Battery formation process optimization device and method

By real-time detection of gas production data of lithium-ion batteries and real-time adjustment of the process parameters of the chemical formation process, the problem of inefficient chemical formation process optimization process in the production of lithium-ion batteries is solved, and more efficient chemical formation process optimization and electrochemical performance improvement are achieved.

CN119009204APending Publication Date: 2024-11-22HEFEI GUOXUAN HIGH TECH POWER ENERGY

Patent Information

Application Number
CN202411061907.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The chemical process optimization process in the production of lithium-ion batteries is inefficient, and the previous verification data is not fully utilized, resulting in long cycles and high costs.

Method used

A battery-based process optimization device is designed, combining real-time data of gas production and component analysis, and real-time detection of gas production rate and proportional information through a gas flowmeter and a gas chromatograph, and real-time adjustment of process parameters by a control unit to achieve online optimization.

Benefits of technology

It improves the efficiency of the chemical process optimization process, makes full use of the previous verification data, shortens the optimization cycle and reduces costs, and improves the electrochemical performance of lithium-ion batteries.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119009204A_ABST
    Figure CN119009204A_ABST
Patent Text Reader

Abstract

The invention relates to a battery formation process optimization device and method, the method comprises initial parameter setting, optimization determination rule setting, battery loading and initialization, battery formation and online optimization, and data arrangement and output, and the device comprises a formation jig, a gas collection container, a gas flowmeter, a gas chromatograph and a control unit. Real-time gas production rate detection is achieved through the gas flow meter, sectional type gas production component analysis is achieved through alternate opening and closing of the two sets of gas paths, and meanwhile real-time data transmission is achieved by means of the control unit; analysis data in the early verification and development stage can be converted into a formation process optimization judgment standard so as to be fully utilized, so that the formation optimization process is more efficient; the method is suitable for different stages of product development, not only can be used for small test verification, but also is suitable for mass production, other detection modules (such as an expansibility test module and the like) can be added according to an optimization scheme, and the method has good universality and expansibility.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of lithium ion battery production, and in particular to a battery formation process optimization device and method. Background Art

[0002] The production process of lithium-ion batteries is a complex and detail-oriented system engineering, in which formation is crucial in the production process of lithium-ion batteries, and it plays a decisive role in the final electrochemical performance of lithium-ion batteries. Formation is the first charging process of the lithium-ion battery after the lithium-ion battery is filled with liquid. The process is accompanied by the formation of the SEI film, which plays a decisive role in the performance of the lithium-ion battery, and is accompanied by gas production. The film formation and gas production of different chemical systems are different.

[0003] At present, the lithium-ion production industry generally adopts the relatively inefficient control variable method to optimize the scheme in the development and management of the formation process, which often involves orthogonal experiments and a series of single-factor gradient experiments in the later stage. Many data obtained in the early verification and development stage (such as gas production and gas composition analysis data, etc.) are not fully utilized, resulting in a long cycle and high cost for the optimization process of the formation process. Summary of the invention

[0004] Technical problem to be solved: In view of the problems existing in the prior art such as the relatively inefficient optimization process in the development and management of formation processes and the under-utilization of data obtained in the early verification and development stage, the present invention proposes a battery formation process optimization device and method, which can realize online optimization of the formation process in combination with real-time data of gas production and component analysis, so that the verification data can be fully utilized and the formation optimization process can be made more efficient.

[0005] Technical solution: The first object of the present invention is to provide a battery formation process optimization device, comprising: a square lithium-ion battery to be tested;

[0006] The formation jig, in which the lithium-ion battery is placed, is used to control the charge and discharge of the lithium-ion battery, and has the functions of charging and discharging, heating, vacuuming and clamping in one;

[0007] A gas collection container, the gas collection container air inlet is connected to the lithium ion battery air outlet, and is used to collect the gas out of the lithium ion battery;

[0008] A gas flow meter, whose air inlet is connected to the air outlet of the gas collection container, and whose air outlet is connected to the air inlet of the gas chromatograph, is used to obtain the gas flow;

[0009] Gas chromatograph, used to obtain information on gas production ratio;

[0010] and a control unit, the control unit is respectively connected to the formation fixture, the gas flow meter, and the gas chromatograph, the gas chromatograph is used to feed back real-time gas production ratio information, the gas flow meter is used to feed back flow information, and the control unit sends the optimized formation process parameters to the formation fixture in real time according to the formation process to be optimized and the optimization judgment standard.

[0011] The square lithium-ion battery formation process parameter online optimization device provided by the present invention can detect the real-time gas production rate and proportion information through a gas flow meter and a gas chromatograph, and transmit the gas production proportion and rate information to a control unit. The control unit performs real-time optimization according to the formation process to be optimized and the optimization judgment standard and returns the optimized formation process parameters to the formation jig, making the formation optimization process more efficient.

[0012] Preferably, the control unit is a PLC control system, including a host computer PLC-M, a gas production ratio feedback processing unit PLC1, a gas production rate feedback processing unit PLC2 and a formation control unit PLC3, wherein the signal input end of PLC1 is electrically connected to the signal output end of the gas chromatograph, the signal input end of PLC2 is electrically connected to the signal output end of the gas flow meter, the signal input end of PLC3 is electrically connected to the signal output end of the formation fixture and the signal output end of PLC-M, respectively, and the signal output end of PLC3 is electrically connected to the signal input end of the formation fixture and the third signal input end of PLC-M; the first signal of PLC-M The signal input terminal is electrically connected to the signal output terminal of PLC1, the second signal input terminal of PLC-M is electrically connected to the signal output terminal of PLC2, the formation process to be optimized and the optimization judgment standard are input into the upper computer PLC-M, after sending the formation step to the formation control unit PLC3, the gas production rate feedback processing unit PLC2 collects the flow information fed back by the gas flow meter, the gas production ratio feedback processing unit PLC1 collects the real-time gas production ratio information fed back by the gas chromatograph, PLC1 and PLC2 feed back the collected information to the upper computer PLC-M, and send the optimized formation process parameters to the formation control unit PLC3 in real time according to the optimization judgment standard.

[0013] Preferably, the battery formation process optimization device also includes a gas collecting bag and a gas production and delivery jig. The gas collection bag is clamped in the gas production and delivery jig to collect the outgoing gas from the gas flow meter. The gas production and delivery jig is used to sense the force and compress the gas collection bag. The air inlet of the gas collection bag is connected to the air outlet of the gas flow meter, and the air outlet of the gas collection bag is connected to the air inlet of the gas chromatograph.

[0014] Preferably, the gas collection bag includes a gas collection bag a and a gas collection bag b, and the gas production and conveying jig includes two gas production and conveying jigs a and b of identical composition, and the gas production and conveying jigs are respectively composed of two horizontal plates that move up and down along vertical guide rails. A power device is provided on the vertical guide rail, and positioning sensors are provided on the upper plate and the lower plate, and a force sensor is provided on the upper plate. The compression of the gas collection bag and the resetting of the jig are achieved by the up and down moving plates.

