Non-secondary pollution dredging construction device and method for river ecological environment restoration
By designing a construction device for river channel dredging, the device drains the sludge into the shape of a mud cake through the volume-controlled valve and mold structure, solving the problems of inefficiency and high cost caused by the sludge carrying moisture, and achieving efficient sludge Clean and store.
Patent Information
- Application Number
- CN202411471330.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2044-10-22
Smart Images

Figure CN118997262B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of river channel dredging, and in particular to a non-secondary pollution dredging construction device and method for river channel ecological environment restoration. Background Art
[0002] Traditional river dredging methods are divided into wet and dry methods. Wet dredging is a method of dredging using large ships and other engineering machinery when there is water in the river; dry dredging is a method of dredging using excavators and other engineering machinery after the river water is pumped out. The wet method is suitable for rivers with large basins and large amounts of water, while the dry method is suitable for rivers with small amounts of water. Therefore, when dredging, it is often necessary to choose different dredging methods based on the actual situation of the river.
[0003] In the existing dredging and dredging construction devices, such as Chinese patent application CN114059608A, the debris in the silt layer can be salvaged by the salvaging component and sent to the debris processing component for debris processing. At the same time, the silt suction component extracts the silt separated from the salvaging component and sends it to the silt processing component for silt processing. In this way, not only the silt in the river channel can be processed, but also the debris in the silt layer can be cleaned up, so that the dredging effect of the river channel is better; by setting the mud leakage hole, the silt adhered to the debris can fall into the mud leakage hole through the discharge pipe, so that the debris and the mud hole are better separated, and the silt is prevented from affecting the treatment process of the debris.
[0004] However, there are still the following problems: during dredging, the silt is cleaned together with a large amount of water, resulting in a large waste of space in the container for the silt, resulting in a low working efficiency of the dredging device. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a non-secondary pollution dredging construction device and method for river ecological environment restoration, which has the function of removing excess water from sludge to form the sludge into a mud cake shape for placement, thereby increasing the effective storage capacity of the construction device for a single sludge cleaning, thereby improving the cleaning efficiency of the construction device for river sludge, and indirectly reducing the use cost of the construction device, etc., and solves the problem that during dredging, the sludge carries a large amount of water together with the sludge, resulting in a large waste of use space in the container for sludge, resulting in low working efficiency of the dredging device.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a non-secondary pollution dredging construction device for river channel ecological environment restoration, comprising a hull, a dredging mechanism arranged on the hull, and an auxiliary mechanism arranged on the hull, the dredging mechanism comprising a bucket and a track wheel, the hull is provided with the bucket, the bucket is located at one end of the hull, and the one end of the hull is the front end of the construction device, the bucket is moved into the river channel to dredge the silt, a plurality of track wheels are arranged at the bottom end of the hull, the track wheels are symmetrically distributed at the corners around the hull, the distance between the track wheel and the hull is adapted to the distance between the hull and the bottom end of the river channel, and the track wheel is used to drive the construction device to move in the river channel; the auxiliary mechanism comprises A lower mold, an upper mold, and a quantity control valve. The lower mold is provided on the hull, and a plurality of mold grooves are provided on the lower mold. The mold grooves of the lower mold are used to press the silt into the shape of a mud cake. The upper mold is provided on the hull, and the upper mold is located directly above the lower mold. The upper mold is adapted to the lower mold, and the upper mold moves downward and abuts against the lower mold to press the silt. The quantity control valve is provided on the hull, and the quantity control valve is located above the lower mold. The quantity control valve is adjacent to the space between the lower mold and the upper mold, and the quantity control valve is opposite to the mold groove of the lower mold. The silt cleaned by the bucket is transported to the quantity control valve, and the quantity control valve shoots the silt into the mold groove of the lower mold.
