Climbing frame wall-attached support connecting structure and concrete slab construction method

By setting the first connector and the adjustable second connector on the pouring formwork, the problems of inaccurate installation positioning of the embedded parts of the traditional climbing frame wall support and low reuse rate of the template are solved, and accurate positioning and simplification are achieved Construction process and cost-reducing effect.

CN118997452APending Publication Date: 2024-11-22GUANGZHOU CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411393748.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The installation of traditional climbing frame wall support embedded parts cannot be guaranteed, and the concrete is easily offset during pouring, which affects the main structure. The embedded sleeve needs to be opened to reduce the reuse rate of formwork, high construction cost, sealing The blocking progress is lagging, affecting the interlayer water cut-off measures.

Method used

The first connecting piece is arranged in the sleeve by using a casting formwork, and the second connecting piece is removable, adjusts in the axial direction to fix the wall-attached support body, and locates the sleeve through the first connecting piece to avoid openings and simplifies construction. Process, improve the recycling rate of templates and reduce construction costs.

Benefits of technology

It improves the accuracy of the sleeve positioning of the concrete wall, simplifies the installation and removal process of the attached wall support, reduces construction costs and safety risks, avoids lag in sealing progress, and improves construction efficiency and reuse of formwork.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997452A_ABST
    Figure CN118997452A_ABST
Patent Text Reader

Abstract

The invention discloses a climbing frame wall-attached support connecting structure and a construction method of a concrete plank, and relates to the technical field of construction equipment, the climbing frame wall-attached support connecting structure comprises the concrete plank, and a sleeve is pre-buried in the concrete plank; the pouring formwork is arranged on the concrete slab; a wall-attached support body; the connecting assembly comprises a first connecting piece and a second connecting piece, the first connecting piece is arranged on the pouring formwork and located in the sleeve, one end of the second connecting piece extends into the sleeve to be connected with the first connecting piece, the other end of the second connecting piece is provided with a pressing component, and the second connecting piece can move in the axial direction of the second connecting piece. Therefore, the wall-attached support body can be fixed to the concrete slab through the pressing component. According to the connecting structure for the wall-attached support of the climbing frame, the accuracy of positioning the sleeve on the poured concrete wall can be improved, so that the whole process of mounting and dismounting the wall-attached support body is simple to operate, and the construction production efficiency is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction equipment, and in particular to a climbing frame wall support connection structure and a concrete slab construction method. Background Art

[0002] The traditional installation of embedded parts of climbing frame wall supports adopts simple embedded sleeves. The embedded sleeves and structural steel bars are tied with steel wire, and the positioning and verticality cannot be guaranteed. It is easy to deviate during concrete pouring. If the embedded sleeves deviate, the structure needs to be opened, which affects the main structure. On the other hand, the use of embedded sleeves requires opening holes in the formwork, which greatly reduces the reuse rate of the formwork; the removal of climbing frame wall supports must wait until the bottom formwork frame is removed. Traditional wall supports require nuts to be set under the formwork. When removing, a separate scaffolding needs to be set up, and the construction cost is high; the traditional climbing frame wall supports embedded hole plugging needs to be carried out during the decoration stage, and the hole plugging progress lags behind, affecting the interlayer water interception measures, increasing the difficulty of on-site civilized construction management, and requiring the installation of bottom formwork and other measures. The plugging process is cumbersome and the construction cost is high. Summary of the invention

[0003] The present application aims to solve one of the above-mentioned technical problems in the prior art. To this end, an embodiment of the present application provides a climbing frame wall support connection structure.

[0004] The embodiment of the present application also provides a construction method of a concrete slab.

[0005] According to an embodiment of the first aspect of the present application, a climbing frame wall-attached support connection structure is provided, including a concrete slab with a sleeve pre-embedded; a casting template, arranged on one side of the concrete slab; a wall-attached support body; a connecting assembly, including a first connecting member and a second connecting member, the first connecting member being arranged on the casting template, the first connecting member being located inside the sleeve, one end of the second connecting member extending into the sleeve and detachably connected to the first connecting member, the other end of the second connecting member having a clamping member, the second connecting member being movable and adjustable along the axial direction of the second connecting member, so that the clamping member can fix the wall-attached support body to the other side of the concrete slab.

