Capacity configuration processing method, device and equipment of source network load storage system, storage medium and program product

By obtaining the topological structure model in the source network load storage system and solving it and quadratic optimization, the rationality problem of equipment installation capacity configuration is solved, energy supply and demand matching and cost optimization are achieved, and energy utilization efficiency and system economy are improved. .

CN118971203APending Publication Date: 2024-11-15YUNNAN POWER GRID CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411182414.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the source network load storage system, how to determine a more reasonable equipment installation capacity configuration to achieve the best matching and balance between energy supply and demand and improve energy use efficiency.

Method used

By obtaining the topological structure model of the target source network load storage system, solving it according to the constraints and objective functions, the initial capacity configuration results are obtained, and the second capacity configuration results are obtained through secondary optimization optimization to meet the wind and light abandonment rate Capacity configuration with the lowest set value and overall cost.

Benefits of technology

A relatively reasonable capacity configuration has been achieved, energy utilization efficiency has been improved, system costs have been reduced, and the wind and light abandonment rate has been maintained at a reasonable level, which has significantly improved the economy and reliability of the energy system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118971203A_ABST
    Figure CN118971203A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of energy configuration optimization, provides a capacity configuration processing method and device of a source network load storage system, equipment, a storage medium and a program product, and can determine relatively reasonable capacity configuration of equipment installation in the source network load storage system. The method comprises the steps of obtaining a topological structure model of a target source network load storage system; solving according to constraint conditions of the topological structure model, the target function, equipment parameters of all equipment included in the target source network load storage system and a load power sequence in a set time period to obtain a first capacity configuration result; and performing secondary optimization on the first capacity configuration result to obtain a second capacity configuration result.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of energy configuration optimization, and in particular to a capacity configuration processing method, device, computer equipment, storage medium and computer program product for a source-grid-load-storage system. Background Art

[0002] The core of the concept of "source-grid-load-storage integration" is to deeply integrate the source of energy production, such as solar photovoltaic power generation, wind power generation, hydropower generation and other renewable energy power generation methods, with the power transmission network, user-side power consumption demand and energy storage system, and then build a coordinated and unified energy system. The goal of this integration is to improve the efficiency of energy use by optimizing the configuration and use of energy, and at the same time achieve the best match and balance between energy supply and demand.

[0003] How to determine a more reasonable capacity configuration for equipment installation in a source-grid-load-storage system is a technical problem that needs to be solved. Summary of the invention

[0004] Based on this, it is necessary to provide a capacity configuration processing method, device, computer equipment, storage medium and computer program product for a source-grid-load-storage system in response to the above technical problems.

[0005] The present application provides a capacity configuration processing method for a source-grid-load-storage system, the method comprising:

[0006] Obtain the topological structure model of the target source grid-load-storage system;

[0007] Solving the problem according to the constraints of the topological structure model, the objective function, the equipment parameters of each equipment included in the target source grid-load-storage system, and the load power sequence within a set period of time to obtain a first capacity configuration result;

[0008] A second optimization is performed on the first capacity configuration result to obtain a second capacity configuration result.

[0009] In one embodiment, the objective function includes that the wind and solar power abandonment rate is not less than a set value; according to the constraint conditions of the topological structure model, the objective function, the equipment parameters of each equipment included in the target source grid load storage system and the load data within a set period, a first capacity configuration result is obtained, including:

[0010] According to the constraints of the topological structure model, the equipment parameters of each equipment included in the target source grid-load-storage system and the load data within a set time period, a power generation configuration value sequence of the wind power generation equipment and a power generation configuration value sequence of the photovoltaic power generation equipment are obtained;

[0011] According to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment, the wind and solar power abandonment rate is obtained;

[0012] If the wind and solar power abandonment rate is not lower than the set value, a first capacity configuration result is obtained according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment.

[0013] In one embodiment, the wind and solar power abandonment rate is obtained according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment, including:

[0014] Summing a sequence of power generation configuration values ​​of the wind power generation equipment and a sequence of power generation configuration values ​​of the photovoltaic power generation equipment to obtain a first value;

[0015] Obtaining a second value according to the power generation configuration value sequence of the wind power generation equipment, the power generation configuration value sequence of the photovoltaic power generation equipment, the load power sequence, and the charge and discharge power sequence of the energy storage equipment;

[0016] The wind and solar power abandonment rate is obtained according to the first value and the second value.