[0007] Preferably, the dredging mechanism also includes a base, one end of the hull is rotatably engaged with the base, a large arm is rotatably engaged with the base, a small arm is rotatably engaged with the large arm, and the bucket is rotatably engaged with the small arm, a first hydraulic rod is arranged between the base and the large arm, one end of the first hydraulic rod is rotatably engaged with the base, and the other end of the first hydraulic rod is rotatably engaged with the large arm, a second hydraulic rod is arranged between the large arm and the small arm, one end of the second hydraulic rod is rotatably engaged with the large arm, and the other end of the second hydraulic rod is rotatably engaged with the small arm, a third hydraulic rod is arranged between the small arm and the bucket, one end of the third hydraulic rod is rotatably engaged with the small arm, and the other end of the third hydraulic rod is rotatably engaged with the bucket.
[0008] Preferably, a plurality of hydraulic columns are fixedly installed at the bottom end of the hull, the fixed rods of the hydraulic columns are fixedly connected to the hull, the hydraulic columns are symmetrically distributed at the four corners of the hull, the extension rods of the respective hydraulic columns are respectively connected to the respective track wheels, and the hydraulic columns drive the track wheels to move so as to always adapt to the bottom end of the river channel.
[0009] Preferably, the bottom end of the base is a gear base, the base passes through the wall of the hull, the gear base of the base is located inside the hull, a drive motor is provided inside the hull, a gear is provided on the shaft of the drive motor, and the gear is meshed with the gear base of the base.
[0010] Preferably, the auxiliary mechanism further comprises a temporary storage box, the temporary storage box is fixedly mounted on the hull, the temporary storage box is used to temporarily store silt after river channel cleaning, a guide hopper is fixedly mounted on the top of the temporary storage box, and the guide hopper is communicated with the temporary storage box.
[0011] Preferably, a first fixing frame is fixedly installed on the hull, one end of the first fixing frame is located at one end of the hull, and the other end of the first fixing frame is located directly above the guide hopper, a first conveyor belt is arranged on the first fixing frame, and the first conveyor belt is adapted to the first fixing frame, a transmission motor is arranged on the hull, and the transmission motor is power-connected to the first conveyor belt, a collecting bucket is fixedly installed on one end of the first fixing frame, the collecting bucket is located at one end of the hull, the top end of the collecting bucket extends to the outside of one end of the hull, the bottom end of the collecting bucket is located directly above one end of the first conveyor belt, and the bottom end width of the collecting bucket is smaller than the width of the first conveyor belt.
[0012] Preferably, a partition plate is slidably fitted at the bottom end of the side wall of the temporary storage box, and the size of the partition plate is adapted to the cross-sectional area of the interior of the temporary storage box. A plurality of springs are provided at the bottom end of the interior of the temporary storage box, and the springs are all located below the partition plate. One end of the spring is connected to the temporary storage box, and the other end of the spring is connected to the partition plate. A detector is fixedly installed at the bottom end of the interior of the temporary storage box, and the detector is located below the partition plate. The detector is connected to a transmission motor signal. When the temporary storage box is filled with sludge, the partition plate is pressed and contacts the detector.
[0013] Preferably, a processing table is fixedly installed on the hull, the processing table is adjacent to the temporary storage box, the lower mold is rotatably cooperated with the processing table, a servo motor is fixedly installed on the processing table, the servo motor is power-connected to the lower mold, a hydraulic cylinder is fixedly installed on the processing table, the upper mold is fixedly installed on the extension rod of the hydraulic cylinder, a mud pump is arranged between the processing table and the temporary storage box, the feed end of the mud pump is connected to the temporary storage box, and the discharge end of the mud pump is fixedly installed with the quantity control valve.
[0014] Preferably, a second fixing frame is fixedly mounted on the hull, the second fixing frame is adjacent to the processing table, a second conveyor belt is arranged on the second fixing frame, the second conveyor belt is adapted to the second fixing frame, a stepper motor is fixedly mounted on the hull, and the stepper motor is power-connected to the second conveyor belt.
[0015] A method for using a device uses the above-mentioned construction device.
