Village and town industrial gathering area performance evaluation method, system and device and storage medium
By constructing a multi-source data-driven performance evaluation method for rural industrial clusters, the problem of insufficient targeting in the performance evaluation of rural industrial clusters in existing technologies is solved, and accurate performance evaluation is achieved, providing an effective reference for urban planning.
Patent Information
- Application Number
- CN202410854731.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-11-19
AI Technical Summary
Existing technologies lack specificity in the performance evaluation of rural industrial clusters, making it difficult to achieve accurate assessments. Furthermore, the indicator system is mainly applicable to urban industrial land and cannot meet the unique needs of rural industrial clusters.
A performance evaluation method for rural industrial clusters based on multi-source data is constructed, including acquiring relevant data, constructing a performance evaluation indicator system, calculating the data of each secondary indicator, determining the weights using the entropy weight TOPSIS method, calculating the comprehensive performance evaluation value, and dividing the performance range.
It enables precise assessment of industrial clusters in villages and towns, provides a more micro-level assessment perspective, and offers urban planners a reference for high-quality redevelopment.
Smart Images

Figure CN118982268A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a performance evaluation method, system, computer equipment and storage medium for industrial clusters in villages and towns, belonging to the technical field of urban planning. Background Art
[0002] In the context of building a strong country in industry, establishing a city based on manufacturing, strictly controlling "large-scale demolition and construction", and advocating high-quality development, industrial stock land is in urgent need of renewal and transformation. As a typical industrial stock land, village and town industrial agglomeration areas have become an important breakthrough to alleviate the shortage of construction land indicators and promote industrial upgrading and development. By building a scientific and reasonable performance evaluation system for village and town industrial agglomeration areas, we will conduct in-depth research on how to achieve intensive and economical use of village and town industrial agglomeration areas and promote the quality upgrade of inefficient industrial stock land.
[0003] However, the specific objects and indicator systems of the current performance evaluation of industrial stock land are relatively limited. The scope of the evaluation objects is relatively large, usually focusing on large-scale urban industrial land, and the performance evaluation of village and town industrial agglomeration areas is limited. In addition, the existing indicator system is also mainly applicable to urban industrial land, while village and town industrial agglomeration areas have their own uniqueness and need to build a more targeted indicator system to achieve accurate evaluation of their performance. Summary of the invention
[0004] In view of this, the present invention provides a performance evaluation method, system, computer equipment and storage medium for village and town industrial clusters, which is based on multi-source data, focuses on village and town industrial clusters in industrial stock land, and evaluates the performance of village and town industrial clusters from a more micro perspective, so as to improve the efficiency and accuracy of performance evaluation of industrial stock land, and provide a reference for high-quality redevelopment of urban stock land.
[0005] The first object of the present invention is to provide a performance evaluation method for industrial clusters in villages and towns.
[0006] The second object of the present invention is to provide a performance evaluation system for village and town industrial clusters.
[0007] A third object of the present invention is to provide a computer device.
[0008] A fourth object of the present invention is to provide a storage medium.
[0009] The first object of the present invention can be achieved by adopting the following technical solutions:
[0010] A performance evaluation method for village and town industrial clusters, the method comprising:
[0011] Acquire relevant data in the target area, including SDK crowd portrait data, POI location point of interest data, road network data, building outline data, enterprise data and map image data;
[0012] Constructing a performance evaluation index system for village and town industrial clusters, which includes four primary indicators of spatial performance, economic performance, social performance and development performance, as well as corresponding secondary indicators;
[0013] Based on the relevant data in the target area, calculate the secondary indicator data corresponding to the spatial performance, economic performance, social performance and development performance in the target area;
[0014] Based on the data of each secondary indicator, determine the weight of each secondary indicator and calculate the comprehensive performance evaluation value.
[0015] Furthermore, the secondary indicators corresponding to the spatial performance include industrialization degree, patch fragmentation and development degree, the secondary indicators corresponding to the economic performance include enterprise scale and economic benefits, the secondary indicators corresponding to the social performance include employment supply and social services, and the secondary indicators corresponding to the development performance include traffic conditions and expansion trends;
[0016] The calculation of the secondary indicator data corresponding to the spatial performance, economic performance, social performance and development performance in the target area based on the relevant data in the target area specifically includes:
[0017] According to the scope of the target area, the target area is divided into N×N grids, and the grid center point elements are obtained, and clipped according to the boundaries;
[0018] According to the building outline data and road network data in the target area, the industrial building coefficient, plot morphology coefficient and volume ratio of the target area are calculated to characterize the industrialization degree, patch fragmentation and development degree respectively;
[0019] Link enterprise data to the grid and calculate the total registered capital of enterprises in the unit grid of the target area to characterize the enterprise size;
[0020] Link the work income in the SDK population profile data to the grid, and calculate the sum of the work income in the grid cells of the target area to represent the economic benefits;
[0021] Link the working population in the SDK population portrait data to the grid, and calculate the total work income in the grid cells of the target area to represent the employment supply;
[0022] Based on the data of various POI locations of catering services, shopping services, life services, transportation facilities services, financial insurance services, accommodation services, science and education and culture services, sports and leisure services, and medical care services in the target area, the ratio of the number of POI points in each grid of the target area to the grid area is calculated to represent social services;
[0023] According to the road network data in the target area, the road network density of the target area is calculated to characterize the traffic conditions;
[0024] According to the map image data in the target area, the expansion index of the target area is calculated to characterize the expansion trend.
