Internal water pressure simulation loading device for tunnel model test
By designing the internal hydraulic pressure simulation loading device of hydraulic chamber and piston pillar, the inconvenience and safety hazards of the high internal hydraulic pressure loading method of tunnels are solved, the safety and reliability of tunnel model tests and the convenience of data acquisition are achieved, and high-pressure water is promoted. Research on industrial tunnels.
Patent Information
- Application Number
- CN202411228438.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-15
AI Technical Summary
The existing tunnel high-inner water pressure loading method has problems such as inconvenience of loading, safety hazards and data acquisition difficulties, especially in indoor model tests, the safety risks and deformation characteristics caused by high-pressure water jets are difficult to visually collect.
An internal hydraulic simulation loading device is designed, including a loading cylinder block and an arc-shaped loading plate. The pressure is applied evenly through the hydraulic chamber and the piston pillar, and the pressure is transmitted using the hydraulic main pipe and branch pipe. The arc-shaped loading plate is tightly connected to the inner wall of the tunnel model. Contact, simulate high internal hydraulic pressure and equipped with mechanical loading to reduce test environment requirements.
It realizes a tunnel model test with convenient loading, safe and reliable loading, can accurately regulate pressure, and facilitate data collection, avoids the safety risks of high-pressure water jets, and promotes the research progress of high-pressure hydraulic tunnels.
Smart Images

Figure CN118961438A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of water conservancy projects, and in particular to an internal water pressure simulation loading device for tunnel model tests. Background Art
[0002] With the vigorous development of large-scale hydropower projects and new energy projects in western my country, a large number of deep-buried, long and high-pressure hydraulic tunnels have been formed. The deformation and failure evolution of tunnel lining structures under high pressure and the load distribution mechanism of lining surrounding rocks have attracted wide attention, which directly affects the structural form and safety evaluation of the lining. At present, some meaningful research and exploration have been carried out on the study of the characteristics of lining structures under high internal water. In terms of experimental research, large-scale on-site internal water loading generally adopts the form of reaction frame + jack, reaction frame + rubber bladder or real water pressure + two-end plugging to achieve high internal pressure loading. Indoor similar model tests also use the form of two-end plugging + real water pressurization or concrete pressure cylinder + real water pressurization to apply high water pressure inside the lining. Large-scale field tests are expensive and are affected by field construction and rock mass quality. Indoor model tests reduce the model size by dozens of times based on similar constants. Indoor model tests have become a common research method. Indoor model tests use high water pressure loading, which requires blocking of both ends of the tunnel and safety measures. Therefore, indoor model high water pressure tests generally need to be carried out in a confined space to avoid safety problems caused by high-pressure water jets. Testing in a confined space will cause the deformation of the model or the mechanical properties cannot be intuitively collected, and the test methods in confined spaces also have limitations. Summary of the invention
[0003] In order to overcome the above-mentioned shortcomings of the existing tunnel high internal pressure loading method, the technical problem to be solved by the present invention is to provide an internal water pressure simulation loading device for tunnel model testing, which is convenient to load, safe and reliable, and easy to collect data.
[0004] The technical solution adopted by the present invention to solve its technical problem is:
[0005] The internal water pressure simulation loading device for tunnel model test comprises a loading cylinder and an arc-shaped loading plate, wherein a plurality of hydraulic chambers are arranged in an annular array around the loading cylinder, piston rods are slidably arranged in the hydraulic chambers, a hydraulic main pipe is arranged in the middle of the loading cylinder, and hydraulic branch pipes are arranged between the hydraulic main pipe and each hydraulic chamber; the number of the arc-shaped loading plates corresponds to the number of the hydraulic chambers, and all the arc-shaped loading plates enclose an annular bushing with an outer diameter identical to the inner diameter of the tunnel model; the piston rods are in one-to-one contact with the inner sides of each arc-shaped loading plate, the annular bushing is pressed tightly against the inner wall of the tunnel model, and a force is applied to the inner wall of the tunnel model.
