Intelligent detection and prevention system and method for shield blockage of viscous stratum

By combining electromagnetic detection technology with an injection controller, intelligent detection and prevention of shield tunnel blockage in cohesive strata have been achieved, solving the problem of clay blockage, improving construction efficiency and reducing costs.

CN118979751APending Publication Date: 2024-11-19TIESIYUAN (HUBEI) ENG SUPERVISION CONSULTING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411114055.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In shield tunneling in clay or mudstone formations, clay easily adheres to the cutterhead and cutter head, causing blockages. Existing technologies for handling this are inefficient and rely on engineering experience, lacking intelligent detection and targeted improvement measures.

Method used

Electromagnetic detection technology is used to monitor geological information in real time. Data is acquired using electromagnetic wave transmitters and receivers, and the risk of blockage is analyzed through a data processing center. Combined with an injection controller, the type and concentration of soil amendment are precisely controlled for targeted treatment.

Benefits of technology

It enables early prediction and precise handling of shield tunnel blockage, improves construction efficiency, reduces project costs, and ensures the safe and continuous tunneling of the shield.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979751A_ABST
    Figure CN118979751A_ABST
Patent Text Reader

Abstract

The invention discloses a viscous stratum shield blockage intelligent detection and prevention system and method, and the method comprises the steps: obtaining electromagnetic detection data in a shield tunneling process through employing an electromagnetic wave detection technology, carrying out the data processing and analysis according to the electromagnetic detection data, and dividing the detected stratum into different blockage risks; and according to the different blocking risks, different muck modifying agents are selected for the detected stratum for muck modifying treatment. The electromagnetic detection technology is utilized to predict the possible blocking condition in the shield tunneling process in advance, a control system is matched to select a targeted improvement scheme for treatment, the defect that a traditional blocking treatment technology lags behind is overcome, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of shield construction technology, and in particular relates to an intelligent detection and prevention system and method for shield blockage in viscous strata. Background Art

[0002] Shield construction has been widely used in rail transit construction due to its safety, high efficiency and wide adaptability. During shield construction, especially when constructing in clay strata or mudstone strata with high clay mineral content, due to the large cohesion of the soil, the cut clay is easy to adhere to the cutter and cutterhead, causing equipment blockage and affecting the construction progress. In order to avoid the problem of mud cake blockage during shield excavation, at present, mechanical means are mainly used to design the cutterhead opening rate, manual chiseling, and improver improvement. However, these means are inefficient and delayed, and manual chiseling requires a high risk factor of opening the warehouse. Among them, the selection of the amount and type of slag improver is heavily dependent on engineering experience, and the applicability of the stratum is poor. Therefore, in order to solve the problem of mud cake blockage when the shield passes through the viscous stratum, an intelligent detection method for shield blockage in the viscous stratum is urgently needed to predict the blockage in advance, and select the appropriate type and amount of improver for slag improvement before the blockage occurs, so as to reduce the construction cost and ensure the safe and continuous excavation of the shield. Summary of the invention

[0003] In order to solve the above technical problems, the present invention proposes an intelligent detection and prevention system and method for shield blockage in viscous strata, which uses electromagnetic detection technology to predict in advance the possible blockage during shield excavation, and cooperates with the prevention and control system to select targeted improvement plans for treatment, avoiding the disadvantages of the lagging traditional blockage treatment technology and improving construction efficiency.

[0004] On the one hand, to achieve the above-mentioned purpose, the present invention provides a system for intelligent detection and prevention of shield blockage in viscous strata, comprising: an intelligent blockage detection subsystem and a blockage prevention subsystem;

[0005] The intelligent blockage detection subsystem is used to obtain electromagnetic detection data during shield tunneling using electromagnetic wave detection technology, perform data processing and analysis based on the electromagnetic detection data, and divide the detected strata into different blockage risks;

[0006] The blockage prevention subsystem is used to select different slag improvers to perform slag improvement treatment on the detected strata according to different blockage risks.