[0025] Furthermore, according to the building outline data and road network data in the target area, the industrial building coefficient, plot morphology coefficient and volume ratio of the target area are calculated to respectively characterize the degree of industrialization, the degree of patch fragmentation and the degree of development, specifically including:
[0026] According to the building outline data and road network data in the target area, the industrial building coefficient of the target area is calculated to characterize the degree of industrialization, as shown in the following formula:
[0027]
[0028] Among them, Q n is the industrial building coefficient, B n is the area of industrial buildings, A n is the area of the structure, D n is the land area of the storage yard, Z n is the total area of the plot;
[0029] According to the building outline data and road network data in the target area, the plot morphology coefficient of the target area is calculated to characterize the patch fragmentation, as follows:
[0030]
[0031] Among them, K n is the plaque fragmentation, S n is the area of a single plot divided by the road network, C n It is the perimeter of a single plot divided by the road network;
[0032] According to the building outline data and road network data in the target area, the volume ratio of the target area is calculated to characterize the degree of development, as follows:
[0033]
[0034] Among them, F n is the floor area ratio, J n is the total building area, Z nThe total area of the plot.
[0035] Furthermore, according to the road network data in the target area, the road network density of the target area is calculated to characterize the traffic conditions, as shown in the following formula:
[0036]
[0037] Among them, F i is the kernel density value, the kernel density analyzed with i as the center point, d ij Represents the distance between two points, and sets the weight to K j , the bandwidth variable is r, and the number of points j within the bandwidth range is n
[0038] Furthermore, according to the map image data in the target area, the expansion index of the target area is calculated to characterize the expansion trend, as shown in the following formula:
[0039]
[0040] Among them, U is the expansion trend, U v and U a are the built-up areas at the end and beginning of the study period, respectively, TLA is the total area of the study area, and T is the study time interval.
[0041] Furthermore, the weight of each secondary indicator is determined according to the data of each secondary indicator, and the comprehensive performance evaluation value is calculated, which specifically includes:
[0042] Rasterize the data of each secondary indicator to convert the vector data into raster data and perform normalization;
[0043] According to the normalized secondary indicator data, calculate the proportion of each secondary indicator data to the secondary indicator;
[0044] According to the proportion of each secondary indicator data to the secondary indicator, the entropy of each secondary indicator is calculated;
[0045] According to the entropy of each secondary indicator, the redundancy of entropy is calculated;
[0046] According to the redundancy of entropy, the weight of each secondary indicator is calculated;
[0047] According to the weight of each secondary indicator, the TOPSIS method is used to calculate the comprehensive performance evaluation value.
[0048] Furthermore, the method further comprises:
[0049] The comprehensive performance evaluation values are sorted and the target area is divided into five zones: low performance zone, medium-low performance zone, medium performance zone, medium-high performance zone, and high performance zone.
[0050] The second object of the present invention can be achieved by adopting the following technical solutions:
[0051] A performance evaluation system for village and town industrial clusters, the system comprising:
[0052] An acquisition module is used to acquire relevant data in the target area, wherein the relevant data includes SDK crowd portrait data, POI location point of interest data, road network data, building outline data, enterprise data and map image data;
[0053] A construction module is used to construct a performance evaluation index system for village and town industrial clusters, wherein the performance evaluation index system includes four primary indicators of spatial performance, economic performance, social performance and development performance, and corresponding secondary indicators;
[0054] The first calculation module is used to calculate the secondary indicator data corresponding to the spatial performance, economic performance, social performance and development performance in the target area based on the relevant data in the target area;
[0055] The second calculation module is used to determine the weight of each secondary indicator according to the data of each secondary indicator, and calculate the comprehensive performance evaluation value.
[0056] Furthermore, the system also includes:
[0057] The division module is used to sort the comprehensive performance evaluation values and divide the target area into five zones: low performance zone, medium-low performance zone, medium performance zone, medium-high performance zone, and high performance zone.
[0058] The third object of the present invention can be achieved by adopting the following technical solutions:
[0059] A computer device includes a processor and a memory for storing a program executable by the processor. When the processor executes the program stored in the memory, the above-mentioned performance evaluation method for village and town industrial clusters is implemented.
[0060] The fourth object of the present invention can be achieved by adopting the following technical solutions:
[0061] A storage medium stores a program, which, when executed by a processor, implements the above-mentioned performance evaluation method for village and town industrial clusters.
[0062] The present invention has the following beneficial effects compared with the prior art:
[0063] The method and system of the present invention are based on multi-source data, focus on village and town industrial clusters in industrial stock land, comprehensively consider their current situation and characteristics, construct a performance evaluation index system for village and town industrial clusters, calculate the secondary indicator data corresponding to spatial performance, economic performance, social performance and development performance in the target area, determine the weight of each secondary indicator, and thus calculate the comprehensive performance evaluation value, evaluate village and town industrial clusters from a more micro perspective, and can effectively and accurately evaluate existing village and town industrial clusters, providing a reference for urban planners to determine the development sequence of industrial stock land. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0065] Figure 1 This is a flow chart of the performance evaluation method for village and town industrial clusters according to Example 1 of the present invention.
[0066] Figure 2 This is a graph showing the industrialization degree of Example 2 of the present invention.
[0067] Figure 3 This is a graph showing the plaque fragmentation results of Example 2 of the present invention.
[0068] Figure 4 This is a diagram showing the development level results of Example 2 of the present invention.
[0069] Figure 5 This is a graph showing the enterprise scale results of Example 2 of the present invention.
[0070] Figure 6 This is a diagram showing the economic benefit results of Example 2 of the present invention.
[0071] Figure 7 This is a diagram of employment supply results of Example 2 of the present invention.
[0072] Figure 8 This is a diagram of social service results according to Example 2 of the present invention.
[0073] Fig. 9 This is a traffic condition result diagram of Example 2 of the present invention.
[0074] Fig.10 This is a diagram showing the expansion trend results of Example 2 of the present invention.
