Nuclear reactor first cycle starting method and device, electronic equipment and storage medium

By analyzing the neutron intensity change data of the secondary neutron source component, the appropriate time to enter the reactor is determined, and the problem of insufficient neutron source strength of the secondary neutron source component is solved, ensuring the successful and stable start of the first cycle of the nuclear reactor.

CN118969331AActive Publication Date: 2024-11-15CHINA NUCLEAR POWER ENGINEERING COMPANY LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410883858.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-11-15
Estimated Expiration
2044-07-03

AI Technical Summary

Technical Problem

In the prior art, when using the secondary neutron source component as the neutron provider for the first cycle of the nuclear reactor, it is necessary to plan the time of the reactor in advance. If it is not appropriate, it may lead to insufficient neutron source strength, affecting the reactor to reach a critical state or cause Loss of core monitoring.

Method used

By obtaining the neutron intensity change data of the secondary neutron source component, selecting the minimum neutron release intensity as the target neutron intensity, combining the preset neutron intensity threshold and the start-up time of the target nuclear reactor, determine the secondary neutron source component. The target time period for the reactor is ensured to be loaded into the nuclear reactor at the appropriate time to achieve the first cycle start-up.

Benefits of technology

It effectively solves the problem of insufficient neutron source strength, ensures that the nuclear reactor can reach and maintain a critical state, and reduces the risks and uncertainties during the first cycle startup process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118969331A_ABST
    Figure CN118969331A_ABST
Patent Text Reader

Abstract

The invention provides a nuclear reactor first cycle starting method and device, electronic equipment and a storage medium, and belongs to the technical field of nuclear power. Neutron intensity change data of a secondary neutron source assembly are obtained, and the neutron intensity change data comprise time steps and neutron release intensity of the time steps; selecting the minimum neutron release intensity from the neutron intensity change data as the target neutron intensity, if the target neutron intensity is greater than or equal to a preset neutron intensity threshold value, acquiring the time step of the target neutron intensity to obtain the target time, and starting the target nuclear reactor according to the target time and the pre-acquired starting duration of the target nuclear reactor. And determining a target in-reactor time period of the secondary neutron source assembly, and carrying out first circulation starting on the target nuclear reactor according to the target in-reactor time period and the secondary neutron source assembly. According to the invention, the proper in-reactor time can be distributed for the secondary neutron source assembly, and the first cycle starting of the nuclear reactor using the secondary source assembly to replace a primary source is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of nuclear power technology, and in particular to a method and device for starting up a nuclear reactor for the first cycle, an electronic device, and a storage medium. Background Art

[0002] In the related art, the 252 The primary neutron source assembly of Cf material provides neutrons for the first cycle startup of a nuclear reactor. Since it is difficult to obtain the primary neutron source assembly, the secondary neutron source assembly that has been irradiated and excited in the existing nuclear power unit is usually used as the neutron provider for the first cycle startup of the nuclear reactor. When using the secondary neutron source assembly as the neutron provider, it is necessary to plan the time for the secondary neutron source assembly to enter the pile in advance. If the planned time for entering the pile is not appropriate, the source strength of the secondary source neutron assembly will not meet the requirements, making the reactor unable to reach a critical state or losing core monitoring during the startup process, affecting the first cycle startup of the reactor. Summary of the invention

[0003] The main purpose of the embodiments of the present application is to propose a method and device for the first cycle startup of a nuclear reactor, an electronic device and a storage medium, aiming to determine a suitable time for a secondary neutron source assembly to enter the reactor and realize the first cycle startup of a nuclear reactor.

[0004] To achieve the above-mentioned purpose, a first aspect of an embodiment of the present application provides a method for starting up a nuclear reactor for the first cycle, the method comprising:

[0005] Acquire neutron intensity variation data of a secondary neutron source component; wherein the secondary neutron source component is an irradiated neutron source component, the neutron intensity variation data includes a time step and a neutron release intensity of the time step, and the neutron intensity variation data is used to characterize a variation trend of the neutron release intensity with the time step;

[0006] Selecting the minimum neutron release intensity from the neutron intensity variation data as the target neutron intensity;

[0007] If the target neutron intensity is greater than or equal to a preset neutron intensity threshold, obtaining the time step of the target neutron intensity to obtain a target time;

[0008] Determining a target time period for loading the secondary neutron source assembly according to the target time and the pre-acquired startup time of the target nuclear reactor;

[0009] The target nuclear reactor is started up for the first time in a cycle according to the target loading time period and the secondary neutron source assembly.

[0010] In some embodiments, the secondary neutron source assembly includes a target nuclide, and obtaining neutron intensity variation data of the secondary neutron source assembly includes:

[0011] Get the time step;

[0012] Acquire the number of nuclides of the target nuclide according to the time step to obtain the number of target nuclides;

[0013] converting the target nuclide quantity into neutron release intensity;

[0014] The neutron intensity variation data is obtained according to the time step and the neutron release intensity at the time step.

[0015] In some embodiments, acquiring the number of nuclides of the target nuclide according to the time step to obtain the number of target nuclides includes:

[0016] Acquire the irradiated neutron flux of the target nuclear reactor according to the time step;

[0017] The target nuclide quantity is obtained by performing nuclide quantity statistics on the time step, the irradiation neutron flux, the pre-acquired decay coefficient of the secondary neutron source component and the pre-acquired nuclear reaction cross section of the secondary neutron source component through a preset nuclide quantity statistics model.

[0018] In some embodiments, the secondary neutron source assembly further includes a first nuclide and a second nuclide, the target nuclide is generated by a nuclear reaction between the first nuclide and the second nuclide, and the preset nuclide quantity statistical model is constructed according to the following steps:

[0019] Acquire the nuclide quantity of the first nuclide to obtain an initial nuclide quantity;

[0020] Performing a model analysis on a first preset nuclide quantity change rate model according to the initial nuclide quantity to obtain a first nuclide quantity statistical model; the first preset nuclide quantity change rate model is used to characterize the nuclide quantity change rate of the first nuclide; the first nuclide quantity statistical model is used to count the nuclide quantity of the first nuclide;

[0021] updating the second preset nuclide quantity change rate model according to the first nuclide quantity statistical model to obtain a third preset nuclide quantity change rate model; the second preset nuclide quantity change rate model is used to characterize the nuclide quantity change rate of the target nuclide;

[0022] The third preset nuclide quantity change rate model is integrated in the time dimension to obtain the preset nuclide quantity statistical model.

[0023] In some embodiments, before determining the target time period for loading the secondary neutron source assembly according to the target time and the pre-acquired startup duration of the target nuclear reactor, the method for starting up the nuclear reactor for the first time cycle further includes:

[0024] The startup duration is obtained, specifically including:

[0025] Acquire a first time when a nuclear power unit including the target nuclear reactor is in a first state;

[0026] Obtaining the current unit power of the nuclear power unit;

[0027] If the current unit power is greater than or equal to a preset power threshold, switching the nuclear power unit from the first state to a second state, and obtaining a second time for the nuclear power unit to switch from the first state to the second state;

[0028] The startup duration is determined according to the first time and the second time.

