SRS transmission method, device and equipment

CN118975368APending Publication Date: 2024-11-15NEW H3C TECH CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202380008597.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-06
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In TDD systems, it is difficult for existing technologies to effectively utilize SBFD time-frequency resources, resulting in limited uplink data transmission rate, increased delay and increased interference, affecting network coverage and capacity.

Method used

By transmitting SRS between user equipment and base stations, SBFD time-frequency resources are used for uplink data transmission, which improves transmission reliability and cell coverage radius, reduces interference, and achieves effective configuration and utilization of SBFD time-frequency resources.

Benefits of technology

It increases the uplink data transmission rate, reduces transmission delay, enhances the accuracy and real-time performance of beamforming, improves network coverage and capacity, and expands cell coverage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118975368A_ABST
    Figure CN118975368A_ABST
Patent Text Reader

Abstract

The invention provides an SRS (Sounding Reference Signal) transmission method, device and equipment. The method comprises the following steps: receiving SRS resource configuration information sent by a base station; wherein the SRS resource configuration information is used for indicating an SRS resource set; wherein the SRS resource set comprises an SRS resource which is overlapped with an uplink sub-band of an SBFD time-frequency resource; and sending the SRS to the base station based on the SRS resources in the SRS resource set. Through the scheme of the invention, the resource utilization rate can be improved, and the transmission reliability of uplink data is improved.
Need to check novelty before this filing date? Find Prior Art

Description

SRS transmission method, device and equipment Technical Field

[0001] The present application relates to the field of communication technology, and in particular to an SRS transmission method, apparatus, and device. Background Art

[0002] TDD (Time Division Duplex) systems are widely used in mobile communication systems, such as 5G systems. In TDD systems, the frame structure is divided into DL (DownLink) time slots, UL (UpLink) time slots, and flexible time slots. The DL time slot includes multiple DL symbols, and downlink data is processed in the frequency domain resources corresponding to these DL symbols. The UL time slot includes multiple UL symbols, and uplink data is processed in the frequency domain resources corresponding to these UL symbols. The flexible time slot includes at least one F (Flexible) symbol. The F symbol can be used for DL, that is, downlink data is processed in the frequency domain resources corresponding to the F symbol. The F symbol can also be used for UL, that is, uplink data is processed in the frequency domain resources corresponding to the F symbol. The F symbol can also be used for GP (Guard Period), that is, the frequency domain resources corresponding to the F symbol are used for protection of uplink and downlink switching. The TDD system can operate in HD (Half Duplex) mode, that is, at the same time, the same frequency domain resources can only be used for UL or DL.

[0003] Summary of the Invention

[0004] The present application provides an SRS transmission method, applied to a user equipment, the method comprising:

[0005] Receive SRS resource configuration information sent by a base station; wherein the SRS resource configuration information is used to indicate an SRS resource set; wherein the SRS resource set includes SRS resources that overlap with an uplink subband of an SBFD time-frequency resource;

[0006] An SRS is sent to a base station based on the SRS resources in the SRS resource set.

[0007] The present application provides an SRS transmission method, applied to a base station, the method comprising:

[0008] Sending sounding reference signal (SRS) resource configuration information to a user equipment, wherein the SRS resource configuration information is used to indicate an SRS resource set used by the user equipment, and the SRS resource set includes an SRS resource that coincides with an uplink subband of a sub-band full-duplex (SBFD) time-frequency resource;

[0009] An SRS is received that is sent by the user equipment based on the SRS resources in the SRS resource set.

[0010] The present application provides an SRS transmission device, applied to a user equipment, the device comprising:

[0011] A receiving module, configured to receive SRS resource configuration information sent by a base station; wherein the SRS resource configuration information is used to indicate an SRS resource set; wherein the SRS resource set includes SRS resources that overlap with an uplink subband of an SBFD time-frequency resource;

[0012] The sending module is configured to send an SRS to a base station based on the SRS resources in the SRS resource set.

[0013] The present application provides an SRS transmission device, applied to a base station, the device comprising:

[0014] a sending module, configured to send sounding reference signal (SRS) resource configuration information to a user equipment, wherein the SRS resource configuration information is used to indicate an SRS resource set used by the user equipment, and the SRS resource set includes an SRS resource that overlaps with an uplink subband of a subband full-duplex (SBFD) time-frequency resource;

[0015] The receiving module is configured to receive the SRS sent by the user equipment based on the SRS resources in the SRS resource set.

[0016] The present application provides a user equipment, including: a processor and a machine-readable storage medium, wherein the machine-readable storage medium stores machine-executable instructions that can be executed by the processor; the processor is configured to execute the machine-executable instructions to implement the above-mentioned example SRS transmission method.

[0017] The present application provides a base station, comprising: a processor and a machine-readable storage medium, wherein the machine-readable storage medium stores machine-executable instructions that can be executed by the processor; the processor is configured to execute the machine-executable instructions to implement the above-mentioned example SRS transmission method.

[0018] It can be seen from the above technical solution that the UE (User Equipment) uses the SRS resources in the SRS (Sounding Reference Signal) resource set to transmit SRS. When the SBFD (Sub-Band Full Duplex) time-frequency resources overlap with the SRS resources, the SBFD time-frequency resources can be used for SRS transmission, further improving the transmission reliability of uplink data and the cell coverage radius, while enhancing the accuracy of downlink beamforming and the real-time performance of beam tracking, reducing the uplink and downlink interference caused by the introduction of SBFD time-frequency resources, and enabling the SBFD time-frequency resource configuration and SRS transmission mechanism to be effectively combined and implemented. From the perspective of the entire system, it can support SRS transmission of the TDD system, improve resource utilization, and improve network coverage and network capacity, increase uplink transmission resources and cell coverage, reduce uplink transmission delay and increase uplink transmission capacity. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] 1A and 1B are schematic flow charts of an SRS transmission method in an example;

[0020] FIG2 is a schematic diagram of configuring an SRS resource set for an SBFD time slot or SBFD symbol;

[0021] FIG3 is a schematic diagram of configuring an SRS resource set for a UL time slot or a UL symbol;

[0022] FIG4 is a schematic diagram of non-contiguous SRS resources;

[0023] FIG5 is a schematic diagram of configuring SRS resource sets for SBFD time slots / SBFD symbols and non-SBFD time slots / non-SBFD symbols;

[0024] FIG6A is a schematic diagram showing that a plurality of third-category SRS resources are continuous SRS resources;

[0025] FIG6B is a schematic diagram showing that a plurality of third-category SRS resources are non-contiguous SRS resources;

[0026] 7A and 7B are schematic structural diagrams of an SRS transmission device in an example;

[0027] FIG8A is a schematic structural diagram of a user equipment in an example;

[0028] FIG8B is a schematic diagram of the structure of a base station in an example. DETAILED DESCRIPTION

[0029] The terms used in the embodiments of this application are only for the purpose of describing specific embodiments and are not intended to limit this application. The singular forms "a," "the," and "the" used in this application and claims are also intended to include plural forms unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used herein refers to any or all possible combinations of one or more associated listed items.

[0030] It should be understood that although the terms first, second, third, etc. may be used to describe various information in the embodiments of the present application, such information should not be limited to these terms. These terms are only used to distinguish information of the same type from each other. For example, without departing from the scope of the present application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" used may also be interpreted as "at the time of" or "when" or "in response to determining".

[0031] TDD systems can operate in HD mode, meaning that at the same time, the same frequency domain resources can only be used for UL or DL. To make more flexible use of frequency domain resources and improve resource utilization, TDD systems can also operate in FD (Full-Duplex) mode, meaning that at the same time, the same frequency domain resources are used for both UL and DL, that is, uplink and downlink data are processed simultaneously on the same frequency domain resources.

[0032] In a TDD system, the frame structure is divided into DL time slots, UL time slots, and flexible time slots. Once the frame structure is determined, the UE can transmit and receive data according to the frame structure. For UEs using HD (Half Duplex) mode, the base station (such as a gNB) schedules the UE to transmit or receive according to the frame structure. For UEs using FD mode, the base station schedules the UE to transmit, receive, or both according to the frame structure. In summary, the base station can configure the frame structure and notify the UE of the frame structure so that the UE understands the frame structure and can correctly transmit and receive data. Furthermore, after understanding the frame structure, the UE can be aware of potential inter-UE interference and use interference cancellation techniques to mitigate interference and improve communication reliability.

[0033] For example, in a TDD system, for a frame structure primarily used for downlink transmission, more DL time slots are usually configured. This results in fewer UL time slots, which in turn limits the uplink transmission rate and increases the transmission delay of uplink data, resulting in a longer uplink transmission delay and the unutilization of uplink services.

[0034] In one example of the present application, an SRS transmission method is proposed. Flexible downlink frequency domain resources and uplink frequency domain resources are configured for UEs using SBFD time-frequency resources. Uplink data can be transmitted using uplink frequency domain resources. That is, uplink frequency domain resources can be configured using downlink time slots or flexible time slots, and uplink data can be transmitted using uplink frequency domain resources, thereby improving the uplink transmission rate and reducing the transmission delay of uplink data. In addition, downlink frequency domain resources can be configured using uplink time slots or flexible time slots, and downlink data can be transmitted using downlink frequency domain resources, thereby improving the downlink transmission rate and reducing the transmission delay of downlink data.

[0035] In one example of the present application, an SRS transmission method is proposed. The method can be applied to a user equipment. FIG1A is a flow chart of the SRS transmission method. The method may include:

[0036] Step 111: Receive SRS resource configuration information sent by a base station. The SRS resource configuration information is used to indicate an SRS resource set; the SRS resource set may include SRS resources that overlap with an uplink subband of an SBFD time-frequency resource, and the SRS resources may be SRS time-frequency resources.

[0037] Step 112: Send an SRS to the base station based on the SRS resources in the SRS resource set.

[0038] In one example of the present application, an SRS transmission method is proposed. The method can be applied to a base station. FIG1B is a flow chart of the SRS transmission method. The method may include:

[0039] Step 121: Send SRS resource configuration information to the user equipment, where the SRS resource configuration information is used to indicate an SRS resource set used by the user equipment, and the SRS resource set includes SRS resources that overlap with an uplink subband of the SBFD time-frequency resource.

[0040] Step 122: Receive an SRS sent by the user equipment based on the SRS resources in the SRS resource set.

[0041] In one example, a user equipment may correspond to a first SRS resource set and a second SRS resource set, and a base station may send first configuration information corresponding to the first SRS resource set and second configuration information corresponding to the second SRS resource set to the user equipment. The first configuration information is used to indicate the first SRS resource set, and the second configuration information is used to indicate the second SRS resource set. The first SRS resource set includes multiple first-type SRS resources that overlap with the uplink subband of the SBFD time-frequency resource, and the second SRS resource set includes multiple second-type SRS resources located in an uplink time slot or uplink symbol.

[0042] In one example, a user equipment may correspond to a third SRS resource set, and a base station may send third configuration information corresponding to the third SRS resource set to the user equipment. The third configuration information is used to indicate the third SRS resource set. The third SRS resource set includes multiple third-category SRS resources, each of which includes at least SRS resources that overlap with an uplink subband of an SBFD time-frequency resource. The multiple third-category SRS resources are contiguous SRS resources, or the multiple third-category SRS resources are non-contiguous SRS resources located in different time slots.

[0043] In one example, both the base station and the user equipment can obtain a pre-configured target bandwidth configuration list, which can be generated based on the initial bandwidth configuration list; wherein, if the number of PRBs between adjacent first physical layer resources and second physical layer resources in the initial bandwidth configuration list is greater than a preset threshold, then the intermediate physical layer resources are added to the initial bandwidth configuration list to obtain a target bandwidth configuration list; wherein, the number of PRBs between the first physical layer resources and the intermediate physical layer resources is not greater than the preset threshold, and the number of PRBs between the intermediate physical layer resources and the second physical layer resources is not greater than the preset threshold. The physical layer resources can be frequency domain resources of the physical layer, and the physical layer resources can also be referred to as bandwidth.

[0044] In an example, the user equipment sends an SRS to the base station based on the SRS resources in the first SRS resource set, which may include but is not limited to: if the first type of SRS resources in the first SRS resource set does not exceed the range of the uplink subband of the SBFD time-frequency resources, then based on the first type of SRS resources in the first SRS resource set, the SRS can be sent to the base station based on the target bandwidth configuration list.

[0045] In an example, if the first type of SRS resources in the first SRS resource set includes a first part of resources that does not exceed the uplink subband range of the SBFD time-frequency resources and a second part of resources that exceeds the uplink subband range of the SBFD time-frequency resources, sending SRS to the base station based on the SRS resources in the first SRS resource set may include but is not limited to: sending SRS to the base station based on the first part of resources in the first type of SRS resources, and sending SRS to the base station based on the second part of resources in the first type of SRS resources.

[0046] Alternatively, the SRS is sent to the base station based on a first part of the first type of SRS resources, and the SRS is prohibited from being sent to the base station based on a second part of the first type of SRS resources.

[0047] Alternatively, it is prohibited to send the SRS to the base station based on the first part of the resources in the first type of SRS resources, and it is prohibited to send the SRS to the base station based on the second part of the resources in the first type of SRS resources.