[0075] Fig.11This is a schematic diagram of the comprehensive performance evaluation value partitioning results of Example 2 of the present invention.
[0076] Fig.12 This is a structural block diagram of the village and town industrial cluster performance evaluation system of Example 2 of the present invention.
[0077] Fig.13 This is a structural block diagram of a computer device according to Embodiment 3 of the present invention. DETAILED DESCRIPTION
[0078] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0079] Embodiment 1:
[0080] like Figure 1 As shown, this embodiment provides a performance evaluation method for village and town industrial agglomeration areas. The method uses a combination of multi-source data and geographic analysis software to construct a performance evaluation index system for village and town industrial agglomeration areas, and accurately and efficiently evaluates the performance of village and town industrial agglomeration areas. The method includes the following steps:
[0081] S101, obtaining relevant data in the target area.
[0082] In this embodiment, relevant data include SDK crowd portrait data, POI location point of interest data, road network data, building outline data, enterprise data and map image data. Enterprise data include Qichacha enterprise data and Tianyancha enterprise data, and map image data is Google map impact data; among them, SDK crowd portrait data includes work income, working population and other information, POI location point of interest data include catering services, shopping services, life services, transportation facilities services, financial insurance services, accommodation services, science and education and culture services, sports and leisure services and medical care services. Various POI location points of interest, road network data include urban main roads, trunk roads and branch road networks in the target area, Qichacha and Tianyancha enterprise data include enterprise name, registration status, establishment date, registration cost, enterprise registration address, enterprise type, enterprise scale and other information, Google map image data includes image maps at the beginning and end of the study time period.
[0083] S102. Establish a performance evaluation index system for village and town industrial clusters.
[0084] In this embodiment, according to the references, the village and town industrial agglomeration area specifically refers to the industrial concentration area on the land owned by the collective economic organization, which is mainly used for industrial, warehousing and logistics purposes. Its characteristics can be summarized as the ownership or use right belongs to the collective land, the industry is mainly industrial or warehousing, the current land use is inefficient and has a certain scale of contiguous concentration area. Village and town industrial agglomeration areas generally have problems such as low spatial concentration, insufficient space production efficiency, idle land waste and complex and unclear property rights; combined with the characteristics and existing problems of village and town industrial agglomeration areas, this embodiment constructs a performance evaluation system from four aspects: spatial performance, economic performance, social performance and development performance. Therefore, the performance evaluation index system includes four first-level indicators of spatial performance, economic performance, social performance and development performance and corresponding second-level indicators, among which the second-level indicators corresponding to spatial performance include industrialization degree, patch fragmentation and development degree, the second-level indicators corresponding to economic performance include enterprise scale and economic benefits, the second-level indicators corresponding to social performance include employment supply and social services, and the second-level indicators corresponding to development performance include traffic conditions and expansion trends.
[0085] S103. Calculate the secondary indicator data corresponding to the spatial performance, economic performance, social performance and development performance in the target area based on the relevant data in the target area.
[0086] This embodiment processes SDK crowd portrait data, POI location point of interest data, road network data, building outline data, Qichacha enterprise data, Tianyancha enterprise data, and Google map image data in the target area, specifically including:
[0087] S1031. Divide the target area into N×N grids according to the target area range, obtain the grid center point elements, and perform clipping according to the boundaries.
[0088] Specifically, the boundary of the target area is extracted and imported into the GIS software. According to the scope of the target area, the target area is divided into 50m×50m grids, and the grid center point elements are obtained and cropped according to the boundary.
[0089] S1032. Based on the building outline data and road network data in the target area, the industrial building coefficient, land shape coefficient, and volume ratio of the target area are calculated to respectively characterize the degree of industrialization, the degree of patch fragmentation, and the degree of development.
[0090] 1) For the degree of industrialization, the road network data and building outline data in the target area are imported into the GIS software, and the road network data is used as the line element to cut the target area to form plot units divided by the road network. The building outline data is screened against the Google map image, the industrial building outline is selected, and the structure and yard land area are calculated. The industrial building coefficient of each plot unit is calculated to characterize the degree of industrialization. The calculation formula is as follows:
[0091]
[0092] Among them, Q n is the industrial building coefficient, B n is the area of industrial buildings, A n is the area of the structure, D n is the land area of the storage yard, Z n The total area of the plot.
[0093] 2) For patch fragmentation, the road network data in the target area is imported into the GIS software, and the road network data is used as the line element to cut the target area to form plot units divided by the road network. The area and perimeter of each plot are calculated using the GIS software computational geometry tool, and the morphological coefficient of each plot unit is calculated to characterize the patch fragmentation. The calculation formula is as follows:
[0094]
[0095] Among them, K n is the plaque fragmentation, S n is the area of a single plot divided by the road network, C n It is the perimeter of a single plot divided by the road network.
[0096] 3) For development intensity, the road network data and building outline data in the target area are imported into GIS software, and the road network data is used as line elements to cut the target area to form plot units divided by the road network. The number of building floors and base area information in the building outline data are used to calculate the volume ratio of each plot unit to characterize the development intensity. The calculation formula is as follows:
[0097]
[0098] Among them, F n is the floor area ratio, J n is the total building area, Z n The total area of the plot.
[0099] S1033. Link the enterprise data to the grid, and calculate the total registered capital of the enterprises in the unit grid of the target area to represent the scale of the enterprises.
[0100] Specifically, for enterprise scale, the obtained Qichacha and Tianyancha enterprise data are preprocessed in a table, retaining three types of information: enterprise name, enterprise address, and registered capital. The enterprise address information is converted into Mars coordinate system coordinates through the batch coordinate conversion tool, and then the longitude and latitude coordinates obtained are converted into WGS-84 coordinate system coordinates through the GIS data converter for subsequent analysis. Export the table data in csv format, import it into GIS, select Display XY data, set the X field to longitude, the Y field to latitude, and select 84 coordinates for the coordinate system; then convert the data with coordinate location into a shp file, import it into GIS again, use the spatial link tool to link it to the grid, and calculate the total registered capital of enterprises in the grid cells of the target area to characterize the scale of the enterprise.