[0017] In one embodiment, obtaining the wind and solar power abandonment rate according to the first value and the second value includes:

[0018] dividing the second value by the first value;

[0019] Based on the division result, the wind and solar power abandonment rate is obtained.

[0020] In one embodiment, performing a secondary optimization on the first capacity configuration result to obtain a second capacity configuration result includes:

[0021] Inputting the first capacity configuration result into the simulation software for secondary optimization;

[0022] If the result obtained by the secondary optimization search meets the requirements, the result obtained by the secondary optimization search is used as the second capacity configuration result.

[0023] The present application provides a capacity configuration processing device for a source-grid-load-storage system, the device comprising:

[0024] A model acquisition module is used to obtain a topological structure model of a target source grid-load-storage system;

[0025] A solution module, used to solve according to the constraints of the topological structure model, the objective function, the equipment parameters of each equipment included in the target source grid load storage system and the load power sequence within a set time period to obtain a first capacity configuration result;

[0026] The optimization module is used to perform a second optimization on the first capacity configuration result to obtain a second capacity configuration result.

[0027] In one embodiment, the objective function includes that the wind and solar power abandonment rate is not less than a set value; and the solution module is further used to:

[0028] According to the constraints of the topological structure model, the equipment parameters of each equipment included in the target source grid-load-storage system and the load data within a set time period, a power generation configuration value sequence of the wind power generation equipment and a power generation configuration value sequence of the photovoltaic power generation equipment are obtained;

[0029] According to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment, the wind and solar power abandonment rate is obtained;

[0030] If the wind and solar power abandonment rate is not lower than the set value, a first capacity configuration result is obtained according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment.

[0031] The present application provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the above method.

[0032] The present application provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program is executed by a processor to execute the above method.

[0033] The present application provides a computer program product, on which a computer program is stored, and the computer program is executed by a processor to perform the above method.

[0034] The above-mentioned method, device, computer equipment, storage medium and computer program product for processing capacity configuration of the source-grid-load-storage system obtain a topological structure model of the target source-grid-load-storage system; solve according to the constraints of the topological structure model, the objective function, the equipment parameters of each equipment included in the target source-grid-load-storage system and the load power sequence within a set time period to obtain a first capacity configuration result; perform a secondary optimization on the first capacity configuration result to obtain a second capacity configuration result, so as to obtain a more reasonable capacity configuration result. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the drawings required for use in the embodiments or the related technical descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0036] Figure 1 A schematic flow chart of a method for processing capacity configuration of a source-grid-load-storage system in one embodiment;

[0037] Figure 2 A schematic flow chart of a method for processing capacity configuration of a source-grid-load-storage system in another embodiment;

[0038] Figure 3 A bar graph of horizontal radiation and clear sky index data in the area where the target park is located in an embodiment;

[0039] Figure 4 A typical load curve diagram of a target park during a certain period of time in an embodiment;

[0040] Figure 5 It is a structural block diagram of a capacity configuration processing device of a source-grid-load-storage system in one embodiment;

[0041] Figure 6 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0042] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0043] The capacity configuration processing method of the source-grid-load-storage system provided in the present application can be executed by a computer device, including: Figure 1 The steps shown are:

[0044] Step S101, obtaining a topological structure model of a target source grid-load-storage system.

[0045] The source-grid-load-storage system planned for the target park can be used as the target source-grid-load-storage system, and a topological structure model of the target source-grid-load-storage system can be established. The target source-grid-load-storage system includes at least one of photovoltaic power generation equipment, wind power generation equipment, energy storage equipment, grid integration equipment and power transmission and distribution equipment.

[0046] Step S102, solving according to the constraints of the topological structure model, the objective function, the equipment parameters of each equipment included in the target source grid-load-storage system, and the load power sequence within a set time period to obtain a first capacity configuration result.

