ratio conditions to ensure that the circumferential tensile stress in the external pipe method is not less than 5 times the tensile strength of the rock mass.
[0047] At the same time, in order to ensure efficient pouring of the slurry, the fluidity of slurries with different water-cement ratios should be tested using a standard slurry consistency meter to ensure that the fluidity of the lime series high-efficiency static crusher slurry is >170mm.
[0048] In a further implementation method, in order to give full play to the rock breaking ability of the efficient static crusher and ensure the safety of mining the remaining pillars, the water-cement ratio of the lime series efficient static crusher should also consider the size of the theoretical optimal water-cement ratio and the duration of the macroscopic fracture surface formation. The details are as follows:
[0049] (1) Determine the water-cement ratio by considering the theoretical optimal water-cement ratio of the hydration reaction of the efficient static crusher
[0050] In order to give full play to the rock breaking ability of the high-efficiency static crusher, the hydration reaction of the high-efficiency static crusher slurry should be fully hydrated as much as possible. The hydration reaction equation of the lime series high-efficiency static crusher is:
[0051] CaO+H2O→Ca(OH)2+64.9 kJ (6)
[0052] Assuming that the mass percentage of CaO content in a certain lime series high-efficiency static crushing agent is X, the theoretical optimal water-cement ratio for the full hydration reaction of the high-efficiency static crushing agent slurry is calculated as follows:
[0053]
[0054] Where: P is the theoretical optimal water-cement ratio for the full hydration reaction of the high-efficiency static crushing agent slurry; X is the mass percentage of CaO content in the high-efficiency static crushing agent, %.
[0055] In practical applications, the water-cement ratio of high-efficiency static crusher slurry should not be less than the theoretical optimal water-cement ratio.
[0056] (2) The water-cement ratio is determined by considering the time it takes for the macroscopic fracture surface of rock to form when a high-efficiency static crusher is used.
[0057] The rock breaking efficiency (duration) of high-efficiency static crusher is closely related to the water-cement ratio of slurry. When the actual water-cement ratio is greater than the theoretical optimal water-cement ratio, the rock breaking efficiency (duration) of high-efficiency static crusher decreases with the increase of the water-cement ratio of slurry. In order to prevent the adjacent rock mass of the charging hole that has completed the slurry pouring during the high-efficiency static crusher slurry pouring, thereby causing a safety accident. Therefore, it should be ensured that the duration from the completion of the slurry pouring of the first charging hole to the appearance of the macroscopic fracture surface in the adjacent area of the charging hole is greater than the duration required for all charging holes to complete the slurry pouring.
[0058] In the mining practice of the remaining pillars, the number of charging holes required for each mining of the remaining pillars is usually certain. Assume that the number of charging holes required for each mining of the remaining pillars is The average time required for each charging hole to complete the slurry pouring is Δt hours, so the completion Total duration of slurry pouring in each charging hole Hours. Assume that the time from the completion of slurry pouring in the first charging hole to the appearance of a macroscopic fracture surface in the vicinity of the charging hole is T. To ensure safety, the time from the completion of slurry pouring in the first charging hole to the appearance of a macroscopic fracture surface in the vicinity of the charging hole is T hours, which should be greater than the total slurry pouring time of the charging hole, t hours. It is recommended that T ≥ t + 1.
[0059] In view of the fact that the hydration reaction of the lime series high-efficiency static crusher is an exothermic reaction. At the same time, different types of rocks have different thermal conductivity coefficients. Therefore, even if the same high-efficiency static crusher is used under the same water-cement ratio, the duration of the macroscopic fracture surface on different types of legacy pillar rock mass is different. It is recommended that before the actual mining of legacy pillars, static rock breaking tests of high-efficiency static crushers under different water-cement ratios should be carried out to obtain the corresponding duration T of the macroscopic fracture surface.i . In meeting T i Determine the water-cement ratio under the condition of ≥t+1.
[0060] The macro fracture surface appears for a period of time T i The determination can be achieved by measuring the surface displacement of the charging hole, and the surface displacement measurement is performed using digital image correlation (DIC).
[0061] In this embodiment, the remaining pillars have been frequently disturbed by blasting during their formation and are blasting disturbed rock masses. According to the GSI surrounding rock classification system, when the GSI value is between 30 and 50, the minimum resistance line w is 30 to 50 cm; when the GSI value is less than 30, the minimum resistance line w is 50 to 65 cm.
