Crack temporary plugging method and device and electronic equipment
By obtaining the three-way stress and sand body distribution of the fracturing layer, and performing multi-stage temporary plugging adjustment, the problem that horizontal seams are prone to spread to high-permeability areas is solved, prompting the cracks to turn to low-permeability areas, and improving oil recovery rate and reservoir utilization are improved efficiency.
Patent Information
- Application Number
- CN202310596159.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-24
- Publication Date
- 2024-11-26
AI Technical Summary
The horizontal seams in the buried shallow reservoirs are prone to expand to high-permeability areas, making it difficult to effectively utilize the remaining oil in the low-permeability areas. The cracks extend along the old cracks during repeated fracturing, reducing the oil recovery rate.
By obtaining the three-way stress of the fracturing layer and the distribution of the sand body plane, we can determine whether it is a horizontal crack, and perform multi-level temporary blocking according to the distribution of the sand body plane, adjust the temporary blocking direction and the dosage of agent, so as to promote the poor physical properties of the cracks and the affected area. The direction of the efficiency is poor and the oil recovery rate is improved.
The optimal matching between the cracks and reservoirs is achieved, the oil recovery rate is improved, and the oil recovery efficiency is significantly increased in the low-permeability areas.
Smart Images

Figure CN119021628A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of oil production engineering, and in particular to a temporary plugging method, device, electronic equipment and storage medium for cracks. Background Art
[0002] Most of the fractures in shallowly buried reservoirs are horizontal fractures. Due to the influence of reservoir heterogeneity, the horizontal fractures on the plane expand in an unbalanced manner and tend to extend to areas with good physical properties. These horizontal fractures have the problems of poor physical properties, poor efficiency, and difficulty in transforming and utilizing the crude oil in the azimuth. Moreover, during the initial fracturing, the fractures tend to expand to high permeability areas. During repeated fracturing, the fractures tend to extend along old fractures, resulting in the inability to effectively tap the potential of the remaining oil in low permeability areas. Summary of the invention
[0003] The purpose of the embodiments of the present invention is to provide a method, device, electronic equipment and storage medium for temporary plugging of fractures, which achieves optimal matching between fractures and reservoirs and improves oil recovery.
[0004] In order to achieve the above-mentioned object, an embodiment of the present invention provides a temporary plugging method for cracks in a fracturing layer, wherein the fracturing layer includes a plurality of cracks, and the method includes:
[0005] Acquire the three-dimensional stress of the fracturing layer and the plane distribution of the sand body, wherein the plane distribution of the sand body is at least one of the sand body type, the number of sand bodies, the sand body permeability and the well pattern spacing;
[0006] Determining whether the crack is a horizontal crack according to the triaxial stress;
[0007] Temporarily plugging the horizontal fractures according to the plane distribution of the sand body, including: determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body.
[0008] Optionally, determining whether the crack is a horizontal crack according to the three-dimensional stress includes: comparing the vertical stress and the minimum horizontal principal stress in the three-dimensional stress;
[0009] If the vertical stress is less than the minimum horizontal principal stress, the crack is a horizontal crack.
[0010] Optionally, the temporary plugging of the horizontal fracture according to the plane distribution of the sand body is a multi-stage temporary plugging, and each stage of temporary plugging requires first judging the plane distribution of the sand body, and adjusting the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body until the temporary plugging is successful.
[0011] Optionally, judging whether the temporary plugging is successful includes: determining whether the temporary plugging is successful according to the construction pressure of the pre-fluid after temporary plugging, the construction pressure of the pre-fluid in the main seam, the construction pressure of adding sand after temporary plugging, and the construction pressure of the concentration of adding sand in the main seam, including:
[0012] If the construction pressure of the pre-fluid after temporary plugging minus the construction pressure of the pre-fluid in the main seam>3MPa, and / or the construction pressure of adding sand after temporary plugging minus the construction pressure of adding sand concentration in the main seam>3MPa, the temporary plugging is successful.
[0013] Optionally, determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body includes:
[0014] Determine the temporary plugging direction according to the sand body type, sand body quantity, sand body permeability and fracture extension direction;
[0015] Determine the fracture radius and conductivity of the horizontal fracture according to the sand body type, fracture extension orientation and well pattern spacing;
[0016] The dosage of the temporary plugging agent is determined according to the crack radius and the flow conductivity of the horizontal crack.
[0017] Optionally, determining the amount of the temporary plugging agent according to the fracture radius and conductivity of the horizontal fracture includes:
[0018]
[0019] Among them, m is the dosage of temporary plugging agent, r is the horizontal crack radius, ρ is the density of temporary plugging agent, and n is the correction coefficient.
[0020] Optionally, the sand body types include river sand, main body sand and non-main body sand;
[0021] The temporary plugging agent is a fibrous in-seam temporary plugging agent and / or a powdery in-seam temporary plugging agent.