[0047] Specifically, the equipment parameters of each device included in the target source grid-load-storage system and the load power sequence within the set time period can be input into the topology structure model, and the topology structure model is solved according to the constraints and the objective function to obtain a capacity configuration result that satisfies the constraints. The capacity configuration result can be called the first capacity configuration result. The first capacity configuration result includes the capacity configuration value of the equipment installed in the target source grid-load-storage system. The set time period can also be called the target cycle, and the set time period can be set to one year, that is, 8760 hours.

[0048] Step S103, performing a second optimization search on the first capacity configuration result to obtain a second capacity configuration result.

[0049] Based on the fact that the capacity configuration of the equipment installed in the target source grid-load-storage system meets the power load in multiple set time periods, a second optimization is performed on the first capacity configuration result to determine the second capacity configuration result that minimizes the overall cost of the target source grid-load-storage system and the comprehensive cost of each device.

[0050] This step may specifically include: inputting the first capacity configuration result into the simulation software for secondary optimization; if the result obtained by the secondary optimization meets the requirements, using the result obtained by the secondary optimization as the second capacity configuration result.

[0051] The simulation software may be HOMER software. The first capacity configuration result is used as the initial value of the HOMER software. The HOMER software uses an enumeration method to find the best value in the calculation results with the goal of minimizing the levelized cost of electricity, and obtains a second capacity result that meets the requirements; wherein the levelized cost of electricity is abbreviated as LCOE in English, and the full name in English is Levelized Cost of Energy.

[0052] In the above-mentioned capacity configuration processing method of the source-grid-load-storage system, a topological structure model of the target source-grid-load-storage system is obtained; the constraints of the topological structure model, the objective function, the equipment parameters of each device included in the target source-grid-load-storage system, and the load power sequence within a set time period are solved to obtain a first capacity configuration result; the first capacity configuration result is optimized secondary to obtain a second capacity configuration result, so that a more reasonable capacity configuration result can be obtained.

[0053] Furthermore, when the target source-grid-load-storage system includes photovoltaic power generation equipment and energy storage equipment, the constraints include: , and .

[0054] in, is the power generation capacity of the photovoltaic power generation equipment, and are the minimum power generation and maximum power generation of photovoltaic power generation equipment respectively; is the capacity of the battery energy storage system in the energy storage device, are the minimum and maximum capacities of the battery energy storage system, respectively; is the capacity of the hydrogen energy storage system in the energy storage device, They are the minimum and maximum capacities of the hydrogen energy storage system respectively.

[0055] Furthermore, the constraints include: .

[0056] The charging power of the battery energy storage system is less than or equal to the maximum charging power of the battery energy storage system. Indicates the number of batteries in the battery energy storage system, represents the maximum charging current, and U represents the rated voltage of the battery.

[0057] Furthermore, the hydrogen energy storage system comprises at least an electrolyzer device, a hydrogen storage container and a fuel cell, wherein the hydrogen produced by the electrolyzer device after being powered on is stored in the hydrogen storage container, and the hydrogen storage container supplies hydrogen to the fuel cell for power generation;

[0058] The maximum output power of the electrolyzer device is determined by the smaller value between the device's own power and the hydrogen energy stored in the hydrogen storage container, satisfying:

[0059] ,

[0060] Among them, P el,max (t) represents the maximum power output of the electrolytic cell device at time t; P el,max is the maximum electrical power output of the electrolyzer device; E HT,MAX Indicates the maximum energy value that a hydrogen storage container can store; E HT (t) represents the actual energy storage of the hydrogen storage container at time t; is the time step; It is the electrical power output efficiency of the electrolyzer device.

[0061] The maximum output power of a fuel cell is affected by the power output characteristics of the fuel cell itself and the energy that can be stored in the hydrogen storage container. The smaller value between the two is taken as the maximum output power of the fuel cell, that is:

[0062] .

[0063] Among them, P PC,max (t) represents the maximum power output of the fuel cell at time t; P PC,max is the maximum power output of the fuel cell; E HT Indicates the actual energy storage of the hydrogen storage container, E HT,MINIndicates the minimum energy value that a hydrogen storage container can store.

