Gas-motor unit change cost compensation method and device

By combining the weighted average price and adjusted generation cost using the SCUC and SCED models, it is possible to accurately determine whether gas turbine units need variable cost compensation. This solves the problem of inaccurate variable cost compensation for gas turbine units, reduces market costs, and promotes orderly competition among units, thereby improving the efficiency of the electricity market and reducing electricity costs for users.

CN118982371APending Publication Date: 2024-11-19POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411012802.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In existing technologies, the variable cost compensation for gas-fired power units is not accurate enough, which leads some gas-fired power units to deliberately submit low prices, affecting the overall sufficiency of natural gas supply and increasing the overall power generation cost in the electricity market. In addition, the variable cost compensation fee outside the market is too high.

Method used

Market clearing calculations are performed using SCUC and SCED models. By combining the weighted average price and adjusted power generation cost, it is possible to accurately determine whether gas turbine units need variable cost compensation. The compensation amount is calculated by adjusting the market conditions and the acceptance level of the units using a preset parameter α.

Benefits of technology

It has improved the accuracy of variable cost compensation for gas-fired power units, reduced the overall operating cost of the market, promoted orderly competition between gas-fired and coal-fired power units, and improved the efficiency of the electricity market and the cost of electricity for users.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982371A_ABST
    Figure CN118982371A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of electricity transaction, and discloses a gas-motor unit change cost compensation method and device. The method comprises the steps of obtaining basic power data; using the SCUC model and the SCED model to obtain the transaction capacity and the transaction price of each gas-motor unit in each preset time period; taking the transaction capacity as a weight to calculate a weighted average price of each gas-motor unit; calculating the adjusted power generation cost of each type of pneumatic motor set based on the change cost compensation standard and the check change cost of each type of pneumatic motor set by using preset parameters; determining the pneumogenerator set with the weighted average price smaller than the adjusted power generation cost as a to-be-compensated pneumogenerator set; and calculating the compensation amount of the to-be-compensated pneumomotor set based on the change cost compensation standard of the to-be-compensated pneumomotor set, the adjusted power generation cost and the weighted average price. According to the method, the accuracy of calculating the change cost compensation of the gas generator set is improved, the overall cost of market operation is reduced, and more ordered competition of the gas generator set and the coal generator set is promoted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power trading, and in particular to a method and device for compensating variable costs of gas-fired power generation units. Background Art

[0002] The price of natural gas is generally higher than that of coal, which results in higher variable costs for gas-fired power generation than for coal-fired power generation. At present, in order to prevent the high-cost gas-fired power generation from raising the marginal clearing price in the electricity spot market, it is generally adopted to compensate for the actual power generation of gas-fired power generation units outside the market. Among them, the variable cost compensation price is the difference between the original on-grid electricity price of gas and the market benchmark electricity price, thereby bringing the cost of gas-fired power generation units to the same level as coal-fired power generation units, reducing the market quotation of gas-fired power generation units, and then reducing the market clearing marginal price.

[0003] However, based on the current market performance, the actual power generation cost of natural gas units is lower than the original on-grid electricity price. Therefore, some gas-fired units have deliberately declared low prices in the spot market to obtain more compensation for off-market variable costs, resulting in a large amount of clearing electricity from high-priced gas-fired units, affecting the overall abundance of natural gas supply. At the same time, it has led to excessively high overall variable cost compensation costs for natural gas units, increasing the overall power generation costs of the electricity market and the overall electricity costs of users. Summary of the invention

[0004] The present invention provides a method and device for compensating for variable costs of gas-fired power units, which can improve the accuracy of judging whether gas-fired power units need to recover variable cost compensation, and also improve the calculation accuracy of variable cost compensation of gas-fired power units, thereby reducing the overall market operation cost and promoting more orderly competition between gas-fired power units and coal-fired power units.

[0005] In order to solve the above technical problems, the present invention provides a method for compensating variable costs of a gas-fired generator set, comprising:

[0006] Obtaining basic power data; wherein the basic power data includes variable cost compensation standards, approved variable costs, declared capacity and price information of several types of gas-fired power units;

[0007] Using the SCUC model and the SCED model, market clearing calculations are performed based on the declared capacity and price information of various gas-fired power units to obtain the transaction capacity and transaction price of each gas-fired power unit in each preset period;

[0008] Taking the transaction capacity as the weight, the weighted average price of each gas-fired power unit is calculated according to the transaction capacity and transaction price of each gas-fired power unit in each preset time period;

[0009] Using preset parameters, based on the variable cost compensation standards and approved variable costs of various gas-fired power generation units, the adjusted power generation costs of various gas-fired power generation units are calculated;

[0010] Compare the weighted average price and adjusted power generation cost of various gas-fired power generation units, and identify the gas-fired power generation units whose weighted average price is less than the adjusted power generation cost as the gas-fired power generation units to be compensated;

[0011] The compensation amount for the gas-fired power units to be compensated is calculated based on the variable cost compensation standard, adjusted power generation cost and weighted average price of the gas-fired power units to be compensated.

[0012] Furthermore, the SCUC model and the SCED model are used to perform market clearing calculations based on the declared capacity and price information of various gas-fired power units, and the transaction capacity and transaction price of each gas-fired power unit in each preset period are obtained, specifically:

[0013] Input the declared capacity and price information of several types of gas-fired power units into the SCUC model and the SCED model respectively;

[0014] The SCUC model and the SCED model are optimized using a preset optimizer to obtain the transaction capacity and transaction price of each gas-fired unit in each preset time period.

[0015] Furthermore, the transaction capacity is used as a weight, and the weighted average price of each gas-fired power unit is calculated according to the transaction capacity and transaction price of each gas-fired power unit in each preset time period, specifically:

[0016]

[0017] Where, WAP i,t is the weighted average price of gas-fired generator set i; P i,j is the transaction capacity of gas-fired unit i in period j; C i,j is the transaction price of gas-fired unit i in period j; N t,i is the number of transaction time periods of gas-fired generator set i in period t.

[0018] Furthermore, the adjusted power generation costs of various gas-fired power generation units are calculated based on the variable cost compensation standards and the approved variable costs of various gas-fired power generation units by using the preset parameters, specifically:

[0019] MC i =(R i -MWP i )×α

[0020] In the formula, MC i is the adjusted power generation cost of gas-fired unit i; R i is the approved variable cost of gas-fired generator set i; MWP i is the variable cost compensation standard of gas-fired generator set i; α is the preset parameter.