[0016] Compared with the prior art, the present invention provides a non-secondary pollution dredging construction device for river ecological environment restoration, which has the following beneficial effects:
[0017] 1. The non-secondary pollution dredging construction device for river channel ecological environment restoration moves the construction device into the river channel, starts the track wheels, the track wheels drive the hull to move in the river channel, starts the bucket, and extends the bucket into the river channel to clean the silt in the river channel. The cleaned silt is transported into the control valve, and the control valve controls a certain amount of silt to be shot into the lower mold. After the silt in the lower mold is filled, the control valve is closed, and then the upper mold is started, and the upper mold is pressed down into the lower mold to press the silt in the lower mold, so that the silt in the lower mold is drained and pressed into a mud cake shape, and then the lower mold is tilted to dump the mud cake out to press the mud cake again, and the pressed mud cake is collected and stored for subsequent silt cleaning, so as to remove excess water from the silt, and the silt is placed in the shape of a mud cake, thereby improving the effective storage capacity of the construction device for cleaning silt in a single time, thereby improving the cleaning efficiency of the construction device for river channel silt, and indirectly reducing the use cost of the construction device;
[0018] 2. The non-secondary pollution dredging construction device for river ecological environment restoration ensures the stable movement of the construction device in the river through the setting of crawler wheels, avoids the shaking of the hull in the river due to the shaking of the river, and ensures the stability of the operation of the construction device;
[0019] 3. The non-secondary pollution dredging construction device for river ecological environment restoration uses a detector. After the temporary storage box is filled with silt, the detector detects that the partition plate is touched, so that the detector signal controls the conveying motor to stop running, thereby avoiding overflow of the temporary storage box and ensuring the overall stable operation of the construction device. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the construction device of the present invention;
[0021] Figure 2 It is a schematic diagram of the structure of the dredging mechanism of the present invention;
[0022] Figure 3 This is a schematic diagram of the structure distribution of the bucket of the present invention;
[0023] Figure 4 This is a schematic diagram of the structure distribution of the crawler wheel of the present invention;
[0024] Figure 5 It is a schematic diagram of the auxiliary mechanism structure of the present invention;
[0025] Figure 6 This is a schematic diagram of the structure distribution of the mud pump of the present invention;
[0026] Figure 7 This is a schematic diagram of the internal structure distribution of the temporary storage box of the present invention;
[0027] Figure 8 It is a schematic diagram of the structural distribution of the processing station of the present invention.
[0028] In the figure: 1. hull; 2. dredging mechanism; 21. base; 22. upper arm; 23. lower arm; 24. bucket; 251. first hydraulic rod; 252. second hydraulic rod; 253. third hydraulic rod; 26. hydraulic column; 27. track wheel; 3. auxiliary mechanism; 31. temporary storage box; 32. guide hopper; 33. first fixed frame; 34. first conveyor belt; 35. collecting bucket; 36. partition plate; 37. spring; 38. detector; 39. processing table; 310. lower mold; 311. servo motor; 312. hydraulic cylinder; 313. upper mold; 314. mud pump; 315. control valve; 316. second fixed frame; 317. second conveyor belt; 318. stepper motor. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] As introduced in the background technology, in order to solve the deficiencies existing in the prior art and the above technical problems, this application proposes a non-secondary pollution dredging construction device and method for river ecological environment restoration.