[0048] Alternatively, if the SBFD time-frequency resources are located in a downlink time slot or downlink symbol, then SRS is sent to the base station based on the first part of the resources in the first category of SRS resources, and sending SRS to the base station based on the second part of the resources in the first category of SRS resources is prohibited, or, sending SRS to the base station based on the first part of the resources in the first category of SRS resources is prohibited, and sending SRS to the base station based on the second part of the resources in the first category of SRS resources is prohibited; if the SBFD time-frequency resources are located in the F time slot or F symbol, then SRS is sent to the base station based on the first part of the resources in the first category of SRS resources, and sending SRS to the base station based on the second part of the resources in the first category of SRS resources.

[0049] Alternatively, SRS transmission indication information is received from the base station. If the SRS transmission indication information allows the SRS to be sent through the second part of the resources, the SRS can be sent to the base station based on the first part of the resources in the first category of SRS resources, and the SRS can be sent to the base station based on the second part of the resources in the first category of SRS resources; if the SRS transmission indication information does not allow the SRS to be sent through the second part of the resources, the SRS can be sent to the base station based on the first part of the resources in the first category of SRS resources, and the sending of SRS to the base station based on the second part of the resources in the first category of SRS resources is prohibited, or the sending of SRS to the base station based on the first part of the resources in the first category of SRS resources is prohibited, and the sending of SRS to the base station based on the second part of the resources in the first category of SRS resources is prohibited.

[0050] Among them, the SBFD time-frequency resources being located in the downlink time slot means: configuring the SBFD time-frequency resources in the downlink time slot, such as configuring the SBFD time-frequency resources in a certain symbol or multiple symbols of the downlink time slot. The SBFD time-frequency resources being located in the downlink symbol means: configuring the SBFD time-frequency resources in the downlink symbol, and the downlink symbol may be a downlink symbol in the downlink time slot, a downlink symbol in the F time slot, or a downlink symbol in the uplink time slot, with no restriction on this. The SBFD time-frequency resources being located in the F time slot means: configuring the SBFD time-frequency resources in the F time slot, such as configuring the SBFD time-frequency resources in a certain symbol or multiple symbols of the F time slot. The SBFD time-frequency resources being located in the F symbol means: configuring the SBFD time-frequency resources in the F symbol, and the F symbol may be an F symbol in the downlink time slot, an F symbol in the F time slot, or an F symbol in the uplink time slot.

[0051] In one example, if transmitting an SRS to a base station based on the second portion of resources in a first category of SRS resources is prohibited, then transmitting an SRS to the base station based on the first portion of resources in the first category of SRS resources may include: determining a target transmit power based on a maximum transmit power; or determining the target transmit power based on the maximum transmit power and a resource ratio; or receiving transmit power indication information from the base station, and if the transmit power indication information is the first indication information, determining the target transmit power based on the maximum transmit power; and if the transmit power indication information is the second indication information, determining the target transmit power based on the maximum transmit power and a resource ratio; wherein the resource ratio may be a resource ratio of the first portion of resources to the first category of SRS resources. At the target transmit power, transmitting the SRS to the base station based on the first portion of resources.

[0052] In an example, for each second-category SRS resource in the second SRS resource set, if the uplink time slot or uplink symbol where the second-category SRS resource is located includes the downlink subband of the SBFD time-frequency resource, and the second-category SRS resource includes a third part of resources that are not located in the downlink subband range and a fourth part of resources located in the downlink subband range, then, sending SRS to the base station based on the SRS resources in the second SRS resource set may include but is not limited to: sending SRS to the base station based on the third part of resources in the second-category SRS resources, and prohibiting sending SRS to the base station based on the fourth part of resources in the second-category SRS resources.

[0053] Alternatively, the SRS is sent to the base station based on the third part of the second type of SRS resources, and the SRS is sent to the base station based on the fourth part of the second type of SRS resources.

[0054] Alternatively, it is prohibited to send the SRS to the base station based on the third part of the second type of SRS resources, and it is prohibited to send the SRS to the base station based on the fourth part of the second type of SRS resources.

[0055] Alternatively, if the third part of the second type of SRS resources includes two non-contiguous resources located on both sides of the downlink subband, SRS is sent to the base station based on the two non-contiguous resources, and sending SRS to the base station based on the fourth part of the second type of SRS resources is prohibited.

[0056] Alternatively, if the third part of resources includes two non-continuous resources located on both sides of the downlink subband, the two non-continuous resources are cascaded to obtain continuous resources, SRS is sent to the base station based on the continuous resources, and sending SRS to the base station based on the fourth part of resources in the second type of SRS resources is prohibited.

[0057] In one example, sending an SRS to a base station based on SRS resources in a third SRS resource set may include, but is not limited to: for each third-category SRS resource in the third SRS resource set, if the third-category SRS resource is located in an uplink time slot or uplink symbol, then the SRS may be sent to the base station based on the third-category SRS resource. Alternatively, if the third-category SRS resource is located in a downlink time slot, downlink symbol, F time slot, or F symbol, and the third-category SRS resource is located within an uplink subband of an SBFD time-frequency resource, then the SRS may be sent to the base station based on the third-category SRS resource. Furthermore, if the third-category SRS resource includes a fifth portion of resources that does not exceed the uplink subband range and a sixth portion of resources that exceeds the uplink subband range, then the SRS may be sent to the base station based on the fifth portion of resources and / or the sixth portion of resources.

[0058] In an example, sending the SRS to the base station based on the fifth part of resources and / or the sixth part of resources may include but is not limited to: sending the SRS to the base station based on the fifth part of resources, and sending the SRS to the base station based on the sixth part of resources.

[0059] Alternatively, the SRS is sent to the base station based on the fifth part of resources, and the SRS is prohibited from being sent to the base station based on the sixth part of resources.

[0060] Alternatively, it is prohibited to send the SRS to the base station based on the fifth part of resources, and it is prohibited to send the SRS to the base station based on the sixth part of resources.

[0061] Alternatively, if the SBFD time-frequency resources are located in a downlink time slot or downlink symbol, then SRS is sent to the base station based on the fifth part of the resources, and sending SRS to the base station based on the sixth part of the resources is prohibited, or sending SRS to the base station based on the fifth part of the resources is prohibited, and sending SRS to the base station based on the sixth part of the resources is prohibited; if the SBFD time-frequency resources are located in the F time slot or F symbol, then SRS is sent to the base station based on the fifth part of the resources, and SRS is sent to the base station based on the sixth part of the resources.

[0062] Alternatively, SRS transmission indication information is received from the base station. If the SRS transmission indication information allows the SRS to be sent through the sixth part of the resources, the SRS is sent to the base station based on the fifth part of the resources, and the SRS is sent to the base station based on the sixth part of the resources; if the SRS transmission indication information does not allow the SRS to be sent through the sixth part of the resources, the SRS is sent to the base station based on the fifth part of the resources, and the sending of the SRS to the base station based on the sixth part of the resources is prohibited, or the sending of the SRS to the base station based on the fifth part of the resources is prohibited, and the sending of the SRS to the base station based on the sixth part of the resources is prohibited.

[0063] In one example, the base station may further send SRS resource indication information to the user equipment, and the user equipment may receive the SRS resource indication information from the base station. The SRS resource indication information is used to indicate whether to allow SRS transmission on SRS resources that overlap with the uplink subband of the SBFD time-frequency resources, or to prohibit SRS transmission on SRS resources that overlap with the uplink subband of the SBFD time-frequency resources.

[0064] As can be seen from the above technical solution, the UE uses the SRS resources in the SRS resource set to transmit SRS. When the SBFD time-frequency resources overlap with the SRS resources, the SBFD time-frequency resources are used for SRS transmission, thereby improving the transmission reliability of uplink data and the cell coverage radius, enhancing the accuracy of downlink beamforming and the real-time performance of beam tracking, reducing the uplink and downlink interference caused by the introduction of SBFD time-frequency resources, and enabling the effective combination and implementation of SBFD time-frequency resource configuration and SRS transmission mechanism. From a system perspective, it can support SRS transmission in TDD systems, improve resource utilization, and improve network coverage and network capacity, increase uplink transmission resources and cell coverage, reduce uplink transmission delay, and increase uplink transmission capacity.

[0065] The above technical solution of the present application is described below with reference to examples.

[0066] The TDD frame structure can be implemented through a combination of semi-static configuration and dynamic indication. Multiple SFCs (Slot Format Combinations) are defined in high-layer signaling using the SFI (Slot Format Indicator). For example, a base station can select slot formats that meet service requirements and add them to the SFC. Table 1 shows some of the slot formats, where D represents a DL symbol, U represents an UL symbol, and F represents a flexible symbol. Each SFC is identified by a fixed ID and contains one or more slot format types.

[0067] Table 1

[0068] After completing SFI configuration, the base station sends multiple slot format combinations to the UE in an RRC message. After configuring multiple slot format combinations via RRC signaling, the base station notifies the UE of the index of the currently used SFC via periodic PDCCH in DCI format 2_0. After correctly receiving the DCI format 2_0 information, the UE determines the slot format for each slot within a certain period based on the SFC index value. At this point, the base station and UE have completed the frame structure configuration through dynamic indication, enabling uplink and downlink data transmission.

[0069] For resource allocation, it can be divided into time domain resource allocation and frequency domain resource allocation (taking the resource allocation of the downlink channel as an example). Time domain resource allocation: The Time domain resource assignment field in the DCI indicates the time domain position of the downlink channel. This field has a total of 4 bits, with values ​​from 0 to 15. Assuming the value is m, then m+1 indicates the row index of the time domain resource allocation table, and the information in this row indicates the time domain resources of the PDSCH. There are two ways of indication: one is to indicate three pieces of information: the time slot offset between the PDSCH and the PDCCH that schedules the PDSCH, the starting symbol of the PDSCH in the time slot, and the symbol length of the PDSCH. The other is to indicate the time slot offset between the PDSCH and the PDCCH that schedules the PDSCH, and a SLIV value. The user equipment calculates the starting symbol and the number of continuous symbols of the PDSCH based on the SLIV value.

[0070] Frequency domain resource allocation: The Frequency domain resource assignment field in the DCI indicates the frequency domain resource allocation of the downlink channel. PDSCH frequency domain resource allocation is divided into Type 0 and Type 1. Type 0 supports non-contiguous resource allocation to obtain frequency diversity gain, and Type 1 supports continuous resource allocation, which can reduce the number of bits required for this field. DCI format 1_0 only supports Type 1. Type 0: For the non-contiguous resource allocation type, an RBG is a VRB group, which consists of P consecutive VRBs. The number is determined by the high-level parameters rbg-Size and BWP bandwidth. Under the resource allocation type of Type 0, Frequency domain resource assignment is used as a bitmap to indicate which RBGs are allocated to the downlink channel. Each bit in the bitmap represents an RBG, and the highest bit corresponds to RBG0. Similarly, a bit of 1 indicates that the RBG is allocated to the downlink channel, and a bit of 0 indicates that it is not a downlink channel resource. Type 1: The frequency domain resource indication field does not serve as a bitmap, but indicates a RIV (Resource Indicator Value) value, which is used by the user equipment to calculate the starting RB and the number of occupied RBs of the downlink channel.

[0071] In a TDD system, the frame structure can be divided into UL time slots, DL time slots, and flexible time slots according to time slots. The symbols in the flexible time slots can be configured as UL symbols, DL symbols, and F symbols. F symbols can be used for UL, DL, or GP. Among them, uplink data can be transmitted in the UL time slot, UL symbols in the flexible time slot, or F symbols. Uplink data cannot be transmitted in the DL time slot or the DL symbols in the flexible time slot. Similarly, downlink data can be transmitted in the DL time slot, DL symbols in the flexible time slot, or F symbols. Downlink data cannot be transmitted in the UL time slot or the UL symbols in the flexible time slot.

[0072] Full-duplex communication can be achieved through SBFD, that is, SBFD time-frequency resources can be configured in time-frequency resources (such as UL time slots, DL time slots, and flexible time slots). In this way, at the same time, data in different directions from other time-frequency resources can be transmitted on the SBFD time-frequency resources. For example, SBFD time-frequency resources are configured in the DL time slot, and uplink data is transmitted via the SBFD time-frequency resources, so that the uplink data is transmitted in the DL time slot. For another example, SBFD time-frequency resources are configured in the DL symbols of the flexible time slot, and uplink data is transmitted via the SBFD time-frequency resources, so that the uplink data is transmitted in the DL symbols of the flexible time slot. For another example, SBFD time-frequency resources are configured in the UL time slot, and downlink data is transmitted via the SBFD time-frequency resources, so that the downlink data is transmitted in the UL time slot. For another example, SBFD time-frequency resources are configured in the UL symbols of the flexible time slot, and downlink data is transmitted via the SBFD time-frequency resources, so that the downlink data is transmitted in the UL symbols of the flexible time slot.

[0073] In one example, the SBFD time-frequency resource may be a time-frequency resource corresponding to an SBFD time slot or a time-frequency resource corresponding to an SBFD symbol. The SBFD symbol may be defined as a symbol that the base station and the UE may be configured with an SBFD sub-band. On the SBFD sub-band of these SBFD symbols (referred to as SBFD time-frequency resources), the base station and the UE may perform full-duplex communication. That is, on the SBFD time-frequency resources, uplink transmission, downlink transmission, or simultaneous uplink and downlink transmission may be performed. The SBFD time-frequency resource may be explicitly indicated as uplink, downlink, or flexible. When the SBFD time-frequency resource is indicated as flexible, uplink or downlink may be flexibly scheduled on the SBFD time-frequency resource. If the SBFD time-frequency resource is not explicitly indicated, it means that it is flexible and can be used to transmit uplink or downlink data. The configuration of the SBFD time slot or SBFD symbol may include: which symbols in the DL time slot, UL time slot, and F time slot are used for SBFD transmission, as well as the implementation period and starting point. For ease of description, in the subsequent embodiments, the SBFD time-frequency resource corresponding to the SBFD time slot is used as an example for explanation.

