Information processing system, information processing method, server, blockchain node, and program

By performing secure calculations and data verification in the blockchain, the confidentiality and transaction verification problems when recording raw material information of industrial products in the blockchain are solved, and the effect of verifying transaction compliance under confidentiality conditions is achieved.

CN118974799AActive Publication Date: 2024-11-15TAKUFUYO CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202380031527.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-02-09
Filing Date
2023-03-24
Publication Date
2024-11-15
Estimated Expiration
2043-03-24

AI Technical Summary

Technical Problem

When recording raw material information of industrial products in blockchain, it is difficult to keep the amount of raw materials contained in the project confidential, while verifying that there is no improper behavior in the transaction, and the ability of third parties to freely view data may damage the competitiveness of the operator.

Method used

Secure calculations are performed through servers and blockchain nodes, the project's commitment value is generated, and relevant transaction data is recorded in the blockchain to verify whether the project is composed of designated raw materials, and at the same time, non-specific third-party reading raw material information is restricted.

Benefits of technology

While keeping the amount of raw materials contained in confidential projects, it verifies that there are no improper behaviors in the transaction and protects the intellectual property and competitiveness of the operator.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118974799A_ABST
    Figure CN118974799A_ABST
Patent Text Reader

Abstract

The information processing system comprises a server, a plurality of block chain nodes and a plurality of terminals. A plurality of block chain nodes read out, from a block chain, first transaction data as past transaction data associated with second transaction data broadcasted by a server. Each of the plurality of block chain nodes verifies whether the item of the second transaction data is composed of the raw material included in the generation source item of the first transaction data based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to an information processing system, an information processing method, a server, a blockchain node and a program. Background Art

[0002] In the past, a technology for recording the tracking information of an item in a blockchain while reducing the data volume of the tracking information of the item of the moving target is known (for example, Japanese Patent Publication No. 2021-64219). In the technology disclosed in Japanese Patent Publication No. 2021-64219, when a server receives a request signal containing identification information of an item of the tracking target, a sequence of transaction data of the movement of the item corresponding to the identification information contained in the request signal and a sequence of accumulators corresponding to the sequence of transaction data are obtained from the blockchain. Then, the server verifies whether the identification information of the item of the tracking target is stored in each accumulator in the sequence of accumulators obtained, and outputs the verification result. Summary of the invention

[0003] Problem that the invention aims to solve

[0004] However, users who use an item as a commodity or service sometimes want to know what elements the item is made of. For example, consider the case of manufacturing an industrial product. It should be noted that industrial products are often made of various raw materials (such as rare metals).

[0005] In particular, in recent years, the United Nations has formulated Sustainable Development Goals (SDGs), which require the provision of projects that take the global environment into consideration. Therefore, if it can be verified that the elements that constitute the project are elements that take the global environment into consideration, it is believed that the verification results can be used as SDGs indicators. However, for processed products or industrial products that use the same raw materials, it is difficult to distinguish the differences from their appearance, etc. On the other hand, if information related to the raw materials of the project (or information related to the process of providing energy) is in a traceable state, indicators can be set, measured, and evaluated based on this information, and the movement of projects whose indicators do not meet the specified benchmarks can also be restricted.

[0006] In addition, before industrial products are provided to consumers, a supply chain of raw materials and intermediate materials is often formed by multiple operators. For example, operator A purchases multiple raw materials a1, a2, and a3, and manufactures intermediate material M from these raw materials a1, a2, and a3. A Next, operator B purchases intermediate material M from operator A. A , to the intermediate material M AAdd raw materials b1 and b2 to produce intermediate material M B Next, operator C purchases intermediate material M from operator B. B , the intermediate material M B Combined with several other intermediate materials to produce industrial products M C Then, the industrial product M is provided from the operator C to the consumer. C .

[0007] In this case, for example, consumers or quality inspection organizations may want to know whether the industrial product M C The origin of the raw materials contained, the content of recycled materials, the purity measured during the purification process, and the proportion of components such as elements or molecules. Furthermore, consumers or organizations that supervise distribution sometimes want to know about industrial products M C In addition, each operator may also want to know information about the raw materials or parts they purchase.

[0008] If data related to such items of transaction objects are made public using network technologies such as blockchain, multiple operators and consumers can freely browse information related to transaction objects. For example, multiple operators and consumers can check what raw materials the parts or intermediate materials they have obtained are made of by browsing information related to the origin of the raw materials contained in a certain part, the content of recycled materials, the purity measured during the purification process, and the proportion of components such as elements or molecules, etc., and can use it to indicate the products they have shipped or to distinguish parts or intermediate materials that do not meet the standards set as targets.

[0009] However, when such data is recorded in the blockchain and made public, multiple unspecified third parties can freely read the data. For example, when the data recorded in the blockchain includes data related to key technologies in manufacturing industrial products, the competitiveness of the operator may be damaged.

[0010] For example, a specific business operator may wish to keep information related to the mixing ratio of raw materials confidential from competing business operators. Such information may be disclosed to business operators with whom it has a direct transaction contract, but it may not be disclosed to third parties with whom it has no contractual relationship.

[0011] The present invention has been made in view of the above-mentioned circumstances, and an object of the present invention is to verify that there is no fraud in the transaction of the raw materials included in the project while keeping the quantity of the raw materials included in the project confidential.

[0012] Solutions for solving problems

[0013] In order to achieve the above-mentioned purpose, the information processing system of the present invention includes: a server, multiple blockchain nodes, and multiple terminals, and the terminal sends to the server: generation target project identification data, which represents the identification information of the generation target project; raw material identification data, which is the identification information of the raw material used when generating the generation target project; quantity data, which represents the quantity of the raw material; and generation source project identification data, which represents the identification information of the generation source project, and the server calculates the commitment value of the generation target project by performing a secure calculation based on the parameter value corresponding to the raw material and the quantity data, stores the combination of the raw material identification data and the generation target project identification data in a prescribed data structure, obtains first transaction data, the first transaction data is transaction data recorded in the blockchain stored in the storage unit of the blockchain node, and is transaction data included in the output data of the generation source project identification data, broadcasts second transaction data to multiple blockchain nodes, and the second transaction data The transaction data is transaction data including an address representing a sending source of the generation target item, an address representing a sending destination of the generation target item, and the data structure, and is transaction data in which the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data. A plurality of blockchain nodes respectively read out from the blockchain each first transaction data as past transaction data associated with the second transaction data broadcast by the server, and based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data, verify whether the generation target item of the second transaction data is composed of the raw materials included in the generation source item of the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw materials of the first transaction data, the second transaction data is recorded in the blockchain.