[0015] Preferably, the battery formation process optimization device also includes an airtight valve a, an airtight valve b and a three-way valve. The outlet of the gas collection bag a and the outlet of the gas collection bag b are connected to the air inlet of the gas chromatograph after merging through a pipeline. The airtight valve a is arranged on the pipeline behind the outlet of the gas collection bag a to control the gas outlet of the gas collection bag a. The airtight valve b is arranged on the pipeline behind the outlet of the gas collection bag b to control the gas outlet of the gas collection bag b. The outlet of the gas flowmeter is divided into two gas paths through the three-way valve, one gas path is connected to the gas collection bag a in the gas production and delivery fixture a, and the other gas path is connected to the gas collection bag b in the gas production and delivery fixture b.

[0016] Preferably, the battery formation process optimization device also includes a control unit PLC-G, the signal input end of the control unit PLC-G is electrically connected to the signal output ends of the positioning sensor and the force sensor in the gas production and conveying jig a and the gas production and conveying jig b, respectively, the first / second signal output end of the control unit PLC-G is electrically connected to the vertical guide rail power device in the gas production and conveying jig a and the gas production and conveying jig b, respectively, for controlling the movement of the upper plate, and at the same time, the third / fourth / fifth signal output end of the control unit PLC-G is electrically connected to the airtight valve a, the airtight valve b and the three-way valve, respectively.

[0017] Preferably, the battery formation process optimization device also includes an air pressure and vacuum pump for detecting the air tightness of the gas path. The vacuum pump is connected to the gas path pipeline connected to the gas chromatograph, the gas collection bag a and the gas collection bag b, and the pressure gauge is arranged between the pipeline connecting the vacuum pump and the gas chromatograph.

[0018] The second object of the present invention is to provide a battery formation process optimization method, based on the above-mentioned battery formation process optimization device, the specific steps are as follows:

[0019] S1: Setting initial parameters: manually inputting the initialization process parameters to be optimized into the control unit;

[0020] S2: Set optimization judgment rules: Input the formation process parameters according to the preliminary formation experiment results of square lithium-ion batteries

[0021] rule;

[0022] S3: Battery formation and online optimization: Send the initialization step to be optimized, and control the formation fixture to start charging through the control unit. As the formation process proceeds, the lithium-ion battery begins to release gas, which is sent to the gas chromatograph through the gas collection container and the gas flow meter. The gas flow meter feeds back the collected gas flow information to the control unit, and the gas chromatograph feeds back the detected gas type and proportion information to the control unit. The control unit adjusts the formation process parameters of each step in real time through the formation fixture;

[0023] S4: Data collation and output: collate the data from the actual formation process, output the optimized formation process parameters, and determine whether the formation results meet expectations. If so, end the optimization process directly; if not, input the optimized formation process parameters and restart steps S1-S5 until the results meet expectations. The optimized formation process parameters include the charge and discharge current, voltage, power, temperature, pressure and step termination conditions of each step of the formation process. The evaluation methods for determining whether the formation results meet expectations include battery disassembly interface analysis, battery cycle performance evaluation or battery impedance test results.

[0024] Furthermore, a battery formation process optimization method is provided, based on the above-mentioned battery formation process optimization device, and the specific steps are as follows:

[0025] S1: Set initial parameters: manually input the process parameters to be optimized into the upper computer PLC-M;

[0026] S2: Setting optimization judgment rules: inputting the judgment rules of formation process parameters according to the preliminary formation experiment results of square lithium-ion batteries;

[0027] S3: Battery cabinet and initialization: Place the lithium-ion battery in the formation fixture, connect the circuit and gas circuit, check whether the circuit connection is correct, check the air tightness of the gas circuit, in the initial state, the gas circuit where the gas collection bag a is located is open, the gas circuit where the gas collection bag b is located is closed, the airtight valve a is opened, the airtight valve b is closed, turn on the vacuum pump, close it after vacuuming, observe the pressure gauge, if the pressure gauge reading is stable, it can be determined that the air tightness of the gas circuit is qualified, then open the airtight valve b, close the airtight valve a, and use the same method to detect the air tightness of the relevant gas circuits;

[0028] S4: Battery formation and online optimization: Send the initialization step to be optimized, the upper computer PLC-M controls the formation fixture through PLC3 to start charging, as the formation process proceeds, the lithium-ion battery starts to release gas, which is sent to the gas collection bag a through the liquid collection bottle and the gas flow meter. The gas flow meter transmits the collected gas flow information to the upper computer PLC-M through the gas production rate feedback processing unit PLC2. The gas collection bag a collects gas and swells. After the gas production and delivery fixture a senses the change in force, it controls the three-way valve through the microcircuit to close the gas path where the gas collection bag a is located and open the gas path where the gas collection bag b is located. At the same time, the gas is compressed by the gas production and delivery fixture a. The gas collecting bag a presses the produced gas into the gas chromatograph, and when the gas collecting bag b is swollen and the gas producing and conveying fixture b senses the change in force, the three-way valve is controlled by the microcircuit to close the gas path where the gas collecting bag b is located and open the gas path where the gas collecting bag a is located. At the same time, the gas collecting bag b is compressed by the gas producing and conveying fixture b to press the produced gas into the gas chromatograph, and then the above process is repeated until the gas production is completed. The gas chromatograph feeds back the detected gas type and proportion information to the upper computer PLC-M through the gas producing rate feedback processing unit PLC1, and the upper computer PLC-M adjusts the formation process parameters of each step in real time through the formation control unit PLC3;

[0029] S5: Data collation and output: collate the data from the actual formation process, output the optimized formation process parameters, and determine whether the formation results meet expectations. If so, end the optimization process directly; if not, input the optimized formation process parameters and restart steps S1-S5 until the results meet expectations. The optimized formation process parameters include the charge and discharge current, voltage, power, temperature, pressure and step termination conditions of each step of the formation process. The evaluation methods for determining whether the formation results meet expectations include battery disassembly interface analysis, battery cycle performance evaluation or battery impedance test results.

[0030] Preferably, the process parameters initialized in step S1 include step mode, mode parameter, step termination parameter, abnormality determination rule, step protection parameter and process protection parameter, wherein the step mode includes sleep, charge or discharge; the mode parameter includes the current, voltage, power, temperature or pressure set in the above step mode; the step termination parameter includes current, voltage, power and / or step time; the abnormality determination rule includes the maximum allowable fluctuation range and fluctuation frequency of the current, voltage, power and / or temperature in the actual formation process, and an abnormality is determined if the limit is exceeded; the protection parameter is the range value of the current, voltage, power, temperature and / or pressure, which is divided into step protection parameter and process protection parameter, wherein the step protection parameter only limits a specific step, and if it exceeds the corresponding range, the step is terminated and the next step is entered, and the process protection parameter limits the entire process, and if it exceeds the corresponding range, the entire formation process is terminated.