[0029] In some embodiments, determining the target time period for loading the secondary neutron source assembly according to the target time and the pre-acquired startup time of the target nuclear reactor includes:

[0030] Determining a target reactor entry time for the secondary neutron source assembly according to the target time and the pre-acquired startup time of the target reactor;

[0031] Obtaining the time when the secondary neutron source assembly is taken out from the initial nuclear reactor to obtain the initial reactor entry time;

[0032] The target stacking time period is determined according to the initial stacking time and the target stacking time.

[0033] In some embodiments, determining the target stacking time period according to the initial stacking time and the target stacking time includes:

[0034] Constructing a time interval according to the initial loading time and the target loading time to obtain an initial loading time period;

[0035] Obtaining a component reference period of the secondary neutron source component; wherein the component reference period is an unavailable period;

[0036] Performing a first time period adjustment on the initial stacking time period according to the component reference time period to obtain a reference stacking time period;

[0037] The reference reactor entry period is adjusted for a second period according to the reactor entry period condition of the target nuclear reactor to obtain the target reactor entry period.

[0038] To achieve the above-mentioned purpose, a second aspect of an embodiment of the present application provides a nuclear reactor first cycle startup device, the device comprising:

[0039] A first acquisition module is used to acquire neutron intensity variation data of a secondary neutron source component; wherein the secondary neutron source component is an irradiated neutron source component, the neutron intensity variation data includes a time step and a neutron release intensity of the time step, and the neutron intensity variation data is used to characterize a variation trend of the neutron release intensity with the time step;

[0040] A screening module, used for selecting the minimum neutron release intensity from the neutron intensity variation data as the target neutron intensity;

[0041] A second acquisition module is used to acquire the time step of the target neutron intensity to obtain the target time if the target neutron intensity is greater than or equal to a preset neutron intensity threshold;

[0042] A determination module, configured to determine a target time period for loading the secondary neutron source assembly according to the target time and a pre-acquired startup duration of the target nuclear reactor;

[0043] A startup module is used to perform a first cycle startup of the target nuclear reactor according to the target loading time period and the secondary neutron source assembly.

[0044] To achieve the above-mentioned purpose, the third aspect of an embodiment of the present application proposes an electronic device, the electronic device comprising a memory and a processor, the memory storing a computer program, and the processor implementing the nuclear reactor first cycle startup method of the above-mentioned first aspect when executing the computer program.

[0045] To achieve the above objectives, the fourth aspect of an embodiment of the present application proposes a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the method for starting a nuclear reactor for the first cycle of the above first aspect is implemented.

[0046] The first cycle startup method of a nuclear reactor, the first cycle startup device of a nuclear reactor, the electronic device and the computer-readable storage medium proposed in the present application obtain the neutron intensity change data of the secondary neutron source assembly to obtain the neutron release intensity of each time step according to the neutron intensity change data. When the nuclear reactor is just started and is in the low power stage, the neutron release intensity is the smallest, so the smallest neutron release intensity is selected from the neutron intensity change data as the target neutron intensity. The target neutron intensity is too small to provide sufficient neutrons for the nuclear reactor, so that the nuclear reactor is at risk of losing core monitoring. The target neutron intensity is compared with the preset neutron intensity threshold to determine whether the target neutron intensity meets the intensity requirements. If the target neutron intensity is greater than or equal to the preset neutron intensity threshold, it means that the target neutron intensity meets the intensity requirements. At this time, the secondary neutron source assembly can be used as the neutron source for the first cycle startup of the nuclear reactor, then the time step of the target neutron intensity is obtained to obtain the target time. It takes a certain amount of time for a nuclear reactor to be loaded and started. According to the target time and the start-up time of the target nuclear reactor obtained in advance, the target loading period of the secondary neutron source assembly is determined, so that the secondary neutron source assembly can be loaded into the nuclear reactor during the target loading period, thereby realizing the first cycle startup of the nuclear reactor using the secondary source assembly to replace the primary source. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 is a flow chart of a method for starting a nuclear reactor for the first cycle provided in an embodiment of the present application;

[0048] Figure 2 yes Figure 1 Flow chart of step S120 in FIG.

[0049] Figure 3 yes Figure 2 Flow chart of step S210 in FIG.

[0050] Figure 4 yes Figure 3 Flow chart of step S330 in FIG.

[0051] Figure 5 yes Figure 4 Flow chart of step S410 in FIG.

[0052] Figure 6 yes Figure 1 Flow chart of step S140 in FIG.

[0053] Figure 7 is another flow chart of the method for starting up a nuclear reactor for the first cycle provided in an embodiment of the present application;

[0054] Figure 8 It is a structural schematic diagram of a nuclear reactor first cycle startup device provided in an embodiment of the present application;

[0055] Fig. 9 It is a schematic diagram of the hardware structure of the electronic device provided in the embodiment of the present application. DETAILED DESCRIPTION

[0056] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0057] It should be noted that, although the functional modules are divided in the device schematic diagram and the logical order is shown in the flowchart, in some cases, the steps shown or described may be performed in a different order than the module division in the device or the order in the flowchart. The terms "first", "second", etc. in the specification, claims and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence.

[0058] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein are only for the purpose of describing the embodiments of this application and are not intended to limit this application.

[0059] In the related art, the 252 The primary neutron source assembly of Cf material provides neutrons for the first cycle startup of the nuclear reactor. Since there may be uncertainties in the acquisition of primary neutron source assemblies, secondary neutron source assemblies that have been irradiated and excited in existing nuclear power units are used as neutron substitutes for the first cycle startup of the nuclear reactor. When using secondary neutron source assemblies as neutron providers, it is necessary to plan the time for the secondary neutron source assembly to enter the reactor in advance. If the planned time for entering the reactor is not appropriate, the source strength of the secondary source neutron assembly will not meet the requirements, making it impossible for the reactor to reach a critical state or causing instability during the startup process, affecting the first cycle startup of the reactor.

[0060] Based on this, the embodiments of the present application provide a nuclear reactor first cycle startup method, a nuclear reactor first cycle startup device, an electronic device and a computer-readable storage medium, aiming to realize the first cycle startup of a nuclear reactor using a secondary source component to replace the primary source.

[0061] The nuclear reactor first cycle startup method, nuclear reactor first cycle startup device, electronic device and computer-readable storage medium provided in the embodiments of the present application are specifically illustrated through the following embodiments. First, the nuclear reactor first cycle startup method in the embodiments of the present application is described.

[0062] The method for starting a nuclear reactor for the first cycle provided in the embodiment of the present application relates to the field of nuclear power technology. The method for starting a nuclear reactor for the first cycle provided in the embodiment of the present application can be applied to a terminal, can also be applied to a server side, and can also be software running in a terminal or a server side. In some embodiments, the terminal can be a smart phone, a tablet computer, a laptop computer, a desktop computer, etc.; the server side can be configured as an independent physical server, or can be configured as a server cluster or a distributed system composed of multiple physical servers, and can also be configured as a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN, and big data and artificial intelligence platforms; the software can be an application that implements the method for starting a nuclear reactor for the first cycle, etc., but is not limited to the above forms.