[0101] S1034. Link the work income in the SDK population portrait data to the grid, and calculate the total work income in the grid cells of the target area to represent the economic benefits.
[0102] Specifically, for economic benefits, import the SDK table data in csv format into GIS, coordinate the table data, select Display XY data, set the X field to longitude, the Y field to latitude, and select 84 coordinates for the coordinate system. Then convert the data with coordinates to a shp file, import it into GIS again, convert it to a raster file, use the interpolation analysis tool to assign values to the grids with missing data, and then convert it to a shp file. Use the spatial link tool to link the work income in the SDK population portrait data to the created surface layer, that is, the grid layer, and calculate the sum of the work income in the grid cells of the target area to represent the economic benefits.
[0103] S1035. Link the working population in the SDK population portrait data to the grid, and calculate the total work income in the grid cells of the target area to represent the employment supply.
[0104] Specifically, for employment supply, import the SDK table data in csv format into GIS, coordinate the table data, select Display XY data, set the X field to longitude, the Y field to latitude, and select 84 coordinates for the coordinate system. Then convert the data with coordinate location into a shp file, import it into GIS again, convert it into a raster file, use the interpolation analysis tool to assign values to the grids with missing data, and then convert it into a shp file. Use the spatial link tool to link the working population in the SDK population portrait data to the created surface layer, that is, the grid layer, and calculate the total number of working people in the grid cells of the target area to represent the employment supply.
[0105] S1036. Based on the POI location data of catering services, shopping services, life services, transportation facilities services, financial insurance services, accommodation services, science and education and culture services, sports and leisure services, and medical care services in the target area, calculate the ratio of the number of POI points in each grid of the target area to the grid area to represent social services.
[0106] Specifically, for social services, the obtained data of various POI locations are imported into GIS software, and the POI points are located using their longitude and latitude coordinates. The POI location data are then linked to the grid, and the ratio of the number of POI points in each grid in the target area to the grid area is calculated to characterize social services. The calculation formula is as follows:
[0107]
[0108] Among them, H n is the average POI density, P n is the total number of POI points of interest in the grid unit, and M is the area of the grid unit.
[0109] S1037. Calculate the road network density of the target area based on the road network data in the target area to characterize the traffic conditions.
[0110] Specifically, for traffic conditions, the urban road network in the target area is imported into GIS software, and the road network is analyzed using the kernel density tool of GIS software. The analysis results are linked to the grid, and the road network density in the target area is calculated to characterize the traffic conditions. The calculation formula is as follows:
[0111]
[0112] Among them, F i is the kernel density value, the kernel density analyzed with i as the center point, d ij Represents the distance between two points, and sets the weight to K j , the bandwidth variable is r, and the number of points j within the bandwidth range is n.
[0113] S1038. Calculate an expansion index of the target area based on the map image data within the target area to characterize the expansion trend.
[0114] Specifically, for the expansion trend, the obtained Google map image data was processed, a research time span was selected to highlight the trend of built-up conditions within the target area, the outlines of the built-up buildings at two time points were manually extracted, converted into surface elements in the GIS software, and the expansion paper number of the target area was calculated to characterize the expansion trend. The calculation formula is as follows:
[0115]
[0116] Among them, U is the expansion trend, U b and U a are the built-up areas at the end and beginning of the study period, respectively, TLA is the total area of the study area, and T is the study time interval.
[0117] In this embodiment, the processed data are linked to the grids divided by the target area, and the value of each influencing factor in the performance evaluation index system is counted to obtain a visualized grid vector diagram of each indicator; specifically, the industrialization degree, patch fragmentation, development degree, traffic conditions, and expansion trend analysis data are sampled to the center point of each grid unit in the target area through ArcGIS, and then spatially linked with the grid units to obtain the industrialization degree, patch fragmentation, and development degree grid vector diagrams; the enterprise scale data, economic benefit data, employment supply data, and social service data are spatially linked with the grid units to obtain the enterprise scale, economic benefit, employment supply, and social service grid vector diagrams.
[0118] This embodiment performs "reclassification" on the processed data and divides it into five categories based on the natural break points classification method. The natural break points classification method is based on the natural grouping inherent in the data, identifies the classification intervals, can most appropriately group similar values, and maximize the differences between classes. This grouping method divides the data into multiple classes, and for these classes, their boundaries are set at locations where the differences in data values are relatively large.
[0119] S104. Determine the weight of each secondary indicator based on the data of each secondary indicator, and calculate the comprehensive performance evaluation value.
[0120] This embodiment uses the entropy weight TOPSIS comprehensive evaluation method to determine the weight of each secondary indicator and calculate the comprehensive potential evaluation value. The entropy weight method is first used to obtain the weight of each indicator, and then the TOPSIS method is used to analyze the data. The specific process is as follows:
[0121] S1041. Rasterize the data of each secondary indicator to convert the vector data into raster data, and perform normalization.
[0122] Specifically, the nine secondary indicator data were rasterized, and the vector data was converted into raster data using the GIS vector-to-raster tool. The Fuzzy Membership tool in the GIS software was then used for normalization. The linear function was selected as the classification value type, and the calculation formula was as follows:
[0123]
[0124] Among them, X' ij represents the standardized value of the i-th evaluation object on the j-th indicator, Xij is the original value, MAX(X j ) and MIN(X j ) represent the maximum and minimum values of the j-th index respectively.