[0006] The above-mentioned climbing frame wall support connection structure has at least the following beneficial effects: the concrete slab is constructed by casting formwork, and before construction, the first connecting member is positioned and fixed on the casting formwork, the sleeve is sleeved on the first connecting member, and then the concrete slab is cast. The partially solidified concrete slab can be used to fix the wall support body. When the wall support body is fixed, the wall support body is placed on the exposed end of the sleeve for positioning, and then the second connecting member is extended into the sleeve, and the second connecting member is adjusted along the axial direction of the first connecting member to press and fix the wall support body. The present application uses the first connecting piece to position the sleeve, thereby improving the accuracy of positioning the sleeve in the casting of the concrete wall, and the first connecting piece is directly installed on the template without the need to drill a hole, which effectively avoids the problem of leakage during concrete casting and improves the recycling rate of the template; in addition, the sleeve is sleeve-connected to the first connecting piece, and the first connecting piece falls off when the casting template is removed, without the need to set up a separate scaffolding. The entire process of installing and removing the wall-mounted support body is simple to operate, which greatly improves the construction production efficiency and reduces safety risks. There is no need to invest in additional templates and other construction measures when sealing the sleeve subsequently.

[0007] According to the climbing frame wall support connection structure described in the embodiment of the first aspect of the present application, a positioning portion is provided at the end of the first connecting member, and the positioning portion is connected to the casting formwork through a locking member. The positioning portion has a positioning surface on one side that is attached to the casting formwork, and along the axial direction of the first connecting member, the first connecting member is perpendicular to the positioning surface.

[0008] According to the climbing frame wall support connection structure described in the embodiment of the first aspect of the present application, the positioning portion has a positioning hole, and the locking piece passes through the positioning hole to connect the casting formwork to press the positioning portion against the casting formwork.

[0009] According to the climbing frame wall support connection structure described in the embodiment of the first aspect of the present application, the central axis of the first connecting member is collinear with the central axis of the second connecting member, and the first connecting member and the second connecting member are connected by threads.

[0010] According to the climbing frame wall support connection structure described in the embodiment of the first aspect of the present application, the first connecting member is provided with a first screw hole running through both ends, and the outer surface of the second connecting member is provided with an external thread adapted to the screw hole.

[0011] According to the climbing frame wall support connection structure described in the embodiment of the first aspect of the present application, the clamping member is detachably connected to the second connecting member, and the clamping member can be adjusted along the axial direction of the second connecting member.

[0012] According to the climbing frame wall support connection structure described in the embodiment of the first aspect of the present application, the clamping member is connected to the second connecting member by threads.

[0013] According to the climbing frame wall support connection structure described in the embodiment of the first aspect of the present application, the outer surface of the second connecting piece is provided with an external thread, and the clamping member has a second screw hole adapted to the external thread.

[0014] According to the climbing frame wall-mounted support connection structure described in the embodiment of the first aspect of the present application, the connection assembly also includes a third connecting member, which is sleeved on the second connecting member and is located between the wall-mounted support body and the clamping member.

[0015] According to an embodiment of the second aspect of the present application, a construction method of a concrete slab is provided, comprising the following steps:

[0016] Assembling the casting formwork, positioning and fixing the first connecting member on a side of the casting formwork used for casting;

[0017] Sleeving the sleeve on the first connecting member so that the sleeve fits with the casting template or the end of the first connecting member;

[0018] Casting a concrete slab on the casting template, after the concrete slab solidifies, placing the wall-attached support body on the exposed end of the sleeve, extending the second connecting member into the sleeve and connecting with the first connecting member, adjusting the second connecting member along the axial direction of the first connecting member so that the pressing member locks and fixes the wall-attached support body;

[0019] After the construction of the concrete slab is completed, the formwork frame in the bottom structure of the climbing frame is removed, and the second connecting piece that locks the bottom wall support body of the climbing frame, the casting formwork and the first connecting piece are removed in sequence;

[0020] One end of the sleeve is blocked with a cover plate, and concrete is poured into the sleeve to block it.