[0074] In one example, SBFD indicated as uplink is called UL-SBFD, i.e., SBFD time-frequency resources are used for uplink, and SBFD indicated as downlink is called DL-SBFD, i.e., SBFD time-frequency resources are used for downlink. To support FD communication, SBFD time-frequency resources can be semi-statically configured, such as through RRC (Radio Resource Control) signaling, or dynamically configured, such as through DCI (Downlink Control Information).

[0075] SBFD time-frequency resources can be configured in DL symbols, F symbols, and UL symbols. Symbols configured with SBFD time-frequency resources are called SBFD symbols, while the remaining symbols without SBFD time-frequency resources are called normal symbols. That is, non-SBFD symbols are called normal symbols, such as UL symbols, DL symbols, and F symbols. SBFD can be configured in some symbols of a timeslot. That is, some symbols of a timeslot are SBFD symbols, while the rest are normal symbols. This allows DL or UL data transmission to span normal symbols or SBFD symbols.

[0076] In one example, a UE can send an SRS to a base station. The SRS is used to detect the channel quality of the uplink frequency band. In TDD full-duplex mode, a SRS resource allocation method is proposed. After configuring SBFD time-frequency resources, if the SRS resources overlap with the SBFD time-frequency resources, an SRS transmission method is defined between the UE and the base station. This method can simultaneously allocate SRS resources to both SBFD time slots / SBFD symbols and non-SBFD time slots / non-SBFD symbols (i.e., regular time slots / regular symbols), allowing the UE and base station to transmit SRS in SBFD time slots or SBFD symbols. This is described below with reference to specific scenarios.

[0077] Case 1: An SRS resource set (SRS resource set) is separately configured for the SBFD time slot or SBFD symbol, and the SRS resource set can be recorded as a first SRS resource set.

[0078] Refer to Figure 2, which is a schematic diagram of configuring SRS resource sets for SBFD time slots or SBFD symbols. SRS resource set 1 is the first SRS resource set, SRS resource set 1 is the SRS resource set configured for SBFD time slots or SBFD symbols, SRS resource set 2 is the second SRS resource set, SRS resource set 2 is the SRS resource set configured for non-SBFD time slots or non-SBFD symbols.

[0079] As shown in Figure 2 , SBFD time-frequency resources can be configured in DL time slots and / or F time slots, and DL time slots and / or F time slots configured with SBFD time-frequency resources are referred to as SBFD time slots. Alternatively, SBFD time-frequency resources can be configured in DL symbols and / or F symbols, and DL symbols and / or F symbols configured with SBFD time-frequency resources are referred to as SBFD symbols. The SBFD time-frequency resources in an SBFD time slot or SBFD symbol are used to indicate the uplink, i.e., the SBFD time-frequency resources are uplink subbands (UL subbands). On this basis, SRS resources can be configured in the uplink subband of the SBFD time-frequency resources, i.e., SRS resource set 1 includes multiple SRS resources. For ease of distinction, these SRS resources can be referred to as first-category SRS resources, and the multiple first-category SRS resources overlap with the uplink subband of the SBFD time-frequency resources.

[0080] As shown in Figure 2, SRS resources can also be configured in UL time slots or UL symbols, that is, SRS resource set 2 includes multiple SRS resources. For the sake of convenience, these SRS resources can be called second-class SRS resources. Multiple second-class SRS resources are located in uplink time slots or uplink symbols.

[0081] Referring to the above scenario, the base station allocates SRS resource set 1 and SRS resource set 2 to the UE, SRS resource set 1 includes multiple first-type SRS resources overlapping with the uplink subband of the SBFD time-frequency resources, and SRS resource set 2 includes multiple second-type SRS resources located in the uplink time slot or uplink symbol.

[0082] The base station may send first configuration information corresponding to SRS resource set 1 and second configuration information corresponding to SRS resource set 2 to the UE. After receiving the first configuration information and the second configuration information, the UE determines SRS resource set 1 based on the first configuration information and determines SRS resource set 2 based on the second configuration information. The first configuration information and the second configuration information may be sent separately or simultaneously, and the sending method may be flexibly set. The first configuration information may be resource configuration information in a dynamic manner or in a semi-static manner, and the second configuration information may be resource configuration information in a dynamic manner or in a semi-static manner.

[0083] In an example, after obtaining SRS resource set 1, the UE can send an SRS to the base station based on the first type of SRS resources in SRS resource set 1, and the base station receives the SRS sent by the UE based on the first type of SRS resources in SRS resource set 1. After obtaining SRS resource set 2, the UE can send an SRS to the base station based on the second type of SRS resources in SRS resource set 2, and the base station receives the SRS sent by the UE based on the second type of SRS resources in SRS resource set 2.

[0084] In one example, for the first type of SRS resources in SRS resource set 1, only the first type of SRS resources are allowed to be within the range of the uplink subband of the SBFD time-frequency resources, that is, the first type of SRS resources are completely located within the uplink subband of the SBFD time-frequency resources, that is, the first type of SRS resources are smaller than the uplink subband of the SBFD time-frequency resources. In this case, the flexibility of base station scheduling may be reduced. When frequency hopping is not configured and only one SRS resource set 1 is configured, some uplink subband PRBs (Physical Resource Blocks) cannot be covered by SRS resources, resulting in a decrease in the accuracy of the base station's downlink beamforming and an inability to accurately obtain the channel status of these PRBs.

[0085] In response to the above findings, the base station and the UE may also obtain a pre-configured target bandwidth configuration list. For example, the base station generates a target bandwidth configuration list and sends the target bandwidth configuration list to the UE, or the base station and the UE configure the target bandwidth configuration list by default, without any restriction.

[0086] The target bandwidth configuration list may be generated based on the initial bandwidth configuration list. For example, if the number of PRBs between adjacent first physical layer resources and second physical layer resources in the initial bandwidth configuration list is greater than a preset threshold, the intermediate physical layer resources are added to the initial bandwidth configuration list to obtain the target bandwidth configuration list. The number of PRBs between the first physical layer resources and the intermediate physical layer resources is not greater than a preset threshold, and the number of PRBs between the intermediate physical layer resources and the second physical layer resources is not greater than a preset threshold.

[0087] For example, taking a preset threshold of 4 as an example, if the number of PRBs separating two adjacent physical layer resources (denoted as the first physical layer resource and the second physical layer resource) is greater than 4 and less than or equal to 8, an intermediate physical layer resource is inserted between the first physical layer resource and the second physical layer resource, and the number of PRBs separating the first physical layer resource and the intermediate physical layer resource is no more than 4, and the number of PRBs separating the intermediate physical layer resource and the second physical layer resource is no more than 4. If the number of PRBs separating the first physical layer resource and the second physical layer resource is greater than 8, at least two (e.g., 2, 3, etc.) intermediate physical layer resources are inserted between the first physical layer resource and the second physical layer resource, so that the number of PRBs separating the two adjacent physical layer resources is no more than 4. After performing the above processing on the initial bandwidth configuration list, a target bandwidth configuration list can be obtained. When the base station and UE perform processing based on the target bandwidth configuration list, even if the first-type SRS resource does not exceed the range of the uplink subband of the SBFD time-frequency resource, the impact on the base station's channel state assessment and downlink beam formation is minimal.

[0088] When the base station performs processing based on the target bandwidth configuration list, the base station can send first configuration information and second configuration information to the UE based on the target bandwidth configuration list, that is, the SRS resources indicated by the first configuration information need to meet the bandwidth requirements of the target bandwidth configuration list, and the SRS resources indicated by the second configuration information need to meet the bandwidth requirements of the target bandwidth configuration list. There is no restriction on this.

[0089] When the UE performs processing based on the target bandwidth configuration list, the UE may send an SRS to the base station based on the target bandwidth configuration list. For example, if the first type of SRS resources in the first SRS resource set does not exceed the range of the uplink subband of the SBFD time-frequency resources, the UE may send an SRS to the base station based on the target bandwidth configuration list based on the first type of SRS resources in the first SRS resource set.

[0090] Table 2 shows an example of an initial bandwidth configuration list.

[0091] Table 2

[0092] Based on the initial bandwidth configuration list, since the number of PRBs separating PHY resources 40 and 48 is equal to 8, PHY resource 44 is inserted into PHY resources 40 and 48. The number of PRBs separating PHY resources 40 and 44 is equal to 4, and the number of PRBs separating PHY resources 44 and 48 is also equal to 4. PHY resource 44 can be placed after the existing 64 PHY resource configurations. Similarly, PHY resource 68 can be inserted into PHY resources 64 and 72, and can be placed after the existing 64 PHY resource configurations. PHY resource 84 can be inserted into PHY resources 80 and 88, and can be placed after the existing 64 PHY resource configurations. Similarly, multiple PHY resources can be inserted into the initial bandwidth configuration list to obtain a target bandwidth configuration list. An example of the target bandwidth configuration list is shown in Table 3. Of course, only three physical layer resources are inserted here, and the number of physical layer resources inserted can be greater, and there is no limitation on this.

[0093] Table 3

[0094] In Tables 2 and 3, C SRS is the sequence number of the physical layer resource configuration, B SRS is the transmission bandwidth configuration, that is, there are 4 transmission bandwidth configurations, namely B SRS =0, 1, 2, 3, m SRS is the SRS transmission bandwidth, N is the frequency modulation times, and this embodiment does not limit how to use Table 2 and Table 3 for processing.

[0095] In an example, for the first type of SRS resources in SRS resource set 1, the first type of SRS resources are allowed to exceed the range of the uplink subband of the SBFD time-frequency resources, that is, the first type of SRS resources configured by the base station are allowed to be larger than the uplink subband range of the SBFD time-frequency resources (located in the DL / F time slot or symbol), that is, the first type of SRS resources include a first part of resources that do not exceed the uplink subband range of the SBFD time-frequency resources and a second part of resources that exceed the uplink subband range of the SBFD time-frequency resources. Based on this, the UE sends an SRS to the base station based on the first type of SRS resources in the first SRS resource set, which may include but is not limited to:

[0096] Mode 11: The UE sends an SRS to the base station based on a first part of resources in the first type of SRS resources, and sends an SRS to the base station based on a second part of resources in the first type of SRS resources.

[0097] For example, if the SBFD time-frequency resource is located in a downlink time slot or downlink symbol, or the SBFD time-frequency resource is located in an F time slot or F symbol, the UE is allowed to send an SRS on resources outside the uplink subband of the SBFD time-frequency resource, and the UE sends the SRS to the base station based on the first part of resources and the second part of resources in the first type of SRS resources. For example, based on the first part of resources and the second part of resources in the first type of SRS resources, the UE can send the SRS to the base station based on the initial bandwidth configuration list or the target bandwidth configuration list.

[0098] Mode 12: The UE sends an SRS to the base station based on a first part of resources in the first type of SRS resources, and is prohibited from sending an SRS to the base station based on a second part of resources in the first type of SRS resources.

[0099] For example, if the SBFD time-frequency resource is located in a downlink time slot or downlink symbol, or the SBFD time-frequency resource is located in an F time slot or F symbol, the UE is not allowed to send SRS on resources outside the uplink subband of the SBFD time-frequency resource. The UE sends SRS to the base station based on the first part of the resources in the first category of SRS resources, and is prohibited from sending SRS to the base station based on the second part of the resources in the first category of SRS resources.

[0100] Mode 13: The UE is prohibited from sending SRS to the base station based on the first part of resources in the first type of SRS resources, and is prohibited from sending SRS to the base station based on the second part of resources in the first type of SRS resources.

[0101] For example, if the first type of SRS resources includes the second part of resources that exceeds the uplink subband range of the SBFD time-frequency resources, it is considered that the configuration is wrong, and therefore, sending the SRS to the base station is prohibited.

[0102] Method 14: If the SBFD time-frequency resources are located in a downlink time slot or a downlink symbol, the UE may send an SRS to the base station based on the first part of the resources in the first category of SRS resources, and prohibit sending an SRS to the base station based on the second part of the resources in the first category of SRS resources, or the UE prohibits sending an SRS to the base station based on the first part of the resources in the first category of SRS resources, and prohibits sending an SRS to the base station based on the second part of the resources in the first category of SRS resources; or, if the SBFD time-frequency resources are located in an F time slot or an F symbol, the UE may send an SRS to the base station based on the first part of the resources in the first category of SRS resources, and send an SRS to the base station based on the second part of the resources in the first category of SRS resources.

[0103] For example, if the SBFD time-frequency resource is located in a downlink time slot or downlink symbol, the UE is not allowed to send an SRS on resources outside the uplink subband of the SBFD time-frequency resource. Based on this, the UE can send an SRS to the base station based on the first part of the resources in the first category of SRS resources, and is prohibited from sending an SRS to the base station based on the second part of the resources in the first category of SRS resources. Alternatively, the UE is prohibited from sending an SRS to the base station based on the first and second parts of the resources in the first category of SRS resources. Alternatively, if the SBFD time-frequency resource is located in an F time slot or F symbol, the UE is allowed to send an SRS on resources outside the uplink subband of the SBFD time-frequency resource. Based on this, the UE can send an SRS to the base station based on the first part of the resources in the first category of SRS resources, and is prohibited from sending an SRS to the base station based on the second part of the resources in the first category of SRS resources.