[0125] S1042. Calculate the proportion of each secondary indicator data to the secondary indicator based on the normalized secondary indicator data. The calculation formula is as follows:
[0126]
[0127] S1043. Calculate the entropy of each secondary indicator according to the proportion of each secondary indicator data to the secondary indicator.
[0128]
[0129] Among them, e j is the entropy of each secondary index, When Y ij = 0, e j =0.
[0130] S1044. Calculate the entropy redundancy based on the entropy of each secondary indicator.
[0131] d j =1-e j
[0132] Among them, d j is the redundancy of entropy.
[0133] S1045. Calculate the weight of each secondary index based on the redundancy of entropy.
[0134]
[0135] The weights of each secondary indicator are calculated through the formula; among them, the weight of industrialization degree is 0.0391, the weight of patch fragmentation is 0.1893, the weight of development intensity is 0.0945, the weight of enterprise scale is 0.0057, the weight of economic benefit is 0.2673, the weight of employment supply is 0.1277, the weight of social services is 0.0049, the weight of traffic conditions is 0.1256, and the weight of expansion trend is 0.1459.
[0136] S1046. Based on the weights of each secondary indicator, use the TOPSIS method to calculate the comprehensive performance evaluation value.
[0137] 1) Set the weight W j Introduced into the decision matrix, the following weighted standardized matrix is obtained:
[0138]
[0139] 2) Calculate the positive ideal value and negative ideal The calculation formula is as follows:
[0140]
[0141] Among them, J + The larger the index set represented, the better. On the contrary, J - The smaller the set of indicators represented, the better.
[0142] 3) Use the Euclidean distance to calculate the distance between the corresponding index 0 value and the positive ideal value and negative ideal value of each evaluation object. The calculation formula is as follows:
[0143]
[0144] in, is the distance between the corresponding index 0 value and the positive ideal value in each evaluation object, is the distance between the corresponding index 0 value and the negative ideal value in each evaluation object.
[0145] In this embodiment, the calculation of the comprehensive performance evaluation value may also include:
[0146] S105. Sort the comprehensive performance evaluation values and divide the target area into five zones: low performance zone, medium-low performance zone, medium performance zone, medium-high performance zone, and high performance zone.
[0147] Specifically, the comprehensive performance evaluation values of the target area grid cells were imported into ArcGIS software for visualization and sorting. The ArcGIS reclassification tool was used to classify the data, and the comprehensive performance evaluation values were divided into five categories based on the natural break point classification method, which were marked from small to large as low performance area, medium-low performance area, medium performance area, medium-high performance area, and high performance area.
[0148] Embodiment 2:
[0149] In order to verify the implementation effect of the performance evaluation method for village and town industrial clusters in the above-mentioned Example 1, this example takes the Xilang Village and Town Industrial Cluster in Liwan District, Guangzhou as an application example for verification. The Xilang Village and Town Industrial Cluster is an important part of the Dongsha Modern Urban Industrial Park in Liwan District, with a land area of approximately 125,000 square meters. It belongs to the Xilang Economic Association of Donghui Street, Liwan District. It is currently an open industrial zone. After the transformation, it plans to develop new generation information technology, life health, artificial intelligence and other high-tech industries.
[0150] The specific scope of this embodiment is north of Dongxi Road, south of Guantao Road, west of Huadi River, and east of Guantao Road, including the Xilang Village industrial cluster area and its surrounding industrial contiguous areas.
[0151] S1. Obtain relevant data in the target area.
[0152] In this embodiment, relevant data include SDK crowd portrait data, Liwan District POI location point of interest data, Liwan District road network data, Liwan District building outline data, research scope Qichacha enterprise data, research scope Tianyancha enterprise data, and research scope Google map image data, among which the SDK crowd portrait data includes work income, working population and other information, POI location point of interest data include various POI location points of interest such as catering services, shopping services, life services, transportation facilities services, financial insurance services, accommodation services, science, education and culture services, sports and leisure services, and medical care services, road network data include urban main roads, trunk roads and branch roads in the target area, Qichacha and Tianyancha enterprise data include enterprise name, registration status, establishment date, registration cost, enterprise registration address, enterprise type, enterprise scale and other information, Google map image data include image maps at the beginning and end of the research time period.
[0153] Furthermore, the SDK population portrait data comes from the Jiguang big data platform, which divides Guangzhou into 150m×150m grids, and conducts statistical analysis on the people living / working in each grid to obtain the population attribute characteristics of the grid each month, including information such as population size, gender, age, income level and consumption level; POI location point of interest data is crawled from the Baidu Map API (Application Program Interface), and each line of data contains information such as name, major category, medium category, minor category, address, province, city, and district, and longitude and latitude coordinates; road network data comes from the Open StreetMap open platform. After downloading, the data is cleaned and filtered to retain fields such as road name and road length; building outline data comes from the Amap API, and each line of data contains fields such as building area, building height and number of floors; Google map image data is obtained through Aowei Interactive Map.
[0154] S2. Establish a performance evaluation index system for village and town industrial clusters.
[0155] According to relevant references, combined with the characteristics and existing problems of village and town industrial clusters, a performance evaluation system was constructed from four aspects: spatial performance, economic performance, social performance and development performance, including nine evaluation indicators: industrialization degree, patch fragmentation and development degree, enterprise scale, economic benefits, employment supply, social services, transportation conditions and expansion trends.
[0156] S3. Based on the relevant data within the target area, calculate the secondary indicator data corresponding to the spatial performance, economic performance, social performance and development performance within the target area.