[0031] Preferably, the step modes in step S1 include sleep, charging or discharging, charging includes constant current charging, constant voltage charging, constant current constant voltage charging or constant power charging, and discharging includes constant current discharge, constant voltage discharge, constant current constant voltage discharge or constant power discharge.

[0032] Preferably, the formation process parameter determination rule in step S2 is the relationship between the formation process parameters and the formation process data, the formation process data includes the gas production rate, gas production type and gas production ratio, and the formation process parameters include the current, voltage, power, temperature or pressure of each step.

[0033] Preferably, in step S4, the microcircuit control principle of the gas production and delivery jig a and the gas production and delivery jig b is as follows:

[0034] 101. Initial state: the upper and lower plates of the gas production and delivery fixture a and the gas production and delivery fixture b remain in an open state, and their positions can be controlled by the positioning sensor. The airtight valve a and the airtight valve b are both kept in a closed state. At this time, the gas path opened by the three-way valve leads to the gas collection bag a;

[0035] 102. Alternating compression a: When the gas collection bag a swells and hits the upper plate of the gas production and delivery fixture a, the force sensor value reaches the upper limit. At this time, the control circuit PLC-G simultaneously completes: 1. Opening the airtight valve a; 2. Making the three-way valve close the gas path of the gas collection bag a and opening the gas path of the gas collection bag b; 3. Controlling the upper plate to move downward, compressing the gas collection bag a, and pressing the produced gas into the gas chromatograph; when the positioning sensor value remains unchanged, PLC-G closes the airtight valve a and controls the upper plate to move upward until it returns to its initial position;

[0036] 103. Alternating compression b: When the gas collection bag b swells and hits the upper plate of the gas production and delivery fixture b, the force sensor value reaches the upper limit. At this time, the control circuit PLC-G simultaneously completes: 1. Opening the airtight valve b; 2. Making the three-way valve close the gas path of the gas collection bag b and open the gas path of the gas collection bag a; 3. Controlling the upper plate to move downward to compress the gas collection bag b; when the positioning sensor value remains unchanged, PLC-G closes the airtight valve a and controls the upper plate to move upward until it returns to its initial position;

[0037] 104. Repeat steps 102 to 103 several times until gas production stops.

[0038] Preferably, in step S2, the vacuum pump is turned on, vacuumed to -20 to -90 kPa, and then turned off. If the pressure gauge reading is stable at <5 kPa within 0.5 to 5 minutes, it can be determined that the air tightness of the gas path is qualified.

[0039] Preferably, in step S4, the capacity of the gas collection bag a and the gas collection bag b is 0.1 to 20 mL.

[0040] Preferably, the gas production and delivery jig a and the gas production and delivery jig b can further accurately control the amount of gas pressed into the gas chromatograph each time by adjusting the force parameters.

[0041] Beneficial effects: The device of the present invention can realize real-time gas production rate detection through a gas flow meter, and the alternating opening and closing of two groups of gas paths can realize segmented gas production component analysis, and at the same time, real-time data transmission can be realized with the help of a control unit;

[0042] The analysis data of the method of the present invention in the early verification and development stage can be converted into a chemical process optimization judgment standard and input into a host computer. The online optimization of the chemical process can be realized by combining the real-time data of gas production and component analysis, so that the verification data can be fully utilized and the chemical optimization process can be made more efficient.

[0043] In summary, the battery formation process optimization device and method provided by the present invention are suitable for different stages of product development, and can be used for both small-scale test verification and mass production. Other detection modules (such as expansion force test modules, etc.) can be added according to the optimization plan, and have good universality and extensibility. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0045] Figure 1 A flow chart of the chemical formation process optimization method provided by the present invention;

[0046] Figure 2 A schematic diagram of the structure of the chemical formation process optimization device provided by the present invention;

[0047] Figure 3 The microcircuit control principle diagram of the gas production and delivery jig a and the gas production and delivery jig b, wherein (a) is the initial state diagram; (b) is alternating compression a; and (c) is alternating compression b.

[0048] In the figure: 0. lithium-ion battery; 1. formation fixture; 2. gas flow meter; 31. gas production and delivery fixture a; 311. upper splint a; 322. lower splint a; 32. gas production and delivery fixture b; 321. upper splint b; 322. lower splint b; 41. gas collection bag a; 42-gas collection bag b; 5. gas chromatograph; 6. vacuum pump; 71. gas-liquid conduit; 72. liquid collecting bottle; 73. three-way valve; 741. airtight valve a; 742. airtight valve b; 75. pressure gauge; 8. control unit. DETAILED DESCRIPTION

[0049] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0050] Therefore, the detailed description of the embodiments of the present invention provided in the following figures is not intended to limit the scope of the claimed invention but is merely representative of selected embodiments of the present invention.

[0051] In the examples of this specification, unless otherwise specified, the devices and raw materials used are common commercially available products.

[0052] The formation jig 1 is a square lithium-ion battery formation jig that integrates charging and discharging, heating, vacuuming and clamping functions, and can be any mainstream formation jig on the market.

[0053] The present invention is a battery formation process optimization device, see Figure 2 , including a square lithium-ion battery to be tested 0, a formation fixture 1, a gas flowmeter 2, a gas production and delivery fixture (gas production and delivery fixture a 31 and gas production and delivery fixture b 32), a gas collection bag (gas collection bag a 41, gas collection bag b 42), a gas chromatograph 5, a vacuum pump 6, a gas-liquid conduit 71, a gas collection container (liquid collection bottle 72), a three-way valve 73, an airtight valve a 741 and an airtight valve b 742, a barometer 75 and a control unit 8.

[0054] The lithium-ion battery 0 is placed in a formation jig 1, and the charge and discharge of the lithium-ion battery 0 is controlled by the formation jig 1. A liquid injection port is provided on the top of the lithium-ion battery 0. The bottom of the liquid collecting bottle 72 is connected to the liquid injection port on the top of the lithium-ion battery 0 through a gas-liquid conduit 71, and the gas outlet of the liquid collecting bottle 72 is connected to the gas inlet of the gas flow meter 2. The gas outlet of the gas flow meter 2 is divided into two gas paths through a three-way valve 73, one gas path is connected to the gas collection bag a 41 in the gas production and delivery jig a 31, and the other gas path is connected to the gas collection bag b 42 in the gas production and delivery jig b 32. The gas outlets of the gas collection bag a 41 and the gas outlets of the gas collection bag b 42 are respectively connected to the gas inlet of the gas chromatograph 5, and the gas production and delivery jig a 31 and the gas production and delivery jig b 32 are used to sense the force and compress the gas collection bag a 41 and the gas collection bag b 42.