[0062] In this embodiment, the charging hole is used to inject high-efficiency static crushing agent slurry. The charging hole can be a horizontal hole or an inclined hole. The arrangement of the charging hole includes: charging hole diameter, hole depth and spacing.
[0063] (1) Charge hole diameter r and hole depth l
[0064] The diameter of the charging hole r when using high-efficiency static crushers to recover the remaining pillars can be consistent with the diameter of the charging hole when metal mines use blasting to break rocks to recover the remaining pillars, but the charging hole diameter should not be greater than 90mm. If it is greater than 90mm, in order to prevent the occurrence of "punching holes", it is recommended to appropriately increase the water-cement ratio of the high-efficiency static crusher slurry under the condition of ensuring the destructive capacity. The depth l of the charging hole is 2.5m.
[0065] (2) Distance between charging holes a
[0066] In order to ensure the rock breaking effect of efficient static crushing agent, the spacing between charging holes should be 1.0 to 1.5 times of the minimum low resistance line w, that is, a = (1.0 to 1.5) w.
[0067] In this embodiment, when the GSI value is between 30 and 50, the charging length L is 0.9 to 1.0 times the charging hole depth l, that is, L = (0.9 to 1.0) l; when the GSI value is less than 30, the charging length L is 0.8 to 0.9 times the charging hole depth l, that is, L = (0.8 to 0.9) l.
[0068] It should be noted that there are no special requirements for the construction of charging holes and it can refer to the daily operations of metal mines. The preparation of high-efficiency static crusher slurry is carried out according to the instructions. There are no special requirements for the pouring of high-efficiency static crusher slurry and it can refer to the drilling and grouting operations of metal mines.
[0069] The specific implementation process of this application is disclosed below through specific embodiments.
[0070] Example 1
[0071] This example takes a legacy pillar in a gold mine as an example. The pillar is composed of a bottom pillar in the upper middle section of the mining area and a top pillar in the lower middle section of the mining area. The thickness of the bottom pillar is 6m, the thickness of the top pillar is 8m, and the horizontal projection of the horizontal pillar is shown in Figure 1. Figure 1 The pillar is designed to be mined by the entry-type filling mining method. A total of 1# to 7# entry roads are arranged in the pillar for mining horizontal pillars. Figure 2 . The cross-sectional size of the access road is 2m×2m, and the distance between adjacent access roads is 4m. During the mining process of the pillars, the access road size will be expanded to 4m×4m through blasting operations, that is, 1m pillars will be mined on both sides of the access road, and 2m pillars will be mined in the height direction of the access road. 2m pillars are left in adjacent access roads and are not mined to maintain the stability of the mining site. The collapsed ore is transported from the access road to the 1# guide section by an electric rake, and then transported from the 1# guide section to the 1# chute by an electric rake. The schematic diagram of the horizontal pillar access mining is shown in the figure below. Figure 3 shown.
[0072] According to the demonstration, the mine first carried out mining on the 6# access road. As the mechanical properties of the horizontal pillars were significantly lower than those of the ore body mined normally, the roof of the access road collapsed on a large scale under the action of blasting vibration. Figure 4 In order to ensure the safety of horizontal pillar mining, the 5#~7# access roads will not be mined, and the 1#~4# access roads will use vibration-free and efficient static crushing agents to mine horizontal pillars.
[0073] (1) Calculation of tensile strength of the rock mass of the remaining ore pillars
[0074] According to the geological report provided by the mine and the test results of the uniaxial compressive strength of the main ore rocks, the geological strength index GSI value of the remaining pillars is 45, and the average uniaxial compressive strength of the rock blocks corresponding to the remaining pillars is σ c is 74MPa. Considering that the residual pillars have been frequently disturbed by blasting during their formation, the disturbance parameter D in the Hoek-Brown strength criterion is taken as 1. According to equations (3) to (5), the tensile strength of the residual pillar rock mass is 0.92MPa. Among them, the parameters S and α in the Hoek-Brown strength criterion are 0.000172232 and 0.506581547 respectively.
[0075] (2) Selection of high-efficiency static crushing agent The mine is located in a non-alpine area, and the HSCA-Ⅱ static crushing agent produced by Shijiazhuang Functional Building Materials Co., Ltd. is selected, and its CaO mass percentage is 70%. According to (7), the theoretical optimal water-cement ratio is 0.225.