[0014] In addition, the server of the present invention is a server in an information processing system, and the information processing system includes: the server, multiple blockchain nodes, and multiple terminals, and the terminal sends to the server: generation target project identification data, which represents the identification information of the generation target project; raw material identification data, which is the identification information of the raw material used when generating the generation target project; quantity data, which represents the quantity of the raw material; and generation source project identification data, which represents the identification information of the generation source project, the server calculates the commitment value of the generation target project by performing a secure calculation based on the parameter value corresponding to the raw material and the quantity data, stores the combination of the raw material identification data and the generation target project identification data in a prescribed data structure, obtains first transaction data, the first transaction data is transaction data recorded in the blockchain stored in the storage unit of the blockchain node, and is transaction data included in the output data of the generation source project identification data, and broadcasts second transaction data to multiple blockchain nodes. , the second transaction data is transaction data including an address representing a sending source of the generation target item, an address representing a sending destination of the generation target item, and the data structure, and is transaction data in which the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data. A plurality of blockchain nodes respectively read out from the blockchain each first transaction data as past transaction data associated with the second transaction data broadcast by the server, and based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data, verify whether the generation target item of the second transaction data is composed of the raw material included in the generation source item of the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw material of the first transaction data, the second transaction data is recorded in the blockchain.

[0015] In addition, the blockchain node of the present invention is a blockchain node in an information processing system, and the information processing system includes: a server, multiple blockchain nodes, and multiple terminals, and the terminal sends to the server: generation target project identification data, which represents the identification information of the generation target project; raw material identification data, which is the identification information of the raw material used when generating the generation target project; quantity data, which represents the quantity of the raw material; and generation source project identification data, which represents the identification information of the generation source project, and the server calculates the commitment value of the generation target project by performing a secure calculation based on the parameter value corresponding to the raw material and the quantity data, stores the combination of the raw material identification data and the generation target project identification data in a prescribed data structure, obtains first transaction data, the first transaction data is the transaction data recorded in the blockchain stored in the storage unit of the blockchain node, and is the transaction data included in the output data by the generation source project identification data, and broadcasts the second transaction data to multiple blockchain nodes. The second transaction data is transaction data including an address representing a sending source of the generation target item, an address representing a sending destination of the generation target item, and the data structure, and the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data. A plurality of blockchain nodes respectively read out from the blockchain each first transaction data as past transaction data associated with the second transaction data broadcasted by the server, and based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data, verify whether the generation target item of the second transaction data is composed of the raw materials included in the generation source item of the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw materials of the first transaction data, the second transaction data is recorded in the blockchain.

[0016] In addition, the information processing method of the present invention is an information processing method executed by an information processing system, wherein the information processing system includes: a server, multiple blockchain nodes, and multiple terminals, wherein the terminal sends to the server: generation target project identification data, which represents identification information of the generation target project; raw material identification data, which is identification information of the raw material used when generating the generation target project; quantity data, which represents the quantity of the raw material; and generation source project identification data, which represents identification information of the generation source project, wherein the server calculates the commitment value of the generation target project by performing a secure calculation based on the parameter value corresponding to the raw material and the quantity data, stores a combination of the raw material identification data and the generation target project identification data in a prescribed data structure, obtains first transaction data, wherein the first transaction data is transaction data recorded in the blockchain stored in the storage unit of the blockchain node, and is transaction data included in the output data by the generation source project identification data, and broadcasts a second transaction data to multiple blockchain nodes. The second transaction data is transaction data including an address representing a sending source of the generation target item, an address representing a sending destination of the generation target item, and the data structure, and the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data. A plurality of blockchain nodes respectively read out from the blockchain each first transaction data as past transaction data associated with the second transaction data broadcasted by the server, and based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data, verify whether the generation target item of the second transaction data is composed of the raw materials included in the generation source item of the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw materials of the first transaction data, the second transaction data is recorded in the blockchain.

[0017] The program of the present invention is a program for being used to enable a server in an information processing system to execute, the information processing system comprising: the server, multiple blockchain nodes, and multiple terminals, the terminal sending to the server: generation target project identification data, which represents identification information of the generation target project; raw material identification data, which is identification information of the raw material used when generating the generation target project; quantity data, which represents the quantity of the raw material; and generation source project identification data, which represents identification information of the generation source project, the server calculates the commitment value of the generation target project by performing a secure calculation based on the parameter value corresponding to the raw material and the quantity data, stores a combination of the raw material identification data and the generation target project identification data in a prescribed data structure, obtains first transaction data, the first transaction data is transaction data recorded in the blockchain stored in the storage unit of the blockchain node, and is transaction data included in the output data by the generation source project identification data, and broadcasts a second transaction data to multiple blockchain nodes. Transaction data, the second transaction data is transaction data including an address representing a sending source of the generation target item, an address representing a sending destination of the generation target item, and the data structure, and is transaction data in which the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data. A plurality of blockchain nodes respectively read out from the blockchain each first transaction data as past transaction data associated with the second transaction data broadcasted by the server, and based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data, verify whether the generation target item of the second transaction data is composed of the raw materials included in the generation source item of the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw materials of the first transaction data, the second transaction data is recorded in the blockchain.

[0018] The program of the present invention is a program for causing a blockchain node in an information processing system to execute, the information processing system comprising: a server, a plurality of the blockchain nodes, and a plurality of terminals, the terminal sending to the server: generation target project identification data, which represents identification information of the generation target project; raw material identification data, which is identification information of the raw material used when generating the generation target project; quantity data, which represents the quantity of the raw material; and generation source project identification data, which represents identification information of the generation source project, the server calculates the commitment value of the generation target project by performing a secure calculation based on a parameter value corresponding to the raw material and the quantity data, stores a combination of the raw material identification data and the generation target project identification data in a prescribed data structure, obtains first transaction data, the first transaction data being transaction data recorded in a blockchain stored in a storage unit of the blockchain node, and being transaction data included in the output data by the generation source project identification data, and broadcasts a second transaction data to a plurality of blockchain nodes. Transaction data, the second transaction data is transaction data including an address representing a sending source of the generation target item, an address representing a sending destination of the generation target item, and the data structure, and is transaction data in which the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data. A plurality of blockchain nodes respectively read out from the blockchain each first transaction data as past transaction data associated with the second transaction data broadcasted by the server, and based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data, verify whether the generation target item of the second transaction data is composed of the raw materials included in the generation source item of the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw materials of the first transaction data, the second transaction data is recorded in the blockchain.

[0019] Effects of the Invention

[0020] According to the present invention, it is possible to obtain an effect of being able to verify that there is no fraud in the transaction of the raw materials included in the item while keeping the quantity of the raw materials included in the item confidential. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a diagram showing an example of a schematic configuration of an information processing system according to the present embodiment.