[0021] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present application is further described below with reference to the accompanying drawings and embodiments;

[0023] Figure 1 This is a schematic diagram of the structure of the connection component of the embodiment of the present application. Figure 1 ;

[0024] Figure 2 This is a schematic diagram of the structure of the connection component of the embodiment of the present application. Figure 2 ;

[0025] Figure 3This is a schematic diagram of the connection of the wall-mounted support body of the embodiment of the present application fixed to the poured concrete wall through the connecting assembly. Figure 1 ;

[0026] Figure 4 This is a schematic diagram of the connection of the wall-attached support body of the present application embodiment fixed to the poured concrete wall through the connecting assembly. Figure 2 .

[0027] Figure numerals: first connecting member 100, screw hole 101, positioning portion 110, positioning hole 111, locking member 120, second connecting member 200, clamping member 210, third connecting member 220, external thread 201, sleeve 300, concrete slab 400, casting formwork 500, wall-mounted support body 600. DETAILED DESCRIPTION

[0028] This section will describe in detail the specific embodiments of the present application. The preferred embodiments of the present application are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present application, but it cannot be understood as a limitation on the scope of protection of the present application.

[0029] In the description of the present application, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0030] In the description of this application, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed", etc. are understood to exclude the number itself, and "above", "below", "within", etc. are understood to include the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0031] In the description of this application, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in this application based on the specific content of the technical solution.

[0032] The traditional installation of embedded parts of climbing frame wall supports has the following disadvantages:

[0033] 1. The verticality of the wire binding sleeve 300 cannot be guaranteed, and it is easy to deviate during concrete pouring. If the embedded sleeve 300 is offset, it is necessary to open a hole in the concrete structure, which affects the main structure.

[0034] 2. In order to fix the wall-mounted support, holes need to be opened in the template at the wall-mounted support. The template has a low reuse rate and there is a risk of leakage during pouring in the template with holes.

[0035] 3. The removal of fasteners such as nuts used to fix the wall-mounted supports at the bottom requires the erection of a separate scaffolding, which results in high construction costs.

[0036] 4. The plugging of the reserved holes produced by the sleeve 300 is delayed and takes a long period of time, which affects the interlayer water interception measures, increases the difficulty of civilized construction management, and requires the installation of bottom templates and other measures. The plugging process is cumbersome and the construction cost is high.

[0037] To solve the above problems, refer to Figures 1 to 4 The present application optimizes the connection between the wall-mounted support and the concrete slab 400, and proposes a climbing frame wall-mounted support connection structure. Specifically, the climbing frame wall-mounted support connection structure includes a concrete slab 400, a casting formwork 500, a wall-mounted support body 600 and a connection component.

[0038] The casting template 500 is arranged on one side of the concrete slab, and the concrete slab 400 is formed by the casting template, wherein the sleeve 300 is embedded in a preset position before the concrete slab 400 is formed, and the concrete slab 400 and the sleeve 300 are an integrated structure after casting.

[0039] The wall-mounted support body 600 for the climbing frame is fixed by a connecting assembly, wherein the connecting assembly includes a first connecting member 100 and a second connecting member 200, wherein the first connecting member 100 is arranged on the casting formwork 500, the first connecting member 100 is located inside the sleeve 300, one end of the second connecting member 200 extends into the sleeve 300 and is detachably connected to the first connecting member 100, and the other end of the second connecting member 200 has a clamping member 210, and the second connecting member 200 can be moved and adjusted along the axial direction of the second connecting member 200, so that the clamping member 210 can fix the wall-mounted support body 600 to the other side of the concrete slab 400.

[0040] The present application uses a casting formwork to construct the concrete slab 400. Before construction, the first connecting member 100 is positioned and fixed on the casting formwork 500, the sleeve 300 is sleeved on the first connecting member 100, and then the casting construction of the concrete slab 400 is carried out. After the concrete slab 400 is partially solidified, the wall support body 600 can be fixed to facilitate the subsequent construction of the climbing frame.