[0076] The fluidity of the slurries with water-cement ratios of 0.225, 0.25 and 0.28 was tested using a standard consistency meter. Figure 5The test results show that when the water-cement ratio is 0.225, 0.25 and 0.28, the fluidity of HSCA slurry is 178.5, 184.8 and 198.6 mm respectively, all of which are greater than 170 mm.
[0077] The hoop tensile stress of HSCA-Ⅱ static crushing agent was tested by the external tube method when the water-cement ratio was 0.225, 0.25 and 0.28. Figure 6 The test water temperature is 24℃. The hoop tensile stress is calculated according to formula (2). Figure 7 It shows that when the water-cement ratio is 0.225, 0.25 and 0.28, the stable hoop tensile stress is 15.42MPa, 6.72MPa and 4.01MPa respectively.
[0078] In view of the fact that the tensile strength of the rock mass of the remaining pillar is 0.92MPa. However, when the water-cement ratio is 0.28, the circumferential tensile stress is 4.01MPa, which is less than 5 times the tensile strength of the rock mass of the remaining pillar. Therefore, it does not meet the requirements. Although the circumferential tensile stress meets the requirements when the water-cement ratio is 0.225, in order to improve the efficiency of on-site crushing agent injection, the static crushing agent water-cement ratio is temporarily set at 0.25.
[0079] The static rock breaking test was carried out using HSCA-II static crushing agent with a water-cement ratio of 0.25. Figure 8 In the experiment, the XTDIC three-dimensional optical speckle system was used to analyze the formation time of the macroscopic fracture surface of the specimen. The formation process of the macroscopic fracture surface, such as Fig. 9 As shown. Fig. 9 On this basis, the macro fracture surface opening value is extracted. Fig.10 It shows that the formation of the macro fracture surface took about 397 minutes, nearly 6.6 hours.
[0080] According to the requirement of "determining the water-cement ratio by considering the formation time of the macroscopic fracture surface of the rock-breaking agent by the high-efficiency static crusher", if the HSCA-II static crusher with a water-cement ratio of 0.25 is used for the mining of the remaining pillars, the total time for drilling and grouting of the mining section should be completed within 5.5 hours. The mine adopts a working pressure of 3.0MPa and a conveying capacity of 3.5m 3 / h HUB3.5 double cylinder mortar pump grouting anchor operation. In view of the HSCA-Ⅱ static crushing agent injection process does not require similar anchor installation and other procedures. Production practice shows that: within 5.5 hours, 50 charging holes with a diameter of 50mm and a hole depth of 2.5m can be completed. Therefore, the number of charging holes arranged in a mining section should not be greater than 50.
[0081] (3) Design of charging holes for mining of remaining pillars
[0082] According to the mining sequence design of 1# to 4# access provided by the mine, the 4# access was mined first. The section of the constructed 4# access is 2×2m 2 After the mining of the remaining pillars, the final cross section is 4×4m 2 The static crushing agent is HSCA-Ⅱ type static crushing agent with a water-cement ratio of 0.25.
[0083] Considering that the number of charge holes in a mining section should not exceed 50, the design divides the mining of the 4# access into three times. In the first mining, the section consists of 2×2m 2 Expanded to 2.8×2.4m 2 The second mining section is 2.8×2.4m 2 Expanded to 3.4×3.2m 2 The third mining section is 3.4×3.2m 2 Expanded to 4.0×4.0m 2 .
[0084] ⅠFirst mining design
[0085] ① According to the existing rock drilling equipment in the mine, the diameter of the horizontal charging hole is 50mm and the hole depth is 2.5m.
[0086] ② The geological strength index GSI value of the remaining pillars is 45, and the minimum resistance line w is 0.4m.
[0087] ③The hole spacing a is equal to the value of the minimum resistance line w, which is 0.4m.
[0088] ④ A total of 20 horizontal charging holes are arranged. Among them, 12 are arranged on the side of the access road, and the charging holes are numbered 1 to 7# and 8 to 14#. 6 are arranged on the top plate of the access road, and the charging holes are numbered 15 to 20#.
[0089] ⑤ To ensure safety, first inject HSCA-II static crushing agent into holes 1 to 7 and 8 to 14. Then, inject into holes 15 to 20.