[0022] Optionally, the method further includes: adding sand to the temporarily blocked horizontal cracks to complete the fracturing.
[0023] In another aspect, the present invention provides a temporary plugging device for fractures in a fracturing layer, wherein the fracturing layer comprises a plurality of fractures, and the device comprises:
[0024] The acquisition unit is used to obtain the three-dimensional stress of the fracturing layer and the plane distribution of the sand body.
[0025] The plane distribution of the sand body is at least one of the sand body type, the number of sand bodies, the sand body permeability and the well pattern spacing;
[0026] A judgment unit, which determines whether the crack is a horizontal crack according to the three-dimensional stress;
[0027] The analysis unit is used to temporarily plug the horizontal fracture according to the plane distribution of the sand body, including: determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body.
[0028] Optionally, determining whether the crack is a horizontal crack according to the three-dimensional stress includes: comparing the vertical stress and the minimum horizontal principal stress in the three-dimensional stress;
[0029] If the vertical stress is less than the minimum horizontal principal stress, the crack is a horizontal crack.
[0030] Optionally, the temporary plugging of the horizontal fractures according to the plane distribution of the sand body is a multi-stage temporary plugging.
[0031] Each level of temporary plugging requires first determining the plane distribution of the sand body, and adjusting the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body until the temporary plugging is successful.
[0032] Optionally, judging whether the temporary plugging is successful includes: determining whether the temporary plugging is successful according to the construction pressure of the pre-fluid after temporary plugging, the construction pressure of the pre-fluid in the main seam, the construction pressure of adding sand after temporary plugging, and the construction pressure of the concentration of adding sand in the main seam, including:
[0033] If the construction pressure of the pre-fluid after temporary plugging minus the construction pressure of the pre-fluid in the main seam>3MPa, and / or the construction pressure of adding sand after temporary plugging minus the construction pressure of adding sand concentration in the main seam>3MPa, the temporary plugging is successful.
[0034] Optionally, determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body includes:
[0035] Determine the temporary plugging direction according to the sand body type, sand body quantity, sand body permeability and fracture extension direction;
[0036] Determine the fracture radius and conductivity of the horizontal fracture according to the sand body type, fracture extension orientation and well pattern spacing;
[0037] The dosage of the temporary plugging agent is determined according to the crack radius and the flow conductivity of the horizontal crack.
[0038] Optionally, determining the amount of the temporary plugging agent according to the fracture radius and conductivity of the horizontal fracture includes:
[0039]
[0040] Among them, m is the dosage of temporary plugging agent, r is the horizontal crack radius, ρ is the density of temporary plugging agent, and n is the correction coefficient.
[0041] Optionally, the sand body types include river sand, main sand and non-main sand; the temporary plugging agent is a fibrous intra-fracture temporary plugging agent and / or a powdery intra-fracture temporary plugging agent.
[0042] Optionally, the device further comprises: a fracturing unit, which is used to add sand to the temporarily blocked horizontal cracks to complete the fracturing.
[0043] On the other hand, the present invention provides an electronic device, comprising: at least one processor; a memory connected to the at least one processor; wherein the memory stores instructions that can be executed by the at least one processor, and the at least one processor implements the above-mentioned method for temporarily plugging cracks in the fracturing layer by executing the instructions stored in the memory.
[0044] On the other hand, the present invention provides a device storing machine instructions, which, when executed on a machine, enables the machine to execute the above-mentioned method for temporarily plugging fractures in a fractured layer.
[0045] The present invention provides a temporary plugging method for fractures in a fracturing layer, wherein the fracturing layer includes a plurality of fractures, and the method includes: obtaining the three-dimensional stress and the plane distribution of the sand body in the fracturing layer, wherein the plane distribution of the sand body is at least one of the sand body type, the number of sand bodies, the permeability of the sand body, and the well pattern and spacing; determining whether the fracture is a horizontal fracture according to the three-dimensional stress; and temporarily plugging the horizontal fracture according to the plane distribution of the sand body, including: determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body. The method promotes the diversion of the fracture into the area with poor physical properties, poor effect, and residual oil enrichment by performing multi-stage temporary plugging on the horizontal fractures, thereby improving the oil recovery rate.