[0021] Furthermore, the compensation amount of the gas-fired power generation units to be compensated is calculated based on the variable cost compensation standard, the adjusted power generation cost and the weighted average price of the gas-fired power generation units to be compensated, specifically:

[0022] Calculate the difference between the adjusted generation cost of the gas-fired power units to be compensated and the weighted average price to form the adjusted difference of the gas-fired power units to be compensated;

[0023] Compare the variable cost compensation standard and the adjusted difference of the gas-fired power units to be compensated, and determine the smaller value between the variable cost compensation standard and the adjusted difference of the gas-fired power units to be compensated as the compensation amount of the gas-fired power units to be compensated.

[0024] Furthermore, the SCUC model is specifically:

[0025] The objective function of the SCUC model is:

[0026]

[0027] Where N is the number of gas-fired generator sets; T is the number of time periods; P i,t is the output of gas-fired generator set i in period t; C i,t (P i,t ) is the operating cost of gas-fired generator set i in period t; is the startup cost of gas-fired generator set i in period t; is the downtime cost of gas-fired generator set i in period t;

[0028] The constraints of the SCUC model include system constraints, crew constraints, and network security constraints;

[0029] Among them, the system constraints of the SCUC model include load balance constraints, system positive reserve capacity constraints, and system negative reserve capacity constraints;

[0030] The load balancing constraints are:

[0031]

[0032] Where P i,t is the output of gas-generator unit i in period t; D t is the system load during period t;

[0033] The system positive reserve capacity constraint is:

[0034]

[0035] In the formula, α i,t is the start and stop status of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t; D tis the system load during period t; is the system positive reserve capacity requirement for period t;

[0036] The system negative reserve capacity constraint is:

[0037]

[0038] In the formula, α i,t is the start and stop status of gas-generator unit i in period t; is the minimum output of gas-generator unit i in period t; D t is the system load during period t; is the system negative reserve capacity requirement for period t;

[0039] The unit constraints of the SCUC model include the upper and lower limits of unit output, the ramping constraints of the unit, and the minimum continuous start and stop time constraints of the unit;

[0040] The upper and lower limits of the unit output are:

[0041]

[0042] Where P i,t is the output of gas-fired generator set i in period t; α i,t is the start and stop status of gas-generator unit i in period t; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t;

[0043] The unit climbing constraint is:

[0044]

[0045] Where P i,t is the output of gas-fired generator set i in period t; P i,t-1 is the output of gas-fired generator set i in period t-1; is the maximum ramp rate of gas-generator unit i; is the maximum down-slope rate of gas-generator unit i; α i,t is the start and stop status of gas-generator unit i in period t; α i,t-1 is the start and stop status of gas-generator unit i in period t-1; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t;

[0046] The minimum continuous start and stop time constraint of the unit is:

[0047]

[0048] Where, TU is the minimum continuous start-up time of the gas generator set; T D The minimum continuous downtime of the gas generator set; is the continuous startup time of gas-generator unit i in period t; is the continuous downtime of gas-generator unit i in period t; α i,t is the start and stop status of gas-generator unit i in period t; α i,t-1 is the start and stop status of gas-generator unit i in period t-1;

[0049] The network security constraints of the SCUC model include line flow constraints and section flow constraints;

[0050] The line power flow constraint is:

[0051]

[0052] In the formula, is the power transmission limit of line l; G l-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on line l; P i,t is the output of gas-fired generator set i in period t; G l-k is the generator output power transfer distribution factor of node k to line l; D k,t is the bus load value of node k in period t; N is the number of gas-fired generator sets; K is the number of nodes in the system;

[0053] The cross-sectional flow constraint is:

[0054]

[0055] In the formula, and are the power flow transmission limits of section s; P i,t is the output of gas-fired generator set i in period t; G s-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on section s; G s-k D is the generator output power transfer distribution factor of node k to section s; k,t is the bus load value of node k in period t.

[0056] Furthermore, the SCED model is specifically:

[0057] The objective function of the SCED model is:

[0058]

[0059] Where N is the number of gas-fired generator sets; T is the number of time periods; P i,t is the output of gas-fired generator set i in period t; Ci,t (P i,t ) is the operating cost of gas-fired generator set i in period t;

[0060] The constraints of the SCED model include system constraints, unit constraints, and network security constraints;

[0061] Among them, the system constraints of the SCED model include load balance constraints;

[0062] The load balancing constraints are:

[0063]

[0064] Where P i,t is the output of gas-generator unit i in period t; D t is the system load during period t;

[0065] The unit constraints of the SCED model include the upper and lower limits of unit output and the unit climbing constraints;

[0066] The upper and lower limits of the unit output are:

[0067]

[0068] Where P i,t is the output of gas-fired generator set i in period t; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t;

[0069] The unit climbing constraint is:

[0070]

[0071] In the formula, is the maximum down-slope rate of gas-generator unit i; is the maximum ramp rate of gas-generator unit i; P i,t is the output of gas-fired generator set i in period t; P i,t-1 is the output of gas-fired generator set i in period t-1;

[0072] The network security constraints of the SCED model include line flow constraints and section flow constraints;

[0073] The line power flow constraint is:

[0074]

[0075] In the formula, is the power transmission limit of line l; G l-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on line l; Pi,t is the output of gas-fired generator set i in period t; G l-k is the generator output power transfer distribution factor of node k to line l; D k,t is the bus load value of node k in period t; N is the number of gas-fired generator sets; K is the number of nodes in the system;

[0076] The cross-sectional flow constraint is:

[0077]

[0078] In the formula, and are the power flow transmission limits of section s; P i,t is the output of gas-fired generator set i in period t; G s-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on section s; G s-k D is the generator output power transfer distribution factor of node k to section s; k,t is the bus load value of node k in period t.

[0079] Furthermore, the value range of the preset parameter is [0, 1].

[0080] The present invention provides a variable cost compensation method for gas-fired power units. By accurately judging whether the gas-fired power units need to recover the variable cost compensation, and by introducing an adjustment coefficient α to adjust the market situation and the acceptance of the units, the variable cost compensation of the gas-fired power units is accurately calculated, thereby reducing the overall cost of market operation, promoting more orderly competition between gas-fired power units and coal-fired power units, effectively improving the efficiency of the power market, and ensuring that resources are optimally allocated. In addition, reducing the overall market operation cost can effectively reduce the user's electricity cost, thereby improving the attractiveness and competitiveness of the power market.