[0064] Furthermore, the constraints also include system power balance constraints, which satisfy:

[0065] The sum of the grid load power consumption and the system excess power is equal to the sum of the power of each distributed power source and the system unmet power, where each distributed power source corresponds to the power generation equipment and energy storage equipment included in the source-grid-load-storage integrated system.

[0066] Furthermore, when the target source-grid-load-storage system also includes wind power generation equipment, the constraints include: .

[0067] P W is the power generated by the wind power generation equipment, They are the minimum power generation and maximum power generation of the wind power generation equipment respectively.

[0068] In one embodiment, the first-level optimization optimizes the capacity configuration of the target source, grid, load and storage system by ensuring that the wind and solar power abandonment rate of the target source, grid, load and storage system is not lower than a set value (the set value can be set to 5%) and that the existing transformer capacity is met.

[0069] Correspondingly, the objective function includes that the wind and solar power abandonment rate is not lower than the set value; solving is performed according to the constraints of the topological structure model, the objective function, the equipment parameters of each device included in the target source grid-load-storage system, and the load data within the set time period to obtain the first capacity configuration result, which may specifically include the following steps: according to the constraints of the topological structure model, the equipment parameters of each device included in the target source grid-load-storage system, and the load data within the set time period, the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment are obtained; according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment, the wind and solar power abandonment rate is obtained; if the wind and solar power abandonment rate is not lower than the set value, then according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment, the first capacity configuration result is obtained.

[0070] According to the constraints of the topological structure model, the equipment parameters of each device included in the target source grid-load-storage system and the load data within the set time period, the power generation configuration value of the wind power generation equipment at each moment within the aforementioned set time period is obtained, thereby forming a power generation configuration value sequence.

[0071] According to the constraints of the topological structure model, the equipment parameters of each device included in the target source grid-load-storage system and the load data within the set time period, the power generation configuration value of the photovoltaic power generation equipment at each moment within the aforementioned set time period is obtained, thereby forming a power generation configuration value sequence.

[0072] The wind and solar power abandonment rates are calculated based on the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment.

[0073] If the wind and solar power abandonment rate is not lower than the set value, a first capacity configuration result is obtained according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment.

[0074] If the wind and solar power abandonment rate is lower than the set value, then the power generation configuration value of the wind power generation equipment and the photovoltaic power generation equipment at each moment in the aforementioned set period is re-determined according to the constraints of the topological structure model, the equipment parameters of each equipment included in the target source grid-load-storage system, and the load data in the set period, and a new power generation configuration value sequence of the wind power generation equipment and a new power generation configuration value sequence of the photovoltaic power generation equipment are obtained. According to the new power generation configuration value sequence of the wind power generation equipment and the new power generation configuration value sequence of the photovoltaic power generation equipment, a new wind and solar power abandonment rate is obtained. If the new wind and solar power abandonment rate is not lower than the set value, the first capacity configuration result is obtained according to the new power generation configuration value sequence of the wind power generation equipment and the new power generation configuration value sequence of the photovoltaic power generation equipment.

[0075] In one embodiment, the wind and solar power abandonment rate is obtained according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment, including: summing the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment to obtain a first value; obtaining a second value according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment, the load power sequence, and the charging and discharging power sequence of the energy storage equipment; and obtaining the wind and solar power abandonment rate according to the first value and the second value.

[0076] The power generation configuration value sequence of the wind power generation equipment includes the power generation configuration value of the wind power generation equipment at each moment in the aforementioned set period, the power generation configuration value sequence of the photovoltaic power generation equipment includes the power generation configuration value of the photovoltaic power generation equipment at each moment in the aforementioned set period, the load power sequence includes the load power at each moment in the aforementioned set period, and the charge and discharge power sequence of the energy storage equipment includes the charge and discharge power of the energy storage equipment at each moment in the aforementioned set period. Daily radiation / kWh·m -2 ·day -1

[0077] According to the power configuration value sequence of the wind power generation equipment and the power configuration value sequence of the photovoltaic power generation equipment, the integral operation is performed according to the following formula: , the integral operation result is taken as the first value. Among them, P W (t) represents the power configuration value of the wind power generation equipment at time t within the aforementioned set period, P PV(t) represents the power generation configuration value of the photovoltaic power generation equipment at time t within the aforementioned set time period.