[0022] Figure 2 This is a schematic block diagram showing a computer that functions as each device constituting the information processing system.

[0023] Figure 3It is an explanatory diagram for explaining the processing of the information processing system according to the present embodiment.

[0024] Figure 4 It is a diagram for explaining this embodiment. DETAILED DESCRIPTION

[0025] Hereinafter, embodiments will be described in detail with reference to the accompanying drawings.

[0026] <System structure of information processing system>

[0027] Figure 1 FIG. 1 is a block diagram showing an information processing system 10 of the present embodiment. Figure 1 As shown, the information processing system 10 of the present embodiment is configured to include: a terminal 12, a server 14, and a blockchain node 16. The devices of the information processing system 10 are connected by a network 20 such as the Internet. In addition, except for the case where a specific node among the multiple blockchain nodes 16A, 16B, and 16C is described, the blockchain node is abbreviated as "blockchain node 16". In addition, except for the case where a specific terminal among the multiple terminals 12A, 12B, 12C, ..., 12X is described, the terminal is abbreviated as "terminal 12".

[0028] In addition, Figure 1 Although three blockchain nodes are shown in FIG, more blockchain nodes may be included. Figure 1 Although four terminals are shown, more terminals may be included.

[0029] In recent years, there has been an increasing demand for disclosure of some of the events that occur during the production or distribution of goods or services (hereinafter referred to as "projects"). For example, operators are sometimes required to disclose the utilization rate of renewable energy, CO2 emissions, or the recycling rate of raw materials used in the project when providing the project as evidence of measures to address environmental issues.

[0030] Currently, such information is often disclosed as the sum of corporate activities within a certain period (e.g., one year). On the other hand, if details are added to each item, this information can be considered as added value to the item. In addition, by adding details to the item, it can also be proved that the item complies with the circulation regulations in the international community.

[0031] Therefore, when a certain operator U1 delivers item X to another operator U2, and operator U2 manufactures a new item Y based on item X, consider the case where this series of events is represented as data representing a transaction ticket. Then, the data representing the transaction ticket is recorded in the blockchain. Since the data representing the transaction ticket is stored in the storage units (not shown) of multiple blockchain nodes 16A, 16B, and 16C, the transaction data recorded in the blockchain is made public. A third party can view the transaction data. As a result, details are added to the project, and a series of information when the project is manufactured or provided is made public.

[0032] However, on the other hand, there is also information that is desired to be kept confidential when manufacturing or providing items. For example, for a business operator who mixes multiple raw materials to produce an intermediate material, it is assumed that information related to the mixing ratio of the raw materials is also the company's key technology and is considered to be kept confidential. This information related to key technology is also the intellectual property of each business operator, so each business operator usually considers avoiding disclosing this intellectual property to third parties without charge.

[0033] Therefore, in the information processing system 10 of this embodiment, information related to the quantity of raw materials included in the project is not recorded in the blockchain, and while the quantity of raw materials included in the project is kept confidential, it is verified that there is no improper behavior in the transaction of the raw materials included in the project.

[0034] Specifically, in the information processing system 10 of the present embodiment, a predetermined security calculation is performed based on the quantity data indicating the quantity of raw materials included in the project and the parameter value set according to the raw materials, thereby calculating the commitment value of each project. In the information processing system 10 of the present embodiment, the commitment value is recorded in the blockchain, and it is verified based on the commitment value that there is no fraud in the transaction of the raw materials included in each project. In this way, it is possible to prevent information related to the quantity of raw materials included in the project from being recorded in the blockchain, and while keeping the quantity of raw materials included in the project confidential, it is verified that there is no fraud in the transaction of the raw materials included in the project.

[0035] Each device included in the information processing system 10 is implemented by a computer including a CPU (Central Processing Unit), a ROM (Read Only Memory) storing programs for implementing each processing routine, a RAM (Random Access Memory) for temporarily storing data, a memory as a storage unit, a network interface, etc.

[0036] The terminal 12, the server 14, and the blockchain node 16 can be, for example, Figure 2The computer 70 shown in the figure is implemented. The computer 70 has a CPU 71, a memory 72 as a temporary storage area, and a non-volatile storage unit 73. In addition, the computer 70 has an input / output interface (I / F) 74 to which an input / output device or the like (not shown) is connected, and a read / write (R / W) unit 75 that controls reading and writing data in a storage medium. In addition, the computer 70 has a network I / F 76 connected to a network such as the Internet. The CPU 71, the memory 72, the storage unit 73, the input / output I / F 74, the R / W unit 75, and the network I / F 76 are connected to each other via a bus 77.

[0037] The storage unit 73 can be implemented by a hard disk drive (HDD), a solid state drive (SSD), a flash memory, etc. In the storage unit 73 as a storage medium, a program for making the computer 70 function is stored. The CPU 71 reads the program from the storage unit 73 and loads it into the memory 72, and sequentially executes the processing of the program.

[0038] <Function of information processing system 10>

[0039] Next, the operation of the information processing system 10 of this embodiment will be described. In this embodiment, a case where the information processing system 10 records the details of product C in the blockchain will be described as an example.

[0040] In addition, product C is configured to include cobalt, nickel, and manganese as its raw materials. In the following, cobalt, nickel, and manganese as raw materials of product C are extracted from product A and product B, and product C is generated using the extracted raw materials. In addition, in the process of generating product C, a part (or all) of the raw materials constituting product A or a part (or all) of the raw materials constituting product B is not consumed, and a product D equivalent to the unconsumed remaining raw materials is generated. Therefore, products A and B are examples of generation source items, and product C is an example of generation target item.

[0041] In this embodiment, it is possible to track the combination of a product as an item and its raw materials (for example, product C is composed of 5 cobalt, 4 nickel, and 9 manganese as raw materials). In addition, in this case, the quantity data of the raw materials needs to be kept confidential. On the other hand, for a third party, it is necessary to prove that, for example, product C is produced from product A and product B.

[0042] Therefore, in this embodiment, it is possible to prove that the item is properly manufactured while keeping the quantity data of the raw materials constituting the item confidential.

[0043] When the user operating the terminal 12 inputs information related to the product C as the generation target item into the terminal 12, the Figure 3 sequence shown.

[0044] In step S100, the terminal 12 receives information related to the project input by the user. In addition, the information related to the project includes, for example, quantity data indicating the quantity of raw materials constituting the product C of the project as the production target. In addition, for example, the quantity (or composition ratio) of the raw materials constituting the product C is as follows.

[0045] Cobalt: 5

[0046] Nickel: 4

[0047] Manganese: 9

[0048] Furthermore, the quantities of raw materials constituting the product A which is a generation source item are as follows.