[0055] The gas outlet of gas collection bag a 41 and the gas outlet of gas collection bag b 42 are connected to the gas inlet of gas chromatograph 5 after being merged through a pipeline. The airtight valve a 741 is arranged on the pipeline behind the gas outlet of gas collection bag a 41 to control the gas outlet of gas collection bag a 41. The airtight valve b 742 is arranged on the pipeline behind the gas outlet of gas collection bag b 42 to control the gas outlet of gas collection bag b 42.

[0056] The vacuum pump 6 and the barometer 75 are used to detect the air tightness of the gas circuit. The vacuum pump 6 is connected to the gas circuit pipeline connecting the gas chromatograph 5, the gas collection bag a 41 and the gas collection bag b 42, and the barometer 75 is arranged between the pipeline connecting the vacuum pump 6 and the gas chromatograph 5.

[0057] The control unit 8 is a PLC control system, including a host computer PLC-M, a gas production ratio feedback processing unit PLC1, a gas production rate feedback processing unit PLC2 and a formation control unit PLC3, wherein the signal input end of PLC1 is electrically connected to the signal output end of the gas chromatograph 5, the signal input end of PLC2 is electrically connected to the signal output end of the gas flow meter 2, the signal input end of PLC3 is electrically connected to the signal output end of the formation fixture 1 and the signal output end of PLC-M respectively, and the signal output end of PLC3 is electrically connected to the signal input end of the formation fixture 1 and the third signal input end of PLC-M respectively; the first signal input end of PLC-M The input end is electrically connected to the signal output end of PLC1, the second signal input end of PLC-M is electrically connected to the signal output end of PLC2, the formation process to be optimized and the optimization judgment standard are input into the upper computer PLC-M, after sending the formation step to the formation control unit PLC3, the gas production rate feedback processing unit PLC2 collects the flow information fed back by the gas flow meter 2, the gas production ratio feedback processing unit PLC1 collects the real-time gas production ratio information fed back by the gas chromatograph 5, PLC1 and PLC2 feed back the collected information to the upper computer PLC-M, and send the optimized formation process parameters to the formation control unit PLC3 in real time according to the optimization judgment standard.

[0058] Furthermore, the gas production and conveying jig a 31 and the gas production and conveying jig b 32 have the same composition, and are respectively composed of two horizontal plates that move up and down along vertical guide rails. A power device is provided on the vertical guide rail, and positioning sensors are provided on the upper and lower plates. A force sensor is provided on the upper plate. The gas collection bag is compressed and the jig is reset through the up and down moving plates.

[0059] Furthermore, the battery formation process optimization device also includes a control unit PLC-G, the signal input end of the control unit PLC-G is electrically connected to the signal output ends of the positioning sensor and the force sensor in the gas production and conveying fixture a 31 and the gas production and conveying fixture b 32, respectively, the first / second signal output end of the control unit PLC-G is electrically connected to the vertical guide rail power device in the gas production and conveying fixture a 31 and the gas production and conveying fixture b 32, respectively, for controlling the movement of the upper plate, and at the same time, the third / fourth / fifth signal output end of the control unit PLC-G is electrically connected to the airtight valve a 741, the airtight valve b 742 and the three-way valve 73, respectively.

[0060] An optimization method based on the above-mentioned battery formation process optimization device, see Figure 1 , the specific steps are as follows:

[0061] S1: Set initial parameters: Manually input the initialization process parameters to be optimized into the upper computer PLC-M. The initialization process parameters include step mode, mode parameters, step termination parameters, abnormal judgment rules, step protection parameters and process protection parameters. The step mode includes sleep, charging (including constant current charging, constant voltage charging, constant current and constant voltage charging or constant power charging) or discharging (constant current discharge, constant voltage discharge, constant current and constant voltage discharge or constant power discharge); the mode parameters include the current, voltage, power, temperature or pressure set in the above step mode; the step termination parameters include performance parameters such as current, voltage, power (such as The termination current size in the constant current and constant voltage mode) and / or step time; the abnormal judgment rules include the maximum allowable fluctuation range and fluctuation frequency of the current, voltage, power and / or temperature in the actual formation process. If the limit is exceeded, it will be judged as abnormal (such as the maximum allowable fluctuation size and the number of continuous fluctuations of the current and voltage during the charging and discharging process); the protection parameters are the range values ​​of current, voltage, power, temperature and / or pressure, which are divided into step protection parameters and process protection parameters. The step protection parameters only limit specific steps. If the corresponding range is exceeded, the step will be terminated and the next step will be entered. The process protection parameters limit the entire process. If the corresponding range is exceeded, the entire formation process will be terminated.

[0062] S2: Setting optimization judgment rules: Inputting formation process parameter judgment rules according to the preliminary formation experiment results of square lithium-ion batteries, wherein the formation process parameter judgment rules are the relationship between formation process parameters and formation process data, wherein the formation process data include gas production rate, gas production type and gas production ratio, and the formation process parameters include the current, voltage, power, temperature or pressure of each process step.

[0063] S3: Battery cabinet and initialization: Place lithium-ion battery 0 in formation fixture 1, connect the circuit and gas circuit, check whether the circuit connection is correct, check the air tightness of the gas circuit, in the initial state, the gas circuit where gas collection bag a 41 is located is a passage, the gas circuit where gas collection bag b 42 is located is closed, the airtight valve a 741 is opened, the airtight valve b 742 is closed, turn on the vacuum pump 6, close it after vacuuming, observe the pressure gauge 75, if the reading of the pressure gauge 75 is stable, it can be determined that the air tightness of the gas circuit is qualified, then open the airtight valve b 742, close the airtight valve a 741, and detect the air tightness of the relevant gas circuits in the same way.

[0064] S4: Battery formation and online optimization: Send the initialization step to be optimized, the upper computer PLC-M controls the formation fixture 1 through PLC3 to start charging, as the formation process proceeds, the lithium-ion battery 0 starts to release gas, and is sent to the gas collection bag a 41 after passing through the liquid collecting bottle 72 and the gas flow meter 2, the gas flow meter 2 transmits the collected gas flow information to the upper computer PLC-M through the gas production rate feedback processing unit PLC2, the gas collection bag a 41 collects gas and swells, and the gas production and delivery fixture a 31 senses the change in force and controls the three-way valve 73 through the microcircuit to close the gas path where the gas collection bag a 41 is located and open the gas path where the gas collection bag b 42 is located, and at the same time compresses the gas collection bag a 41 through the gas production and delivery fixture a 31, and presses the produced gas into the gas chromatograph 5, and wait for the gas collection bag b 42 to collect gas and swell, and the gas production and delivery fixture b 32 senses the change in force and controls the three-way valve 73 through the microcircuit to close the gas collection bag b 42. The gas path where the gas collecting bag a 41 is located is opened at the same time, and the gas collecting bag b 42 is compressed by the gas production and delivery fixture b 32 to press the produced gas into the gas chromatograph 5. The above process is repeated until the gas production is completed. The gas chromatograph 5 feeds back the detected gas type and proportion information to the host computer PLC-M through the gas production rate feedback processing unit PLC2. The host computer PLC-M adjusts the formation process parameters of each step in real time through the formation control unit PLC3.