[0041] Among them, the fixing process of the wall-mounted support body 600 is to place the wall-mounted support body 600 on the exposed end of the sleeve 300 for positioning, and then extend the second connecting member 200 into the sleeve 300, and adjust the second connecting member 200 along the axial direction of the first connecting member 100. The second connecting member 200 approaches the casting template 500 and drives the clamping member 210 to press against the wall-mounted support body 600, so as to clamp and fix the wall-mounted support body 600, which is convenient for subsequent climbing frame construction.

[0042] The present application uses the first connecting member 100 to position the sleeve 300, thereby improving the accuracy of positioning the sleeve 300 in the casting concrete wall, and the first connecting member 100 is directly installed above the template, without the need to drill holes in the casting template, effectively avoiding the problem of concrete pouring leakage, and the integrity of the casting template 500 enables the template to be recycled.

[0043] In addition, when the wall-mounted support body 600 is removed, the second connecting member 200 is adjusted in a direction away from the casting formwork until the second connecting member 200 is disconnected from the first connecting member 100. At this time, the wall-mounted support body 600 can be removed, and then the casting formwork can be removed. Since the sleeve 300 is sleeve-connected to the first connecting member 100, the first connecting member 100 will fall off when the casting formwork is removed. There is no need to set up a separate scaffolding. The entire process of installing and removing the wall-mounted support body 600 is simple to operate, which greatly improves construction production efficiency while reducing safety risks. There is no need to invest in additional construction measures such as formwork when sealing the sleeve 300 later.

[0044] In some specific embodiments, a positioning portion 110 is provided at the end of the first connecting member 100, and the positioning portion 110 is connected to the casting template 500 through a locking member 120. The positioning portion 110 has a positioning surface on one side that is in contact with the casting template 500, and along the axial direction of the first connecting member 100, the first connecting member 100 is perpendicular to the positioning surface.

[0045] By setting the first connector 100 to be perpendicular to the positioning surface, it is ensured that when the positioning part 110 is fixed to the casting template, the main part of the first connector 100 is perpendicular to the casting template. The setting of the positioning part 110 ensures that the sleeve 300 is accurately formed in the concrete slab 400. The setting of the positioning part 110 facilitates the positioning and fixing of the first connector 100, which is beneficial to the positioning of the sleeve 300. Furthermore, after the positioning part 110 is attached to the casting template, it is fixed by the locking member 120, and there is no need to perform additional hole drilling operations on the casting template 500, which is beneficial to ensure the integrity of the casting template, and it can continue to be reused later, effectively avoiding the problem of concrete pouring leakage, while improving the recycling rate of the template, reducing construction costs, simplifying the operation process, and improving production efficiency.

[0046] In some specific embodiments, the positioning portion 110 has a positioning hole 111, at least two positioning holes 111 are provided, and the locking member 120 passes through the positioning hole 111 to connect the casting template 500, so as to press the positioning portion 110 against the casting template 500. The locking member 120 may be a steel nail. The steel nail will not cause cracks or holes in the casting template 500, which is conducive to ensuring the integrity of the casting template, and can also effectively position and fix the first connecting member 100.

[0047] In some embodiments, the central axis of the first connecting member 100 is collinear with the central axis of the second connecting member 200, so that the direction of force is collinear with the axis. The first connecting member 100 and the second connecting member 200 are connected by threads, so that the second connecting member 200 can be adjusted along the axial direction of the first connecting member 100, and the pressing member 210 can also have a certain pre-tightening force to press the wall support body 600.

[0048] In some embodiments, the first connecting member 100 is provided with a first screw hole 101 running through both ends, the second connecting member 200 is a column, and the outer surface of the second connecting member 200 is provided with an external thread 201 adapted to the screw hole 101. The second connecting member 200 is adjusted along the axial direction of the first connecting member 100 by the cooperation between the first screw hole 101 and the external thread 201. When adjusting the second connecting member 200, the second connecting member 200 can be rotated. Of course, in order to quickly rotate the second connecting member 200, a through hole can be opened in the radial direction of the second connecting member 200, and the second connecting member 200 can be quickly rotated by a rod.