[0049] Cobalt: 3

[0050] Nickel: 7

[0051] Manganese: 5

[0052] Furthermore, the quantities of raw materials constituting the product B which is a generation source item are as follows.

[0053] Cobalt: 4

[0054] Manganese: 8

[0055] Furthermore, the amounts of raw materials constituting the product D corresponding to the remaining raw materials that are not consumed are as follows.

[0056] Cobalt: 2

[0057] Nickel: 3

[0058] Manganese: 4

[0059] In step S102, the terminal 12 sends to the server 14: item identification data (hereinafter referred to as "item ID") representing identification information of the product C being the generation target; item ID of the product A being the generation source; item ID of the product B being the generation source; raw material identification data (hereinafter referred to as "raw material ID") serving as identification information of the raw materials constituting the product C; and quantity data representing the quantity (or ratio) of the raw materials consumed when generating the product C.

[0060] In step S104, the server 14 receives the data transmitted from the terminal 12 in step S102. In addition, in step S104, the server 14 acquires the parameter value corresponding to the raw material of the received raw material ID, the blind parameter value G corresponding to the blind factor, and the random coefficient r with respect to the blind parameter value G. The blind factor rG is data indicating a virtual raw material that is not actually included in the product C. The random coefficient r with respect to the blind parameter value G is also the value of the blind quantity data corresponding to the number of blind factors.

[0061] In addition, the parameter value and the blind parameter value G are obtained by calculation using a commitment scheme with additive isomorphism. For example, the parameter value and the blind parameter value G are calculated using a Pedersen commitment as an example of a known method (for example, refer to Section 3 of https: / / link.springer.com / content / pdf / 10.1007%2F3-540-46766-1_9.pdf#page=3!). When the parameter value and the blind parameter value G are calculated using the Pedersen commitment, a point (coordinate) on the elliptic curve whose discrete logarithm is unknown is selected as the parameter value and the blind parameter value G corresponding to each raw material. Thus, a parameter value and a blind parameter value G with additive isomorphism are obtained. For example, the following is obtained as the parameter value of each raw material.

[0062] Cobalt: H C

[0063] Nickel: H N

[0064] Manganese: H M

[0065] Blind parameter value: G

[0066] It should be noted that the commitment value C of product A, which is the source project A and the committed value C of product B, which is the source project B Calculate according to the following formula. r1, r2 are random coefficients relative to the blind parameter value G. These commitment values ​​C A , C B As described later, it is recorded in the past transaction data in the blockchain.

[0067] [Number 1]

[0068] C A =r1G+3H c +7H N +5H M

[0069] C B =r2G+4H C +0H N +8H M

[0070] In step S106, the server 14 calculates the commitment value C of product C by performing a secure calculation as shown in the following formula: C , the safety calculation is to convert the parameter value H corresponding to each raw material C , H N , H MThe blind parameter value G, the quantity data of each raw material and the random coefficient r3 relative to the blind parameter value G are multiplied and added.

[0071] [Number 2]

[0072] C C =r3G+5H C +4H N +9H M In addition, the above commitment value is equivalent to a point on the elliptic curve whose discrete logarithm is unknown. Therefore, it is impossible to use the above commitment value C C Calculate how much of the raw material is contained in product C.

[0073] Furthermore, in step S106, the server 14 calculates the commitment value C of the product D by performing a secure calculation as shown in the following formula: D , the safety calculation is to convert the parameter value H corresponding to each raw material C , H N , H M The blind parameter value G, the quantity data of each raw material and the random coefficient r4 relative to the blind parameter value G are multiplied and added.

[0074] [Number 3]

[0075] C D =r4G+2H C +3H N +4H N

[0076] In addition, when the commitment value is calculated without introducing the blinding factor rG, the commitment value is the same when different items are composed of the same number of raw materials or the same raw material ratio. By introducing the blinding factor rG, the commitment values ​​of different items can be different even when different items are composed of the same number of raw materials or the same raw material ratio.

[0077] In addition, in order to make the following formula (A) mentioned later hold true, the random coefficients r1, r2, r3, and r4 are adjusted and set in advance so as to satisfy the following formula (B).

[0078] [Number 4]

[0079] C A +C B -(C C +C D )=0G

[0080] (A)

[0081] r1+r2-(r3+r4)=0

[0082] (B)

[0083] In step S108, the server 14 stores the combination of the item ID of product C and the raw material ID of each raw material in an accumulator disclosed in, for example, Japanese Patent Application Laid-Open No. 2021-064219. By storing various data in the accumulator, it is possible to record the tracking information of the item in the blockchain while reducing the amount of data of the tracking information of the item. In addition, the server 14 similarly stores the combination of the item ID of product D and the raw material ID of each raw material in a prescribed data structure.

[0084] In addition, as described above, the server 14 sets the parameter value H C , H N , H M And the blind parameter value G. Based on the parameter value H C , H N , H M The commitment value calculated by using the blind parameter value G, the quantity data corresponding to the combination of raw materials, and the random coefficient is different from the commitment value calculated using other combinations of raw materials and is unique. Therefore, the commitment value can also be used as identification data. The parameter value H used in calculating the commitment value C , H N , H M And the blind parameter value G is stored and managed in a storage unit (not shown) of the server 14 .

[0085] Next, the server 14 obtains: transaction data of an accumulator whose output data contains the item ID of product A, which is a generation source; and transaction data of an accumulator whose output data contains the item ID of product B, which is a generation source, by accessing the blockchain node 16. In addition, the server 14 obtains the transaction data based on the transaction ID attached to the transaction data.

[0086] Specifically, in step S110, the server 14 sends a request signal to the blockchain node 16 in order to obtain the transaction data of the accumulator that records the item ID of the product A of the generation source and the item ID of the product B of the generation source in the output data.

[0087] In step S112, when the blockchain node 16 receives the request signal sent by the server 14 in the above step S110, it sends to the server 14: past transaction data recorded with the item ID of product A as output information; and past transaction data recorded with the item ID of product B as output data. In this embodiment, such past transaction data is also referred to as first transaction data.

[0088] In step S114 , the server 14 obtains the first transaction data output by the blockchain node 16 .

[0089] In step S116 , the server 14 generates second transaction data including an address indicating a source of product C that is a generation target item, an address indicating a destination of product C, and the above-described data structure.

[0090] Specifically, the server 14 includes the output data of the past first transaction data in the input data of the second transaction data. In addition, the server 14 generates the second transaction data in a manner such that the input data of the second transaction data also includes the transaction ID on the blockchain related to the past first transaction data. In addition, the server 14 includes the project ID, raw material ID, and commitment value of product C in the output data constituting the second transaction data. In addition, as described above, the project ID and raw material ID of product C are stored in an accumulator as a prescribed data structure. In addition, the commitment value may be further stored in the accumulator. Although in this embodiment, the case where the project ID and raw material ID are stored in the accumulator is used as an example for explanation, the project ID and raw material ID may not be stored in the accumulator, but may be directly recorded in the output data constituting the second transaction data.