[0090] ⑥ In order to reduce the probability of "spray hole", the charging length L of each charging hole is taken as 2.3m, which is about 0.9 times the depth of the charging hole.
[0091] The design of the first charging hole for recovery is shown in Fig.11 .
[0092] Ⅱ First mining design
[0093] ①The diameter of the horizontal charging hole is 50mm and the hole depth is 2.5m.
[0094] ② The GSI value of the geological strength index of the remaining pillars is 45, the minimum resistance line w of the approach roof is 0.4m, and the minimum resistance line w of the two sides of the approach is 0.3m.
[0095] ③The hole spacing a is 0.4m.
[0096] ④ A total of 34 horizontal charging holes are arranged. Among them, 18 are arranged on the side of the access road, and the charging holes are numbered 1 to 9# and 10 to 18#. 16 are arranged on the top plate of the access road, and the charging holes are numbered 19 to 34#.
[0097] ⑤First, inject HSCA-II static crushing agent into 1~9# and 10~18#. Then, inject 19~34# charging holes.
[0098] ⑥ The charging length L of each charging hole is 2.3m, which is about 0.9 times the depth of the charging hole.
[0099] The design of the charging hole for the second recovery is shown in Fig.12 .
[0100] ⅢFirst mining design
[0101] ①The diameter of the horizontal charging hole is 50mm and the hole depth is 2.5m.
[0102] ② The GSI value of the geological strength index of the remaining pillars is 45, the minimum resistance line w of the approach roof is 0.4m, and the minimum resistance line w of the two sides of the approach is 0.3m.
[0103] ③The hole spacing a is 0.4m.
[0104] ④ A total of 40 horizontal charging holes are arranged. Among them, 22 are arranged on the side of the access road, and the charging holes are numbered 1 to 11# and 12 to 22#. 14 are arranged on the top plate of the access road, and the charging holes are numbered 19 to 34#.
[0105] ⑤First, inject HSCA-II static crushing agent into 1~11# and 12~22#. Then, inject 23~40# charging holes.
[0106] ⑥ The charging length L of each charging hole is 2.3m, which is about 0.9 times the depth of the charging hole.
[0107] The design of the charging hole for the third recovery is shown in Fig.13 .
[0108] (5) Effect of mining the remaining pillars
[0109] HSCA-Ⅱ static crushing agent with a water-cement ratio of 0.25 was used to carry out mining of the remaining pillar 6# access. Fig.14 and Fig.15. The statistical results show that compared with the 6# access route, which could not recover the remaining pillars due to the influence of blasting vibration, the 4# access route has mined a total of 665t of ore, 1401g of gold, and 215t of sulfur. The above shows that the use of high-efficiency static crushing agents to recover the remaining pillars in metal mines can effectively avoid the adverse effects of blasting vibration, thereby improving the recovery rate of the remaining pillars.
Claims
1. A method for recovering the ore pillars left in metal mines using a high-efficiency static crusher. It is characterized in that The lime series of high-efficiency static crushers are used to design the minimum resistance line w. After the high-efficiency static crushers are charged through the charging holes, the metal mine pillars are mined.
2. The method according to claim 1, It is characterized in that The water-cement ratio of the lime series high-efficiency static crusher is adjusted so that the hoop tensile stress measured in the external tube method is not less than 5 times the tensile strength of the rock mass, and the slurry fluidity is greater than 170 mm.
3. The method according to claim 1, It is characterized in that The minimum resistance line w is determined according to the GSI surrounding rock classification system. When the GSI value is between 30 and 50, the minimum resistance line is 30 to 50 cm; when the GSI value is less than 30, the minimum resistance line is 50 to 65 cm.
4. The method according to claim 1, It is characterized in that The charging hole has a diameter of less than 90 mm and a hole depth of 2.5 m.
5. The method according to claim 1, It is characterized in that The relationship between the charging hole spacing a and the minimum resistance line w is: the charging hole spacing a should be 1.0 to 1.5 times the minimum resistance line w, that is, a = (1.0 to 1.5) w.
6. The method according to claim 5, It is characterized in that The charging length of the charging hole is: when the GSI value is between 30 and 50, the charging length L is 0.9 to 1.0 times the hole depth l of the charging hole, that is, L = (0.9 to 1.0) l; when the GSI value is less than 30, the charging length L is 0.8 to 0.9 times the hole depth l of the charging hole, that is, L = (0.8 to 0.9) l.
