Braided tube forming device and forming method

By designing a braided pipe molding device including a shell, glue coating component and glue spray component, the problem of scraping off glue liquid during extrusion and injection of glue is solved, and the uniform penetration of glue liquid is achieved and the quality of glue injection is improved.

CN118991059BActive Publication Date: 2025-04-22XUZHOU HENGHUI BRAIDING MACHINE
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411471804.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2025-04-22
Estimated Expiration
2044-10-22

AI Technical Summary

Technical Problem

Existing braided pipe molding equipment easily scrapes off the glue liquid on the braided pipe when extruding and injecting glue, resulting in too little glue liquid on the outside of the braided pipe, affecting the quality of the glue injection.

Method used

A braided tube forming device is designed, including a housing, a glue coating assembly and a glue spray assembly. The glue coating assembly passes through the glue pressure between the first and second gear rings to ensure that the glue liquid penetrates into the braided layer and replenishes the outer glue liquid through the spray head. The glue spray assembly uses the driving gear and motor to drive the extrusion wheel and spray head to spray the braided pipe evenly and replenish glue.

Benefits of technology

It effectively reduces the leakage of glue liquid, ensures that the glue liquid is evenly applied to the outside of the braided pipe, improves the quality of glue injection, and avoids damage to the pump body by excessive pressure through spring adjustment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118991059B_ABST
    Figure CN118991059B_ABST
Patent Text Reader

Abstract

The present invention discloses a braided tube forming device and forming method, the forming device comprises a shell and a glue coating component, a reflux pipe is arranged at the bottom of the shell, and the bottom of the reflux pipe is connected to a box, a pump body is arranged on the top of the box, and the pump body is connected to the inside of the shell through a pipeline, the glue coating component is arranged in the middle of the shell, and the glue coating component comprises a first baffle ring, a support rod, a second baffle ring, a fixed tube, a sealing ring, a sealing rod, a spring, a limit plate, a screw and a limit cylinder. The present invention can transport the glue liquid inside the box to between the first baffle ring and the second baffle ring, and at the same time, the inner sides of the first baffle ring and the second baffle ring are tightly attached to the outer side of the braided tube, thereby reducing the leakage of the glue liquid, and the spring can push the sealing rod to make it close to the sealing ring, so that in the process of glue injection, the glue liquid between the first baffle ring and the second baffle ring can have a certain pressure, so as to penetrate into the braided layer, thereby improving the effect of glue coating.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of braided tube production, in particular to a braided tube forming device and a forming method. Background Art

[0002] Braided tubes can be divided into single-end tubes, braided tubes, shower tubes, etc. according to their uses. Single-end tubes are mainly used for faucets, sinks and other kitchen and bathroom hardware. In the production process of braided tubes, a molding device is needed to inject glue into the tubes when the tubes are braided in multiple layers.

[0003] For example, the invention with publication number CN116572561A discloses a carbon fiber pultruded braided tube forming device. The invention sets arc blocks and spiral ridges, and the spiral ridges on the two arc blocks can squeeze the tube core and the carbon fiber braided layer on the tube core after glue injection, thereby at least to a certain extent driving out the bubbles in the carbon fiber braided layer after glue injection, and then the air is pumped out of the sliding cavity through the air pumping port by the air pumping device, and then the bubbles in the carbon fiber braided layer are pumped out through the air pumping hole, so that the sliding cavity is in a negative pressure state, avoiding air from entering the carbon fiber braided layer after glue injection, thereby affecting the glue injection quality of the carbon fiber braided layer. However, in the actual use of such equipment, the spiral ridges will also scrape off the glue on the braided tube during extrusion, resulting in too little glue on the outside of the braided tube.

[0004] Therefore, in view of this, a braided tube forming device and a forming method are proposed. Summary of the invention

[0005] The object of the present invention is to provide a braided tube forming device and a forming method to solve the problems raised in the above background technology.