[0031] Example 1
[0032] In a typical implementation of the present application, Figure 1As shown, a non-secondary pollution dredging construction device for river channel ecological environment restoration includes a hull 1, a dredging mechanism 2 arranged on the hull 1, and an auxiliary mechanism 3 arranged on the hull 1. The dredging mechanism 2 includes a bucket 24 and a track wheel 27. The hull 1 is provided with a bucket 24, and the bucket 24 is located at one end of the hull 1. The one end of the hull 1 is the front end of the construction device. The bucket 24 moves into the river channel to dredge the silt. A plurality of track wheels 27 are arranged at the bottom end of the hull 1. The track wheels 27 are symmetrically distributed at the corners around the hull 1. The distance between the track wheel 27 and the hull 1 is adapted to the distance between the hull 1 and the bottom end of the river channel. The track wheel 27 is used to drive the construction device to move in the river channel; the auxiliary mechanism 3 includes a lower mold 310, an upper mold 313, and a control valve 315. The hull 1 is provided with a lower mold 310, and a plurality of mold grooves are provided on the lower mold 310. The mold grooves of the lower mold 310 are used to press the silt into the shape of a mud cake. The hull 1 is provided with an upper mold 313, and the upper mold 313 is located directly above the lower mold 310. The upper mold 313 is adapted to the lower mold 310. The upper mold 313 moves downward and abuts against the lower mold 310 to press the silt. The hull 1 is provided with a quantity control valve 315, and the quantity control valve 315 is located above the lower mold 310. The quantity control valve 315 is adjacent to the space between the lower mold 310 and the upper mold 313. The quantity control valve 315 is opposite to the mold groove of the lower mold 310. The silt cleaned by the bucket 24 is transported to the quantity control valve 315, and the quantity control valve 315 shoots the silt into the mold groove of the lower mold 310.
[0033] When using the present invention, the construction device is moved into the river channel, the track wheel 27 is started, the track wheel 27 drives the hull 1 to move in the river channel, the bucket 24 is started, the bucket 24 is extended into the river channel to clean the silt in the river channel, the cleaned silt is transported into the control valve 315, the control valve 315 controls a certain amount of silt to be injected into the lower mold 310, after the silt in the lower mold 310 is filled, the control valve 315 is closed, and then the upper mold 313 is started, and the upper mold 313 is pressed down into the lower mold 310 to The silt in the lower mold 310 is pressed so that the silt in the lower mold 310 is drained and pressed into a mud cake shape, and then the lower mold 310 is tilted to pour out the mud cake to press the mud cake again. The pressed mud cake is collected and stored for subsequent silt cleaning, thereby removing excess water from the silt and placing it in a mud cake shape, thereby increasing the effective storage capacity of the construction device for single silt cleaning, thereby improving the cleaning efficiency of the construction device for river silt, and indirectly reducing the use cost of the construction device.
[0034] Example 2
[0035] like Figure 2-Figure 4As shown, the difference from the above embodiment is that the dredging mechanism 2 also includes a base 21, one end of the hull 1 is rotatably matched with the base 21, the base 21 is rotatably matched with a large arm 22, the large arm 22 is rotatably matched with a small arm 23, and the small arm 23 is rotatably matched with a bucket 24, a first hydraulic rod 251 is arranged between the base 21 and the large arm 22, one end of the first hydraulic rod 251 is rotatably matched with the base 21, the other end of the first hydraulic rod 251 is rotatably matched with the large arm 22, a second hydraulic rod 252 is arranged between the large arm 22 and the small arm 23, one end of the second hydraulic rod 252 is rotatably matched with the large arm 22, the other end of the second hydraulic rod 252 is rotatably matched with the small arm 23, a third hydraulic rod 253 is arranged between the small arm 23 and the bucket 24, one end of the third hydraulic rod 253 is rotatably matched with the small arm 23, and the other end of the third hydraulic rod 253 is rotatably matched with the bucket 24.
[0036] Furthermore, a plurality of hydraulic columns 26 are fixedly installed at the bottom end of the hull 1, and the fixed rods of the hydraulic columns 26 are fixedly connected to the hull 1. The hydraulic columns 26 are symmetrically distributed at the corners around the hull 1, and the extension rods of the hydraulic columns 26 are respectively connected to the track wheels 27. The hydraulic columns 26 drive the track wheels 27 to move so as to always adapt to the bottom of the river channel.
[0037] Furthermore, the bottom end of the base 21 is a gear base, and the base 21 passes through the wall of the hull 1. The gear base of the base 21 is located inside the hull 1. A driving motor is provided inside the hull 1. A gear is provided on the shaft of the driving motor, and the gear is meshed with the gear base of the base 21.