[0046] Other features and advantages of the embodiments of the present invention will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following specific implementations, they are used to explain the embodiments of the present invention, but do not constitute a limitation on the embodiments of the present invention. In the accompanying drawings:
[0048] Figure 1 It is a schematic flow diagram of a method for temporarily plugging cracks in a fracturing layer according to the present invention;
[0049] Figure 2 is a diagram of in-situ stress interpretation of the L8-SM3101 well in an embodiment of the present invention;
[0050] Figure 3 It is the sedimentary phase belt, oil saturation, oil layer connection section and water absorption section diagram of the L8-SM3101 well Grape II 7-9 to II 10 layers in the embodiment of the present invention;
[0051] Figure 4 It is the sedimentary phase zone, oil saturation, oil layer connection section and water absorption section diagram of the 5+6 layer of the L8-SM3101 well in the embodiment of the present invention;
[0052] Figure 5It is the sedimentary phase belt, oil saturation, oil layer connection section and water absorption section diagram of Sa III 1-3 layer in the embodiment of the present invention;
[0053] Figure 6 This is a simulation optimization diagram of fracture parameters of a reservoir with a permeability of 500mD in an embodiment of the present invention;
[0054] Figure 7 Schematic diagram of the fracturing construction process in an embodiment of the present invention;
[0055] Figure 8 It is a schematic diagram of the fracturing construction curve of the layers Ⅱ7-9 to Ⅱ10 in the L8-SM3101 well in an embodiment of the present invention. DETAILED DESCRIPTION
[0056] The specific implementation of the embodiment of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the embodiment of the present invention, and is not used to limit the embodiment of the present invention.
[0057] Figure 1 Schematic diagram of a temporary plugging method for a fractured layer according to the present invention. Figure 1 As shown, the method includes: step S101 is to obtain the three-dimensional stress of the fracturing layer and the plane distribution of the sand body, and the plane distribution of the sand body is at least one of the sand body type, the number of sand bodies, the permeability of the sand body and the well pattern spacing.
[0058] According to a specific implementation method, the three-dimensional stress of the fractured layer and the plane distribution of the sand body are determined based on methods such as geostress test experiments, X-mac logging interpretation results or conventional logging interpretation results. If the fractured layer has geostress test experimental data, the experimental data is preferably used as the three-dimensional stress of the fractured layer; if the fractured layer has no geostress test experimental data, but has X-mac logging interpretation results, the X-mac logging interpretation results are preferably used as the three-dimensional stress of the fractured layer; if the fractured layer has no geostress test experimental data and X-mac logging interpretation results, but only conventional logging interpretation results, the conventional logging interpretation results are used as the three-dimensional stress of the fractured layer.
[0059] The sand body types include river sand, main sand and non-main sand, etc. The temporary plugging agent is a fibrous inter-fracture temporary plugging agent and / or a powder inter-fracture temporary plugging agent. The plane distribution of the sand body also includes the physical properties of the sand body.
[0060] The temporary plugging agent is a substance that can temporarily reduce the permeability of the formation or temporarily plug the high permeability oil layer. After being mixed with a water-soluble polymer and injected into the well, it can quickly form a thin and dense temporary plugging zone of the oil layer under the action of the pressure difference, and can be unblocked by itself or manually after a certain period of time. According to its solubility and working principle, it can be divided into the following four categories: acid-soluble temporary plugging agent, oil-soluble temporary plugging agent, water-soluble temporary plugging agent and one-way pressure temporary plugging agent. For example, during acidification, solid particles such as paraffin, tantalum powder or silicon powder are added to the acid solution; when the acid solution penetrates into the high permeability section, the solid particles are filtered out from the acid solution, blocking the pores of the high permeability layer, so that most of the acid solution enters the medium and low permeability layers. After acidification, the paraffin and tantalum particles are dissolved by the oil, and the silicon powder flows to the ground with the oil and gas.
[0061] Step S102 is to determine whether the crack is a horizontal crack according to the three-dimensional stress. The determination of whether the crack is a horizontal crack according to the three-dimensional stress includes: comparing the vertical stress and the minimum horizontal principal stress in the three-dimensional stress; if the vertical stress is less than the minimum horizontal principal stress, the crack is a horizontal crack. Specifically, according to the three-dimensional stress of the fracturing layer section, it is determined whether the crack is a horizontal crack. When the vertical stress < minimum horizontal principal stress < maximum horizontal principal stress, the crack is a horizontal crack.
[0062] Step S103 is to temporarily plug the horizontal fracture according to the plane distribution of the sand body, including: determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body.
[0063] Specifically, the temporary plugging of the horizontal fractures according to the plane distribution of the sand body is a multi-stage temporary plugging, and each stage of temporary plugging needs to first determine the plane distribution of the sand body, and adjust the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body until the temporary plugging is successful. According to different plane distributions of the sand body, the extension direction of the fractures before temporary plugging and after each stage of temporary plugging is determined.
[0064] According to a specific implementation method, judging whether the temporary plugging is successful includes: determining whether the temporary plugging is successful based on the construction pressure of the pre-fluid after temporary plugging, the construction pressure of the pre-fluid in the main seam, the construction pressure of sand addition after temporary plugging and the construction pressure of sand addition concentration in the main seam, including: the construction pressure of the pre-fluid after temporary plugging - the construction pressure of the pre-fluid in the main seam > 3MPa, and / or the construction pressure of sand addition after temporary plugging - the construction pressure of sand addition concentration in the main seam > 3MPa, then the temporary plugging is successful.