[0063] The present application can be used in many general or special computer system environments or configurations. For example: personal computers, server computers, handheld or portable devices, tablet devices, multiprocessor systems, microprocessor-based systems, set-top boxes, programmable consumer electronics, network PCs, minicomputers, mainframe computers, distributed computing environments including any of the above systems or devices, etc. The present application can be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. The present application can also be practiced in distributed computing environments, in which tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules can be located in local and remote computer storage media including storage devices.

[0064] Figure 1 is an optional flow chart of a method for starting a nuclear reactor for the first cycle provided in an embodiment of the present application. Figure 1 The method may include but is not limited to steps S110 to S150.

[0065] Step S110, obtaining neutron intensity variation data of a secondary neutron source assembly; wherein the secondary neutron source assembly is an irradiated neutron source assembly, the neutron intensity variation data includes a time step and a neutron release intensity of the time step, and the neutron intensity variation data is used to characterize a variation trend of the neutron release intensity with respect to the time step;

[0066] Step S120, selecting the minimum neutron release intensity from the neutron intensity variation data as the target neutron intensity;

[0067] Step S130, if the target neutron intensity is greater than or equal to the preset neutron intensity threshold, then the time step of the target neutron intensity is obtained to obtain the target time;

[0068] Step S140, determining a target time period for loading the secondary neutron source assembly according to the target time and the start-up time of the target nuclear reactor acquired in advance;

[0069] Step S150, starting the target nuclear reactor for the first time according to the target loading period and the secondary neutron source assembly.

[0070] The secondary neutron source assembly is an important part of the nuclear reactor core and is used to provide a sufficient neutron injection rate level for the nuclear reactor. The secondary neutron source assembly consists of an antimony-beryllium (Sb-Be) pellet wrapped in a stainless steel cladding. The secondary neutron source assembly includes a first nuclide and a second nuclide. The first nuclide is antimony (Sb). 123 Sb, the second nuclide is beryllium (Be), the second nuclide is 9 Be. The secondary neutron source assembly also includes a target nuclide, which is 124 Sb, the target nuclide is generated by the nuclear reaction between the first nuclide and the second nuclide. The high-energy gamma ray and the second nuclide undergo a (γ,n) photonuclear reaction to generate neutrons, and the first nuclide undergoes a (n,γ) activation reaction under neutron irradiation to proliferate into the target nuclide. Due to the uncertainty in the acquisition of the primary neutron source assembly, the secondary neutron source assembly is fired in the initial nuclear reactor as a substitute, and the fired secondary neutron source assembly is removed from the initial nuclear reactor and loaded into the target nuclear reactor, and the neutrons generated by the secondary neutron source assembly are used to complete the first cycle startup of the target nuclear reactor. The initial nuclear reactor is a nuclear reactor that has completed the first cycle startup and is operating stably, and the target nuclear reactor is a nuclear reactor to be started for the first cycle. The first cycle startup of a nuclear reactor refers to the first time a nuclear reactor is put into use. After removing the secondary neutron source assembly from the initial nuclear reactor, the target nuclide decays at a rate of about 60 days and releases gamma rays, and the generated gamma rays undergo a photonuclear reaction with the second nuclide to release neutrons. The source intensity of the secondary neutron source assembly obtained through the neutron production process is related to the gamma rays released by the target nuclide and the number of target nuclides.

[0071] See also Figure 2 In some embodiments, step S110 may include but is not limited to steps S210 to S240:

[0072] Step S210, obtaining a time step;

[0073] Step S220, acquiring the number of nuclides of the target nuclide according to the time step to obtain the number of target nuclides;

[0074] Step S230, converting the target nuclide quantity into neutron release intensity;

[0075] Step S240, obtaining neutron intensity variation data according to the time step and the neutron release intensity of the time step.

[0076] In step S210 of some embodiments, whether the target nuclear reactor can successfully complete the first cycle startup is related to the source strength of the secondary neutron source assembly. When the source strength reaches the required source strength condition, the target nuclear reactor can successfully complete the first cycle startup. For the first reactor of a nuclear power plant, such as the first reactor of a model or the first reactor of a site, there is a large uncertainty in the loading and startup period. Equipment problems, installation constraints, and even disturbances such as unexpected reactor jumps after startup will affect the availability of secondary neutron source assemblies. In addition, the firing of secondary neutron source assemblies needs to be carried out within the existing operating units (12-18 month cycle), and most of the matching analysis and decision-making of secondary neutron source assemblies require 20-30 months of pre-loading, which further increases the risk of secondary neutron source assembly availability decisions. The present application obtains neutron intensity variation data by analyzing the proliferation and decay process of target nuclides in secondary neutron source components, so as to determine the appropriate stack entry time window in advance based on the neutron intensity variation data, so that the stack entry time window matches the loading time window of the target reactor, thereby ensuring the availability of the secondary source neutron components and reducing the risk of availability decisions.

[0077] The prediction of the time window for entering the reactor is not only based on a certain time point, but also needs to be combined with comprehensive considerations from multiple angles such as construction period risk and decay characteristics. By considering the decay characteristics of the target nuclide and the uncertainty of the loading and startup period, the accuracy of the prediction of the time window for entering the reactor can be improved. The time step is the time point of the preset period, which is used to measure the time after the secondary neutron source assembly is removed from the reactor. The preset period includes the time period after the secondary neutron source assembly is removed from the initial nuclear reactor and the preset risk period. The preset risk period is the pre-set risk period of each stage from loading to startup of the target nuclear reactor. The target nuclear reactor from loading to startup mainly includes three stages: loading, pre-criticality, startup and power increase. The preset risk period is shown in Table 1.

[0078] Table 1

[0079]

[0080] Due to unplanned reactor trips caused by equipment or design reasons during the startup and power increase phases, a construction period with 10 unplanned shutdowns and 5 unplanned shutdowns is assumed in Table 2, where FP represents full power. As a conservative boundary for analyzing the actual decay of the secondary neutron source assembly in the first reactor, as long as the construction period of the first reactor does not exceed the above construction period assumption, the residual activity of the secondary neutron source assembly can still meet the unit restart requirements.

[0081] Table 2

[0082]

[0083] In step S220 of some embodiments, the number of nuclides of the target nuclides at each time step within a preset time period is obtained to obtain the number of target nuclides at each time step.

[0084] In step S230 of some embodiments, the neutron release intensity is the source intensity of the secondary neutron source assembly. Since the neutron release intensity is related to the number of target nuclides, the number of target nuclides can be used as the neutron release intensity, and the neutron release intensity can be represented by the number of target nuclides.