[0007] According to the intelligent detection and prevention system for shield blockage in viscous strata provided by the present invention, the intelligent blockage detection subsystem includes an electromagnetic receiver, an electromagnetic wave transmitter and a data processing center;

[0008] The electromagnetic receiver is calibrated, the emission frequency of the electromagnetic wave transmitter is adjusted, electromagnetic waves are emitted into the soil bin and the screw conveyor, and the signal strength and reflectivity of the reflected electromagnetic are collected and recorded by the electromagnetic receiver to obtain electromagnetic detection data. The electromagnetic detection data is received by the wireless signal receiver of the data processing center and uploaded to the computer for data analysis.

[0009] According to the intelligent detection and prevention system for shield blockage in viscous formations provided by the present invention, the electromagnetic wave transmitter adopts a TEM array transmitter with an arrangement spacing of 50 cm and a transmission frequency of 20 to 40 kHz. It generates a short pulse electromagnetic field to penetrate the formation to monitor the formation geological information in real time and update the data in real time.

[0010] According to the intelligent detection and prevention system for shield blockage in viscous strata provided by the present invention, the electromagnetic receivers are equidistantly arranged on the cutter head and the inner wall of the screw conveyor, and are used to receive, amplify and record electromagnetic signals reflected by underground soil.

[0011] According to the intelligent detection and prevention system for shield blockage in viscous formations provided by the present invention, the blockage prevention subsystem includes an injection controller and an injection pipeline;

[0012] The injection controller controls the soil improver to be injected into the cutter disc, the soil bin and the screw conveyor through the injection pipeline to improve the soil according to the electromagnetic detection data.

[0013] According to the intelligent detection and prevention system for shield blockage in viscous strata provided by the present invention, the slag improver includes water, hydrogen peroxide, an anti-adhesive agent and a foaming agent.

[0014] According to the intelligent detection and prevention system for shield blockage in viscous strata provided by the present invention, the blockage risk is divided into level I blockage risk, level II blockage risk and level III blockage risk;

[0015] The judgment basis for the Class I blocking risk is that the signal intensity is greater than 100nV and the reflectivity is greater than 75%;

[0016] The judgment basis of the Class II blockage risk is that the signal strength is 50nV to 100nV and the reflectivity is 50% to 75%;

[0017] The judgment basis of the Class III blockage risk is 10Nv~50nV and the reflectivity is 25%~50%.

[0018] According to the intelligent detection and prevention system for shield blockage in viscous strata provided by the present invention, a method for selecting different slag improvers for the detected strata to improve the slag according to different blockage risks includes:

[0019] When the blocking risk is level I, a slag improver with an anti-adhesive agent at a concentration of 1.75-2.5% and a foaming agent at a concentration of 2.5-3.5% is selected to perform slag improvement treatment;

[0020] When the blocking risk is level II blocking risk, a slag improver with a concentration of 0.75-1.0% anti-adhesive agent and a concentration of 2.5-3.0% foaming agent is selected to perform slag improvement treatment;

[0021] When the blockage risk is level III, a slag improvement agent with a concentration of 3.0-5.0% hydrogen peroxide and a concentration of 1.5-2.0% foaming agent is selected to carry out slag improvement treatment.

[0022] On the other hand, to achieve the above-mentioned purpose, the present invention also provides a method for intelligent detection and prevention of shield blockage in viscous strata, comprising the following steps:

[0023] Using electromagnetic wave detection technology to obtain electromagnetic detection data during shield tunneling, performing data processing and analysis based on the electromagnetic detection data, and dividing the detected strata into different blockage risks;

[0024] According to the different blockage risks, different slag improvers are selected for the detected strata to carry out slag improvement treatment.