[0078] According to the power configuration value sequence of wind power generation equipment, the power configuration value sequence of photovoltaic power generation equipment, the load power sequence and the charging and discharging power sequence of energy storage equipment, the integral operation is performed according to the following formula: , the integral operation result is used as the second value. Among them, P L (t) represents the load power at time t within the aforementioned set period, P S (t) represents the charging and discharging power of the energy storage device at time t within the aforementioned set time period.

[0079] In one embodiment, the wind and solar power abandonment rate is obtained according to the first value and the second value, including: dividing the second value by the first value; and obtaining the wind and solar power abandonment rate according to the division result.

[0080] In order to better understand the above method, an application example of the capacity configuration processing method of the source-grid-load-storage system of the present application is described in detail below.

[0081] To construct a topological structure model of the target source grid-load-storage system, the equipment parameters of each device included in the target source grid-load-storage system and the load power sequence within a set time period can be input into the topological structure model, and the topological structure model can be solved according to the constraints and the objective function to obtain the first capacity configuration result that meets the constraints.

[0082] When the target source grid-load-storage system includes wind power generation equipment and photovoltaic power generation equipment, the first capacity configuration result includes the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment. The power generation configuration value sequence of the wind power generation equipment includes the power generation configuration value of the wind power generation equipment at each moment in the aforementioned set period, and the power generation configuration value sequence of the photovoltaic power generation equipment includes the power generation configuration value of the photovoltaic power generation equipment at each moment in the aforementioned set period.

[0083] The process of obtaining the first capacity configuration result is as follows: Figure 2 As shown:

[0084] Step S201, set t=1;

[0085] Step S202: setting the power configuration value P of the photovoltaic power generation equipment at time t PV (t), set the power configuration value P of the wind power generation equipment at time t W (t);

[0086] Step S203, determine P PV (t), P W (t) and P S(t) Is the sum less than P? L (t);

[0087] If yes, then go to step S204 and set the power grid output P G (t) is equal to P L (t)-P PV (t)-P W (t)-P S (t);

[0088] In the grid-connected operation mode of the source-grid-load-storage system, the main grid can be regarded as a dispatchable power unit. In this case, its installation cost can be assumed to be zero, and its rated power is equivalent to the maximum transmission capacity between the microgrid and the main grid. In addition, the hourly operation and maintenance cost in this operation mode is defined as the difference between the cost of the system purchasing electricity from the grid during this period and the income obtained from selling electricity to the grid. For the source-grid-load-storage system, the specific relationship between the grid power, load power consumption and the power of each distributed power source is as follows:

[0089] ;

[0090] Where P L (t), P S (t), P G (t), P unmet (t) are the actual load power of the source-grid-load-storage system at time t, the charging and discharging power of the energy storage equipment, the grid output, and the missing power.

[0091] Power balance constraint of source-grid-load-storage system: The power inside the source-grid-load-storage system should satisfy: the sum of load power consumption and system excess power is equal to the sum of distributed power sources and system unsatisfied power. The specific relationship is as follows:

[0092] ;

[0093] Where P L (t), P excess (t), P S (t), P G (t), P unmet (t) are the actual load power, excess power, charging and discharging power of energy storage equipment, grid output and missing power of the source-grid-load-storage system at time t.

[0094] If it is not less than, then go to step S205 to determine P PV (t) and P W(t) is less than C, where C is the maximum threshold of renewable energy consumption of the target source-grid-load-storage system, which can be set as needed; if so, set the power configuration value of the next moment, so that t=t+1; if not less than C, reset the power configuration value of t=1.

[0095] Through the above method, the power generation configuration values ​​of the wind power generation equipment and the photovoltaic power generation equipment at each moment in the set period of 8760 hours are determined, and the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment are formed. According to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment, the wind and solar power abandonment rate is calculated.

[0096] Step S206, determining whether the wind and solar power abandonment rate is not lower than a set value.