[0085] In step S240 of some embodiments, the time step and the neutron release intensity of the time step are used as neutron intensity variation data. Alternatively, the time step is used as the horizontal axis and the neutron release intensity of the time step is used as the vertical axis, and the time step and the neutron release intensity are plotted by a drawing tool to obtain the neutron intensity variation data of the irradiated secondary neutron source assembly. Alternatively, the neutron release intensity of each time step is arranged in sequence according to the sequence of the time step, and the sorted time step and the neutron release intensity are used as the neutron intensity variation data. The neutron intensity variation data is used to characterize the variation of the neutron release intensity with the time step. The irradiated secondary neutron source assembly is a secondary source assembly fired by an existing nuclear power unit.

[0086] Through the above steps S210 to S240, neutron intensity variation data can be obtained, so as to determine a suitable time for the secondary neutron source assembly to enter the stack based on the neutron intensity variation data.

[0087] See also Figure 3 In some embodiments, step S220 may include but is not limited to steps S310 to S320:

[0088] Step S310, obtaining the irradiated neutron flux of the target nuclear reactor according to the time step;

[0089] Step S320, performing nuclide quantity statistics on the time step, irradiation neutron flux, the pre-acquired decay coefficient of the secondary neutron source component, and the pre-acquired nuclear reaction cross section of the secondary neutron source component through a preset nuclide quantity statistics model to obtain the target nuclide quantity.

[0090] In step S310 of some embodiments, in combination with the core design parameters of the target nuclear reactor core, such as uranium enrichment, component size, reflector layer, and core size, the proliferation and decay of the target nuclide are simulated by Monte Carlo simulation technology within the preset risk period, and the neutron release intensity at the nuclear instrument position outside the target nuclear reactor pressure vessel can be obtained. Assuming that the secondary neutron source assembly has been loaded into the target nuclear reactor, the first nuclide in the secondary neutron source assembly is converted into the target nuclide by neutron irradiation in the core. At this time, the target nuclide has both a proliferation effect and a decay effect, and the number of target nuclides is related to the proliferation rate and the decay rate. It should be noted that 124 Sb itself will continue to decay, and only in a neutron environment above a certain intensity can sufficient activation reaction occur. 124 Sb can be effectively multiplied. The operating nuclear power units can provide such an environment for the secondary neutron source components. The operating cycle of the operating nuclear power units is generally 12-18 months. The secondary neutron source components can effectively multiply during this period to form secondary neutron source components with a certain neutron release intensity. 124 Sb does not multiply indefinitely. 124 When Sb accumulates to a certain amount, 124 The decay rate of Sb gradually 124 The proliferation rate of Sb reaches equilibrium and the proliferation of the secondary neutron source component reaches saturation.

[0091] After the first loading, the target nuclear reactor is in a subcritical or low power state, and there is nothing inside the reactor that can 124 In a neutron environment where Sb can effectively multiply, the source strength of the secondary neutron source assembly (secondary source) will still decrease over time. Therefore, for the matching analysis of the secondary source strength, the power changes after the nuclear power unit is loaded should be fully considered. After the secondary source is loaded into the target nuclear reactor, whether the target nuclide multiplies is related to the power of the nuclear power unit to which the target nuclear reactor belongs. The secondary source will only multiply when the power of the nuclear power unit to which the target nuclear reactor belongs reaches a certain power level. This power level is generally about 2% of the full power of the nuclear power plant. The irradiation neutron flux is used to characterize the neutron flux level of the environment where the secondary neutron source assembly is located. The irradiation neutron flux is related to the power of the nuclear power unit to which the target nuclear reactor belongs. The irradiation neutron flux is expressed as φ=P·φ FP , where φ FP It indicates the neutron flux level at full power, P indicates the power of the nuclear power unit, 0≤P≤100%, and φ indicates the irradiation neutron flux. It should be noted that when the secondary neutron source assembly is removed from the initial nuclear reactor, P is 0, and the secondary neutron source assembly is not in a proliferation state. 124Sb only has decay effects. Therefore, when the time step is in the time period after the secondary neutron source assembly is removed from the initial nuclear reactor, the irradiation neutron flux of this time step is 0, and when the time step is in the preset risk period, the irradiation neutron flux of this time step is related to the power of the nuclear power unit.

[0092] In step S320 of some embodiments, the decay coefficient is a parameter describing the decay rate of the target nuclide, which is a dimensionless constant with a unit of seconds (s). -1 ). 124 The decay coefficient of Sb can be 1.33×10 -7 s -1 The nuclear reaction cross section is a physical quantity that describes the probability of a nuclear reaction. It is used to measure the probability of a specific reaction between an incident particle and a target nucleus. The time step, irradiation neutron flux, decay coefficient of the secondary neutron source component, and the nuclear reaction cross section are input into the preset nuclide quantity statistical model for nuclide quantity statistics to obtain the target nuclide quantity for the time step. The preset nuclide quantity statistical model is used to count the nuclide quantity of the target nuclide at each time step.

[0093] Through the above steps S310 to S320, the number of target nuclides in each time step can be obtained. The changing trend of the number of target nuclides in multiple time steps can reflect the changing trend of the source strength, so that a suitable time window for loading the pile can be selected based on the changing trend, thereby ensuring the availability of the secondary source.

[0094] See also Figure 4 In some embodiments, the process of constructing the preset nuclide quantity statistical model may include but is not limited to steps S410 to S440:

[0095] Step S410, obtaining the nuclide quantity of the first nuclide to obtain the initial nuclide quantity;

[0096] Step S420, performing a model analysis on the first preset nuclide quantity change rate model according to the initial nuclide quantity to obtain a first nuclide quantity statistical model; the first preset nuclide quantity change rate model is used to characterize the nuclide quantity change rate of the first nuclide; the first nuclide quantity statistical model is used to count the nuclide quantity of the first nuclide;

[0097] Step S430, updating the second preset nuclide quantity change rate model according to the first nuclide quantity statistical model to obtain a third preset nuclide quantity change rate model; the second preset nuclide quantity change rate model is used to characterize the nuclide quantity change rate of the target nuclide;

[0098] Step S440, performing model integration on the third preset nuclide quantity change rate model in the time dimension to obtain a preset nuclide quantity statistical model.

[0099] In step S410 of some embodiments, the number of the first nuclide in the secondary neutron source component under the initial condition is obtained to obtain the initial nuclide number. The initial nuclide number is the number of the first nuclide in the secondary neutron source component under the initial condition. 123 The atomic number (number of nuclides) of Sb. The initial condition refers to that the secondary neutron source assembly is not activated by neutron irradiation, that is, the secondary neutron source assembly is not fired.

[0100] In step S420 of some embodiments, the first preset nuclide quantity change rate model is used to characterize the first nuclide 123 The nuclide quantity change rate of Sb is the change rate of the nuclide quantity of the first nuclide over time. The first preset nuclide quantity change rate model is expressed as:

[0101]

[0102] in, is the rate of change of the number of nuclides of the first nuclide; N a (t) is the time step t 123 The atomic number of Sb; σ represents 123 Sb reacts with neutrons to produce 124 The nuclear reaction cross section of Sb; φ represents the irradiation neutron flux.