[0104] Mode 15: The UE receives SRS transmission indication information from the base station. If the SRS transmission indication information allows the sending of the SRS through the second part of resources, the UE may send the SRS to the base station based on the first part of resources in the first category of SRS resources, and send the SRS to the base station based on the second part of resources in the first category of SRS resources. Alternatively, if the SRS transmission indication information does not allow the sending of the SRS through the second part of resources, the UE may send the SRS to the base station based on the first part of resources in the first category of SRS resources, and prohibit the sending of the SRS to the base station based on the second part of resources in the first category of SRS resources, or the UE prohibits the sending of the SRS to the base station based on the first part of resources in the first category of SRS resources, and prohibits the sending of the SRS to the base station based on the second part of resources in the first category of SRS resources.

[0105] For example, the base station can indicate through signaling (such as 1 or 2 bits of signaling, which is referred to as SRS transmission indication information) whether the UE is allowed to send SRS on resources other than the uplink subband of the SBFD time-frequency resources. For example, the base station can send the SRS transmission indication information to the UE through a DCI message, or the base station can send the SRS transmission indication information to the UE through a MAC CE message, or the base station can send the SRS transmission indication information to the UE through an RRC message.

[0106] If the SBFD time-frequency resource is located in a downlink time slot, downlink symbol, F time slot, or F symbol, and if the SRS transmission indication information is used to allow the UE to send an SRS on resources outside the uplink subband of the SBFD time-frequency resource, the UE sends an SRS to the base station based on the first part of resources and the second part of resources in the first category of SRS resources. If the SRS transmission indication information is used to not allow the UE to send an SRS on resources outside the uplink subband of the SBFD time-frequency resource, the UE sends an SRS to the base station based on the first part of resources in the first category of SRS resources, and is prohibited from sending an SRS to the base station based on the second part of resources in the first category of SRS resources, or the UE is prohibited from sending an SRS to the base station based on the first part of resources and the second part of resources.

[0107] In one example, for methods 12, 14, and 15, if the UE is not allowed to send SRS on resources other than the uplink subband of the SBFD time-frequency resources, that is, the UE sends SRS to the base station based on the first part of resources and is prohibited from sending SRS to the base station based on the second part of resources, then the SRS transmit power can also be controlled. For example, the SRS transmit power can be controlled in the following manner:

[0108] Mode 21: The UE determines a target transmit power based on the maximum transmit power. At the target transmit power, the UE sends an SRS to the base station based on the first part of the first type of SRS resources.

[0109] For example, the maximum transmission power is recorded as SRS Pmax, which is the transmission power matching the first type of SRS resources (first part resources and second part resources). In method 21, SRS is sent according to SRS Pmax, thereby increasing the transmission power of SRS and enhancing the uplink coverage range.

[0110] Mode 22: The UE determines a target transmit power based on the maximum transmit power and a resource ratio, where the resource ratio may be a ratio of the first portion of resources to the first type of SRS resources. At the target transmit power, the UE sends an SRS to the base station based on the first portion of resources in the first type of SRS resources.

[0111] For example, the resource ratio is available PRB / total allocated PRB, where available PRB represents the number of PRBs occupied by the first part of resources, and total allocated PRB represents the number of PRBs occupied by the first type of SRS resources (the first part of resources and the second part of resources). In mode 22, SRS is sent according to SRS Pmax*(available PRB / total allocated PRB), thereby reducing interference to the downlink channel.

[0112] Mode 23: The UE receives transmit power indication information from the base station. If the transmit power indication information is the first indication information, the target transmit power is determined based on the maximum transmit power. If the transmit power indication information is the second indication information, the target transmit power is determined based on the maximum transmit power and the resource ratio.

[0113] For example, the base station can indicate the method for determining the target transmit power through signaling (such as 1-bit signaling, which is called transmit power indication information). For example, the base station can send the transmit power indication information to the UE through a DCI message, or send the transmit power indication information to the UE through a MAC CE message, or send the transmit power indication information to the UE through an RRC message.

[0114] If the transmit power indication information is the first indication information (such as the first value, such as 0), the first indication information indicates that the target transmit power is determined based on the maximum transmit power, and the UE sends the SRS according to SRS Pmax.

[0115] Alternatively, if the transmit power indication information is the second indication information (such as the second value, such as 1), the second indication information is used to indicate that the target transmit power is determined based on the maximum transmit power and the resource ratio, then the UE can send SRS according to SRS Pmax*(available PRB / total allocated PRB).

[0116] In one example, for the second type of SRS resources in SRS resource set 2, the second type of SRS resources can be configured in a UL time slot or UL symbol. If the UL time slot or UL symbol does not have SBFD time-frequency resources, the UE can send an SRS to the base station based on the second type of SRS resources.

[0117] If there is an SBFD time-frequency resource in the UL time slot or UL symbol, the SBFD time-frequency resource is used to indicate downlink, that is, the SBFD time-frequency resource is a downlink subband (DL Subband), and the second-type SRS resource does not overlap with the downlink subband of the SBFD time-frequency resource, then the UE sends an SRS to the base station based on the second-type SRS resource.

[0118] In an example, referring to FIG3 , which is a schematic diagram of configuring an SRS resource set for a UL time slot or UL symbol, if an SBFD time-frequency resource exists in the UL time slot or UL symbol, the SBFD time-frequency resource is used to indicate a downlink, that is, the SBFD time-frequency resource is a downlink subband, and the second-type SRS resource coincides with the downlink subband of the SBFD time-frequency resource, that is, the second-type SRS resource includes a third portion of resources that are not within the downlink subband range and a fourth portion of resources within the downlink subband range. Based on this, the UE sends an SRS to the base station based on the second-type SRS resources in the second SRS resource set, which may include but is not limited to:

[0119] Mode 31: The UE sends an SRS to the base station based on the third part of the second type of SRS resources, and is prohibited from sending an SRS to the base station based on the fourth part of the second type of SRS resources.

[0120] For example, the UE is not allowed to send SRS in the downlink subband of the SBFD time-frequency resources, that is, only partial SRS is sent. Based on this, the SRS is sent to the base station based on the third part of the second type of SRS resources, and it is prohibited to send SRS to the base station based on the fourth part of the second type of SRS resources.

[0121] Mode 32: The UE sends an SRS to the base station based on the third part of the second type of SRS resources, and sends an SRS to the base station based on the fourth part of the second type of SRS resources.

[0122] For example, the UE is allowed to send SRS in the downlink subband of the SBFD time-frequency resources, that is, all SRSs are allowed to be transmitted, even the SRSs within the downlink subband of the SBFD time-frequency resources will be sent. Based on this, the UE sends SRS to the base station based on the third and fourth parts of the resources in the second type of SRS resources.

[0123] Mode 33: The UE is prohibited from sending SRS to the base station based on the third part of the second type of SRS resources, and is prohibited from sending SRS to the base station based on the fourth part of the second type of SRS resources.

[0124] For example, if the second type of SRS resources include the fourth part of resources located in the downlink subband range, it is considered that the configuration is wrong, and therefore, the UE is prohibited from sending SRS to the base station based on the second type of SRS resources.

[0125] Method 34: If the third part of resources includes two non-continuous resources located on both sides of the downlink subband, the UE cascades the two non-continuous resources to obtain continuous resources, and sends SRS to the base station based on the continuous resources, and prohibits sending SRS to the base station based on the fourth part of resources in the second type of SRS resources.

[0126] For example, see Figure 4, which illustrates a schematic diagram of non-contiguous SRS resources. The third portion of resources includes resources located above the downlink subband (resource a1) and resources located below the downlink subband (resource a2). Resources a1 and a2 are two non-contiguous resources. Based on this, the UE can concatenate resources a1 and a2, eliminating the downlink subband resources to obtain a contiguous resource consisting of resources a1 and a2. The UE can then send an SRS to the base station based on this contiguous resource.

[0127] The base station and the UE may preconfigure a resource concatenation indication, which indicates whether to perform resource concatenation. Alternatively, the base station may send a resource concatenation indication to the UE, which indicates whether to perform resource concatenation. If the resource concatenation indication indicates that resource concatenation is to be performed, the UE may concatenate two non-contiguous resources to obtain a continuous resource and send an SRS to the base station based on the continuous resource. If the resource concatenation indication indicates that resource concatenation is not to be performed, the UE may send an SRS to the base station based on the two non-contiguous resources without concatenating the two non-contiguous resources.

[0128] Mode 35: If the third part of the second type of SRS resources includes two non-contiguous resources located on both sides of the downlink subband, the UE sends SRS to the base station based on the two non-contiguous resources and prohibits sending SRS to the base station based on the fourth part of the second type of SRS resources.

[0129] For example, as shown in Figure 4, the third resource portion includes resource a1 located on the upper side of the downlink subband and resource a2 located on the lower side of the downlink subband. Resource a1 and resource a2 are two non-contiguous resources. Based on this, non-contiguous SRS resource allocation can be performed, that is, the UE sends SRS to the base station based on two non-contiguous resources. The signaling design that allows the configuration of two SRS frequency domain resources can be as follows:

[0130] In the above signaling design, the positions of two non-contiguous resources (such as resource a1 and resource a2) may be indicated, and an SRS may be sent based on the position of resource a1, and an SRS may be sent based on the position of resource a2.

[0131] The above-mentioned methods 31, 32, 33, 34, and 35 can be flexibly switched through signaling. For example, the base station can send signaling to the UE, instructing the UE to use method 31 for processing, or instructing the UE to use method 32 for processing, or instructing the UE to use method 33 for processing, or instructing the UE to use method 34 for processing, or instructing the UE to use method 35 for processing.

[0132] In one example, if the UE transmits an SRS to the base station based on the third portion of resources and prohibits transmitting the SRS to the base station based on the fourth portion of resources, the SRS transmit power can be controlled. For example, the UE determines a target transmit power based on the maximum transmit power (the transmit power matching the second type of SRS resources), and transmits the SRS to the base station based on the third portion of resources at the target transmit power.

[0133] Alternatively, the UE determines the target transmit power based on the maximum transmit power and the resource ratio, which can be the resource ratio of the third part of resources to the second type of SRS resources. At the target transmit power, the UE sends SRS to the base station based on the third part of resources.

[0134] Alternatively, the UE receives transmit power indication information from the base station, and if the transmit power indication information is the first indication information, determines the target transmit power based on the maximum transmit power; if the transmit power indication information is the second indication information, determines the target transmit power based on the maximum transmit power and the resource ratio. At the target transmit power, the UE sends the SRS to the base station based on the third portion of resources.

[0135] Case 2: an SRS resource set (SRS resource set) is configured for the SBFD time slot / SBFD symbol and the non-SBFD time slot / non-SBFD symbol, and the SRS resource set is recorded as a third SRS resource set.

[0136] Referring to Figure 5, there is a schematic diagram illustrating the configuration of SRS resource sets for SBFD time slots / SBFD symbols and non-SBFD time slots / non-SBFD symbols. SRS resource set 3 is a third SRS resource set. The SBFD time-frequency resources include uplink subbands, and SRS resources are configured in the uplink subbands of the SBFD time-frequency resources. That is, SRS resource set 3 includes multiple third-category SRS resources, and the third-category SRS resources overlap with the uplink subbands of the SBFD time-frequency resources. Alternatively, SRS resources are configured in UL time slots or UL symbols. That is, SRS resource set 3 includes multiple third-category SRS resources, and the third-category SRS resources are located in uplink time slots or uplink symbols.

[0137] Referring to the above scenario, the base station allocates SRS resource set 3 to the UE, SRS resource set 3 includes multiple third-type SRS resources overlapping with the uplink subband of the SBFD time-frequency resources, and / or, SRS resource set 3 includes multiple third-type SRS resources located in the uplink time slot or uplink symbol.

[0138] The base station sends third configuration information corresponding to SRS resource set 3 to the UE. After receiving the third configuration information, the UE determines SRS resource set 3 based on the third configuration information. The third configuration information is dynamic resource configuration information or semi-static resource configuration information. After obtaining SRS resource set 3, the UE sends an SRS to the base station based on the third type of SRS resources in SRS resource set 3, and the base station receives the SRS based on the third type of SRS resources in SRS resource set 3.

[0139] In one example, the multiple third-category SRS resources in SRS resource set 3 may be contiguous SRS resources. FIG6A illustrates a schematic diagram of the multiple third-category SRS resources being contiguous SRS resources. The multiple third-category SRS resources in SRS resource set 3 may also be non-contiguous SRS resources located in different time slots. FIG6B illustrates a schematic diagram of the multiple third-category SRS resources being non-contiguous SRS resources.

[0140] In an example, for each third type SRS resource in the third SRS resource set, if the third type SRS resource is located in an uplink time slot or uplink symbol, the SRS transmission method based on the third type SRS resource can refer to the SRS transmission method based on the second type SRS resource.

[0141] For example, if there is no SBFD time-frequency resource in the uplink time slot or uplink symbol, the UE may send an SRS to the base station based on the third type of SRS resources.