[0038] Among them, the hydraulic column 26 is firstly used to extend and retract to adapt to the height of the water surface in the river channel and the crawler wheel 27 is used to drive the construction device to move so as to move the construction device into the river channel. When excavating the silt in the river channel, the driving motor is started, and the driving motor drives the base 21 to rotate by using the gear and the gear base, so that the base 21 is turned to the direction where the silt needs to be cleaned, and then the first hydraulic rod 251 is started, and the first hydraulic rod 251 drives the base 21 and the upper arm 22 to rotate relative to each other, and the second hydraulic rod 252 is started, and the second hydraulic rod 252 drives the upper arm 22 and the lower arm 23 to rotate relative to each other, and the third hydraulic rod 253 is started, and the third hydraulic rod 253 drives the lower arm 23 and the bucket 24 to rotate relative to each other, so that the upper arm 22, the lower arm 23, and the bucket 24 form a mechanical arm for excavating silt and extend into the river channel to clean the silt.
[0039] Example 3
[0040] like Figure 5-Figure 8 As shown, the difference from the above embodiment is that the auxiliary mechanism 3 also includes a temporary storage box 31, the temporary storage box 31 is fixedly installed on the hull 1, the temporary storage box 31 is used to temporarily store the silt after the river channel is cleaned, and a guide hopper 32 is fixedly installed on the top of the temporary storage box 31, and the guide hopper 32 is connected to the temporary storage box 31.
[0041] Furthermore, a first fixed frame 33 is fixedly installed on the hull 1, one end of the first fixed frame 33 is located at one end of the hull 1, and the other end of the first fixed frame 33 is located directly above the guide hopper 32. A first conveyor belt 34 is arranged on the first fixed frame 33, and the first conveyor belt 34 is adapted to the first fixed frame 33. A transmission motor is arranged on the hull 1, and the transmission motor is power-connected to the first conveyor belt 34. A collecting bucket 35 is fixedly installed on one end of the first fixed frame 33, and the collecting bucket 35 is located at one end of the hull 1. The top end of the collecting bucket 35 extends to the outside of one end of the hull 1, and the bottom end of the collecting bucket 35 is located directly above one end of the first conveyor belt 34. The bottom end width of the collecting bucket 35 is smaller than the width of the first conveyor belt 34.
[0042] Among them, after the bucket 24 scoops up the silt, the bucket 24 pours the silt into the collecting bucket 35, and the collecting bucket 35 guides the silt to the first conveyor belt 34 on the first fixed frame 33, and the first conveyor belt 34 is started. The first conveyor belt 34 drives the silt to move to transfer the silt into the guide hopper 32, and the silt flows into the temporary storage box 31 through the guide hopper 32.
[0043] Furthermore, a partition plate 36 is slidably fitted at the bottom end of the side wall of the temporary storage box 31, and the size of the partition plate 36 is adapted to the cross-sectional area inside the temporary storage box 31. A plurality of springs 37 are provided at the bottom end of the interior of the temporary storage box 31, and the springs 37 are all located below the partition plate 36. One end of the spring 37 is connected to the temporary storage box 31, and the other end of the spring 37 is connected to the partition plate 36. A detector 38 is fixedly installed at the bottom end of the interior of the temporary storage box 31, and the detector 38 is located below the partition plate 36. The detector 38 is connected to the transmission motor signal. When the temporary storage box 31 is full of sludge, the partition plate 36 is pressed and contacts the detector 38.
[0044] Among them, as the sludge enters the temporary storage box 31, the sludge presses the partition plate 36 to move, and the partition plate 36 presses the spring 37 to contract. When the temporary storage box 31 is full of sludge, the total weight of the sludge presses the partition plate 36 so that the partition plate 36 touches the detector 38. When the detector 38 detects that the temporary storage box 31 is full of sludge, the detector 38 controls the transmission motor to stop running, so that the first conveyor belt 34 stops transferring the sludge. After the sludge in the temporary storage box 31 is discharged, the first conveyor belt 34 will resume operation.