[0103] Formula (1) is a first-order linear differential equation, and the initial number of nuclides is the time step of 0. 123 The number of atoms of Sb is calculated by solving the first preset nuclide quantity change rate model according to the initial nuclide quantity to obtain the first nuclide quantity statistical model. The first nuclide quantity statistical model is used to count the nuclide quantity of the first nuclide at each time step. The first nuclide quantity statistical model is the integral of the first preset nuclide quantity change rate model in the time dimension. The first nuclide quantity statistical model is expressed as:

[0104] N a (t) = N0e -σφt , formula (2)

[0105] Where N0 is the initial number of nuclides.

[0106] In step S430 of some embodiments, the second preset nuclide quantity change rate model is used to characterize the target nuclide 124 The nuclide quantity change rate of Sb is the speed at which the nuclide quantity of the target nuclide changes over time. The second preset nuclide quantity change rate model is expressed as:

[0107]

[0108] in, is the target nuclide number change rate; P is the target nuclide generation rate; D is the target nuclide decay rate; N a (t) is the time step t123 The atomic number of Sb; σ represents 123 Sb reacts with neutrons to produce 124 The nuclear reaction cross section of Sb; φ represents the irradiation neutron flux; λ is the decay coefficient; N(t) is the time step t 124 The atomic number of Sb.

[0109] Substitute the first nuclide quantity statistical model into the second preset nuclide quantity change rate model, update the second preset nuclide quantity change rate model, and obtain a third preset nuclide quantity change rate model. The third preset nuclide quantity change rate model is used to characterize the target nuclide 124 The rate of change of the number of nuclides of Sb is expressed as:

[0110]

[0111] In step S440 of some embodiments, the third preset nuclide quantity change rate model is a first-order linear non-homogeneous differential equation, and the third preset nuclide quantity change rate model can be solved by the constant variation method. Specifically, the third preset nuclide quantity change rate model is model-integrated in the time dimension to obtain a preset nuclide quantity statistical model. Since no activation reaction occurs under the initial conditions, the nuclide quantity of the target nuclide is 0, that is, N(t) is 0, where t is 0. Solving the preset nuclide quantity statistical model according to N(t)=0, we get:

[0112]

[0113] The neutron intensity change data includes the initial time step and the initial source strength. The initial time step is the first time step from the previous time step to the next time step, which is the time starting point of the preset time period. The initial time step is 0, indicating that the secondary neutron source component has just left the reactor. The initial source strength is the neutron release intensity of the first time step, that is, the neutron release intensity after the secondary neutron source component is fired out of the reactor. The initial source strength, that is, the number of target nuclides, after the secondary neutron source component is fired out of the reactor can be determined by formula (5) and the firing time of the secondary neutron source component in the operating unit.

[0114] In the above steps S410 to S440, a preset nuclide quantity statistical model is constructed by using the change rate of the first nuclide and the change rate of the target nuclide, so as to obtain the nuclide quantity of the target nuclide that changes with time using the preset nuclide quantity statistical model.

[0115] In step S120 of some embodiments, the source range meter quantity of the initial time step is determined by combining the initial source strength with the nuclear instrument detector set outside the target nuclear reactor. The source range meter quantity is the product of the source strength at the location of the source range probe and the sensitivity of the nuclear instrument detector, and its unit is cps. The source range meter quantity A(0) of the initial time step of a nuclear power plant can be 130cps. It should be noted that after the core structure and loading arrangement of the nuclear reactor are fixed, the relationship (sensitivity) between the secondary source strength and the source range meter quantity is a fixed coefficient. After the secondary neutron source assembly is separated from the breeding environment of the initial nuclear reactor, the firing time of the secondary neutron source assembly in the initial nuclear reactor can be substituted into formula (2) and formula (5), and the nuclide quantity Na1 of the first nuclide in the initial time step (after leaving the reactor) is obtained by formula (2), and the target nuclide quantity N1 of the target nuclide in the initial time step is obtained by formula (5). According to Na1 and N combined with the irradiation neutron flux φ after leaving the reactor, the number of target nuclides changes with time, and the subsequent change of the secondary source intensity with time can be obtained. To simplify the analysis, the source intensity change can be integrated and calculated with the unit power instead of the irradiation neutron flux. According to the relationship between the secondary source source intensity and the source range meter quantity, the neutron intensity change data can be converted into nuclear instrument count change data that can be monitored. The nuclear instrument count change data includes the time step and the source range meter quantity of the neutron release intensity of the time step. The nuclear instrument count change data can be described by a curve.

[0116] When analyzing the availability of secondary source components, relevant technologies usually use loading as the target node and use the availability of the secondary source components for the first loading as an evaluation indicator. However, the core of the unit after the first loading is still in a subcritical state or a low-power state, and the secondary source strength is still decaying according to a half-life of about 60 days. If the secondary source strength is too low at this time or faces major constraints in the unit design and equipment and needs to be in a retreat state, the secondary source strength may not be able to meet the minimum source strength requirements for unit startup. In order to ensure the availability of secondary neutron source components, it is necessary to consider the impact of nuclear power unit power on source strength. It should be noted that the continuous decay of secondary neutron source components makes it have a maximum available time after leaving the reactor. When using secondary neutron source components to start a nuclear power unit, the unit startup and power increase should be completed within this time.

[0117] For the secondary source components of a specific size that have been manufactured, after the secondary neutron source components are fired out of the pile, the number of target nuclides decays over time. Only when the nuclear power unit is under a certain irradiation neutron flux can the proliferation of the target nuclides be achieved. Therefore, there is a minimum data point in the neutron intensity change data. Before the unit is officially increased in power, the secondary source strength is in a continuous decline process. After the start-up (official power increase), the secondary source strength increases with the increase in power during the unit startup process. When the reactor is just started and is in the low-power stage, the source strength is the minimum, and the minimum data point is the source strength when the target nuclear reactor is in the low-power stage. Select the minimum neutron release intensity from the neutron intensity change data as the target neutron intensity. Alternatively, select the minimum source range meter number from the nuclear instrument count change data as the target neutron intensity.

[0118] In step S130 of some embodiments, due to the decay characteristics of the secondary source itself and the potential risk of accidental shutdown of the first reactor of the nuclear power plant, the secondary source strength before critical operation needs to be greater than the minimum source strength requirement. The main risk of secondary source decision is that after the secondary source has decayed for a long time, such as after the reactor is accidentally shut down at low power, the secondary source strength is too small to provide enough monitorable neutrons for the reactor. In order to ensure the availability of the secondary neutron source assembly, if the target neutron intensity is greater than or equal to the preset neutron intensity threshold, it means that the secondary neutron source assembly can be used as the startup neutron source of the target nuclear reactor, then the time step of the target neutron intensity is obtained, and the target time is obtained to calculate the loading time window based on the target time. If the target neutron intensity is less than the preset neutron intensity threshold, it means that the secondary neutron source assembly cannot be used as the startup neutron source of the target nuclear reactor, then the secondary neutron source assembly fired by other initial nuclear reactors is selected or the preset risk period is adjusted to update the neutron intensity change data, and the loading time window is calculated based on the updated neutron intensity change data. The preset neutron intensity threshold is set corresponding to the target neutron intensity. If the target neutron intensity uses the source range meter quantity as an evaluation indicator, the preset neutron intensity threshold also uses the source range meter quantity indicator. At this time, the preset neutron intensity threshold is the minimum count that the nuclear instrument can monitor. After the secondary source is put into the pile, if the secondary source strength cannot match the subsequent construction period requirements, the target nuclear reactor needs to unload the fuel and source, resulting in excessive cost for the unit startup, which is an unacceptable situation. Therefore, the basic requirement is that the unit will not unload after loading. The preset neutron intensity threshold can be 0.5cps (Count per second) or 0.5 / sensitivity, where / represents division operation.