[0006] To achieve the above-mentioned object, the first aspect of the present invention provides a braided tube forming device, which includes a shell and a glue coating component, a return pipe is arranged at the bottom of the shell, and the bottom of the return pipe is connected to a box body, a pump body is arranged on the top of the box body, and the pump body is connected to the inside of the shell body through a pipeline, and the glue coating component is arranged in the middle of the shell body;

[0007] The glue coating assembly includes a first retaining ring fixedly arranged at one end of the inner part of the shell and a support rod symmetrically arranged on the inner side of the shell, and the end of the support rod is connected to the second retaining ring, the top of the shell is connected to a fixed tube, and a sealing ring is arranged inside the upper end of the fixed tube, a sealing rod is arranged on the inner side of the sealing ring, and the end of the sealing rod is connected to a spring, a limiting plate is arranged on one side of the spring, and a screw is rotatably connected to one side of the limiting plate, the outer side of the middle part of the screw is threadedly connected to the limiting cylinder, and the limiting cylinder is fixedly connected to the fixed tube;

[0008] A glue spraying assembly is arranged in the middle of the shell, and the glue spraying assembly comprises a bracket fixedly arranged at the top center of the shell and a motor installed at the top of the bracket, and a driving gear is connected to the bottom of the motor, a first double-toothed shaft is meshed on one side of the driving gear, and the first double-toothed shaft is rotatably connected to the shell, a first gear ring is meshed on one side of the lower end of the first double-toothed shaft, a diverter ring is fixed on one side of the first gear ring, and baffles are slidably connected on both sides of the diverter ring, and the baffles are fixedly connected to the shell, and nozzles are arranged on the inner side of the diverter ring at equal intervals.

[0009] Furthermore, a kneading assembly is connected to the other side of the driving gear, and the kneading assembly includes a second double-toothed shaft, a second gear ring and a rotating ring. The other side of the driving gear is meshed with a second double-toothed shaft, and one side of the lower end of the second double-toothed shaft is meshed with a second gear ring, and a rotating ring is fixed to one side of the second gear ring.

[0010] Furthermore, the kneading assembly also includes a limit bar, a connecting frame and an extrusion wheel. The inner side of the rotating ring is slidably connected to the limit bar, and the limit bar is fixedly connected to the second baffle ring. A connecting frame is equidistantly arranged on one side of the rotating ring, and the end of the connecting frame is rotatably connected to the extrusion wheel.

[0011] Furthermore, a rubber scraper ring is arranged at the other end of the interior of the shell, and a rubber pushing assembly is arranged on one side of the rubber scraper ring, and the rubber pushing assembly includes a third double-toothed shaft, a first rack and a drive frame, the other side of the first double-toothed shaft is meshed with the third double-toothed shaft, and one side of the third double-toothed shaft is meshed with the first rack, and the drive frame is fixed to the outer side of the first rack.

[0012] Furthermore, the rubber pushing assembly also includes a second rack, a sliding rod and a scraper. The second rack is fixed on the inner side of the driving frame, and the sliding rod is fixed on one side of the driving frame. The outer side of the sliding rod is slidably connected to the scraper, and the scraper is slidably connected to the shell.

[0013] Furthermore, the rubber pushing assembly also includes a first magnet, a second magnet and a third magnet. The first magnet is fixed at the top center of the driving frame, the second magnet is arranged at the inner front end of the shell, and the third magnet is arranged at the inner rear end of the shell.

[0014] A second aspect of the present invention provides a braided tube forming method, which is applied to the above-mentioned braided tube forming device, comprising the following steps:

[0015] S1: After the braided tube is inserted into the shell, the pump is started to transport the glue inside the shell to between the first retaining ring and the second retaining ring;

[0016] S2: Start the motor to drive the rotating ring to rotate synchronously through the driving gear, the second double-toothed shaft, and the second gear ring, so as to drive multiple extrusion wheels to squeeze and knead the outer side of the braided tube;

[0017] S3: When the external device drives the braided tube to move to the right, the second retaining ring will squeeze the glue inside the braided layer, and when the pressure of the glue between the first retaining ring and the second retaining ring is too large, the spring will contract. At this time, the glue will pass through the sealing ring and can be sprayed out from the nozzle on the diverter ring through the fixed tube, replenishing the small glue droplets on the outside of the braided tube;

[0018] S4: The driving gear will also drive the diverter ring to rotate through the first double-toothed shaft and the first gear ring, so that the glue on the outside of the pipe can be evenly attached during the spraying process;

[0019] S5: The scraper ring will scrape off the excess glue on the outside of the braided tube. At this time, the first double-toothed shaft will also drive the third double-toothed shaft to work, and the first rack can be used to drive the drive frame to rotate. When the first magnet is aligned with the second magnet, the magnetic attraction will drive the drive frame to slide toward the scraper. At this time, the third double-toothed shaft will engage with the second rack, and when the third double-toothed shaft continues to rotate, the drive frame will drive the scraper to move in the opposite direction, and the third magnet will absorb the first magnet to reset the drive frame. Therefore, in the process of reciprocating rotation of the drive frame, the sliding rod can drive the scraper to push the glue on the upper part of the scraper ring to both sides, so that the glue can flow into the box through the reflux pipe under the action of gravity for recovery.