[0025] Technical effect of the invention: The invention discloses an intelligent detection and prevention system and method for shield blockage in viscous strata, which uses electromagnetic wave detection technology to predict the shield tunneling process in viscous strata in advance, accurately predict the risk level and location of shield blockage, and avoid the disadvantages of lag in traditional technology processing; the invention selects targeted improvement plans according to the risk electromagnetic detection results, the blockage risk level and location. The invention selects a variety of modifiers for combined use and is equipped with an injection controller to accurately control the injection amount and concentration, has strong stratum adaptability, and reduces engineering costs while ensuring safe shield tunneling. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0027] Figure 1 1 is a structural schematic diagram of an intelligent detection and prevention system for shield blockage in viscous strata according to an embodiment of the present invention, wherein 1 is a stratum; 2 is a soil bin; 3 is a cutter head; 4 is a screw conveyor; 5 is an electromagnetic receiver; 6 is an electromagnetic wave transmitter; 7 is a data processing center; 8 is an injection controller; 9 is water; 10 is hydrogen peroxide; 11 is an anti-adhesive agent; 12 is a foaming agent; 13 is an injection pipeline;

[0028] Figure 2 The present invention is a flowchart of an intelligent method for detecting and preventing shield blockage in viscous formations according to an embodiment of the present invention. DETAILED DESCRIPTION

[0029] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0030] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0031] like Figure 1 As shown, in this embodiment, a system for intelligent detection and prevention of shield blockage in viscous strata is provided, including: an intelligent blockage detection subsystem and a blockage prevention subsystem;

[0032] The intelligent blockage detection subsystem is used to obtain electromagnetic detection data during shield tunneling using electromagnetic wave detection technology, perform data processing and analysis based on the electromagnetic detection data, and divide the detected stratum 1 into different blockage risks;

[0033] The blockage prevention subsystem is used to select different slag improvers for the detected stratum 1 to perform slag improvement treatment according to different blockage risks.

[0034] Furthermore, the intelligent blockage detection subsystem includes an electromagnetic receiver 5, an electromagnetic wave transmitter 6 and a data processing center 7; the electromagnetic wave transmitter 6 and the electromagnetic receiver 5 are arranged on the inner wall of the cutter disc 3 and the screw conveyor 4 as required, the electromagnetic receiver 5 is calibrated, the transmission frequency of the electromagnetic wave transmitter 6 is adjusted, and electromagnetic waves are transmitted into the soil bin 2 and the screw conveyor 4. The electromagnetic receiver 5 collects and records the signal strength and reflectivity of the reflected electromagnetic to obtain electromagnetic detection data, which is received by the wireless signal receiver of the data processing center 7 and uploaded to the computer for data analysis. The electromagnetic wave transmitter 6 uses a TEM array transmitter with an arrangement spacing of 50 cm and a transmission frequency of 20 to 40 kHz. It monitors the geological information of the formation in real time by generating a short pulse electromagnetic field to penetrate the formation, and updates the data in real time, making the detection results more accurate and reliable. The electromagnetic receiver 5 is equidistantly arranged on the inner wall of the cutter disc 3 and the screw conveyor 4 to receive, amplify and record the electromagnetic signals reflected by the underground soil.

[0035] Furthermore, the blockage prevention subsystem includes an injection controller 8 and an injection pipeline 13; a slag improver is used to improve the soil of the cutter head 3, the soil bin 2 and the screw conveyor 4 by injecting it through the injection pipeline 13; the injection controller 8 is used to control the type and amount of the slag improver injection according to the electromagnetic detection data to save costs. The injection controller 8 controls the electric valve of the improver storage tank, and injects different types and concentrations of improvers according to the blockage of the stratum soil, which not only ensures the smooth and safe excavation of the shield, but also saves engineering costs and improves the applicability of the project. The slag improver includes water 9, hydrogen peroxide 10, anti-adhesive agent 11 and foaming agent 12. Multiple improvers are used in combination to avoid the disadvantage of poor stratum applicability of a single improver.

[0036] Furthermore, the blockage risk is divided into level I blockage risk, level II blockage risk and level III blockage risk; the basis for judging level I blockage risk is that the signal strength is greater than 100nV and the reflectivity is greater than 75%; the basis for judging level II blockage risk is that the signal strength is 50nV~100nV and the reflectivity is 50%~75%; the basis for judging level III blockage risk is 10Nv~50nV and the reflectivity is 25%~50%.