[0081] Accordingly, the present invention provides a variable cost compensation device for a gas-fired generator set, comprising: an acquisition module, a calculation module, a weighting module, an adjustment module, a comparison module and a compensation determination module;

[0082] The acquisition module is used to acquire basic power data; wherein the basic power data includes variable cost compensation standards, approved variable costs, declared capacity and price information of several types of gas-fired generator sets;

[0083] The calculation module is used to use the SCUC model and the SCED model to perform market clearing calculations based on the declared capacity and price information of various gas-fired power units, and obtain the transaction capacity and transaction price of each gas-fired power unit in each preset time period;

[0084] The weighted module is used to calculate the weighted average price of each gas-fired power unit based on the transaction capacity and transaction price of each gas-fired power unit in each preset time period by taking the transaction capacity as the weight;

[0085] The adjustment module is used to calculate the adjusted power generation cost of various gas-fired power generation units based on the variable cost compensation standards and the approved variable costs of various gas-fired power generation units using preset parameters;

[0086] The comparison module is used to compare the weighted average price and the adjusted power generation cost of various gas-fired generator sets, and determine the gas-fired generator set whose weighted average price is less than the adjusted power generation cost as the gas-fired generator set to be compensated;

[0087] The compensation determination module is used to calculate the compensation amount of the gas-fired power generation unit to be compensated based on the variable cost compensation standard, the adjusted power generation cost and the weighted average price of the gas-fired power generation unit to be compensated.

[0088] Furthermore, the calculation module includes: an input unit and an optimization unit;

[0089] The input unit is used to input the declared capacity and price information of several types of gas-fired generator sets into the SCUC model and the SCED model respectively;

[0090] The optimization unit is used to optimize the SCUC model and the SCED model using a preset optimizer to obtain the transaction capacity and transaction price of each gas-fired unit in each preset time period.

[0091] The present invention provides a variable cost compensation device for gas-fired power units. Based on the organic combination of modules, the device accurately determines whether the gas-fired power units need to recover the accuracy of variable cost compensation, and introduces an adjustment coefficient α to adjust the market situation and the acceptance of the units, accurately calculates the variable cost compensation of the gas-fired power units, and reduces the overall cost of market operation, promotes more orderly competition between gas-fired power units and coal-fired power units, effectively improves the efficiency of the power market, and ensures that resources are optimally allocated. In addition, reducing the overall market operation cost can effectively reduce the user's electricity cost, thereby improving the attractiveness and competitiveness of the power market. BRIEF DESCRIPTION OF THE DRAWINGS

[0092] Figure 1 A schematic diagram of a flow chart of an embodiment of a method for compensating for variable costs of a gas-fired generator set provided by the present invention;

[0093] Figure 2 A schematic diagram of the capacity price declared for the gas-fired power unit provided by the present invention;

[0094] Figure 3 A schematic structural diagram of an embodiment of a variable cost compensation device for a gas-fired generator set provided by the present invention. DETAILED DESCRIPTION

[0095] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0096] The flowcharts shown in the accompanying drawings are only examples and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps may also be decomposed, combined or partially merged, so the actual execution order may change according to actual conditions.

[0097] Some embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.

[0098] Example 1

[0099] See also Figure 1 , is a flow chart of an embodiment of a method for compensating for variable costs of a gas-fired generator set provided by the present invention, the method comprising steps 101 to 106, each of which is specifically as follows:

[0100] Step 101: Obtain basic power data; wherein the basic power data includes variable cost compensation standards, approved variable costs, declared capacities and price information of several types of gas-fired power units.

[0101] In the first embodiment of the present invention, the basic power data required for calculating the variable cost compensation of gas-fired power units include the variable cost compensation standard prices of various gas-fired power units, the approved variable costs of various gas-fired power units, and the capacity and price information reported by various gas-fired power units in the power spot market every day. Among them, the approved variable costs of various gas-fired power units are updated monthly, and the latest approved variable costs of the month are obtained when calculating the variable cost compensation.

[0102] Step 102: Using the SCUC model and the SCED model, market clearing calculations are performed based on the declared capacity and price information of various gas-fired power units to obtain the transaction capacity and transaction price of each gas-fired power unit in each preset time period.

[0103] Furthermore, in the first embodiment of the present invention, the SCUC model and the SCED model are used to perform market clearing calculations based on the declared capacity and price information of various gas-fired power units, and the transaction capacity and transaction price of each gas-fired power unit in each preset time period are obtained, specifically:

[0104] Input the declared capacity and price information of several types of gas-fired power units into the SCUC model and the SCED model respectively;

[0105] The SCUC model and the SCED model are optimized using a preset optimizer to obtain the transaction capacity and transaction price of each gas-fired unit in each preset time period.

[0106] In the first embodiment of the present invention, the declared data of the gas-fired power units, i.e., the declared capacity and price information, etc., are input into the SCUC and SCED model systems, and a mature optimization algorithm software package (such as CPLEX) is called to perform market clearing calculations on the SCUC model and the SCED model, which can determine the clearing capacity and transaction price of the gas-fired power units in each time period.

[0107] Furthermore, in the first embodiment of the present invention, SCUC is a safety constrained unit combination. The SCUC model of the present invention is a full-time safety constrained unit combination model. The model divides a day into several time periods, and considers multiple time periods of a day to establish the objective function of the model. The objective function of the model is to minimize the power purchase cost, which is specifically:

[0108] The objective function of the SCUC model is:

[0109]

[0110] Where N is the number of gas-fired generator sets; T is the total number of time periods considered; P i,t is the output of gas-fired generator set i in period t; C i,t (P i,t ) is the operating cost of gas-fired generator set i in period t; is the startup cost of gas-fired generator set i in period t; is the downtime cost of gas-fired unit i in period t; among them, the unit operation cost C i,t (P i,t ) is a multi-segment linear function of the unit output.

[0111] The constraints of the SCUC model include system constraints, crew constraints, and network security constraints;

[0112] Among them, the system constraints of the SCUC model include load balance constraints, system positive reserve capacity constraints, and system negative reserve capacity constraints;

[0113] For each time period t, the load balancing constraint is:

[0114]

[0115] Where P i,t is the output of gas-generator unit i in period t; D tis the system load during period t, which has deducted the net power supplied by the interconnection line.