[0020] The present invention has the following beneficial effects:

[0021] 1. The present invention can transport the glue inside the box body to between the first baffle ring and the second baffle ring, and at the same time, the inner sides of the first baffle ring and the second baffle ring are tightly attached to the outer side of the braided tube, thereby reducing the leakage of the glue, and the spring can push the sealing rod to make it close to the sealing ring. Therefore, during the glue injection process, the glue between the first baffle ring and the second baffle ring can have a certain pressure so that it can penetrate into the braided layer, thereby improving the effect of gluing, and when the braided tube moves to the right, the second baffle ring can also squeeze the glue inside the braided layer to remove bubbles, so that the braided layer is full of glue, and when the glue on the surface of the braided tube is too little, the subsequent glue spraying assembly can also be used to supplement the outer glue to improve the effect of gluing, and at the same time, when the pressure between the first baffle ring and the second baffle ring is too large, the spring will contract, and at this time, the glue can be depressurized to avoid damage to the pump body due to excessive pressure, and at the same time, the screw can be rotated according to demand to adjust the position of the limit plate, thereby changing the elastic force of the spring to adapt to different usage requirements.

[0022] 2. In the present invention, when the glue passes through the sealing ring, it can flow back to the inside of the shell through the fixed pipe. At this time, the diverter ring is used to block the glue so that it can only be sprayed out through the nozzle. Small droplets of glue can be sprayed on the outside of the braided tube to supplement the glue on the outside of the braided tube. At the same time, large bubbles in the glue can also be discharged through the nozzle, and the motor can be started to drive the diverter ring to rotate through the driving gear, the first double-toothed shaft and the first gear ring, and the diverter ring is limited by the retaining bar. Therefore, during the spraying process, the glue on the outside of the pipeline can be evenly adhered, which is beneficial to improving the quality of glue coating.

[0023] When the first and second gears are engaged, the first and second gears are engaged with each other, and the third gear is engaged with the first gear, so that the first gear can be easily sucked out of the scraper and the second gears are easily sucked out of the scraper. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the braided tube forming device of the present invention;

[0025] Figure 2 It is a schematic diagram of the internal structure of the housing of the braided tube forming device of the present invention;

[0026] Figure 3 It is a schematic diagram of the three-dimensional structure of the kneading component part of the braided tube forming device of the present invention;

[0027] Figure 4 It is a schematic diagram of the internal structure of the fixed tube of the braided tube forming device of the present invention;

[0028] Figure 5 It is a schematic diagram of the three-dimensional structure of the diverter ring of the braided tube forming device of the present invention;

[0029] Figure 6 It is a schematic diagram of the three-dimensional structure of the rubber pushing component of the braided tube forming device of the present invention.

[0030] In the figure: 1, housing; 2, return pipe; 3, box; 4, pump body; 5, glue coating assembly; 501, first retaining ring; 502, support rod; 503, second retaining ring; 504, fixed pipe; 505, sealing ring; 506, sealing rod; 507, spring; 508, limit plate; 509, screw; 510, limit cylinder; 6, glue spraying assembly; 601, bracket; 602, motor; 603, driving gear; 604, first double-toothed shaft; 605, first gear ring; 606, split Flow ring; 607, baffle; 608, nozzle; 7, kneading component; 701, second double-toothed shaft; 702, second gear ring; 703, rotating ring; 704, limit strip; 705, connecting frame; 706, extrusion wheel; 8, scraper ring; 9, glue pushing component; 901, third double-toothed shaft; 902, first rack; 903, driving frame; 904, second rack; 905, sliding rod; 906, scraper; 907, first magnet; 908, second magnet; 909, third magnet. DETAILED DESCRIPTION

[0031] See also Figures 1 to 6 The braided tube forming device of the present invention includes a shell 1 and a glue coating component 5. A return pipe 2 is arranged at the bottom of the shell 1, and the bottom of the return pipe 2 is connected to a box body 3. A pump body 4 is arranged on the top of the box body 3, and the pump body 4 is connected to the interior of the shell 1 through a pipeline. The glue coating component 5 is arranged in the middle of the shell 1.