[0097] If the wind and solar power abandonment rate is lower than the set value, return to step S201 and regenerate the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment until the calculated wind and solar power abandonment rate is not lower than the set value, and the corresponding first capacity configuration result is obtained.

[0098] If the wind and solar power abandonment rate is not lower than the set value, the process proceeds to step S207 to obtain a first capacity configuration result according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment.

[0099] Step S208, inputting the first capacity configuration result into HOMER software for secondary optimization;

[0100] Step S209: If the result obtained by the secondary optimization search meets the requirements, the result obtained by the secondary optimization search is used as the second capacity configuration result.

[0101] Taking an industrial park as an example, optimize the capacity of the park's photovoltaic array (i.e. photovoltaic power generation equipment) and the capacity of the energy storage equipment.

[0102] First, the basic data of the industrial park is obtained, including solar radiation data, load data and main equipment parameters of the system in a certain period;

[0103] Among them, solar radiation data can be obtained from the existing database, which includes monthly average solar horizontal irradiance intensity data and clear sky index data, such as Figure 3 As shown, the power generation capacity of the photovoltaic power generation equipment can be determined based on the solar radiation data.

[0104] Since the load data of the industrial park adopts the method of purchasing electricity from the power grid, the relevant data can be found according to the market; that is, the current local industrial peak, valley and flat electricity prices are shown in Table 1; the peak period is 10:00-12:00, 14:00-19:00, and the electricity price is 1.0377 yuan; the low period is 00:00-8:00, and the electricity price is 0.2320 yuan; the normal period is 8:00-10:00, 12:00-14:00, 19:00-24:00, and the electricity price is 0.6104 yuan.

[0105]

[0106] Table 1

[0107] The typical 24-hour load curve of an industrial park in a certain year is as follows: Figure 4 As shown in the chart, the total power consumption reached 178 million kWh, with an average monthly power consumption of 14.3 million kWh. The maximum total power supply load of the 110kV substation in the park in that year was 40274kW, the minimum was 4170kW, the average load was 16531kW, and the annual power consumption was 178 million kWh. Figure 4 It can be seen that electricity demand peaks in winter and summer, and the daily electricity load also shows an oscillating distribution. The electricity load is highest during the day and the night before, and relatively low in the early morning. The peak load is concentrated in 8:00-11:00 and 13:00-17:00.

[0108] The main equipment parameters of the system can be pre-evaluated and set, as shown in Table 2;

[0109]

[0110] Table 2

[0111] The parameters of the equipment used in the industrial park are shown in Table 2. The solar photovoltaic panels of the photovoltaic power generation equipment are general-purpose solar photovoltaic panels, and the photovoltaic panel derating factor is 80%; the battery type of the energy storage equipment is a lithium battery, and the rated capacity and voltage of the single cell are 1MWh and 600V respectively, and the charging and discharging efficiency is 90%. The initial investment cost, replacement cost, operation and maintenance cost and life cycle of the photovoltaic array and lithium battery are shown in Table 2. Assuming an annual real interest rate of 8%, an inflation rate of 3%, and a project life cycle of 25 years. In the HOMER software, a load-following scheduling strategy is used to manage the operation of the battery.

[0112] In this example, if the objective function is that the new energy power generation consumption rate of the source-grid-load-storage integrated system is greater than 95%, under the constraints of the system load balance and the installed capacity of each equipment determined above, the capacity configuration of the photovoltaic power generation equipment, wind power generation equipment, energy storage equipment, etc. planned in the industrial park is calculated, and the capacity configuration of the source-grid-load-storage integrated system can be determined, as shown in Table 3 below;

[0113]

[0114] Table 3

[0115] Furthermore, the upper limit of the allowable installed capacity that meets the conditions for new energy consumption is used as the initial value of the HOMER software, and the HOMER software is input into the enumeration method to find the best solution within the calculation results with the levelized cost of electricity as the objective function. The results of the HOMER software optimization capacity matching are shown in Table 4.