[0116] Under the premise of ensuring the power balance of the system, a certain amount of spare capacity is reserved in the system to prevent the deviation of system load forecast and the imbalance fluctuation of system supply and demand caused by various actual operation accidents.

[0117] To ensure that the total daily startup capacity meets the system's minimum spare capacity, the system's positive spare capacity constraint can be described as:

[0118]

[0119] In the formula, α i,t is the start and stop status of gas-generator unit i in period t, α i,t =0 means the unit is shut down, α i,t =1 means the unit is on; is the maximum output of gas-fired generator set i in period t; D t is the system load during period t; is the system positive reserve capacity requirement for period t;

[0120] The system negative reserve capacity constraint can be described as:

[0121]

[0122] In the formula, α i,t is the start and stop status of gas-generator unit i in period t; is the minimum output of gas-generator unit i in period t; D t is the system load during period t; is the system negative reserve capacity requirement for period t.

[0123] The unit constraints of the SCUC model include the upper and lower limits of unit output, the ramping constraints of the unit, and the minimum continuous start and stop time constraints of the unit;

[0124] The output of the unit should be within its maximum / minimum technical output range, so the upper and lower limits of the unit output are:

[0125]

[0126] Where P i,t is the output of gas-fired generator set i in period t; α i,t is the start and stop status of gas-generator unit i in period t; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t;

[0127] If the gas generator unit stops, that is, α i,t=0, at this time, the unit output can be limited to 0 through this constraint condition; when the unit is turned on, α i,t =1, in this case, the constraint condition is the conventional upper and lower limit constraints of output.

[0128] When the gas-fired unit is climbing up or down a slope, it should meet the climbing rate requirements, so the unit climbing constraint is:

[0129]

[0130] Where P i,t is the output of gas-fired generator set i in period t; P i,t-1 is the output of gas-fired generator set i in period t-1; is the maximum ramp rate of gas-generator unit i; is the maximum down-slope rate of gas-generator unit i; α i,t is the start and stop status of gas-generator unit i in period t; α i,t-1 is the start and stop status of gas-generator unit i in period t-1; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-generator unit i in period t.

[0131] Due to the physical properties of gas-fired generator sets and actual operation requirements, it is required that the gas-fired generator sets meet the minimum continuous start / stop time. Therefore, the minimum continuous start / stop time constraint of the unit is:

[0132]

[0133] Where, T U is the minimum continuous start time of the gas generator set; T D The minimum continuous downtime of the gas generator set; is the continuous startup time of gas-generator unit i in period t; is the continuous downtime of gas-generator unit i in period t; α i,t is the start and stop status of gas-generator unit i in period t; α i,t-1 is the start and stop status of gas-generator unit i in period t-1;

[0134] in, and The state variable α can be used i,t (i=1~N, t=1~T), specifically:

[0135]

[0136] In the formula, α i,k is the start and stop status of gas-generator unit i in time period k; T U is the minimum continuous start time of the gas generator set; T DIt is the minimum continuous downtime of the gas generator set.

[0137] The network security constraints of the SCUC model include line flow constraints and section flow constraints;

[0138] The line power flow constraint is:

[0139]

[0140] In the formula, is the power transmission limit of line l; G l-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on line l; P i,t is the output of gas-fired generator set i in period t; G l-k is the generator output power transfer distribution factor of node k to line l; D k,t is the bus load value of node k in period t; N is the number of gas-fired generator sets; K is the number of nodes in the system.

[0141] In the unit combination model, the flow constraints of key sections need to be considered. The flow constraints of sections can be described as:

[0142]

[0143] In the formula, and are the power flow transmission limits of section s; P i,t is the output of gas-fired generator set i in period t; G s-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on section s; G s-k D is the generator output power transfer distribution factor of node k to section s; k,t is the bus load value of node k in period t.

[0144] Furthermore, in the first embodiment of the present invention, SCED, namely security constrained economic dispatch, the SCED model of the present invention divides a day into several time periods, and considers multiple time periods of a day to establish the objective function of the model. The objective function of the model is to minimize the power purchase cost, specifically:

[0145] The objective function of the SCED model is:

[0146]

[0147] Where N is the number of gas-fired generator sets; T is the total number of time periods considered; P i,t is the output of gas-fired generator set i in period t; C i,t (P i,t ) is the operating cost of gas-fired unit i in period t, which is a multi-segment linear function of the unit output.

[0148] The constraints of the SCED model include system constraints, unit constraints, and network security constraints;

[0149] Among them, the system constraints of the SCED model include load balance constraints;

[0150] For each time period t, the load balancing constraint is:

[0151]

[0152] Where P i,t is the output of gas-generator unit i in period t; D t is the system load during period t, which has deducted the net power supplied by the interconnection line.

[0153] The unit constraints of the SCED model include the upper and lower limits of unit output and the unit climbing constraints;

[0154] The output of the unit should be within its maximum / minimum technical output range, so the upper and lower limits of the unit output are:

[0155]

[0156] Where P i,t is the output of gas-fired generator set i in period t; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-generator unit i in period t.

[0157] When the unit is climbing up or down a slope, it should meet the climbing rate requirements. The climbing constraint can be described as:

[0158]

[0159] In the formula, is the maximum down-slope rate of gas-generator unit i; is the maximum ramp rate of gas-generator unit i; P i,t is the output of gas-fired generator set i in period t; P i,t-1 is the output of gas-fired generator set i in period t-1.

[0160] The network security constraints of the SCED model include line flow constraints and section flow constraints;

[0161] The line power flow constraint is:

[0162]

[0163] In the formula, is the power transmission limit of line l; G l-iis the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on line l; P i,t is the output of gas-fired generator set i in period t; G l-k is the generator output power transfer distribution factor of node k to line l; D k,t is the bus load value of node k in period t; N is the number of gas-fired generator sets; K is the number of nodes in the system.

[0164] In the unit combination model, the flow constraints of key sections need to be considered. The flow constraints of sections can be described as:

[0165]

[0166] In the formula, and are the power flow transmission limits of section s; P i,t is the output of gas-fired generator set i in period t; G s-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on section s; G s-k D is the generator output power transfer distribution factor of node k to section s; k,t is the bus load value of node k in period t.