[0065] The method of determining the temporary plugging direction and the amount of temporary plugging agent according to the planar distribution of the sand body comprises: determining the temporary plugging direction according to the sand body type, the number of sand bodies, the sand body permeability and the fracture extension direction; determining the fracture radius and the conductivity of the horizontal fracture according to the sand body type, the fracture extension direction and the well pattern spacing; and determining the amount of temporary plugging agent according to the fracture radius and the conductivity of the horizontal fracture.
[0066] Specifically, the cracks will gradually extend into the river sand, main sand, and non-main sand according to the physical properties and permeability of the sand body, and the number of temporary plugging times in the cracks will be designed according to the number of sand body types. Rock mechanics parameters are obtained, and fracture parameters are optimized using fracturing software according to the rock mechanics parameters. The fracture radius and conductivity required before and after temporary plugging and after each level of temporary plugging are optimized according to the different sand body properties of the plane sand body, the fracture extension direction before and after temporary plugging, and the well spacing of the well pattern.
[0067] The method of determining the amount of the temporary plugging agent according to the fracture radius and the flow conductivity of the horizontal fracture comprises: Among them, m is the dosage of temporary plugging agent (in kg), r is the horizontal fracture radius (in m), ρ is the density of temporary plugging agent (for example, 1.25×103kg / m3), n is the correction coefficient, and 0.3 is the thickness of temporary plugging segment (in m).
[0068] For temporary plugging construction in the on-site joints, under the same construction displacement and liquid conditions, if the difference between the construction pressure of the pre-liquid stage after temporary plugging and the construction pressure of the pre-liquid stage in the main joint is greater than 3MPa, or the difference between the construction pressure of a certain sand addition concentration stage after temporary plugging and the construction pressure of the same sand addition concentration stage in the main joint is greater than 3MPa, the temporary plugging is successful.
[0069] The present invention also includes: adding sand to the temporarily blocked horizontal cracks to complete fracturing. Fracturing refers to a method of using hydraulic force to form cracks in the oil and gas layer during oil or gas production, also known as hydraulic fracturing. The oil and gas layer fracturing process uses a fracturing truck to squeeze a high-pressure, large-displacement liquid with a certain viscosity into the oil layer. After many cracks are pressed into the oil layer, proppants (such as quartz sand, etc.) are added to fill the cracks to improve the permeability of the oil and gas layer, so as to increase the water injection volume (water injection wells) or oil production (oil wells). Commonly used fracturing fluids include five basic types: water-based fracturing fluids, oil-based fracturing fluids, emulsion fracturing fluids, foam fracturing fluids, and acid-based fracturing fluids.
[0070] The invention performs multi-stage temporary plugging on horizontal fractures, thereby causing the fractures to turn into areas with poor physical properties, poor response and residual oil enrichment, thereby improving the oil recovery rate.
[0071] The present invention also proposes a specific embodiment of the L8-SM3101 well, the well depth of the L8-SM3101 well is 1352m, the original formation pressure is 11.18MPa, the current formation pressure is 11.02MPa, the daily liquid production before fracturing is 62t, the daily oil production is 3.3t, and the comprehensive water content is 94.75%. The main target layers are the Grape II 7-9 to II 10 layers, the Grape I 5+6 layers, and the Sa III 1-3 layers, and the same layer section has been fractured twice.
[0072] Conventional fracturing technology was used before, with 6-8m of sand added to a single layer. 3 In the initial stage after fracturing, the daily fluid increase was 12t, the daily oil increase was 2.6t, the water content decreased by 1.4%, and the cumulative oil increase was 312t; in 2020, the multi-fracture fracturing technology was adopted, and the initial daily fluid increase was 63t, the daily oil increase was 13.8t, the water content decreased by 6.1%, and the cumulative oil increase was 2412t.
[0073] The temporary plugging and fracturing method of the present invention comprises the following steps:
[0074] Step 1: Use conventional logging interpretation results to calculate the three-dimensional stress of the fractured layer. Figure 2 shown.
[0075] Step 2: The vertical stress of the fracturing section is 20-23MPa. Analyze that the vertical stress is less than the minimum horizontal principal stress and less than the maximum horizontal principal stress, and judge that the crack is a horizontal crack.
[0076] Step 3: According to the plane distribution of different sand bodies, determine the extension direction of the cracks before temporary plugging and after each level of temporary plugging. Specifically, the temporary plugging of the horizontal cracks according to the plane distribution of the sand body is a multi-level temporary plugging. Each level of temporary plugging needs to first determine the plane distribution of the sand body, and adjust the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body until the temporary plugging is successful. According to the plane distribution of different sand bodies, determine the extension direction of the cracks before temporary plugging and after each level of temporary plugging.