[0119] Substituting the preset risk duration in Table 1 or Table 2 into formula (5), the neutron intensity change data expressed in the form of a curve can be obtained after fully considering the risk. After the secondary source loading time of the target nuclear reactor, i.e., the target loading time, is determined, the time interval between the initial time step corresponding to the starting value of the curve (the value of the neutron release intensity when x=0) and the loading time of the loading platform (the time interval between the loading time and the 0 time step) is affected by the operating unit of the initial nuclear reactor used to fire the secondary neutron source assembly. Selecting different firing units will form different source intensity change curves for the target nuclear reactor. The minimum source range meter number of the source intensity change curve should not be less than 0.5cps, and this is used as a standard for the preliminary screening of the firing window of the operating unit. The secondary source firing needs to be linked with the overhaul window of the operating unit. Generally, the operating cycle of the operating unit is 12-18 months, and the secondary source firing needs to be decided at least 2 years in advance. The long time span between the two has a large uncertainty, resulting in a high decision difficulty for the secondary source firing. In the case of relatively uncertain construction period of the first reactor, multiple sets of secondary neutron source components can be fired to cover the possible use time interval of the unit. The embodiment of the present application analyzes the neutron intensity change data of the secondary sources of different fired units after leaving the reactor by considering the impact of factors such as risk period, unit power, and secondary source decay characteristics on source strength to reduce the difficulty of decision-making. Secondary neutron source components fired by operating units that meet this standard can be selected for the first cycle startup of the target nuclear reactor.

[0120] It should be noted that the secondary source can only be put into the reactor during the overhaul window of the operating unit and removed from the reactor after the unit completes the operating cycle. Among them, the operating unit is equivalent to the shuttle bus for secondary source firing, with fixed boarding and alighting times. The selection of the secondary source firing unit cannot be separated from the overhaul plan of the operating unit.

[0121] See also Figure 5 In some embodiments, before step S410, the method for starting the nuclear reactor for the first cycle may further include obtaining the startup time. The specific process of obtaining the startup time includes but is not limited to steps S510 to S540:

[0122] Step S510, obtaining a first time when a nuclear power unit including a target nuclear reactor is in a first state;

[0123] Step S520, obtaining the current unit power of the nuclear power unit;

[0124] Step S530: if the current unit power is greater than or equal to the preset power threshold, the nuclear power unit is switched from the first state to the second state, and a second time for the nuclear power unit to switch from the first state to the second state is obtained;

[0125] Step S540, determining the startup duration according to the first time and the second time.

[0126] In step S510 of some embodiments, the first state is a subcritical state or a low power state, and the first time is the time step of the nuclear power unit in the first state, such as the 14th month after the secondary neutron source assembly is out of the reactor. The subcritical state is a state where the neutron multiplication ratio is less than 1, and the low power state is a state where the nuclear reactor is within the normal operating range but the power output is low.

[0127] In step S520 of some embodiments, the unit power of the nuclear power unit at the current time step is obtained to obtain the current unit power. The current unit power can be pre-set according to a preset risk period.

[0128] In step S530 of some embodiments, the second state is a power boost state, and the unit power in the second state is greater than the unit power in the first state. If the current unit power is greater than or equal to the preset power threshold, it means that the nuclear power unit is in the power boost stage, and the nuclear power unit is switched from the first state to the second state. The time step for the nuclear power unit to switch from the first state to the second state is obtained to obtain the second time. The second time is the time after the secondary neutron source assembly is out of the stack, and the second time is after the first time.

[0129] In step S540 of some embodiments, the second time is subtracted from the first time to obtain the startup duration, which is the duration that the nuclear power unit is in the first state.

[0130] Through the above steps S510 to S540, the startup duration can be obtained, so as to determine the stacking time window based on the startup duration.

[0131] See also Figure 6 In some embodiments, step S140 may include but is not limited to steps S610 to S630:

[0132] Step S610, determining a target time for the secondary neutron source assembly to enter the reactor according to the target time and the start-up time of the target reactor acquired in advance;

[0133] Step S620, obtaining the time when the secondary neutron source assembly is taken out from the initial nuclear reactor to obtain the initial reactor entry time;

[0134] Step S630, determining a target stacking time period according to the initial stacking time and the target stacking time.

[0135] In step S610 of some embodiments, the target time is subtracted from the startup time to obtain the target loading time, which is the latest time when the secondary neutron source assembly can be loaded into the target nuclear reactor, for example, the 12th month after the secondary neutron source assembly is unloaded from the reactor.

[0136] In step S620 of some embodiments, the time when the secondary neutron source assembly is taken out of the initial nuclear reactor is obtained to obtain the initial stack entry time. The initial nuclear reactor is a nuclear reactor used to burn the secondary neutron source assembly and operates stably. The initial stack entry time is the earliest time when the secondary neutron source assembly can be loaded into the target nuclear reactor, and the initial stack entry time is before the target stack entry time. The initial stack entry time is the initial time step, and the initial stack entry time can be set to 0, indicating the 0th day after the secondary neutron source assembly is taken out of the stack. That is, after the secondary neutron source assembly is burned out of the stack, the secondary neutron source assembly is immediately loaded into the target nuclear reactor without considering the limiting factors such as transportation and decay of the secondary neutron source assembly.

[0137] In step S630 of some embodiments, a target stacking time period is determined according to a time window formed by the initial stacking time and the target stacking time.

[0138] Through the above steps S610 to S630, an accurate loading time window can be determined, the availability of the secondary neutron source assembly is guaranteed, and the target nuclear reactor can be successfully started up for the first cycle.

[0139] See also Figure 7 In some embodiments, step S630 may include but is not limited to steps S710 to S740:

[0140] Step S710, constructing a time interval according to the initial loading time and the target loading time to obtain an initial loading time period;

[0141] Step S720, obtaining a component reference period of a secondary neutron source component; wherein the component reference period is an unavailable period;

[0142] Step S730, adjusting the initial stacking period by a first period according to the component reference period to obtain a reference stacking period;

[0143] Step S740, adjusting the reference reactor loading period by a second period according to the reactor loading period condition of the target nuclear reactor to obtain a target reactor loading period.