[0006] Furthermore, a plurality of hydraulic cavities in a circular array on the same ring is regarded as a group of hydraulic cavities, the length of the loading cylinder is equivalent to the length of the tunnel model, and a plurality of groups of hydraulic cavities are evenly spaced on the loading cylinder along its axial direction.
[0007] Furthermore, the length of the arc-shaped loading plate is equal to the length of the loading cylinder; or the length of the arc-shaped loading plate is the value obtained by dividing the length of the loading cylinder by the number of groups of hydraulic chambers.
[0008] Furthermore, a loading cylinder and its surrounding hydraulic cavity are used as a loading component, and multiple loading components are arranged along the axis of the tunnel model. The hydraulic main pipe runs through the front and rear ends of the loading cylinder, and the hydraulic main pipes of multiple loading components are connected by connecting pipes.
[0009] Furthermore, the length of the arc-shaped loading plate is equal to the length of the tunnel model, or the length of the arc-shaped loading plate is equal to the length of a single loading component.
[0010] Furthermore, the hydraulic main pipe of the loading cylinder body is divided into a three-section structure, the middle part is a transition section with a smaller inner diameter, and the two ends are connecting sections with a larger inner diameter, and the hydraulic branch pipe is connected to the middle part of the transition section; two connecting parts are symmetrically arranged at both ends of the connecting pipe, and the connecting parts are, from the outside to the inside, an inner connecting section, a positioning section and an outer connecting section with gradually increasing outer diameters, the inner connecting section is matched and docked with the transition section, and an inner sealing groove is provided on the inner connecting section, the step surface between the positioning section and the inner connecting section abuts against the step surfaces of the transition section and the connecting section, and an outer sealing groove is provided on the positioning section, and the outer connecting section is matched and docked with the connecting section.
[0011] Furthermore, the length of the inner connecting section of the connecting pipe is less than half of the transition section of the hydraulic main pipe, and the length of one end of the connecting pipe inserted into the hydraulic main pipe is half of the length of the entire connecting pipe.
[0012] Furthermore, the connecting pipe on the loading cylinder body at the head end is connected to the oil inlet pipe of the hydraulic system, and the connecting pipe on the loading cylinder body at the tail end is provided with an exhaust valve.
[0013] Furthermore, the loading cylinder is a hexagonal prism structure, and the hydraulic chambers are arranged on six sides of the hexagonal prism.
[0014] Furthermore, an annular groove for accommodating a sealing ring is provided at one end of the piston column located in the hydraulic chamber, and an arc-shaped loading surface matching the arc-shaped loading plate is provided at the other end of the piston column.
[0015] The beneficial effects of the present invention are as follows: by arranging a plurality of hydraulic chambers and piston rods in an annular array around the loading cylinder body, and connecting each hydraulic chamber to the hydraulic main pipe by means of a hydraulic branch pipe, each hydraulic chamber can be evenly filled with hydraulic oil through the hydraulic main pipe, thereby providing uniform pressure for each piston rod, and the pressure is then evenly transmitted to the inner wall of the tunnel model through the arc-shaped loading plate, thereby simulating the situation in which the tunnel is subjected to the internal water pressure; the entire device adopts the form of mechanical loading, which has low requirements on the test environment, can avoid the safety problems caused by high-pressure water jets, and the applied pressure can be precisely controlled, and can also be coordinated with more monitoring technologies to collect and study data on the test process, thereby accelerating the research progress of high-pressure hydraulic tunnels. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0017] Figure 2 It is a structural schematic diagram of a loading cylinder of the present invention;
[0018] Figure 3 is a structural sectional view of a loading cylinder of the present invention;
[0019] Figure 4 It is a structural schematic diagram of the piston column of the present invention;
[0020] Figure 5 It is a schematic diagram of the connection between the connecting pipe and the loading cylinder of the present invention;
[0021] Figure 6 It is a schematic diagram of the installation of the annular bushing of the present invention;
[0022] Figure 7 It is a schematic diagram of the installation of the loading cylinder of the present invention.