[0157] The vector map of the industrial agglomeration area of Xilang Village in Liwan District, Guangzhou and its surrounding industrial contiguous areas was extracted. The specific scope is north of Dongxi Road, south of Guantao Road, west of Huadi River, and east of Guantao Road. The obtained file was imported into GIS software; according to the scope of the target area, the target area was divided into 50m×50m grids, and the grid center point elements were obtained, which were clipped according to the boundaries.
[0158] For the degree of industrialization, the road network data and building outline data in the target area are imported into the GIS software, and the road network data is used as the line element to cut the target area to form plot units divided by the road network. The building outline data is screened against the Google map, the industrial building outline is selected, and the structure and yard land area are calculated. The industrial building coefficient of each plot unit is calculated to characterize the degree of industrialization, such as Figure 2 shown.
[0159] For the patch fragmentation, the road network data in the target area is imported into the GIS software, and the road network data is used as the line element to cut the target area to form plot units divided by the road network. The area and perimeter of each plot are calculated using the GIS software computational geometry tool, and the morphological coefficient of each plot unit is calculated to characterize the patch fragmentation, such as Figure 3 shown.
[0160] For development intensity, the road network data and building outline data in the target area are imported into GIS software, and the road network data is used as line elements to cut the target area to form plot units divided by the road network. The number of building floors and base area information in the building outline data are used to calculate the volume ratio of each plot unit to characterize the development intensity, such as Figure 4 shown.
[0161] For enterprise scale, the obtained Qichacha and Tianyancha enterprise data are pre-processed in a table, retaining three types of information: enterprise name, enterprise address, and registered capital. The enterprise address information is converted into Mars coordinate system coordinates through the batch coordinate conversion tool, and then the longitude and latitude coordinates obtained are converted into WGS-84 coordinate system coordinates through the GIS data converter for subsequent analysis. Export the table data in csv format, import it into GIS, select Display XY data, set the X field to longitude, the Y field to latitude, and select 84 coordinates for the coordinate system; then convert the coordinate-located data into a shp file, import it into GIS again, use the spatial link tool to link it to the grid, and calculate the total registered capital of enterprises in the grid cells of the target area to characterize the scale of the enterprise, such as Figure 5 shown.
[0162] For economic benefits, import the SDK table data in csv format into GIS, coordinate the table data, select Display XY data, set the X field to longitude, the Y field to latitude, and select 84 coordinates for the coordinate system. Then convert the data with coordinates to a shp file, import it into GIS again, convert it to a raster file, use the interpolation analysis tool to assign values to the grids with missing data, and then convert it to a shp file. Use the spatial link tool to link the work income in the SDK population portrait data to the created surface layer, that is, the grid layer, and calculate the sum of the work income in the grid cells of the target area to represent the economic benefits, such as Figure 6 shown.
[0163] For employment supply, import the SDK table data in csv format into GIS, coordinate the table data, select Display XY data, set the X field to longitude, the Y field to latitude, and select 84 coordinates for the coordinate system. Then convert the data with coordinate location into a shp file, import it into GIS again, convert it into a raster file, use the interpolation analysis tool to assign values to the grids with missing data, and then convert it into a shp file. Use the spatial link tool to link the working population in the SDK population portrait data to the created surface layer, that is, the grid layer, and calculate the total number of working people in the grid cells of the target area to represent the employment supply, such as Figure 7 shown.
[0164] For social services, the obtained data of various POI locations are imported into GIS software, and the POI points are located using their longitude and latitude coordinates. The POI location data are then linked to the grid, and the ratio of the number of POI points in each grid in the target area to the grid area is calculated to characterize the social services, such as Figure 8 shown.
[0165] For traffic conditions, the urban road network in the target area is imported into GIS software, and the road network is analyzed using the kernel density tool of GIS software. The analysis results are linked to the grid, and the road network density in the target area is calculated to characterize the traffic conditions, such as Fig. 9 shown.
[0166] For the expansion trend, the obtained Google map image map data were processed, a research time span was selected to highlight the trend of built-up conditions within the target area, the outlines of built-up buildings at two time points were manually extracted, converted into surface elements in GIS software, and the expansion paper number of the target area was calculated to characterize the expansion trend, e.g. Fig.10 shown.
[0167] S4. Determine the weight of each secondary indicator based on the data of each secondary indicator and calculate the comprehensive performance evaluation value.
[0168] This embodiment uses the entropy weight TOPSIS comprehensive evaluation method to determine the weight of each secondary indicator and calculate the comprehensive potential evaluation value. The entropy weight method is first used to obtain the weight of each indicator, and then the TOPSIS method is used to analyze the data. The obtained comprehensive performance evaluation value is as follows: Fig.11 shown.
[0169] S5. Sort the comprehensive performance evaluation values and divide the target area into five zones: low performance zone, medium-low performance zone, medium performance zone, medium-high performance zone, and high performance zone.
[0170] Specifically, the comprehensive performance evaluation values of the target area grid units were imported into ArcGIS software for visualization and sorting. The ArcGIS reclassification tool was used to classify the data, and the comprehensive performance evaluation values were divided into five categories based on the natural break point classification method, which were marked from small to large as low performance area, medium-low performance area, medium performance area, medium-high performance area, and high performance area. The comprehensive performance evaluation value ranges were 0.046811305-0.09317166 for low performance area, 0.09317166-0.186343321 for medium performance area, 0.186343321-0.279514982 for medium-high performance area, 0.279514982-0.372686642 for medium-high performance area, and 0.372686642-0.465858303 for high performance area.
[0171] From the final results, it can be seen that the performance evaluation value of the Xilang Village Industrial Cluster in Liwan District, Guangzhou is mainly located in the medium-low performance area and the low performance area, and the comprehensive performance evaluation value is low, and it is urgent to carry out updating and renovation work in the near future.