[0065] S5: Data collation and output: collate the data in the actual formation process, output the optimized formation process parameters, determine whether the formation results meet expectations, if yes, directly end the optimization process; if not, input the optimized formation process parameters, restart steps S1-S5 until the results meet expectations, the optimized formation process parameters include the charge and discharge current, voltage, power, temperature, pressure and step termination conditions of each step of the formation process. The evaluation means to determine whether the formation results meet expectations include battery disassembly interface analysis, battery cycle performance evaluation or battery impedance test results.

[0066] Further, see Figure 3 The microcircuit control principle of the gas production and delivery fixture a 31 and the gas production and delivery fixture b 32 in S4 is as follows:

[0067] 101. Initial state: the upper and lower plates of the gas production and delivery fixture a 31 and the gas production and delivery fixture b 32 remain in an open state, and their positions can be controlled by a positioning sensor. The airtight valve a 741 and the airtight valve b 742 are both kept in a closed state. At this time, the air path opened by the three-way valve 73 leads to the gas collection bag a 41;

[0068] 102. Alternating compression a: When the gas collecting bag a 41 swells and hits the upper plate of the gas production and delivery fixture a 31, the force sensor value reaches the upper limit. At this time, the control circuit PLC-G simultaneously completes: 1. Opening the airtight valve a 741; 2. Making the three-way valve 73 close the gas path of the gas collecting bag a 41 and open the gas path of the gas collecting bag b 42; 3. Controlling the upper plate to move downward, compressing the gas collecting bag a 41, and pressing the produced gas into the gas chromatograph 5; when the positioning sensor value remains unchanged, PLC-G closes the airtight valve a 741 and controls the upper plate to move upward until it returns to the initial position;

[0069] 103. Alternating compression b: When the gas collecting bag b 41 swells and hits the upper plate of the gas production and delivery fixture b 32, the force sensor value reaches the upper limit. At this time, the control circuit PLC-G simultaneously completes: 1. Opening the airtight valve b 742; 2. Making the three-way valve close the gas path of the gas collecting bag b 42 and open the gas path of the gas collecting bag a 41; 3. Controlling the upper plate to move downward to compress the gas collecting bag b 42; when the positioning sensor value remains unchanged, PLC-G closes the airtight valve a 742 and controls the upper plate to move upward until it returns to its initial position;

[0070] 104. Repeat steps 102 to 103 several times until gas production stops.

[0071] Based on the above-mentioned device and method, the ternary NCM532 lithium-ion battery is used as the verification object to optimize the formation process in Table 1:

[0072] Table 1: Chemical processes to be optimized

[0073]

[0074]

[0075] * The mode parameters only indicate the non-zero voltage and current parameters. Constant parameters such as temperature and pressure are not marked. In this embodiment, no special marking is made. The default temperature = 45°C and the pressure = atmospheric pressure

[0076] **Abnormal determination rules Here only some key rules are listed

[0077] Example 1: Optimizing the formation process parameters based on the relationship between gas production and current

[0078] This embodiment combines the theoretical research on SEI film formation to establish the relationship between gas production information and chemical formation process as shown in the following table:

[0079] Table 2: Gas production-current optimization judgment conditions

[0080] Main gas components Gas production rate* Optimum formation current / C Voltage range Step end condition <![CDATA[H2、CO2]]> 0~1 0.02 <2.5V <![CDATA[When the proportion of C2H4 is the largest]]> <![CDATA[C2H4]]> 1~14 0.04 2.5~3.2V <![CDATA[When the proportion of CH4 is the largest]]> <![CDATA[CH4]]> 14~25 0.08 3.2~3.4V <![CDATA[When the proportion of C2H6 is the largest]]> <![CDATA[C2H6]]> 5~16 0.1 3.4~3.6V When CO accounts for the largest proportion CO 1~5 0.2 3.6~3.8V When the gas production rate is <1 CO 0~11 0.3 >3.8V When the gas production rate is 0

[0081] * The maximum gas production rate of <2.5V is 1, the same below

[0082] The above table is the formation process optimization judgment conditions in the method for online optimization of formation parameters of a square lithium-ion battery provided by the present invention.

[0083] S1: Set initial parameters: manually input the chemical process parameters in Table 1 into the PLC-M in the host computer;

[0084] S2: Setting optimization judgment rules: manually input the chemical process parameters in Table 2 into the PLC-M in the host computer;

[0085] S3: Battery cabinet and initialization: Place battery 0 in formation fixture 1, set heating temperature to 45℃, set clamping force to 0.08MPa, connect circuit and gas circuit, check whether circuit connection is correct, check gas tightness of gas circuit, specific operation is: open gas-tight valve a 741, close gas-tight valve b 742, start vacuum pump 6, pump to -60kPa and then close vacuum valve 6, observe pressure gauge 75, if vacuum degree <5kPa within 1min, it can be judged that gas circuit is gas-tight, then open gas-tight valve b 742, close gas-tight valve a 741, and detect gas tightness of relevant gas circuit in the same way;

[0086] S4: Battery formation and online optimization: Send the formation steps in Table 1, the gas flow meter 2 collects the gas production rate data and feeds it back to PLC2, selects the gas collection bag a 41 and the gas collection bag b 42 of size 15mL, adjusts the force parameters of the gas delivery fixture a31 and the gas delivery fixture b 32 to 1N, controls the gas production of the gas chromatograph 5 to be 10mL each time, and the gas chromatograph 5 continuously analyzes the gas components and their proportions in the formation gas online, and feeds the data back to PLC1; PLC1 and PLC2 process the received relevant data and output the gas production rate value and the real-time main component code of the gas production as shown in Table 2 to the upper computer PLC-M (this embodiment directly outputs the gas chemical formula for the upper computer to identify), and the upper computer adjusts the formation process parameters online according to the values ​​fed back by PLC1 and PLC2 and the judgment rules of Table 2. If the formation proceeds to the second step 0.02C charging, PL When C1 feedbacks "C2H4", the process jumps to the 3rd step of sleep. After the sleep ends, it is charged at 0.04C until PLC feedbacks "CH4" and the process jumps to the 5th step of sleep. According to the rules in Table 2, each time a cutoff condition is reached, the host computer sends a sleep step for 10 minutes and then enters the next charging step in Table 2 until the gas production rate is 0. PLC2 feedbacks "0" to the host computer PLC-M, and the process jumps to the last step of sleep and ends the formation process at the end of sleep. The optimization method of the step protection parameters is to take the cutoff voltage value of the next charging step, and the final voltage still retains the protection parameters of the last step of the original process.