[0091] In addition, as described above, in the process of producing product C, when part (or all) of the raw materials are not consumed, data related to product D corresponding to the remaining raw materials that are not consumed is also included in the accumulator. This recording method is one example of expressing the conservation law between the raw materials represented by the input data and the raw materials represented by the output data in one transaction data. As another method, an example of recording the waste of the remaining raw materials generated when the item to be produced is produced in another blockchain and referencing it between different blockchains is also considered.

[0092] Figure 4 is a diagram showing a data structure for explaining transaction data. Figure 4 As shown, the transaction data TX2 includes an address indicating a source of product delivery and an address indicating a destination of product delivery.

[0093] Furthermore, if Figure 4 As shown, the input data of the transaction data TX2 includes the output data of the past transaction data TX1 - 1 and the output data of the past transaction data TX1 - 2 .

[0094] On the other hand, Figure 4As shown, the output data of transaction data TX2 includes an accumulator containing the item ID and raw material ID of the product C that is the target of generation. Furthermore, the accumulator also includes the item ID and raw material ID of the product D that is generated from the remaining raw materials. In addition, the output data of transaction data TX1-1 and transaction data TX1-2 that are transaction data of the generation source items include accumulators storing the item IDs and raw material IDs of products A and B that were the targets of generation in the past.

[0095] In step S118 , the server 14 broadcasts the second transaction data generated in step S118 to multiple blockchain nodes 16 .

[0096] In step S120, the plurality of blockchain nodes 16 receive the second transaction data respectively. In step S120, the plurality of blockchain nodes 16 read out each first transaction data as past transaction data associated with the second transaction data from the blockchain respectively. Specifically, the plurality of blockchain nodes 16 read out each first transaction data from the blockchain according to a prescribed protocol based on the identification data on the blockchain related to the past first transaction data contained in the second transaction data.

[0097] In step S122, the plurality of blockchain nodes 16 respectively determine the commitment value C of the product C contained in the second transaction data TX2. C and the remaining commitment value C of product D D , and the commitment value C of product A included in the first transaction data TX1-1 A and the commitment value C of product B included in the first transaction data TX1-2 B By comparing the relationship between the two, it is verified whether the product C which is the generation target item of the second transaction data TX2 is composed of the raw materials of the products A and B which are the generation source items of the first transaction data TX1-1 and TX1-2.

[0098] As described above, when each parameter value and blinding factor are generated by Pedersen commitment, the commitment value of the past transaction data included in the input data in the second transaction data should be equal to the commitment value included in the output data. Therefore, for example, when the sum of the commitment values ​​included in the input data in the second transaction data is not equal to the sum of the commitment values ​​included in the output data in the second transaction data, the item of the generation target is not properly generated for some reason.

[0099] Therefore, multiple blockchain nodes 16 record the second transaction data in the blockchain when the sum of the commitment values ​​contained in the output data in the first transaction data (the sum of the commitment values ​​contained in the input data in the second transaction data) is equal to the sum of the commitment values ​​contained in the output data in the second transaction data.

[0100] On the other hand, when the sum of the commitment values ​​contained in the output data within the first transaction data (the sum of the commitment values ​​contained in the input data within the second transaction data) is not equal to the sum of the commitment values ​​contained in the output data within the second transaction data, multiple blockchain nodes 16 do not record the second transaction data in the blockchain and discard it.

[0101] In addition, for example, when the output data includes a plurality of item IDs, the total value of the plurality of commitment values ​​included in the output data of the transaction data is also disclosed on the blockchain.

[0102] Specifically, as shown in the following calculation formula, the commitment value C of the product C included in the second transaction data TX2 is C The commitment value C is equivalent to the remaining amount of raw materials produced when producing product C D The sum of the committed values ​​of the raw materials included in the first transaction data TX1-1 and TX-2 (C A With C B When the sum of the second transaction data TX1-1 and TX-2 is equal, multiple blockchain nodes 16 respectively determine that product C of the second transaction data TX2 is composed of the raw materials of multiple first transaction data TX1-1 and TX-2.

[0103] [Number 5]

[0104] C A +C B -(C C +C D )=0

[0105] In step S124, when it is determined that the product C of the second transaction data TX2 is composed of the raw materials of the first transaction data TX1-1 and TX-2, multiple blockchain nodes 16 respectively record the second transaction data TX2 in the blockchain.

[0106] In addition, according to the commitment value recorded in the transaction data, overflow occurs when the addition process of the commitment value implemented by each blockchain node 16 is performed, and an erroneous calculation result may be obtained. Therefore, it is preferable to include a proof that the commitment value is within an appropriate range. In this implementation, for example, a range proof can be included. As an example of a known method, proof schemes such as Borromean Ring Signatures (https: / / www.semanticscholar.org / paper / Borromean-Ring-Signatures-%E2%88%97-Maxwell-Poelstra / 4160470c7f6cf05ffc81a98e8fd67fb0c84836ea) and Bulletproofs (https: / / eprint.iacr.org / 2017 / 1066.pdf) can be used.

[0107] In addition, when receiving a request signal indicating a request to disclose the parameter value corresponding to the raw material ID from the terminal 12, the server 14 performs authentication processing with the terminal 12 that sent the request signal. Furthermore, when the terminal 12 that sent the request signal is a terminal that is previously permitted to disclose the parameter value, the server 14 discloses the parameter value to the terminal 12 that sent the request signal. The terminal 12 verifies whether the product C is properly manufactured based on the disclosed parameter value and the committed value recorded in the transaction data.

[0108] For example, a user who has received the target product C decommits using the commitment value recorded in the blockchain in order to confirm whether the product C is manufactured using appropriate raw materials.

[0109] In addition, when Pedersen commitment is used in the calculation of the commitment value, the commitment can be released according to the following steps.

[0110] Specifically, for example, the terminal 12X operated by the user who has received the product C or a third party user sends a predetermined request signal to the server 14 according to the user's operation. In response to the request signal, the server 14 sends the parameter value H to the terminal 12X operated by the user after the above-mentioned authentication process. C , H N , H M , the quantity data of the raw materials (cobalt: 5, nickel: 4, manganese: 9), and the blinding factor rG. In addition, the terminal 12X accesses the blockchain node 16 to obtain the commitment value C of the product C recorded in the second transaction data. C .