[0023] Marked in the figure are, 1-loading cylinder, 2-arc-shaped loading plate, 3-tunnel model, 4-annular bushing, 5-connecting pipe, 11-hydraulic chamber, 12-piston column, 13-hydraulic main pipe, 14-hydraulic branch pipe, 51-inner connecting section, 52-positioning section, 53-outer connecting section, 54-inner sealing groove, 55-outer sealing groove, 121-annular groove, 122-arc-shaped loading surface, 131-transition section, 132-connecting section. DETAILED DESCRIPTION
[0024] The present invention is further described below in conjunction with the accompanying drawings.
[0025] It should be noted that if there are directional indication terms in the present invention, such as up, down, left, right, front, and back directions and orientation terms, they are for the purpose of facilitating the description of the relative position relationship between components, and are not specific to the absolute position of the related components or the position relationship between components. They are only used to explain the relative position relationship and movement of the components in a certain posture. If the specific posture changes, the directional indication will also change accordingly. If there are terms related to quantity in the present invention, such as "multiple", "multiple", "several", etc., they specifically refer to two or more.
[0026] like Figure 1-3 As shown, an internal water pressure simulation loading device for tunnel model test provided by the present invention comprises a loading cylinder 1 and an arc-shaped loading plate 2, wherein a plurality of hydraulic chambers 11 are arranged in an annular array around the loading cylinder 1, a piston column 12 is slidably arranged in the hydraulic chamber 11, a hydraulic main pipe 13 is arranged in the middle of the loading cylinder 1, and a hydraulic branch pipe 14 is arranged between the hydraulic main pipe 13 and each hydraulic chamber 11; the number of the arc-shaped loading plates 2 corresponds to the number of the hydraulic chambers 11, and all the arc-shaped loading plates 2 enclose an annular bushing 4 whose outer diameter is the same as the inner diameter of the tunnel model 3, and the piston column 12 abuts against the inner side of each arc-shaped loading plate 2 one by one, presses the annular bushing 4 against the inner wall of the tunnel model 3, and applies a force to the inner wall of the tunnel model 3.
[0027] The number of hydraulic chambers 11 is mainly designed according to the size of the tunnel model 3. The larger the size, the more hydraulic chambers 11 there are. Usually, 6 to 10 are more appropriate. The present invention preferably uses 6, and the loading cylinder 1 is set into a hexagonal prism structure. The 6 hydraulic chambers 11 are respectively set on the six sides of the hexagonal prism, so that the manufacturing and processing accuracy of the hydraulic chamber 11 can be ensured. The axis of the hydraulic chamber 11 is preferably arranged radially with the center of the loading cylinder 1 as the center, so that the force of the piston column 12 acts vertically on the arc-shaped loading plate 2. For the piston column 12, if Figure 4 As shown, in order to improve the sealing performance, one end of the piston rod 12 located in the hydraulic chamber 11 is provided with an annular groove 121 for accommodating a sealing ring, and in order to increase the force-bearing area, the other end of the piston rod 12 is provided with an arc-shaped loading surface 122 matching the arc-shaped loading plate 2. The arc-shaped loading plate 2 is preferably made of a steel plate with sufficient strength to ensure that the force of the piston rod 12 is evenly distributed on the inner wall of the tunnel model 3. Of course, in order to complete the loading test, some other supporting components are also required, such as a hydraulic control system, a data acquisition and recording system, etc.
[0028] The use process of the present invention is as follows: in the device design stage, the annular bushing 4 is first designed according to the size of the tunnel model 3 to ensure that the outer diameter of the annular bushing 4 is equivalent to the inner diameter of the tunnel model 3, or slightly smaller than the inner diameter of the tunnel model 3, and then the annular bushing 4 is equally divided according to the number of hydraulic chambers 11 around the loading cylinder 1 to obtain the arc loading plate 2, and then the size of the loading cylinder 1, the hydraulic chamber 11 and the piston rod 12 are designed according to the pressure to be applied; when conducting the test, various detection instruments are first installed on the tunnel model 3, and then the arc loading plate 2 is assembled on the inner wall of the tunnel model 3, and then the loading cylinder 1 is placed so that the piston rod 12 corresponds to the arc loading plate 2 one by one, and finally the hydraulic main pipe 13 of the loading cylinder 1 is connected to the oil pipe of the hydraulic system, and the hydraulic oil synchronously applies force to all piston rods 12 through the hydraulic branch pipe 14, and the test data is recorded by the detection instrument.