[0087] S5: Data collation and output: According to the actual formation process, the cut-off voltage of each step is output and sorted into the optimized formation steps as follows:

[0088] Table 3: Formation optimization scheme obtained in Example 1

[0089]

[0090]

[0091] After disassembly interface analysis, the obtained formation interface is more uniform in lithium insertion than before optimization. The battery cycle life obtained through long-term performance test analysis is significantly increased compared with before optimization.

[0092] Comparative Example 1

[0093] Since it is impossible to optimize the formation process online in real time, the control variable method is used for experimental design (only step 4 is adjusted):

[0094] Table 4: Optimized process of comparative example 1

[0095]

[0096]

[0097] Example 2 Optimizing the chemical formation process parameters based on the relationship between gas production and optimal film forming temperature

[0098] Table 5 Gas generation-optimal film forming temperature optimization judgment conditions

[0099]

[0100] The following is a brief description of S4, focusing on how to achieve optimization judgment:

[0101] S4: The initial temperature is set to 35°C, and the formation proceeds to the second step of 0.02C charging. PLC1 feedbacks "C2H4, CH4, C2H6" (this type of gas can also be collectively referred to as "hydrocarbon" for signal feedback here), and the process jumps to the third step of sleep. At the same time, PLC-M sends an instruction to the formation fixture to adjust the temperature to 45°C. After the sleep is terminated, it is charged at 0.1C until PLC1 feedbacks "CO". The process jumps to the fifth step of sleep. At the same time, PLC-M sends an instruction to the formation fixture to adjust the temperature to 40°C. Finally, the formation continues according to the original process until the end of the process. The optimization method of the step protection parameter is to take the cutoff voltage value of the next charging step, and the final voltage still retains the last step protection parameter of the original process. The rest is the same as Example 1. See Table 6 for the results of the optimized formation process.

[0102] Table 6 Optimized formation process of Example 2

[0103]

[0104]

[0105] Comparative Example 2

[0106] Since it is impossible to optimize the formation process online in real time, the only way is to simply change the formation temperature in the original three charging steps:

[0107] Table 7 Comparative Example 2 Optimization Process

[0108]

[0109]

[0110] Example 3 Optimizing current parameters based on the relationship between gas production and standing time

[0111] Since a large amount of gas is produced during the charging process in the fourth step of the formation process to be optimized, a suitable standing step can be appropriately inserted to alleviate the impact of the excessively fast gas production rate on the formation interface (such as disturbance of the electrolyte affecting ion transport, gas accumulation inside the electrode and inability to be discharged in time, etc.). Therefore, this embodiment optimizes step 4 in Table 1.

[0112] Table 8 Gas production-standing time optimization judgment conditions

[0113]

[0114] Note: The above default gas production rate is single peak type.

[0115] Table 9 Optimized Formation Process of Example 3

[0116]

[0117]

[0118] The following is a brief description of S4, focusing on how to achieve optimization judgment:

[0119] S4: According to Table 1, the formation is carried out to the third step of 0.02C charging. PLC-M inserts the rest step according to the real-time data fed back by PLC2. In the rising stage of gas production rate, such as when the gas production rate reaches 15 for the first time at 3.12V, PLC-M sends a command, and the process enters the rest step with a rest time of 10min. When the gas production rate reaches 20 for the first time at 3.28V, PLC-M sends a command, and the process enters the rest step with a rest time of 20min. Then the gas production enters the falling stage. When the gas production rate drops to 20 at 3.43V, PLC-M sends a command, and the process enters the rest step with a rest time of 30min. In this way, the rest step is inserted until the final voltage reaches 3.6V. After 10min of rest, the formation is continued according to the original process until the process ends. The optimization method of the step protection parameters is to take the cut-off voltage value of the next charging step, and the final voltage still retains the protection parameters of the last step of the original process.

[0120] Comparative Example 3

[0121] Since it is not possible to optimize the formation process online in real time, a simple rest step can only be inserted, and the time is also maintained at the same 10 minutes:

[0122] Table 10 Comparative Example 3 Optimized Process

[0123]

[0124]

[0125] The battery performance of the above examples and comparative examples is shown in the following table:

[0126] Table 11 Comparison of some performance data of batteries in the embodiment and comparative example

[0127]

[0128]

[0129] It can be seen from the above table that the battery performance (Examples 1 to 3) optimized by the method and device provided by the present invention is better than that of the corresponding comparative examples 1 to 3: the high first efficiency indicates that fewer side reactions are generated in the SEI film formation stage, and a relatively regular SEI film that effectively protects the internal structure is formed. The negative electrode sheet after the cycle is also relatively thin, indicating that the SEI film has better stability than the comparative example in long-term cycles. The high capacity retention rate after the cycle further illustrates the above two points.

[0130] From the results of the above embodiments and comparative examples, it can be seen that the optimization of the comparative example does not fully utilize the previous gas production verification results, and after multiple optimizations using the control variable method, no results better than those of the embodiments have been obtained. The embodiments fully utilize the previous gas production verification results, convert them into optimization judgment rules, and use a device for online optimization of square lithium-ion battery formation parameters provided by the present invention to achieve better results through only one experiment.

[0131] The above are only a few application examples of the present invention. By combining the above optimization directions and acquiring more preliminary research data, more optimization solutions can be obtained. Therefore, full use of existing research and historical data can be achieved. For example, improving the device or adding accessories can realize a more "intelligent" process optimization "think tank".

[0132] In summary, the method and device for online optimization of formation parameters of a square lithium-ion battery provided by the present invention can realize online optimization of formation process parameters.

[0133] For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific circumstances; the preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can well understand and use the present invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A battery formation process optimization device, characterized in that: include: The square lithium-ion battery to be tested (0); A formation jig (1), in which the lithium-ion battery (0) is placed, and the formation jig (1) is used to control the charging and discharging of the lithium-ion battery (0), and has the functions of charging and discharging, heating, vacuuming and clamping in one. A gas collection container, the gas collection container having an air inlet connected to the gas outlet of the lithium ion battery (0) and used for collecting gas discharged from the lithium ion battery (0); A gas flow meter (2), the gas inlet of which is connected to the gas outlet of the gas collection container, and the gas outlet of which is connected to the gas inlet of the gas chromatograph (5), for obtaining the gas flow rate; A gas chromatograph (5), used to obtain information on gas production ratio; and a control unit (8), the control unit (8) being connected to the formation jig (1), the gas flow meter (2), and the gas chromatograph (5) respectively, the gas chromatograph (5) being used to feed back real-time gas production ratio information, the gas flow meter (2) being used to feed back flow information, and the control unit (8) sending optimized formation process parameters to the formation jig (1) in real time according to the formation process to be optimized and the optimization judgment standard.