[0032] Specifically, the glue coating assembly 5 includes a first baffle ring 501, a support rod 502, a second baffle ring 503, a fixed tube 504, a sealing ring 505, a sealing rod 506, a spring 507, a limit plate 508, a screw 509 and a limit cylinder 510. The first baffle ring 501 is fixed at one end of the inner part of the shell 1, and the support rod 502 is symmetrically arranged on the inner side of the shell 1, and the end of the support rod 502 is connected to the second baffle ring 503. The top of the shell 1 is connected to the fixed tube 504, and the sealing ring 505 is arranged inside the upper end of the fixed tube 504. The sealing rod 506 is arranged on the inner side of the sealing ring 505, and the end of the sealing rod 506 is connected to the spring 507. A limit plate 508 is arranged on one side of the spring 507, and a screw 509 is rotatably connected to one side of the limit plate 508. The outer middle part of the screw 509 is threadedly connected to the limit cylinder 510, and the limit cylinder 510 is fixedly connected to the fixed tube 504.

[0033] A glue spraying assembly 6 is provided in the middle of the shell 1. The glue spraying assembly 6 includes a bracket 601, a motor 602 and a driving gear 603. The bracket 601 is fixed in the top center of the shell 1, and the motor 602 is placed on the top of the bracket 601, and the driving gear 603 is connected to the bottom of the motor 602. The glue spraying assembly 6 also includes a first double-toothed shaft 604 and a first gear ring 605. The first double-toothed shaft 604 is meshed on one side of the driving gear 603, and the first double-toothed shaft 604 is rotatably connected to the shell 1, and the first double-toothed shaft 604 is meshed on one side of the lower end of the first double-toothed shaft 604. The glue spraying assembly 6 also includes a diverter ring 606, a baffle 607 and a nozzle 608. The diverter ring 606 is fixed on one side of the first gear ring 605, and the baffles 607 are slidably connected to both sides of the diverter ring 606, and the baffles 607 are fixedly connected to the shell 1, and the nozzles 608 are arranged on the inner side of the diverter ring 606 at equal intervals.

[0034] The specific operation is as follows. Before use, the screw 509 is rotated as needed to adjust the position of the limit plate 508, thereby changing the elastic force of the spring 507. During use, the pump body 4 is first started to transport the glue inside the box body 3 to between the first baffle ring 501 and the second baffle ring 503. At the same time, the inner sides of the first baffle ring 501 and the second baffle ring 503 are tightly attached to the outer side of the braided tube, thereby reducing the leakage of the glue. The spring 507 will push the sealing rod 506 to make it close to the sealing ring 505, so that the glue between the first baffle ring 501 and the second baffle ring 503 can have a certain pressure so that it can penetrate into the braided layer.

[0035] When the braided tube moves to the right, the second baffle ring 503 can also squeeze the glue inside the braided layer to remove bubbles, so that the braided layer is filled with glue, and when the pressure between the first baffle ring 501 and the second baffle ring 503 is too large, the spring 507 will contract, and the glue will pass through the sealing ring 505 and flow back to the inside of the shell 1 through the fixed tube 504. At this time, the diverter ring 606 is used to block the glue so that it can only be sprayed out through the nozzle 608, so that small droplets of glue can be sprayed on the outside of the braided tube to supplement the glue on the outside of the braided tube. At the same time, large bubbles in the glue can also be discharged through the nozzle 608, and the motor 602 will also drive the diverter ring 606 to rotate through the driving gear 603, the first double-toothed shaft 604 and the first gear ring 605, so that the glue on the outside of the pipeline can be evenly adhered during the spraying process.

[0036] See also Figure 2 , Figure 3 , Figure 5 and Figure 6, the other side of the driving gear 603 is connected to a kneading component 7, the kneading component 7 includes a second double-toothed shaft 701, a second gear ring 702 and a rotating ring 703, the other side of the driving gear 603 is meshed with the second double-toothed shaft 701, and one side of the lower end of the second double-toothed shaft 701 is meshed with the second gear ring 702, and a rotating ring 703 is fixed to one side of the second gear ring 702, the kneading component 7 also includes a limit strip 704, a connecting frame 705 and an extrusion wheel 706, the inner side of the rotating ring 703 is slidably connected to the limit strip 704, and the limit strip 704 is fixedly connected to the second baffle ring 503, a connecting frame 705 is equidistantly arranged on one side of the rotating ring 703, and the end of the connecting frame 705 is rotatably connected to the extrusion wheel 706, a scraper ring 8 is arranged at the other end of the interior of the shell 1, and a glue pushing component 9 is arranged on one side of the scraper ring 8.