[0037] Further, according to the different blockage risk levels and blockage locations, the injection controller 8 is adjusted to select different types and concentrations of improvers to be injected to improve the slag at the blockage risk location, specifically including: Level I blockage risk improvement plan: Construction in this stratum is very prone to blockage, which seriously affects the shield tunneling speed. The traditional single use of foaming agent for slag improvement cannot solve the problem of mud cake in high-viscosity strata. The injection controller 8 is adjusted to control the ratio of the anti-adhesive agent 11, the foaming agent 12 and the water 9. It is preferred that the anti-adhesive agent 11 with a concentration of 1.75-2.5% and the foaming agent 12 with a concentration of 2.5-3.5% are mixed and injected into the cutter head 3, the soil bin 2 and the screw conveyor 4 through the injection pipeline 13 to improve the slag;

[0038] Level II blocking risk improvement plan: This formation has a medium blocking risk. The ratio of the anti-adhesive agent 11, the foaming agent 12 and the water 9 is regulated by adjusting the injection controller 8. It is preferred that the anti-adhesive agent 11 with a concentration of 0.75-1.0% and the foaming agent 12 with a concentration of 2.5-3.0% are mixed and then injected into the cutter head 3, the soil bin 2 and the screw conveyor 4 through the injection pipeline 13 to improve the slag soil.

[0039] Level III blockage risk improvement plan: This type of formation has a low blockage risk. The ratio of hydrogen peroxide 10, foaming agent 12 and water 9 is regulated by adjusting the injection controller 8. It is preferred that 3.0-5.0% concentration of hydrogen peroxide 10 is mixed with 1.5-2.0% concentration of foaming agent 12, and then injected into the cutter head 3, soil bin 2 and screw conveyor 4 through the injection pipeline 13 to improve the slag.

[0040] Determining the location of the blockage specifically includes: because the blockage refers to the blockage of the shield machine cutterhead, the clay is equivalent to blocking the opening of the cutterhead, and the reflected waveform is different through the transmission and feedback of the electromagnetic signal from the rear to the front. For example, the electromagnetic wave will feedback a waveform when encountering a metal cutterhead, and may not feedback when encountering an opening, and feedback another waveform when encountering clay blockage. It can be roughly determined where the cutterhead is blocked. For example, if there are openings in some places, it means there is no blockage, and if some places are blocked by mud cakes, there is a blockage, and the position is determined by the reflected signal.

[0041] like Figure 2 As shown, this embodiment also provides a method for intelligent detection and prevention of shield blockage in viscous formations, comprising the following steps:

[0042] Use electromagnetic wave detection technology to obtain electromagnetic detection data during shield tunneling, perform data processing and analysis based on the electromagnetic detection data, and divide the detected strata into different blockage risks;

[0043] According to different blockage risks, different soil conditioners are selected for soil improvement treatment of the tested strata.

[0044] The present invention discloses an intelligent detection and prevention system and method for shield blockage in viscous strata, which uses electromagnetic wave detection technology to predict the shield tunneling process in viscous strata in advance, accurately predict the risk level and location of shield blockage, and avoid the disadvantages of lagging treatment of traditional technologies; the present invention selects targeted improvement schemes according to the risk electromagnetic detection results, the blockage risk level and location. The present invention selects a variety of modifiers for combined use and is equipped with an injection controller to accurately control the injection amount and concentration, has strong stratum adaptability, and reduces engineering costs while ensuring safe shield tunneling.

[0045] The above are only preferred specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. An intelligent detection and prevention system for shield blockage in viscous strata, characterized in that: include: Intelligent congestion detection subsystem and congestion prevention subsystem; The intelligent blockage detection subsystem is used to obtain electromagnetic detection data during shield tunneling using electromagnetic wave detection technology, perform data processing and analysis based on the electromagnetic detection data, and divide the detected strata (1) into different blockage risks; The blockage prevention subsystem is used to select different slag improvers to perform slag improvement treatment on the detected stratum (1) according to different blockage risks.