[0111] The terminal 12X performs the following operations based on the parameter value H:C , H N , H M , the quantity data of raw materials (cobalt: 5, nickel: 4, manganese: 9), the blinding factor rG, and the commitment value C of the second transaction data recorded in the blockchain C , using a known decommitment method, generates a verification result indicating whether product C is properly manufactured by products A and B. The commitment value C of product C recorded in the second transaction data C If the calculation is based on the quantity data of the raw materials and the product C is properly manufactured from the products A and B (hereinafter referred to as "properly produced product C"), the terminal 12X displays the verification result on the display unit (not shown). On the other hand, if the product C is not properly produced, the terminal 12X displays the verification result on the display unit (not shown).

[0112] In addition, it is highly likely that the user who received the product C received the ingredient list of the product C from the user who generated the product C. Therefore, the terminal 12X operated by the user who received the product C can also generate the product C based on the quantity data of the raw materials (cobalt: 5, nickel: 4, manganese: 9) and the parameter value H recorded in the ingredient list. C , H N , H M , and the blinding factor rG, calculate the commitment value C of product C by yourself C Therefore, the terminal 12X operated by the user who receives the product C can also calculate the commitment value C C 'With the commitment value C recorded in the blockchain C The comparison is performed and a verification result is generated indicating whether the product C is properly produced.

[0113] In addition, the blinding factor rG may be generated by the terminal 12X operated by the user who received the product C, and the generated values ​​may be sent to the server 14. In this case, the terminal 12X operated by the user who received the product C sends the blinding factor rG to the server 14 in step S104.

[0114] Furthermore, without disclosing the blinding factor rG to the terminal 12X, it is possible to use a known decommitment method to generate a verification result indicating whether the product C was properly generated based on a subtraction value obtained by subtracting the blinding factor rG from each commitment value and a digital signature generated by the blinding factor rG.

[0115] In addition, KZG commitment can also be used in the calculation of commitment value (see, for example, https: / / www.iacr.org / archive / asiacrypt2010 / 6477178 / 6477178.pdf). When Pedersen commitment is used, the quantity data of the raw materials included in the commitment value must be disclosed when the commitment is released. In contrast, when KZG commitment is used, only the quantity data of a part of the raw materials can be disclosed. KZG commitment is a commitment scheme using polynomials.

[0116] Specifically, when the KZG commitment is used in the calculation of the commitment value, the quantity data of the raw materials constituting a part of the project can be disclosed only, while the quantity data of other raw materials can be kept confidential. When the KZG commitment is used in the calculation of the commitment value, the commitment value is calculated using a polynomial. In addition, when the KZG commitment is used in the calculation of the commitment value, the commitment values ​​calculated using different polynomials can be added together by utilizing the property of additive isomorphism.

[0117] When KZG commitment is used in the calculation of the commitment value, the parameter value and blind parameter value representing the raw material of the object are set to x, and the value calculated by the polynomial f(x) is used as the quantity of the raw material of the object and the blind factor value to form the polynomial f(x). A KZG commitment is generated for the polynomial to generate a commitment value that keeps the raw materials and their quantities confidential.

[0118] In addition, the above-mentioned blind parameter value may not be included when constructing the polynomial.

[0119] In addition, although the above example uses Pedersen commitment and KZG commitment as examples for calculating commitment values, any commitment scheme can be used as long as it has additive isomorphism.

[0120] As described above, the terminal of the information processing system of this embodiment sends to the server: generation target project identification data, which indicates identification information of the generation target project; raw material identification data, which is identification information of the raw material used when generating the generation target project; quantity data, which indicates the quantity of the raw material; and generation source project identification data, which indicates identification information of the generation source project. The server calculates the commitment value of the generation target project by performing a secure calculation based on the parameter value and quantity data corresponding to the raw material. The server stores the combination of the commitment value, the raw material identification data, and the generation target project identification data in a prescribed data structure. The server obtains the first transaction data, which is the transaction data recorded in the blockchain stored in the storage unit of the blockchain node, and the generation source project identification data is included in the output data. In addition, the server broadcasts the second transaction data to multiple blockchain nodes, which is the transaction data including the address of the sending source indicating the generation target project, the address of the sending destination indicating the generation target project, and the data structure, and the generation source project identification data is included in the input data, and the data structure including the generation target project identification data is included in the output data. Multiple blockchain nodes read out each first transaction data as past transaction data associated with the second transaction data broadcasted by the server from the blockchain. Multiple blockchain nodes verify whether the items of the second transaction data are composed of the raw materials contained in the source items of the first transaction data based on the relationship between the commitment value of the target item contained in the second transaction data and the commitment value of the source item contained in the first transaction data, and record the second transaction data in the blockchain when it is determined that the target item of the second transaction data is composed of the raw materials of the first transaction data. In this way, it is possible to verify that there is no improper behavior in the transaction of the raw materials contained in the item while keeping the quantity of the raw materials contained in the item confidential.

[0121] Furthermore, by introducing a blinding factor rG when calculating the committed value of an item, it is possible to prevent committed values ​​of different items from becoming the same value.

[0122] In addition, the present invention is not limited to the above-mentioned embodiment, and various modifications and applications are possible without departing from the gist of the present invention.

[0123] For example, items are not limited to real objects but also include specific data.

[0124] In addition, although the above-mentioned embodiment describes the case where the blinding factor rG is introduced when calculating the commitment value, the present invention is not limited thereto and the commitment value may be calculated without introducing the blinding factor rG.

[0125] In addition, although the above embodiment is described by taking the case where the random coefficients r1, r2, r3, and r4 are pre-adjusted in a manner that satisfies the above formula (B), the present invention is not limited thereto. In the case where the random coefficients r1, r2, r3, and r4 do not satisfy the above formula (B), by adding a digital signature to the value on the right side of the following formula, it is possible to verify whether the product of the generation target is properly manufactured by the product of the generation source using a known method.

[0126] [Number 6]

[0127] C A +C B -(C C -C D )=(r1+r2-(r3+r4))G

[0128] In this case, as described above, the server 14 uses the blinding factor rG to calculate the commitment value C of the product C of the generation target when calculating the commitment value of the product C of the generation target. C Then, the server 14 calculates the commitment value C of the product C included in the second transaction data. C The promised value C equivalent to the remaining amount of raw materials D The sum (C C +C D ), and the sum of the commitment values ​​of the products A and B of the generating sources included in the plurality of first transaction data (C A +C B ) generates the digital signature of the server 14 and appends the digital signature to the second transaction data. A +C B )-(C C +C D ) is not 0, since a digital signature is attached to the result of the operation, it is possible to verify based on the digital signature whether the target product is properly manufactured from the source product.