[0037] In some embodiments, the rubber pushing assembly 9 includes a third double-toothed shaft 901, a first rack 902 and a driving frame 903, the other side of the first double-toothed shaft 604 is meshed with the third double-toothed shaft 901, and one side of the third double-toothed shaft 901 is meshed with the first rack 902, and the driving frame 903 is fixed to the outer side of the first rack 902, the rubber pushing assembly 9 also includes a second rack 904, a sliding rod 905 and a scraper 906, the inner side of the driving frame 903 is fixed with the second rack 904, and one side of the driving frame 903 is fixed with the sliding rod 905, the outer side of the sliding rod 905 is slidably connected with the scraper 906, and the scraper 906 is slidably connected to the shell 1, the rubber pushing assembly 9 also includes a first magnet 907, a second magnet 908 and a third magnet 909, the first magnet 907 is fixed to the top center of the driving frame 903, the second magnet 908 is arranged at the inner front end of the shell 1, and the third magnet 909 is arranged at the inner rear end of the shell 1.

[0038] The specific operation is as follows: start the motor 602, so that it drives the second double-toothed shaft 701 to work through the active gear 603, and the rotating ring 703 can be driven to rotate synchronously through the second gear ring 702, and the rotating ring 703 is limited by the limit bar 704 to improve the stability of the rotating ring 703 during rotation. Therefore, during the rotation of the rotating ring 703, it can drive multiple extrusion wheels 706 to squeeze and rub the outer side of the braided tube to improve the effect of glue penetration. At the same time, the connecting frame 705 can also stir the glue between the first baffle ring 501 and the second baffle ring 503 during movement, thereby accelerating the internal bubbles to overflow upward, which is beneficial to improve the effect of exhaust. After gluing, the braided tube will pass through the scraper ring 8 to scrape off the excess glue on the outer side of the braided tube. At this time, the first double-toothed shaft 604 will also drive the third double-toothed shaft 901 to work, and it can pass through the first rack 902 The driving frame 903 is driven to rotate, so that the sliding rod 905 drives the scraper 906 to push the glue on the upper part of the scraper ring 8 toward the direction of the second magnet 908, and as the driving frame 903 rotates, when the first magnet 907 is aligned with the second magnet 908, under the action of the magnetic attraction, the driving frame 903 will be driven to slide toward the scraper 906, at this time, the third double-toothed shaft 901 will mesh with the second rack 904, and when the third double-toothed shaft 901 continues to rotate, the driving frame 903 will drive the scraper 906 to move in the opposite direction, and the upper glue will be pushed to the third magnet 909, and the third magnet 909 will attract the first magnet 907, so that the driving frame 903 is reset. Therefore, during operation, the scraper 906 can be made to swing back and forth so as to move the glue to both ends to avoid glue accumulation and affect glue recovery. After that, the glue will flow through the reflux pipe 2 to the box 3 for recovery under the action of gravity.

[0039] When in use, first use an external conveying device to convey the braided tube to the inside of the housing 1, then start the pump body 4 to convey the glue liquid inside the box body 3 to between the first baffle ring 501 and the second baffle ring 503, and at the same time, the inner sides of the first baffle ring 501 and the second baffle ring 503 are tightly attached to the outer side of the braided tube, and the spring 507 pushes the sealing rod 506 to make it close to the sealing ring 505, so that the glue liquid between the first baffle ring 501 and the second baffle ring 503 has a certain pressure, so as to penetrate into the braided layer;

[0040] Then, the motor 602 is started to drive the second double-toothed shaft 701 to work through the driving gear 603, and the rotating ring 703 can be driven to rotate synchronously through the second gear ring 702, and the rotating ring 703 is limited by the limit bar 704. Therefore, during the rotation of the rotating ring 703, the plurality of extrusion wheels 706 can be driven to squeeze and rub the outer side of the braided tube. At the same time, the connecting frame 705 can also stir the glue between the first baffle ring 501 and the second baffle ring 503 during movement, thereby accelerating the internal bubbles to overflow upward;