[0167] Step 103: Using the transaction capacity as a weight, and calculating the weighted average price of each gas-fired power unit according to the transaction capacity and transaction price of each gas-fired power unit in each preset time period.

[0168] Furthermore, in the first embodiment of the present invention, the transaction capacity is used as the weight, and the weighted average price of each gas-fired power unit is calculated according to the transaction capacity and transaction price of each gas-fired power unit in each preset time period, specifically:

[0169]

[0170] Where, WAP i,t is the weighted average price of gas-fired generator set i; P i,j is the transaction capacity of gas-fired unit i in period j; C i,j is the transaction price of gas-fired unit i in period j; N t,i is the number of transaction time periods of gas-fired generator set i in period t.

[0171] In the first embodiment of the present invention, after obtaining the transaction capacity and transaction price of various gas-fired power units in various time periods using the SCUC model and the SCED model, for each gas-fired power unit, the transaction power is used as the weight to calculate its weighted average price per hour. Figure 2, is a schematic diagram of the declared capacity price of the gas-fired power unit provided by the present invention, the horizontal axis of the curve is the declared capacity, and the vertical axis is the declared price. The winning capacity of the gas-fired power unit, that is, the transaction capacity of the gas-fired power unit, can be obtained in the curve; the declared price corresponding to the transaction capacity of the gas-fired power unit is the transaction price; according to the winning capacity curve, the number of declared capacity segments of the gas-fired power unit in the t period can be obtained. Therefore, according to the winning capacity of the gas-fired power unit, the declared price corresponding to the declared capacity and the number of declared capacity segments that won the bid, the weighted average price of the gas-fired power unit can be calculated using the above formula.

[0172] Step 104: Using preset parameters, based on the variable cost compensation standards and the approved variable costs of various gas-fired power generation units, the adjusted power generation costs of various gas-fired power generation units are calculated.

[0173] Further, in the first embodiment of the present invention, the adjusted power generation cost of each type of gas-fired generator set is calculated based on the variable cost compensation standard and the approved variable cost of each type of gas-fired generator set using preset parameters, specifically:

[0174] MC i =(R i -MWP i )×α

[0175] In the formula, MC i is the adjusted power generation cost of gas-fired unit i; R i is the approved variable cost of gas-fired generator set i; MWP i is the variable cost compensation standard of gas-fired generator set i; α is the preset parameter.

[0176] Furthermore, in the first embodiment of the present invention, the value range of the preset parameter is [0, 1].

[0177] In the first embodiment of the present invention, the preset parameter α is used to adjust the approved variable cost of the gas-fired generator set to provide a basis for the subsequent calculation of the variable cost compensation. The parameter α is used to adjust the relationship between the variable cost compensation standard and the approved variable cost of the gas-fired generator set. In order to balance the intensity of the penalty and the acceptance of the gas-fired generator set, the value of α can be flexibly adjusted to control the value range of α to [0,1]. Generally, α is around 0.9.

[0178] Step 105: Compare the weighted average price of various gas-fired power generation units with the adjusted power generation cost, and determine the gas-fired power generation units whose weighted average price is less than the adjusted power generation cost as the gas-fired power generation units to be compensated.

[0179] Furthermore, in the first embodiment of the present invention, if the weighted average price of a gas-fired generator set is less than the adjusted power generation cost, it is considered that the gas-fired generator set needs to recover variable cost compensation, otherwise it is not necessary. Therefore, after calculating the weighted average price and adjusted power generation cost of the gas-fired generator set, the gas-fired generator set needs to reach WAP i,t <MC i After the compensation recovery conditions are met, the subsequent compensation recovery amount calculation is triggered.

[0180] Step 106: Calculate the compensation amount of the gas-fired power generation units to be compensated based on the variable cost compensation standard, the adjusted power generation cost and the weighted average price of the gas-fired power generation units to be compensated.

[0181] Further, in the first embodiment of the present invention, the compensation amount of the gas-fired power generation unit to be compensated is calculated based on the variable cost compensation standard, the adjusted power generation cost and the weighted average price of the gas-fired power generation unit to be compensated, specifically:

[0182] Calculate the difference between the adjusted generation cost of the gas-fired power units to be compensated and the weighted average price to form the adjusted difference of the gas-fired power units to be compensated;

[0183] Compare the variable cost compensation standard and the adjusted difference of the gas-fired power units to be compensated, and determine the smaller value between the variable cost compensation standard and the adjusted difference of the gas-fired power units to be compensated as the compensation amount of the gas-fired power units to be compensated.

[0184] In the first embodiment of the present invention, for each gas-fired power generation unit and each time period that needs compensation and recovery, the adjusted power generation cost of the gas-fired power generation unit is first subtracted from the weighted average price of the gas-fired power generation unit to obtain the adjusted difference; then the adjusted difference is compared with the variable cost compensation standard pre-set in the basic power data, and the smaller of the two is used as the compensation amount for the gas-fired power generation unit, and compensation recovery is performed based on the compensation amount.

[0185] In summary, the first embodiment of the present invention provides a method for compensating for variable costs of gas-fired power units. By accurately judging whether the gas-fired power units need to recover the accuracy of variable cost compensation, and by introducing an adjustment coefficient α to adjust the market situation and the acceptance of the units, the variable cost compensation of the gas-fired power units is accurately calculated, thereby reducing the overall cost of market operation, promoting more orderly competition between gas-fired power units and coal-fired power units, effectively improving the efficiency of the power market, and ensuring that resources are optimally allocated. In addition, reducing the overall operating cost of the market can effectively reduce the user's electricity cost, thereby improving the attractiveness and competitiveness of the power market.