[0129] In the above embodiment, the case where product D corresponding to unconsumed surplus raw materials is generated when product C is generated is described as an example, but the present invention is not limited to this, and the present embodiment can be applied even when no surplus raw materials are generated.

[0130] In addition, in the above-mentioned embodiment, the case where the server 14 executes various processes is described as an example, but part or all of these various processes can also be executed by the terminal 12 or the blockchain node 16.

[0131] In addition, in the present specification, an embodiment in which a program is pre-installed is described, but the program can also be provided by storing it in a computer-readable recording medium. For example, the program can also be provided in a non-transitory storage medium such as a CD-ROM (Compact Disk Read Only Memory), a DVD-ROM (Digital Versatile Disk Read Only Memory), and a USB (Universal Serial Bus) memory. In addition, the program can also be downloaded from an external device via a network.

[0132] In addition, the processing of the software (program) read and executed by the CPU in the above-mentioned embodiment may also be performed by various processors other than the CPU. As the processor in this case, examples are given of PLD (Programmable Logic Device) (PLD) ...

[0133] In addition, each process of this embodiment can also be constituted by a computer or server having a general-purpose processing device and a storage device, and each process can be executed by a program. The program is stored in a storage device, and can also be recorded in a recording medium such as a magnetic disk, an optical disk, a semiconductor memory, or can also be provided through a network. Of course, any other structural elements do not have to be implemented by a single computer or server, and can also be implemented by being distributed in multiple computers connected by a network.

[0134] All documents, patent applications, and technical standards described in this specification are incorporated herein by reference to the same extent as if each document, patent application, and technical standard was specifically and individually described as being incorporated by reference.

[0135] In addition, it should be noted that in the above embodiments, if there is no description of "only based on ××", "only according to ××", or "only in the case of ××", it is assumed in this specification that additional information can be considered. As an example, a description such as "in the case of a, perform b" does not necessarily mean "in the case of a, always perform b" unless explicitly stated.

[0136] In addition, even if there are aspects of performing operations different from those described in this specification in certain methods, programs, terminals, devices, servers or systems (hereinafter referred to as "methods, etc."), each mode of the disclosed technology is aimed at operations that are the same as any of the operations described in this specification, and the existence of operations different from the operations described in this specification does not exclude the method, etc. from the scope of the various modes of the technology of the present invention.

[0137] This specification incorporates by reference the entire contents disclosed in Japanese Patent Application No. 2022-061015 filed on March 31, 2022 and Japanese Patent Application No. 2023-018759 filed on February 9, 2023. All documents, patent applications, and technical standards described in this specification are incorporated by reference in this specification to the same extent as if each document, patent application, and technical standard was specifically and individually described as being cited by reference.

Claims

1. An information processing system, comprising: Server, multiple blockchain nodes, and multiple terminals, The terminal sends to the server: generated target item identification data, which indicates identification information of the generated target item; Raw material identification data, which is identification information of a raw material used when generating a target item; quantity data indicating the quantity of the raw material; and generation source item identification data indicating identification information of the generation source item, The server calculates the commitment value of the production target item by performing a secure calculation based on the parameter value corresponding to the raw material and the quantity data, The server stores the combination of the raw material identification data and the generation target item identification data in a predetermined data structure, The server acquires first transaction data, the first transaction data being transaction data recorded in the blockchain stored in the storage unit of the blockchain node and transaction data in which the generation source item identification data is included in the output data, The server broadcasts second transaction data to multiple blockchain nodes, the second transaction data being transaction data including an address indicating a source of the generation target item, an address indicating a destination of the generation target item, and the data structure, wherein the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data, A plurality of blockchain nodes respectively read out from the blockchain respective first transaction data as past transaction data associated with the second transaction data broadcasted by the server, Multiple blockchain nodes verify whether the generation target item of the second transaction data is composed of the raw materials included in the generation source item of the first transaction data based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw materials of the first transaction data, the second transaction data is recorded in the blockchain.

2. The information processing system according to claim 1, wherein: When the plurality of blockchain nodes verify whether the generation target item of the second transaction data is composed of the plurality of raw materials of the first transaction data, When the sum of the commitment value of the generation target item contained in the second transaction data, the commitment value equivalent to the remaining amount of the raw material generated when the generation target item is generated, and the sum of the commitment values ​​of the generation source items contained in multiple first transaction data are equal, it is determined that the generation target item of the second transaction data is composed of the raw materials of multiple first transaction data.

3. The information processing system according to claim 1 or 2, wherein: When the server receives a request signal indicating a request to disclose the parameter value, the server performs an authentication process with the terminal that is the source of the request signal, and when the terminal that is the source of the request signal is a terminal that has been previously authorized to disclose the parameter value, the server discloses the parameter value to the terminal that is the source of the request signal.

4. The information processing system according to any one of claims 1 to 3, wherein: When the server calculates the commitment value of the target generation project, The commitment value of the generation target project is calculated by adding the result of the multiplication and addition operation of the blind parameter value corresponding to the blind factor of the raw material that is not substantially included in the generation target project and the blind quantity data representing the quantity of the pre-adjusted blind factor to the result of the multiplication and addition operation of the parameter value and the quantity data.

5. The information processing system according to any one of claims 1 to 3, wherein: When the server calculates the commitment value of the target generation project, The commitment value of the generation target item is calculated by adding the result of the multiplication and addition operation of the blind parameter value corresponding to the blind factor representing the raw material substantially not included in the generation target item and the blind quantity data representing the random number of the blind factor to the result of the multiplication and addition operation of the parameter value and the quantity data, For information representing the difference between the sum of the commitment value of the generation target item contained in the second transaction data and the commitment value equivalent to the remaining amount of the raw material generated when the generation target item is generated, and the sum of the commitment values ​​of the generation source items contained in multiple first transaction data, the digital signature of the server is generated and the digital signature is added to the second transaction data.

6. The information processing system according to any one of claims 1 to 3, wherein: When the server calculates the commitment value of the target generation project, By adding a blind parameter value corresponding to a blind factor representing a raw material that is not substantially included in the generation target item and blind quantity data representing the number of pre-adjusted blind factors to the input of the security calculation, the commitment value of the generation target item is calculated, thereby improving confidentiality.

7. The information processing system according to claim 1, wherein: When calculating the commitment value, KZG commitment is used, and only a portion of the quantity data of the raw materials can be disclosed. The KZG commitment is a commitment scheme using polynomials.