[0144] In step S710 of some embodiments, the initial stacking time is used as the left endpoint of the interval, the target stacking time is used as the right endpoint of the interval, and the time interval is constructed according to the left endpoint of the interval and the right endpoint of the interval to obtain the initial stacking period. The initial stacking period is defined by the left endpoint of the interval and the right endpoint of the interval, including the left endpoint of the interval, the right endpoint of the interval, and all time steps between the two endpoints.

[0145] In step S720 of some embodiments, the component reference time period of the secondary neutron source component is obtained, and the component reference time period is a time period during which the secondary neutron source component is unavailable due to restrictive conditions. The firing of the secondary source is subject to restrictive conditions such as secondary source manufacturing and transportation, transport containers and transportation requirements. For example, to facilitate the transportation and loading and unloading of the secondary source, the surface radioactive dose of the transport container should be less than 2mSv / h. After the secondary source is fired out of the pile, due to the possible strong source intensity of the firing and the performance of the radiation shielding container, the secondary source cannot be transported at the first time. The secondary source needs to decay to a certain intensity before it can be transported. In addition, combined with the time required for transportation itself, there is also an unavailable interval after the secondary source is out of the pile.

[0146] In step S730 of some embodiments, the component reference period is removed from the initial stacking period to adjust the initial stacking period to obtain a reference stacking period. The reference stacking period is the available time interval of the secondary neutron source component after considering the component reference period.

[0147] In step S740 of some embodiments, the loading period condition is the loading time window required by the target nuclear reactor. The first loading of a nuclear power plant generally has a clear time, but due to many factors such as the large number of nuclear power unit equipment, large construction volume, complex construction and installation logic, and strict external supervision requirements, it is often necessary to adjust the plan for the first loading time, resulting in a large uncertainty in the first loading time. The secondary source firing needs to be advanced for 2 years or more. When it is found that no source is available, the best loading decision time has been missed, affecting the startup of the target nuclear reactor. In order to obtain an accurate loading time window, the intersection period of the reference loading period and the time window represented by the loading period condition is selected to obtain the target loading period. For example, if the reference loading period is completely within the time window represented by the loading period condition, the reference loading period is used as the target loading period. If part of the reference loading period is within the time window represented by the loading period condition, the part is used as the target loading period. If the time window represented by the loading time period condition is completely within the reference loading time period, the time window represented by the loading time period condition is used as the target loading time period. It should be noted that if there are multiple operating units firing secondary neutron source components, the union of multiple target loading time periods obtained by multiple operating units can be selected as the loading time window for the final decision. For example, secondary neutron source component 1 and secondary neutron source component 2 are fired by two operating nuclear power units of a nuclear power plant respectively. After obtaining the first target loading time period of secondary neutron source component 1 and the second target loading time period of secondary neutron source component 2, the fired secondary neutron source component 1 is provided to the nuclear power unit to which the target nuclear reactor belongs for use in the first target loading time period, and the fired secondary neutron source component 2 is provided to the nuclear power unit to which the target nuclear reactor belongs for use in the second target loading time period, so that the available interval of the secondary neutron source component should fully cover the loading demand interval, that is, the loading time window required by the target nuclear reactor. In addition, the secondary source firing range can be expanded to group plants and group reactors, and a complete and continuous secondary source available range can be formed based on the above logic.

[0148] The above steps S710 to S740 ensure the accuracy of the target loading time period by removing the unavailable time period and taking into account the loading time required by the target nuclear reactor, so as to achieve the first cycle startup of the target nuclear reactor.

[0149] In step S150 of some embodiments, a secondary neutron source assembly is loaded into a target nuclear reactor during a target loading period, and the target nuclear reactor is started up for the first time.

[0150] See also Figure 8 The embodiment of the present application further provides a nuclear reactor first cycle startup device, which can implement the above-mentioned nuclear reactor first cycle startup method, and the nuclear reactor first cycle startup device includes:

[0151] The first acquisition module 810 is used to acquire neutron intensity variation data of a secondary neutron source component; wherein the secondary neutron source component is an irradiated neutron source component, the neutron intensity variation data includes a time step and a neutron release intensity of the time step, and the neutron intensity variation data is used to characterize a variation trend of the neutron release intensity with the time step;

[0152] A screening module 820 is used to select the minimum neutron release intensity from the neutron intensity variation data as the target neutron intensity;

[0153] A second acquisition module 830 is used to acquire the time step of the target neutron intensity to obtain the target time if the target neutron intensity is greater than or equal to a preset neutron intensity threshold;

[0154] A determination module 840 is used to determine a target time period for loading the secondary neutron source assembly according to the target time and the start-up time of the target nuclear reactor acquired in advance;

[0155] The startup module 850 is used to perform a first cycle startup of the target nuclear reactor according to the target loading period and the secondary neutron source assembly.

[0156] The specific implementation of the nuclear reactor first cycle startup device is basically the same as the specific implementation of the above-mentioned nuclear reactor first cycle startup method, and will not be repeated here.

[0157] The embodiment of the present application also provides an electronic device, the electronic device includes a memory and a processor, the memory stores a computer program, and the processor implements the above-mentioned nuclear reactor first cycle startup method when executing the computer program. The electronic device can be any intelligent terminal including a tablet computer, a car computer, etc.

[0158] See also Fig. 9 , Fig. 9 The hardware structure of an electronic device of another embodiment is illustrated, and the electronic device includes:

[0159] The processor 910 may be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present application.

[0160] The memory 920 can be implemented in the form of a read-only memory (ROM), a static storage device, a dynamic storage device, or a random access memory (RAM). The memory 920 can store an operating system and other application programs. When the technical solution provided in the embodiment of this specification is implemented by software or firmware, the relevant program code is stored in the memory 920, and the processor 910 calls and executes the nuclear reactor first cycle startup method of the embodiment of this application;

[0161] Input / output interface 930, used to implement information input and output;

[0162] Communication interface 940, used to realize communication interaction between the device and other devices, which can be realized through wired mode (such as USB, network cable, etc.) or wireless mode (such as mobile network, WI FI, Bluetooth, etc.);

[0163] bus 950 , which transmits information between the various components of the device (e.g., processor 910 , memory 920 , input / output interface 930 , and communication interface 940 );

[0164] The processor 910 , the memory 920 , the input / output interface 930 , and the communication interface 940 are connected to each other in communication within the device via a bus 950 .

[0165] An embodiment of the present application also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the first cycle startup method of the nuclear reactor is implemented.

[0166] The memory, as a non-transient computer-readable storage medium, can be used to store non-transient software programs and non-transient computer executable programs. In addition, the memory may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0167] The embodiments described in the embodiments of the present application are intended to more clearly illustrate the technical solutions of the embodiments of the present application and do not constitute a limitation on the technical solutions provided in the embodiments of the present application. Those skilled in the art will appreciate that with the evolution of technology and the emergence of new application scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.

[0168] Those skilled in the art will appreciate that the technical solutions shown in the figures do not constitute a limitation on the embodiments of the present application, and may include more or fewer steps than shown in the figures, or a combination of certain steps, or different steps.