[0186] Example 2

[0187] See also Figure 3, is a schematic structural diagram of an embodiment of a variable cost compensation device for a gas-fired generator set provided by the present invention, the device comprising an acquisition module 201, a calculation module 202, a weighting module 203, an adjustment module 204, a comparison module 205 and a compensation determination module 206;

[0188] The acquisition module 201 is used to acquire basic power data; wherein the basic power data includes variable cost compensation standards, approved variable costs, declared capacity and price information of several types of gas-fired power units;

[0189] The calculation module 202 is used to use the SCUC model and the SCED model to perform market clearing calculations based on the declared capacity and price information of various gas-fired power units, and obtain the transaction capacity and transaction price of each gas-fired power unit in each preset time period;

[0190] The weighting module 203 is used to use the transaction capacity as a weight, and calculate the weighted average price of each gas-fired unit according to the transaction capacity and transaction price of each gas-fired unit in each preset time period;

[0191] The adjustment module 204 is used to calculate the adjusted power generation cost of each type of gas-fired power generation unit based on the variable cost compensation standard and the approved variable cost of each type of gas-fired power generation unit by using preset parameters;

[0192] The comparison module 205 is used to compare the weighted average price of various gas-fired generator sets with the adjusted power generation cost, and determine the gas-fired generator set with the weighted average price less than the adjusted power generation cost as the gas-fired generator set to be compensated;

[0193] The compensation determination module 206 is used to calculate the compensation amount of the gas-fired power generation unit to be compensated based on the variable cost compensation standard, the adjusted power generation cost and the weighted average price of the gas-fired power generation unit to be compensated.

[0194] Further, in the second embodiment of the present invention, the calculation module 202 includes: an input unit and an optimization unit;

[0195] The input unit is used to input the declared capacity and price information of several types of gas-fired generator sets into the SCUC model and the SCED model respectively;

[0196] The optimization unit is used to optimize the SCUC model and the SCED model using a preset optimizer to obtain the transaction capacity and transaction price of each gas-fired unit in each preset time period.

[0197] Furthermore, in the second embodiment of the present invention, the SCUC model is specifically:

[0198] The objective function of the SCUC model is:

[0199]

[0200] Where N is the number of gas-fired generator sets; T is the number of time periods; P i,t is the output of gas-fired generator set i in period t; C i,t (P i,t ) is the operating cost of gas-fired generator set i in period t; is the startup cost of gas-fired generator set i in period t; is the downtime cost of gas-fired generator set i in period t;

[0201] The constraints of the SCUC model include system constraints, crew constraints, and network security constraints;

[0202] Among them, the system constraints of the SCUC model include load balance constraints, system positive reserve capacity constraints, and system negative reserve capacity constraints;

[0203] The load balancing constraints are:

[0204]

[0205] Where P i,t is the output of gas-generator unit i in period t; D t is the system load during period t;

[0206] The system positive reserve capacity constraint is:

[0207]

[0208] In the formula, α i,t is the start and stop status of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t; D t is the system load during period t; is the system positive reserve capacity requirement for period t;

[0209] The system negative reserve capacity constraint is:

[0210]

[0211] In the formula, α i,t is the start and stop status of gas-generator unit i in period t; is the minimum output of gas-generator unit i in period t; D t is the system load during period t; is the system negative reserve capacity requirement for period t;

[0212] The unit constraints of the SCUC model include the upper and lower limits of unit output, the ramping constraints of the unit, and the minimum continuous start and stop time constraints of the unit;

[0213] The upper and lower limits of the unit output are:

[0214]

[0215] Where P i,t is the output of gas-fired generator set i in period t; α i,t is the start and stop status of gas-generator unit i in period t; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t;

[0216] The unit climbing constraint is:

[0217]

[0218] Where P i,t is the output of gas-fired generator set i in period t; P i,t-1 is the output of gas-fired generator set i in period t-1; is the maximum ramp rate of gas-generator unit i; is the maximum down-slope rate of gas-generator unit i; α i,t is the start and stop status of gas-generator unit i in period t; α i,t-1 is the start and stop status of gas-generator unit i in period t-1; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t;

[0219] The minimum continuous start and stop time constraint of the unit is:

[0220]

[0221] Where, T U is the minimum continuous start-up time of the gas generator set; T D The minimum continuous downtime of the gas generator set; is the continuous startup time of gas-generator unit i in period t; is the continuous downtime of gas-generator unit i in period t; α i,t is the start and stop status of gas-generator unit i in period t; α i,t-1 is the start and stop status of gas-generator unit i in period t-1;

[0222] The network security constraints of the SCUC model include line flow constraints and section flow constraints;

[0223] The line power flow constraint is:

[0224]

[0225] In the formula, is the power transmission limit of line l; G l-iis the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on line l; P i,t is the output of gas-fired generator set i in period t; G l-k is the generator output power transfer distribution factor of node k to line l; D k,t is the bus load value of node k in period t; N is the number of gas-fired generator sets; K is the number of nodes in the system;

[0226] The cross-sectional flow constraint is:

[0227]

[0228] In the formula, and are the power flow transmission limits of section s; P i,t is the output of gas-fired generator set i in period t; G s-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on section s; G s-k D is the generator output power transfer distribution factor of node k to section s; k,t is the bus load value of node k in period t.

[0229] Furthermore, in the second embodiment of the present invention, the SCED model is specifically:

[0230] The objective function of the SCED model is:

[0231]

[0232] Where N is the number of gas-fired generator sets; T is the number of time periods; P i,t is the output of gas-fired generator set i in period t; C i,t (P i,t ) is the operating cost of gas-fired generator set i in period t;

[0233] The constraints of the SCED model include system constraints, unit constraints, and network security constraints;

[0234] Among them, the system constraints of the SCED model include load balance constraints;

[0235] The load balancing constraints are:

[0236]

[0237] Where P i,t is the output of gas-generator unit i in period t; D t is the system load during period t;

[0238] The unit constraints of the SCED model include the upper and lower limits of unit output and the unit climbing constraints;

[0239] The upper and lower limits of the unit output are:

[0240]

[0241] Where P i,t is the output of gas-fired generator set i in period t; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t;

[0242] The unit climbing constraint is:

[0243]

[0244] In the formula, is the maximum down-slope rate of gas-generator unit i; is the maximum ramp rate of gas-generator unit i; P i,t is the output of gas-fired generator set i in period t; P i,t-1 is the output of gas-fired generator set i in period t-1;

[0245] The network security constraints of the SCED model include line flow constraints and section flow constraints;

[0246] The line power flow constraint is:

[0247]

[0248] In the formula, is the power transmission limit of line l; G l-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on line l; P i,t is the output of gas-fired generator set i in period t; G l-k is the generator output power transfer distribution factor of node k to line l; D k,t is the bus load value of node k in period t; N is the number of gas-fired generator sets; K is the number of nodes in the system;

[0249] The cross-sectional flow constraint is:

[0250]

[0251] In the formula, and are the power flow transmission limits of section s; P i,t is the output of gas-fired generator set i in period t; G s-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on section s; G s-kD is the generator output power transfer distribution factor of node k to section s; k,t is the bus load value of node k in period t.