[0077] The cracks will gradually extend into the river sand, main sand, and non-main sand according to the physical properties and permeability of the sand body. The number of temporary plugging times in the cracks will be designed according to the number of sand body types. Rock mechanics parameters are obtained, and fracture parameters are optimized using fracturing software according to the rock mechanics parameters. The fracture radius and conductivity required before and after temporary plugging and after each level of temporary plugging are optimized according to the different sand body properties of the plane sand body, the fracture extension direction before and after temporary plugging, and the well pattern spacing.
[0078] Specifically, Figure 3 As shown, the Ⅱ7-9 to Ⅱ10 layers of Pu were fractured twice, the phase change on the plane was drastic, the water injection effect was poor, the green non-main sand in the phase belt diagram was not well utilized, and there were residual oil-rich areas with no injection or poor water injection effect.
[0079] Through multi-stage temporary plugging and fracturing in horizontal seams, the cracks successively extended into the yellow main sand, non-main sand in the northeast direction, and non-main sand in the northwest direction. According to the number of sand body types, three temporary pluggings in the seams were designed.
[0080] like Figure 4As shown in the figure, the 5+6 layers of Pu I were fractured twice, the oil layers connected to the water injection wells were poorly developed, the water injection effect was poor, and there were residual oil-rich areas with no injection or poor water injection effect. Through multi-stage temporary plugging fracturing in horizontal fractures, the fractures were successively extended into the yellow main sand and red river sand. According to the number of sand body types and the injection-production relationship, three temporary pluggings were designed in the fractures.
[0081] like Figure 5 As shown in the figure, the Sa III 1-3 layers have been fractured twice, and the phase change is drastic on the plane. There is only one water injection direction (L8-3132 well in the south), and there is residual oil in the enrichment direction. Through multi-stage temporary plugging fracturing in the horizontal seams, the fractures are successively extended into the red river sand, yellow main sand, and green non-main sand. According to the number of sand body types and the injection-production relationship, the temporary plugging in the seams is designed three times.
[0082] Step 4: Optimize the parameters of artificial fractures and establish fractures that match the reservoir according to the reservoir properties and development well pattern. Figure 6 As shown in the figure, the reservoir permeability is 500mD, and a fracturing model is established. According to the production capacity prediction results of different schemes, the fracture radius is designed to be 50m and the fracture conductivity is 25um. 2 .cm.
[0083] The optimized fracture radius of the Portuguese II 7-9 to II 10 layers is 50m, and the proppant scale is 55m 3 , construction displacement is 3m 3 / min. The optimized fracture radius of the 5+6 layer of Pu I is 50m, and the proppant scale is 32m 3 , construction displacement is 3m 3 / min. The optimized fracture radius of the Sa III 1-3 layer is 50m, and the proppant scale is 32m 3 , construction displacement is 3m 3 / min.
[0084] Step 5: To achieve the purpose of layer-by-layer reconstruction, the temporary plugging position in the crack is selected at the end of the artificial crack. The temporary plugging agent in the crack is preferably a powder temporary plugging agent, and the amount of temporary plugging agent is 200kg, such as Figure 7 shown.
[0085] Step 6: On-site fracturing construction. From the three-stage fracturing construction, the fracture extension pressure after temporary plugging is higher than the extension pressure before temporary plugging by more than 3MPa. The fracture pump stop pressure after temporary plugging is higher than the pump stop pressure before temporary plugging, indicating that the fracture changes direction and extends to a new reservoir position. Figure 8 shown.
[0086] Step 7: The construction mode of first creating the seams and then filling the sand was adopted to complete the horizontal seam to azimuthal fracturing construction. Figure 8 shown.
[0087] This well adopted the sitting pressure multi-layer pipe string to repeat the fracturing for 3 stages, and injected a total of 1018m3 of fracturing fluid, 119m3 of quartz sand, and 2700kg of temporary plugging agent. The construction went smoothly. The initial daily production of fracturing was 93t of liquid, 9.8t of oil, 50t of daily fluid increase, 7.4t of daily oil increase, and the water content decreased by 6.2%, which achieved remarkable results compared with the conventional fracturing process.
[0088] The present invention also provides a temporary plugging device for fractures in a fracturing layer, wherein the fracturing layer includes a plurality of fractures, and the device includes: an acquisition unit for acquiring the three-dimensional stress and the plane distribution of the sand body in the fracturing layer, wherein the plane distribution of the sand body is at least one of the sand body type, the number of sand bodies, the permeability of the sand body, and the well pattern and spacing; a judgment unit for determining whether the fracture is a horizontal fracture according to the three-dimensional stress; and an analysis unit for temporarily plugging the horizontal fracture according to the plane distribution of the sand body, including: determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body. The device can systematically, effectively, quantitatively, and accurately determine the optimal fracture radius, fracture conductivity, number of temporary plugging times in the fracture, amount of temporary plugging agent, and temporary plugging construction diagnostic parameters for temporary plugging in the horizontal fracture, thereby achieving the optimal matching of the fracture and the reservoir and improving the transformation effect.