[0169] The device embodiments described above are merely illustrative, and the units described as separate components may or may not be physically separated, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0170] Those skilled in the art will appreciate that all or some of the steps in the methods disclosed above, and the functional modules / units in the systems and devices may be implemented as software, firmware, hardware, or a suitable combination thereof.

[0171] The terms "first", "second", "third", "fourth", etc. (if any) in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0172] It should be understood that in the present application, "at least one (item)" means one or more, and "plurality" means two or more. "And / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can mean: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b or c can mean: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, c can be single or multiple.

[0173] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the above units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. The mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0174] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0175] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0176] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including multiple instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods of various embodiments of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, referred to as ROM), random access memory (Random Access Memory, referred to as RAM), disk or optical disk and other media that can store programs.

[0177] The preferred embodiments of the present invention are described above with reference to the accompanying drawings, but the scope of the rights of the present invention is not limited thereto. Any modification, equivalent substitution and improvement made by a person skilled in the art without departing from the scope and essence of the present invention should be within the scope of the rights of the present invention.

Claims

1. A method for starting up a nuclear reactor for the first cycle, characterized in that: The method comprises: Acquire neutron intensity variation data of a secondary neutron source component; wherein the secondary neutron source component is an irradiated neutron source component, the neutron intensity variation data includes a time step and a neutron release intensity of the time step, and the neutron intensity variation data is used to characterize a variation trend of the neutron release intensity with the time step; Selecting the minimum neutron release intensity from the neutron intensity variation data as the target neutron intensity; If the target neutron intensity is greater than or equal to a preset neutron intensity threshold, obtaining the time step of the target neutron intensity to obtain a target time; Determining a target time period for loading the secondary neutron source assembly according to the target time and the pre-acquired startup time of the target nuclear reactor; The target nuclear reactor is started up for the first time in a cycle according to the target loading time period and the secondary neutron source assembly.

2. The method for starting up a nuclear reactor for the first cycle according to claim 1, characterized in that: The secondary neutron source component includes a target nuclide, and obtaining neutron intensity change data of the secondary neutron source component includes: Get the time step; Acquire the number of nuclides of the target nuclide according to the time step to obtain the number of target nuclides; converting the target nuclide quantity into neutron release intensity; The neutron intensity variation data is obtained according to the time step and the neutron release intensity at the time step.

3. The method for starting up a nuclear reactor for the first cycle according to claim 2, characterized in that: The step of acquiring the number of nuclides of the target nuclide according to the time step to obtain the number of target nuclides includes: Acquire the irradiated neutron flux of the target nuclear reactor according to the time step; The target nuclide quantity is obtained by performing nuclide quantity statistics on the time step, the irradiation neutron flux, the pre-acquired decay coefficient of the secondary neutron source component and the pre-acquired nuclear reaction cross section of the secondary neutron source component through a preset nuclide quantity statistics model.

4. The method for starting up a nuclear reactor for the first cycle according to claim 3, characterized in that: The secondary neutron source assembly further includes a first nuclide and a second nuclide, the target nuclide is generated by a nuclear reaction between the first nuclide and the second nuclide, and the preset nuclide quantity statistical model is constructed according to the following steps: Acquire the nuclide quantity of the first nuclide to obtain an initial nuclide quantity; Performing a model analysis on a first preset nuclide quantity change rate model according to the initial nuclide quantity to obtain a first nuclide quantity statistical model; the first preset nuclide quantity change rate model is used to characterize the nuclide quantity change rate of the first nuclide; the first nuclide quantity statistical model is used to count the nuclide quantity of the first nuclide; updating the second preset nuclide quantity change rate model according to the first nuclide quantity statistical model to obtain a third preset nuclide quantity change rate model; the second preset nuclide quantity change rate model is used to characterize the nuclide quantity change rate of the target nuclide; The third preset nuclide quantity change rate model is integrated in the time dimension to obtain the preset nuclide quantity statistical model.

5. The method for starting up a nuclear reactor for the first cycle according to any one of claims 1 to 4, characterized in that: Before determining the target time period for loading the secondary neutron source assembly according to the target time and the pre-acquired startup time of the target nuclear reactor, the method for starting up the nuclear reactor for the first time cycle further includes: The startup duration is obtained, specifically including: Acquire a first time when a nuclear power unit including the target nuclear reactor is in a first state; Obtaining the current unit power of the nuclear power unit; If the current unit power is greater than or equal to a preset power threshold, switching the nuclear power unit from the first state to a second state, and obtaining a second time for the nuclear power unit to switch from the first state to the second state; The startup duration is determined according to the first time and the second time.

6. The method for starting up a nuclear reactor for the first cycle according to any one of claims 1 to 4, characterized in that: Determining the target time period for loading the secondary neutron source assembly according to the target time and the pre-acquired startup time of the target nuclear reactor includes: Determining a target reactor entry time for the secondary neutron source assembly according to the target time and the pre-acquired startup time of the target reactor; Obtaining the time when the secondary neutron source assembly is taken out from the initial nuclear reactor to obtain the initial reactor entry time; The target stacking time period is determined according to the initial stacking time and the target stacking time.

7. The method for starting up a nuclear reactor for the first cycle according to claim 6, characterized in that: Determining the target stacking time period according to the initial stacking time and the target stacking time includes: Constructing a time interval according to the initial loading time and the target loading time to obtain an initial loading time period; Obtaining a component reference period of the secondary neutron source component; wherein the component reference period is an unavailable period; Performing a first time period adjustment on the initial stacking time period according to the component reference time period to obtain a reference stacking time period; The reference reactor entry period is adjusted for a second period according to the reactor entry period condition of the target nuclear reactor to obtain the target reactor entry period.

8. A nuclear reactor first cycle startup device, characterized in that: The device comprises: A first acquisition module is used to acquire neutron intensity variation data of a secondary neutron source component; wherein the secondary neutron source component is an irradiated neutron source component, the neutron intensity variation data includes a time step and a neutron release intensity of the time step, and the neutron intensity variation data is used to characterize a variation trend of the neutron release intensity with the time step; A screening module, used for selecting the minimum neutron release intensity from the neutron intensity variation data as the target neutron intensity; A second acquisition module is used to acquire the time step of the target neutron intensity to obtain the target time if the target neutron intensity is greater than or equal to a preset neutron intensity threshold; A determination module, configured to determine a target time period for loading the secondary neutron source assembly according to the target time and a pre-acquired startup time of the target nuclear reactor; A startup module is used to perform a first cycle startup of the target nuclear reactor according to the target loading time period and the secondary neutron source assembly.

9. An electronic device, characterized in that The electronic device comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the method for starting a nuclear reactor for the first cycle as claimed in any one of claims 1 to 7 when executing the computer program.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method for starting up a nuclear reactor for the first cycle according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Secondary neutron source supply method for starting first cycle of nuclear power station

    CN113689962A

  • Am-Be neutron source assembly suitable for large nuclear reactor and reactor core

    CN115547526A

  • Nuclear reactor first cycle starting method

    CN116798668A