[0172] It should be noted that although the method operations of the above embodiments are described in a specific order, this does not require or imply that these operations must be performed in this specific order, or that all the operations shown must be performed to achieve the desired results. On the contrary, the steps depicted can be performed in a different order. Additionally or alternatively, some steps can be omitted, multiple steps can be combined into one step, and / or one step can be decomposed into multiple steps.
[0173] Embodiment 3:
[0174] like Fig.12 As shown, this embodiment provides a performance evaluation system for village and town industrial clusters, which includes an acquisition module 1201, a construction module 1202, a first calculation module 1203 and a second calculation module 1204. The specific functions of each module are as follows:
[0175] Acquisition module 1201, used to acquire relevant data in the target area, the relevant data including SDK crowd portrait data, POI location point of interest data, road network data, building outline data, enterprise data and map image data;
[0176] Construction module 1202 is used to construct a performance evaluation index system for village and town industrial clusters, wherein the performance evaluation index system includes four primary indicators of spatial performance, economic performance, social performance and development performance and corresponding secondary indicators;
[0177] The first calculation module 1203 is used to calculate the secondary indicator data corresponding to the spatial performance, economic performance, social performance and development performance in the target area according to the relevant data in the target area;
[0178] The second calculation module 1204 is used to determine the weight of each secondary indicator according to each secondary indicator data, and calculate the comprehensive performance evaluation value.
[0179] Furthermore, the village and town industrial cluster performance evaluation system of this embodiment may also include:
[0180] The division module 1205 is used to sort the comprehensive performance evaluation values and divide the target area into five zones: low performance zone, medium-low performance zone, medium performance zone, medium-high performance zone, and high performance zone.
[0181] Embodiment 4:
[0182] This embodiment provides a computer device, such as Fig.13 As shown, it includes a processor 1302, a memory, an input device 1303, a display device 1304 and a network interface 1305 connected through a system bus 1301. The processor is used to provide computing and control capabilities. The memory includes a non-volatile storage medium 1306 and an internal memory 1307. The non-volatile storage medium 1306 stores an operating system, a computer program and a database. The internal memory 1307 provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. When the processor 1302 executes the computer program stored in the memory, the performance evaluation method of the village and town industrial agglomeration area in the above-mentioned embodiment 1 is implemented as follows:
[0183] Obtain relevant data in the target area, including SDK crowd portrait data, POI location point of interest data, road network data, building outline data, enterprise data and map image data; construct a performance evaluation index system for village and town industrial clusters, which includes four first-level indicators of spatial performance, economic performance, social performance and development performance and corresponding second-level indicators; calculate the second-level indicator data corresponding to the spatial performance, economic performance, social performance and development performance in the target area based on the relevant data in the target area; determine the weight of each second-level indicator based on the data of each second-level indicator, and calculate the comprehensive performance evaluation value
[0184] Furthermore, it may also include:
[0185] The comprehensive performance evaluation values are sorted and the target area is divided into five zones: low performance zone, medium-low performance zone, medium performance zone, medium-high performance zone, and high performance zone.
[0186] Embodiment 5:
[0187] This embodiment provides a storage medium, which is a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the performance evaluation method of the village and town industrial cluster area in the above embodiment 1 is implemented as follows:
[0188] Obtain relevant data in the target area, including SDK crowd portrait data, POI location point of interest data, road network data, building outline data, enterprise data and map image data; construct a performance evaluation index system for village and town industrial clusters, which includes four first-level indicators of spatial performance, economic performance, social performance and development performance and corresponding second-level indicators; calculate the second-level indicator data corresponding to the spatial performance, economic performance, social performance and development performance in the target area based on the relevant data in the target area; determine the weight of each second-level indicator based on the data of each second-level indicator, and calculate the comprehensive performance evaluation value
[0189] Furthermore, it may also include:
[0190] The comprehensive performance evaluation values are sorted and the target area is divided into five zones: low performance zone, medium-low performance zone, medium performance zone, medium-high performance zone, and high performance zone.
[0191] It should be noted that the computer-readable storage medium of the present embodiment may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0192] In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device, or device. In this embodiment, the computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The computer-readable signal medium may also be any computer-readable storage medium other than a computer-readable storage medium, which may send, propagate, or transmit a program used by or in combination with an instruction execution system, device, or device. The computer program contained on the computer-readable storage medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.
[0193] The computer readable storage medium can be written in one or more programming languages or a combination thereof to execute the computer program of the present embodiment, and the programming language includes an object-oriented programming language, such as Java, Python, C++, and also includes a conventional procedural programming language, such as C language or a similar programming language. The program can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or completely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (e.g., using an Internet service provider to connect through the Internet).
[0194] In summary, the method and system of the present invention are based on multi-source data, focus on village and town industrial clusters in industrial stock land, comprehensively consider their current situation and characteristics, construct a performance evaluation index system for village and town industrial clusters, calculate the secondary indicator data corresponding to spatial performance, economic performance, social performance and development performance in the target area, determine the weight of each secondary indicator, and thus calculate the comprehensive performance evaluation value, evaluate village and town industrial clusters from a more micro perspective, and can effectively and accurately evaluate existing village and town industrial clusters, providing a reference for urban planners to determine the development sequence of industrial stock land.
[0195] The above description is only a preferred embodiment of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention.
Claims
1. A performance evaluation method for village and town industrial clusters, characterized in that: The method comprises: Acquire relevant data in the target area, including SDK crowd portrait data, POI location point of interest data, road network data, building outline data, enterprise data and map image data; Constructing a performance evaluation index system for village and town industrial clusters, which includes four primary indicators of spatial performance, economic performance, social performance and development performance, as well as corresponding secondary indicators; Based on the relevant data within the target area, calculate the secondary indicator data corresponding to the spatial performance, economic performance, social performance and development performance within the target area; Based on the data of each secondary indicator, determine the weight of each secondary indicator and calculate the comprehensive performance evaluation value.