[0252] Furthermore, in the second embodiment of the present invention, the transaction capacity is used as the weight, and the weighted average price of each gas-fired power unit is calculated according to the transaction capacity and transaction price of each gas-fired power unit in each preset time period, specifically:

[0253]

[0254] Where, WAP i,t is the weighted average price of gas-fired generator set i; P i,j is the transaction capacity of gas-fired unit i in period j; C i,j is the transaction price of gas-fired unit i in period j; N t,i is the number of transaction time periods of gas-fired generator set i in period t.

[0255] Further, in the second embodiment of the present invention, the adjusted power generation cost of each type of gas-fired generator set is calculated based on the variable cost compensation standard and the approved variable cost of each type of gas-fired generator set by using preset parameters, specifically:

[0256] MC i =(R i -MWP i )×α

[0257] In the formula, MC i is the adjusted power generation cost of gas-fired unit i; R i is the approved variable cost of gas-fired generator set i; MWP i is the variable cost compensation standard of gas-fired generator set i; α is the preset parameter.

[0258] Furthermore, in the second embodiment of the present invention, the value range of the preset parameter is [0, 1].

[0259] Further, in the second embodiment of the present invention, the compensation amount of the gas-fired power generation unit to be compensated is calculated based on the variable cost compensation standard, the adjusted power generation cost and the weighted average price of the gas-fired power generation unit to be compensated, specifically:

[0260] Calculate the difference between the adjusted generation cost of the gas-fired power units to be compensated and the weighted average price to form the adjusted difference of the gas-fired power units to be compensated;

[0261] Compare the variable cost compensation standard and the adjusted difference of the gas-fired power units to be compensated, and determine the smaller value between the variable cost compensation standard and the adjusted difference of the gas-fired power units to be compensated as the compensation amount of the gas-fired power units to be compensated.

[0262] In summary, the second embodiment of the present invention provides a variable cost compensation device for gas-fired power units, which is based on the organic combination of modules, accurately determines whether the gas-fired power units need to recover the accuracy of variable cost compensation, and introduces the adjustment coefficient α to adjust the market situation and the acceptance of the units, accurately calculates the variable cost compensation of the gas-fired power units, and reduces the overall cost of market operation, promotes more orderly competition between gas-fired power units and coal-fired power units, effectively improves the efficiency of the power market, and ensures that resources are optimally allocated. In addition, reducing the overall operating cost of the market can effectively reduce the user's electricity cost, thereby improving the attractiveness and competitiveness of the power market.

[0263] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for compensating variable costs of gas-fired power units, characterized in that: include: Obtaining basic power data; wherein the basic power data includes variable cost compensation standards, approved variable costs, declared capacity and price information of several types of gas-fired power units; Using the SCUC model and the SCED model, market clearing calculations are performed based on the declared capacity and price information of various gas-fired power units to obtain the transaction capacity and transaction price of each gas-fired power unit in each preset period; Taking the transaction capacity as the weight, the weighted average price of each gas-fired power unit is calculated according to the transaction capacity and transaction price of each gas-fired power unit in each preset time period; Using preset parameters, based on the variable cost compensation standards and approved variable costs of various gas-fired power generation units, the adjusted power generation costs of various gas-fired power generation units are calculated; Compare the weighted average price and adjusted power generation cost of various gas-fired power generation units, and identify the gas-fired power generation units whose weighted average price is less than the adjusted power generation cost as the gas-fired power generation units to be compensated; The compensation amount for the gas-fired power units to be compensated is calculated based on the variable cost compensation standard, adjusted power generation cost and weighted average price of the gas-fired power units to be compensated.

2. The variable cost compensation method for gas-fired generator sets according to claim 1, characterized in that: The SCUC model and the SCED model are used to perform market clearing calculations based on the declared capacity and price information of various gas-fired power units, and the transaction capacity and transaction price of each gas-fired power unit in each preset period are obtained, specifically: Input the declared capacity and price information of several types of gas-fired power units into the SCUC model and the SCED model respectively; The SCUC model and the SCED model are optimized using a preset optimizer to obtain the transaction capacity and transaction price of each gas-fired unit in each preset time period.

3. The variable cost compensation method for gas-fired generator sets according to claim 2, characterized in that: The transaction capacity is used as the weight, and the weighted average price of each gas-fired power unit is calculated according to the transaction capacity and transaction price of each gas-fired power unit in each preset time period, specifically: Where, WAP i,t is the weighted average price of gas-fired generator set i; P i,j is the transaction capacity of gas-fired unit i in period j; C i,j is the transaction price of gas-fired unit i in period j; N t,i is the number of transaction time periods of gas-fired generator set i in period t.

4. The variable cost compensation method for gas-fired generator sets according to claim 3, characterized in that: The adjusted power generation costs of various gas-fired power generation units are calculated by using preset parameters based on the variable cost compensation standards and the approved variable costs of various gas-fired power generation units, specifically: MC i =(R i -MWP i )×α In the formula, MC i is the adjusted power generation cost of gas-fired unit i; R i is the approved variable cost of gas-fired generator set i; MWP i is the variable cost compensation standard of gas-fired generator set i; α is the preset parameter.

5. The variable cost compensation method for gas-fired generator sets according to claim 4, characterized in that: The compensation amount of the gas-fired power generation units to be compensated is calculated based on the variable cost compensation standard, the adjusted power generation cost and the weighted average price of the gas-fired power generation units to be compensated, specifically: Calculate the difference between the adjusted generation cost of the gas-fired power units to be compensated and the weighted average price to form the adjusted difference of the gas-fired power units to be compensated; Compare the variable cost compensation standard and the adjusted difference of the gas-fired power units to be compensated, and determine the smaller value between the variable cost compensation standard and the adjusted difference of the gas-fired power units to be compensated as the compensation amount of the gas-fired power units to be compensated.