[0089] According to a specific implementation method, the three-dimensional stress of the fractured layer and the plane distribution of the sand body are determined based on methods such as geostress test experiments, X-mac logging interpretation results or conventional logging interpretation results. If the fractured layer has geostress test experimental data, the experimental data is preferably used as the three-dimensional stress of the fractured layer; if the fractured layer has no geostress test experimental data, but has X-mac logging interpretation results, the X-mac logging interpretation results are preferably used as the three-dimensional stress of the fractured layer; if the fractured layer has no geostress test experimental data and X-mac logging interpretation results, but only conventional logging interpretation results, the conventional logging interpretation results are used as the three-dimensional stress of the fractured layer.
[0090] Determining whether the crack is a horizontal crack based on the three-dimensional stress includes: comparing the vertical stress and the minimum horizontal principal stress in the three-dimensional stress; if the vertical stress is less than the minimum horizontal principal stress, the crack is a horizontal crack.
[0091] The temporary plugging of the horizontal fractures according to the plane distribution of the sand body is a multi-stage temporary plugging. Each stage of temporary plugging requires first judging the plane distribution of the sand body, and adjusting the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body until the temporary plugging is successful.
[0092] Specifically, the cracks will gradually extend into the river sand, main sand, and non-main sand according to the physical properties and permeability of the sand body, and the number of temporary plugging times in the cracks will be designed according to the number of sand body types. Rock mechanics parameters are obtained, and fracture parameters are optimized using fracturing software according to the rock mechanics parameters. The fracture radius and conductivity required before and after temporary plugging and after each level of temporary plugging are optimized according to the different sand body properties of the plane sand body, the fracture extension direction before and after temporary plugging, and the well spacing of the well pattern.
[0093] Judging whether the temporary plugging is successful includes: determining whether the temporary plugging is successful according to the construction pressure of the pre-fill liquid after temporary plugging, the construction pressure of the pre-fill liquid in the main seam, the construction pressure of sand addition after temporary plugging and the construction pressure of sand addition concentration in the main seam, including: the construction pressure of the pre-fill liquid after temporary plugging - the construction pressure of the pre-fill liquid in the main seam>3MPa, and / or, the construction pressure of sand addition after temporary plugging - the construction pressure of sand addition concentration in the main seam>3MPa, then the temporary plugging is successful.
[0094] The method of determining the temporary plugging direction and the amount of temporary plugging agent according to the planar distribution of the sand body comprises: determining the temporary plugging direction according to the sand body type, the number of sand bodies, the sand body permeability and the fracture extension direction; determining the fracture radius and the conductivity of the horizontal fracture according to the sand body type, the fracture extension direction and the well pattern spacing; and determining the amount of temporary plugging agent according to the fracture radius and the conductivity of the horizontal fracture.
[0095] The method of determining the amount of the temporary plugging agent according to the fracture radius and the flow conductivity of the horizontal fracture comprises:
[0096]
[0097] Wherein, m is the dosage of temporary plugging agent, r is the horizontal fracture radius, ρ is the density of temporary plugging agent, and n is the correction coefficient. The sand body types include river sand, main sand and non-main sand; the temporary plugging agent is a fibrous intra-fracture temporary plugging agent and / or a powder intra-fracture temporary plugging agent.
[0098] The device also includes: a fracturing unit, which is used to add sand to the temporarily plugged horizontal cracks to complete the fracturing. The device temporarily plugs the horizontal cracks at multiple levels to cause the cracks to turn into the areas with poor physical properties, poor response and residual oil enrichment, thereby improving the oil recovery rate.
[0099] The temporary plugging method of the fractured layer of the present invention includes: obtaining the three-dimensional stress and the plane distribution of the sand body of the fractured layer, wherein the plane distribution of the sand body is at least one of the sand body type, the number of sand bodies, the sand body permeability and the well pattern spacing; determining whether the fracture is a horizontal fracture according to the three-dimensional stress; and temporarily plugging the horizontal fracture according to the plane distribution of the sand body, including: determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body. The method promotes the diversion of the fracture into the area with poor physical properties, poor effect and residual oil enrichment by performing multi-stage temporary plugging on the horizontal fracture.
[0100] The present invention can systematically, effectively, quantitatively and accurately determine the optimal fracture radius, fracture conductivity, number of temporary plugging times in fractures, dosage of temporary plugging agent and temporary plugging construction diagnostic parameters for temporary plugging-to-azimuth fracturing in horizontal fractures, thereby achieving optimal matching between the fracture system and the reservoir and improving the transformation effect.
[0101] On the other hand, the present invention also provides an electronic device, comprising: at least one processor; a memory connected to the at least one processor; wherein the memory stores instructions that can be executed by the at least one processor, and the at least one processor implements the above-mentioned method for temporarily plugging cracks in the fracturing layer by executing the instructions stored in the memory.