2. The performance evaluation method for village and town industrial clusters according to claim 1 is characterized in that: The secondary indicators corresponding to the spatial performance include industrialization degree, patch fragmentation and development degree; the secondary indicators corresponding to the economic performance include enterprise scale and economic benefits; the secondary indicators corresponding to the social performance include employment supply and social services; the secondary indicators corresponding to the development performance include traffic conditions and expansion trends; The calculation of the secondary indicator data corresponding to the spatial performance, economic performance, social performance and development performance in the target area based on the relevant data in the target area specifically includes: According to the scope of the target area, the target area is divided into N×N grids, and the grid center point elements are obtained, and clipped according to the boundaries; According to the building outline data and road network data in the target area, the industrial building coefficient, plot morphology coefficient and volume ratio of the target area are calculated to characterize the industrialization degree, patch fragmentation and development degree respectively; Link enterprise data to the grid and calculate the total registered capital of enterprises in the unit grid of the target area to characterize the enterprise size; Link the work income in the SDK population profile data to the grid, and calculate the sum of the work income in the grid cells of the target area to represent the economic benefits; Link the working population in the SDK population portrait data to the grid, and calculate the total work income in the grid cells of the target area to represent the employment supply; Based on the data of various POI locations of catering services, shopping services, life services, transportation facilities services, financial insurance services, accommodation services, science and education and culture services, sports and leisure services, and medical care services in the target area, the ratio of the number of POI points in each grid of the target area to the grid area is calculated to represent social services; According to the road network data in the target area, the road network density of the target area is calculated to characterize the traffic conditions; According to the map image data in the target area, the expansion index of the target area is calculated to characterize the expansion trend.
3. The performance evaluation method for village and town industrial clusters according to claim 2 is characterized in that: The industrial building coefficient, plot morphology coefficient and volume ratio of the target area are calculated based on the building outline data and road network data in the target area to respectively characterize the industrialization degree, patch fragmentation and development degree, specifically including: According to the building outline data and road network data in the target area, the industrial building coefficient of the target area is calculated to characterize the degree of industrialization, as shown in the following formula: Among them, Q n is the industrial building coefficient, B n is the area of industrial buildings, A n is the area of the structure, D n is the land area of the storage yard, Z n is the total area of the plot; According to the building outline data and road network data in the target area, the plot morphology coefficient of the target area is calculated to characterize the patch fragmentation, as follows: Among them, K n is the plaque fragmentation, S n is the area of a single plot divided by the road network, C n It is the perimeter of a single plot divided by the road network; According to the building outline data and road network data in the target area, the volume ratio of the target area is calculated to characterize the degree of development, as follows: Among them, F n is the floor area ratio, J n is the total building area, Z n The total area of the plot.
4. The performance evaluation method for village and town industrial clusters according to claim 2 is characterized in that: According to the road network data in the target area, the road network density of the target area is calculated to characterize the traffic conditions, as shown in the following formula: Among them, F i is the kernel density value, the kernel density analyzed with i as the center point, d ij Represents the distance between two points, and sets the weight to K j , the bandwidth variable is r, and the number of points j within the bandwidth range is n.
5. The performance evaluation method for village and town industrial clusters according to claim 2 is characterized in that: According to the map image data in the target area, the expansion index of the target area is calculated to characterize the expansion trend, as shown in the following formula: Among them, U is the expansion trend, U b and U a are the built-up areas at the end and beginning of the study period, respectively, TLA is the total area of the study area, and T is the study time interval.
6. The performance evaluation method for village and town industrial clusters according to claim 1 is characterized in that: The weight of each secondary indicator is determined according to the data of each secondary indicator, and the comprehensive performance evaluation value is calculated, which specifically includes: Rasterize the data of each secondary indicator to convert the vector data into raster data and perform normalization; According to the normalized secondary indicator data, calculate the proportion of each secondary indicator data to the secondary indicator; According to the proportion of each secondary indicator data to the secondary indicator, the entropy of each secondary indicator is calculated; According to the entropy of each secondary indicator, the redundancy of entropy is calculated; According to the redundancy of entropy, the weight of each secondary indicator is calculated; According to the weight of each secondary indicator, the TOPSIS method is used to calculate the comprehensive performance evaluation value.
7. The performance evaluation method for village and town industrial clusters according to any one of claims 1 to 6 is characterized in that: The method further comprises: The comprehensive performance evaluation values are sorted and the target area is divided into five zones: low performance zone, medium-low performance zone, medium performance zone, medium-high performance zone, and high performance zone.
8. A performance evaluation system for village and town industrial clusters, characterized in that: The system comprises: An acquisition module is used to acquire relevant data in the target area, wherein the relevant data includes SDK crowd portrait data, POI location point of interest data, road network data, building outline data, enterprise data and map image data; A construction module is used to construct a performance evaluation index system for village and town industrial clusters, wherein the performance evaluation index system includes four primary indicators of spatial performance, economic performance, social performance and development performance, and corresponding secondary indicators; The first calculation module is used to calculate the secondary indicator data corresponding to the spatial performance, economic performance, social performance and development performance in the target area based on the relevant data in the target area; The second calculation module is used to determine the weight of each secondary indicator according to the data of each secondary indicator, and calculate the comprehensive performance evaluation value.
9. A computer device comprising a processor and a memory for storing a program executable by the processor, characterized in that: When the processor executes the program stored in the memory, it implements the performance evaluation method for village and town industrial clusters described in any one of claims 1-7.
10. A storage medium storing a program, characterized in that: When the program is executed by the processor, the performance evaluation method for village and town industrial clusters described in any one of claims 1-7 is implemented.