6. The variable cost compensation method for gas-fired generator sets according to claim 2, characterized in that: The SCUC model is specifically: The objective function of the SCUC model is: Where N is the number of gas-fired generator sets; T is the number of time periods; P i,t is the output of gas-fired generator set i in period t; C i,t (P i,t ) is the operating cost of gas-fired generator set i in period t; is the startup cost of gas-fired generator set i in period t; is the downtime cost of gas-fired generator set i in period t; The constraints of the SCUC model include system constraints, crew constraints, and network security constraints; Among them, the system constraints of the SCUC model include load balance constraints, system positive reserve capacity constraints, and system negative reserve capacity constraints; The load balancing constraints are: Where P i,t is the output of gas-fired generator set i in period t; D t is the system load during period t; The system positive reserve capacity constraint is: In the formula, α i,t is the start and stop status of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t; D t is the system load during period t; is the system positive reserve capacity requirement for period t; The system negative reserve capacity constraint is: In the formula, α i,t is the start and stop status of gas-generator unit i in period t; is the minimum output of gas-generator unit i in period t; D t is the system load during period t; is the system negative reserve capacity requirement for period t; The unit constraints of the SCUC model include the upper and lower limits of unit output, the ramping constraints of the unit, and the minimum continuous start and stop time constraints of the unit; The upper and lower limits of the unit output are: Where P i,t is the output of gas-fired generator set i in period t; α i,t is the start and stop status of gas-generator unit i in period t; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t; The unit climbing constraint is: Where P i,t is the output of gas-fired generator set i in period t; P i,t-1 is the output of gas-fired generator set i in period t-1; is the maximum ramp rate of gas-generator unit i; is the maximum down-slope rate of gas-generator unit i; α i,t is the start and stop status of gas-generator unit i in period t; α i,t-1 is the start and stop status of gas-generator unit i in period t-1; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t; The minimum continuous start and stop time constraint of the unit is: Where, T U is the minimum continuous start time of the gas generator set; T D The minimum continuous downtime of the gas generator set; is the continuous startup time of gas-generator unit i in period t; is the continuous downtime of gas-generator unit i in period t; α i,t is the start and stop status of gas-generator unit i in period t; α i,t-1 is the start and stop status of gas-generator unit i in period t-1; The network security constraints of the SCUC model include line flow constraints and section flow constraints; The line power flow constraint is: In the formula, is the power transmission limit of line l; G l-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on line l; P i,t is the output of gas-fired generator set i in period t; G l-k is the generator output power transfer distribution factor of node k to line l; D k,t is the bus load value of node k in period t; N is the number of gas-fired generator sets; K is the number of nodes in the system; The cross-sectional flow constraint is: In the formula, and are the power flow transmission limits of section s; P i,t is the output of gas-fired generator set i in period t; G s-i G is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on section s; s-k D is the generator output power transfer distribution factor of node k to section s; k,t is the bus load value of node k in period t.

7. The variable cost compensation method for gas-fired generator sets according to claim 2, characterized in that: The SCED model is specifically: The objective function of the SCED model is: Where N is the number of gas-fired generator sets; T is the number of time periods; P i,t is the output of gas-fired generator set i in period t; C i,t (P i,t ) is the operating cost of gas-fired generator set i in period t; The constraints of the SCED model include system constraints, unit constraints, and network security constraints; Among them, the system constraints of the SCED model include load balance constraints; The load balancing constraints are: Where P i,t is the output of gas-fired generator set i in period t; D t is the system load during period t; The unit constraints of the SCED model include the upper and lower limits of unit output and the unit climbing constraints; The upper and lower limits of the unit output are: Where P i,t is the output of gas-fired generator set i in period t; is the minimum output of gas-generator unit i in period t; is the maximum output of gas-fired generator set i in period t; The unit climbing constraint is: In the formula, is the maximum down-slope rate of gas-generator unit i; is the maximum ramp rate of gas-generator unit i; P i,t is the output of gas-fired generator set i in period t; P i,t-1 is the output of gas-fired generator set i in period t-1; The network security constraints of the SCED model include line flow constraints and section flow constraints; The line power flow constraint is: In the formula, is the power transmission limit of line l; G l-i is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on line l; P i,t is the output of gas-fired generator set i in period t; G l-k is the generator output power transfer distribution factor of node k to line l; D k,t is the bus load value of node k in period t; N is the number of gas-fired generator sets; K is the number of nodes in the system; The cross-sectional flow constraint is: In the formula, and are the power flow transmission limits of section s; P i,t is the output of gas-fired generator set i in period t; G s-i G is the generator output power transfer distribution factor of the node where the gas-fired generator set i is located on section s; s-k D is the generator output power transfer distribution factor of node k to section s; k,t is the bus load value of node k in period t.

8. The variable cost compensation method for gas-fired generator sets according to claim 4, characterized in that: The value range of the preset parameter is [0, 1].

9. A variable cost compensation device for a gas-fired generator set, characterized in that: include: An acquisition module, a calculation module, a weighting module, an adjustment module, a comparison module and a compensation determination module; The acquisition module is used to acquire basic power data; wherein the basic power data includes variable cost compensation standards, approved variable costs, declared capacity and price information of several types of gas-fired generator sets; The calculation module is used to use the SCUC model and the SCED model to perform market clearing calculations based on the declared capacity and price information of various gas-fired power units, and obtain the transaction capacity and transaction price of each gas-fired power unit in each preset time period; The weighted module is used to calculate the weighted average price of each gas-fired power unit based on the transaction capacity and transaction price of each gas-fired power unit in each preset time period by taking the transaction capacity as the weight; The adjustment module is used to calculate the adjusted power generation cost of various gas-fired power generation units based on the variable cost compensation standards and the approved variable costs of various gas-fired power generation units using preset parameters; The comparison module is used to compare the weighted average price and the adjusted power generation cost of various gas-fired generator sets, and determine the gas-fired generator set whose weighted average price is less than the adjusted power generation cost as the gas-fired generator set to be compensated; The compensation determination module is used to calculate the compensation amount of the gas-fired power generation unit to be compensated based on the variable cost compensation standard, the adjusted power generation cost and the weighted average price of the gas-fired power generation unit to be compensated.

10. The variable cost compensation device for gas-fired generator sets according to claim 9, characterized in that: The calculation module includes: an input unit and an optimization unit; The input unit is used to input the declared capacity and price information of several types of gas-fired generator sets into the SCUC model and the SCED model respectively; The optimization unit is used to optimize the SCUC model and the SCED model using a preset optimizer to obtain the transaction capacity and transaction price of each gas-fired unit in each preset time period.