[0142] Alternatively, if the uplink time slot or uplink symbol has SBFD time-frequency resources, and the SBFD time-frequency resources include downlink subbands, and the third type of SRS resources do not overlap with the downlink subbands of the SBFD time-frequency resources, the UE sends SRS to the base station based on the third type of SRS resources.

[0143] Alternatively, if there is SBFD time-frequency resource in the uplink time slot or uplink symbol, and the SBFD time-frequency resource includes a downlink subband, and the third type of SRS resource coincides with the downlink subband of the SBFD time-frequency resource, then the UE can use method 31, or method 32, or method 33, or method 34, or method 35 to send SRS to the base station, which will not be repeated here.

[0144] In one example, for each third-category SRS resource in the third SRS resource set, if the third-category SRS resource is located in a downlink time slot, downlink symbol, F time slot, or F symbol, and the third-category SRS resource is located within the uplink subband of the SBFD time-frequency resource, that is, does not exceed the range of the uplink subband of the SBFD time-frequency resource, that is, the third-category SRS resource is smaller than the uplink subband of the SBFD time-frequency resource, then the UE can send an SRS to the base station based on the third-category SRS resource. For example, based on the third-category SRS resource, the UE can send an SRS to the base station based on the target bandwidth configuration list.

[0145] In an example, for each third-category SRS resource in the third SRS resource set, if the third-category SRS resource is located in a downlink time slot, a downlink symbol, an F time slot or an F symbol, and the third-category SRS resource exceeds the range of the uplink subband of the SBFD time-frequency resource, that is, the third-category SRS resource includes the fifth part of resources that does not exceed the uplink subband range and the sixth part of resources that has exceeded the uplink subband range, then the UE can send SRS to the base station based on the fifth part of resources and / or the sixth part of resources.

[0146] Mode 41: The UE sends an SRS to the base station based on the fifth part of the resources in the third type of SRS resources, and sends an SRS to the base station based on the sixth part of the resources in the third type of SRS resources.

[0147] For example, if the SBFD time-frequency resource is located in a downlink time slot or downlink symbol, or the SBFD time-frequency resource is located in an F time slot or F symbol, the UE is allowed to send SRS on resources outside the uplink subband of the SBFD time-frequency resource, and the UE sends SRS to the base station based on the fifth part of the resources and the sixth part of the resources.

[0148] Mode 42: The UE sends an SRS to the base station based on the fifth part of the third type of SRS resources, and is prohibited from sending an SRS to the base station based on the sixth part of the third type of SRS resources.

[0149] For example, if the SBFD time-frequency resource is located in a downlink time slot or downlink symbol, or the SBFD time-frequency resource is located in an F time slot or F symbol, the UE is not allowed to send SRS on resources outside the uplink subband of the SBFD time-frequency resource. The UE sends SRS to the base station based on the fifth part of the resources in the third category of SRS resources, and is prohibited from sending SRS to the base station based on the sixth part of the resources in the third category of SRS resources.

[0150] Mode 43: The UE is prohibited from sending SRS to the base station based on the fifth part of resources in the third type of SRS resources, and is prohibited from sending SRS to the base station based on the sixth part of resources in the third type of SRS resources.

[0151] For example, if the third type of SRS resources includes the sixth part of resources that exceeds the uplink subband range of the SBFD time-frequency resources, it is considered that the configuration is wrong, and therefore, the SRS is prohibited from being sent to the base station.

[0152] Method 44: If the SBFD time-frequency resources are located in the downlink time slot or downlink symbol, the UE can send SRS to the base station based on the fifth part of the resources, and prohibit sending SRS to the base station based on the sixth part of the resources, or prohibit sending SRS to the base station based on the fifth part of the resources, and prohibit sending SRS to the base station based on the sixth part of the resources; if the SBFD time-frequency resources are located in the F time slot or F symbol, the UE can send SRS to the base station based on the fifth part of the resources, and send SRS to the base station based on the sixth part of the resources.

[0153] For example, if the SBFD time-frequency resources are located in the downlink time slot or downlink symbol, the UE is not allowed to send SRS on resources outside the uplink subband of the SBFD time-frequency resources. Based on this, the UE sends SRS to the base station based on the fifth part of resources and is prohibited from sending SRS to the base station based on the sixth part of resources, or is prohibited from sending SRS to the base station based on the fifth part of resources and is prohibited from sending SRS to the base station based on the sixth part of resources.

[0154] Alternatively, if the SBFD time-frequency resources are located in the F time slot or F symbol, the UE is allowed to send SRS on resources outside the uplink subband of the SBFD time-frequency resources. Based on this, the UE can send SRS to the base station based on the fifth part of the resources and send SRS to the base station based on the sixth part of the resources.

[0155] Method 45: The UE receives SRS transmission indication information from the base station. If the SRS transmission indication information allows the sending of SRS through the sixth part of resources, the UE may send SRS to the base station based on the fifth part of resources, and send SRS to the base station based on the sixth part of resources; or, if the SRS transmission indication information does not allow the sending of SRS through the sixth part of resources, the UE may send SRS to the base station based on the fifth part of resources, and prohibit sending SRS to the base station based on the sixth part of resources, or prohibit sending SRS to the base station based on the fifth part of resources, and prohibit sending SRS to the base station based on the sixth part of resources.

[0156] For example, the base station can indicate whether to allow the UE to send SRS on resources other than the uplink subband of the SBFD time-frequency resources through signaling (such as 1 or 2 bits of signaling, which is referred to as SRS transmission indication information). For example, the base station can send the SRS transmission indication information to the UE through a DCI message, a MAC CE message, or an RRC message. If the SRS transmission indication information is used to allow the UE to send SRS on resources other than the uplink subband of the SBFD time-frequency resources, the UE sends the SRS to the base station based on the fifth part of resources and the sixth part of resources. If the SRS transmission indication information is used to not allow the UE to send SRS on resources other than the uplink subband of the SBFD time-frequency resources, the UE sends the SRS to the base station based on the fifth part of resources and is prohibited from sending the SRS to the base station based on the sixth part of resources, or is prohibited from sending the SRS to the base station based on the fifth part of resources and is prohibited from sending the SRS to the base station based on the sixth part of resources.

[0157] In an example, if the UE is not allowed to transmit the SRS on resources other than the uplink sub-band of the SBFD time-frequency resources, the transmit power of the SRS may also be controlled.

[0158] For example, the UE determines the target transmit power based on the maximum transmit power, and at the target transmit power, the UE sends the SRS to the base station based on the fifth part of resources. Or,

[0159] The UE determines the target transmit power based on the maximum transmit power and the resource ratio, which can be the resource ratio of the fifth part of resources to the third type of SRS resources. Under the target transmit power, the UE sends SRS to the base station based on the fifth part of resources. Or,

[0160] The UE receives transmit power indication information from the base station. If the transmit power indication information is the first indication information, the target transmit power is determined based on the maximum transmit power. If the transmit power indication information is the second indication information, the target transmit power is determined based on the maximum transmit power and the resource ratio. At the target transmit power, the UE sends the SRS to the base station based on the fifth part of the resources.

[0161] In one example, the base station may further send SRS resource indication information to the UE, and the UE receives the SRS resource indication information, where the SRS resource indication information is used to indicate whether to allow SRS transmission on SRS resources that overlap with the uplink subband of the SBFD time-frequency resources, or to prohibit SRS transmission on SRS resources that overlap with the uplink subband of the SBFD time-frequency resources. If SRS transmission on SRS resources that overlap with the uplink subband of the SBFD time-frequency resources is prohibited, the UE will not transmit SRS on SRS resources that overlap with the uplink subband.

[0162] For example, for aperiodic, semi-persistent, and periodic SRS transmission processes, the base station can use 1-bit signaling (i.e., SRS resource indication information) to indicate whether SRS transmission is allowed in SRS resources that overlap with the uplink subband of the SBFD time-frequency resources. For example, if the bit is 1, SRS transmission is allowed, and if the bit is 0, SRS transmission is not allowed, thereby reducing the processing complexity of the UE.

[0163] As can be seen from the above technical solution, the UE uses the SRS resources in the SRS resource set to transmit SRS. When the SBFD time-frequency resources overlap with the SRS resources, the SBFD time-frequency resources are used for SRS transmission, thereby improving the transmission reliability of uplink data and the cell coverage radius, enhancing the accuracy of downlink beamforming and the real-time performance of beam tracking, reducing the uplink and downlink interference caused by the introduction of SBFD time-frequency resources, and enabling the effective combination and implementation of SBFD time-frequency resource configuration and SRS transmission mechanism. From a system perspective, it can support SRS transmission in TDD systems, improve resource utilization, and improve network coverage and network capacity, increase uplink transmission resources and cell coverage, reduce uplink transmission delay, and increase uplink transmission capacity.

[0164] Based on the same inventive concept, an SRS transmission device, a base station, and a UE corresponding to the above-mentioned SRS transmission method are also provided. Since the principles of solving the problems by the base station and the UE are similar to those of the SRS transmission method, the implementation of the base station and the UE can refer to the implementation of the SRS transmission method, and the repeated parts will not be repeated.

[0165] Based on the same application concept as the above method, this application proposes an SRS transmission device as an example, which is applied to a user equipment, as shown in FIG7A , and includes:

[0166] The receiving module 711 is configured to receive SRS resource configuration information sent by a base station; wherein the SRS resource configuration information is used to indicate an SRS resource set; wherein the SRS resource set includes SRS resources that overlap with an uplink subband of an SBFD time-frequency resource;

[0167] The sending module 712 is configured to send an SRS to a base station based on the SRS resources in the SRS resource set.

[0168] In one example, the SRS resource configuration information includes first configuration information of a first SRS resource set and second configuration information of a second SRS resource set, the first configuration information is used to indicate the first SRS resource set, and the second configuration information is used to indicate the second SRS resource set; wherein, the first SRS resource set includes multiple first-type SRS resources overlapping with the uplink subband of the SBFD time-frequency resource, and the second SRS resource set includes multiple second-type SRS resources located in the uplink time slot or uplink symbol; or,

[0169] The SRS resource configuration information includes third configuration information of an SRS resource set, where the third configuration information is used to indicate a third SRS resource set, where the third SRS resource set includes multiple third-category SRS resources, and the multiple third-category SRS resources include at least SRS resources that overlap with the uplink subband of the SBFD time-frequency resources; wherein the multiple third-category SRS resources are continuous SRS resources, or the multiple third-category SRS resources are non-continuous SRS resources located in different time slots.

[0170] In one example, the apparatus further includes: an acquisition module, configured to acquire a preconfigured target bandwidth configuration list, where the target bandwidth configuration list is generated based on an initial bandwidth configuration list; wherein, if the number of PRBs between adjacent first physical layer resources and second physical layer resources in the initial bandwidth configuration list is greater than a preset threshold, then adding an intermediate physical layer resource to the initial bandwidth configuration list to obtain a target bandwidth configuration list; wherein the number of PRBs between the first physical layer resource and the intermediate physical layer resource is not greater than a preset threshold, and the number of PRBs between the intermediate physical layer resource and the second physical layer resource is not greater than a preset threshold;

[0171] The sending module 712 is specifically used to send the SRS to the base station based on the SRS resources in the first SRS resource set: if the first type of SRS resources in the first SRS resource set does not exceed the range of the uplink subband of the SBFD time-frequency resources, then based on the first type of SRS resources in the first SRS resource set, send the SRS to the base station based on the target bandwidth configuration list.

[0172] In an example, if the first type of SRS resources in the first SRS resource set includes a first portion of resources that does not exceed the uplink subband range of the SBFD time-frequency resources and a second portion of resources that exceeds the uplink subband range of the SBFD time-frequency resources; the sending module 712 is specifically used to send the SRS to the base station based on the SRS resources in the first SRS resource set: send the SRS to the base station based on the first portion of resources in the first type of SRS resources, and send the SRS to the base station based on the second portion of resources in the first type of SRS resources; or,

[0173] Sending an SRS to the base station based on a first portion of resources in the first type of SRS resources, and prohibiting sending an SRS to the base station based on a second portion of resources in the first type of SRS resources; or,

[0174] Prohibit the transmission of SRS to the base station based on the first part of resources in the first type of SRS resources, and prohibit the transmission of SRS to the base station based on the second part of resources in the first type of SRS resources; or

[0175] If the SBFD time-frequency resource is located in a downlink time slot or a downlink symbol, then an SRS is sent to the base station based on the first part of the resources in the first category of SRS resources, and it is prohibited to send an SRS to the base station based on the second part of the resources in the first category of SRS resources, or, it is prohibited to send an SRS to the base station based on the first part of the resources in the first category of SRS resources, and it is prohibited to send an SRS to the base station based on the second part of the resources in the first category of SRS resources; if the SBFD time-frequency resource is located in an F time slot or an F symbol, then an SRS is sent to the base station based on the first part of the resources in the first category of SRS resources, and it is prohibited to send an SRS to the base station based on the second part of the resources in the first category of SRS resources; or,

[0176] Receive SRS transmission indication information from the base station, and if the SRS transmission indication information allows sending SRS through the second part of resources, send SRS to the base station based on the first part of resources in the first category of SRS resources, and send SRS to the base station based on the second part of resources in the first category of SRS resources; if the SRS transmission indication information does not allow sending SRS through the second part of resources, send SRS to the base station based on the first part of resources in the first category of SRS resources, and prohibit sending SRS to the base station based on the second part of resources in the first category of SRS resources, or prohibit sending SRS to the base station based on the first part of resources in the first category of SRS resources, and prohibit sending SRS to the base station based on the second part of resources in the first category of SRS resources.