2. The intelligent detection and prevention system for shield blockage in viscous formations according to claim 1 is characterized in that: The intelligent blockage detection subsystem comprises an electromagnetic receiver (5), an electromagnetic wave transmitter (6) and a data processing center (7); The electromagnetic receiver (5) is calibrated, the emission frequency of the electromagnetic wave transmitter (6) is adjusted, and electromagnetic waves are emitted into the soil bin (2) and the screw conveyor (4). The electromagnetic receiver (5) collects and records the signal strength and reflectivity of the reflected electromagnetic waves to obtain electromagnetic detection data. The electromagnetic detection data is received by the wireless signal receiver of the data processing center (7) and uploaded to the computer for data analysis.

3. The intelligent detection and prevention system for shield blockage in viscous formations as claimed in claim 2 is characterized in that: The electromagnetic wave transmitter (6) adopts a TEM array transmitter, which is arranged at a spacing of 50 cm and a transmission frequency of 20 to 40 kHz. It generates a short pulse electromagnetic field to penetrate the stratum to monitor the stratum geological information in real time and update the data in real time.

4. The intelligent detection and prevention system for shield blockage in viscous strata according to claim 2 is characterized in that: The electromagnetic receivers (5) are arranged at equal distances on the cutter head (3) and the inner wall of the screw conveyor (4) and are used to receive, amplify and record electromagnetic signals reflected by the underground soil.

5. The intelligent detection and prevention system for shield blockage in viscous strata according to claim 2, characterized in that: The blockage prevention subsystem includes an injection controller (8) and an injection pipeline (13); The injection controller (8) controls the soil improver to be injected into the cutter disc (3), the soil bin (2) and the screw conveyor (4) through the injection pipeline (13) according to the electromagnetic detection data to improve the soil.

6. The intelligent detection and prevention system for shield blockage in viscous strata according to claim 5 is characterized in that: The slag improver comprises water (9), hydrogen peroxide (10), an anti-adhesive agent (11) and a foaming agent (12).

7. The intelligent detection and prevention system for shield blockage in viscous strata according to claim 6, characterized in that: The congestion risk is divided into level I congestion risk, level II congestion risk and level III congestion risk; The judgment basis for the Class I blocking risk is that the signal intensity is greater than 100nV and the reflectivity is greater than 75%; The judgment basis of the Class II blockage risk is that the signal strength is 50nV to 100nV and the reflectivity is 50% to 75%; The judgment basis of the Class III blockage risk is 10Nv~50nV and the reflectivity is 25%~50%.

8. The intelligent detection and prevention system for shield blockage in viscous strata according to claim 7, characterized in that: According to different blockage risks, the method of selecting different slag improvers for the detected stratum (1) to improve the slag includes: When the clogging risk is level I, a slag improvement agent having a concentration of 1.75-2.5% of an anti-adhesive agent (11) and a concentration of 2.5-3.5% of a foaming agent (12) is selected to perform slag improvement treatment; When the clogging risk is level II, a slag improvement agent having a concentration of 0.75 to 1.0% of an anti-adhesive agent (11) and a concentration of 2.5 to 3.0% of a foaming agent (12) is selected to perform slag improvement treatment; When the clogging risk is level III, a slag improvement agent comprising 3.0-5.0% hydrogen peroxide (10) and 1.5-2.0% foaming agent (12) is selected to perform slag improvement treatment.

9. A method of an intelligent detection and prevention system for shield blockage in viscous strata according to any one of claims 1 to 8, characterized in that: The following steps are involved: Using electromagnetic wave detection technology to obtain electromagnetic detection data during shield tunneling, performing data processing and analysis based on the electromagnetic detection data, and dividing the detected strata into different blockage risks; According to the different blockage risks, different slag improvers are selected for the detected strata to carry out slag improvement treatment.