[0049] In some embodiments, the clamping member 210 is detachably connected to the second connector 200, and the clamping member 210 can be adjusted along the axial direction of the second connector 200. The clamping member is detachably arranged, so that the second connector 200 can be conveniently pre-connected to the first connector 100 in advance, and the wall-mounted support body 600 can be removed without disassembling the second connector 200 during subsequent removal, which is convenient for assembly and disassembly. At the same time, both the second connector 200 and the clamping member 210 can be adjusted toward the casting template, so that the connection assembly can adapt to the clamping and fixing of wall-mounted support bodies 600 of different sizes.

[0050] In some specific embodiments, the pressing member 210 is connected to the second connecting member 200 by threads. Further, the outer surface of the second connecting member 200 is provided with an external thread 201 , and the pressing member 210 has a second screw hole adapted to the external thread 201 .

[0051] In some embodiments, the connection assembly further includes a third connection member 220, which is sleeved on the second connection member 200 and is located between the wall-mounted support body 600 and the pressing member 210. When the wall-mounted support body 600 is pressed by the pressing member 210, the presence of the third connection member 220 can increase the contact area between the pressing member 210 and the wall-mounted support body 600, so as to facilitate the balanced force acting on the wall-mounted support body 600, and avoid the situation where the wall-mounted support body 600 is damaged due to excessive force locally.

[0052] In some embodiments, the present application also provides a construction method of a concrete slab 400, which specifically includes the following steps:

[0053] Assemble the casting template 500, then position and fix the first connecting member 100 on the side of the casting template 500 used for casting, and ensure that the first connecting member is perpendicular to the casting template 500. The setting position of the first connecting member 100 is determined according to the predetermined position of the sleeve 300.

[0054] Then the sleeve 300 is sleeved on the first connecting member 100, and the sleeve 300 is fit with the casting template 500 or the end of the first connecting member 100 to prevent concrete slurry from seeping into the space between the sleeve 300 and the first connecting member 100, which is not conducive to the subsequent disassembly of the first connecting member 100. At the same time, the positioning of the sleeve 300 is achieved through the first connecting member 100.

[0055] After the sleeve 300 is positioned, the concrete slab 400 is poured on the casting template 500. After the concrete slab 400 solidifies, part of the sleeve 300 is exposed outside the concrete slab 400. The wall-mounted support body 600 is placed on the exposed end of the sleeve 300. The second connecting member 200 is inserted into the sleeve 300 and connected to the first connecting member 100. The second connecting member 200 is adjusted along the axial direction of the first connecting member 100 so that the clamping member 210 locks and fixes the wall-mounted support body 600 to facilitate the subsequent climbing frame assembly and connection construction.

[0056] After the concrete slab 400 is completely constructed, the formwork frame in the bottom structure of the climbing frame is removed, and the second connecting member 200, the casting template 500 and the first connecting member 100 that lock the bottom wall support body 600 of the climbing frame are removed in turn. After the second connecting member 200 is disconnected from the first connecting member 100, the wall support body 600 can be removed, and then the casting template can be removed. When removing the casting template, because the first positioning member is connected to the casting template 500, the first connecting member 100 can be removed when the casting template is removed, and then the first connecting member 100 and the casting template can be removed.

[0057] Finally, one end of the sleeve 300 is sealed with a cover plate, and concrete is poured into the sleeve 300 from the other end to seal it.

[0058] Compared with the prior art, the climbing frame wall support connection structure of the present application has the following beneficial effects:

[0059] 1. The arrangement of the first connecting member 100 and the positioning portion 110 ensures the positioning accuracy of the sleeve 300, simplifies the positioning construction process of the sleeve 300, and improves the construction efficiency and quality;

[0060] 2. The punch-free design reduces the workload of opening and sealing the casting formwork, improves the reuse rate of the casting formwork, and reduces the construction cost;

[0061] 3. The installation and disassembly of the entire connection structure is simple and quick, which reduces the high-altitude operation of the operating frame and reduces safety risks. It can also be adjusted according to different construction requirements and has strong adaptability;

[0062] 4. In addition, it also solves the problems of delayed progress in sealing reserved holes, the need for additional template investment and other construction measures, high construction costs, and cumbersome operations.