[0177] In one example, if it is prohibited to send an SRS to a base station based on the second part of resources in the first category of SRS resources, the sending module 712 is specifically used to send an SRS to the base station based on the first part of resources in the first category of SRS resources: determine the target transmit power based on the maximum transmit power; or determine the target transmit power based on the maximum transmit power and the resource ratio; or receive transmit power indication information from the base station, if the transmit power indication information is the first indication information, determine the target transmit power based on the maximum transmit power, if the transmit power indication information is the second indication information, determine the target transmit power based on the maximum transmit power and the resource ratio; wherein the resource ratio is the resource ratio of the first part of resources to the first category of SRS resources;

[0178] Send an SRS to a base station based on the first portion of resources at the target transmit power.

[0179] In one example, for each second-category SRS resource in the second SRS resource set, if the uplink time slot or uplink symbol where the second-category SRS resource is located includes a downlink subband of the SBFD time-frequency resource, and the second-category SRS resource includes a third part of resources that are not located in the downlink subband range and a fourth part of resources located in the downlink subband range; when the sending module 712 sends the SRS to the base station based on the SRS resources in the second SRS resource set, it is specifically used to: send the SRS to the base station based on the third part of the resources in the second-category SRS resources, and prohibit sending the SRS to the base station based on the fourth part of the resources in the second-category SRS resources; or,

[0180] Sending an SRS to the base station based on a third portion of resources in the second type of SRS resources, and sending an SRS to the base station based on a fourth portion of resources in the second type of SRS resources; or,

[0181] Prohibit sending SRS to the base station based on the third part of the second-type SRS resources, and prohibit sending SRS to the base station based on the fourth part of the second-type SRS resources; or

[0182] If the third part of the second-type SRS resources includes two non-contiguous resources located on both sides of the downlink subband, sending the SRS to the base station based on the two non-contiguous resources, and prohibiting sending the SRS to the base station based on the fourth part of the second-type SRS resources; or

[0183] If the third part of resources includes two non-continuous resources located on both sides of the downlink subband, the two non-continuous resources are cascaded to obtain continuous resources, SRS is sent to the base station based on the continuous resources, and it is prohibited to send SRS to the base station based on the fourth part of resources in the second type of SRS resources.

[0184] In one example, the sending module 712 is specifically configured to send an SRS to the base station based on the SRS resources in the third SRS resource set: for each third type of SRS resource in the third SRS resource set, if the third type of SRS resource is located in an uplink time slot or an uplink symbol, send an SRS to the base station based on the third type of SRS resource; or,

[0185] If the third type of SRS resources are located in a downlink time slot, a downlink symbol, an F time slot or an F symbol, and the third type of SRS resources are located within the uplink subband of the SBFD time-frequency resources, then the SRS is sent to the base station based on the third type of SRS resources; if the third type of SRS resources include a fifth part of resources that does not exceed the uplink subband range and a sixth part of resources that has exceeded the uplink subband range, then the SRS is sent to the base station based on the fifth part of resources and / or the sixth part of resources.

[0186] In one example, when the sending module 712 sends the SRS to the base station based on the fifth part of resources and / or the sixth part of resources, it is specifically configured to: send the SRS to the base station based on the fifth part of resources, and send the SRS to the base station based on the sixth part of resources; or,

[0187] Sending an SRS to the base station based on the fifth part of resources, and prohibiting sending an SRS to the base station based on the sixth part of resources; or

[0188] Prohibit sending SRS to the base station based on the fifth part of resources, prohibit sending SRS to the base station based on the sixth part of resources; or,

[0189] If the SBFD time-frequency resources are located in a downlink time slot or downlink symbol, an SRS is sent to the base station based on the fifth part of resources, and it is prohibited to send an SRS to the base station based on the sixth part of resources, or it is prohibited to send an SRS to the base station based on the fifth part of resources, and it is prohibited to send an SRS to the base station based on the sixth part of resources; if the SBFD time-frequency resources are located in an F time slot or an F symbol, an SRS is sent to the base station based on the fifth part of resources, and it is prohibited to send an SRS to the base station based on the sixth part of resources; or,

[0190] Receive SRS transmission indication information from the base station. If the SRS transmission indication information allows sending the SRS through the sixth part of resources, send the SRS to the base station based on the fifth part of resources, and send the SRS to the base station based on the sixth part of resources; if the SRS transmission indication information does not allow sending the SRS through the sixth part of resources, send the SRS to the base station based on the fifth part of resources, and prohibit sending the SRS to the base station based on the sixth part of resources, or prohibit sending the SRS to the base station based on the fifth part of resources, and prohibit sending the SRS to the base station based on the sixth part of resources.

[0191] In one example, the receiving module 711 is further used to receive SRS resource indication information from the base station; wherein the SRS resource indication information is used to indicate that SRS is allowed to be sent on SRS resources that overlap with the uplink subband of the SBFD time-frequency resources, or that SRS is prohibited from being sent on SRS resources that overlap with the uplink subband of the SBFD time-frequency resources.

[0192] Based on the same application concept as the above method, this application proposes an SRS transmission device as an example, which is applied to a base station, as shown in FIG7B . The device includes:

[0193] a sending module 721, configured to send sounding reference signal (SRS) resource configuration information to a user equipment, wherein the SRS resource configuration information is used to indicate an SRS resource set used by the user equipment, and the SRS resource set includes an SRS resource that coincides with an uplink subband of a sub-band full-duplex (SBFD) time-frequency resource;

[0194] The receiving module 722 is configured to receive the SRS sent by the user equipment based on the SRS resources in the SRS resource set.

[0195] In one example, when the sending module 721 sends SRS resource configuration information to the user equipment, it is specifically used to: if the user equipment corresponds to a first SRS resource set and a second SRS resource set, send the first configuration information corresponding to the first SRS resource set and the second configuration information corresponding to the second SRS resource set to the user equipment; wherein, the first SRS resource set includes a plurality of first-type SRS resources overlapping with the uplink subband of the SBFD time-frequency resource, and the second SRS resource set includes a plurality of second-type SRS resources located in an uplink time slot or an uplink symbol; or,

[0196] If the user equipment corresponds to a third SRS resource set, the third configuration information corresponding to the third SRS resource set is sent to the user equipment; wherein the third SRS resource set includes multiple third-category SRS resources, and the multiple third-category SRS resources at least include SRS resources that overlap with the uplink subband of the SBFD time-frequency resources; the multiple third-category SRS resources are continuous SRS resources, or the multiple third-category SRS resources are non-continuous SRS resources located in different time slots.

[0197] In one example, the device also includes: an acquisition module, used to obtain a pre-configured target bandwidth configuration list, where the target bandwidth configuration list is generated based on an initial bandwidth configuration list; if the number of PRBs between adjacent first physical layer resources and second physical layer resources in the initial bandwidth configuration list is greater than a preset threshold, then the intermediate physical layer resources are added to the initial bandwidth configuration list to obtain a target bandwidth configuration list; wherein the number of PRBs between the first physical layer resources and the intermediate physical layer resources is not greater than the preset threshold, and the number of PRBs between the intermediate physical layer resources and the second physical layer resources is not greater than the preset threshold.

[0198] In one example, the sending module 721 is further used to send SRS resource indication information to the user equipment; wherein the SRS resource indication information is used to indicate that SRS is allowed to be sent in SRS resources that coincide with the uplink subband of the SBFD time-frequency resources, or that SRS is prohibited from being sent in SRS resources that coincide with the uplink subband of the SBFD time-frequency resources.

[0199] Based on the same application concept as the above method, a base station is proposed in an example of the present application, as shown in Figure 8A. The base station may include a processor 811 and a machine-readable storage medium 812, and the machine-readable storage medium 812 stores machine-executable instructions that can be executed by the processor 811; the processor 811 is used to execute the machine-executable instructions to implement the SRS transmission method disclosed in the above example of the present application.

[0200] In one example, the processor 811 may include one or more processing cores, such as a 4-core processor, an 8-core processor, etc. The processor 811 may be implemented in at least one hardware form of DSP (Digital Signal Processing), FPGA (Field-Programmable Gate Array), and PLA (Programmable Logic Array). The processor 811 may also include a main processor and a coprocessor. The main processor is a processor for processing data in the awake state, also known as a CPU (Central Processing Unit); the coprocessor is a low-power processor for processing data in the standby state. In some embodiments, the processor 811 may be integrated with a GPU (Graphics Processing Unit), which is responsible for rendering and drawing the content to be displayed on the display screen.

[0201] In one example, the base station may optionally include a peripheral device interface 813 and at least one peripheral device. The processor 811 and the peripheral device interface 813 may be connected via a bus or signal lines. Each peripheral device may be connected to the peripheral device interface 813 via a bus, signal lines, or circuit boards. The peripheral device may include at least one of a radio frequency circuit 814 and a power supply 815.

[0202] The radio frequency circuit 814 is used to receive and transmit RF (Radio Frequency) signals, also known as electromagnetic signals. The radio frequency circuit 814 communicates with communication networks and other communication devices via electromagnetic signals. The radio frequency circuit 814 converts electrical signals into electromagnetic signals for transmission, or converts received electromagnetic signals into electrical signals. Optionally, the radio frequency circuit 814 includes: an antenna system, an RF transceiver, one or more amplifiers, a tuner, an oscillator, a digital signal processor, a user identity module card, etc. The radio frequency circuit 814 can communicate with user equipment via at least one wireless communication protocol. The wireless communication protocol includes, but is not limited to: the World Wide Web, a metropolitan area network, an intranet, various generations of mobile communication networks (2G, 3G, 4G, and 5G), a wireless local area network, and / or a WiFi (Wireless Fidelity) network.

[0203] The power supply 815 is used to supply power to various components in the base station. The power supply 815 can be alternating current, direct current, a disposable battery, or a rechargeable battery.

[0204] For example, when the processor 811 executes machine-executable instructions, it controls the radio frequency circuit 814 to implement the following steps: receiving SRS resource configuration information sent by the base station; wherein the SRS resource configuration information is used to indicate an SRS resource set, and the SRS resource set includes SRS resources that overlap with the uplink subband of the SBFD time-frequency resources; and sending SRS to the base station based on the SRS resources in the SRS resource set.

[0205] Based on the same application concept as the above method, a user device is proposed in an example of the present application, as shown in Figure 8B, the user device may include a processor 821 and a machine-readable storage medium 822, and the machine-readable storage medium 822 stores machine-executable instructions that can be executed by the processor 821; the processor 821 is used to execute the machine-executable instructions to implement the SRS transmission method disclosed in the above example of the present application.

[0206] In one example, the processor 821 may include one or more processing cores, such as a quad-core processor, an octal-core processor, etc. The processor 821 may be implemented in at least one hardware form selected from the group consisting of a DSP, an FPGA, and a PLA. The processor 821 may also include a main processor and a coprocessor.

[0207] In one example, the user device further includes a peripheral device interface 823 and at least one peripheral device. The processor 821 and the peripheral device interface 823 may be connected via a bus or signal lines. Each peripheral device may be connected to the peripheral device interface 823 via a bus, signal lines, or circuit boards. The peripheral device may include at least one of a radio frequency circuit 824, a touch screen display 825, a camera 826, and a power supply 827.

[0208] The radio frequency circuit 824 is used to receive and transmit RF signals, also known as electromagnetic signals. The radio frequency circuit 824 communicates with the communication network and other communication devices via electromagnetic signals. The radio frequency circuit 824 converts electrical signals into electromagnetic signals for transmission, or converts received electromagnetic signals into electrical signals. Optionally, the radio frequency circuit 824 includes: an antenna system, an RF transceiver, one or more amplifiers, a tuner, an oscillator, a digital signal processor, a subscriber identity module card, etc. The radio frequency circuit 824 can communicate with the base station via at least one wireless communication protocol. Such wireless communication protocols include, but are not limited to, the World Wide Web, a metropolitan area network, an intranet, various generations of mobile communication networks, a wireless local area network, and / or WiFi.

[0209] The display screen 825 is used to display a UI (User Interface). The UI may include graphics, text, icons, videos, and any combination thereof. When the display screen 825 is a touch screen display, the display screen 825 also has the ability to collect touch signals on or above the surface of the display screen 825. The touch signals can be input as control signals to the processor 821 for processing. In this case, the display screen 825 can also be used to provide virtual buttons and / or virtual keyboards, also known as soft buttons and / or soft keyboards.

[0210] In some embodiments, the display screen 825 can be one, set on the front panel of the user device; in other embodiments, the display screen 825 can be at least two, set on different surfaces of the user device or in a folding design; in still other embodiments, the display screen 825 can be a flexible display screen, set on a curved surface or a folding surface of the user device. Even more, the display screen 825 can be set into a non-rectangular irregular shape, that is, a special-shaped screen. The display screen 825 can be made of materials such as LCD (Liquid Crystal Display) and OLED (Organic Light-Emitting Diode).