[0041] Next, when the braided tube moves to the right, the second baffle ring 503 can also squeeze the glue inside the braided layer to remove bubbles, and when the pressure of the glue between the first baffle ring 501 and the second baffle ring 503 is too large, the spring 507 will shrink, and the glue will pass through the sealing ring 505, and can flow back to the inside of the housing 1 through the fixed tube 504. At this time, the bypass ring 606 is used to block the glue so that it can only be sprayed through the nozzle 608, so that small glue droplets can be sprayed on the outside of the braided tube to supplement the glue on the outside of the braided tube, and the driving gear 603 will also drive the bypass ring 606 to rotate through the first double-toothed shaft 604 and the first gear ring 605, and use the baffle 607 to limit the bypass ring 606, so that the glue on the outside of the pipeline can be evenly attached during the spraying process;

[0042] Finally, the scraper ring 8 will scrape off the excess glue on the outside of the braided tube. At this time, the first double-toothed shaft 604 will also drive the third double-toothed shaft 901 to work, and the first rack 902 can drive the driving frame 903 to rotate, so that the sliding rod 905 drives the scraper 906 to push the glue on the upper part of the scraper ring 8 toward the second magnet 908. After the driving frame 903 rotates, when the first magnet 907 is aligned with the second magnet 908, the driving frame 903 will be driven by the magnetic attraction. Slide toward the scraper 906, at this time the third double-toothed shaft 901 will mesh with the second rack 904, when the third double-toothed shaft 901 continues to rotate, the driving frame 903 will drive the scraper 906 to move in the opposite direction, so that the upper glue liquid can be pushed to the third magnet 909, and the third magnet 909 will attract the first magnet 907, so that the driving frame 903 is reset, so as to move the glue liquid to both ends, and then the glue liquid will flow through the reflux pipe 2 under the action of gravity to the box body 3 for recovery.

[0043] The embodiments of the present invention are given for the purpose of illustration and description, and are not intended to be exhaustive or to limit the invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.

Claims

1. A braided tube forming device, characterized in that: It comprises a shell (1) and a glue coating assembly (5), wherein a return pipe (2) is arranged at the bottom of the shell (1), and the bottom of the return pipe (2) is connected to a box (3), a pump body (4) is arranged on the top of the box (3), and the pump body (4) is connected to the inside of the shell (1) through a pipeline, and the glue coating assembly (5) is arranged in the middle of the shell (1); The glue coating component (5) comprises a first retaining ring (501) fixedly arranged at one end of the interior of the shell (1) and a support rod (502) symmetrically arranged on the inner side of the shell (1), and the end of the support rod (502) is connected to a second retaining ring (503), the top of the shell (1) is connected to a fixing tube (504), and a sealing ring (505) is arranged inside the upper end of the fixing tube (504), a sealing rod (506) is arranged on the inner side of the sealing ring (505), and the end of the sealing rod (506) is connected to a spring (507), a limiting plate (508) is arranged on one side of the spring (507), and a screw rod (509) is rotatably connected to one side of the limiting plate (508), the outer side of the middle part of the screw rod (509) is threadedly connected to a limiting cylinder (510), and the limiting cylinder (510) is fixedly connected to the fixing tube (504); A glue spraying assembly (6) is arranged in the middle of the shell (1), and the glue spraying assembly (6) comprises a bracket (601) fixedly arranged at the top center of the shell (1) and a motor (602) installed at the top of the bracket (601), and a driving gear (603) is connected to the bottom of the motor (602), and a first double-toothed shaft (604) is meshed on one side of the driving gear (603), and the first double-toothed shaft (604) is rotatably connected to the shell (1). A first gear ring (605) is meshed with one side of the lower end of the first double-toothed shaft (604), a diverter ring (606) is fixed to one side of the first gear ring (605), and retaining bars (607) are slidably connected to both sides of the diverter ring (606), and the retaining bars (607) are fixedly connected to the housing (1), and nozzles (608) are arranged at equal intervals on the inner side of the diverter ring (606), and the glue that passes through the sealing ring (505) is sprayed out through the nozzles (608); A rubber scraping ring (8) is arranged at the other end of the interior of the shell (1), and a rubber pushing assembly (9) is arranged on one side of the rubber scraping ring (8), the rubber pushing assembly (9) comprising a third double-toothed shaft (901), a first rack (902) and a driving frame (903), the other side of the first double-toothed shaft (604) is meshed with the third double-toothed shaft (901), and one side of the third double-toothed shaft (901) is meshed with the first rack (902), and the driving frame (903) is fixed to the outer side of the first rack (902); The rubber pushing assembly (9) further comprises a second rack (904), a sliding rod (905) and a scraper (906); the second rack (904) is fixed on the inner side of the driving frame (903), and the sliding rod (905) is fixed on one side of the driving frame (903); the outer side of the sliding rod (905) is slidably connected to the scraper (906), and the scraper (906) is slidably connected to the housing (1); The rubber pushing component (9) also includes a first magnet (907), a second magnet (908) and a third magnet (909); the first magnet (907) is fixed at the top center of the driving frame (903); the second magnet (908) is arranged at the inner front end of the shell (1); and the third magnet (909) is arranged at the inner rear end of the shell (1).