[0102] The processor includes a kernel, which retrieves corresponding program units from the memory. One or more kernels can be provided, and the oil recovery can be increased by adjusting kernel parameters.
[0103] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.
[0104] An embodiment of the present invention provides a storage medium on which a program is stored. When the program is executed by a processor, the method for temporarily plugging cracks in a fracturing layer is implemented.
[0105] An embodiment of the present invention provides a processor, which is used to run a program, wherein the method for temporarily plugging cracks in a fracturing layer is executed when the program is run.
[0106] The embodiment of the present invention provides a device, the device includes a processor, a memory, and a program stored in the memory and can be run on the processor, and the processor implements the following steps when executing the program: obtaining the three-dimensional stress and the plane distribution of the sand body of the fracturing layer, the plane distribution of the sand body is at least one of the sand body type, the number of sand bodies, the permeability of the sand body, and the well pattern and spacing; determining whether the crack is a horizontal crack according to the three-dimensional stress; temporarily plugging the horizontal crack according to the plane distribution of the sand body, including: determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body. The device in this article can be a server, a PC, a PAD, a mobile phone, etc.
[0107] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program that initializes the following method steps: obtaining the three-dimensional stress and sand body plane distribution of the fracturing layer, wherein the sand body plane distribution is at least one of the sand body type, sand body number, sand body permeability, and well pattern spacing; determining whether the fracture is a horizontal fracture based on the three-dimensional stress; temporarily plugging the horizontal fracture based on the sand body plane distribution, including: determining the temporary plugging direction and the amount of temporary plugging agent based on the sand body plane distribution. Optionally, the temporary plugging of the horizontal fracture based on the sand body plane distribution is a multi-stage temporary plugging, and each stage of temporary plugging needs to first determine the sand body plane distribution, and adjust the temporary plugging direction and the amount of temporary plugging agent based on the sand body plane distribution until the temporary plugging is successful. Judging whether the temporary plugging is successful includes: determining whether the temporary plugging is successful based on the construction pressure of the pre-fluid after temporary plugging, the construction pressure of the pre-fluid in the main seam, the construction pressure of the sand after temporary plugging and the construction pressure of the sand concentration in the main seam, including: the construction pressure of the pre-fluid after temporary plugging minus the construction pressure of the pre-fluid in the main seam>3MPa, and / or the construction pressure of the sand after temporary plugging minus the construction pressure of the sand concentration in the main seam>3MPa, then the temporary plugging is successful. Determining the temporary plugging direction and the amount of temporary plugging agent based on the plane distribution of the sand body includes: determining the temporary plugging direction based on the sand body type, the number of sand bodies, the permeability of the sand body and the direction of fracture extension; determining the fracture radius and conductivity of the horizontal fracture based on the sand body type, the fracture extension direction and the well pattern spacing; determining the amount of temporary plugging agent based on the fracture radius and conductivity of the horizontal fracture. Determining the amount of temporary plugging agent based on the fracture radius and conductivity of the horizontal fracture includes:
[0108]
[0109] Wherein, m is the amount of temporary plugging agent, r is the horizontal fracture radius, ρ is the density of temporary plugging agent, and n is the correction coefficient. The sand body types include river sand, main sand and non-main sand; the temporary plugging agent is a fibrous intra-fracture temporary plugging agent and / or a powder-type intra-fracture temporary plugging agent. The method also includes: adding sand to the temporarily plugged horizontal fracture to complete fracturing.
[0110] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0111] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0112] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0113] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0114] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0115] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0116] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0117] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0118] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
Claims
1. A method for temporarily plugging cracks in a fracturing layer, wherein the fracturing layer comprises a plurality of cracks, characterized in that: The method includes: Acquire the three-dimensional stress of the fracturing layer and the plane distribution of the sand body, wherein the plane distribution of the sand body is at least one of the sand body type, the number of sand bodies, the sand body permeability and the well pattern spacing; Determining whether the crack is a horizontal crack according to the triaxial stress; Temporarily plugging the horizontal fractures according to the plane distribution of the sand body, including: determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body.
2. The method according to claim 1, characterized in that The determining whether the crack is a horizontal crack according to the triaxial stress comprises: comparing the vertical stress and the minimum horizontal principal stress among the three-dimensional stresses; If the vertical stress is less than the minimum horizontal principal stress, the crack is a horizontal crack.
3. The method according to claim 1, characterized in that The temporary plugging of the horizontal fractures according to the plane distribution of the sand body is a multi-stage temporary plugging. Each stage of temporary plugging requires first judging the plane distribution of the sand body, and adjusting the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body until the temporary plugging is successful.