[0211] The camera assembly 826 is used to capture images or videos. Optionally, the camera assembly 826 includes a front camera and a rear camera. Typically, the front camera is set on the front panel of the user device, and the rear camera is set on the back of the user device. In some embodiments, there are at least two rear cameras, which are any one of a main camera, a depth of field camera, a wide-angle camera, and a telephoto camera, so as to realize the fusion of the main camera and the depth of field camera to realize the background blur function, the fusion of the main camera and the wide-angle camera to realize panoramic shooting and VR (Virtual Reality) shooting function or other fusion shooting functions. In some embodiments, the camera assembly 826 may also include a flash. The flash can be a single-color temperature flash or a dual-color temperature flash. A dual-color temperature flash refers to a combination of a warm light flash and a cold light flash, which can be used for light compensation at different color temperatures.

[0212] Power supply 827 is used to power various components in the user device. Power supply 827 can be AC ​​power, DC power, a disposable battery, or a rechargeable battery. When power supply 827 includes a rechargeable battery, the rechargeable battery can be a wired rechargeable battery or a wireless rechargeable battery. A wired rechargeable battery is a battery that is charged via a wired line, while a wireless rechargeable battery is a battery that is charged via a wireless coil. The rechargeable battery can also be used to support fast charging technology.

[0213] For example, when the processor 821 executes machine-executable instructions, it controls the radio frequency circuit 824 to implement the following steps: sending SRS resource configuration information to the user equipment, where the SRS resource configuration information is used to indicate the SRS resource set used by the user equipment, and the SRS resource set includes SRS resources that overlap with the uplink subband of the SBFD time-frequency resources; and receiving the SRS sent by the user equipment based on the SRS resources in the SRS resource set.

[0214] Based on the same application concept as the above method, an example of this application also provides a machine-readable storage medium, on which a number of computer instructions are stored. When the computer instructions are executed by a processor, the SRS transmission method disclosed in the above example of this application can be implemented.

[0215] The machine-readable storage medium may be any electronic, magnetic, optical, or other physical storage device that may contain or store information, such as executable instructions, data, and the like. For example, the machine-readable storage medium may be: RAM (Random Access Memory), volatile memory, non-volatile memory, flash memory, a storage drive (such as a hard disk drive), a solid-state drive, any type of storage disk (such as a CD, DVD, etc.), or similar storage media, or a combination thereof.

[0216] The systems, devices, modules, or units described in the above embodiments may be implemented by a computer entity or by a product having certain functions. A typical implementation device is a computer, which may be in the form of a personal computer, laptop computer, cellular phone, camera phone, smartphone, personal digital assistant, media player, navigation device, email transceiver, game console, tablet computer, wearable device, or any combination of these devices.

[0217] The foregoing is merely an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present application should all be included within the scope of the claims of the present application.

Claims

1. A SRS transmission method, characterized in that: Applied to user equipment, the method includes: Receive sounding reference signal SRS resource configuration information sent by a base station; wherein the SRS resource configuration information is used to indicate an SRS resource set, and the SRS resource set includes an SRS resource that overlaps with an uplink subband of a subband full-duplex SBFD time-frequency resource; The SRS is sent to the base station based on the SRS resources in the SRS resource set.

2. The method according to claim 1, characterized in that: The SRS resource configuration information includes first configuration information of a first SRS resource set and second configuration information of a second SRS resource set, the first configuration information is used to indicate the first SRS resource set, and the second configuration information is used to indicate the second SRS resource set; wherein the first SRS resource set includes a plurality of first-type SRS resources overlapping with an uplink subband of an SBFD time-frequency resource, and the second SRS resource set includes a plurality of second-type SRS resources located in an uplink time slot or an uplink symbol; or, The SRS resource configuration information includes third configuration information of an SRS resource set, and the third configuration information is used to indicate a third SRS resource set, and the third SRS resource set includes multiple third-category SRS resources, and the multiple third-category SRS resources at least include SRS resources that overlap with the uplink subband of the SBFD time-frequency resources; wherein the multiple third-category SRS resources are continuous SRS resources, or the multiple third-category SRS resources are non-continuous SRS resources located in different time slots.

3. The method according to claim 2, characterized in that The method further includes: obtaining a preconfigured target bandwidth configuration list, where the target bandwidth configuration list is generated based on the initial bandwidth configuration list; wherein, if the number of PRBs between adjacent first physical layer resources and second physical layer resources in the initial bandwidth configuration list is greater than a preset threshold, adding the intermediate physical layer resource to the initial bandwidth configuration list to obtain the target bandwidth configuration list; wherein the number of PRBs between the first physical layer resource and the intermediate physical layer resource is not greater than the preset threshold, and the number of PRBs between the intermediate physical layer resource and the second physical layer resource is not greater than the preset threshold; The sending an SRS to a base station based on the SRS resources in the first SRS resource set includes: If the first type of SRS resources in the first SRS resource set does not exceed the range of the uplink subband of the SBFD time-frequency resources, an SRS is sent to the base station based on the first type of SRS resources in the first SRS resource set and based on the target bandwidth configuration list.

4. The method according to claim 2, characterized in that: If the first type of SRS resources in the first SRS resource set includes a first part of resources that does not exceed the uplink subband range of the SBFD time-frequency resources and a second part of resources that exceeds the uplink subband range of the SBFD time-frequency resources; The sending an SRS to a base station based on the SRS resources in the first SRS resource set includes: Sending an SRS to a base station based on a first part of resources in the first type of SRS resources, and sending an SRS to a base station based on a second part of resources in the first type of SRS resources; or, Sending an SRS to a base station based on a first part of resources in the first type of SRS resources, and prohibiting sending an SRS to a base station based on a second part of resources in the first type of SRS resources; or, Prohibit sending SRS to the base station based on the first part of resources in the first type of SRS resources, and prohibit sending SRS to the base station based on the second part of resources in the first type of SRS resources; or, If the SBFD time-frequency resources are located in a downlink time slot or a downlink symbol, an SRS is sent to the base station based on the first part of the resources in the first category of SRS resources, and it is prohibited to send an SRS to the base station based on the second part of the resources in the first category of SRS resources, or, it is prohibited to send an SRS to the base station based on the first part of the resources in the first category of SRS resources, and it is prohibited to send an SRS to the base station based on the second part of the resources in the first category of SRS resources; if the SBFD time-frequency resources are located in an F time slot or an F symbol, an SRS is sent to the base station based on the first part of the resources in the first category of SRS resources, and an SRS is sent to the base station based on the second part of the resources in the first category of SRS resources; or, Receive SRS transmission indication information from the base station, and if the SRS transmission indication information allows sending the SRS through the second part of resources, send the SRS to the base station based on the first part of resources in the first category of SRS resources, and send the SRS to the base station based on the second part of resources in the first category of SRS resources; if the SRS transmission indication information does not allow sending the SRS through the second part of resources, send the SRS to the base station based on the first part of resources in the first category of SRS resources, and prohibit sending the SRS to the base station based on the second part of resources in the first category of SRS resources, or prohibit sending the SRS to the base station based on the first part of resources in the first category of SRS resources, and prohibit sending the SRS to the base station based on the second part of resources in the first category of SRS resources.

5. The method according to claim 4, characterized in that If it is prohibited to send the SRS to the base station based on the second part of the first-type SRS resources, sending the SRS to the base station based on the first part of the first-type SRS resources includes: Determine the target transmit power based on the maximum transmit power; or determine the target transmit power based on the maximum transmit power and the resource ratio; or, receive transmit power indication information from the base station, if the transmit power indication information is the first indication information, determine the target transmit power based on the maximum transmit power, if the transmit power indication information is the second indication information, determine the target transmit power based on the maximum transmit power and the resource ratio; wherein the resource ratio is the resource ratio of the first part of resources to the first type of SRS resources; Sending an SRS to a base station based on the first part of resources at the target transmit power.

6. The method according to claim 2, characterized in that For each second-type SRS resource in the second SRS resource set, if the uplink time slot or uplink symbol where the second-type SRS resource is located includes a downlink subband of the SBFD time-frequency resource, and the second-type SRS resource includes a third part of resources that are not located in the downlink subband range and a fourth part of resources that are located in the downlink subband range; The sending the SRS to the base station based on the SRS resources in the second SRS resource set includes: Sending an SRS to a base station based on a third part of resources in the second type of SRS resources, and prohibiting sending an SRS to a base station based on a fourth part of resources in the second type of SRS resources; or, Sending an SRS to a base station based on a third part of resources in the second type of SRS resources, and sending an SRS to a base station based on a fourth part of resources in the second type of SRS resources; or, Prohibit sending SRS to the base station based on the third part of the second-type SRS resources, and prohibit sending SRS to the base station based on the fourth part of the second-type SRS resources; or, If the third part of the second type of SRS resources includes two non-contiguous resources located on both sides of the downlink subband, the SRS is sent to the base station based on the two non-contiguous resources, and the SRS is prohibited from being sent to the base station based on the fourth part of the second type of SRS resources; or, If the third part of resources includes two non-continuous resources located on both sides of the downlink subband, the two non-continuous resources are cascaded to obtain continuous resources, SRS is sent to the base station based on the continuous resources, and sending SRS to the base station based on the fourth part of resources in the second type of SRS resources is prohibited.

7. The method according to claim 2, characterized in that The sending the SRS to the base station based on the SRS resources in the third SRS resource set includes: For each third type of SRS resource in the third SRS resource set, if the third type of SRS resource is located in an uplink time slot or an uplink symbol, sending an SRS to the base station based on the third type of SRS resource; Alternatively, if the third type of SRS resources are located in a downlink time slot, a downlink symbol, an F time slot or an F symbol, and the third type of SRS resources are located within the uplink subband of the SBFD time-frequency resources, then the SRS is sent to the base station based on the third type of SRS resources; if the third type of SRS resources include a fifth portion of resources that does not exceed the uplink subband range and a sixth portion of resources that has exceeded the uplink subband range, then the SRS is sent to the base station based on the fifth portion of resources and / or the sixth portion of resources.

8. The method according to claim 7, characterized in that The sending the SRS to the base station based on the fifth part of resources and / or the sixth part of resources includes: Sending SRS to the base station based on the fifth part of resources, and sending SRS to the base station based on the sixth part of resources; or, sending SRS to the base station based on the fifth part of resources, and prohibiting sending SRS to the base station based on the sixth part of resources; or, prohibiting sending SRS to the base station based on the fifth part of resources, and prohibiting sending SRS to the base station based on the sixth part of resources; or, If the SBFD time-frequency resources are located in a downlink time slot or a downlink symbol, an SRS is sent to the base station based on the fifth part of the resources, and it is prohibited to send an SRS to the base station based on the sixth part of the resources, or it is prohibited to send an SRS to the base station based on the fifth part of the resources, and it is prohibited to send an SRS to the base station based on the sixth part of the resources; if the SBFD time-frequency resources are located in an F time slot or an F symbol, an SRS is sent to the base station based on the fifth part of the resources, and an SRS is sent to the base station based on the sixth part of the resources; or, Receive SRS transmission indication information from the base station, and if the SRS transmission indication information allows sending the SRS through the sixth part of resources, send the SRS to the base station based on the fifth part of resources, and send the SRS to the base station based on the sixth part of resources; if the SRS transmission indication information does not allow sending the SRS through the sixth part of resources, send the SRS to the base station based on the fifth part of resources, and prohibit sending the SRS to the base station based on the sixth part of resources, or prohibit sending the SRS to the base station based on the fifth part of resources, and prohibit sending the SRS to the base station based on the sixth part of resources.

9. The method according to any one of claims 1 to 8, characterized in that: The method further comprises: SRS resource indication information is received from the base station; wherein the SRS resource indication information is used to indicate that SRS is allowed to be sent in SRS resources that overlap with the uplink subband of the SBFD time-frequency resources, or that SRS is prohibited to be sent in SRS resources that overlap with the uplink subband of the SBFD time-frequency resources.

10. A SRS transmission method, characterized in that: Applied to a base station, the method comprises: Sending sounding reference signal SRS resource configuration information to a user equipment, wherein the SRS resource configuration information is used to indicate an SRS resource set used by the user equipment, and the SRS resource set includes an SRS resource overlapping with an uplink subband of a subband full-duplex SBFD time-frequency resource; Receive an SRS sent by the user equipment based on the SRS resources in the SRS resource set.

11. The method according to claim 10, characterized in that The sending SRS resource configuration information to the user equipment includes: If the user equipment corresponds to a first SRS resource set and a second SRS resource set, first configuration information corresponding to the first SRS resource set and second configuration information corresponding to the second SRS resource set are sent to the user equipment; wherein the first SRS resource set includes a plurality of first-type SRS resources overlapping with an uplink subband of an SBFD time-frequency resource, and the second SRS resource set includes a plurality of second-type SRS resources located in an uplink time slot or an uplink symbol; or, If the user equipment corresponds to a third SRS resource set, third configuration information corresponding to the third SRS resource set is sent to the user equipment; wherein the third SRS resource set includes multiple third-category SRS resources, and the multiple third-category SRS resources at least include SRS resources that overlap with the uplink subband of the SBFD time-frequency resources; the multiple third-category SRS resources are continuous SRS resources, or the multiple third-category SRS resources are non-continuous SRS resources located in different time slots.