[0029] In the study of the tunnel model 3, some only perform stress analysis on a specific section, and some perform overall stress analysis on a certain section of the cavern. For the analysis of a specific section, it is only necessary to ensure that a circle of hydraulic chambers 11 on the loading cylinder 1 is located on the plane where the section is located. For the analysis of the entire cavern, it is also necessary to set multiple hydraulic chambers 11 along the length direction of the cavern. In order to analyze the entire cavern, the present invention provides the following two solutions:
[0030] Solution 1: A plurality of hydraulic chambers 11 in a circular array on the same ring is a group of hydraulic chambers. The length of the loading cylinder 1 is equivalent to the length of the tunnel model 3. The loading cylinder 1 is provided with a plurality of groups of hydraulic chambers at even intervals along its axial direction.
[0031] Option 2: Figure 7 As shown, a loading cylinder 1 and a circle of hydraulic chambers 11 around it are used as a loading component, and multiple loading components are arranged along the axis of the tunnel model 3. The hydraulic main pipe 13 runs through the front and rear ends of the loading cylinder 1, and the hydraulic main pipes 13 of multiple loading components are connected by a connecting pipe 5.
[0032] The above two solutions have their own advantages and disadvantages. Solution 1 is an integral structure, which is slightly more complicated in processing and manufacturing, but easy to install and use; Solution 2 is a structural form of splicing multiple loading components. The installation and use process is more complicated, but it can be flexibly adjusted to adapt to tunnel models 3 of different lengths. In the above two solutions, each hydraulic chamber 11 is connected to the hydraulic main pipe 13 through an independent hydraulic branch pipe 14, so it can ensure that the force applied by all piston rods 12 is the same, and the effect of internal water pressure on the tunnel model 3 can be simulated.
[0033] In order to increase the flexibility of the test, the preferred solution of the present invention is the second preferred solution. For the connection mode between the connecting pipe 5 and the hydraulic main pipe 13, the preferred solution of the present invention is as follows: Figure 5As shown, the hydraulic main pipe 13 of the loading cylinder 1 is divided into three sections, the middle part is a transition section 131 with a smaller inner diameter, and the two ends are connecting sections 132 with a larger inner diameter, and the hydraulic branch pipe 14 is connected to the middle part of the transition section 131; the connecting pipe 5 is a hard steel pipe structure, and two connecting parts are symmetrically arranged at both ends, and the connecting parts are, from the outside to the inside, an inner connecting section 51 with a gradually increasing outer diameter, a positioning section 52 and an outer connecting section 53. During installation, the inner connecting section 51 is matched and docked with the transition section 131 of the hydraulic main pipe 13, and the outer connecting section 53 is matched and docked with the connecting section 132. The inner connecting section 51 is provided with an inner sealing groove 54, and a sealing ring is arranged in the inner sealing groove 54 to realize inner sealing. The whole connecting pipe 5 is axially positioned by abutting the step surface between the positioning section 52 and the inner connecting section 51 on the step surface between the transition section 131 and the connecting section 132 of the hydraulic main pipe 13. The positioning section 52 is provided with an outer sealing groove 55, and a sealing ring is arranged in the outer sealing groove 55 to realize outer sealing. The two seals can ensure that the hydraulic oil will not leak.