2. A battery formation process optimization device according to claim 1, characterized in that: The control unit (8) is a PLC control system, comprising a host computer PLC-M, a gas production ratio feedback processing unit PLC1, a gas production rate feedback processing unit PLC2 and a formation control unit PLC3, wherein the signal input end of PLC1 is electrically connected to the signal output end of the gas chromatograph (5), the signal input end of PLC2 is electrically connected to the signal output end of the gas flow meter (2), the signal input end of PLC3 is electrically connected to the signal output end of the formation jig (1) and the signal output end of PLC-M respectively, and the signal output end of PLC3 is electrically connected to the signal input end of the formation jig (1) and the third signal input end of PLC-M respectively; the third signal input end of PLC-M is electrically connected to the third signal input end of PLC-M; A signal input terminal is electrically connected to a signal output terminal of PLC1, a second signal input terminal of PLC-M is electrically connected to a signal output terminal of PLC2, the formation process to be optimized and the optimization judgment standard are input into the upper computer PLC-M, after the formation step is sent to the formation control unit PLC3, the gas production rate feedback processing unit PLC2 collects the flow information fed back by the gas flow meter (2), the gas production ratio feedback processing unit PLC1 collects the real-time gas production ratio information fed back by the gas chromatograph (5), PLC1 and PLC2 feed back the collected information to the upper computer PLC-M, and send the optimized formation process parameters to the formation control unit PLC3 in real time according to the optimization judgment standard.

3. A battery formation process optimization device according to claim 1, characterized in that: The battery formation process optimization device also includes a gas collection bag and a gas production and delivery fixture, wherein the gas collection bag is clamped in the gas production and delivery fixture and is used to collect the outgoing gas from the gas flow meter (2); The gas production and delivery jig is used to sense force and compress a gas collection bag, the gas inlet of the gas collection bag is connected to the gas outlet of a gas flow meter (2), and the gas outlet of the gas collection bag is connected to the gas inlet of a gas chromatograph (5).

4. A battery formation process optimization device according to claim 3, characterized in that: The gas collection bag comprises a gas collection bag a (41) and a gas collection bag b (42), and the gas production and conveying jig comprises two gas production and conveying jigs a (31) and a gas production and conveying jig b (32) of the same composition, and the gas production and conveying jigs are respectively composed of two horizontal flat plates that move up and down along a vertical guide rail, a power device is provided on the vertical guide rail, positioning sensors are provided on the upper flat plate and the lower flat plate, and a force sensor is provided on the upper flat plate, and compression of the gas collection bag and resetting of the jig are achieved by the flat plates that move up and down.

5. A battery formation process optimization device according to claim 4, characterized in that: The battery formation process optimization device further comprises an airtight valve a (741), an airtight valve b (742) and a three-way valve (73); the gas outlet of the gas collection bag a (41) and the gas outlet of the gas collection bag b (42) are connected to the gas inlet of the gas chromatograph (5) after merging through a pipeline; the airtight valve a (741) is arranged on the pipeline behind the gas outlet of the gas collection bag a (41) and is used to control the gas outlet of the gas collection bag a (41); the airtight valve b (742) is arranged on the pipeline behind the gas outlet of the gas collection bag b (42) and is used to control the gas outlet of the gas collection bag b (42); the gas outlet of the gas flow meter (2) is divided into two gas paths through the three-way valve (73); one gas path is connected to the gas collection bag a (41) in the gas production and transportation fixture a (31), and the other gas path is connected to the gas collection bag b (42) in the gas production and transportation fixture b (32).

6. A battery formation process optimization device according to claim 5, characterized in that: The battery formation process optimization device also includes a control unit PLC-G, wherein the signal input end of the control unit PLC-G is electrically connected to the signal output ends of the positioning sensor and the force sensor in the gas production and conveying fixture a (31) and the gas production and conveying fixture b (32), respectively; the first / second signal output end of the control unit PLC-G is electrically connected to the vertical guide rail power device in the gas production and conveying fixture a (31) and the gas production and conveying fixture b (32), respectively, for controlling the movement of the upper plate; and at the same time, the third / fourth / fifth signal output end of the control unit PLC-G is electrically connected to the airtight valve a (741), the airtight valve b (742) and the three-way valve (73), respectively.

7. A battery formation process optimization device according to claim 6, characterized in that: The battery formation process optimization device also includes a pressure gauge (75) and a vacuum pump (6) for detecting the air tightness of the gas path. The vacuum pump (6) is connected to a gas path pipeline connecting a gas chromatograph (5), a gas collection bag a (41) and a gas collection bag b (42). The pressure gauge (75) is arranged between the pipeline connecting the vacuum pump (6) and the gas chromatograph (5).

8. A battery formation process optimization method, characterized in that: Based on the battery formation process optimization device described in claim 1, the specific steps are as follows: S1: Setting initial parameters: manually inputting the initial process parameters to be optimized into the control unit (8); S2: Setting optimization judgment rules: inputting the judgment rules of formation process parameters according to the preliminary formation experiment results of square lithium-ion batteries; S3: Battery formation and online optimization: Send the initialization step to be optimized, and control the formation jig (1) to start charging through the control unit (8). As the formation process proceeds, the lithium-ion battery (0) starts to release gas, which is then sent to the gas chromatograph (5) through the gas collection container and the gas flow meter (2). The gas flow meter (2) feeds back the collected gas flow information to the control unit (8), and the gas chromatograph (5) feeds back the detected gas type and ratio information to the control unit (8). The control unit (8) adjusts the formation process parameters of each step in real time through the formation jig (1); S4: Data collation and output: collate the data from the actual formation process, output the optimized formation process parameters, and determine whether the formation results meet expectations. If so, end the optimization process directly; If not, input the optimized formation process parameters and restart steps S1-S5 until the result meets expectations. The optimized formation process parameters include the charge and discharge current, voltage, power, temperature, pressure and step termination conditions of each step of the formation process. The evaluation means to determine whether the formation result meets expectations include battery disassembly interface analysis, battery cycle performance evaluation or battery impedance test results.