8. A server, which is a server in an information processing system, the information processing system comprising: The server, multiple blockchain nodes and multiple terminals, The terminal sends to the server: generated target item identification data, which indicates identification information of the generated target item; Raw material identification data, which is identification information of a raw material used when generating a target item; quantity data indicating the quantity of the raw material; and generation source item identification data indicating identification information of the generation source item, The server calculates the commitment value of the production target item by performing a secure calculation based on the parameter value corresponding to the raw material and the quantity data, The server stores the combination of the raw material identification data and the generation target item identification data in a predetermined data structure, The server acquires first transaction data, the first transaction data being transaction data recorded in the blockchain stored in the storage unit of the blockchain node and transaction data in which the generation source item identification data is included in the output data, The server broadcasts second transaction data to multiple blockchain nodes, the second transaction data being transaction data including an address indicating a source of the generation target item, an address indicating a destination of the generation target item, and the data structure, wherein the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data, A plurality of blockchain nodes respectively read out from the blockchain respective first transaction data as past transaction data associated with the second transaction data broadcasted by the server, Multiple blockchain nodes verify whether the generation target item of the second transaction data is composed of the raw materials included in the generation source item of the first transaction data based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw materials of the first transaction data, the second transaction data is recorded in the blockchain.

9. A blockchain node, which is a blockchain node in an information processing system, the information processing system comprising: A server, a plurality of said blockchain nodes, and a plurality of terminals, The terminal sends to the server: generated target item identification data, which indicates identification information of the generated target item; Raw material identification data, which is identification information of a raw material used when generating a target item; quantity data indicating the quantity of the raw material; and generation source item identification data indicating identification information of the generation source item, The server calculates the commitment value of the production target item by performing a secure calculation based on the parameter value corresponding to the raw material and the quantity data, The server stores the combination of the raw material identification data and the generation target item identification data in a predetermined data structure, The server acquires first transaction data, the first transaction data being transaction data recorded in the blockchain stored in the storage unit of the blockchain node and transaction data in which the generation source item identification data is included in the output data, The server broadcasts second transaction data to multiple blockchain nodes, the second transaction data being transaction data including an address indicating a source of the generation target item, an address indicating a destination of the generation target item, and the data structure, wherein the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data, A plurality of blockchain nodes respectively read out from the blockchain respective first transaction data as past transaction data associated with the second transaction data broadcasted by the server, Multiple blockchain nodes verify whether the generation target item of the second transaction data is composed of the raw materials included in the generation source item of the first transaction data based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw materials of the first transaction data, the second transaction data is recorded in the blockchain.

10. An information processing method, which is an information processing method executed by an information processing system, the information processing system comprising: Server, multiple blockchain nodes, and multiple terminals, The terminal sends to the server: generated target item identification data, which indicates identification information of the generated target item; Raw material identification data, which is identification information of a raw material used when generating a target item; quantity data indicating the quantity of the raw material; and generation source item identification data indicating identification information of the generation source item, The server calculates the commitment value of the production target item by performing a secure calculation based on the parameter value corresponding to the raw material and the quantity data, The server stores the combination of the raw material identification data and the generation target item identification data in a predetermined data structure, The server acquires first transaction data, the first transaction data being transaction data recorded in the blockchain stored in the storage unit of the blockchain node and transaction data in which the generation source item identification data is included in the output data, The server broadcasts second transaction data to multiple blockchain nodes, the second transaction data being transaction data including an address indicating a source of the generation target item, an address indicating a destination of the generation target item, and the data structure, wherein the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data, A plurality of blockchain nodes respectively read out from the blockchain respective first transaction data as past transaction data associated with the second transaction data broadcasted by the server, Multiple blockchain nodes verify whether the generation target item of the second transaction data is composed of the raw materials included in the generation source item of the first transaction data based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw materials of the first transaction data, the second transaction data is recorded in the blockchain.

11. A program for causing a server in an information processing system to execute, the information processing system comprising: The server, multiple blockchain nodes, and multiple terminals, The terminal sends to the server: generated target item identification data, which indicates identification information of the generated target item; Raw material identification data, which is identification information of a raw material used when generating a target item; quantity data indicating the quantity of the raw material; and generation source item identification data indicating identification information of the generation source item, The server calculates the commitment value of the production target item by performing a secure calculation based on the parameter value corresponding to the raw material and the quantity data, The server stores the combination of the raw material identification data and the generation target item identification data in a predetermined data structure, The server acquires first transaction data, the first transaction data being transaction data recorded in the blockchain stored in the storage unit of the blockchain node and transaction data in which the generation source item identification data is included in the output data, The server broadcasts second transaction data to multiple blockchain nodes, the second transaction data being transaction data including an address indicating a source of the generation target item, an address indicating a destination of the generation target item, and the data structure, wherein the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data, A plurality of blockchain nodes respectively read out from the blockchain respective first transaction data as past transaction data associated with the second transaction data broadcasted by the server, Multiple blockchain nodes verify whether the generation target item of the second transaction data is composed of the raw materials included in the generation source item of the first transaction data based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw materials of the first transaction data, the second transaction data is recorded in the blockchain.

12. A program for causing a blockchain node in an information processing system to execute, the information processing system comprising: A server, a plurality of said blockchain nodes, and a plurality of terminals, The terminal sends to the server: generated target item identification data, which indicates identification information of the generated target item; Raw material identification data, which is identification information of a raw material used when generating a target item; quantity data indicating the quantity of the raw material; and generation source item identification data indicating identification information of the generation source item, The server calculates the commitment value of the production target item by performing a secure calculation based on the parameter value corresponding to the raw material and the quantity data, The server stores the combination of the raw material identification data and the generation target item identification data in a predetermined data structure, The server acquires first transaction data, the first transaction data being transaction data recorded in the blockchain stored in the storage unit of the blockchain node and transaction data in which the generation source item identification data is included in the output data, The server broadcasts second transaction data to multiple blockchain nodes, the second transaction data being transaction data including an address indicating a source of the generation target item, an address indicating a destination of the generation target item, and the data structure, wherein the generation source item identification data is included in the input data, and the data structure including the generation target item identification data is included in the output data, A plurality of blockchain nodes respectively read out from the blockchain respective first transaction data as past transaction data associated with the second transaction data broadcasted by the server, Multiple blockchain nodes verify whether the generation target item of the second transaction data is composed of the raw materials included in the generation source item of the first transaction data based on the relationship between the commitment value of the generation target item included in the second transaction data and the commitment value of the generation source item included in the first transaction data. If it is determined that the generation target item of the second transaction data is composed of the raw materials of the first transaction data, the second transaction data is recorded in the blockchain.

Citation Information

Patent Citations

  • Asset transaction method, device, storage medium and compute device

    CN109472696A

  • Production anti-counterfeiting traceability system and method based on block chain

    CN110503438A

  • Traceability management system for wine industry supply chain based on block chain

    CN112330345A

  • Traceability system for pet food

    JP2020035436A

  • Transaction method, program, verifying apparatus and creating method

    JP2020071617A