[0116]

[0117] Table 4

[0118] Table 4 lists the current energy consumption of the industrial park, which is completely purchased from the external power grid, that is, Plan A, and Plan B, an integrated source-grid-load-storage system obtained by secondary optimization calculation. Plan C is the optimal plan obtained by enumeration method directly using HOMER software without secondary optimization calculation.

[0119] By comparing the economic performance of the capacity optimization matching results, we can obtain the data in Table 5;

[0120]

[0121] Table 5

[0122] Considering the simulation results of the new energy consumption rate, under the premise of ensuring system reliability and meeting realistic constraints, the economic efficiency of the source-grid-load-storage integrated system has been significantly improved compared with the existing energy consumption of the industrial park, the annual carbon emissions have been greatly reduced, and the wind and solar power abandonment rate has been maintained at a reasonable level below 5%, with significant optimization effects;

[0123] As can be seen from Table 5, Scheme A performs better in the key indicator of abandoned light rate; the abandoned light rate of Scheme B is only 4.98%, which is much lower than 9.51% of Scheme C. Abandonment rate is an important indicator to measure the performance of photovoltaic power generation equipment. A low abandonment rate means that the system can use photovoltaic energy more effectively and reduce energy waste. Therefore, from the perspective of abandoned light rate, Scheme A shows higher energy utilization efficiency and better performance. Scheme B performs better in terms of internal rate of return, return on investment and abandoned light rate, while Scheme C has more advantages in terms of cost per kilowatt-hour, proportion of new energy power generation and annual average carbon emissions. In summary, if the core goal of system planning is to improve the utilization efficiency of photovoltaic power generation and reduce energy waste, then Scheme B is a better choice.

[0124] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0125] Based on the same inventive concept, the embodiment of the present application also provides a source-grid-load-storage system capacity configuration processing device for implementing the above-mentioned source-grid-load-storage system capacity configuration processing method. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above-mentioned method, so the specific limitations in the embodiments of the capacity configuration processing device for one or more source-grid-load-storage systems provided below can refer to the limitations of the capacity configuration processing method for the source-grid-load-storage system above, and will not be repeated here.

[0126] In one embodiment, Figure 5 As shown, a capacity configuration processing device for a source-grid-load-storage system is provided, comprising:

[0127] Model acquisition module 501, used to acquire the topological structure model of the target source grid-load-storage system;

[0128] A solution module 502 is used to solve according to the constraints of the topology model, the objective function, the equipment parameters of each equipment included in the target source grid load storage system, and the load power sequence within a set time period to obtain a first capacity configuration result;

[0129] The optimization module 503 is used to perform a second optimization on the first capacity configuration result to obtain a second capacity configuration result.

[0130] In one embodiment, the objective function includes a wind and solar power abandonment rate that is not lower than a set value; the solution module 502 is also used to: obtain a power generation configuration value sequence of wind power generation equipment and a power generation configuration value sequence of photovoltaic power generation equipment according to the constraints of the topological structure model, the equipment parameters of each equipment included in the target source grid-load-storage system, and the load data within a set time period; obtain the wind and solar power abandonment rate according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment; if the wind and solar power abandonment rate is not lower than the set value, obtain the first capacity configuration result according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment.

[0131] In one embodiment, the solution module 502 is also used to: sum the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment to obtain a first value; obtain a second value based on the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment, the load power sequence and the charging and discharging power sequence of the energy storage equipment; and obtain the wind and solar power abandonment rate based on the first value and the second value.

[0132] In one embodiment, the solving module 502 is further used to: divide the second value by the first value; and obtain the wind and solar power abandonment rate according to the division result.

[0133] In one embodiment, the optimization module 503 is further used to: input the first capacity configuration result into the simulation software for secondary optimization; if the result obtained by the secondary optimization meets the requirements, use the result obtained by the secondary optimization as the second capacity configuration result.

[0134] Each module in the capacity configuration processing device of the source-grid-load-storage system can be implemented in whole or in part by software, hardware, or a combination thereof. Each module can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to each module.

[0135] In an exemplary embodiment, a computer device is provided, the internal structure of which can be shown as follows: Figure 6As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data involved in the above method. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a capacity configuration processing method for a source-grid-load-storage system is implemented.