9. A battery formation process optimization method, characterized in that: Based on the battery formation process optimization device described in claim 7, the specific steps are as follows: S1: Set initial parameters: manually input the process parameters to be optimized into the upper computer PLC-M; S2: Setting optimization judgment rules: inputting the judgment rules of formation process parameters according to the preliminary formation experiment results of square lithium-ion batteries; S3: Battery cabinet and initialization: Place the lithium-ion battery (0) in the formation fixture (1), connect the circuit and the gas circuit, check whether the circuit connection is correct, and check the air tightness of the gas circuit. In the initial state, the gas circuit where the gas collection bag a (41) is located is open, and the gas circuit where the gas collection bag b (42) is located is closed. The airtight valve a (741) is opened, and the airtight valve b (742) is closed. Turn on the vacuum pump (6), evacuate and then close it, observe the pressure gauge (75), if the reading of the pressure gauge (75) is stable, it can be determined that the air tightness of the gas circuit is qualified, then open the airtight valve b (742), close the airtight valve a (741), and use the same method to detect the air tightness of the relevant gas circuits; S4: Battery formation and online optimization: Send the initialization step to be optimized, the upper computer PLC-M controls the formation fixture (1) through PLC3 to start charging, as the formation process proceeds, the lithium ion battery (0) starts to release gas, which is sent to the gas collection bag a (41) through the liquid collection bottle (72) and the gas flow meter (2), and the gas flow meter (2) transmits the collected gas flow information to the upper computer PLC-M through the gas production rate feedback processing unit PLC2, the gas collection bag a (41) is swollen with gas collection, and the gas production and delivery fixture a (31) senses the change in force and controls the three-way valve (73) through the microcircuit to close the gas path where the gas collection bag a (41) is located and open the gas path where the gas collection bag b (42) is located, and at the same time, the pressure of the gas production and delivery fixture a (31) is released. The gas collecting bag a (41) is compressed to press the produced gas into the gas chromatograph (5). When the gas collecting bag b (42) is swollen and the gas producing conveying fixture b (32) senses the change in force, the three-way valve (73) is controlled by the microcircuit to close the gas path where the gas collecting bag b (42) is located and open the gas path where the gas collecting bag a (41) is located. At the same time, the gas collecting bag b (42) is compressed by the gas producing conveying fixture b (32) to press the produced gas into the gas chromatograph (5). The above process is then repeated until the gas production is completed. The gas chromatograph (5) feeds back the detected gas type and proportion information to the upper computer PLC-M through the gas producing rate feedback processing unit PLC1. The upper computer PLC-M adjusts the formation process parameters of each step in real time through the formation control unit PLC3. S5: Data collation and output: collate the data from the actual formation process, output the optimized formation process parameters, and determine whether the formation results meet expectations. If so, end the optimization process directly; If not, input the optimized formation process parameters and restart steps S1-S5 until the result meets expectations. The optimized formation process parameters include the charge and discharge current, voltage, power, temperature, pressure and step termination conditions of each step of the formation process. The evaluation means to determine whether the formation result meets expectations include battery disassembly interface analysis, battery cycle performance evaluation or battery impedance test results.

10. A battery formation process optimization method according to claim 8 or 9, characterized in that: The process parameters initialized in step S1 include step mode, mode parameter, step termination parameter, abnormality judgment rule, step protection parameter and process protection parameter, wherein the step mode includes sleep, charge or discharge; the mode parameter includes the current, voltage, power, temperature or pressure set in the above step mode; the step termination parameter includes current, voltage, power and / or step time; The abnormality judgment rules include the maximum allowable fluctuation range and fluctuation frequency of current, voltage, power and / or temperature in the actual formation process. If the limit is exceeded, it is judged as abnormal; The protection parameters are the range values ​​of current, voltage, power, temperature and / or pressure, which are divided into step protection parameters and process protection parameters. The step protection parameters only limit specific steps. If they exceed the corresponding range, the step will be terminated and the next step will be entered. The process protection parameters limit the entire process. If they exceed the corresponding range, the entire formation process will be terminated.

11. A battery formation process optimization method according to claim 10, characterized in that: In step S1, the step modes include sleep, charging or discharging, charging includes constant current charging, constant voltage charging, constant current constant voltage charging or constant power charging, and discharging includes constant current discharging, constant voltage discharging, constant current constant voltage discharging or constant power discharging.

12. A battery formation process optimization method according to claim 8 or 9, characterized in that: In step S2, the formation process parameter determination rule is the relationship between the formation process parameters and the formation process data, the formation process data includes the gas production rate, gas production type and gas production ratio, and the formation process parameters include the current, voltage, power, temperature or pressure of each step.

13. A battery formation process optimization method according to claim 12, characterized in that: In step S4, the microcircuit control principle of the gas production and delivery jig a (31) and the gas production and delivery jig b (32) is as follows:

101. Initial state: the upper and lower plates of the gas production and delivery fixture a (31) and the gas production and delivery fixture b (32) remain in an open state, and their positions can be controlled by a positioning sensor. The airtight valve a (741) and the airtight valve b (742) are both kept in a closed state. At this time, the air path opened by the three-way valve (73) leads to the gas collection bag a (41); 102. Alternating compression a: When the gas collecting bag a (41) collects gas and swells to hit the upper plate of the gas production and conveying fixture a (31), the force sensor value reaches the upper limit. At this time, the control circuit PLC-G simultaneously completes:

1. Opening the airtight valve a (741); 2. Making the three-way valve (73) close the gas path of the gas collecting bag a (41) and open the gas path of the gas collecting bag b (42); 3. Controlling the upper plate to move downward, compressing the gas collecting bag a (41), and pressing the produced gas into the gas chromatograph (5); when the positioning sensor value remains unchanged, PLC-G closes the airtight valve a (741) and controls the upper plate to move upward until it returns to its initial position; 103. Alternating compression b: When the gas collecting bag b (41) collects gas and swells to hit the upper plate of the gas production and conveying fixture b (32), the force sensor value reaches the upper limit. At this time, the control circuit PLC-G simultaneously completes:

1. Opening the airtight valve b (742); 2. Making the three-way valve close the gas path of the gas collecting bag b (42) and open the gas path of the gas collecting bag a (41); 3. Controlling the upper plate to move downward to compress the gas collecting bag b (42); when the positioning sensor value remains unchanged, PLC-G closes the airtight valve a (742) and controls the upper plate to move upward until it returns to its initial position; 104. Repeat steps 102 to 103 several times until gas production stops.

Citation Information

Patent Citations

  • Device and method for analyzing components of gas produced by battery through electrochemistry-gas chromatography-mass spectrometry

    CN113340967A

  • Formation and aging method of battery cell and lithium ion battery

    CN114335769A

  • Sodium ion battery formation method

    CN117154259A

  • Systems and methods for automated optimization of a multi-mode inductively coupled plasma mass spectrometer

    US20150235827A1

  • Lithium battery formation stage product quality prediction method and system

    WO2023202098A1

Cited By

  • Airflow control system and method for jig blowing

    CN119576029A

  • Airflow control system and method for jig blowing

    CN119576029B

  • Soft package battery formation gas production analysis system and method

    CN119715044A