[0063] On the whole, the climbing frame wall support connection structure of the present application can facilitate the installation, removal and sealing of the climbing frame wall support. Compared with the existing installation, removal and sealing methods of the climbing frame wall support, the connection structure of the present application has the advantages of simple structure, no need for drilling, precise positioning, recyclable, easy assembly and disassembly, etc. The construction method is simple and easy to operate. The construction method of the concrete slab 400 used in the connection structure can effectively improve the efficiency and accuracy of the installation, removal and sealing of the climbing frame wall support.

[0064] The embodiments of the present application are described in detail above in conjunction with the accompanying drawings, but the present application is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present application.

Claims

1. A climbing frame wall support connection structure, characterized in that: include A concrete slab, wherein the concrete slab is pre-embedded with a sleeve; A casting template is arranged on one side of the concrete slab; Wall support body; The connection assembly includes a first connection member and a second connection member, wherein the first connection member is arranged on the casting formwork, the first connection member is located inside the sleeve, one end of the second connection member extends into the sleeve and is detachably connected to the first connection member, and the other end of the second connection member has a clamping member, and the second connection member can be moved and adjusted along the axial direction of the second connection member so that the clamping member can fix the wall-attached support body to the other side of the concrete slab.

2. The climbing frame wall support connection structure according to claim 1 is characterized in that: A positioning portion is provided at the end of the first connecting member, and the positioning portion is connected to the casting template via a locking member. The side of the positioning portion that is in contact with the casting template has a positioning surface, and along the axial direction of the first connecting member, the first connecting member is perpendicular to the positioning surface.

3. The climbing frame wall support connection structure according to claim 2 is characterized in that: The positioning portion has a positioning hole, and the locking member passes through the positioning hole to connect with the casting template so as to press the positioning portion against the casting template.

4. The climbing frame wall support connection structure according to any one of claims 1 to 3, characterized in that: The central axis of the first connecting member is colinear with the central axis of the second connecting member, and the first connecting member is connected to the second connecting member via threads.

5. The climbing frame wall support connection structure according to claim 4 is characterized in that: The first connecting member is provided with first screw holes running through two ends, and the outer surface of the second connecting member is provided with external threads adapted to the screw holes.

6. The climbing frame wall support connection structure according to any one of claims 1 to 3, characterized in that: The pressing member is detachably connected to the second connecting member, and the pressing member can be adjusted along the axial direction of the second connecting member.

7. The climbing frame wall support connection structure according to claim 6 is characterized in that: The pressing member is connected to the second connecting member by threads.

8. The climbing frame wall support connection structure according to claim 7 is characterized in that: The outer surface of the second connecting piece is provided with an external thread, and the pressing member has a second screw hole adapted to the external thread.

9. The climbing frame wall support connection structure according to any one of claims 1 to 3, characterized in that: The connection assembly also includes a third connection member, which is sleeved on the second connection member and is located between the wall-mounted support body and the clamping member.

10. A method for constructing a concrete slab, based on the climbing frame wall support connection structure according to any one of claims 1 to 9, characterized in that: The steps include: Assembling the casting formwork, positioning and fixing the first connecting member on a side of the casting formwork used for casting; Sleeving the sleeve on the first connecting member so that the sleeve fits with the casting template or the end of the first connecting member; Casting a concrete slab on the casting template, after the concrete slab solidifies, placing the wall-attached support body on the exposed end of the sleeve, extending the second connecting member into the sleeve and connecting with the first connecting member, adjusting the second connecting member along the axial direction of the first connecting member so that the pressing member locks and fixes the wall-attached support body; After the construction of the concrete slab is completed, the formwork frame in the bottom structure of the climbing frame is removed, and the second connecting piece that locks the bottom wall support body of the climbing frame, the casting formwork and the first connecting piece are removed in sequence; One end of the sleeve is blocked with a cover plate, and concrete is poured into the sleeve to block it.