12. The method according to claim 11, characterized in that The method also includes: obtaining a preconfigured target bandwidth configuration list, where the target bandwidth configuration list is generated based on an initial bandwidth configuration list; wherein, if the number of PRBs between adjacent first physical layer resources and second physical layer resources in the initial bandwidth configuration list is greater than a preset threshold, adding an intermediate physical layer resource to the initial bandwidth configuration list to obtain a target bandwidth configuration list; wherein the number of PRBs between the first physical layer resource and the intermediate physical layer resource is not greater than a preset threshold, and the number of PRBs between the intermediate physical layer resource and the second physical layer resource is not greater than a preset threshold.

13. The method according to claim 10, characterized in that The method further comprises: Sending SRS resource indication information to the user equipment; wherein the SRS resource indication information is used to indicate that the SRS is allowed to be sent in the SRS resource that overlaps with the uplink subband of the SBFD time-frequency resource, or that the SRS is prohibited in the uplink subband of the SBFD time-frequency resource. The SRS is sent with overlapping SRS resources.

14. An SRS transmission device, characterized in that: Applied to user equipment, the device comprises: A receiving module, configured to receive sounding reference signal SRS resource configuration information sent by a base station; wherein the SRS resource configuration information is used to indicate an SRS resource set; wherein the SRS resource set includes an SRS resource that overlaps with an uplink subband of a subband full-duplex SBFD time-frequency resource; The sending module is used to send the SRS to the base station based on the SRS resources in the SRS resource set.

15. The device according to claim 14, characterized in that The SRS resource configuration information includes first configuration information of a first SRS resource set and second configuration information of a second SRS resource set, the first configuration information is used to indicate the first SRS resource set, and the second configuration information is used to indicate the second SRS resource set; wherein the first SRS resource set includes a plurality of first-type SRS resources overlapping with an uplink subband of an SBFD time-frequency resource, and the second SRS resource set includes a plurality of second-type SRS resources located in an uplink time slot or an uplink symbol; or, The SRS resource configuration information includes third configuration information of an SRS resource set, and the third configuration information is used to indicate a third SRS resource set, and the third SRS resource set includes multiple third-category SRS resources, and the multiple third-category SRS resources at least include SRS resources that overlap with the uplink subband of the SBFD time-frequency resources; wherein the multiple third-category SRS resources are continuous SRS resources, or the multiple third-category SRS resources are non-continuous SRS resources located in different time slots.

16. The device according to claim 15, characterized in that The device also includes: an acquisition module, configured to acquire a preconfigured target bandwidth configuration list, wherein the target bandwidth configuration list is generated based on an initial bandwidth configuration list; wherein, if the number of PRBs between adjacent first physical layer resources and second physical layer resources in the initial bandwidth configuration list is greater than a preset threshold, then adding an intermediate physical layer resource to the initial bandwidth configuration list to obtain a target bandwidth configuration list; wherein the number of PRBs between the first physical layer resource and the intermediate physical layer resource is not greater than a preset threshold, and the number of PRBs between the intermediate physical layer resource and the second physical layer resource is not greater than a preset threshold; When the sending module sends the SRS to the base station based on the SRS resources in the first SRS resource set, it is specifically used to: if the first type of SRS resources in the first SRS resource set does not exceed the range of the uplink subband of the SBFD time-frequency resources, then based on the first type of SRS resources in the first SRS resource set, send the SRS to the base station based on the target bandwidth configuration list.

17. The device according to claim 15, characterized in that If the first type of SRS resources in the first SRS resource set includes a first part of resources that do not exceed the uplink subband range of the SBFD time-frequency resources and a second part of resources that exceed the uplink subband range of the SBFD time-frequency resources; the sending module sends the SRS to the base station based on the SRS resources in the first SRS resource set specifically for: Sending an SRS to a base station based on a first part of resources in the first type of SRS resources, and sending an SRS to a base station based on a second part of resources in the first type of SRS resources; or, Sending an SRS to a base station based on a first part of resources in the first type of SRS resources, and prohibiting sending an SRS to the base station based on a second part of resources in the first type of SRS resources; or, Prohibit sending an SRS to a base station based on a first part of resources in the first type of SRS resources, and prohibit sending an SRS to a base station based on a second part of resources in the first type of SRS resources; or, If the SBFD time-frequency resource is located in a downlink time slot or a downlink symbol, an SRS is sent to a base station based on a first part of the first type of SRS resources, and it is prohibited to send an SRS to a base station based on a second part of the first type of SRS resources, or it is prohibited to send an SRS to a base station based on a first part of the first type of SRS resources, and it is prohibited to send an SRS to a base station based on a second part of the first type of SRS resources; If the SBFD time-frequency resource is located in the F time slot or the F symbol, sending the SRS to the base station based on the first part of the resources in the first type of SRS resources, and sending the SRS to the base station based on the second part of the resources in the first type of SRS resources; or, receiving SRS transmission indication information from the base station, and if the SRS transmission indication information allows the SRS to be sent through the second part of resources, sending the SRS to the base station based on the first part of resources in the first type of SRS resources, and sending the SRS to the base station based on the second part of resources in the first type of SRS resources; If the SRS transmission indication information does not allow the sending of SRS through the second part of resources, then the SRS is sent to the base station based on the first part of the resources in the first category of SRS resources, and the sending of SRS to the base station based on the second part of the resources in the first category of SRS resources is prohibited, or the sending of SRS to the base station based on the first part of the resources in the first category of SRS resources is prohibited, and the sending of SRS to the base station based on the second part of the resources in the first category of SRS resources is prohibited.

18. The device according to claim 17, characterized in that If it is prohibited to send the SRS to the base station based on the second part of the first-type SRS resources, the sending module sends the SRS to the base station based on the first part of the first-type SRS resources specifically for: Determine the target transmit power based on the maximum transmit power; or determine the target transmit power based on the maximum transmit power and the resource ratio; or, receive transmit power indication information from the base station, if the transmit power indication information is the first indication information, determine the target transmit power based on the maximum transmit power, if the transmit power indication information is the second indication information, determine the target transmit power based on the maximum transmit power and the resource ratio; wherein the resource ratio is the resource ratio of the first part of resources to the first type of SRS resources; Sending an SRS to a base station based on the first part of resources at the target transmit power.

19. The device according to claim 15, characterized in that For each second type of SRS resource in the second SRS resource set, if the uplink time slot or uplink symbol where the second type of SRS resource is located includes a downlink subband of the SBFD time-frequency resource, and the second type of SRS resource includes a third part of resources that are not located in the downlink subband range and a fourth part of resources located in the downlink subband range; the sending module sends the SRS to the base station based on the SRS resources in the second SRS resource set, specifically for: Sending an SRS to a base station based on a third part of resources in the second type of SRS resources, and prohibiting sending an SRS to a base station based on a fourth part of resources in the second type of SRS resources; or, Sending an SRS to a base station based on a third portion of resources in the second type of SRS resources, and sending an SRS to a base station based on a fourth portion of resources in the second type of SRS resources; or, Prohibit sending an SRS to a base station based on a third part of resources in the second type of SRS resources, and prohibit sending an SRS to a base station based on a fourth part of resources in the second type of SRS resources; or, If the third part of the second type of SRS resources includes two non-contiguous resources located on both sides of the downlink subband, the SRS is sent to the base station based on the two non-contiguous resources, and the SRS is prohibited from being sent to the base station based on the fourth part of the second type of SRS resources; or, If the third part of resources includes two non-continuous resources located on both sides of the downlink subband, the two non-continuous resources are cascaded to obtain continuous resources, SRS is sent to the base station based on the continuous resources, and sending SRS to the base station based on the fourth part of resources in the second type of SRS resources is prohibited.

20. The device according to claim 15, characterized in that The sending module is specifically used to send the SRS to the base station based on the SRS resources in the third SRS resource set: For each third type of SRS resource in the third SRS resource set, if the third type of SRS resource is located in an uplink time slot or an uplink symbol, sending an SRS to the base station based on the third type of SRS resource; Alternatively, if the third type of SRS resource is located in a downlink time slot, a downlink symbol, an F time slot or an F symbol, and the third type of SRS resource is located within an uplink subband of the SBFD time-frequency resource, then an SRS is sent to the base station based on the third type of SRS resource; If the third type of SRS resources includes a fifth portion of resources that does not exceed the uplink subband range and a sixth portion of resources that exceeds the uplink subband range, an SRS is sent to a base station based on the fifth portion of resources and / or the sixth portion of resources.

21. The device according to claim 20, characterized in that When the sending module sends the SRS to the base station based on the fifth part of resources and / or the sixth part of resources, it is specifically used to: Sending an SRS to the base station based on the fifth part of resources, and sending an SRS to the base station based on the sixth part of resources; Alternatively, sending the SRS to the base station based on the fifth part of resources, and prohibiting sending the SRS to the base station based on the sixth part of resources; Alternatively, it is prohibited to send the SRS to the base station based on the fifth part of resources, and it is prohibited to send the SRS to the base station based on the sixth part of resources; or, If the SBFD time-frequency resource is located in a downlink time slot or a downlink symbol, an SRS is sent to the base station based on the fifth part of resources, and it is prohibited to send an SRS to the base station based on the sixth part of resources, or it is prohibited to send an SRS to the base station based on the fifth part of resources, and it is prohibited to send an SRS to the base station based on the sixth part of resources; If the SBFD time-frequency resource is located in the F time slot or the F symbol, the SRS is sent to the base station based on the fifth part of the resources, and the SRS is sent to the base station based on the sixth part of the resources; or, receiving SRS transmission indication information from the base station, and if the SRS transmission indication information allows the SRS to be sent through the sixth part of resources, sending the SRS to the base station based on the fifth part of resources, and sending the SRS to the base station based on the sixth part of resources; If the SRS transmission indication information does not allow the sending of SRS through the sixth part of resources, then the SRS is sent to the base station based on the fifth part of resources, and the sending of SRS to the base station based on the sixth part of resources is prohibited, or the sending of SRS to the base station based on the fifth part of resources is prohibited, and the sending of SRS to the base station based on the sixth part of resources is prohibited.

22. The device according to any one of claims 14 to 21, characterized in that The receiving module is also used to receive SRS resource indication information from the base station; wherein the SRS resource indication information is used to indicate that SRS is allowed to be sent in SRS resources that overlap with the uplink subband of the SBFD time-frequency resources, or that SRS is prohibited from being sent in SRS resources that overlap with the uplink subband of the SBFD time-frequency resources.

23. An SRS transmission device, characterized in that: Applied to a base station, the device comprises: A sending module, configured to send sounding reference signal SRS resource configuration information to a user equipment, wherein the SRS resource configuration information is used to indicate an SRS resource set used by the user equipment, and the SRS resource set includes an SRS resource overlapping with an uplink subband of a subband full-duplex SBFD time-frequency resource; The receiving module is used to receive the SRS sent by the user equipment based on the SRS resources in the SRS resource set.

24. The device according to claim 23, characterized in that When the sending module sends the SRS resource configuration information to the user equipment, it is specifically used to: If the user equipment corresponds to a first SRS resource set and a second SRS resource set, first configuration information corresponding to the first SRS resource set and second configuration information corresponding to the second SRS resource set are sent to the user equipment; wherein the first SRS resource set includes a plurality of first-type SRS resources overlapping with an uplink subband of an SBFD time-frequency resource, and the second SRS resource set includes a plurality of second-type SRS resources located in an uplink time slot or an uplink symbol; or, If the user equipment corresponds to a third SRS resource set, third configuration information corresponding to the third SRS resource set is sent to the user equipment; wherein the third SRS resource set includes multiple third-category SRS resources, and the multiple third-category SRS resources at least include SRS resources that overlap with the uplink subband of the SBFD time-frequency resources; the multiple third-category SRS resources are continuous SRS resources, or the multiple third-category SRS resources are non-continuous SRS resources located in different time slots.

25. The device according to claim 24, characterized in that The device also includes: an acquisition module, used to acquire a preconfigured target bandwidth configuration list, where the target bandwidth configuration list is generated based on an initial bandwidth configuration list; wherein, if the number of PRBs between adjacent first physical layer resources and second physical layer resources in the initial bandwidth configuration list is greater than a preset threshold, then adding an intermediate physical layer resource to the initial bandwidth configuration list to obtain a target bandwidth configuration list; wherein the number of PRBs between the first physical layer resource and the intermediate physical layer resource is not greater than a preset threshold, and the number of PRBs between the intermediate physical layer resource and the second physical layer resource is not greater than a preset threshold.

26. The device according to claim 23, characterized in that The sending module is also used to send SRS resource indication information to the user equipment; wherein the SRS resource indication information is used to indicate that SRS is allowed to be sent in SRS resources that overlap with the uplink subband of the SBFD time-frequency resources, or that SRS is prohibited from being sent in SRS resources that overlap with the uplink subband of the SBFD time-frequency resources.

27. A user equipment, characterized in that: include: a processor and a machine-readable storage medium storing machine-executable instructions executable by the processor; The processor is used to execute machine executable instructions to implement the method described in any one of claims 1-9.

28. A base station, characterized in that: include: a processor and a machine-readable storage medium storing machine-executable instructions executable by the processor; The processor is used to execute machine executable instructions to implement the method described in any one of claims 10-13.

Citation Information

Patent Citations

  • Sounding reference signal transmission method, terminal device and network device

    CN112134672A

  • Frequency division duplex sounding reference signal sending method, device, equipment and medium

    CN115395999A

  • Sounding reference signal (SRS) resource configuration techniques

    US20210391963A1

  • Sounding reference signal configurations for subband full duplex operation in new radio

    WO2021247224A1