[0136] Those skilled in the art will understand that Figure 6 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0137] In one embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps in the above-mentioned various method embodiments when executing the computer program.

[0138] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0139] In one embodiment, a computer program product is provided, on which a computer program is stored, and the computer program is used by a processor to execute the steps in the above-mentioned various method embodiments.

[0140] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.

[0141] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.

[0142] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0143] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A capacity configuration processing method for a source-grid-load-storage system, characterized in that: The method comprises: Obtain the topological structure model of the target source grid-load-storage system; Solving the problem according to the constraints of the topological structure model, the objective function, the equipment parameters of each equipment included in the target source grid-load-storage system, and the load power sequence within a set period of time to obtain a first capacity configuration result; A second optimization is performed on the first capacity configuration result to obtain a second capacity configuration result.

2. The method according to claim 1, characterized in that The objective function includes that the wind and solar power abandonment rate is not lower than a set value; according to the constraint conditions of the topological structure model, the objective function, the equipment parameters of each equipment included in the target source grid load storage system and the load data within a set period, a first capacity configuration result is obtained, including: According to the constraints of the topological structure model, the equipment parameters of each equipment included in the target source grid-load-storage system and the load data within a set time period, a power generation configuration value sequence of the wind power generation equipment and a power generation configuration value sequence of the photovoltaic power generation equipment are obtained; According to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment, the wind and solar power abandonment rate is obtained; If the wind and solar power abandonment rate is not lower than the set value, a first capacity configuration result is obtained according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment.

3. The method according to claim 2, characterized in that According to the power configuration value sequence of wind power generation equipment and the power configuration value sequence of photovoltaic power generation equipment, the wind and solar power abandonment rate is obtained, including: Summing a sequence of power generation configuration values ​​of the wind power generation equipment and a sequence of power generation configuration values ​​of the photovoltaic power generation equipment to obtain a first value; Obtaining a second value according to the power generation configuration value sequence of the wind power generation equipment, the power generation configuration value sequence of the photovoltaic power generation equipment, the load power sequence, and the charge and discharge power sequence of the energy storage equipment; The wind and solar power abandonment rate is obtained according to the first value and the second value.

4. The method according to claim 3, characterized in that Obtaining the wind and solar power abandonment rate according to the first value and the second value, including: dividing the second value by the first value; Based on the division result, the wind and solar power abandonment rate is obtained.

5. The method according to claim 1, characterized in that Performing a second optimization on the first capacity configuration result to obtain a second capacity configuration result includes: Inputting the first capacity configuration result into the simulation software for secondary optimization; If the result obtained by the secondary optimization search meets the requirements, the result obtained by the secondary optimization search is used as the second capacity configuration result.

6. A capacity configuration processing device for a source-grid-load-storage system, characterized in that: The device comprises: A model acquisition module is used to obtain a topological structure model of a target source grid-load-storage system; A solution module, used to solve according to the constraints of the topological structure model, the objective function, the equipment parameters of each equipment included in the target source grid load storage system and the load power sequence within a set time period to obtain a first capacity configuration result; The optimization module is used to perform a second optimization on the first capacity configuration result to obtain a second capacity configuration result.

7. The device according to claim 6, characterized in that The objective function includes that the wind and solar power abandonment rate is not less than a set value; the solution module is also used for: According to the constraints of the topological structure model, the equipment parameters of each equipment included in the target source grid-load-storage system and the load data within a set time period, a power generation configuration value sequence of the wind power generation equipment and a power generation configuration value sequence of the photovoltaic power generation equipment are obtained; According to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment, the wind and solar power abandonment rate is obtained; If the wind and solar power abandonment rate is not lower than the set value, a first capacity configuration result is obtained according to the power generation configuration value sequence of the wind power generation equipment and the power generation configuration value sequence of the photovoltaic power generation equipment.

8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the method according to any one of claims 1 to 5 is implemented.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.

Citation Information

Cited By

  • Wind and light storage capacity optimal configuration method and system based on rod-pumped well group load

    CN120237730A

  • Wind, solar and storage capacity optimization configuration method and system based on pumping well group load

    CN120237730B