[0045] Furthermore, a processing table 39 is fixedly installed on the hull 1, and the processing table 39 is adjacent to the temporary storage box 31. A lower mold 310 is rotatably matched on the processing table 39. A servo motor 311 is fixedly installed on the processing table 39, and the servo motor 311 is power-connected to the lower mold 310. A hydraulic cylinder 312 is fixedly installed on the processing table 39, and an upper mold 313 is fixedly installed on the extension rod of the hydraulic cylinder 312. A mud pump 314 is arranged between the processing table 39 and the temporary storage box 31, and a feed end of the mud pump 314 is connected to the temporary storage box 31, and a control valve 315 is fixedly installed on the discharge end of the mud pump 314.
[0046] Furthermore, a second fixing frame 316 is fixedly installed on the hull 1, and the second fixing frame 316 is adjacent to the processing table 39. A second conveyor belt 317 is arranged on the second fixing frame 316, and the second conveyor belt 317 is adapted to the second fixing frame 316. A stepper motor 318 is fixedly installed on the hull 1, and the stepper motor 318 is power-connected to the second conveyor belt 317.
[0047] When the mud cake is pressed, the mud pump 314 is started, the mud pump 314 extracts the sludge in the temporary storage box 31 and sends it to the control valve 315, the control valve 315 controls the discharge amount of the sludge and discharges the sludge into the lower mold 310, the hydraulic cylinder 312 is started, the hydraulic cylinder 312 drives the upper mold 313 to move, so that the upper mold 313 and the lower mold 310 are pressed against each other, so as to squeeze and drain the sludge in the lower mold 310, thereby pressing the sludge into a mud cake in the lower mold 310. Then, the servo motor 311 on the processing table 39 is started, and the servo motor 311 drives the lower mold 310 to rotate. The lower mold 310 is tilted to dump the mud cake onto the second conveyor belt 317 on the second fixed frame 316. The stepper motor 318 is started, and the stepper motor 318 drives the second conveyor belt 317 to rotate, so that the second conveyor belt 317 drives the mud cake to be transferred, and the workers collect and organize the mud cake transferred by the second conveyor belt 317, thereby effectively cleaning and storing the sludge.
[0048] The overall working principle of the construction device is as follows: the construction device is moved into the river channel, the track wheel 27 is started, the track wheel 27 drives the hull 1 to move in the river channel, the bucket 24 is started, the bucket 24 is extended into the river channel to clean the silt in the river channel, and the cleaned silt is transported into the control valve 315, the control valve 315 controls a certain amount of silt to be shot into the lower mold 310, and after the silt in the lower mold 310 is filled, the control valve 315 is closed, and then the upper mold 313 is started, and the upper mold 313 is pressed down into the lower mold 310 to suppress the silt in the lower mold 310, so that the silt in the lower mold 310 is drained and pressed into a mud cake shape, and then the lower mold 310 The mud cake is tilted to be dumped out to be pressed again, and the pressed mud cake is collected and stored for subsequent sludge cleaning, thereby removing excess water from the sludge and placing the sludge in the shape of a mud cake, thereby increasing the effective storage capacity of the construction device for single sludge cleaning, thereby improving the cleaning efficiency of the construction device for river sludge, and indirectly reducing the use cost of the construction device; wherein, the hydraulic column 26 is firstly used to extend and adapt to the height of the water surface in the river channel, and the crawler wheel 27 is used to drive the construction device to move so as to move the construction device into the river channel. When digging the river channel sludge, the drive motor is started, and the drive motor drives the base 21 to rotate by using the gear and the gear base, so that the base 21 turns to The direction where the silt needs to be cleaned is then started, and the first hydraulic rod 251 is driven to drive the base 21 and the arm 22 to rotate relative to each other, the second hydraulic rod 252 is started, and the second hydraulic rod 252 drives the arm 22 and the arm 23 to rotate relative to each other, and the third hydraulic rod 253 is started, and the third hydraulic rod 253 drives the arm 23 and the bucket 24 to rotate relative to each other, so that the arm 22, the arm 23, and the bucket 24 form a mechanical arm for digging silt and extend it into the river channel to clean the silt; after the bucket 24 scoops up the silt, the bucket 24 pours the silt into the collecting bucket 35, and the