[0034] As for the stability of the connection of the connecting pipe 5, since the two ends of the middle connecting pipe 5 are respectively inserted into the two loading cylinders 1, and the loading cylinder 1 is fixed on the arc loading plate 2 by the piston rod 12, the loading cylinder 1 can ensure that the middle connecting pipe 5 will not fall off from the loading cylinder 1. The connecting pipe 5 at the end needs to ensure the stability of its connection with the hydraulic main pipe 13 through an external structure, and a fixed connection method such as threaded connection or welding can also be used. During the test, the connecting pipe 5 on the loading cylinder 1 at the head end is connected to the oil inlet pipe of the hydraulic system, and an exhaust valve can be set on the connecting pipe 5 on the loading cylinder 1 at the tail end. At the initial stage of loading, the exhaust valve is opened first, and then oil is injected into the loading cylinder 1, so that the hydraulic main pipe 13, the hydraulic branch pipe 14 and the hydraulic cavity 11 form an internal cavity for exhaust and liquid addition. After sufficient exhaust, the exhaust valve is closed, and the high-pressure pump is turned on to start applying liquid pressure. When the hydraulic pressure reaches the working threshold, the piston rod 12 will move toward the arc loading plate 2, and continue to pressurize until the pressure applied by the arc loading plate 2 reaches the required internal water pressure.
[0035] Furthermore, in order to prevent the connecting pipe 5 from blocking the hydraulic branch pipe 14, the length of the inner connecting section 51 of the connecting pipe 5 can be set to be less than half of the transition section 131 of the hydraulic main pipe 13, so that after the connecting pipes 5 at both ends of the hydraulic main pipe 13 are inserted, there is still a gap between the two connecting pipes 5, and the hydraulic branch pipe 14 is located in the middle of the transition section 131, so the connecting pipe 5 will not block the entrance of the hydraulic branch pipe 14. In addition, in order to enable multiple loading components to be tightly spliced together, the length of one end of the connecting pipe 5 inserted into the hydraulic main pipe 13 is half of the length of the entire connecting pipe 5, so that when the two ends of the connecting pipe 5 are fully inserted into the two loading cylinders 1, the two loading cylinders 1 just stick together. In this way, the position of each loading component can be better determined, so that it can be better installed corresponding to the arc loading plate 2.
[0036] When conducting a simulation test on the entire cavern, the present invention provides three solutions for the arc loading plate 2. The first solution is to set the length of the arc loading plate 2 to be equal to the length of the loading cylinder 1, that is, equal to the length of the tunnel model 3, so that the number of arc loading plates 2 can be reduced, but the disadvantage is that it is easy to cause deformation of the arc loading plate 2; the second solution is designed according to the solution that multiple groups of hydraulic chambers are provided on the loading cylinder 1, and the arc loading plate 2 is divided according to the number of groups, that is, the length of the arc loading plate 2 is the value of the length of the loading cylinder 1 divided by the number of groups of hydraulic chambers 11; the third solution is designed according to the solution of splicing multiple loading components, such as Figure 6 , Figure 7 As shown, the length of the arc loading plate 2 is equivalent to the length of a single loading assembly. The arc loading plates 2 of the second and third schemes are both shorter, and are not easily deformed during the manufacturing and use process, and can evenly distribute the force of the piston rod 12 to the inner wall of the tunnel model 3.
[0037] The present invention uses mechanical loading to simulate internal water pressure, which can not only ensure uniform transmission and precise regulation of pressure, but also reduce test environment requirements, avoid safety problems caused by high-pressure water jets, and cooperate with more monitoring technologies to collect and study data during the test process, which is beneficial to the research work of high-pressure hydraulic tunnels.
Claims
1. An internal water pressure simulation loading device for tunnel model test, characterized in that: The invention comprises a loading cylinder (1) and an arc-shaped loading plate (2). The loading cylinder (1) is provided with a plurality of hydraulic chambers (11) in an annular array around the loading cylinder (1). A piston column (12) is slidably arranged in the hydraulic chamber (11). A hydraulic main pipe (13) is provided in the middle of the loading cylinder (1). A hydraulic branch pipe (14) is provided between the hydraulic main pipe (13) and each hydraulic chamber (11). The number of the arc-shaped loading plates (2) corresponds to the number of the hydraulic chambers (11). All the arc-shaped loading plates (2) enclose an annular bushing (4) having an outer diameter identical to the inner diameter of a tunnel model (3). The piston column (12) abuts against the inner side of each arc-shaped loading plate (2) in a one-to-one manner, presses the annular bushing (4) against the inner wall of the tunnel model (3), and applies a force to the inner wall of the tunnel model (3).