2. The braided tube forming device according to claim 1, characterized in that: The other side of the driving gear (603) is connected to a kneading assembly (7), and the kneading assembly (7) comprises a second double-toothed shaft (701), a second gear ring (702) and a rotating ring (703). The other side of the driving gear (603) is meshed with the second double-toothed shaft (701), and one side of the lower end of the second double-toothed shaft (701) is meshed with the second gear ring (702), and the rotating ring (703) is fixed to one side of the second gear ring (702).

3. The braided tube forming device according to claim 2, characterized in that: The kneading assembly (7) further comprises a limit strip (704), a connecting frame (705) and an extrusion wheel (706); the inner side of the rotating ring (703) is slidably connected to the limit strip (704), and the limit strip (704) is fixedly connected to the second baffle ring (503); a connecting frame (705) is equidistantly arranged on one side of the rotating ring (703), and the end of the connecting frame (705) is rotatably connected to the extrusion wheel (706).

4. A braided tube forming method, characterized in that: The braided tube forming device as claimed in claim 3 comprises the following steps: S1: After the braided tube is inserted into the housing (1), the pump body (4) is started to transport the glue liquid inside the box body (3) to between the first baffle ring (501) and the second baffle ring (503); S2: starting the motor (602) so that it drives the rotating ring (703) to rotate synchronously through the driving gear (603), the second double-toothed shaft (701), and the second gear ring (702), thereby driving the plurality of extrusion wheels (706) to squeeze and knead the outer side of the braided tube; S3: When the external device drives the braided tube to move to the right, the second retaining ring (503) squeezes the glue inside the braided layer, and when the pressure of the glue between the first retaining ring (501) and the second retaining ring (503) is too large, the spring (507) contracts, and the glue passes through the sealing ring (505), and is sprayed out from the nozzle (608) on the diverter ring (606) through the fixed tube (504), and small glue drops are added to the outside of the braided tube; S4: The driving gear (603) drives the diverter ring (606) to rotate through the first double-toothed shaft (604) and the first gear ring (605), so that the glue on the outside of the pipeline can be evenly attached during the spraying process; S5: The scraper ring (8) scrapes off the excess glue on the outside of the braided tube. At this time, the first double-toothed shaft (604) also drives the third double-toothed shaft (901) to work, and drives the drive frame (903) to rotate through the first rack (902). When the first magnet (907) is aligned with the second magnet (908), under the action of the magnetic attraction, the drive frame (903) is driven to slide toward the scraper (906). At this time, the third double-toothed shaft (901) will mesh with the second rack (904), and when the third When the double-toothed shaft (901) rotates continuously, the driving frame (903) drives the scraper (906) to move in the opposite direction, and the third magnet (909) attracts the first magnet (907), so that the driving frame (903) is reset. During the reciprocating rotation of the driving frame (903), the sliding rod (905) can drive the scraper (906) to push the glue on the upper part of the scraper ring (8) to both sides, so that the glue can flow into the box (3) through the return pipe (2) under the action of gravity for recovery.

Citation Information

Patent Citations

  • Carbon fiber pultrusion woven pipe forming equipment

    CN116572561A

  • Gumming method of continuous fiber-woven pultrusion tubes

    CN102765200A

  • Improved glue injection mold for fiber weaving, winding and pultrusion pipeline

    CN113232332A