collecting bucket 35 guides the silt to the first conveyor belt 34 on the first fixed frame 33, and the shovel 24 is started. The first conveyor belt 34 is driven, and the first conveyor belt 34 drives the sludge to move, so as to transfer the sludge into the guide hopper 32, and the sludge flows into the temporary storage box 31 through the guide hopper 32; as the sludge enters the temporary storage box 31, the sludge presses the partition plate 36 to move, and the partition plate 36 presses the spring 37 to contract. When the sludge in the temporary storage box 31 is full, the total weight of the sludge presses the partition plate 36 to make the partition plate 36 contact the detector 38. When the detector 38 detects that the temporary storage box 31 is full of sludge, the detector 38 controls the transmission motor to stop running, so that the first conveyor belt 34 stops transferring the sludge. After the sludge in the temporary storage box 31 is discharged, the first conveyor belt 34 will resume operation;When the mud cake is pressed, the mud pump 314 is started, and the mud pump 314 extracts the sludge in the temporary storage box 31 and sends it to the control valve 315. The control valve 315 controls the discharge amount of the sludge and discharges the sludge into the lower mold 310. The hydraulic cylinder 312 is started, and the hydraulic cylinder 312 drives the upper mold 313 to move, so that the upper mold 313 and the lower mold 310 are pressed against each other, thereby squeezing and draining the sludge in the lower mold 310, so that the sludge is pressed into a mud cake in the lower mold 310, and then the hydraulic cylinder 312 is started. The servo motor 311 on the processing table 39 is driven, and the servo motor 311 drives the lower mold 310 to rotate, and the lower mold 310 is tilted to dump the mud cake onto the second conveyor belt 317 on the second fixed frame 316, and the stepper motor 318 is started, and the stepper motor 318 drives the second conveyor belt 317 to rotate, so that the second conveyor belt 317 drives the mud cake to be transferred, and the workers collect and organize the mud cake transferred from the second conveyor belt 317, thereby effectively cleaning and storing the sludge. ;
[0049] A method for using a device uses the above-mentioned construction device.
[0050] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A dredging construction device for river ecological environment restoration without secondary pollution, comprising a hull, a dredging mechanism arranged on the hull, and an auxiliary mechanism arranged on the hull, characterized in that: The desilting mechanism comprises a bucket and track wheels. The bucket is arranged on the hull, and the bucket is located at one end of the hull. One end of the hull is the front end of the construction device. The bucket moves into the river channel to desilt the silt. A plurality of track wheels are arranged at the bottom end of the hull. The track wheels are symmetrically distributed at the corners around the hull. The distance between the track wheels and the hull is matched with the distance between the hull and the bottom end of the river channel. The track wheels are used to drive the construction device to move in the river channel. The auxiliary mechanism comprises a lower mold, an upper mold, and a control valve. The lower mold is provided on the hull, and a plurality of mold grooves are provided on the lower mold. The mold grooves of the lower mold are used to press the sludge into the shape of a mud cake. The upper mold is provided on the hull, and the upper mold is located directly above the lower mold. The upper mold is adapted to the lower mold, and the upper mold moves downward to abut against the lower mold to press the sludge. The control valve is provided on the hull, and the control valve is located above the lower mold. The control valve is adjacent to the space between the lower mold and the upper mold, and the control valve is opposite to the mold groove of the lower mold. The sludge cleaned by the bucket is transported into the control valve, and the control valve shoots the sludge into the mold groove of the lower mold. The auxiliary mechanism also includes a temporary storage box, which is fixedly installed on the hull and is used to temporarily store sludge after river channel cleaning. A guide hopper is fixedly installed on the top of the temporary storage box, and the guide hopper is connected to the temporary storage box; A first fixing frame is fixedly installed on the hull, one end of the first fixing frame is located at one end of the hull, and the other end of the first fixing frame is located directly above the guide hopper, a first conveyor belt is arranged on the first fixing frame, and the first conveyor belt is adapted to the first fixing frame, a transmission motor is arranged on the