2. The internal water pressure simulation loading device for tunnel model test according to claim 1, characterized in that: A plurality of hydraulic chambers (11) in an annular array on the same circular ring is regarded as a group of hydraulic chambers. The length of the loading cylinder (1) is equivalent to the length of the tunnel model (3). The loading cylinder (1) is provided with a plurality of groups of hydraulic chambers at even intervals along its axial direction.
3. The internal water pressure simulation loading device for tunnel model test according to claim 2, characterized in that: The length of the arc-shaped loading plate (2) is equivalent to the length of the loading cylinder (1); or the length of the arc-shaped loading plate (2) is the value obtained by dividing the length of the loading cylinder (1) by the number of groups of hydraulic chambers (11).
4. The internal water pressure simulation loading device for tunnel model test according to claim 1, characterized in that: A loading cylinder (1) and a hydraulic chamber (11) around it serve as a loading component. A plurality of loading components are arranged along the axis of a tunnel model (3). The hydraulic main pipe (13) runs through the front and rear ends of the loading cylinder (1). The hydraulic main pipes (13) of the plurality of loading components are connected via a connecting pipe (5).
5. The internal water pressure simulation loading device for tunnel model test according to claim 4, characterized in that: The length of the arc-shaped loading plate (2) is equivalent to the length of the tunnel model (3), or the length of the arc-shaped loading plate (2) is equivalent to the length of a single loading component.
6. The internal water pressure simulation loading device for tunnel model test according to claim 4, characterized in that: The hydraulic main pipe (13) of the loading cylinder (1) is divided into three sections, the middle section is a transition section (131) with a smaller inner diameter, and the two ends are connecting sections (132) with a larger inner diameter, and the hydraulic branch pipe (14) is connected to the middle section of the transition section (131); two connecting parts are symmetrically arranged at the two ends of the connecting pipe (5), and the connecting parts are, from the outside to the inside, an inner connecting section (51) with an increasing outer diameter, a positioning section (52) and an outer connecting section (53), the inner connecting section (51) and the transition section (131) are matched and docked, and an inner sealing groove (54) is provided on the inner connecting section (51), the step surface between the positioning section (52) and the inner connecting section (51) abuts against the step surfaces of the transition section (131) and the connecting section (132), and an outer sealing groove (55) is provided on the positioning section (52), and the outer connecting section (53) and the connecting section (132) are matched and docked.
7. The internal water pressure simulation loading device for tunnel model test according to claim 6, characterized in that: The length of the inner connecting section (51) of the connecting pipe (5) is less than half of the transition section (131) of the hydraulic main pipe (13), and the length of one end of the connecting pipe (5) inserted into the hydraulic main pipe (13) is half of the length of the entire connecting pipe (5).
8. The internal water pressure simulation loading device for tunnel model test according to claim 6, characterized in that: The connecting pipe (5) on the loading cylinder body (1) at the head end is connected to the oil inlet pipe of the hydraulic system, and the connecting pipe (5) on the loading cylinder body (1) at the tail end is provided with an exhaust valve.
9. The internal water pressure simulation loading device for tunnel model test according to any one of claims 1 to 8, characterized in that: The loading cylinder (1) is a hexagonal prism structure, and the hydraulic chamber (11) is arranged on six side surfaces of the hexagonal prism.
10. The internal water pressure simulation loading device for tunnel model test according to any one of claims 1 to 8, characterized in that: One end of the piston column (12) located in the hydraulic chamber (11) is provided with an annular groove (121) for accommodating a sealing ring, and the other end of the piston column (12) is provided with an arc-shaped loading surface (122) matching the arc-shaped loading plate (2).
Citation Information
Cited By
Hydraulic tunnel model test device
CN120467858A
Heavy-load light-weight coiled tubing injection head clamping block
CN121539228A