4. The method according to claim 3, characterized in that Determining that the temporary blocking is successful includes: The success of temporary plugging is determined based on the construction pressure of the pre-filling fluid after temporary plugging, the construction pressure of the pre-filling fluid in the main seam, the construction pressure of adding sand after temporary plugging, and the construction pressure of adding sand concentration in the main seam, including: The construction pressure of the pre-pad fluid after temporary plugging minus the construction pressure of the pre-pad fluid in the main seam>3MPa, and / or, If the construction pressure of adding sand after temporary plugging minus the construction pressure of adding sand concentration to the main seam > 3MPa, the temporary plugging is successful.
5. The method according to claim 1, characterized in that The method of determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body comprises: Determine the temporary plugging direction according to the sand body type, sand body quantity, sand body permeability and fracture extension direction; Determine the fracture radius and conductivity of the horizontal fracture according to the sand body type, fracture extension orientation and well pattern spacing; The dosage of the temporary plugging agent is determined according to the crack radius and the flow conductivity of the horizontal crack.
6. The method according to claim 5, characterized in that The method of determining the amount of the temporary plugging agent according to the fracture radius and the conductivity of the horizontal fracture comprises: Among them, m is the dosage of temporary plugging agent, r is the horizontal crack radius, ρ is the density of temporary plugging agent, n is the correction factor.
7. The method according to claim 1, characterized in that The sand body types include channel sand, main body sand and non-main body sand; The temporary plugging agent is a fibrous in-seam temporary plugging agent and / or a powdery in-seam temporary plugging agent.
8. The method according to claim 1, characterized in that The method further includes: Add sand to the temporarily blocked horizontal cracks to complete the fracturing.
9. A temporary plugging device for cracks in a fracturing layer, wherein the fracturing layer comprises a plurality of cracks, characterized in that: The device includes: An acquisition unit is used to acquire the three-dimensional stress of the fracturing layer and the plane distribution of the sand body, wherein the plane distribution of the sand body is at least one of the sand body type, the number of sand bodies, the permeability of the sand body and the well pattern and well spacing; A judgment unit, which determines whether the crack is a horizontal crack according to the three-dimensional stress; The analysis unit is used to temporarily plug the horizontal fracture according to the plane distribution of the sand body, including: determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body.
10. The device according to claim 9, characterized in that The determining whether the crack is a horizontal crack according to the triaxial stress comprises: comparing the vertical stress and the minimum horizontal principal stress among the three-dimensional stresses; If the vertical stress is less than the minimum horizontal principal stress, the crack is a horizontal crack.
11. The device according to claim 9, characterized in that The temporary plugging of the horizontal fractures according to the plane distribution of the sand body is a multi-stage temporary plugging. Each stage of temporary plugging requires first judging the plane distribution of the sand body, and adjusting the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body until the temporary plugging is successful.
12. The device according to claim 11, characterized in that Determining that the temporary blocking is successful includes: The success of temporary plugging is determined based on the construction pressure of the pre-filling fluid after temporary plugging, the construction pressure of the pre-filling fluid in the main seam, the construction pressure of adding sand after temporary plugging, and the construction pressure of adding sand concentration in the main seam, including: The construction pressure of the pre-pad fluid after temporary plugging minus the construction pressure of the pre-pad fluid in the main seam>3MPa, and / or, If the construction pressure of adding sand after temporary plugging minus the construction pressure of adding sand concentration to the main seam > 3MPa, the temporary plugging is successful.
13. The device according to claim 9, characterized in that The method of determining the temporary plugging direction and the amount of temporary plugging agent according to the plane distribution of the sand body comprises: Determine the temporary plugging direction according to the sand body type, sand body quantity, sand body permeability and fracture extension direction; Determine the fracture radius and conductivity of the horizontal fracture according to the sand body type, fracture extension orientation and well pattern spacing; The dosage of the temporary plugging agent is determined according to the crack radius and the flow conductivity of the horizontal crack.
14. The device according to claim 13, characterized in that The method of determining the amount of the temporary plugging agent according to the fracture radius and the conductivity of the horizontal fracture comprises: Among them, m is the dosage of temporary plugging agent, r is the horizontal crack radius, ρ is the density of temporary plugging agent, n is the correction factor.
15. The device according to claim 9, characterized in that The sand body types include channel sand, main body sand and non-main body sand; The temporary plugging agent is a fibrous in-seam temporary plugging agent and / or a powdery in-seam temporary plugging agent.
16. The device according to claim 9, characterized in that The device also includes: The fracturing unit is used to add sand to the temporarily blocked horizontal fractures to complete the fracturing.
17. An electronic device, characterized in that: The electronic device includes: at least one processor; a memory connected to the at least one processor; The memory stores instructions that can be executed by the at least one processor, and the at least one processor implements the method for temporarily plugging fractures in a hydraulic layer as claimed in any one of claims 1 to 8 by executing the instructions stored in the memory.
18. A machine-readable storage medium, characterized in that: Machine instructions are stored, and when the machine instructions are executed on the machine, the machine executes the temporary plugging method for fractures in a fractured layer as claimed in any one of claims 1 to 8.