hull, and the transmission motor is connected to the first conveyor belt by power, a collecting bucket is fixedly installed on one end of the first fixing frame, the collecting bucket is located at one end of the hull, the top end of the collecting bucket extends to the outside of one end of the hull, the bottom end of the collecting bucket is located directly above one end of the first conveyor belt, and the bottom end width of the collecting bucket is smaller than the width of the first conveyor belt; A partition plate is slidably fitted at the bottom end of the side wall of the temporary storage box, and the size of the partition plate is adapted to the cross-sectional area of the interior of the temporary storage box. A plurality of springs are arranged at the bottom end of the interior of the temporary storage box, and the springs are all located below the partition plate. One end of the spring is connected to the temporary storage box, and the other end of the spring is connected to the partition plate. A detector is fixedly installed at the bottom end of the interior of the temporary storage box, and the detector is located below the partition plate. The detector is connected to the transmission motor signal. When the temporary storage box is filled with sludge, the partition plate is pressed and contacts the detector; A processing table is fixedly installed on the hull, the processing table is adjacent to the temporary storage box, the lower mold is rotatably matched on the processing table, a servo motor is fixedly installed on the processing table, the servo motor is power-connected to the lower mold, a hydraulic cylinder is fixedly installed on the processing table, the upper mold is fixedly installed on the extension rod of the hydraulic cylinder, a mud pump is arranged between the processing table and the temporary storage box, the feed end of the mud pump is connected to the temporary storage box, and the discharge end of the mud pump is fixedly installed with the control valve.
2. The non-secondary pollution dredging construction device for river ecological environment restoration according to claim 1 is characterized by: The dredging mechanism also includes a base, one end of the hull is rotatably engaged with the base, a large arm is rotatably engaged with the base, a small arm is rotatably engaged with the large arm, and the bucket is rotatably engaged with the small arm. A first hydraulic rod is arranged between the base and the large arm, one end of the first hydraulic rod is rotatably engaged with the base, and the other end of the first hydraulic rod is rotatably engaged with the large arm. A second hydraulic rod is arranged between the large arm and the small arm, one end of the second hydraulic rod is rotatably engaged with the large arm, and the other end of the second hydraulic rod is rotatably engaged with the small arm. A third hydraulic rod is arranged between the small arm and the bucket, one end of the third hydraulic rod is rotatably engaged with the small arm, and the other end of the third hydraulic rod is rotatably engaged with the bucket.
3. The non-secondary pollution dredging construction device for river ecological environment restoration according to claim 2 is characterized by: A plurality of hydraulic columns are fixedly installed at the bottom end of the hull, the fixed rods of the hydraulic columns are fixedly connected to the hull, the hydraulic columns are symmetrically distributed at the corners around the hull, the extension rods of the hydraulic columns are respectively connected to the track wheels, and the hydraulic columns drive the track wheels to move so as to always adapt to the bottom end of the river channel.
4. The non-secondary pollution dredging construction device for river ecological environment restoration according to claim 3 is characterized by: The bottom end of the base is a gear base, and the base passes through the wall of the hull. The gear base of the base is located inside the hull. A drive motor is arranged inside the hull, and a gear is arranged on the shaft of the drive motor, and the gear is meshed with the gear base of the base.
5. The non-secondary pollution dredging construction device for river ecological environment restoration according to claim 4 is characterized by: A second fixing frame is fixedly mounted on the hull, the second fixing frame is adjacent to the processing table, a second conveyor belt is arranged on the second fixing frame, the second conveyor belt is adapted to the second fixing frame, a stepper motor is fixedly mounted on the hull, and the stepper motor is power-connected to the second conveyor belt.
6. A method for using a construction device, characterized in that: The non-secondary pollution dredging construction device for river ecological environment restoration described in any one of claims 1 to 5 is used.